Documentos de Académico
Documentos de Profesional
Documentos de Cultura
MEMORIA DE CALCULOS
DISEÑO DE DEFENSA RIBEREÑA
a). DATOS:
B = 80
Q = ?????
S = 0.007 pendiente del sector
Y 3.50 m
n = 0.028
Fb = 1.2 Material Barro "arcilla fangosa"
Fs = 0.2 Para material Grueso
D50 = 5 mm
A = 280 M2
P = 87 M2
Q = 1823.79 m3
FORMULA
FORMULA
DATOS:
Fb = 1.2 K:Lechos naturales
Fs = 0.2 de rio con fuertes
C = 500 transporte de acarreo
Q = 1823.79 m3/sg
γ = 1.800 Tn/m3 MATERIAL GRAVA DE
K = 28.43 CANTOS RODADOS
RESULTADO S = 0.0018
1.3.- CALCULO DE LA PROFUNDIDAD DE SOCAVACION: DE LIST VAN LEBEDIEV
FORMULA
FORMULA
DATOS:
Q = 1823.79 m3/sg Ks:Lechos naturales
bo = 80.00 m de rio con acarreo
S = 0.007 regular
Ks = 34
RESULTADO t = 3.49 m
RESULTADO a = 2.84
DATOS DE TABLA:
FORMULA = TIRANTE
DATOS:
a = 2.84
t = 3.49 m
γS = 1.80 Tn/m3
B' = 0.82
RESULTADO ts = 11.43 m
RESULTADO HS = 7.94 m
FORMULA
FORMULA
DATOS:
a = 2.84
t = 3.49 m
Dm = 5 mm
B' = 0.82
RESULTADO ts = 11.19 m
RESULTADO HS = 7.70 m
t = 3.49 m
Ø COEF. EN FUNCION DE LA
Vm = 5.00 m/s Hcanales MAXIMA DESCARGA Y PENDIENTE
ALTURA DE MURO =
HM = 5.02 m 5.00 m
2.- RESUMEN DE DATOS PARA EL DISEÑO DE ESPIGONES DE GAVIONES
Q = 1823.79 m3/sg
B = 80.00 m
t = 3.49 m
HM = 5.00 m
HS = 7.94 m
Lcolchon = 11.91 m
Vm = 5.00 m/s
Ecolchon = 0.50 m
DATOS:
γ = 1.800 Tn/m3
t = 3.49 m
DATOS:
H = 5.00 m
RESULTADO d= 1.67 m
* FORMULA γg = γgavion
DATOS:
γP = γrelleno = 2.5 Tn/m3
n = % de vacio = 0.3
DATOS: DESCRIPCION
δ = 30º δ = ANG. FRICCION TERRENO
β = 90º β = ANG. FORMADO P EL PLANO
Ea = 10.96 Tn/m
* FORMULA
DATOS:
VGAVION = 9.00 m3
γGAVION = 2.50 Tn/m3
RESULTADO W = 22.50 Tn
* FORMULA
DATOS:
w = 22.50 Tn
Ev = 5.48 Tn/m
α = 0º
EH = 9.49 Tn/m
Ø = 30º
DATOS:
EH = 9.49 Tn/m
d = 1.67 m
DATOS:
W = 22.50 Tn/m
S' = 1.50 m
Ev = 5.48 Tn/m
S = 1.70 Tn-m
DATOS:
MR = 43.07 Tn-m
Mv = 15.82 Tn-m
c). VERIFICACION
* FORMULA
DATOS:
W = 22.50 Tn
Ev = 5.48 Tn/m
α = 0º
EH = 9.49 Tn/m
RESULTADO R = 27.98 Tn
DATOS:
b = 3.50 m
MR = 43.07 Tn-m
Mv = 15.82 Tn-m
R = 27.98 Tn
RESULTADO e = 0.78 m
FORMULA
FORMULA
DATOS:
R = 27.98 Tn
b = 3.50 m
e = 0.78 m
B = 5.00 m