CONCEPTO: EXCAVACION

LOCALIZACION DIMENCIONES
TOTAL
EJE TRAMO UM LARGO ANCHO ALTO
A 1a2 M3 2.5 2.5 2 12.5

CONCEPTO:FIRME DE CONCRETO
LOCALIZACION DIMENCIONES
TOTAL
EJE TRAMO UM LARGO ALTO ANCHO
A 1A2 M3 2.5 0.1 2.5 0.625

CONCEPTO:CADENAS
LOCALIZACION DIMENCIONES
TOTAL
EJE TRAMO UM LARGO ANCHO ALTO
A 1A2 M3 2.5 0.2 0.15 0.075
B 1A2 M3 2.5 0.2 0.15 0.075
1 A-B M3 2.5 0.2 0.15 0.075
2 A-B M3 2.5 0.2 0.15 0.075
0.3
CONCEPTO:CASTILLOS
LOCALIZACION DIMENCIONES
TOTAL
EJE TRAMO UM LARGO ANCHO ALTO
A 1A2 ML 0.2 0.15 2 0.06
B 1A2 ML 0.2 0.15 2 0.06
1 A-B ML 0.2 0.15 2 0.06
2 A-B ML 0.2 0.15 2 0.06

CONCEPTO: MURO DE BLOCK


LOCALIZACION DIMENCIONES
TOTAL
EJE TRAMO UM LARGO ALTO PIEZAS
A 1A2 M3 2.5 2 13 65
B 1A2 M3 2.5 2 13 65
1 A-B M3 2.5 2 13 65
2 A-B M3 2.5 2 13 65

CONCEPTO: REVOCADO
LOCALIZACION DIMENCIONES
TOTAL
EJE TRAMO UM LARGO ALTO PZA(M3)
A 1A2 M3 2.5 2 0.03 0.15
B 1A2 M3 2.5 2 0.03 0.15
1 A-B M3 2.5 2 0.03 0.15
2 A-B M3 2.5 2 0.03 0.15

CONCEPTO: PULIDO
LOCALIZACION DIMENCIONES
TOTAL
EJE TRAMO UM LARGO ALTO PZA(M3)
A 1A2 M3 2.5 2 0.01 0.05
B 1A2 M3 2.5 2 0.01 0.05
1 A-B M3 2.5 2 0.01 0.05
2 A-B M3 2.5 2 0.01 0.05

CONCEPTO: LOSA
LOCALIZACION DIMENCIONES
TOTAL
EJE TRAMO UM LARGO ALTO ANCHO
A 1A2 M3 2.5 0.12 2.5 0.75

EXCAVACION COSTO

CONCEPTO EXCAVACION Y EMPAREJAMIENTO PZA

DESCRIPCION UNIDAD CANTIDAD COSTO IMPORTE


MATERIALES
PALA,PICO, CARRETILLA Y BARRETA PZA 9 $1,872 $1,872
SUMA DE MATERIALES: $1872
MANO DE OBRA
CUADRILLA 02 (1 OFICIAL +1 PEON) JOR 0.27217 $750.76 $750.76
CUADRILLA 02 ( 1 OFICIAL +1 PEON) $750.76
SUMA DE MATERIALES: $750.76
CUADRILLA 02 (1 OFICIAL + 1 PEON) $750.76
MAQUINA
RENTA DE MAQUINA HORAS 77.52 $450.00 $4,360.50
SUMA DE HORAS: $4,360.5

BASICOS O AUXLIARES

COSTO DIRECTO (1)+(2)+(3)+(4)

CONCEPTO: COLADO DE FIRME Y CADENAS M3

DESCRIPCION UNIDAD CANTIDAD COSTO IMPORTE


MATERIALES
CEMENTO M3 6.25 $1,500 $24.23
GRAVA PARA FIRME Y CADENA M3 3.82 $1,800
AGUA DE PIPA USO 0.0333 $4.50 $0.40
SUMA DE MATERIALES: $3304.5
MANO DE OBRA
CUDRILLA 02 (OFICIAL + AYUDANTE) JOR 0.27217 $750.76 $750.76
$750.76
SUMA DE MANO DE OBRA: $750.76
$750.76

COSTO DIRECTO (1)+(2)


CONCEPTO: LOSA + CASTILLOS

DESCRIPCION UNIDAD CANTIDAD COSTO IMPORTE


MATERIALES
CEMENTO M3 6.25 $1,500 $24.23
GRAVA PARA FIRME Y CADENA M3 3.82 $1,800
MADERA ML 0.99 $1,500
AGUA DE PIPA USO 0.0333 $4.50 $0.40
SUMA DE MATERIALES: $4804.5
MANO DE OBRA
CUDRILLA 02 (OFICIAL + AYUDANTE) JOR 0.27217 $750.76 $750.76
$750.76
SUMA DE MANO DE OBRA: $750.76

COSTO DIRECTO (1)+(2)

CONCEPTO: REPELLADO + PULIDO

DESCRIPCION UNIDAD CANTIDAD COSTO IMPORTE


MATERIALES
MORTERO CEMENTO-ARENA-CAL M3 0.8 $1,500 $24.23
AGUA DE PIPA USO 0.0333 $4.50 $0.40
SUMA DE MATERIALES $1529.13
MANO DE OBRA
CUDRILLA 02 (OFICIAL + AYUDANTE) JOR 0.27217 $750.76 $750.76
$750.76
SUMA DE MANO DE OBRA: $750.76

COSTO DIRECTO (1)+(2)

DESCRIPCION:PEGADO DE BLOCK

DESCRIPCION UNIDAD CANTIDAD COSTO IMPORTE


MATERIALES
MORTERO CEMENTO-ARENA-CAL M3 0.8 $1,500 $24.23
AGUA DE PIPA USO 0.0333 $4.50 $0.40
BLOCK M2 260 $7,500
ARNERO USO 1 $96.50
SUMA DE MATERIALES $9.101
MANO DE OBRA
CUDRILLA 02 (OFICIAL + AYUDANTE) JOR 0.27217 $750.76 $750.76
$750.76
SUMA DE MANO DE OBRA: $750.76

COSTO DIRECTO (1)+(2)


-1

-2

$6,983.26

-1

-2

2,700.00
-1

-2

555.26

-1

-2

555.26

-1

-2

555.26