1.2 SEI RED ELÉCTRICA PROVICIONAL UN 1 $ 2,236,530.00
1.3 DEMOLICÓN PLACA MACIZA 0.15 M2 1233 $ 47,896.00
1.4 LOCALIZACIÓN Y REPLANTEO DE CIMIENTOS CON ELEMENTOS DEM2 1233 $ 14,942.00
1.5 SEI RED AGUA PROVICIONAL UN 1 $ 1,489,094.00
2.1 EXCAVACIÓN CARGUE A MANO + RETIRO DE ESCOMBROS CON BM3 97.85 $ 67,963.00
2.2 EXCAVACIÓN CON ORUGA Y RETIRO CON VOLQUETA 14M3 M3 1745.46 $ 43,087.00
2.3 SYC RELLENO COMPACTADO ROCA MUERTA INCLUYE PLANEACIÓM3 407.43 $ 50,468.00
3.1 SYP ZAPATAS CONCRETO REFORZADO 21MPa M3 343.42 $ 657,596.00
3.2 SYA ACERO DE REFUERZO 420MPa N 2 1/4" KG 104.4 $ 8,043.00
3.3 SYA ACERO DE REFUERZO 420MPa N 3 3/8" KG 5036.18 $ 8,046.00
3.4 SYA ACERO DE REFUERZO 420MPa N 4 1/2" KG 8750.43 $ 8,046.00
3.5 SYA ACERO DE REFUERZO 420MPa N 5 5/8" KG 5812.48 $ 6,665.00
3.6 SYA ACERO DE REFUERZO 420MPa N 6 3/4" KG 19555.31 $ 6,697.00
3.7 SYA ACERO DE REFUERZO 420MPa N 8 1" KG 791.21 $ 6,697.00
3.8 SYC LOSA DE CONCRETO 21MPa SOBRE LAMINA COLABORANTE M2 2283.3 $ 82,336.00
3.9 SYA ACERO DE REFUERZO 420MPa N 7 7/8 KG 12833.18 $ 6,872.00
3.10 SYC VIGA DE CIMENTACION CONCRETO 21MPa M3 110.87 $ 673,490.00
3.11 CONTRAPISO EN CONCRETO E=0.15 M2 1273.22 $ 145,238.00
3.12 SYC CONCRETO CICLOPEO 2500 PSI 40% RAJON PARA BASES M3 494.98 $ 304,279.00
3.13 SYC PDESTALES CONCRETO 21MPa M 29.19 $ 1,309,535.00
3.14 SYC FOSO ASCENSOR DE CONCRETO 28MPa M3 5.21 $ 683,381.00
3.15 SYC CONCRETO PARA HUELLAS ESCALERAS METALICA 21MPa M3 3.37 $ 570,353.00
3.16 SEI MALLA ELECTROSOLDADA M-131-5MM @15CM 2.40X6M KG 150.48 $ 8,824.00
3.17 SEI MALLA ELECTROSOLDADA M-084-4MM @15CM 2.40X6M KG 8255.46 $ 9,208.00
3.18 SYC GROUTING DE NIVELACION E=0.05 PLACAS BASE UN 42 $ 89,467.00
3.19 SYC
SPM ESTRUCTURA ACERO INCLUYE SOLDADURA TORNILLERÍA M2
SOLADO DE LIMPIEZA E=0.05 7 MPA 458.82 $ 18,737.00
4.1 SAND BLASTING + ANTICORROSIVO KG 576410 $ 9,680.00
4.2 SYC
0.10X0.12X0.29 MORTERO DE PEGA TIPO S INCLUYE LAVADO M2
DECK LAMINA COLABORANTE 2" C 18 2283 $ 157,517.00
5.1 IMPERMEABILIZACIÓN Y SELLO EN AMBAS CARAS M2 699.65 $ 78,692.00
5.2 SEI REFUERZO HORIZONTAL MUROS DE MAMPOSTERÍA EN GRAFKG 2.84 $ 3,679.00
5.3 SEI REFUERZO HORIZONTAL MUROS DE MAMPOSTERÍA EN GRAFKG 528.53 $ 4,095.00
6.1 SYC BASE BASE GRANULAR TIPO INVIAS B-400 M3 190.98 $ 105,555.00
6.2 SYC
SYC JUNTA DE CONTRACCION H0.05 + SELLO AUTONIVELANTE ML
JUNTA DE DE DILATACIÓN DE 6MM 582.54 $ 41,999.00
6.3 CAMA DE APOYO
SEI CUBIERTA + PASAJUNTAS
PANEL TECHMET 40NPIR
6 LISA
CAL0.35MX0.3
26/28 COLOR ML 394.92 $ 44,081.00
7.1 9002/9002 METECNO + CONSUMIBLES M2 1176 $ 248,588.00
7.2 SEI CANAL LÁMINA C 16 + PINTURA AMBAS CARAS + ESCALERILL ML 174 $ 198,469.00
TOTAL COSTO DIRECTO
ADMINISTRACIÓN 7%
IMPREVISTOS 2%
UTILIDAD 2.5%
IVA/UTILIDAD 19.00%
TOTAL PROYECTO
PLAZO DE ENTREGA
$ 1,003,535.00 $ 1,003,535.00
$ 2,236,530.00 $ 2,236,530.00
$ 47,896.00 $ 59,055,768.00
$ 14,942.00 $ 18,423,486.00
$ 1,489,094.00 $ 1,489,094.00
$ 67,963.00 $ 6,650,179.55
$ 43,087.00 $ 75,206,635.02
$ 50,468.00 $ 20,562,177.24
$ 657,596.00 $ 225,831,618.32
$ 8,043.00 $ 839,689.20
$ 8,046.00 $ 40,521,104.28
$ 8,046.00 $ 70,405,959.78
$ 6,665.00 $ 38,740,179.20
$ 6,697.00 $ 130,961,911.07
$ 6,697.00 $ 5,298,733.37
$ 82,336.00 $ 187,997,788.80
$ 6,872.00 $ 88,189,612.96
$ 673,490.00 $ 74,669,836.30
$ 145,238.00 $ 184,919,926.36
$ 304,279.00 $ 150,612,019.42
$ 1,309,535.00 $ 38,225,326.65
$ 683,381.00 $ 3,560,415.01
$ 570,353.00 $ 1,922,089.61
$ 8,824.00 $ 1,327,835.52
$ 9,208.00 $ 76,016,275.68
$ 89,467.00 $ 3,757,614.00
$ 18,737.00 $ 8,596,910.34
$ 9,680.00 $ 5,579,648,800.00
$ 157,517.00 $ 359,611,311.00
$ 78,692.00 $ 55,056,857.80
$ 3,679.00 $ 10,448.36
$ 4,095.00 $ 2,164,330.35
$ 105,555.00 $ 20,158,893.90
$ 41,999.00 $ 24,466,097.46
$ 44,081.00 $ 17,408,468.52
$ 248,588.00 $ 292,339,488.00
$ 198,469.00 $ 34,533,606.00
OTAL COSTO DIRECTO $ 7,902,420,552.07
ADMINISTRACIÓN 7% $ 553,169,438.64
IMPREVISTOS 2% $ 158,048,411.04
UTILIDAD 2.5% $ 197,560,513.80
IVA/UTILIDAD 19.00% $ 37,536,497.62
PESO PEDESTALES
PEDESTAL CANTIDADVARILLA No.PESO KGVARILLA No. PESO KG VARILLA No. PESO KG CONCRETO
p1a 6 #7 127.1 #4 27.8 #3 24.7 0.57
p1b 15 #7 127.1 #4 24.4 #3 23.3 0.57
p1c 5 #7 127.1 #4 17.4 #3 16.7 0.57
p2 1 #7 168.9 #4 13.9 #3 13.3 0.57
p3 8 #7 158.8 #4 19.4 #3 22.2 0.66
p3a 7 #7 158.8 #4 31 #3 16.7 0.66
Total kg #7 867.8 #4 133.9 #3 116.9 TOTAL
CONTRATADO
KG VARILLAS TOTALES
# TOT KG CONSOLIDADO CONTRATADO
#3 0 3754.9 5036.18
#4 5547 5547 8750.43
#5 3560 3560 5812.48
#6 10359 18252 19555.31
#7 7202 7202 12833.18
#8 803 803 791.25
EJE B / C KG EJE
#6 66.2
VCE-2 4.95 3 4.95 3
#3 KG EJE
1.6 32 28.7 28.7 66.2
EJE B / C KG EJE
#6 48.2
VCE-3
CANT 2 3.6 3 3.6 3
#3 KG EJE
1.6 25 22.4 44.8 96.3
EJEF KG EJE
#6 105.3
VCE-4 5.9 4 5.9 4
#3 KG EJE
1.6 35 31.4 31.4 105.3
PEDESTALES
VIGAS DE CIMENTACIÓN
160.8
TOTAL KG #3 TOTAL KG #6
3754.9 7893.8
TOTAL KG #3 TOTAL KG #6
KG EJE EJE F KG EJE
107.0 #6 109
3 8.1 3 8.2 3
KG EJE #3 KG EJE
54.7 1.6 35 31.4 308.2 630.5
ÁREA PESO
#3 0.71 0.56
#4 1.29 0.994
CONCRETO 21MPA
M3 EJECUTADOS M3 CONTRATADOS DIF(M3)
343.42 343.42 0.00
101.1 110.87 9.8
25.34 29.2 3.8