METRADO IMPRENTA BARRANCO CASCO ESTRUCTURAL


PARTIDAS DE CONCRETO ARMADO
Metrado
Descripción Und Total 1er Piso 2do Piso 3ro Piso 4to Piso
LIMPIEZA M2 255 255 0 0 0
TRAZO M2 935.93 935.93 0 0 0
EXCAVACION M3 189.89 189.89 0 0 0
RELLENO M3 67.5 67.5 0 0 0
ELIMINACION DE MATERIAL EXCEDENTE M3 645.62 645.62 0 0 0 cimentacion
COMPACTAD M2 225 225 0 0 0
SOLADO M2 123.15 123.15 0 0 0
ACERO CIMIENTO REFORZA KG 428.064 428.064 0 0 0
ENCOFRAD M2 142.62 142.62 0 0 0
CONCRETO M3 87.62 87.62 0 0 0
ACERO ZAPATA KG 2351.89 2351.89 0 0 0
ACERO VIGA DE CIMENTACION KG 731.57 731.57 0 0 0
DESENCOFRAD M2 142.62 142.62 0 0 0
FALSO PISO M2 225 225 0 0 0
ACERO KG 19875.07 4968.7675 4968.7675 4968.7675 4968.7675
ENCOFRADO m2 2422.23 605.5575 605.5575 605.5575 605.5575 vertical
CONCRETO M3 150.66 37.665 37.665 37.665 37.665
DESENCOFRADO m2 2422.23 605.5575 605.5575 605.5575 605.5575
ENCOFRADO M2 1065.64 266.41 266.41 266.41 266.41
ACERO KG 16754.57 4188.6425 4188.6425 4188.6425 4188.6425 horizontal
LADRILLO UND 6156 1539 1539 1539 1539
CONCRETO M3 131.15 32.7875 32.7875 32.7875 32.7875

5 sectores primer piso METRADO DE SECTORES POR PISO


Metrado 1er
Descripción Und S1P1 S2P1 S3P1 S4P1 S5P1
Piso
LIMPIEZA M2 255 51 51 51 51 51
TRAZO M2 935.93 187.186 187.186 187.186 187.186 187.186
EXCAVACION M3 189.89 37.978 37.978 37.978 37.978 37.978
RELLENO M3 67.5 13.5 13.5 13.5 13.5 13.5
ELIMINACION DE MATERIAL EXCEDENTE M3 645.62 129.124 129.124 129.124 129.124 129.124 cimentacion
COMPACTAD M2 225 45 45 45 45 45
SOLADO M2 123.15 24.63 24.63 24.63 24.63 24.63
ACERO CIMIENTO REFORZA KG 428.064 85.6128 85.6128 85.6128 85.6128 85.6128
ENCOFRAD M2 142.62 28.524 28.524 28.524 28.524 28.524
CONCRETO M3 87.62 17.524 17.524 17.524 17.524 17.524
ACERO ZAPATA KG 2351.89 470.378 470.378 470.378 470.378 470.378
ACERO VIGA DE CIMENTACION KG 731.57 146.314 146.314 146.314 146.314 146.314
DESENCOFRAD M2 142.62 28.524 28.524 28.524 28.524 28.524

FALSO PISO M2 225 45 45 45 45 45


ACERO KG 4968.7675 993.7535 993.7535 993.7535 993.7535 993.7535
ENCOFRADO m2 605.5575 121.1115 121.1115 121.1115 121.1115 121.1115 vertical
CONCRETO M3 37.665 7.533 7.533 7.533 7.533 7.533
DESENCOFRADO m2 605.5575 121.1115 121.1115 121.1115 121.1115 121.1115
ENCOFRADO M2 266.41 53.282 53.282 53.282 53.282 53.282
ACERO KG 4188.6425 837.7285 837.7285 837.7285 837.7285 837.7285 horizontal
LADRILLO UND 1539 307.8 307.8 307.8 307.8 307.8
CONCRETO M3 32.7875 6.5575 6.5575 6.5575 6.5575 6.5575

3 sectores de 1er piso METRADO PROMEDIO DE SECTORES POR PISO


Descripción Und Metrado 1er S1P1 S2P1 S3P1
Piso

LIMPIEZA M2 255 85 85 85
TRAZO M2 935.93 311.9766667 311.97666667 311.9766667
EXCAVACION M3 189.89 63.29666667 63.296666667 63.29666667
RELLENO M3 67.5 22.5 22.5 22.5
ELIMINACION DE MATERIAL EXCEDENTE M3 645.62 215.2066667 215.20666667 215.2066667 cimentacion
COMPACTAD M2 225 75 75 75
SOLADO M2 123.15 41.05 41.05 41.05
ACERO CIMIENTO REFORZA KG 428.064 142.688 142.688 142.688
ENCOFRAD M2 142.62 47.54 47.54 47.54
CONCRETO M3 87.62 29.20666667 29.206666667 29.20666667
ACERO ZAPATA KG 2351.89 783.9633333 783.96333333 783.9633333
ACERO VIGA DE CIMENTACION KG 731.57 243.8566667 243.85666667 243.8566667
DESENCOFRAD M2 142.62 47.54 47.54 47.54
FALSO PISO M2 225 75 75 75
ACERO KG 4968.7675 1656.255833 1656.2558333 1656.255833
ENCOFRADO m2 605.5575 201.8525 201.8525 201.8525 vertical
CONCRETO M3 37.665 12.555 12.555 12.555
DESENCOFRADO m2 605.5575 201.8525 201.8525 201.8525
ENCOFRADO M2 266.41 88.80333333 88.803333333 88.80333333
ACERO KG 4188.6425 1396.214167 1396.2141667 1396.214167 horizontal
LADRILLO UND 1539 513 513 513
CONCRETO M3 32.7875 10.92916667 10.929166667 10.92916667

2 sectores de 1er piso METRADO PROMEDIO DE SECTORES POR PISO


Descripción Und Metrado 1er S1P1 S2P1
Piso
LIMPIEZA M2 255 127.5 127.5
TRAZO M2 935.93 467.965 467.965
EXCAVACION M3 189.89 94.945 94.945
RELLENO M3 67.5 33.75 33.75
ELIMINACION DE MATERIAL EXCEDENTE M3 645.62 322.81 322.81 cimentacion
COMPACTAD M2 225 112.5 112.5
SOLADO M2 123.15 61.575 61.575
ACERO CIMIENTO REFORZA KG 428.064 214.032 214.032
ENCOFRAD M2 142.62 71.31 71.31
CONCRETO M3 87.62 43.81 43.81
ACERO ZAPATA KG 2351.89 1175.945 1175.945
ACERO VIGA DE CIMENTACION KG 731.57 365.785 365.785
DESENCOFRAD M2 142.62 71.31 71.31
FALSO PISO M2 225 112.5 112.5
ACERO KG 4968.7675 2484.38375 2484.38375
ENCOFRADO m2 605.5575 302.77875 302.77875 vertical
CONCRETO M3 37.665 18.8325 18.8325
DESENCOFRADO m2 605.5575 302.77875 302.77875
ENCOFRADO M2 266.41 133.205 133.205
ACERO KG 4188.6425 2094.32125 2094.32125 horizontal
LADRILLO UND 1539 769.5 769.5
CONCRETO M3 32.7875 16.39375 16.39375
ANEXO 3

METRADO IMPRENTA BARRANCO CASCO ESTRUCTURAL


PARTIDAS DE CONCRETO ARMADO

Descripción Und Metrado 1er Piso 2do Piso 3ro Piso 4to Piso
Total
LIMPIEZA M2 255 255 0 0 0
TRAZO M2 935.93 935.93 0 0 0
EXCAVACION M3 189.89 189.89 0 0 0
RELLENO M3 67.5 67.5 0 0 0
ELIMINACION DE MATERIAL EXCEDENTE M3 645.62 645.62 0 0 0
COMPACTAD M2 225 225 0 0 0
SOLADO M2 123.15 123.15 0 0 0
ACERO CIMIENTO REFORZA KG 428.064 428.064 0 0 0
ENCOFRAD M2 142.62 142.62 0 0 0
CONCRETO M3 87.62 87.62 0 0 0
ACERO ZAPATA KG 2351.89 2351.89 0 0 0
ACERO VIGA DE CIMENTACION KG 731.57 731.57 0 0 0
DESENCOFRAD M2 142.62 142.62 0 0 0
FALSO PISO M2 225 225 0 0 0

5 sectores primer piso METRADO DE SECTORES POR PISO


Metrado 1er
Descripción Und S1P1 S2P1 S3P1 S4P1 S5P1
Piso
LIMPIEZA M2 255 51 51 51 51 51
TRAZO M2 935.93 187.186 187.186 187.186 187.186 187.186
EXCAVACION M3 189.89 37.978 37.978 37.978 37.978 37.978
RELLENO M3 67.5 13.5 13.5 13.5 13.5 13.5
ELIMINACION DE MATERIAL EXCEDENTE M3 645.62 129.124 129.124 129.124 129.124 161.405
COMPACTAD M2 225 45 45 45 45 56.25
SOLADO M2 123.15 24.63 24.63 24.63 24.63 30.7875
ACERO CIMIENTO REFORZA KG 428.064 85.6128 85.6128 85.6128 85.6128 85.6128
ENCOFRAD M2 142.62 28.524 28.524 28.524 28.524 35.655
CONCRETO M3 87.62 17.524 17.524 17.524 17.524 21.905
ACERO ZAPATA KG 2351.89 470.378 470.378 470.378 470.378 587.9725
ACERO VIGA DE CIMENTACION KG 731.57 146.314 146.314 146.314 146.314 146.314
DESENCOFRAD M2 142.62 28.524 28.524 28.524 28.524 28.524

FALSO PISO M2 225 45 45 45 45 45

4 sectores primer piso METRADO DE SECTORES POR PISO

Descripción Und Metrado 1er S1P1 S2P1 S3P1 S4P1


Piso
LIMPIEZA M2 255 63.75 63.75 63.75 63.75
TRAZO M2 935.93 233.9825 233.9825 233.9825 233.9825
EXCAVACION M3 189.89 47.4725 47.4725 47.4725 47.4725
RELLENO M3 67.5 16.875 16.875 16.875 16.875
ELIMINACION DE MATERIAL EXCEDENTE M3 645.62 161.405 161.405 161.405 161.405
COMPACTAD M2 225 56.25 56.25 56.25 56.25
SOLADO M2 123.15 30.7875 30.7875 30.7875 30.7875
ACERO CIMIENTO REFORZA KG 428.064 107.016 107.016 107.016 107.016

ENCOFRAD M2 142.62 35.655 35.655 35.655 35.655


CONCRETO M3 87.62 21.905 21.905 21.905 21.905
ACERO ZAPATA KG 2351.89 587.9725 587.9725 587.9725 587.9725
ACERO VIGA DE CIMENTACION KG 731.57 182.8925 182.8925 182.8925 182.8925
DESENCOFRAD M2 142.62 35.655 35.655 35.655 35.655
FALSO PISO M2 225 56.25 56.25 56.25 56.25

3 sectores de 1er piso METRADO DE SECTORES POR PISO


Metrado 1er
Descripción Und S1P1 S2P1 S3P1
Piso
LIMPIEZA M2 255 85 85 85
TRAZO M2 935.93 311.9766667 311.97666667 311.9766667
EXCAVACION M3 189.89 63.29666667 63.296666667 63.29666667
RELLENO M3 67.5 22.5 22.5 22.5
ELIMINACION DE MATERIAL EXCEDENTE M3 645.62 215.2066667 215.20666667 215.2066667

COMPACTAD M2 225 75 75 75
SOLADO M2 123.15 41.05 41.05 41.05
ACERO CIMIENTO REFORZA KG 428.064 142.688 142.688 142.688
ENCOFRAD M2 142.62 47.54 47.54 47.54
CONCRETO M3 87.62 29.20666667 29.206666667 29.20666667
ACERO ZAPATA KG 2351.89 783.9633333 783.96333333 783.9633333
ACERO VIGA DE CIMENTACION KG 731.57 243.8566667 243.85666667 243.8566667
DESENCOFRAD M2 142.62 47.54 47.54 47.54
FALSO PISO M2 225 75 75 75

2 sectores de 1er piso METRADO DE SECTORES POR PISO

Descripción Und Metrado 1er S1P1 S2P1


Piso
LIMPIEZA M2 255 127.5 127.5
TRAZO M2 935.93 467.965 467.965
EXCAVACION M3 189.89 94.945 94.945
RELLENO M3 67.5 33.75 33.75
ELIMINACION DE MATERIAL EXCEDENTE M3 645.62 322.81 322.81
COMPACTAD M2 225 112.5 112.5
SOLADO M2 123.15 61.575 61.575
ACERO CIMIENTO REFORZA KG 428.064 214.032 214.032
ENCOFRAD M2 142.62 71.31 71.31
CONCRETO M3 87.62 43.81 43.81
ACERO ZAPATA KG 2351.89 1175.945 1175.945
ACERO VIGA DE CIMENTACION KG 731.57 365.785 365.785
DESENCOFRAD M2 142.62 71.31 71.31
FALSO PISO M2 225 112.5 112.5
ANEXO 3

METRADO IMPRENTA BARRANCO CASCO ESTRUCTURAL


PARTIDAS DE CONCRETO ARMADO
Metrado
Descripción Und 1er Piso 2do Piso 3ro Piso 4to Piso
Total
ACERO KG 19875.07 4968.7675 4968.7675 4968.7675 4968.7675
ENCOFRADO m2 2422.23 605.5575 605.5575 605.5575 605.5575
CONCRETO M3 150.66 37.665 37.665 37.665 37.665
DESENCOFRADO m2 2422.23 605.5575 605.5575 605.5575 605.5575

4 sectores primer piso METRADO DE SECTORES POR PISO


Descripción Und Metrado 1er S1P1 S2P1 S3P1 S4P1
Piso
ACERO KG 4968.7675 1242.191875 1242.191875 1242.191875 1242.191875
ENCOFRADO m2 605.5575 151.389375 151.389375 151.389375 151.389375
CONCRETO M3 37.665 9.41625 9.41625 9.41625 9.41625
DESENCOFRADO m2 605.5575 151.389375 151.389375 151.389375 151.389375

3 sectores de 1er piso METRADO DE SECTORES POR PISO


Metrado 1er
Descripción Und S1P1 S2P1 S3P1
Piso
ACERO KG 4968.7675 1656.255833 1656.2558333 1656.255833
ENCOFRADO m2 605.5575 201.8525 201.8525 201.8525
CONCRETO M3 37.665 12.555 12.555 12.555
DESENCOFRADO m2 605.5575 201.8525 201.8525 201.8525

2 sectores de 1er piso METRADO DE SECTORES POR PISO


Metrado 1er
Descripción Und S1P1 S2P1
Piso
ACERO KG 4968.7675 2484.38375 2484.38375
ENCOFRADO m2 605.5575 302.77875 302.77875
CONCRETO M3 37.665 18.8325 18.8325
DESENCOFRADO M2 605.5575 302.77875 302.77875
ANEXO 3

METRADO IMPRENTA BARRANCO CASCO ESTRUCTURAL


PARTIDAS DE CONCRETO ARMADO
Metrado
Descripción Und 1er Piso 2do Piso 3ro Piso 4to Piso
Total
ENCOFRADO M2 1065.64 266.41 266.41 266.41 266.41
ACERO KG 16754.57 4188.6425 4188.6425 4188.6425 4188.6425
LADRILLO UND 6156 1539 1539 1539 1539
CONCRETO M3 131.15 32.7875 32.7875 32.7875 32.7875

4 sectores primer piso METRADO DE SECTORES POR PISO


Descripción Und Metrado 1er S1P1 S2P1 S3P1 S4P1
Piso
ENCOFRADO M2 266.41 66.6025 66.6025 66.6025 66.6025
ACERO KG 4188.6425 1047.160625 1047.160625 1047.160625 1047.160625
LADRILLO UND 1539 384.75 384.75 384.75 384.75
CONCRETO M3 32.7875 8.196875 8.196875 8.196875 8.196875

3 sectores de 1er piso METRADO DE SECTORES POR PISO


Metrado 1er
Descripción Und S1P1 S2P1 S3P1
Piso
ENCOFRADO M2 266.41 88.80333333 88.803333333 88.80333333
ACERO KG 4188.6425 1396.214167 1396.2141667 1396.214167
LADRILLO UND 1539 513 513 513
CONCRETO M3 32.7875 10.92916667 10.929166667 10.92916667

2 sectores de 1er piso METRADO DE SECTORES POR PISO


Metrado 1er
Descripción Und S1P1 S2P1
Piso
ENCOFRADO M2 266.41 133.205 133.205
ACERO KG 4188.6425 2094.32125 2094.32125
LADRILLO UND 1539 769.5 769.5
CONCRETO M3 32.7875 16.39375 16.39375