02 SERVICIOS PUBLICOS
02.01 RENOVACION DE LA RED DE AGUA
02.01.01 OBRAS PRELIMINARES
CONTROL PLANIMETRICO Y ALTIMETRICO - TRABAJOS TOPOGRAFICOS
02.01.01.01
02.01.02 MOVIMIENTO DE TIERRAS
02.01.02.01 EXCAVACION MANUAL T-NORMAL P/TUB 63 a 110mm HASTA 1.50M.
02.01.02.02 REFINE Y NIVELACION DE ZANJAS T.S.R P/TUB. 63-110mm.
02.01.02.03 CAMA DE APOYO P/TUB. DE 63-110mm T.N.
02.01.02.04 RELLENO COMPACTADO ZANJAS P/TUB. 63mm a 110mm H=1.50M
02.01.03 SUMINISTRO E INSTALACION DE TUBERIAS PVC
02.01.03.01 TUBERIA PVC - U DE 90mm C-10 U.F.
02.01.03.02 TUBERIA PVC -U DE 110mm C-10 .U.F.
02.01.03.03 CODO PVC C-10 P/AGUA 90mm x 11.25º UF
02.01.03.04 CODO PVC C-10 P/AGUA 90mm x 22.5º UF
02.01.03.05 CODO PVC C-10 P/AGUA 90mm x 45º UF
02.01.03.06 CODO PVC P/AGUA 90mm x 90º UF
02.01.03.07 CODO PVC P/AGUA 110mm x 11.25º UF
02.01.03.08 CODO PVC P/AGUA 110mm x 22.5º UF
02.01.03.09 CODO PVC P/AGUA 110mm x 45º UF
02.01.03.10 INSTALAC. DE ACCESORIOS PVC /RED AGUA POTABLE DE 63mm A 110mm
02.01.03.11 INSTALAC.TUBERIA PVC C-10 DE 63mm A 110mm
02.01.04 ACCESORIOS SANITARIOS
02.01.04.01 VALVULA COMP. HIERRO DUCTIL ISO 7259 DE 90mm
02.01.04.02 VALVULA COMPUERTA HIERRO DUCTIL ISO 7259 Ø 110mm
02.01.05 PRUEBAS HIDRAULICAS Y DESINFECCION DE TUBERIAS
02.01.05.01 Prueba a Zanja Tapada y Desinfeccion de Tuberia de 63mm A 160 mm
02.02 RENOVACION DE LA RED DE DESAGUE
02.02.01 OBRAS PRELIMINARES
CONTROL PLANIMETRICO Y ALTIMETRICO - TRABAJOS TOPOGRAFICOS
02.02.01.01
02.02.02 MOVIMIENTO DE TIERRAS
02.02.02.01 Excavacion Manual de zanja T.N. p/tub 160mm - 200mm h=1.50
02.02.02.02 Refine y nivelacion de zanja T.N. tub. 160mm - 355mm
02.02.02.03 Cama de apoyo p/tub. 160 - 355mm T.N.
02.02.02.04 Relleno y comp. de Zanja p/tub. 160 - 200mm h=1.50m
02.02.03 SUMINISTRO E INSTALACION DE TUBERIAS PVC
02.02.03.01 Tuberia PVC- U SN2 de160mm incl. Anillo
02.02.03.02 Tuberia PVC- U SN2 de 200mm incl. Anillo
02.02.03.03 Instalacion Tuberia PVC- U de 160mm - 200mm- 250mm- 315mm - 355mm
02.02.04 BUZONES DE INSPECCION
02.02.04.01 REUBICACION DE BUZON STANDAR D= 1.20 M. H=1.50 M.
02.02.04.02 REPOSICION DE CONCRETO p/LOSA DE PISTA e = 0.20 m. (f'c= 210 kg/cm2.)
02.02.05 PRUEBA HIDRÁULICA
02.02.05.01 Prueba hidraulica de tub. 160 - 355mm p/desague
02.02.06 REPOSICIÓN DE CONEXIONES DOMICILIARIAS
02.02.06.01 CONEXIONES DOMICILIARIAS DE AGUA TUB.PVC 3" A 1/2"
02.02.06.02 CONEXIONES DOMICILIARIAS DE DESAGUE TUB. PVC-U SN2 160MM A 160MM
02.02.06.03 CONEXIONES DOMICILIARIAS DE DESAGUE TUB. PVC-U SN2 160MM A 200MM
02.03 INFRAESTRUCTURA ELECTRICA, TELEFONIA E INTERNET
02.03.01 Sistema de Iluminacion incluye provision e instalacion de estructura de soporte (poste) - reubicación-lumina
02.04 TRANSITABILIDAD PEATONAL
02.04.01 SARDINELES
02.04.01.01 Trazo, Niveles y Replanteo durrante el proceso
02.04.01.02 Excavacion Manual para Sardineles
02.04.01.03 Acarreo de material de exedente c/bugui D=50 m.
02.04.01.04 Eliminación de material excedente (D=5 KM)
02.04.01.05 Encofrado en sardinel integral
02.04.01.06 Concreto fc = 175 kgf/cm2 en sardineles
02.04.01.07 Aserrado de Juntas en Sardineles
02.04.01.08 Juntas en sardinel integral
02.04.01.09 Curado de concreto en Sardineles
02.04.02 VEREDAS
02.04.02.01 Trazo, Niveles y Replanteo durrante el proceso
02.04.02.02 Excavacion Manual para Veredas
02.04.02.03 Acarreo de material de exedente c/bugui D=50 m.
02.04.02.04 Eliminación de material excedente (D=5 KM)
02.04.02.05 Perfilado, nivelacion y compactado manual de sanjas
02.04.02.06 Encofrado y Desencofrado normal p`Veredas
02.04.02.07 Empedrado c/P.M. de 6" (e=0.15 m.)
02.04.02.08 Concreto fc = 175 kgf/cm2 en Veredas
02.04.02.09 SUMINISTRO Y COLOCACION DE ADOQUINES DE CONCRETO PREFABRICADOS TIPO BANDERA
02.04.03 SEGURIDAD PEATONAL
02.04.03.01 BARANDA METALICA c/TUBO F°G° 2"x1.00 m. DE ALTURA
02.04.04 SEÑALIZACION VERTICAL Y HORIZONTAL
02.04.04.01 TRABAJOS PRELIMINARES
02.04.04.01.01 LIMPIEZA PRELIMINAR
02.04.04.01.02 TRAZO, NIVELES Y REPLANTEO
02.04.04.02 SEÑALIZACION VERTICAL
02.04.04.02.01 PANEL SEÑAL REGLAMENTARIA
02.04.04.02.02 PANEL SEÑAL INFORMATIVA
02.04.04.02.03 PANEL SEÑAL PREVENTIVA
02.04.04.02.04 INSTALACION DE SEÑALIZACION VERTICAL
02.04.04.03 SEÑALIZACION HORIZONTAL
02.04.04.03.01 LINEA CONTINUA BLANCA
02.04.04.03.02 LINEA CONTINUA AMARILLA
02.04.04.03.03 LINEA DISCONTINUA BLANCA
02.04.04.03.04 CRUCERO PEATONAL e=0.50m
02.04.04.03.05 LINEA DE PARE
02.04.04.03.06 SOLO FLECHA DE FRENTE
02.04.04.03.07 FLECHA BIDIRECCIONAL (de frente - a la izquierda y a la derecha)
02.04.04.03.08 FLECHA DE FRENTE Y CON GIRO DERECHA/IZQUIERDA
02.04.04.03.09 FLECHA SOLO GIRO DERECHA/IZQUIERDA
02.04.04.03.10 FLECHA SOLO DE FRENTE PARA CICLOVIA
02.04.04.03.11 SIMBOLO DE BICICLETA PARA CICLOVIA
02.04.04.03.12 PINTURA EN SARDINELES
02.04.04.04 MOBILIARIO URBANO
02.04.04.04.01 DADOS DE CONCRETO DE 40X40X40 CM.
02.04.04.04.01.01 CONCRETO EN DADOS
02.04.04.04.01.02 EXCAVACION PARA DADOS DE CONCRETO
02.04.04.04.01.03 ENCOFRADO PARA DADOS DE CONCRETO
02.04.04.04.01.04 BANCAS DE CONCRETO Y MADERA
02.04.04.04.01.05 BOLARDOS DE METAL
02.04.04.04.01.06 ESTACIONAMIENTO METÁLICO PARA BICICLETAS
02.04.04.04.01.07 REJILLA METÁLICA PARA ÁRBOLES (D=0.80 M.)
02.04.04.05 PUENTES PEATONALES DE CONCRETO ARMADO
02.04.04.05.01 LOSA DE CONCRETO ARMADO
02.04.04.04.01.01 TRAZO Y REPLANTEO
02.04.04.04.01.02 ENCOFRADO Y DESENCOFRADO DE LOSA DE PONTON
02.04.04.04.01.03 CONCRETO f'c=210 kg/cm2
02.04.04.04.01.04 ACERO fy=4200 kg/cm2 GRADO 60
02.04.04.05.02 CARPINTERIA METALICA
02.04.04.05.02.01 BARANDA TUBO FIERRO GALVANIZADO PASAMANO 2"
02.04.04.05.02.02 PINTURA EN BARANDAS METALICAS
2.05 TRANSITABILIDAD VEHICULAR
02.05.01 PUENTE CARROZABLE (CALLE FELIPE SICUS)
02.05.01.01 ESTRIBOS
02.05.01.01.01 OBRAS PRELIMINARES
02.05.01.01.01.01 LIMPIEZA DE TERRENO MANUAL
02.05.01.01.01.02 TRAZO Y REPLANTEO
02.05.01.01.02 MOVIMIENTO DE TIERRAS
02.05.01.01.02.01 EXCAVACION PARA CIMIENTOS DE ESTRIBOS
02.05.01.01.02.02 ELIMINACION (TRANSPORTE) VOLQUETE DE 6 m3, D=5 km
02.05.01.01.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO
02.05.01.01.03 OBRAS DE CONCRETO SIMPLE
02.05.01.01.03.01 CONCRETO 1:12 +30% P.G.
02.05.01.01.03.02 CONCRETO f'c=175 kg/cm2 + 30% P.G
02.05.01.01.03.03 ENCOFRADO Y DESENCOFRADO DE ESTRIBOS
02.05.01.01.03.04 0
02.05.01.02 LOSAS
02.05.01.02.01 TRAZO Y REPLANTEO
02.05.01.02.02 ENCOFRADO Y DESENCOFRADO DE LOSA DE PONTON
02.05.01.02.03 CONCRETO f'c=210 kg/cm2
02.05.01.02.04 ACERO fy=4200 kg/cm2 GRADO 60
02.05.01.02.05 VARIOS
02.05.01.02.05.01 APOYO DE NEOPRENE SHORE 70. DE 0.50 X 0.22 X 0.05 m
02.05.01.03 BARANDAS Y VEREDAS
02.05.01.03.01 OBRAS DE CONCRETO ARMADO
02.05.01.03.01.01 CONCRETO f'c=210 kg/cm2
02.05.01.03.01.02 ENCOFRADO Y DESENCOFRADO NORMAL
02.05.01.03.02 CARPINTERIA METALICA
02.05.01.03.02.01 BARANDA TUBO FIERRO GALVANIZADO PASAMANO 2"
02.05.01.03.02.02 PINTURA EN BARANDAS METALICAS
02.05.02 PAVIMENTACION DE VIAS
02.05.02.01 OBRAS PRELIMINARES
02.05.02.01.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR
02.05.02.02 MOVIMIENTO DE TIERRAS
02.05.02.02.01 CORTE DE TERRENO A NIVEL DE SUBRASANTE CON EQUIPO
02.05.02.02.02 ELIMINACION DE DESMONTE A 4KM DE DISTANCIA
02.05.02.02.03 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO
02.05.02.02.04 PERFILADO RIEGO Y COMPACTADO DE SUBRASANTE
02.05.03 PAVIMENTOS
02.05.03.01 CONFORMACION DE SUBBASE DEL PAVIMENTO (e=0.30m)
02.05.03.01.01 CONFORMACION DE SUB BASE GRANULAR
02.05.03.02 SUPERFICIE DE RODADURA (e=0.20m)
02.05.03.02.01 ENCOFRADO Y DESENCOFRADO DE LOSAS
02.05.03.02.02 CONCRETO PREMEZCLADO f'c=210 kg/cm2
02.05.03.02.03 CURADO DE LOSAS DE CONCRETO
02.05.03.02.04 ACERO LISO EN JUNTAS DE CONTRACCION 3/4" @0.30 L=0.60m
02.05.03.02.05 SELLADO DE JUNTAS DE DILATACION EN LOSAS DE 0.02m x 0.05m
03 SISTEMA DE EVACUACION DE AGUAS PLUVIALES
03.01 CANAL CERRADO DE EVACUACION DE AGUAS PLUVIALES
03.01.01 Trazo, Niveles y Replanteo durrante el proceso
03.01.02 Excavacion Manual Para Canal
03.01.03 Acarreo de material de exedente c/bugui D=50 m.
03.01.04 Eliminación de material excedente (D=5 KM)
03.01.05 Perfilado, nivelacion y compactado manual de sanjas
SOLADO DE PIEDRA ASENTADA EN Cº f'c 100 Kg/cm2 (e=0.30m).
03.01.06
03.01.07 ENCOFRADO Y DESENCOFRADO DE CANAL CERRADO
03.01.08 CONCRETO p/CANAL (f'c= 210 Kg/cm2.)
03.01.09 ACERO DE REFUERZO G-60, fy= 4,200 Kg/cm2.
03.01.10 SELLADO ASFALTICO DE JUNTAS DE CONSTRUCCION
03.02 SUMIDEROS
03.02.01 Trazo, Niveles y Replanteo durrante el proceso
03.02.02 Excavacion Manual para Sumidero
03.02.03 Acarreo de material de exedente c/bugui D=50 m.
03.02.04 Eliminación de material excedente (D=5 KM)
03.02.05 Perfilado, nivelacion y compactado manual de sanjas
03.02.06 Concreto f´c=100 para solados
03.02.07 Encofrado y desencofrado para sumidero
03.02.08 CONCRETO EN MUROS FC=210 KG/CM2
03.02.09 Acero Corrugado de 1/2" f`y=4200 kg/cm2
03.02.10 Rejilla Metalica para Sumideros
03.02.11 Tarrajeo con Impermeabilizante
04 ADECUADA PROTECCION NATURAL
04.01 ADQUISICION DE PLANTONES FORESTALES
04.01.01 Compra de plantones
04.01.02 Carguio, Descarguio y Transporte de plantones
04.01.03 Extraccion de Especies forestales
04.01.04 Extraccion de plantas arbustivas
04.02 ESTABLECIMIENTO DE PLANTACIONES DEFINITIVAS
04.02.01 Trazo y marcación de hoyos
04.02.02 Apertura de hoyos
04.02.03 Plantación definitiva.
04.03 MANTENIMIENTO DE PLANTACIONES
04.03.01 Recalce de plantaciones forestales
04.03.02 Poda de plantaciones forestales
04.03.03 Riego de plantaciones forestales: (frecuencia: 1vez/año)
04.04 CAPACITACION
04.04.01 Capacitacion
04.05 REVEGETACION EN ESTRUCTURAS DE DEFENSA RIBEREÑA
04.05.01 ADQUISICION DE CEPELLONES DE KIKUYO
04.05.01.01 Compra de cepellones para defensa ribereña
04.05.01.02 Transporte de cepellones para defensa ribereña
04.05.01.03 Extraccion manual de cepellones
04.05.02 COLOCACION DE CEPELLONES
04.05.02.01 Acarreo de tierra agrícola
04.05.02.02 Construccion de Area de tratamiento
04.05.02.03 Colocado de cepellones de kikuyo en defensa ribereña
04.05.03 MANTENIMIENTO DE CEPELLONES
04.05.03.01 Riego en Estructuras de Defensa Riberena
04.05.04 CAPACITACION
04.05.04.01 Capacitacion
04.06 CONSTRUCCION DE ESTRUCTURAS DE APOYO DE VEGETACION
04.06.01 CONSTRUCCIÓN DE TERRAPLENES DE TIERRA
04.06.01.01 Limpieza Manual de Terreno
04.06.01.02 Trazo, nivelación y replanteo
04.06.01.03 Acarreo de tierra agrícola
04.06.02 ACONDICIONAMIENTO DE AREA VERDE
04.06.02.01 Construccion de Area de tratamiento
04.06.02.02 Perfilado de Area de Tratamiento (Terraplenes)
04.06.02.03 Colocación de cepellones (Champas)
04.06.02.04 Riego estructuras de apoyo (frecuencia: 2 veces/mes)
04.06.02.05 Poda estructuras de apoyo (frecuencia: 1vez/mes)
04.06.03 ACONDICIONAMIENTO DE AREA ORNAMENTAL
04.06.03.01 ADQUISICION DE ESPECIES ORNAMENTALES
04.06.03.01.01 Compra de plantas ornamentales
04.06.03.01.02 Transporte de plantas ornamentales
04.06.03.02 PLANTACION EN TERRAPLENES
04.06.03.02.01 Trazo y marcación
04.06.03.02.02 Apertura de hoyo y perfilado
04.06.03.02.03 Plantacion de ornamentales
04.06.03.03 MANTENIMIENTO DE AREAS ORNAMENTALES
04.06.03.03.01 Recalce
04.06.03.03.02 Riego - Fertilizacion
04.06.03.03.03 Poda de plantas ornamentales
04.06.03.04 CAPACITACION
04.06.03.04.01 Capacitacion
05 ADECUADO CONOCIMIENTO DE RIESGOS
05.01 PROMOCIÓN DE LA ORGANIZACIÓN SOCIAL
05.01.01 presentacion del proyecto
05.01.02 seleccion de promotores de gestion de riesgos
05.01.03 adecuacion de estatutos y reglamento interno que incorpore la gestion de desastres
05.02 CAPACITACION A LAS ORGANIZACIONES DE BASE Y POBLACION
05.02.01 taller de liderazgo para promotores
05.02.02 taller de gestion de riesgos de desastres para promotores
05.02.03 taller de gestion de riesgos de desastres para poblacion
05.02.04 taller ley de recursos hidricos y faja marginal para promotores
05.02.05 taller de recursos hidricos y faja marginal para poblacion
05.02.06 taller conservacion del medio ambiente para promotores
05.02.07 taller conservacion del medio ambiente para poblacion
05.03 SENSIBILIZACION A LAS ORGANIZACIONES DE BASE Y POBLACION
05.03.01 Planificación y organización del proyecto
05.03.01.01 spot de radio presentacion del proyecto
05.03.01.02 spot tv presentacion del proyecto
05.03.01.03 desarrollo del paln de difusion de medios
05.03.01.04 mapeo de actores sociales
05.03.01.05 creacion del logo del proyecto
05.03.01.06 diseño de mascota de campaña(concepto ,diseño grafico,animacion3D)
05.03.01.07 composicion de una cancion emblematica
05.03.01.08 banner grafico para paraderos
05.03.01.09 spot para radio version quechua y castellano
05.03.01.10 spot para tv (primer espot)
05.03.01.11 primer folleto informativo sobre el proyecto
05.03.01.12 afiche para anuncio del proyecto
05.03.01.13 carpeta para documento
05.03.01.14 lapiceros con logo del proyecto
05.03.01.15 gorras con logo del proyecto
05.03.01.16 chalecos con logo y nombre del proyecto y campaña
05.03.01.17 casaca con logo y nombre del proyecto y campaña
05.03.01.18 Desarrollo de Plan de Capacitación y Educación
05.03.01.19 Creación de Gingle
05.03.01.20 elaboracion de pagina web
05.03.01.21 reportajes informativos sobre el rio Cachimayo
05.03.01.22 tiras de historietas
05.03.01.23 boletines informativos virtuales y escritos
05.03.01.24 campaña de limpieza
05.03.01.25 campaña de reforestacion y mantenimiento de areas verdes
05.03.01.26 sistematizacion y registro
05.03.01.27 publicacion de sistematizacion
05.03.01.28 video documental de la experiencia
05.03.01.29 conferencia de prensa
05.03.01.30 Orientación y coordinación con las Organizaciones Sociales para la Monumentacon de Hitos
05.03.01.31 Mediación de conflictos en la obtención de licencia social y liberación de faja marginal
05.03.01.32 Adecuación de estatutos para la gestión del riesgo de desastres
05.04 SISTEMA DE ALERTA TEMPRANA
05.04.01 SISTEMA DE COMUNICACIÓN Y DIFUSIÓN DEL CENTRO DE OPERACIONES DE EMERGENCIA
05.04.01.01 Sistema de comunicación y difusión del COE
05.04.02 SISTEMA DE ALERTA Y ALARMA
05.04.02.01 Equipamiento para el sistema de alerta y alarma
05.04.03 SISTEMA DE EVACUACIÓN
05.04.03.01 Elaboración de un Plan de Evacuación
05.04.03.02 Señalización de puntos críticos rutas de evacuación y lugares seguros
05.04.04 OPERACIÓN, FUNCIONAMIENTO Y CAPACITACIÓN
05.04.04.01 Establecimiento de protocolos de medición, comunicación y operación
05.04.04.02 Capacitación en SAT y Gestión de riesgos para autoridades municipales
05.04.04.03 Curso en SAT y Gestión de riesgos para personal profesional y técnico de los COE
05.04.04.04 Taller de capacitación a la población sobre el SAT
05.04.05 PUESTA A PUNTO DEL PLAN (SIMULACROS)
05.04.05.01 Servicio de producción de spot de radio y televisión
05.04.05.02 Difusión en medio de comunicación televisiva
05.04.05.03 Difusión en medio de comunicación radial
05.04.05.04 Difusión en redes sociales
05.04.05.05 Difusión escrita
05.04.05.06 Transmisión en vivo por televisión
05.05 TALLERES DE CAPACITACIÓN
05.05.01 TALLERES DE CAPACITACIÓN PARA PROMOTORES SOCIALES DEL PROYECTO
05.05.01.01 Taller de capacitación para promotores sociales
05.05.02 TALLERES DE CAPACITACIÓN PARA BRIGADISTAS
05.05.02.01 Taller de gestión de riesgos de desastres
05.05.02.02 Taller de aplicación de la Ley de Recursos hídricos
05.05.02.03 Taller de conservación y preservación de las áreas reforestadas en la faja marginal
05.05.02.04 Taller para el manejo de residuos sólidos y líquidos
05.05.03 TALLERES DE CAPACITACIÓN PARA POBLACIÓN
05.05.03.01 Taller de gestión de riesgos de desastres para población
05.05.03.02 Taller de Recursos hídricos, Conservación y preservación de áreas reforestadas y Manejo de RRSS y líq
05.05.03.03 Taller de capacitación y educación en gestión de riesgo de desastres en instituciones educativas beneficia
05.05.04 TALLERES DE INCLUSIÓN SOCIAL
05.05.04.01 Taller de inclusión social
Und. Metrado
mes 5.00
GLB 1.00
VJE 10.00
M2 22,247.05
m3 2,061.69
m3 2,680.19
m3 6,230.70
m3 8,099.91
und 4.00
M2 600.00
mes 12.00
m 2,980.00
GLB 1.00
SALUD EN EL TRABAJ
GLB 1.00
GLB 1.00
GLB 1.00
GLB 1.00
GLB 1.00
GLB 1.00
RANTE EL TRABAJO
GLB 1.00
und 300.00
m3 8,632.76
m3 8,632.76
m3 8,632.76
m3 21.60
M2 237.60
m3 180.00
m2 118.80
M2 2.14
m 11.88
m3 2,468.76
M2 1,225.98
m3 3,703.14
M2 12,343.80
M2 128.52
m 4,086.60
m3 51.66
M2 172.20
M2 5,369.25
M2 1,215.00
m3 1,050.14
M2 2,789.90
m3 187.60
M2 4,904.40
m3 959.44
m3 243.88
m2 4,998.00
mes 5.50
m2 8,205.00
m3 22,298.00
m2 6,788.40
m3 705.84
m3 3,389.20
m2 18,391.20
m 662.10
kg 378,221.01
m3 6,004.51
m 540.80
m3 811.20
m3 14,462.10
m3 10,186.67
mes 0.50
m2 295.20
m3 138.38
m2 129.15
m3 110.70
m3 11.07
m2 55.35
kg 692.87
m3 20,229.70
m3 184.43
m3 24.60
m3 347.78
m3 34.44
KM 170.00
GLB 1.00
Eqo 1.00
Eqo 1.00
must 1.00
Eqo 1.00
GLB 6.00
mes 12.00
und 10.00
und 3.00
und 6.00
GLB 360.00
Bls 103,690.31
kg 431,125.02
p2 54,894.05
Bls 103,690.31
kg 431,125.02
p2 54,894.05
Bls 103,690.31
kg 431,125.02
p2 54,894.05
Bls 103,690.31
mes 3.00
m 2,028.00
m 2,028.00
m 2,028.00
m 2,028.00
m 1,014.00
m 1,014.00
und 10.00
und 10.00
und 10.00
und 10.00
und 10.00
und 10.00
und 10.00
und 70.00
m 2,028.00
und 6.00
und 6.00
GBL 1.00
mes 3.00
m 2,028.00
m 2,028.00
m 2,028.00
M.L 2,028.00
und 1,014.00
und 1,014.00
m 2,028.00
und 36.00
M2 72.00
m 2,028.00
und 70.00
und 35.00
und 35.00
GLB 1.00
mes 1.00
m3 628.25
m3 816.72
m3 816.72
M2 2,667.85
m3 633.01
m 1,841.23
m 1,841.23
m 2,223.40
mes 1.00
m3 1,307.13
m3 1,699.27
m3 1,699.27
M2 9,899.50
M2 5,228.52
M2 3,988.50
m3 989.95
M2 9,899.50
m 5,330.04
m2 6,759.24
mes 0.20
und 140.00
und 60.00
und 60.00
und 260.00
m 3,339.88
m 1,975.78
m 2,093.50
m2 340.20
m2 226.80
m2 59.20
m2 29.76
m2 28.00
m2 12.00
m2 54.50
m2 42.00
m2 2,501.33
m3 5.12
m3 5.12
m2 51.20
und 60.00
und 152.00
m 60.00
und 24.00
mes 75.60
m2 80.40
m3 15.12
kg 2,254.39
m 108.00
m 108.00
m2 172.92
mes 0.20
m3 328.30
m3 426.79
m3 101.47
m3 37.52
m3 161.49
m2 205.62
UND 0.00
m2 0.20
m2 65.60
m3 21.50
kg 2,070.13
u 10.00
m3 2.52
m2 9.00
m 12.80
m 12.80
mes 4.00
m3 592.50
m3 770.25
m3 711.00
m2 2,571.60
m2 2,571.60
m2 99.32
m3 514.32
m2 2,571.60
kg 1,406.25
m 496.60
mes 0.10
m3 0.10
m3 169.88
m3 169.88
M2 90.12
m3 90.12
M2 217.79
m3 49.57
kg 4,255.02
m 50.07
mes 78.48
m3 113.80
m3 147.93
m3 147.93
M2 78.48
m3 3.92
M2 130.80
m3 31.39
kg 172.96
m 65.40
M2 189.66
mll 3.00
mll 3.00
und 251.00
mll 1.00
M2 913.63
und 7,251.00
und 7,251.00
und 7,251.00
mll 1.25
HA 0.60
Evento 6.00
M2 3,007.21
M2 6,014.41
M2 3,007.21
m3 601.44
M2 6,014.41
M2 6,014.41
HA 0.60
Evento 3.00
M2 6,014.41
M2 6,014.41
m3 3,007.21
M2 6,014.41
M2 6,014.41
M2 6,014.41
HA 0.60
HA 0.60
mll 4.00
mll 4.00
M2 360.00
M2 360.00
M2 360.00
M2 360.00
HA 0.60
HA 0.60
Evento 6.00
TLL 1.00
TLL 1.00
TLL 1.00
TLL 1.00
TLL 1.00
TLL 1.00
TLL 1.00
TLL 1.00
TLL 1.00
TLL 1.00
GLB 1.00
GLB 1.00
mes 1.00
mes 1.00
mes 1.00
mes 1.00
mes 1.00
GLB 1.00
GLB 1.00
GLB 1.00
día 1.00
día 1.00
día 1.00
und 1.00
und 1.00
und 1.00
und 1.00
mes 1.00
mes 1.00
und 1.00
GLB 1.00
GLB 1.00
mes 1.00
GLB 1.00
GLB 1.00
GLB 1.00
GLB 1.00
GLB 1.00
GLB 1.00
GESTIÓN 1.00
GESTIÓN 1.00
GESTIÓN 1.00
GLB 1.00
GLB 1.00
GLB 1.00
GLB 1.00
GLB 1.00
CAP 1.00
TLL 1.00
TLL 1.00
SERVICI 1.00
SERVICI 1.00
SERVICI 1.00
SERVICI 1.00
mll 1.00
SERVICI 1.00
und 1.00
TLL 1.00
TLL 1.00
TLL 1.00
TLL 1.00
TLL 7.00
TLL 3.00
TLL 7.00
TLL 10.00
PLANILLA DE METRADOS
PROYECTO:
PARTIDA DESCRIPCION UNID. VECES LONG. ANCHO
02 SERVICIOS PUBLICOS
02.01 RENOVACION DE LA RED DE AGUA
02.01.01 OBRAS PRELIMINARES
CONTROL PLANIMETRICO Y ALTIMETRICO - TRABAJOS TOPOGRAFICOS
02.01.01.01 mes 1.00
02.01.02 MOVIMIENTO DE TIERRAS
02.01.02.01 EXCAVACION MANUAL T-NORMAL P/TUB 63 a 110mm m 1.00 2,028.00
02.01.02.02 REFINE Y NIVELACION DE ZANJAS T.S.R P/TUB. 63- m 1.00 2,028.00
02.01.02.03 CAMA DE APOYO P/TUB. DE 63-110mm T.N. m 1.00 2,028.00
02.01.02.04 RELLENO COMPACTADO ZANJAS P/TUB. 63mm a 11 m 1.00 2,028.00
02.01.03 SUMINISTRO E INSTALACION DE TUBERIAS PVC
02.01.03.01 TUBERIA PVC - U DE 90mm C-10 U.F. m 1.00 1,014.00
02.01.03.02 TUBERIA PVC -U DE 110mm C-10 .U.F. m 1.00 1,014.00
02.01.03.03 CODO PVC C-10 P/AGUA 90mm x 11.25º UF und 10.00
02.01.03.04 CODO PVC C-10 P/AGUA 90mm x 22.5º UF und 10.00
02.01.03.05 CODO PVC C-10 P/AGUA 90mm x 45º UF und 10.00
02.01.03.06 CODO PVC P/AGUA 90mm x 90º UF und 10.00
02.01.03.07 CODO PVC P/AGUA 110mm x 11.25º UF und 10.00
02.01.03.08 CODO PVC P/AGUA 110mm x 22.5º UF und 10.00
02.01.03.09 CODO PVC P/AGUA 110mm x 45º UF und 10.00
02.01.03.10 INSTALAC. DE ACCESORIOS PVC /RED AGUA POTA und 70.00
02.01.03.11 INSTALAC.TUBERIA PVC C-10 DE 63mm A 110mm m 1.00 2,028.00
02.01.04 ACCESORIOS SANITARIOS
02.01.04.01 VALVULA COMP. HIERRO DUCTIL ISO 7259 DE 90mm und 6.00
02.01.04.02 VALVULA COMPUERTA HIERRO DUCTIL ISO 7259 Ø und 6.00
02.01.05 PRUEBAS HIDRAULICAS Y DESINFECCION DE TUBERI
02.01.05.01 Prueba a Zanja Tapada y Desinfeccion de Tuberia de GBL 1.00
02.02 RENOVACION DE LA RED DE DESAGUE
02.02.01 OBRAS PRELIMINARES
CONTROL PLANIMETRICO Y ALTIMETRICO - TRABAJOS TOPOGRAFICOS
02.02.01.01 mes 3.00
02.02.02 MOVIMIENTO DE TIERRAS
02.02.02.01 Excavacion Manual de zanja T.N. p/tub 160mm - 200mm m 1.00 2,028.00
02.02.02.02 Refine y nivelacion de zanja T.N. tub. 160mm - 355mm m 1.00 2,028.00
02.02.02.03 Cama de apoyo p/tub. 160 - 355mm T.N. m 1.00 2,028.00
02.02.02.04 Relleno y comp. de Zanja p/tub. 160 - 200mm h=1.50m M.L 1.00 2,028.00
02.02.03 SUMINISTRO E INSTALACION DE TUBERIAS PVC
02.02.03.01 Tuberia PVC- U SN2 de160mm incl. Anillo und 1.00 1,014.00
02.02.03.02 Tuberia PVC- U SN2 de 200mm incl. Anillo und 1.00 1,014.00
02.02.03.03 Instalacion Tuberia PVC- U de 160mm - 200mm- 250 m 1.00 2,028.00
02.02.04 BUZONES DE INSPECCION
02.02.04.01 REUBICACION DE BUZON STANDAR D= 1.20 M. H=1.5 und 36.00
02.02.04.02 REPOSICION DE CONCRETO p/LOSA DE PISTA e = 0.20 M2 72.00
02.02.05 PRUEBA HIDRÁULICA
02.02.05.01 Prueba hidraulica de tub. 160 - 355mm p/desague m 1.00 2,028.00
02.02.06 REPOSICIÓN DE CONEXIONES DOMICILIARIAS
02.02.06.01 CONEXIONES DOMICILIARIAS DE AGUA TUB.PVC 3" A und 70.00
02.02.06.02 CONEXIONES DOMICILIARIAS DE DESAGUE TUB. P und 35.00
02.02.06.03 CONEXIONES DOMICILIARIAS DE DESAGUE TUB. P und 35.00
02.03 INFRAESTRUCTURA ELECTRICA, TELEFONIA E INTERN
02.03.01 Sistema de Iluminacion incluye provision e instalacion de e GLB 1.00
DESCRIPCION UNID. VECES LONG. ANCHO
02.04 TRANSITABILIDAD PEATONAL
02.04.01 SARDINELES
02.04.01.01 Trazo, Niveles y Replanteo durrante el proceso mes 1.00
02.04.02 VEREDAS
02.04.02.01 Trazo, Niveles y Replanteo durrante el proceso mes 1.00
LADO IZQ. KM 00+720 AL 02+770 1.00 50.00 4.10
LADO IZQ. KM 00+830 AL 00+850 1.00 20.00 3.40
LADO IZQ. KM 001+320 AL 01+390 2.00 70.00 1.50
LADO DERE. KM 01+390 AL 01+610 1.00 220.00 1.80
LADO IZQ. KM 01+530 AL 01+610 1.00 80.00 1.80
LADO IZQ. KM 01+660 AL 01+832.8 1.00 213.20 1.80
LADO IZQ. KM 01+838 AL 02+260 1.00 422.00 1.20
AREAS PASIVAS KM 1+990 AL 2+030 1.00 40.00 2.50
AREAS PASIVAS KM 2+080 AL 2+100 1.00 20.00 1.20
LADO IZQ. KM 02+280 AL 02+420 1.00 240.00 1.00
AREA PASIVA. KM 02+300 AL 02+380 1.00 80.00 11.50
LADO DERE. KM 02+380 AL 02+600 1.00 220.00 1.50
LADO DERE. KM 02+890 AL 02+940 1.00 105.60 1.00
AREA PASIVA. KM 03+380 1.00 36.30 9.80
CICLOVIA MARGEN IZQUIERDA
TRAMO 0+610 AL 02+660 1.00 2,050.00 2.50
TRAMO 02+780 AL 02+830 1.00 50.00 2.50
TRAMO 02+930 AL 02+950 1.00 20.00 2.50
CICLOVIA MARGEN DERECHA
TRAMO 1+280 AL 1+390 1.00 110.00 2.50
TRAMO 1+390 AL 1+470 1.00 80.00 1.40
TRAMO 2+890 AL 3+010 1.00 120.00 1.40
TRAMO 3+320 AL 3+360 1.00 40.00 1.40
02.04.02.02 Excavacion Manual para Veredas m3
LADO IZQ. KM 00+720 AL 02+770 1.00 50.00 0.30
LADO IZQ. KM 00+830 AL 00+850 1.00 20.00 0.30
LADO IZQ. KM 001+320 AL 01+390 2.00 70.00 0.30
LADO DERE. KM 01+390 AL 01+610 1.00 220.00 0.30
LADO IZQ. KM 01+530 AL 01+610 1.00 80.00 0.30
LADO IZQ. KM 01+660 AL 01+832.8 1.00 213.20 0.30
LADO IZQ. KM 01+838 AL 02+260 1.00 422.00 0.30
AREAS PASIVAS KM 1+990 AL 2+030 1.00 40.00 0.30
AREAS PASIVAS KM 2+080 AL 2+100 1.00 20.00 0.30
LADO IZQ. KM 02+280 AL 02+420 1.00 240.00 0.30
AREA PASIVA. KM 02+300 AL 02+380 1.00 80.00 0.30
LADO DERE. KM 02+380 AL 02+600 1.00 220.00 0.30
LADO DERE. KM 02+890 AL 02+940 1.00 105.60 0.30
AREA PASIVA. KM 03+380 1.00 36.30 0.30
CICLOVIA MARGEN IZQUIERDA
TRAMO 0+610 AL 02+660 1.00 2,050.00 0.30
TRAMO 02+780 AL 02+830 1.00 50.00 0.30
TRAMO 02+930 AL 02+950 1.00 20.00 0.30
CICLOVIA MARGEN DERECHA
TRAMO 1+280 AL 1+390 1.00 110.00 0.30
TRAMO 1+390 AL 1+470 1.00 80.00 0.30
TRAMO 2+890 AL 3+010 1.00 120.00 0.30
TRAMO 3+320 AL 3+360 1.00 40.00 0.30
02.05.01.02 LOSAS
02.05.01.02.05 VARIOS
02.05.03 PAVIMENTOS
02.05.03.01 CONFORMACION DE SUBBASE DEL PAVIMENTO (e=0.3
02.05.03.01.01 CONFORMACION DE SUB BASE GRANULAR m2
LADO DERC. KM 01+390 AL 01+430 1.00 30.00 3.00
LADO DERC. KM 01+470 AL 01+580 1.00 110.00 3.00
LADO IZQ. KM 01+840 AL 02+060 1.00 220.00 2.60
LADO IZQ. KM 02+140 AL 02+190 1.00 50.00 2.60
LADO DERC. KM 03+317 AL 03+380 1.00 63.00 2.60
02.05.03.02 SUPERFICIE DE RODADURA (e=0.20m)
02.05.03.02.01 ENCOFRADO Y DESENCOFRADO DE LOSAS m2
LADO DERC. KM 01+390 AL 01+430 14.00 3.00
LADO DERC. KM 01+470 AL 01+580 38.00 3.00
LADO IZQ. KM 01+840 AL 02+060 75.00 2.60
LADO IZQ. KM 02+140 AL 02+190 18.00 3.20
LADO DERC. KM 03+317 AL 03+380 22.00 4.00
39.00
3.00 3.00 78/4 39 39
19.5
2,028.00 2,028.00 507 40 3 4.225 17
3.00 90 22.5
816.72 20 4 10.209031625
0.12 1.09 2.5
0.16 23.78
39.09 20 3 0.651535
0.07 1.62
0.07 12.60
0.16 2.13 39.09
12.79 20 3 0.2132
0.16 10.66
0.12 3.60
0.12 1.56
0.12 23.40
105.04 20 3 1.7507333333
0.12 34.56
0.12 27.00
0.07 14.92
0.12 151.92
0.12 140.40
0.12 86.40
0.12 18.00
0.12 14.40 471.32 20 3 7.8553333333
0.07 1.40
0.12 28.80
0.12 12.00
0.12 18.00
275.00 275.00
112.00 112.00
168.00 168.00
56.00 56.00
1,307.13 3 10 4357.1 DIAS
15.00 15.00
174.75 3 10 5.825
6.00 6.00 6
42.00 42.00 228.75 3 10 7.625 8
66.00 66.00
24.00 24.00 331.71 3 10 11.057 11
63.96 63.96
126.60 126.60
12.00 12.00
6.00 6.00
72.00 72.00 20
571.92 3 10 19.064
24.00 24.00
66.00 66.00
31.68 31.68
10.89 10.89
33.00 33.00
24.00 24.00
36.00 36.00
12.00 12.00
9,899.50 40 3 82.495833333 40
205.00
1,554.25 40 3 12.952083333
68.00 68.00 6.2801151573
210.00 210.00 1,766.25 40 3 14.71875 7.136724077
396.00 396.00
144.00 144.00 2,317.01 40 3 19.308416667 9.3621294005
383.76 383.76
506.40 506.40
100.00 100.00
24.00 24.00
240.00 240.00 17.221031365
4,261.99 40 3 35.516583333
920.00 920.00
330.00 330.00
105.60 105.60
355.74 355.74
275.00 275.00
112.00 112.00
168.00 168.00
56.00 56.00
5,228.52 45
60.00 60.00
699.00 14 2.5 19.971428571
24.00 24.00 6.0160427807
168.00 168.00 915.00 14 2.5 26.142857143 7.8750774598
264.00 264.00
96.00 96.00 1,326.84 14 2.5 37.909714286 11.419636914
255.84 255.84
506.40 506.40
48.00 48.00
24.00 24.00
288.00 288.00 19.689242845
2,287.68 14 2.5 65.362285714
96.00 96.00
264.00 264.00
126.72 126.72
43.56 43.56
132.00 132.00
96.00 96.00
144.00 144.00
48.00 48.00
3,988.50 8 10 49.85625
205.00 205.00
273.00 8 10 3.4125
68.00 68.00
210.00 210.00 210.00 8 10 2.625
396.00 396.00
144.00 144.00 923.76 8 10 11.547
383.76 383.76
506.40 506.40
100.00 100.00
24.00 24.00
240.00 240.00
2,581.74 8 10 32.27175
920.00 920.00
330.00 330.00
105.60 105.60
355.74 355.74
989.95 18 1 54.997222222
0.10 20.50 20.50
155.43 18 1 8.6347222222
0.10 6.80 6.80 9
0.10 21.00 27.30 182.93 18 1 10.1625 10
0.10 39.60 39.60 13
0.10 14.40 14.40 231.70 18 1 12.872277778
231.70 18 1 12.872277778
0.10 38.38 38.38
0.10 50.64 50.64
0.10 10.00 10.00
0.10 2.40 2.40
0.10 24.00 24.00 24
426.20 18 1 23.677722222
0.10 92.00 92.00
0.10 33.00 33.00 56
0.10 10.56 10.56
0.10 35.57 35.57
275.00 275.00
112.00 112.00
168.00 168.00
56.00 56.00
1,975.78 1,975.78
1,019.64 1,019.64 750 1.5 0.9063466667 0.75
956.14 956.14 750 1.5 0.8499022222 2.25
2,093.50 2,093.50
634.11 634.11 750 1.5 0.5636533333 1
62.00 62.00 750 1.5 0.0551111111 0.5
17.49 1
777.70 750 1.5 0.6912888889
760.21
590.89 1
619.69 750 1.5 0.5508355556
28.80
340.20
0.90 340.20 85.05 30 5 0.567
dias
0.20 0.20 5.2 1.3 40 0.1 1.5
80.40 10.05 2 4 1.25625 2.5125
75.60
0.20 4.80
0.20 15.12 15.12 2.52 3 2 0.42 0.63
PESO/ML 2,254.39 2,254.39 150 1 15.02928 3.75732
0.99 966.17
0.99 1,288.22 2
37.52 1 1 1 1
0.40 46.90 37.52
161.49 2 1.5 1.5 3
5.58 161.49
205.62 2.5 2 2 4
3.15 69.36
2.75 45.10
3.15 91.16
21.50
0.40 21.50
2,070.13 3.5 3.5 3 4
2.24 1,272.43
1.55 258.87
0.99 272.24
0.99 266.59
4.00 dias
90.00 8,100.00 0.6558739773 1.25
330.00 108,900.00 8.8178612503 9
572.00 327,184.00 26.492774245 26.5
130.00 16,900.00 1.3684284218 1.39
226.80 51,438.24 4.1650621054 4.5 32.39
512,522.24 41.5
592.50
90.00 45.00 45.00 0.2278481013
1
330.00 165.00 165.00 0.835443038
572.00 286.00 286.00 1.4481012658
130.00 65.00 65.00 0.3291139241 2
63.00 31.50 31.50 0.1594936709
592.50 3
770.25 1
711.00
90.00 27.00 27.00 0.1518987342
0.656
330.00 99.00 99.00 0.5569620253
572.00 171.60 171.60 0.9654008439
130.00 39.00 39.00 0.2194092827 1.5
63.00 18.90 18.90 0.1063291139
355.50 355.50 355.50 2
2,571.60
90.00 90.00 90.00 0.0699953336
0.45
330.00 330.00 330.00 0.2566495567
572.00 572.00 0.4448592316
130.00 130.00 0.1011043708 0.85
163.80 163.80 0.1273915072
1,285.80 1,285.80 1,285.80 1
2,571.60
90.00 90.00 90.00 0.1399906673
0.656
330.00 330.00 330.00 0.5132991134
572.00 572.00 0.8897184632
130.00 130.00 0.2022087416 1.5
163.80 163.80 0.2547830145
1,285.80 1,285.80 1,285.80 2
99.32
0.20 8.40 8.40 0.7611759968
3
0.20 22.80 22.80 2.0660491341
0.20 39.00 39.00 3.5340314136
0.20 11.52 11.52 1.0438985099 6.35
0.20 17.60 17.60 1.5948449456
99.32 99.32 99.32 9
514.32
90.00 18.00 18.00 1.0499300047
5
330.00 66.00 66.00 3.8497433504
572.00 114.40 114.40 6.6728884741
130.00 26.00 26.00 1.5165655623 10.35
163.80 32.76 32.76 1.9108726085
257.16 257.16 257.16 15
2,571.60
90.00 90.00 90.00 1.0499300047
5
330.00 330.00 330.00 3.8497433504
572.00 572.00 6.6728884741
130.00 130.00 1.5165655623 10.35
163.80 163.80 1.9108726085
1,285.80 1,285.80 1,285.80 15
1,406.25 4 5
496.60
42.00 0.4228755538
1.5706806283
114.00 1.1478050745
195.00 1.9633507853
57.60 0.5799436166 3.38
88.00 0.8860249698
496.60 5
0.10 2.6
16.80
1.20
1.20 19.20 1 40 0.48
3.12 19.20
5.40
3.60
9.60 21.72 21.72 1 40 0.543
12.00
6.00
16.80
9.60
4.80 49.20 49.20 1 40 1.23
90.12 0.10 90.12 1 40 2.253
1.45 24.36
1.45 1.74 130.67 30 1 4.3556666667
1.45 1.74
1.45 4.52 27.84 27.84 30 1 0.928 1
1.45 7.83
1.45 5.22
1.45 13.92
1.45 17.40 44.37 44.37 30 1 1.479 1.78
1.45 8.70
1.45 24.36
1.45 13.92
1.45 6.96 71.34 71.34 30 1 2.378 2.378
f.e. 169.88
1.45 1.30 31.67
1.45 1.30 2.26
1.45 1.30 2.26
1.45 1.30 5.88 36.19 36.19 30 1 1.2064
1.45 1.30 10.18
1.45 1.30 6.79
1.45 1.30 18.10
1.45 1.30 22.62 57.68 57.68 30 1 1.9227
1.45 1.30 11.31
1.45 1.30 31.67
1.45 1.30 18.10
1.45 1.30 9.05 92.74 92.74 30 1 3.0914
169.88
90.12
16.80
1.20
1.20
3.12 19.20 19.20 30 1 0.64
5.40
3.60
9.60
12.00 30.60 30.60 30 1 1.02
6.00
16.80
9.60
4.80 49.20 49.20 30 1 1.64
90.12
16.80
1.20 99.00 20 1 4.95
1.20
3.12 19.20 19.20 20 1 0.96
5.40
3.60
9.60
12.00 30.60 30.60 20 1 1.53
6.00
16.80
9.60
4.80 49.20 49.20 20 1 2.46
217.79
1.00 28.00
12.60
1.00 2.00
0.90 46.40
1.00 5.20
2.34
1.00 9.00
4.05
1.00 16.00
7.20 52.49
1.00 20.00
9.00
1.00 10.00
4.50
1.00 28.00
12.60
1.00 8.00
3.60 118.90
49.57
1.00 4.20
0.20 5.04
1.00 0.30
0.20 0.36 10.56
1.00 0.78
0.20 0.94
1.00 1.35
0.20 1.62
1.00 2.40
0.20 2.88 11.95
1.00 3.00
0.20 3.60
1.00 1.50
0.20 1.80
1.00 4.20
0.20 5.04
1.00 1.20
0.20 1.44 27.06
peso/metro 4,255.02
78.48 tramos : 1 2 3 4
55.08
23.40 dias 1 0 1 1
113.80
1.45 79.87 1 1 2
1.45 33.93
f.e. 147.93
1.45 1.30 103.83 1 1 2
1.45 1.30 44.11
147.93
78.48 0.5 0.5 1
3.92
0.05 2.75 1 0 1 1
0.05 1.17
130.80 metrad rend cuadr
1.00 10.20
1.00 10.20
1.00 10.20
40.80 12.00 2.50 1.36
1.00 10.20
1.00 10.20
1.00 10.20
1.00 13.00
1.00 10.20
69.60 12.00 2.50 2.32
1.00 13.00
1.00 10.20
1.00 13.00
31.39
1.00 1.53
0.20 0.92
1.00 1.53
7.34 12 12 0.051
0.20 0.92
1.00 1.53
0.20 0.92
1.00 1.53
0.20 0.92
1.00 1.53
0.20 0.92
10.46 12 12 0.0726666667
1.00 1.53
0.20 0.92
1.00 1.53
0.20 0.92
1.00 1.95
0.20 1.17
1.00 1.53
0.20 0.92
1.00 1.53
0.20 0.92
1.00 1.95
0.20 1.17
172.96
0.5 0 0.5 1
peso/metro 250 2
0.99 32.21 32.21 32.21
0.99 45.62 45.62 45.62 123.45 0.9876384
0.99 45.62 45.62 45.62
1.00 10.20
0.90 4.59
1.00 10.20
0.90 4.59
1.00 10.20
0.90 4.59 44.37 10 1.75 1.5
1.00 10.20
0.90 4.59
1.00 10.20
0.90 4.59
1.00 10.20
0.90 4.59
1.00 10.20
0.90 4.59 59.16 10 1.75 1.5
1.00 13.00
0.90 5.85
1.00 10.20
0.90 4.59
1.00 13.00
0.90 5.85
1.00 10.20
0.90 4.59
1.00 13.00
0.90 5.85 86.13 10 1.75 2
913.63 913.63 1
7,251.00 7,251.00 2.5
7,251.00 7,251.00 2.5
3.00 1 1 1
6.00 6.00 3 3
Duración
34 días 34 8.5
11 días 11 2.75
13 días 13 3.25
20 días 20 5
2
2.25
2
15
2 dias cada tramo
26
11
11
6
7
10
17
6
8
11.5
20
45.5
3
3.5
2.2
1
dias
48
48
48
6
2
6
2
10
13
1
1
41.5
2
9
15
15
9
5
5
5.158
5
1
3
11
10.8895
5.13
14
1
2
1
5
2
5
1
1
1
1
4
10
10
10
10
90
5
10
10
25
65
20
7
9
25
67
6
20
12
12
1
4
2
9
8
10
2
1
6
DESCRIPCION UND No.
Veces
MUROS DE CONTENCION
MUROS DE CONTENCION DE CONCRETO ARMADO
TRAZO, NIVELACION Y REPLANTEO DURANTE EL PROCESO m2
Muro lado izquierdo
MURO TIPO N° 01 KM 0+613.000 AL 0+720.000 1
KM 0+800.000 AL 0+880.000 1
KM 1+000.000 AL 1+027.000 1
KM 1+180.000 AL 1+240.000 1
KM 1+420.000 AL 1+480.000 1
KM 1+540.000 AL 1+582.000 1
KM 1+622.000 AL 1+660.000 1
KM 1+680.000 AL 1+800.000 1
KM 2+060.000 AL 2+300.000 1
MURO TIPO N° 02 KM 0+720.000 AL 0+760.000 1
KM 0+780.000 AL 0+800.000 1
KM 0+880.000 AL 1+000.000 1
KM 1+393.000 AL 1+420.000 1
KM 1+800.000 AL 1+980.000 1
KM 2+640.000 AL 2+660.000 1
MURO TIPO N° 03 KM 1+480.000 AL 1+540.000 1
KM 1+660.000 AL 1+680.000 1
KM 1+980.000 AL 2+060.000 1
KM 2+320.000 AL 2+380.000 1
KM 2+480.000 AL 2+640.000 1
MURO TIPO N° 04 KM 2+300.000 AL 2+320.000 1
KM 2+380.000 AL 2+480.000 1
Muro lado derecho MURO TIPO N° 01 KM 0+800.000 AL 0+865.000 1
KM 1+420.000 AL 1+582.000 1
MURO TIPO N° 02 KM 0+780.000 AL 0+800.000 1
KM 1+320.000 AL 1+420.000 1
TABLAESTACADO PARA EXCAVACIONES Y ESTRUCTURAS m2
Muro lado izquierdo
MURO TIPO N° 01 KM 0+613.000 AL 0+720.000 1
KM 0+800.000 AL 0+880.000 1
KM 1+000.000 AL 1+027.000 1
KM 1+180.000 AL 1+240.000 1
KM 1+420.000 AL 1+480.000 1
KM 1+540.000 AL 1+582.000 1
KM 1+622.000 AL 1+660.000 1
KM 1+680.000 AL 1+800.000 1
KM 2+060.000 AL 2+300.000 1
MURO TIPO N° 02 KM 0+720.000 AL 0+760.000 1
KM 0+780.000 AL 0+800.000 1
KM 0+880.000 AL 1+000.000 1
KM 1+393.000 AL 1+420.000 1
KM 1+800.000 AL 1+980.000 1
KM 2+640.000 AL 2+660.000 1
MURO TIPO N° 03 KM 1+480.000 AL 1+540.000 1
KM 1+660.000 AL 1+680.000 1
KM 1+980.000 AL 2+060.000 1
KM 2+320.000 AL 2+380.000 1
KM 2+480.000 AL 2+640.000 1
MURO TIPO N° 04 KM 2+300.000 AL 2+320.000 1
KM 2+380.000 AL 2+480.000 1
Muro lado derecho MURO TIPO N° 01 KM 0+800.000 AL 0+865.000 1
KM 1+420.000 AL 1+582.000 1
MURO TIPO N° 02 KM 0+780.000 AL 0+800.000 1
KM 1+320.000 AL 1+420.000 1
CORTE DE MATERIAL NO CLASIFICADO CON MAQUINARIA m3
Muro lado izquierdo
MURO TIPO N° 01 KM 0+613.000 AL 0+720.000 1
KM 0+800.000 AL 0+880.000 1
KM 1+000.000 AL 1+027.000 1
KM 1+180.000 AL 1+240.000 1
KM 1+420.000 AL 1+480.000 1
KM 1+540.000 AL 1+582.000 1
KM 1+622.000 AL 1+660.000 1
KM 1+680.000 AL 1+800.000 1
KM 2+060.000 AL 2+300.000 1
MURO TIPO N° 02 KM 0+720.000 AL 0+760.000 1
KM 0+780.000 AL 0+800.000 1
KM 0+880.000 AL 1+000.000 1
KM 1+393.000 AL 1+420.000 1
KM 1+800.000 AL 1+980.000 1
KM 2+640.000 AL 2+660.000 1
MURO TIPO N° 03 KM 1+480.000 AL 1+540.000 1
KM 1+660.000 AL 1+680.000 1
KM 1+980.000 AL 2+060.000 1
KM 2+320.000 AL 2+380.000 1
KM 2+480.000 AL 2+640.000 1
MURO TIPO N° 04 KM 2+300.000 AL 2+320.000 1
KM 2+380.000 AL 2+480.000 1
Muro lado derecho MURO TIPO N° 01 KM 0+800.000 AL 0+865.000 1
KM 1+420.000 AL 1+582.000 1
MURO TIPO N° 02 KM 0+780.000 AL 0+800.000 1
KM 1+320.000 AL 1+420.000 1
NIVELACION Y COMPACTADO CON MAQUINARIA m2
Muro lado izquierdo
MURO TIPO N° 01 KM 0+613.000 AL 0+720.000 1
KM 0+800.000 AL 0+880.000 1
KM 1+000.000 AL 1+027.000 1
KM 1+180.000 AL 1+240.000 1
KM 1+420.000 AL 1+480.000 1
KM 1+540.000 AL 1+582.000 1
KM 1+622.000 AL 1+660.000 1
KM 1+680.000 AL 1+800.000 1
KM 2+060.000 AL 2+300.000 1
MURO TIPO N° 02 KM 0+720.000 AL 0+760.000 1
KM 0+780.000 AL 0+800.000 1
KM 0+880.000 AL 1+000.000 1
KM 1+393.000 AL 1+420.000 1
KM 1+800.000 AL 1+980.000 1
KM 2+640.000 AL 2+660.000 1
MURO TIPO N° 03 KM 1+480.000 AL 1+540.000 1
KM 1+660.000 AL 1+680.000 1
KM 1+980.000 AL 2+060.000 1
KM 2+320.000 AL 2+380.000 1
KM 2+480.000 AL 2+640.000 1
MURO TIPO N° 04 KM 2+300.000 AL 2+320.000 1
KM 2+380.000 AL 2+480.000 1
Muro lado derecho MURO TIPO N° 01 KM 0+800.000 AL 0+865.000 1
KM 1+420.000 AL 1+582.000 1
MURO TIPO N° 02 KM 0+780.000 AL 0+800.000 1
KM 1+320.000 AL 1+420.000 1
SOLADOS CONCRETO f'c=100 kg/cm2 E=0.10 m3
Muro lado izquierdo
MURO TIPO N° 01 KM 0+613.000 AL 0+720.000 1
KM 0+800.000 AL 0+880.000 1
KM 1+000.000 AL 1+027.000 1
KM 1+180.000 AL 1+240.000 1
KM 1+420.000 AL 1+480.000 1
KM 1+540.000 AL 1+582.000 1
KM 1+622.000 AL 1+660.000 1
KM 1+680.000 AL 1+800.000 1
KM 2+060.000 AL 2+300.000 1
MURO TIPO N° 02 KM 0+720.000 AL 0+760.000 1
KM 0+780.000 AL 0+800.000 1
KM 0+880.000 AL 1+000.000 1
KM 1+393.000 AL 1+420.000 1
KM 1+800.000 AL 1+980.000 1
KM 2+640.000 AL 2+660.000 1
MURO TIPO N° 03 KM 1+480.000 AL 1+540.000 1
KM 1+660.000 AL 1+680.000 1
KM 1+980.000 AL 2+060.000 1
KM 2+320.000 AL 2+380.000 1
KM 2+480.000 AL 2+640.000 1
MURO TIPO N° 04 KM 2+300.000 AL 2+320.000 1
KM 2+380.000 AL 2+480.000 1
Muro lado derecho MURO TIPO N° 01 KM 0+800.000 AL 0+865.000 1
KM 1+420.000 AL 1+582.000 1
MURO TIPO N° 02 KM 0+780.000 AL 0+800.000 1
KM 1+320.000 AL 1+420.000 1
FALSA ZAPATA DE CONCRETO CICLOPEO f'c=175 kg/cm2 +80%P.M m2
Muro lado izquierdo
MURO TIPO N° 01 KM 0+613.000 AL 0+720.000 1
KM 0+800.000 AL 0+880.000 1
KM 1+000.000 AL 1+027.000 1
KM 1+180.000 AL 1+240.000 1
KM 1+420.000 AL 1+480.000 1
KM 1+540.000 AL 1+582.000 1
KM 1+622.000 AL 1+660.000 1
KM 1+680.000 AL 1+800.000 1
KM 2+060.000 AL 2+300.000 1
MURO TIPO N° 02 KM 0+720.000 AL 0+760.000 1
KM 0+780.000 AL 0+800.000 1
KM 0+880.000 AL 1+000.000 1
KM 1+393.000 AL 1+420.000 1
KM 1+800.000 AL 1+980.000 1
KM 2+640.000 AL 2+660.000 1
MURO TIPO N° 03 KM 1+480.000 AL 1+540.000 1
KM 1+660.000 AL 1+680.000 1
KM 1+980.000 AL 2+060.000 1
KM 2+320.000 AL 2+380.000 1
KM 2+480.000 AL 2+640.000 1
MURO TIPO N° 04 KM 2+300.000 AL 2+320.000 1
KM 2+380.000 AL 2+480.000 1
Muro lado derecho MURO TIPO N° 01 KM 0+800.000 AL 0+865.000 1
KM 1+420.000 AL 1+582.000 1
MURO TIPO N° 02 KM 0+780.000 AL 0+800.000 1
KM 1+320.000 AL 1+420.000 1
ENCOFRADO Y DESENCOFRADO DE MUROS DE CONTENCION m2
Muro lado izquierdo
MURO TIPO N° 01 KM 0+613.000 AL 0+720.000
KM 0+800.000 AL 0+880.000
KM 1+000.000 AL 1+027.000
KM 1+180.000 AL 1+240.000
KM 1+420.000 AL 1+480.000
KM 1+540.000 AL 1+582.000
KM 1+622.000 AL 1+660.000
KM 1+680.000 AL 1+800.000
KM 2+060.000 AL 2+300.000
Zapata 2
Pantalla 2
MURO TIPO N° 02 KM 0+720.000 AL 0+760.000
KM 0+780.000 AL 0+800.000
KM 0+880.000 AL 1+000.000
KM 1+393.000 AL 1+420.000
KM 1+800.000 AL 1+980.000
KM 2+640.000 AL 2+660.000
Zapata 2
Pantalla 2
MURO TIPO N° 03 KM 1+480.000 AL 1+540.000
KM 1+660.000 AL 1+680.000
KM 1+980.000 AL 2+060.000
KM 2+320.000 AL 2+380.000
KM 2+480.000 AL 2+640.000
Zapata 2
Pantalla 2
MURO TIPO N° 04 KM 2+300.000 AL 2+320.000
KM 2+380.000 AL 2+480.000
Zapata 2
Pantalla 2
Muro lado derecho
MURO TIPO N° 01 KM 0+800.000 AL 0+865.000
KM 1+420.000 AL 1+582.000
Zapata 2
Pantalla 2
MURO TIPO N° 02 KM 0+780.000 AL 0+800.000
KM 1+320.000 AL 1+420.000
Zapata 2
Pantalla 2
JUNTA DE CONTRACCION CON TEKNOPORT E=1" m
Muro lado izquierdo
MURO TIPO N° 01 KM 0+613.000 AL 0+720.000 12
12
KM 0+800.000 AL 0+880.000 9
9
KM 1+000.000 AL 1+027.000 3
3
KM 1+180.000 AL 1+240.000 7
7
KM 1+420.000 AL 1+480.000 7
7
KM 1+540.000 AL 1+582.000 5
5
KM 1+622.000 AL 1+660.000 5
5
KM 1+680.000 AL 1+800.000 14
14
KM 2+060.000 AL 2+300.000 27
27
MURO TIPO N° 02 KM 0+720.000 AL 0+760.000 5
5
KM 0+780.000 AL 0+800.000 3
3
KM 0+880.000 AL 1+000.000 14
14
KM 1+393.000 AL 1+420.000 3
3
KM 1+800.000 AL 1+980.000 20
20
KM 2+640.000 AL 2+660.000 3
3
MURO TIPO N° 03 KM 1+480.000 AL 1+540.000 7
7
KM 1+660.000 AL 1+680.000 3
3
KM 1+980.000 AL 2+060.000 9
9
KM 2+320.000 AL 2+380.000 7
7
KM 2+480.000 AL 2+640.000 18
18
MURO TIPO N° 04 KM 2+300.000 AL 2+320.000 3
3
KM 2+380.000 AL 2+480.000 12
12
Muro lado derecho
MURO TIPO N° 01 KM 0+800.000 AL 0+865.000 12
12
KM 1+420.000 AL 1+582.000 12
12
MURO TIPO N° 02 KM 0+780.000 AL 0+800.000 5
5
KM 1+320.000 AL 1+420.000 5
5
ACERO DE REFUERZO Diam. = 3/8" f'y=4200 kg/cm2 PARA MURO kg
Muro lado izquierdo
MURO TIPO N° 01 KM 0+613.000 AL 0+720.000 1
KM 0+800.000 AL 0+880.000 1
KM 1+000.000 AL 1+027.000 1
KM 1+180.000 AL 1+240.000 1
KM 1+420.000 AL 1+480.000 1
KM 1+540.000 AL 1+582.000 1
KM 1+622.000 AL 1+660.000 1
KM 1+680.000 AL 1+800.000 1
KM 2+060.000 AL 2+300.000 1
MURO TIPO N° 02 KM 0+720.000 AL 0+760.000 1
KM 0+780.000 AL 0+800.000 1
KM 0+880.000 AL 1+000.000 1
KM 1+393.000 AL 1+420.000 1
KM 1+800.000 AL 1+980.000 1
KM 2+640.000 AL 2+660.000 1
MURO TIPO N° 03 KM 1+480.000 AL 1+540.000 1
KM 1+660.000 AL 1+680.000 1
KM 1+980.000 AL 2+060.000 1
KM 2+320.000 AL 2+380.000 1
KM 2+480.000 AL 2+640.000 1
Muro lado derecho MURO TIPO N° 01 KM 0+800.000 AL 0+865.000 1
KM 1+420.000 AL 1+582.000 1
MURO TIPO N° 02 KM 0+780.000 AL 0+800.000 1
KM 1+320.000 AL 1+420.000 1
ACERO DE REFUERZO DE 1/2" f'y=4200 kg/cm2 kg
Muro lado izquierdo
MURO TIPO N° 01 KM 0+613.000 AL 0+720.000 1
KM 0+800.000 AL 0+880.000 1
KM 1+000.000 AL 1+027.000 1
KM 1+180.000 AL 1+240.000 1
KM 1+420.000 AL 1+480.000 1
KM 1+540.000 AL 1+582.000 1
KM 1+622.000 AL 1+660.000 1
KM 1+680.000 AL 1+800.000 1
KM 2+060.000 AL 2+300.000 1
MURO TIPO N° 02 KM 0+720.000 AL 0+760.000 1
KM 0+780.000 AL 0+800.000 1
KM 0+880.000 AL 1+000.000 1
KM 1+393.000 AL 1+420.000 1
KM 1+800.000 AL 1+980.000 1
KM 2+640.000 AL 2+660.000 1
MURO TIPO N° 03 KM 1+480.000 AL 1+540.000 1
KM 1+660.000 AL 1+680.000 1
KM 1+980.000 AL 2+060.000 1
KM 2+320.000 AL 2+380.000 1
KM 2+480.000 AL 2+640.000 1
MURO TIPO N° 04 KM 2+300.000 AL 2+320.000 1
KM 2+380.000 AL 2+480.000 1
Muro lado derecho MURO TIPO N° 01 KM 0+800.000 AL 0+865.000 1
KM 1+420.000 AL 1+582.000 1
MURO TIPO N° 02 KM 0+780.000 AL 0+800.000 1
KM 1+320.000 AL 1+420.000 1
ACERO DE REFUERZO DE 5/8" f'y=4200 kg/cm2 kg
Muro lado izquierdo
MURO TIPO N° 01 KM 0+613.000 AL 0+720.000 1
KM 0+800.000 AL 0+880.000 1
KM 1+000.000 AL 1+027.000 1
KM 1+180.000 AL 1+240.000 1
KM 1+420.000 AL 1+480.000 1
KM 1+540.000 AL 1+582.000 1
KM 1+622.000 AL 1+660.000 1
KM 1+680.000 AL 1+800.000 1
KM 2+060.000 AL 2+300.000 1
MURO TIPO N° 03 KM 1+480.000 AL 1+540.000 1
KM 1+660.000 AL 1+680.000 1
KM 1+980.000 AL 2+060.000 1
KM 2+320.000 AL 2+380.000 1
KM 2+480.000 AL 2+640.000 1
MURO TIPO N° 04 KM 2+300.000 AL 2+320.000 1
KM 2+380.000 AL 2+480.000 1
Muro lado derecho
MURO TIPO N° 01 KM 0+800.000 AL 0+865.000 1
KM 1+420.000 AL 1+582.000 1
ACERO DE REFUERZO DE 3/4" f'y=4200 kg/cm2 kg
Muro lado izquierdo
MURO TIPO N° 03 KM 1+480.000 AL 1+540.000 1
KM 1+660.000 AL 1+680.000 1
KM 1+980.000 AL 2+060.000 1
KM 2+320.000 AL 2+380.000 1
KM 2+480.000 AL 2+640.000 1
ACERO DE REFUERZO DE 1" f'y=4200 kg/cm2 kg
Muro lado izquierdo
MURO TIPO N° 04 KM 2+300.000 AL 2+320.000 1
KM 2+380.000 AL 2+480.000 1
CONCRETO PREMEZCLADO F'C = 210 kg/cm2 m3
Muro lado izquierdo
MURO TIPO N° 01 KM 0+613.000 AL 0+720.000 1
KM 0+800.000 AL 0+880.000 1
KM 1+000.000 AL 1+027.000 1
KM 1+180.000 AL 1+240.000 1
KM 1+420.000 AL 1+480.000 1
KM 1+540.000 AL 1+582.000 1
KM 1+622.000 AL 1+660.000 1
KM 1+680.000 AL 1+800.000 1
KM 2+060.000 AL 2+300.000 1
Zapata 1
Pantalla 1
MURO TIPO N° 02 KM 0+720.000 AL 0+760.000 1
KM 0+780.000 AL 0+800.000 1
KM 0+880.000 AL 1+000.000 1
KM 1+393.000 AL 1+420.000 1
KM 1+800.000 AL 1+980.000 1
KM 2+640.000 AL 2+660.000 1
Zapata 1
Pantalla 1
MURO TIPO N° 03 KM 1+480.000 AL 1+540.000 1
KM 1+660.000 AL 1+680.000 1
KM 1+980.000 AL 2+060.000 1
KM 2+320.000 AL 2+380.000 1
KM 2+480.000 AL 2+640.000 1
Zapata 1
Pantalla 1
MURO TIPO N° 04 KM 2+300.000 AL 2+320.000 1
KM 2+380.000 AL 2+480.000 1
Zapata 1
Pantalla 1
Muro lado derecho
MURO TIPO N° 01 KM 0+800.000 AL 0+865.000 1
KM 1+420.000 AL 1+582.000 1
Zapata 1
Pantalla 1
MURO TIPO N° 02 KM 0+780.000 AL 0+800.000 1
KM 1+320.000 AL 1+420.000 1
Zapata 1
Pantalla 1
CURADO y CUIDADO DE CONCRETO m2
Muro lado izquierdo
MURO TIPO N° 01 KM 0+613.000 AL 0+720.000 2
KM 0+800.000 AL 0+880.000 2
KM 1+000.000 AL 1+027.000 2
KM 1+180.000 AL 1+240.000 2
KM 1+420.000 AL 1+480.000 2
KM 1+540.000 AL 1+582.000 2
KM 1+622.000 AL 1+660.000 2
KM 1+680.000 AL 1+800.000 2
KM 2+060.000 AL 2+300.000 2
MURO TIPO N° 02 KM 0+720.000 AL 0+760.000 2
KM 0+780.000 AL 0+800.000 2
KM 0+880.000 AL 1+000.000 2
KM 1+393.000 AL 1+420.000 2
KM 1+800.000 AL 1+980.000 2
KM 2+640.000 AL 2+660.000 2
MURO TIPO N° 03 KM 1+480.000 AL 1+540.000 2
KM 1+660.000 AL 1+680.000 2
KM 1+980.000 AL 2+060.000 2
KM 2+320.000 AL 2+380.000 2
KM 2+480.000 AL 2+640.000 2
MURO TIPO N° 04 KM 2+300.000 AL 2+320.000 2
KM 2+380.000 AL 2+480.000 2
Muro lado derecho MURO TIPO N° 01 KM 0+800.000 AL 0+865.000 2
KM 1+420.000 AL 1+582.000 2
MURO TIPO N° 02 KM 0+780.000 AL 0+800.000 2
KM 1+320.000 AL 1+420.000 2
DRENAJE CON TUBERIA PVC SAP DE 2" m
Muro lado izquierdo
MURO TIPO N° 01 KM 0+613.000 AL 0+720.000 28.53
KM 0+800.000 AL 0+880.000 21.33
KM 1+000.000 AL 1+027.000 7.20
KM 1+180.000 AL 1+240.000 16.00
KM 1+420.000 AL 1+480.000 16.00
KM 1+540.000 AL 1+582.000 11.20
KM 1+622.000 AL 1+660.000 10.13
KM 1+680.000 AL 1+800.000 32.00
KM 2+060.000 AL 2+300.000 64.00
MURO TIPO N° 02 KM 0+720.000 AL 0+760.000 10.67
KM 0+780.000 AL 0+800.000 5.33
KM 0+880.000 AL 1+000.000 32.00
KM 1+393.000 AL 1+420.000 7.20
KM 1+800.000 AL 1+980.000 48.00
KM 2+640.000 AL 2+660.000 5.33
MURO TIPO N° 03 KM 1+480.000 AL 1+540.000 16.00
KM 1+660.000 AL 1+680.000 5.33
KM 1+980.000 AL 2+060.000 21.33
KM 2+320.000 AL 2+380.000 16.00
KM 2+480.000 AL 2+640.000 42.67
MURO TIPO N° 04 KM 2+300.000 AL 2+320.000 5.33
Muro lado derecho KM 2+380.000 AL 2+480.000 26.67
MURO TIPO N° 01 KM 0+800.000 AL 0+865.000 17.33
KM 1+420.000 AL 1+582.000 43.20
MURO TIPO N° 02 KM 0+780.000 AL 0+800.000 5.33
KM 1+320.000 AL 1+420.000 26.67
RELLENO CON MATERIAL FILTRANTE SELECCIONADO m3
Muro lado izquierdo
MURO TIPO N° 01 KM 0+613.000 AL 0+720.000 1
KM 0+800.000 AL 0+880.000 1
KM 1+000.000 AL 1+027.000 1
KM 1+180.000 AL 1+240.000 1
KM 1+420.000 AL 1+480.000 1
KM 1+540.000 AL 1+582.000 1
KM 1+622.000 AL 1+660.000 1
KM 1+680.000 AL 1+800.000 1
KM 2+060.000 AL 2+300.000 1
MURO TIPO N° 02 KM 0+720.000 AL 0+760.000 1
KM 0+780.000 AL 0+800.000 1
KM 0+880.000 AL 1+000.000 1
KM 1+393.000 AL 1+420.000 1
KM 1+800.000 AL 1+980.000 1
KM 2+640.000 AL 2+660.000 1
MURO TIPO N° 03 KM 1+480.000 AL 1+540.000 1
KM 1+660.000 AL 1+680.000 1
KM 1+980.000 AL 2+060.000 1
KM 2+320.000 AL 2+380.000 1
KM 2+480.000 AL 2+640.000 1
MURO TIPO N° 04 KM 2+300.000 AL 2+320.000 1
Muro lado derecho KM 2+380.000 AL 2+480.000 1
MURO TIPO N° 01 KM 0+800.000 AL 0+865.000 1
KM 1+420.000 AL 1+582.000 1
MURO TIPO N° 02 KM 0+780.000 AL 0+800.000 1
KM 1+320.000 AL 1+420.000 1
RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO SELECCIONADO PARA MURO CON m3
Muro lado izquierdo
MURO TIPO N° 01 KM 0+613.000 AL 0+720.000 1
KM 0+800.000 AL 0+880.000 1
KM 1+000.000 AL 1+027.000 1
KM 1+180.000 AL 1+240.000 1
KM 1+420.000 AL 1+480.000 1
KM 1+540.000 AL 1+582.000 1
KM 1+622.000 AL 1+660.000 1
KM 1+680.000 AL 1+800.000 1
KM 2+060.000 AL 2+300.000 1
MURO TIPO N° 02 KM 0+720.000 AL 0+760.000 1
KM 0+780.000 AL 0+800.000 1
KM 0+880.000 AL 1+000.000 1
KM 1+393.000 AL 1+420.000 1
KM 1+800.000 AL 1+980.000 1
KM 2+640.000 AL 2+660.000 1
MURO TIPO N° 03 KM 1+480.000 AL 1+540.000 1
KM 1+660.000 AL 1+680.000 1
KM 1+980.000 AL 2+060.000 1
KM 2+320.000 AL 2+380.000 1
KM 2+480.000 AL 2+640.000 1
MURO TIPO N° 04 KM 2+300.000 AL 2+320.000 1
Muro lado derecho KM 2+380.000 AL 2+480.000 1
MURO TIPO N° 01 KM 0+800.000 AL 0+865.000 1
KM 1+420.000 AL 1+582.000 1
MURO TIPO N° 02 KM 0+780.000 AL 0+800.000 1
KM 1+320.000 AL 1+420.000 1
ELIMINACION DE MATERIAL EXCEDENTE m3
Muro lado izquierdo
MURO TIPO N° 01 KM 0+613.000 AL 0+720.000
KM 0+800.000 AL 0+880.000
KM 1+000.000 AL 1+027.000
KM 1+180.000 AL 1+240.000
KM 1+420.000 AL 1+480.000
KM 1+540.000 AL 1+582.000
KM 1+622.000 AL 1+660.000
KM 1+680.000 AL 1+800.000
KM 2+060.000 AL 2+300.000
MURO TIPO N° 02 KM 0+720.000 AL 0+760.000
KM 0+780.000 AL 0+800.000
KM 0+880.000 AL 1+000.000
KM 1+393.000 AL 1+420.000
KM 1+800.000 AL 1+980.000
KM 2+640.000 AL 2+660.000
MURO TIPO N° 03 KM 1+480.000 AL 1+540.000
KM 1+660.000 AL 1+680.000
KM 1+980.000 AL 2+060.000
KM 2+320.000 AL 2+380.000
KM 2+480.000 AL 2+640.000
MURO TIPO N° 04 KM 2+300.000 AL 2+320.000
Muro lado derecho KM 2+380.000 AL 2+480.000
MURO TIPO N° 01 KM 0+800.000 AL 0+865.000
KM 1+420.000 AL 1+582.000
MURO TIPO N° 02 KM 0+780.000 AL 0+800.000
KM 1+320.000 AL 1+420.000
ZAPATAS
ZAPATAS KM 1+027.000 AL 1+180.000 41
COLUMNAS
COLUMNAS KM 1+027.000 AL 1+180.000 41
VIGA VOLADO
VIGA VOLADO KM 1+027.000 AL 1+180.000 41
VIGA LONGITUDINAL
VIGA LONGITUDINAL KM 1+027.000 AL 1+180.000 1
SARDINEL DE VOLADIZO
SARDINEL DE VOLADIZO KM 1+027.000 AL 1+180.000 1
RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO SELECCIONADO PARA MURO CON m3
COLUMNAS
COLUMNAS KM 1+027.000 AL 1+180.000 41
ELIMINACION DE MATERIAL EXCEDENTE m3
COLUMNAS
COLUMNAS KM 1+027.000 AL 1+180.000 41
DEMOL MURO EXIST. P/ZAPATAS
ZAPATAS KM 1+027.000 AL 1+180.000 41.00
REPOSICION DE MURO DE CONCRETO CICLOPEO(f'c = 175 kg/cm2.+ 70% PIEDRA.) m3
REPOSICION MURO EXIST. P/ZAPATAS
REPOSICION MURO EXIST. P/ZAPATAS
KM 1+027.000 AL 1+180.000 41.00
ELEMENTOS
Longitud Ancho Alto Area (CAD) Volumen (CAD) TOTAL
Coeficientes Sub-Total
m m m m2 m3
8,594.40
107.00
80.00
27.00
60.00
60.00
42.00
38.00
120.00
240.00
774.00 0.45 696.60
86.00 3.50
774.00 4.00 6,192.00
40.00
20.00
120.00
27.00
180.00
20.00
407.00 0.45 366.30
46.00 2.70
407.00 3.00 2,442.00
60.00
20.00
80.00
60.00
160.00
380.00 0.45 342.00
43.00 2.70
380.00 5.00 3,800.00
20.00
100.00
120.00 1.10 264.00
14.00 2.70
120.00 6.00 1,440.00
65.00
162.00
227.00 0.45 204.30
26.00 3.50
227.00 4.00 1,816.00
20.00
100.00
120.00 0.45 108.00
14.00 2.70
120.00 3.00 720.00
662.10
107.00
80.00
27.00
60.00
60.00
42.00
38.00
120.00
240.00
774.00 3.50 0.45 1,219.05
774.00 0.33 4.00 1,006.20
40.00 -
20.00
120.00
27.00
180.00
20.00
407.00 2.70 0.45 494.51
407.00 0.33 3.00 396.83
60.00 -
20.00
80.00
60.00
160.00
380.00 4.00 0.45 684.00
380.00 0.38 5.00 712.50
20.00 -
100.00
120.00 5.10 0.50 306.00
120.00 0.45 5.00 270.00
65.00
162.00
227.00 3.50 0.45 357.53
227.00 0.33 4.00 295.10
20.00
100.00
120.00 2.70 0.45 145.80
120.00 0.33 3.00 117.00
49,230.00
1.00 28.53
1.00 21.33
1.00 7.20
1.00 16.00
1.00 16.00
1.00 11.20
1.00 10.13
1.00 32.00
1.00 64.00
1.00 10.67
1.00 5.33
1.00 32.00
1.00 7.20
1.00 48.00
1.00 5.33
1.00 16.00
1.00 5.33
1.00 21.33
1.00 16.00
1.00 42.67
1.00 5.33
1.00 26.67
1.00 17.33
1.00 43.20
1.00 5.33
1.00 26.67
811.20
214.54
0.61 13.31
1.99 0.30 6.57
0.46 10.16
1.585 0.30 5.23
0.84 0.30 0.25 0.67
0.86 0.30 0.25 0.71
0.43 26.66
1.496 0.30 13.91
405.44
344.96
240.77
240.77
942.31
184.43
1+180.000 AL 1+240.000
1+393.000 AL 1+420.000
1+420.000 AL 1+480.000
1+480.000 AL 1+540.000
1+540.000 AL 1+582.000
NO
1+622.000 AL 1+660.000
1+660.000 AL 1+680.000
1+680.000 AL 1+800.000
1+800.000 AL 1+980.000
1+980.000 AL 2+060.000
2+060.000 AL 2+300.000
2+300.000 AL 2+320.000
2+320.000 AL 2+380.000
2+380.000 AL 2+480.000
2+480.000 AL 2+640.000
2+640.000 AL 2+660.000
DEMOLICION Y REMOCION DE INFRAESTRUCTURA EXISTENTE.
800
1420
780
1320
11.07
LOSAS MACIZAS
N° PIEZAS N° ELEM.
ELEMENTO DESCRICION f LONG 1/4"
IGUALES IGUALES
LOSA L 1.73
LOSA 1.32
LOSA 0.84
LOSA 0.86
LOSA 1.23
LOSA 1.82
N° PIEZAS N° ELEM.
ELEMENTO DESCRICION f LONG 1/4"
IGUALES IGUALES
LOSA L 1.73
LOSA L 1.32
LOSA 0.84
LOSA 0.86
LOSA L 1.23
LOSA 1.82
A° SUP 5/8" 2.70 3.00 61.00
190.85
188.14
143.14
142.50
190.85
89.06
190.85
91.29
596.40
414.00
1216.66
1263.29
143.40
113.70
148.33
120.87
96.95
127.14
99.87
99.87
41.03
99.87
99.87
41.03
340.63
273.23
328.45
766.84
568.03
881.33