Está en la página 1de 57

MUNICIPALIDAD DISTRITAL DE MARANURA

SUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL

INFORME TÉCNICO MENSUAL N° 06

"AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL


SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA
CONVENCION - DEPARTAMENTO DE CUSCO"

August-2022
MUNICIPALIDAD DISTRITAL DE MARANURA
SUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL

INFORME TÉCNICO MENSUAL N° 06

"AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL


SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA
CONVENCION - DEPARTAMENTO DE CUSCO"

August-2022
MUNICIPALIDAD DISTRITAL DE MARANURA
SUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL
INFORME TÉCNICO MENSUAL N° 06

"AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA


DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO"

August-2022

MUNICIPALIDAD DISTRITAL DE MARANURA


SUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL
INFORME TÉCNICO MENSUAL N° 06

"AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA


DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO"

August-2022

MUNICIPALIDAD DISTRITAL DE MARANURA


SUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL
INFORME TÉCNICO MENSUAL N° 06

"AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA


DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO"

August-2022
MUNICIPALIDAD DISTRITAL DE MARANURA
SUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL
INFORME TÉCNICO MENSUAL N° 06

"AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA


DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO"

August-2022
MUNICIPALIDAD DISTRITAL DE MARANURA
SUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL

INFORME TÉCNICO MENSUAL N° 06

"AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL


SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA
CONVENCION - DEPARTAMENTO DE CUSCO"

RESIDENTE DE OBRA :ING. Jorge Luis Valencia Cordova


INSPECTOR DE OBRA :ING. Edgar Viamonte Calla

August-2022
LIDAD DISTRITAL DE MARANURA
INFRAESTRUCTURA Y DESARROLLO TERRITORIAL

TÉCNICO MENSUAL N° 06

MIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL


DEL DISTRITO DE MARANURA - PROVINCIA DE LA
CION - DEPARTAMENTO DE CUSCO"

August-2022
REVISION : ING. Edgar Viamonte Calla
MUNICIPALIDAD DISTRITAL DE MARANURA FICHA TECNICA DE OBRA - agosto 2022 FECHA : 10/2/2022
SUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL
DATOS GENERALES MES : August-2022
UBICACIÓN NOMBRE DE LA OBRA Y/O PROYECTO: UNIDAD OPERATIVA
DPTO. CUSCO
MUNICIPALIDAD DISTRITAL DE MARANURA
PROV. LA CONVENCION "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE
DIST. MARANURA MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO" MODALIDAD ADMINISTRACIÓN DIRECTA
LOC. PIÑALPATA, LLAULLIYOC LUYCHO ALTO
PERFIL EXPEDIENTE TECNICO
CODIGO UNICO VARIACIÓN VIABILIDAD PLAZO EJECUCIÓN AMPLIACIÓN DE PLAZO
2350362 RES. APROB. R.G.M. N° 000043-2022-MDM-GM/LC RES. APROB./MODIFIC. 1
INVERSIONES
MONTO S/. 1,942,458.31 MONTO S/. 1,809,517.41 RES. APROB./MODIFIC. 2 240 días dias
FECHA 7/9/2018 FECHA 2/23/2022 RES. APROB./MODIFIC. 3
RES. APROB./MODIFIC. 4
RES. APROB./MODIFIC. 5
CADENA FUNCIONAL AMPLIACIÓN DE PLAZO N° 01
SEC. FUNC. FUNCION DIVISION FUNCIONAL GRUPO FUNCIONAL PROYECTO PROGRAMA META FINALIDAD RESOLUCION
0012 18 040 0089 2350362 0083 00001 0241825
INFORMACIÓN DE AGENTES
COLEG AGENTE CARGO ESPEC. HABILIDAD FECHA INICIO FECHA FINAL DNI N° CELULAR CORREO ELECTR. RESOLUCIÓN

INSPECTORES DE OBRA
R.S.G.S.L.P. N° 007-2022-
CIP: 69600 ING. EDGAR VIAMONTE CALLA 1er Supervisor Ing. Civil Habilitado 3/7/2022 23922885 984-004434
SGSLP-MDM/LC
RESIDENTES DE OBRA
Jlvalcor@hotmail.com R.S.G.I.D.T N° 06-2022-SGIDT-
CIP: 110644 ING. JORGE LUIS VALENCIA CORDOVA 1er Residente Ing. Civil Habilitado 3/1/2022 41795481 966-609393
MDM/LC

DEL TIEMPO DE EJECUCION Y PARALIZACIONES


PLAZO INICIAL APROBADO : 240 DIAS CALENDARIO RESOLUCIÓN DE APROBACION R.G.M. N° 000043-2022-MDM-GM/LC COORDENADAS UTM : 756768.0000 8564951.0000
FECHA DE INICIO : 3/21/2022 RESOLUCIÓN / ACTA / ASIENTO ACTA DE CUADERNO DE OBRA FECHA DE CONCLUSION 11/15/2022
DE LAS AMPLIACIONES PRESUPUESTALES Y DE PLAZO
1ra AMPLIACIÓN DE PLAZO DIAS CALENDARIOS RESOLUCION DE APROBACIÓN FECHA DE CONCLUSION REPROGRAMADA
2da AMPLIACIÓN DE PLAZO DIAS CALENDARIOS RESOLUCION DE APROBACIÓN FECHA DE CONCLUSION REPROGRAMADA
3ra AMPLIACIÓN DE PLAZO DIAS CALENDARIOS RESOLUCION DE APROBACIÓN FECHA DE CONCLUSION REPROGRAMADA

AVANCE FISICO PROGRAMADO ACUMULADO 100.00%


AVANCE FISICO EJECUTADO ACUMULADO 24.43%
ESTADO DE LA OBRA EN EJECUCIÓN
RESUMEN INFORME MENSUAL
RESUMEN DE AVANCE FISICO DE LA OBRA - COSTO DIRECTO AVANCE FINANCIERO MENSUAL A NIVEL DEVENGADOS
PROGRAMADO - EXPEDIENTE TECNICO REPROGRAMADO EJECUCIÓN - EXP. TECN EJECUCIÓN - ADICIONALES/DEDUCTIVOS EJECUCIÓN FISICA AVANCE FINANCIERO EJECUTADO SALDO PRESUPUESTAL
MES
MENSUAL ACUMULADO MENSUAL ACUMULADO MENSUAL DDT. P.N M.M MENSUAL ACUMULADO
VAL. % VAL. % VAL. % VAL. % VAL. % VAL. % VAL. VAL. VAL. % VALOR % MONTO % % ACUM. REAL %
INICIO
- - - - - - - - - 0.00% 51,546.56 2.85% 2.85% 1,757,970.85 97.15%
OBRA
Mar-22 49,132.50 3.29% 49,132.50 3.29% - - 15,185.23 1.02% - - - 15,185.23 1.02% 15,185.23 1.02% 16,513.10 0.91% 3.76% 1,741,457.75 96.24%
Apr-22 83,522.84 5.60% 132,655.34 8.90% - - 95,509.20 6.40% - - - 95,509.20 6.40% 110,694.43 7.42% 261,892.60 14.47% 18.23% 1,479,565.15 81.77%
May-22 127,718.60 8.56% 260,373.94 17.46% - - 125,315.09 8.40% - - - 125,315.09 8.40% 236,009.52 15.83% 233,122.57 12.88% 31.12% 1,246,442.58 68.88%
Jun-22 189,760.82 12.72% 450,134.76 30.18% - - 128,287.52 8.60% - - - 128,287.52 8.60% 364,297.04 24.43% 231,519.30 12.79% 43.91% 1,014,923.28 56.09%
Jul-22 208,677.54 13.99% 658,812.30 44.18% - - 121,288.03 8.13% - - - 121,288.03 8.13% 485,585.07 32.56% 258,255.62 14.27% 58.18% 756,667.66 41.82%
Aug-22 320,743.09 21.51% 979,555.39 65.68% - - - - -
Sep-22 131,773.97 8.84% 1,111,329.36 74.52% - - - - -
Oct-22 362,349.89 24.30% 1,473,679.25 98.82% - - - - -
Nov-22 17,658.55 1.18% 1,491,337.80 100.00% - - - - -
Dec-22
TOTAL 1,491,337.80 25.48% 1,491,337.80 100.00% - 485,585.07 32.56% - - - - 485,585.07 32.56% 485,585.07 32.56% TOT. 1,052,849.75 58.18% 58.18% 756,667.66 41.82%
CURVA AVANCE FISICO PROGRAMADO VS EJECUTADO
1.20

98.82% 100.00% 1.00


0

0.80
74.52%
% DE AVANCE

65.68%
0.60

44.18%
32.56% 0.40
30.18%
24.43%

15.83%
17.46% 0.20
7.42%
8.90%
0.00% 1.02%
3.29%
- -
INICIO OBRA 44621 44652 44682 44713 44743 44774 44805 44835 44866 44896

CURVA DE AVANCE FISICO VS FINANCIERO


1.20

1.00

0.80

58.18%
0.60
43.91%

31.12%
0.40
32.56%

18.23% 24.43%

15.83%
0.20
2.85% 3.76% 7.42%
0.00% 1.02%
-0.00

-0.20
PANEL FOTOGRAFICO CORRESPONDIENTE AL MES : August-2022

SE OBSERVA EL MODULO CON TECHO TARRAJEO INTERIOR TARRAJEO EXTERIOR. ARMADO DE ACERO DE REFUERZO FY=4200, EN RESERVORIO DE 2.5 M3 EN EL SECTOR DE LLAULLIYOC VACIADO DE CONCRETO F'C = 280 KG/CM2 EN RESERVORIO DE 2.5 M3 EN EL SECTOR DE LLAULLIYOC

SE OBSERVA LA INSTALACION DE PUERTAS Y CONSTRUCCION DE LAVATORIOS EXTERIORES EN MODULOS TARRAJEO INTERIOR EN RESERVORIO DE 2.5 M3 EN EL SECTOR DE LLAULLIYOC UTILIZANDO IMPERMEABILIZANTE TARRAJEO EXTERIOR DE MODULODULOS

……………………………………………………………………………….. ………………………………………………………………………………..
FIRMA Y SELLO DEL RESIDENTE FIRMA Y SELLO DEL SUPERVISOR
CONTENIDO

INFORME TÉCNICO MENSUAL N° 06


August-22
DESCRIPCION FORMATO CONTROL

1.- Contenido F-1 P


2.- Ficha Tecnica del Proyecto F-2 P
3.- Formato 12-B F-3 P
4.- Infobras F-4 P
5.- Memoria Descriptiva F-5 P
6.- Informe Ejecutivo F-6 P
7.- Documentos de Ejecucion de Obra F-7 P
7.1. Actas F-7.1 P
7.1.1. Acta de Entrega de Terreno F-7.1.1 P
7.1.2. Acta de Inicio de Obra F-7.1.2 P
7.2. Resoluciones F-7.2 P
7.2.1. Resolucion de Aprobacion del Expediente Tecnico F-7.2.1 P
8.- Documentos de Asignacion de Funciones F-8 P
8.1. Resolucion de Asignacion de Residente de Obra F-8.1 P
8.2. Resolucion de Asignacion de Inspector de Obra F-8.2 P
8.3. Memorandum de Asignacion Personal Tecnico - Administrativo F-8.3 P
9.- Ejecucion Fisica F-9 P
9.1. Grafico de Avance Fisico vs Avance Finaciero F-9.1 P
9.2. Resumen de Valorizaciones F-9.2 P
9.3. Valorización Programada F-9.3 P
9.4. Hoja de Metrado Programado F-9.4 P
10.- Movimiento de Almacén de Obra F-10 P
10.1. Resumen de los Movimiento de Almacén (ingreso-egreso) F-10.1 P
10.2. Movimiento Diario de Almacen de Materiales F-10.2 P
10.3. Saldo Valorizacion de Almacen F-10.3 P
10.4. Notas de Entrada de Almacen F-10.4 P
10.5. Notas de Salida de Almacen - materiales F-10.5 P
10.6. Notas de Salida de Almacen - combustible F-10.6 P
11.- Movimiento de Equipo y/o Maquinaria F-11 P
11.1. Resumen de Movimiento de Equipo(Propio) F-11.1 P
11.2. Resumen de Movimiento de Maquinaria ( Alquilado) F-11.2 P
11.3. Valorizacion Diario de Equipo (Propio) F-11.3 P
11.4. Partes Diarios de Equipos Propios F-11.4 P
11.5. Valorizacion Diario de Maquinaria Alquilado) F-11.5 P
11.6. Partes Diarios de Maquinaria (Alquilado) F-11.6 P
12.- Ejecucion Financiera F-12 P
12.1. Resumen de Presupuestal de Gastos por Especifica a nivel devengado F-12.1 P
12.2. Auxiliar Estandar F-12.2 P
13.- Control de Calidad F-13 P
14.- Hojas de Tareo de Personal Tecnico y Obrero F-14 P
15.- Registro Fotográfico F-15 P
16.- Cuaderno de Obra (Copias) F-16 P
17.- Anexos F-17 P
17.1. Planos F-17.1 P
17.2. Seguridad, Salud y Bioseguridad ante el Covid-19 en el Trabajo F-17.2 P
17.3. Registro de Capacitacion y/o Induccion al Personal F-17.3 P
17.4. Formatos de Analisis de Trabajos Seguros (A.T.S) F-17.4. P
17.5. Informe del personal tecnico administrativo F-17.5 P
CONTENIDO

INFORME TECNICO MENSUAL


August-2022
No DESCRIPCIÓN FORMATO CONTROL
1.00 Ficha Tecnica del Proyecto F-1 P
2.00 Contenido F-2 P
3.00 Informe Mensual F-3 P
4.00 Grafico de Avance Fisico vs Avance Finaciero F-4 P
5.00 Resumen de Valorizaciones F-5 P
6.00 Valorizaciónes de Avance de Obra F-6 P
6.1. Valorización Programada F-6.1 P
6.2. Valorización de Mayores Metrados F-6.2 X
6.3. Valorización de Partidas Nuevas F-6.3 X
6.4. Valorización de Deductivos F-6.4 X
9.00 Ejecucion Fisica F-7 P
9.4. Metrados Diarios - Programado F-7.1 P
7.2. Metrados Diarios - Mayores Metrados F-7.2 X
7.3. Metrados Diarios - Partidas Nuevas F-7.3 X
7.4. Metrados Diarios Deductivos F-7.4 X
8.00 Movimiento de Almacén Valorizado F-8 P
8.1. Resumen de los Movimiento de Almacén F-8.1 P
8.2 Movimiento Diario de Almacen de Materiales (Programados) F-8.2 P
8.4 Movimiento Diario de Almacén de Materiales en Transferencia F-8.3 X
8.5. Movimiento de Almacén de Materiales de Prestamos F-8.4 X
9.00 Movimiento de Equipo y/o Maquinaria Valorizada F-9 P
9.1. Resumen de Movimiento de Equipo y/o Maquinaria (Propio) F-9.1 P
9.2. Control Diario de Equipo y/o Maquinaria (Propio) F-9.2 P
9.3. Resumen de Movimiento de Equipo y/o Maquinaria (contratado) F-9.3 P
9.4. Control Diario de Equipo y/o Maquinaria (contratado) F-9.4 P
10.00 Ejecucion Financiera F-10 P
10.1. Resumen de Gasto por Especifica F-10.1 P
10.2. Manifiesto Total de Gastos F-10.2 P
10.3. Manifiesto Total de Gastos por Especifica F-10.3 P
11.00 Hojas de Tareo de Personal Tecnico y Obreros F-11 P
12.00 Registro Fotográfico F-12 P
13.00 Cuaderno de Obra (Copias) F-13 P
14.00 Anexos F-14 P
15.00 Seguridad y Salud en el Trabajo F-15 P
P : Presento X : No Presento Paginas 0
INFORMACIÓN GENERAL
6.- INFORME EJECUTIVO
CORRESPONDIENTE AL MES : agosto 01 AL 31
OBRA : "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA -
PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO"
A GENERALIDADES:
A.1 DATOS DEL PROYECTO
OBRA : "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL
DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE
LA CONVENCION - DEPARTAMENTO DE CUSCO"
ENTIDAD : MUNICIPALIDAD DISTRITAL DE MARANURA
U. EJECUTORA : SUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL
LUGAR : MARANURA
DIV. FUNC. : 040
PROGRAMA : 0083
GRUPO FUNC. : 0089
FUNCIÓN : 18
META : 00001
FINALIDAD : 0241825
CODIGO UNIFICADO : 2350362
CODIGO SNIP : 2350362

A.1.1 UBICACIÓN DEL PLROYECTO

SECTOR : LLAULLIYOC, PIÑALPATA Y LUYCHO ALTO


DISTRITO : MARANURA
PROVINCIA : LA CONVENCION
DEPARTAMENTO CUSCO

ESQUEMA HIDRAULICO

CAPTACION LUYCHO ALTO

CAPTACION DE MANATE LLAULLIYOC

CAPTACION SUPERFICIAL INSIENSUYOC

CAPTACION SUPERFICIAL
ROCOTOCHAYOC

CAPTACION MANANTIAL HUERTO


DEL EDEN
INFORMACIÓN GENERAL
6.- INFORME EJECUTIVO
CORRESPONDIENTE AL MES : agosto 01 AL 31
OBRA : "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA -
PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO"
A.2 DATOS GENERALES :
A.2.1 FORMULADOR DEL EXPEDIENTE :
1. PROYECTISTA : Ing. Hugo Camilo Amador Challco
REG. COLEGIATURA : CIP N° : 259104 Telefono: 961-746555
ESPECIALIDAD : Ingeniero Civil
2. PROYECTISTA : Ing° Genix Anderson Pallarco Castro
REG. COLEGIATURA : CIP N° : 190563 Telefono:
ESPECIALIDAD : Ingeniero Forestal y Ambiental
A.2.1 RESIDENTES DE OBRA :
1°. PRIMER RESIDENTE : ING. JORGE LUIS VALENCIA CORDOVA
REG. COLEGIATURA : CIP: 110644 Telefono: 966-609393
PERIODO : Año 2022
ESPECIALIDAD : INGENIERO CIVIL

A.2.2 INSPECTORES DE OBRA:


1°. PRIMER INSPECTOR DE OBRA : ING. EDGAR VIAMONTE CALLA
REG. COLEGIATURA : CIP: 69600 Telefono: 984-004434
PERIODO : Año 2022
ESPECIALIDAD : INGENIERO CIVIL

A.3 FECHA REPORTADA : CORRESPONDIENTE AL MES : agosto 01 AL 31


A.4 VALORIZACION FINANCIERA - FASE DEVENGADO
Presupuesto Aprobado : S/. 1,809,517.41 100.00%
Presupuesto Asignado : S/. 1,809,517.41 100.00%
Presupuesto Ejecutado-(AVANCE FINANCIERO)
Valorizacion Anterior : S/. 1,052,849.74 58.18%
Valorizacion Actual : S/. - 0.00%
Presupuesto Total Ejecutado : S/. 1,052,849.74 58.18%
Total Saldo Presupuestal : S/. 756,667.67 41.82%
Certificacion Presupuestal Actual : S/. 1,174,073.43 64.88%
Total Saldo Certificado : S/. 635,443.98 35.12%

AVANCE FINANCIERO

41.82%

LEYENDA

• 1 Valorizaion Anterior
• 2 Valorizacion Actual 58.18%

• 3 Saldo Presupuestal

A.5 VALORIZACIÓN FISICA A COSTO DIRECTO:


Valorizacion Acumulada anterior : S/. 485,585.07 32.56%
Valorizacion Actual (Del Mes) : S/. - 0.00%
Valorizacion Acumulada : S/. 485,585.07 32.56%
Saldo Valorizado : S/. 1,005,752.73 67.44%

AVANCE FISICO

32.56%

LEYENDA

• 1 Valorizaion Anterior
• 2 Valorizacion Del Mes
• 3 Saldo de Valorizacion 67.44%
INFORMACIÓN GENERAL
6.- INFORME EJECUTIVO
CORRESPONDIENTE AL MES : agosto 01 AL 31
OBRA : "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA -
PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO"
P.T. S/1,809,517.41 Ampl. N° 01 S/. Pres. Total S/.
C.D. S/1,491,337.80 S/.,0.00 S/. 1´809,517.41
Ampl. N° 02 S/. Pres. Total S/.
C.D.- S/1,491,337.80 S/.,0.00 S/. 1´809,517.41

AVANCE FISICO - PROGRAMADO ANTERIOR % DEL MES % ACUMULADO %


Valorización Part. Programadas 1,491,337.80 203,382.40 13.64% 121,288.03 8.13% 324,670.43 21.77%
Exp. Modif. N° 01 - Aprobado
Val. Adicional Part. Nuevas -
Val. Mayores Metrados -
Deductivos -
Valor. Acum. Total Part. Prog. + Adi 1,491,337.80 203,382.40 13.64% 121,288.03 8.13% 324,670.43 21.77%

A.6 CRONOGRAMA DE EJECUCION:


Programado (SEGÚN EXP. MODIFICADO N° 05) : 240 Dias calendario
Fecha de Inicio de Obra : 3/21/2022
Fecha de Conclusión (Programada) : 11/15/2022

PLAZO DE EJECUCION DE OBRA


Plazo Programado : 240 Dias 100.00%
Plazo ejecutado anterior : 102 Dias 42.50%
Plazo ejecutado del mes : 31 Dias 12.92%
Plazo de ejecucion acumulado : 133 Dias 55.42%
Saldo de Plazo de ejecucion : 107 Dias 44.58%

PLAZO DE EJECION

44.58% 42.50%

LEYENDA

• 1 Plazo ejecutado anterior


• 2 Plazo ejecutado del mes
• 3 Saldo de plazo de ejecucion

12.92%

A.7 ZONA DE INFLUENCIA


Lugar / Sector : Piñalpata, Llaulliyoc y Luycho Alto
Distrito : Maranura
Provincia : La Convención
Región : Cusco
BENEFICIARIOS POR SECTORES N° Familias N° Personas
Llaulliyoc : 15 familias 75 habitantes
Piñalpata : 35 familias 175 habitantes
Luycho Alto : 24 familias 120 habitantes
Total Benefieciarios : 74 familias 370 habitantes

Este gráfico no está disponible en su versión de Excel.

Si edita
35 Fam
esta forma o guarda el libro en un formato de archivo diferente, el
24 Fam
gráfico no se podrá utilizar.

LEYENDA

1 Llaulliyoc
2 Piñalpata
3 Luycho Alto 15 Fam
INFORMACIÓN GENERAL
6.- INFORME EJECUTIVO
CORRESPONDIENTE AL MES : agosto 01 AL 31
OBRA : "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA -
PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO"
A.8 JUSTIFICACIÓN DE LAS SOLUCIONES ADOPTADAS
Las soluciones adoptadas se basan en criterios técnicos de acuerdo a la topografía de la zona, oferta de agua, cantidad de beneficiarios y sobre todo en base a las pérdidas de agua y
presión estática en el abastecimiento de agua potable en la zona; en cuanto a los sistemas de eliminación de excretas está dado por el sistema de arrastre hidráulico con un tratamiento
primario de biodigestor en la zona de intervención.

A.9 COMPONENTES DEL EXPEDIENTE TECNICO


COMPONENTE 01. Adecuado sistema de abastecimiento de agua, con una población promedio beneficiaria de agua de 146. Con 01 unidad de Captación de Ladera en el lugar

denominado Rocotochayoc (Aforo 0.19 lt/seg) y 01 unidad de Captación superficial de Riachuelo en el lugar denominado Insinsuyoc (Aforo 0.17 lt/seg); con sistema de tratamiento que

comprende de 01 unidades de Sedimentado, 01 unidades de Pre filtro Dinámico de Grava y 01 unidades de Filtro Lento de Arena; con una línea de conducción de 511 metros lineales con

tubería PVC SAP de clase 10 de 1”; con obras de arte que comprende de una unidad de cámara de reunión, 15 unidades de cámara rompe presiones y 02 unidades de cámara de

distribución de caudales; un reservorio de 5.5 m3; una red de distribución con tubería de PVC SAP de clase 10 de 3/4” 4,655.63 metros lineales y 1/2” de 3,169.13 metros lineales; 6
unidades de 1/2” de válvula de purga y válvula de control . COMPONENTE 02. Adecuado sistema de eliminación de excretas; que comprende de 56 unidades de módulos de letrinas con

arrastre hidráulico con tanque septico , pozo percolador, pozo séptico y labatorios. COMPONENTE 03. Promociona y capacitación de la JASS, que comprende la promoción contara con un

programa de capacitación a los integrantes del concejo directivo de la JASS, a los usuarios y a la organización de mujeres mediante el desarrollo de talleres.

RESIDENTE DE OBRA INSPECTOR DE OBRA


B ASPECTOS TECNICO
B.1 BREVE DESCRIPCION DE LA META ANUAL
Se tiene programado la ejecucion de partidas en funcion de la asignacion presupuestal, las partidas programadas son: Trazo y
replanteo, excavacion de zantas en linea de conduccion, linea de aduccion y linea de distribucion, construccion de captaciones,
construccion de reservorios, construccion de camaras de reunion, construccion de camaras de distribucion, construccion de camaras
rompe presion, construccion de letrinas con el sistema de agua potable y tratamiento de aguas servidas con la instalacion de
biodigestores y sistema de infiltracion.

Se recomienda que, durante la ejecución de la obra, la población beneficiaria aporte con mano de obra no calificada para trabajos
como limpieza de vegetación natural, excavación en terreno natural, perfilado y transporte de materiales en especial materiales para
letrinas; el cual debe ser valorizado como aporte de beneficiarios.
Entre las responsabilidades asumidas se consideran:
• Libre disponibilidad de terreno.
• Apoyo en mano de obra no calificada en trabajos conocido también como faenas de la población beneficiaria.
• Capacitación sobre las normas de seguridad durante el proceso constructivo.

B.2 DOCUMENTOS TECNICOS

DOCUMENTO NÚMERO FECHA MONTO PLAZO


Resol. de Aprob. Exp. Tecn. R.G.M. N° 000043-2022-MDM-GM/LC 2/23/2022 S/. 1´809,517.41 240 dias calendario
Resol. de Aprob. Exp. Tec. Modif. 1
TOTAL PLAZO DE EJECUCIÓN 240 dias calendario
Acta de Inicio de Obra ACTA - CUADERNO DE OBRA 3/21/2022
Acta de Entrega de Terreno ACTA 3/21/2022

B.3 RECURSOS UTILIZADOS


B.3.1 RECURSOS HUMANOS

CATEGORIA MUNICIPALIDAD CONVENIO SERVICIO


Residente de Obra 1
Inspector de Obra 1
Asistente Técnico 1
Responsable de almacen 1
Asistente Administrativo 1
Promotoria Social 1
auxiliar Administrativo 0
Guardian (dia/noche) 2
Topografo 1
Operador de maquinaria liviana 2
Maestro de Obra 1
Operario 21
Oficial 8
Peon 37
Total 78 0

B.3.2 PLANILLA DE TAREOS AL COSTO DIRECTO E INDIRECTO (DEVENGADO)


COSTO DIRECTO Y GASTOS GENERALES
PRESUPUESTO PLANILLA - 2022
2021 ACUM. SALDO
PROGRAMADO ANTERIOR ACTUAL
C.D 432,237.16 0.00 187,183.74 126,021.07 313,204.81 119,032.35
G.G 170,847.30 0.00 92,725.63 0.00 92,725.63 78,121.67
CONVENIOS NO SE TIENE NINGUN CONVENIO
BENEFICIARIOS
TOTAL 603,084.46 0.00 279,909.37 126,021.07 405,930.44 197,154.02

COMENTARIO

La ejecucion de gasto de personal de obra corresponde al mes de Julio del 2022, ademas se debe indicar que el pago
del personal de Gastos Generales no fue devengado al 31 de Julio del 2022.
B.3.3 RECURSOS DE MAQUINARIA Y EQUIPO

MAQUINARIA/EQUIPOS MUNICIP. APOYO ALQUILADO


MÁQUINA DE SOLDAR 0 0 0
TRONZADORA DE METALES DE 14" 2300 W 0 0 0
VIBRADOR DE CONCRETO 1 0 0
MESCLADORA DE CONCRETO 1 0 0
CAMIONETA 4X4 DOBLE CABINA 0 0 1
VOQUETE DE 2 M3 0 0 1
MOTOSIERRA 0 1 0

EQUIPO DE INGENIERIA MUNICIP. APOYO ALQUILADO


ESTACION TOTAL 0 0 0
GPS DIFERENCIAL 0 0 0
NIVEL TOPOGRAFICO 1 0 0
MIRA 4 m. PLEGABLE CIFRAS DERECHAS 0 0 0
Total 3 1 0

B.3.4 VALORIZACION DE MAQUINARIA Y EQUIPO

SEGÚN UNIDAD DE MEDIDA.


PROGRAMADO
DESCRIPCION ANTERIOR ACUMULADO ACTUAL ACUMULADO SALDO
PROPIO
VOLQUETE 2 M3 2 DIAS 2 DIAS 2 DIAS 0 DIAS
ALQUILADO
CAMIONETA 4X4 182 DIAS 76 DIAS 23 DIAS 99 DIAS 83 DIAS
VOLQUETE 2 M3 150 DIAS 60 DIAS 24 DIAS 84 DIAS 66 DIAS
APOYO

SEGÚN MONTO
PROGRAMADO
DESCRIPCION ANTERIOR ACTUAL ACUMULADO SALDO

PROPIO S/ - S/ - S/ - S/ - S/ -
ALQUILADO S/ 45,300.00 S/ 18,600.00 S/ 6,330.00 S/ 24,930.00 S/ 20,370.00
CAMIONETA 4X4 S/ 27,300.00 S/ 11,400.00 S/ 3,450.00 S/ 14,850.00 S/ 12,450.00
VOLQUETE 2 M3 S/ 18,000.00 S/ 7,200.00 S/ 2,880.00 S/ 10,080.00 S/ 7,920.00
APOYO S/ - S/ - S/ - S/ - S/ -
TOTAL S/ 45,300.00 S/ 18,600.00 S/ 6,330.00 S/ 24,930.00 S/ 20,370.00
B.4 AVANCE FISICO
B.4.1 BREVE APRECIACION SOBRE LA VALORIZACION MENSUAL
ITEM PARTIDA Columna1 Columna2 Columna3 U.M. METRADO
1.1.2…TRANSPORTE DE MATERIALES A OBRA CON MAQUINARIA COMPONENTE 1 gbl 0.00
1.1.3…TRANSPORTE MANUAL DE MATERIALES DE PIE DE CARRETERA COM gbl 0.00
1.1.4…ALQUILER DE ALMACEN DE OBRA Y OFICINA mes 1.00
1.2.1.1…TRAZO, NIVELES Y REPLANTEO m² 0.00
1.2.1.2…LIMPIEZA MANUAL DE TERRENO m² 0.00
1.2.1.3…EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 0.00
1.2.1.4…PERFILADO Y COMPACTADO MANUAL m² 0.00
1.2.1.5…ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 0.00
1.2.1.8…CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 1.76
1.7.9…TUBO PVC NTP 399.002 DN 26.5 MM C-10 m 50.00
1.7.10…RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO EN CAPA m³ 11.00
1.10.1.6…ENCOFRADO Y DESENCOFRADO m² 0.00
1.10.1.7…ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 0.00
1.10.1.11…CONCRETO F´C=280 KG/CM2 (MEZCLA MANUAL) C/IMPERMEABILI m³ 0.00
1.10.1.12…CURADO DE CONCRETO m² 0.00
1.10.1.13…TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 0.00
1.10.1.14…TARRAJEO EN MUROS E=1.5 CM m² 0.00
1.11.1.4…PERFILADO Y COMPACTADO MANUAL m² 0.00
1.11.1.5…ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 0.00
1.11.1.6…ENCOFRADO Y DESENCOFRADO m² 0.00
1.11.1.7…ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 0.00
1.11.1.8…CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 0.00
1.11.1.9…EMPEDRADO E=12.5CM m² 0.00
1.11.1.11…CONCRETO F´C=280 KG/CM2 (MEZCLA MANUAL) C/IMPERMEABILI m³ 0.00
1.11.1.12…CURADO DE CONCRETO m² 0.00
1.11.1.13…TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 0.00
1.11.1.14…TARRAJEO EN MUROS E=1.5 CM m² 0.00
1.13.1…TRAZO, NIVELES Y REPLANTEO m² 24.00
1.13.2…LIMPIEZA MANUAL DE TERRENO m² 24.00
1.13.3…EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 14.40
1.13.4…PERFILADO Y COMPACTADO MANUAL m² 344.00
1.13.5…CAMA DE APOYO CON MATERIAL PROPIO SELECCIONADO E=0.10 m m² 280.00
1.13.9…TUBO PVC NTP 399.002 DN 21 MM C-10 m 115.00
1.13.10…RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO EN CAP m³ 154.00
1.13.11…ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 0.00
1.16.1…TRAZO, NIVELES Y REPLANTEO m² 136.00
1.16.2…LIMPIEZA MANUAL DE TERRENO m² 136.00
1.16.3…EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 81.60
1.16.4…PERFILADO Y COMPACTADO MANUAL m² 236.00
1.16.5…CAMA DE APOYO CON MATERIAL PROPIO SELECCIONADO E=0.10 m m² 230.00
1.16.6…TUBO PVC NTP 399.002 DN 21 MM C-10 m 524.00
1.16.7…RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO EN CAPA m³ 134.40
2.1.1…TRANSPORTE DE MATERIALES A OBRA CON MAQUINARIA COMPONENTE 2 gbl 0.00
2.1.2…TRANSPORTE MANUAL DE MATERIALES DE PIE DE CARRETERA COMPONENT gbl 0.00
2.2.1.1…LIMPIEZA MANUAL DE TERRENO m² 83.20
2.2.1.2…TRAZO, NIVELES Y REPLANTEO EN LETRINAS m² 72.00
2.2.2.1…EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 43.42
2.2.2.2…PERFILADO Y COMPACTADO MANUAL m² 66.61
2.2.2.3…ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 49.43
2.2.3.1…CIMIENTO CORRIDO C:H 1:10+60%P.G. (MEZCLA MANUAL) m³ 10.92
2.2.3.2…ENCOFRADO Y DESENCOFRADO m² 26.49
2.2.3.3…SOBRECIMIENTO C:H 1:6+25%P..M. (MEZCLA MANUAL) m³ 2.10
2.2.3.4…CURADO DE CONCRETO m² 49.14
2.2.4.1…MURO DE BLOQUETA DE 15X20X40CM m² 173.90
2.2.5.1…ENCOFRADO Y DESENCOFRADO DE VIGUETAS m² 49.14
2.2.5.2…ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 261.38
2.2.5.3…CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 4.88
2.2.5.4…CURADO DE CONCRETO m² 49.14
2.2.6.1…EMPEDRADO E=12.5CM m² 100.66
2.2.6.2…ENCOFRADO Y DESENCOFRADO m² 0.00
2.2.6.3…CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 8.54
2.2.6.4…CURADO DE CONCRETO m² 106.12
2.2.6.5…ENCHAPADO DE PISOS 0.45X0.45M m² 78.32
2.2.7.1…TARRAJEO EN MUROS E=1.5 CM m² 448.72
2.2.7.2…DERRAMES A=0.15 M MORTERO 1:5 m 43.99
2.2.7.3…ENCHAPADO CON CERÁMICO 0.30X0.40 m² 135.43
2.2.8.1…ZOCALO CERÁMICO m 69.00
2.2.9.1…CORREA P/TECHO CON MADERA TRATADA m 434.70
2.2.9.2…COBERTURA CON PLANCHA DE CALAMINA m² 172.50
2.2.10.1…PUERTA DE MADERA TIPO PERSIANA und 0.00
2.2.13.1…TRAZO, NIVELES Y REPLANTEO m² 225.12
2.2.13.2…EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 96.48
2.2.13.3…PERFILADO Y COMPACTADO MANUAL m² 225.12
2.2.13.4…CAMA DE APOYO CON MATERIAL PROPIO SELECCIONADO E=0.10 m² 225.12
2.2.13.5…TUBO PVC SAP C-10 DE1/2" m 223.20
2.2.13.6…TUBO PVC SAL DE 2" m 268.80
2.2.13.7…TUBO PVC SAL DE 4" m 162.00
2.2.13.8…RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO EN CA m³ 85.20
2.2.13.9…ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 8.16
2.2.14.4…LLAVE PARA DUCHA und 24.00
2.2.14.6…CODO F°G° DE 1/2" und 72.00
2.2.14.7…CODO PVC SAP 1/2" und 24.00
2.2.14.8…TEE PVC SAP DE 1/2" und 48.00
2.2.14.10…VÁLVULA GLOBO DE 1/2" INCL. ACCESORIOS und 48.00
2.2.14.14…CODO PVC SAL 4" und 48.00
2.2.14.15…CODO PVC SAL 2" und 240.00
2.2.14.16…YEE PVC SAL DE 2" und 24.00
2.2.14.17…TEE PVC SAL DE 4" C/R 2" und 24.00
2.2.14.18…TEE PVC SAL 2" und 24.00
2.2.14.19…SOMBRERO DE VENTILACIÓN DE 2" und 24.00
3.2.1.1…MATERIAL DE PROMOCIÓN ENTREGADO POR EL PROYECTO gbl 0.00
3.2.1.2…MATERIAL PARA TALLERES PROMOCIÓN (ANTES Y DURANTE) gbl 0.00
3.3.1.1…MATERIAL PARA TALLERES DE CAPACITACIÓN A JASS gbl 0.00
3.3.1.2…MATERIAL DE CAPACITACIÓN ENTREGADO POR EL PROYECTO gbl 0.00
3.3.2.1…PAGO POR HONORARIOS TALLERES DE CAPACITACIÓN JASS gbl 0.00
3.4.2…EQUIPO DE PROTECCIÓN COLECTIVA gbl 0.00
3.4.3…SEÑALIZACIÓN TEMPORAL DE SEGURIDAD Y BIOSEGURIDAD gbl 0.00
3.4.4…MONITOREO Y SENSIBILIZACIÓN DE SEGURIDAD Y BIOSEGURIDAD SEGÚN mes 0.00
3.4.5…RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SAL gbl 0.00
3.4.6…IMPLEMENTOS DE SEGURIDAD SEGÚN PROTOCOLOS COVID 19 gbl 0.00

OBSERVACIONES: 0…..1

B.4.2 VALORIZACIÓN DE OBRA - C.D TOTAL

DESCRIPCION PROGRAMADO ANTERIOR % ACTUAL % ACUMULADO % SALDO %


Programado 1,491,337.80 203,382.40 13.64% 121,288.03 8.13% 324,670.43 21.77% 1,166,667.37 78.23%
Partidas Nuevas - -
Mayor Metrado - -
Deductivos - -
TOTAL 1,491,337.80 203,382.40 13.64% 121,288.03 8.13% 324,670.43 21.77% 1,166,667.37 78.23%
*NOTA:
C. ASPECTO FINANCIERO

C.1 VALORIZACION DE ALMACEN DE OBRA


C.1.1 MOVIMIENTO DE ALMACEN VALORIZADA (Ingreso)

PERIODOS DE GESTION
DESCRIPCION ANTERIOR TOTAL SALDO
ACTUAL ACUMULADO
ACUMULADO
Programado
S/ 848,814.64 S/ 510,163.79 S/ 49,870.17 S/ 560,033.96 S/ 560,033.96 S/ 288,780.67
CD+GG
TOTAL S/ 848,814.64 S/ 510,163.79 S/ 560,033.96 S/ 560,033.96 S/ 288,780.67

C.1.2 MOVIMIENTO DE ALMACEN VALORIZADA (Egresos)

PERIODOS DE GESTION
DESCRIPCION ANTERIOR TOTAL SALDO
ACTUAL ACUMULADO
ACUMULADO
Programado
S/ 848,814.64 S/ 115,141.05 S/ 105,535.26 S/ 220,676.31 S/ 220,676.31 S/ 628,138.33
CD+GG
TOTAL S/ 848,814.64 S/ 115,141.05 S/ 220,676.31 S/ 220,676.31 S/ 628,138.33

C.1.3 MOVIMIENTO DE ALMACEN VALORIZADA (Saldos)

PERIODOS DE GESTION
DESCRIPCION INGRESO EGRESO SALDO EN
ACUMULADO ACUMULADO ALMACEN
Programado
S/ 848,814.64 S/ 560,033.96 S/ 220,676.31 S/ 339,357.65
CD+GG

TOTAL S/ 848,814.64 S/ 560,033.96 S/ 220,676.31 S/ 339,357.65

COMENTARIO.-
Se informa que los materiales, que se mencionan en el presente informe corresponde a la adquisicion para el proyecto

C.2 EJECUCION FINANCIERA POR METAS


C.2.1 EJECUCION DE METAS FINANCIERAS

DESCRIPCION PROGRAMADO EJECUTADO ANTERIOR ACTUAL ACUMULADO SALDO


ACUMULADO AL MES (acumulado) MES TOTAL
2021
2021
Municipalidad S/ 1,809,517.41 S/ - S/ 1,052,849.74 S/ - S/ 1,052,849.74 S/ 756,667.67
Convenio S/ - S/ - S/ - S/ - S/ -
Beneficiarios S/ - S/ - S/ - S/ - S/ -
TOTAL S/ 1,809,517.41 S/ - S/ 1,052,849.74 S/ - S/ 1,052,849.74 S/ 756,667.67

D. ASPECTO ADMINISTRATIVO

a la fecha se observa que la ejecucion financiera se encuentra por encima de la ejecucion fisica, esto debido a que ya se tiene adquirido la mayoria de los
materiales que estan internadas en almacen de obra para el uso en las partidas programadas.

E. ASPECTO SOCIAL
Se tiene oposicion de algunos beneficiaros para el paso de las tuberias por los terrenos que les corresponden que generan retrasos en la ejecucion del
proyecto.

F. OBSERVACIONES Y RECOMENDACIONES
9.1. GRAFICO DE AVANCE FISICO VS AVANCE FINACIERO

OBRA"AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION -
DEPARTAMENTO DE CUSCO"

DIAGRAMA DE AVANCE FISICO PROGRAMADO-EJECUTADO (CURVA "S")


COSTO DIRECTO DE OBRA: S/. 1,491,337.80 CORRESPONDE AL MES: August-2022

TOTAL PRESUPUESTADO: S/. 1,809,517.41 PRESENTACIÓN: 2-Oct-22

PROGRAMADO REPROGRAMADO EJECUTADO


ITEM PERIODO (S/.) PORCENTAJE (S/.) PORCENTAJE (S/.) PORCENTAJE
MENSUAL ACUMULADO MENSUAL ACUMULADO MENSUAL ACUMULADO MENSUAL ACUMULADO MENSUAL ACUMULADO MENSUAL ACUMULADO
0 INICIO 0.00% 0.00%
1 Mar-22 49,132.50 49,132.50 3.29% 3.29% 15,185.23 15,185.23 1.02% 1.02%
2 Apr-22 83,522.84 132,655.34 5.60% 8.90% 95,509.20 110,694.43 6.40% 7.42%
3 May-22 127,718.60 260,373.94 8.56% 17.46% 125,315.09 236,009.52 8.40% 15.83%
4 Jun-22 189,760.82 450,134.76 12.72% 30.18% 128,287.52 364,297.04 8.60% 24.43%
5 Jul-22 208,677.54 658,812.30 13.99% 44.18% 121,288.03 485,585.07 8.13% 32.56%
6 Aug-22 320,743.09 979,555.39 21.51% 65.68%
7 Sep-22 131,773.97 1,111,329.36 8.84% 74.52%
8 Oct-22 362,349.89 1,473,679.25 24.30% 98.82%
9 Nov-22 17,658.55 1,491,337.80 1.18% 100.00%
10 Dec-22

TOTAL: 1,491,337.80 1,491,337.80 100.00% 0.00 0.00% 485,585.07 485,585.07 32.56% 32.56%

120.00%
AVANCE FÍSICO ACUMULADO
(PROGRAMADO Vs. EJECUTADO)

98.82% 100.00%
100.00%

80.00% 74.52%
65.68%

60.00%

44.18%
40.00% 30.18%

17.46% 32.56%
20.00% 8.90% 24.43%
3.29% 15.83% PROGRAMADO
0.00%
7.42%
0.00% 0.00% 1.02%
INICIO

mar-22

abr-22

may-22

jun-22

jul-22

ago-22

sep-22

oct-22

nov-22

AVANCE FISICO MENSUAL


(PROGRAMADO Vs. EJECUTADO) 24.30%
25.00%

21.51%

20.00%

15.00% 13.99%
12.72%

10.00% 8.60% 8.84%


8.56%
8.40% 8.13% PROGRAMADO
6.40% EJECUTADO
5.60%
5.00% 3.29%

1.18%
1.02%
0.00%
mar-22

abr-22

may-22

jun-22

jul-22

ago-22

sep-22

oct-22

nov-22

dic-22
9.1. GRAFICO DE AVANCE FISICO VS AVANCE FINACIERO

OBRA"AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION -
DEPARTAMENTO DE CUSCO"

DIAGRAMA DE AVANCE FINANCIERO PROGRAMADO-EJECUTADO


OBRA"AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION -
DEPARTAMENTO DE CUSCO"

COSTO DIRECTO DE OBRA: S/. 1,491,337.80 CORRESPONDE AL MES: August-2022


TOTAL PRESUPUESTADO: S/. 1,809,517.41 PRESENTACION: 2-Oct-22

PROGRAMADO REPROGRAMADO EJECUTADO


ITEM PERIODO (S/.) PORCENTAJE (S/.) PORCENTAJE (S/.) PORCENTAJE
MENSUAL ACUMULADO MENSUAL ACUMULADO MENSUAL ACUMULADO MENSUAL ACUMULADO MENSUAL ACUMULADO MENSUAL ACUMULADO
0 INICIO 51,546.55 51,546.55 2.85% 2.85% 51,546.55 51,546.55 2.85% 2.85%
1 Mar-22 42,842.74 94,389.29 2.37% 5.22% 16,513.10 68,059.65 0.91% 3.76%
2 Apr-22 343,581.55 437,970.84 18.99% 24.20% 261,892.60 329,952.25 14.47% 18.23%
3 May-22 196,512.85 634,483.69 10.86% 35.06% 233,122.57 563,074.82 12.88% 31.12%
4 Jun-22 300,914.31 935,398.00 16.63% 51.69% 231,519.30 794,594.12 12.79% 43.91%
5 Jul-22 127,679.95 1,063,077.96 7.06% 58.75% 258,255.62 1,052,849.74 14.27% 58.18%
6 Aug-22 330,039.40 1,393,117.35 18.24% 76.99%
7 Sep-22 156,314.25 1,549,431.60 8.64% 85.63%
8 Oct-22 104,740.05 1,654,171.65 5.79% 91.42%
9 Nov-22 104,740.05 1,758,911.70 5.79% 97.20%
10 Dec-22 50,605.70 1,809,517.40 2.80% 100.00%

TOTAL: 1,809,517.40 1,809,517.40 100.00% 100.00% 0.00 0.00% 1,052,849.74 1,052,849.74 58.18% 58.18%

AVANCE FINANCIERO ACUMULADO


120.00% (PROGRAMADO Vs. EJECUTADO)

100.00%
100.00% 97.20%
91.42%
85.63%

76.99%
80.00%

58.75%
60.00%
51.69%

35.06%
40.00% 43.91%
24.20%
31.12%
20.00%
5.22% PROGRAMADO
2.85% 18.23%
EJECUTADO
2.85%
3.76%
0.00%
INICIO

mar-22

abr-22

may-22

jun-22

jul-22

ago-22

sep-22

oct-22

nov-22

dic-22

AVANCE FINANCIERO MENSUAL


(PROGRAMADO Vs. EJECUTADO)

25.00%

18.99% 20.00%
18.24%
16.63%

14.47%
14.27% 15.00%
12.88% 12.79%
EJECUTADO
PROGRAMADO 10.86%

8.64% 10.00%
7.06%
5.79% 5.79%
5.00%
2.85% 2.85% 2.80%
2.37%
0.91%
0.00%
INICIO

mar-22

abr-22

may-22

jun-22

jul-22

ago-22

sep-22

oct-22

nov-22

dic-22
9.2. RESUMEN DE VALORIZACIONES
"AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA
OBRA
CONVENCION - DEPARTAMENTO DE CUSCO"
ENTIDAD MUNICIPALIDAD DISTRITAL DE MARANURA LUGAR MARANURA
U. EJECUTORA SUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL DIV. FUNC. 040
RESIDENTE DE OBRA ING. Jorge Luis Valencia Cordova PROGRAMA 0083
INSPECTOR DE OBRA ING. Edgar Viamonte Calla GRUPO FUNC. 0089
FECHA August-2022 FUNCIÓN 18
CODIGO UNIFICADO 2350362
ANTERIOR ACTUAL ACUMULADO  SALDO
VALORIZACION PRESUPUESTO
VALORIZADO S/. % VALORIZADO S/. % VALORIZADO S/. % VALORIZADO S/. %
COSTO DIRECTO
PROGRAMADO S/. 1,491,337.80 S/. 203,382.40 13.64% S/. 121,288.03 8.13% S/. 324,670.43 21.77% S/. 1,166,667.37 78.23%
PARTIDA NUEVA
MAYORES METRADOS
TOTAL ACUMULADO AL COSTO DIRECTO S/. 1,491,337.80 S/. 203,382.40 13.64% S/. 121,288.03 8.13% S/. 324,670.43 21.77% S/. 1,166,667.37 78.23%
* Valorizacion al costo directo según presupuesto "Aprobado"

COSTO DIRECTO S/. 1,491,337.80 S/ 203,382.40 S/. 121,288.03 S/. 324,670.43 S/. 1,166,667.37
GASTOS GENERALES 14.84% S/. 221,334.80 S/. 30,184.71 13.64% S/. 18,000.79 8.13% S/. 48,185.50 21.77% S/. 173,149.30 78.23%
GASTOS DE SUPERVISIÓN 3.94% S/. 58,726.08 S/. 8,008.82 13.64% S/. 4,776.09 8.13% S/. 12,784.91 21.77% S/. 45,941.17 78.23%
ELABORACIÓN DE EXPEDIENTE TÉCNICO 1.58% S/. 23,511.91 S/. 3,206.46 13.64% S/. 1,912.18 8.13% S/. 5,118.64 21.77% S/. 18,393.27 78.23%
LIQUIDACIÓN DE OBRA 0.98% S/. 14,606.82 S/. 1,992.02 13.64% S/. 1,187.95 8.13% S/. 3,179.97 21.77% S/. 11,426.85 78.23%
SUB TOTAL COSTO INDIRECTO S/. 318,179.61 S/. 43,392.01 13.64% S/. 25,877.01 8.13% S/. 69,269.02 21.77% S/. 248,910.59 78.23%
TOTAL CD+CI: S/. 1,809,517.41 S/. 246,774.41 13.64% S/. 147,165.04 8.13% S/. 393,939.45 21.77% S/. 1,415,577.96 78.23%
9. VALORIZACIÓNES DE AVANCE DE OBRA
9.3. VALORIZACIÓN PROGRAMADA
OBRA "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO" LUGAR MARANURA
ENTIDAD MUNICIPALIDAD DISTRITAL DE MARANURA DIV. FUNC. 040
U. EJECUTORSUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL PROGRAMA 0083
RESIDENTE DING. Jorge Luis Valencia Cordova GRUPO FUNC. 0089
INSPECTOR DING. Edgar Viamonte Calla FUNCIÓN 18
FECHA August-2022 CODIGO UNIFICADO 2350362
PRESUPUESTO BASE AVANCE
METRADO COSTOS
MES ANTERIOR EN EL MES ACUMULADO SALDO
ITEMS DESCRIPCION PARTIDA
U.M. CANT P.U. PARCIAL METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ %
1 COMPONENTE 1: ADECUADO SISTEMA DE ABASTECIMENTO DE AGUA
526,005.44

1.1 TRABAJOS PRELIMINARES 47,083.31


1.1.1 CARTEL DE OBRA (3.60X2.40M) und 3.00 659.57 1,978.71 - 0.00% - - 0.00% - - 0.00% 3.00 1,978.71 100.00%
1.1.2 TRANSPORTE DE MATERIALES A OBRA CON MAQUINARIA COMPONENTE 1 gbl 1.00 6,134.73 6,134.73 0.14 858.86 14.00% - - 0.00% 0.14 858.86 14.00% 0.86 5,275.87 86.00%
1.1.3 TRANSPORTE MANUAL DE MATERIALES DE PIE DE CARRETERA gbl 1.00 36,569.87 36,569.87 0.24 8,776.77 24.00% - - 0.00% 0.24 8,776.77 24.00% 0.76 27,793.10 76.00%
1.1.4 COMPONENTE 1
ALQUILER DE ALMACEN DE OBRA Y OFICINA mes 8.00 300.00 2,400.00 1.00 300.00 12.50% 1.00 300.00 12.50% 2.00 600.00 25.00% 6.00 1,800.00 75.00%
1.2 CAPTACIÓN SUPERFICIAL INSIENSUYOC 25,918.32
1.2.1 ESTRUCTURA Y ACABADOS 23,588.94
1.2.1.1 TRAZO, NIVELES Y REPLANTEO m² 37.86 1.62 61.33 37.86 61.33 100.00% - - 0.00% 37.86 61.33 100.00% - - 0.00%
1.2.1.2 LIMPIEZA MANUAL DE TERRENO m² 37.86 1.34 50.73 37.86 50.73 100.00% - - 0.00% 37.86 50.73 100.00% - - 0.00%
1.2.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 29.93 21.37 639.60 29.93 639.60 100.00% - - 0.00% 29.93 639.60 100.00% - - 0.00%
1.2.1.4 PERFILADO Y COMPACTADO MANUAL m² 30.30 1.49 45.15 30.30 45.15 100.00% - - 0.00% 30.30 45.15 100.00% - - 0.00%
1.2.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 29.93 17.81 533.05 29.93 533.05 100.00% - - 0.00% 29.93 533.05 100.00% - - 0.00%
1.2.1.6 ENCOFRADO Y DESENCOFRADO m² 64.32 40.29 2,591.45 - - 0.00% 64.32 2,591.45 100.00% 64.32 2,591.45 100.00% - - 0.00%
1.2.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 595.38 7.64 4,548.70 - - 0.00% 595.38 4,548.70 100.00% 595.38 4,548.70 100.00% - - 0.00%
1.2.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 25.12 265.80 6,676.90 1.76 467.81 7.01% 1.76 467.81 7.01% 3.52 935.62 14.01% 21.60 5,741.28 85.99%
1.2.1.9 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 2.23 371.80 829.11 - - 0.00% - - 0.00% - - 0.00% 2.23 829.11 100.00%
1.2.1.10 CONCRETO F´C=210KG/CM2 (MEZCLA MANUAL) m³ 8.33 458.30 3,817.64 - - 0.00% - - 0.00% - - 0.00% 8.33 3,817.64 100.00%
1.2.1.11 CURADO DE CONCRETO m² 91.74 0.50 45.87 - - 0.00% - - 0.00% - - 0.00% 91.74 45.87 100.00%
1.2.1.12 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 51.01 56.20 2,866.76 - - 0.00% - - 0.00% - - 0.00% 51.01 2,866.76 100.00%
1.2.1.13 TARRAJEO EN MUROS E=1.5 CM m² 25.96 18.94 491.68 - - 0.00% - - 0.00% - - 0.00% 25.96 491.68 100.00%
1.2.1.14 PINTADO DE ESTRUCTURAS HIDRAULICAS m² 25.96 6.55 170.04 - - 0.00% - - 0.00% - - 0.00% 25.96 170.04 100.00%
1.2.1.15 EMBOQUILLADO DE PIEDRA Y CONCRETO F´C=140 KG/CM2 (MEZCLA m³ 1.27 173.96 220.93 - - 0.00% 1.27 220.93 100.00% 1.27 220.93 100.00% - - 0.00%
1.2.2 MANUAL)
TUBERÍA Y ACCESORIOS 1,394.54
1.2.2.1 COMPUERTA METÁLICA DE 0.50X0.90M und 1.00 151.07 151.07 - - 0.00% - - 0.00% - - 0.00% 1.00 151.07 100.00%
1.2.2.2 REJILLA METÁLICA DE 0.20X0.10 M und 1.00 28.58 28.58 - - 0.00% - - 0.00% - - 0.00% 1.00 28.58 100.00%
1.2.2.3 ACCESORIOS CAPTACIÓN INSIENSUYOC gbl 1.00 960.45 960.45 - - 0.00% - - 0.00% - - 0.00% 1.00 960.45 100.00%
1.2.2.4 TAPA METÁLICA DE 0.80X0.80 INCL. ACCESORIOS und 2.00 127.22 254.44 - - 0.00% - - 0.00% - - 0.00% 2.00 254.44 100.00%
1.2.3 CERCO PERIMÉTRICO DE PROTECCIÓN 934.84
1.2.3.1 POSTES DE TUBO F°G° DE 2" CON GANCHOS und 7.00 90.00 630.00 - - 0.00% - - 0.00% - - 0.00% 7.00 630.00 100.00%
1.2.3.2 ALAMBRE DE PUES PARA CERCO PERIMÉTRICO m 150.00 0.84 126.00 - - 0.00% - - 0.00% - - 0.00% 150.00 126.00 100.00%
1.2.3.3 PUERTA METÁLICA DE ACCESO und 1.00 178.84 178.84 - - 0.00% - - 0.00% - - 0.00% 1.00 178.84 100.00%
1.3 CAPTACIÓN DE LADERA HUERTO DEL EDEN 6,667.46
1.3.1 ESTRUCTURA Y ACABADOS 5,340.12
1.3.1.1 TRAZO, NIVELES Y REPLANTEO m² 13.34 1.62 21.61 - - 0.00% - - 0.00% - - 0.00% 13.34 21.61 100.00%
1.3.1.2 LIMPIEZA MANUAL DE TERRENO m² 13.34 1.34 17.88 - - 0.00% - - 0.00% - - 0.00% 13.34 17.88 100.00%
1.3.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 12.01 21.37 256.65 - - 0.00% - - 0.00% - - 0.00% 12.01 256.65 100.00%
1.3.1.4 PERFILADO Y COMPACTADO MANUAL m² 13.34 1.49 19.88 - - 0.00% - - 0.00% - - 0.00% 13.34 19.88 100.00%
1.3.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 12.01 17.81 213.90 - - 0.00% - - 0.00% - - 0.00% 12.01 213.90 100.00%
1.3.1.6 ENCOFRADO Y DESENCOFRADO m² 25.78 40.29 1,038.68 - - 0.00% - - 0.00% - - 0.00% 25.78 1,038.68 100.00%
1.3.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 87.29 7.64 666.90 - - 0.00% - - 0.00% - - 0.00% 87.29 666.90 100.00%
1.3.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 2.33 265.80 619.31 - - 0.00% - - 0.00% - - 0.00% 2.33 619.31 100.00%
1.3.1.9 CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL)+30% PIEDRA MEDIANA m³ 1.40 238.58 334.01 - - 0.00% - - 0.00% - - 0.00% 1.40 334.01 100.00%
1.3.1.10 CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 1.26 294.44 370.99 - - 0.00% - - 0.00% - - 0.00% 1.26 370.99 100.00%
1.3.1.11 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 1.31 371.80 487.06 - - 0.00% - - 0.00% - - 0.00% 1.31 487.06 100.00%

F-9.3(24/57)
9. VALORIZACIÓNES DE AVANCE DE OBRA
9.3. VALORIZACIÓN PROGRAMADA
OBRA "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO" LUGAR MARANURA
ENTIDAD MUNICIPALIDAD DISTRITAL DE MARANURA DIV. FUNC. 040
U. EJECUTORSUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL PROGRAMA 0083
RESIDENTE DING. Jorge Luis Valencia Cordova GRUPO FUNC. 0089
INSPECTOR DING. Edgar Viamonte Calla FUNCIÓN 18
FECHA August-2022 CODIGO UNIFICADO 2350362
PRESUPUESTO BASE AVANCE
METRADO COSTOS
MES ANTERIOR EN EL MES ACUMULADO SALDO
ITEMS DESCRIPCION PARTIDA
U.M. CANT P.U. PARCIAL METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ %
1.3.1.12 CURADO DE CONCRETO m² 31.12 0.50 15.56 - - 0.00% - - 0.00% - - 0.00% 31.12 15.56 100.00%
1.3.1.13 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 12.35 56.20 694.07 - - 0.00% - - 0.00% - - 0.00% 12.35 694.07 100.00%
1.3.1.14 TARRAJEO EN MUROS E=1.5 CM m² 14.79 18.94 280.12 - - 0.00% - - 0.00% - - 0.00% 14.79 280.12 100.00%
1.3.1.15 PINTADO DE ESTRUCTURAS HIDRAULICAS m² 13.25 6.55 86.79 - - 0.00% - - 0.00% - - 0.00% 13.25 86.79 100.00%
1.3.1.16 EMBOQUILLADO DE PIEDRA Y CONCRETO F´C=140 KG/CM2 (MEZCLA m³ 0.05 173.96 8.70 - - 0.00% - - 0.00% - - 0.00% 0.05 8.70 100.00%
1.3.1.17 MANUAL)
RELLENO DE ZONA DE INFILTRACIÓN CON GRAVA m³ 2.38 87.40 208.01 - - 0.00% - - 0.00% - - 0.00% 2.38 208.01 100.00%
1.3.2 TUBERÍA Y ACCESORIOS 572.50
1.3.2.1 TAPA METÁLICA DE 0.60X0.60 INCL ACCESORIOS und 2.00 96.21 192.42 - - 0.00% - - 0.00% - - 0.00% 2.00 192.42 100.00%
1.3.2.2 ACCESORIOS CAPTACIÓN HUERTO DEL EDEN gbl 1.00 380.08 380.08 - - 0.00% - - 0.00% - - 0.00% 1.00 380.08 100.00%
1.3.3 CERCO PERIMÉTRICO DE PROTECCIÓN 754.84
1.3.3.1 POSTES DE TUBO F°G° DE 2" CON GANCHOS und 5.00 90.00 450.00 - - 0.00% - - 0.00% - - 0.00% 5.00 450.00 100.00%
1.3.3.2 ALAMBRE DE PUES PARA CERCO PERIMÉTRICO m 150.00 0.84 126.00 - - 0.00% - - 0.00% - - 0.00% 150.00 126.00 100.00%
1.3.3.3 PUERTA METÁLICA DE ACCESO und 1.00 178.84 178.84 - - 0.00% - - 0.00% - - 0.00% 1.00 178.84 100.00%
1.4 CAPTACIÓN SUPERFICIAL ROCOTOCHAYOC 21,579.81
1.4.1 ESTRUCTURA Y ACABADOS 19,343.83
1.4.1.1 TRAZO, NIVELES Y REPLANTEO m² 26.19 1.62 42.43 - - 0.00% - - 0.00% - - 0.00% 26.19 42.43 100.00%
1.4.1.2 LIMPIEZA MANUAL DE TERRENO m² 26.19 1.34 35.09 - - 0.00% - - 0.00% - - 0.00% 26.19 35.09 100.00%
1.4.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 21.55 21.37 460.52 - - 0.00% - - 0.00% - - 0.00% 21.55 460.52 100.00%
1.4.1.4 PERFILADO Y COMPACTADO MANUAL m² 26.19 1.49 39.02 - - 0.00% - - 0.00% - - 0.00% 26.19 39.02 100.00%
1.4.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 21.55 17.81 383.81 - - 0.00% - - 0.00% - - 0.00% 21.55 383.81 100.00%
1.4.1.6 ENCOFRADO Y DESENCOFRADO m² 61.08 40.29 2,460.91 - - 0.00% - - 0.00% - - 0.00% 61.08 2,460.91 100.00%
1.4.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 513.34 7.64 3,921.92 - - 0.00% - - 0.00% - - 0.00% 513.34 3,921.92 100.00%
1.4.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 18.49 265.80 4,914.64 - - 0.00% - - 0.00% - - 0.00% 18.49 4,914.64 100.00%
1.4.1.9 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 2.23 371.80 829.11 - - 0.00% - - 0.00% - - 0.00% 2.23 829.11 100.00%
1.4.1.10 CONCRETO F´C=210KG/CM2 (MEZCLA MANUAL) m³ 6.61 458.30 3,029.36 - - 0.00% - - 0.00% - - 0.00% 6.61 3,029.36 100.00%
1.4.1.11 CURADO DE CONCRETO m² 80.94 0.50 40.47 - - 0.00% - - 0.00% - - 0.00% 80.94 40.47 100.00%
1.4.1.12 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 42.14 56.20 2,368.27 - - 0.00% - - 0.00% - - 0.00% 42.14 2,368.27 100.00%
1.4.1.13 TARRAJEO EN MUROS E=1.5 CM m² 25.96 18.94 491.68 - - 0.00% - - 0.00% - - 0.00% 25.96 491.68 100.00%
1.4.1.14 PINTADO DE ESTRUCTURAS HIDRAULICAS m² 25.96 6.55 170.04 - - 0.00% - - 0.00% - - 0.00% 25.96 170.04 100.00%
1.4.1.15 EMBOQUILLADO DE PIEDRA Y CONCRETO F´C=140 KG/CM2 (MEZCLA m³ 0.90 173.96 156.56 - - 0.00% - - 0.00% - - 0.00% 0.90 156.56 100.00%
1.4.2 MANUAL)
TUBERÍA Y ACCESORIOS 1,301.14
1.4.2.1 COMPUERTA METÁLICA DE 0.50X0.90M und 1.00 151.07 151.07 - - 0.00% - - 0.00% - - 0.00% 1.00 151.07 100.00%
1.4.2.2 REJILLA METÁLICA DE 0.20X0.10 M und 1.00 28.58 28.58 - - 0.00% - - 0.00% - - 0.00% 1.00 28.58 100.00%
1.4.2.3 ACCESORIOS CAPTACIÓN ROCOTOCHAYOC gbl 1.00 867.05 867.05 - - 0.00% - - 0.00% - - 0.00% 1.00 867.05 100.00%
1.4.2.4 TAPA METÁLICA DE 0.80X0.80 INCL. ACCESORIOS und 2.00 127.22 254.44 - - 0.00% - - 0.00% - - 0.00% 2.00 254.44 100.00%
1.4.3 CERCO PERIMÉTRICO DE PROTECCIÓN 934.84
1.4.3.1 POSTES DE TUBO F°G° DE 2" CON GANCHOS und 7.00 90.00 630.00 - - 0.00% - - 0.00% - - 0.00% 7.00 630.00 100.00%
1.4.3.2 ALAMBRE DE PUES PARA CERCO PERIMÉTRICO m 150.00 0.84 126.00 - - 0.00% - - 0.00% - - 0.00% 150.00 126.00 100.00%
1.4.3.3 PUERTA METÁLICA DE ACCESO und 1.00 178.84 178.84 - - 0.00% - - 0.00% - - 0.00% 1.00 178.84 100.00%
1.5 DESARENADOR 7,050.88
1.5.1 ESTRUCTURA Y ACABADOS 4,111.28
1.5.1.1 TRAZO, NIVELES Y REPLANTEO m² 8.67 1.62 14.05 - - 0.00% - - 0.00% - - 0.00% 8.67 14.05 100.00%
1.5.1.2 LIMPIEZA MANUAL DE TERRENO m² 8.67 1.34 11.62 - - 0.00% - - 0.00% - - 0.00% 8.67 11.62 100.00%
1.5.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 7.80 21.37 166.69 - - 0.00% - - 0.00% - - 0.00% 7.80 166.69 100.00%
1.5.1.4 PERFILADO Y COMPACTADO MANUAL m² 8.67 1.49 12.92 - - 0.00% - - 0.00% - - 0.00% 8.67 12.92 100.00%
1.5.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 7.80 17.81 138.92 - - 0.00% - - 0.00% - - 0.00% 7.80 138.92 100.00%
1.5.1.6 ENCOFRADO Y DESENCOFRADO m² 17.62 40.29 709.91 - - 0.00% - - 0.00% - - 0.00% 17.62 709.91 100.00%

F-9.3(25/57)
9. VALORIZACIÓNES DE AVANCE DE OBRA
9.3. VALORIZACIÓN PROGRAMADA
OBRA "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO" LUGAR MARANURA
ENTIDAD MUNICIPALIDAD DISTRITAL DE MARANURA DIV. FUNC. 040
U. EJECUTORSUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL PROGRAMA 0083
RESIDENTE DING. Jorge Luis Valencia Cordova GRUPO FUNC. 0089
INSPECTOR DING. Edgar Viamonte Calla FUNCIÓN 18
FECHA August-2022 CODIGO UNIFICADO 2350362
PRESUPUESTO BASE AVANCE
METRADO COSTOS
MES ANTERIOR EN EL MES ACUMULADO SALDO
ITEMS DESCRIPCION PARTIDA
U.M. CANT P.U. PARCIAL METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ %
1.5.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 150.05 7.64 1,146.38 - - 0.00% - - 0.00% - - 0.00% 150.05 1,146.38 100.00%
1.5.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 0.42 265.80 111.64 - - 0.00% - - 0.00% - - 0.00% 0.42 111.64 100.00%
1.5.1.9 CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 0.04 294.44 11.78 - - 0.00% - - 0.00% - - 0.00% 0.04 11.78 100.00%
1.5.1.10 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 1.73 371.80 643.21 - - 0.00% - - 0.00% - - 0.00% 1.73 643.21 100.00%
1.5.1.11 CURADO DE CONCRETO m² 25.55 0.50 12.78 - - 0.00% - - 0.00% - - 0.00% 25.55 12.78 100.00%
1.5.1.12 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 14.48 56.20 813.78 - - 0.00% - - 0.00% - - 0.00% 14.48 813.78 100.00%
1.5.1.13 TARRAJEO EN MUROS E=1.5 CM m² 9.73 18.94 184.29 - - 0.00% - - 0.00% - - 0.00% 9.73 184.29 100.00%
1.5.1.14 PINTADO DE ESTRUCTURAS HIDRAULICAS m² 9.73 6.55 63.73 - - 0.00% - - 0.00% - - 0.00% 9.73 63.73 100.00%
1.5.1.15 EMBOQUILLADO DE PIEDRA Y CONCRETO F´C=140 KG/CM2 (MEZCLA m³ 0.40 173.96 69.58 - - 0.00% - - 0.00% - - 0.00% 0.40 69.58 100.00%
1.5.2 MANUAL)
TUBERÍA Y ACCESORIOS 1,429.92
1.5.2.1 TAPA METÁLICA DE 0.40X0.40 INCL ACCESORIOS und 2.00 75.57 151.14 - - 0.00% - - 0.00% - - 0.00% 2.00 151.14 100.00%
1.5.2.2 ACCESORIOS TIPICOS PARA DESARENADORES gbl 1.00 1,094.70 1,094.70 - - 0.00% - - 0.00% - - 0.00% 1.00 1,094.70 100.00%
1.5.2.3 BRIDA ROMPE AGUA DE F°G° 1" INCL. ACCESORIOS und 2.00 48.77 97.54 - - 0.00% - - 0.00% - - 0.00% 2.00 97.54 100.00%
1.5.2.4 BRIDA ROMPE AGUA DE F°G° 3/4" INCL. ACCESORIOS und 2.00 43.27 86.54 - - 0.00% - - 0.00% - - 0.00% 2.00 86.54 100.00%
1.5.3 CERCO PERIMÉTRICO DE PROTECCIÓN 1,509.68
1.5.3.1 POSTES DE TUBO F°G° DE 2" CON GANCHOS und 10.00 90.00 900.00 - - 0.00% - - 0.00% - - 0.00% 10.00 900.00 100.00%
1.5.3.2 ALAMBRE DE PUES PARA CERCO PERIMÉTRICO m 300.00 0.84 252.00 - - 0.00% - - 0.00% - - 0.00% 300.00 252.00 100.00%
1.5.3.3 PUERTA METÁLICA DE ACCESO und 2.00 178.84 357.68 - - 0.00% - - 0.00% - - 0.00% 2.00 357.68 100.00%
1.6 FILTRO LENTO DE ARENA 15,749.53
1.6.1 ESTRUCTURA Y ACABADOS 13,959.38
1.6.1.1 TRAZO, NIVELES Y REPLANTEO m² 15.48 1.62 25.08 - - 0.00% 15.48 25.08 100.00% 15.48 25.08 100.00% - - 0.00%
1.6.1.2 LIMPIEZA MANUAL DE TERRENO m² 15.48 1.34 20.74 - - 0.00% 15.48 20.74 100.00% 15.48 20.74 100.00% - - 0.00%
1.6.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 18.58 21.37 397.05 - - 0.00% 18.58 397.05 100.00% 18.58 397.05 100.00% - - 0.00%
1.6.1.4 PERFILADO Y COMPACTADO MANUAL m² 15.48 1.49 23.07 - - 0.00% 15.48 23.07 100.00% 15.48 23.07 100.00% - - 0.00%
1.6.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 18.58 17.81 330.91 - - 0.00% 18.58 330.91 100.00% 18.58 330.91 100.00% - - 0.00%
1.6.1.6 ENCOFRADO Y DESENCOFRADO m² 80.61 40.29 3,247.78 - - 0.00% 80.61 3,247.78 100.00% 80.61 3,247.78 100.00% - - 0.00%
1.6.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 395.25 7.64 3,019.71 - - 0.00% - - 0.00% - - 0.00% 395.25 3,019.71 100.00%
1.6.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 0.48 265.80 127.58 - - 0.00% 0.48 127.58 100.00% 0.48 127.58 100.00% - - 0.00%
1.6.1.9 CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 0.04 294.44 11.78 - - 0.00% - - 0.00% - - 0.00% 0.04 11.78 100.00%
1.6.1.10 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 1.58 371.80 587.44 - - 0.00% - - 0.00% - - 0.00% 1.58 587.44 100.00%
1.6.1.11 CONCRETO F´C=210KG/CM2 (MEZCLA MANUAL) m³ 4.15 458.30 1,901.95 - - 0.00% - - 0.00% - - 0.00% 4.15 1,901.95 100.00%
1.6.1.12 CURADO DE CONCRETO m² 85.53 0.50 42.77 - - 0.00% - - 0.00% - - 0.00% 85.53 42.77 100.00%
1.6.1.13 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 43.60 56.20 2,450.32 - - 0.00% - - 0.00% - - 0.00% 43.60 2,450.32 100.00%
1.6.1.14 TARRAJEO EN MUROS E=1.5 CM m² 35.67 18.94 675.59 - - 0.00% - - 0.00% - - 0.00% 35.67 675.59 100.00%
1.6.1.15 PINTADO DE ESTRUCTURAS HIDRAULICAS m² 35.67 6.55 233.64 - - 0.00% - - 0.00% - - 0.00% 35.67 233.64 100.00%
1.6.1.16 EMBOQUILLADO DE PIEDRA Y CONCRETO F´C=140 KG/CM2 (MEZCLA m³ 0.30 173.96 52.19 - - 0.00% - - 0.00% - - 0.00% 0.30 52.19 100.00%
1.6.1.17 MANUAL)
COLOCADO DE SOPORTE BASE CON LADRILLO TIPO KING KONG m² 6.36 34.22 217.64 - - 0.00% - - 0.00% - - 0.00% 6.36 217.64 100.00%
1.6.1.18 RELLENO DE ZONA DE INFILTRACIÓN CON GRAVA m³ 1.59 87.40 138.97 - - 0.00% - - 0.00% - - 0.00% 1.59 138.97 100.00%
1.6.1.19 RELLENO DE ZONA DE INFILTRACIÓN CON ARENA GRUESA LAVADA m³ 5.08 89.60 455.17 - - 0.00% - - 0.00% - - 0.00% 5.08 455.17 100.00%
1.6.2 TUBERÍA Y ACCESORIOS 1,790.15
1.6.2.1 TAPA METÁLICA DE 0.60X0.60 INCL ACCESORIOS und 1.00 96.21 96.21 - - 0.00% - - 0.00% - - 0.00% 1.00 96.21 100.00%
1.6.2.2 COMPUERTA METÁLICA DE 0.20X0.35 und 2.00 84.40 168.80 - - 0.00% - - 0.00% - - 0.00% 2.00 168.80 100.00%
1.6.2.3 ACCESORIOS PARA FILTRO LENTO gbl 1.00 1,525.14 1,525.14 - - 0.00% - - 0.00% - - 0.00% 1.00 1,525.14 100.00%
1.7 LINEA DE CONDUCCIÓN 71,000.04
1.7.1 TRAZO, NIVELES Y REPLANTEO m² 1,201.16 1.62 1,945.88 - - 0.00% 20.00 32.40 1.67% 20.00 32.40 1.67% 1,181.16 1,913.48 98.33%
1.7.2 LIMPIEZA MANUAL DE TERRENO m² 1,201.16 1.34 1,609.55 - - 0.00% 20.00 26.80 1.67% 20.00 26.80 1.67% 1,181.16 1,582.75 98.33%
1.7.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 720.70 21.37 15,401.36 - - 0.00% 12.00 256.44 1.67% 12.00 256.44 1.67% 708.70 15,144.92 98.33%

F-9.3(26/57)
9. VALORIZACIÓNES DE AVANCE DE OBRA
9.3. VALORIZACIÓN PROGRAMADA
OBRA "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO" LUGAR MARANURA
ENTIDAD MUNICIPALIDAD DISTRITAL DE MARANURA DIV. FUNC. 040
U. EJECUTORSUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL PROGRAMA 0083
RESIDENTE DING. Jorge Luis Valencia Cordova GRUPO FUNC. 0089
INSPECTOR DING. Edgar Viamonte Calla FUNCIÓN 18
FECHA August-2022 CODIGO UNIFICADO 2350362
PRESUPUESTO BASE AVANCE
METRADO COSTOS
MES ANTERIOR EN EL MES ACUMULADO SALDO
ITEMS DESCRIPCION PARTIDA
U.M. CANT P.U. PARCIAL METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ %
1.7.4 PERFILADO Y COMPACTADO MANUAL m² 1,201.16 1.49 1,789.73 - - 0.00% 20.00 29.80 1.67% 20.00 29.80 1.67% 1,181.16 1,759.93 98.33%
1.7.5 CAMA DE APOYO CON MATERIAL PROPIO SELECCIONADO E=0.10 m m² 1,201.16 3.38 4,059.92 - - 0.00% - - 0.00% - - 0.00% 1,201.16 4,059.92 100.00%
1.7.6 TUBO PVC NTP 399.002 DN 30 MM C-15 m 839.92 13.88 11,658.09 - - 0.00% - - 0.00% - - 0.00% 839.92 11,658.09 100.00%
1.7.7 TUBO PVC NTP 399.002 DN 30 MM C-10 m 319.33 12.59 4,020.36 - - 0.00% - - 0.00% - - 0.00% 319.33 4,020.36 100.00%
1.7.8 TUBO PVC NTP 399.002 DN 26.5 MM C-15 m 571.96 10.99 6,285.84 - - 0.00% - - 0.00% - - 0.00% 571.96 6,285.84 100.00%
1.7.9 TUBO PVC NTP 399.002 DN 26.5 MM C-10 m 1,271.69 10.49 13,340.03 500.00 5,245.00 39.32% 50.00 524.50 3.93% 550.00 5,769.50 43.25% 721.69 7,570.53 56.75%
1.7.10 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO EN CAPAS DE m³ 660.64 14.54 9,605.71 92.40 1,343.50 13.99% 11.00 159.94 1.67% 103.40 1,503.44 15.65% 557.24 8,102.27 84.35%
1.7.11 E=0.20M
ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 72.07 17.81 1,283.57 - - 0.00% - - 0.00% - - 0.00% 72.07 1,283.57 100.00%
1.8 CAMARA DE REUNIÓN 6,767.63
1.8.1 ESTRUCTURA Y ACABADOS 3,800.87
1.8.1.1 TRAZO, NIVELES Y REPLANTEO m² 5.04 1.62 8.16 - - 0.00% - - 0.00% - - 0.00% 5.04 8.16 100.00%
1.8.1.2 LIMPIEZA MANUAL DE TERRENO m² 5.04 1.34 6.75 - - 0.00% - - 0.00% - - 0.00% 5.04 6.75 100.00%
1.8.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 1.01 21.37 21.58 - - 0.00% - - 0.00% - - 0.00% 1.01 21.58 100.00%
1.8.1.4 PERFILADO Y COMPACTADO MANUAL m² 5.04 1.49 7.51 - - 0.00% - - 0.00% - - 0.00% 5.04 7.51 100.00%
1.8.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 1.01 17.81 17.99 - - 0.00% - - 0.00% - - 0.00% 1.01 17.99 100.00%
1.8.1.6 ENCOFRADO Y DESENCOFRADO m² 22.84 40.29 920.22 - - 0.00% - - 0.00% - - 0.00% 22.84 920.22 100.00%
1.8.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 121.92 7.64 931.47 - - 0.00% - - 0.00% - - 0.00% 121.92 931.47 100.00%
1.8.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 0.25 265.80 66.45 - - 0.00% - - 0.00% - - 0.00% 0.25 66.45 100.00%
1.8.1.9 CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 0.02 294.44 5.89 - - 0.00% - - 0.00% - - 0.00% 0.02 5.89 100.00%
1.8.1.10 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 1.77 371.80 658.09 - - 0.00% - - 0.00% - - 0.00% 1.77 658.09 100.00%
1.8.1.11 CURADO DE CONCRETO m² 29.12 0.50 14.56 - - 0.00% - - 0.00% - - 0.00% 29.12 14.56 100.00%
1.8.1.12 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 12.72 56.20 714.86 - - 0.00% - - 0.00% - - 0.00% 12.72 714.86 100.00%
1.8.1.13 TARRAJEO EN MUROS E=1.5 CM m² 15.40 18.94 291.68 - - 0.00% - - 0.00% - - 0.00% 15.40 291.68 100.00%
1.8.1.14 PINTADO DE ESTRUCTURAS HIDRAULICAS m² 15.40 6.55 100.87 - - 0.00% - - 0.00% - - 0.00% 15.40 100.87 100.00%
1.8.1.15 EMBOQUILLADO DE PIEDRA Y CONCRETO F´C=140 KG/CM2 (MEZCLA m³ 0.20 173.96 34.79 - - 0.00% - - 0.00% - - 0.00% 0.20 34.79 100.00%
1.8.2 MANUAL)
TUBERÍA Y ACCESORIOS 2,966.76
1.8.2.1 TAPA METÁLICA DE 0.60X0.60 INCL ACCESORIOS und 2.00 96.21 192.42 - - 0.00% - - 0.00% - - 0.00% 2.00 192.42 100.00%
1.8.2.2 TAPA METÁLICA DE 0.80X0.80 INCL. ACCESORIOS und 2.00 127.22 254.44 - - 0.00% - - 0.00% - - 0.00% 2.00 254.44 100.00%
1.8.2.3 ACCESORIOS CAMARA DE REUNIÓN INSIENSUYOC gbl 1.00 973.22 973.22 - - 0.00% - - 0.00% - - 0.00% 1.00 973.22 100.00%
1.8.2.4 ACCESORIOS CAMARA DE REUNIO SISTEMA PIÑALPATA gbl 1.00 1,118.88 1,118.88 - - 0.00% - - 0.00% - - 0.00% 1.00 1,118.88 100.00%
1.8.2.5 TUBO DE VENTILACIÓN DE F°G° DE 2" und 2.00 213.90 427.80 - - 0.00% - - 0.00% - - 0.00% 2.00 427.80 100.00%
1.9 CAMARA ROMPE PRESIÓN TIPO 6 6,989.32
1.9.1 ESTRUCTURA Y ACABADOS 5,252.57
1.9.1.1 TRAZO, NIVELES Y REPLANTEO m² 6.60 1.62 10.69 - - 0.00% 2.20 3.56 33.30% 2.20 3.56 33.30% 4.40 7.13 66.70%
1.9.1.2 LIMPIEZA MANUAL DE TERRENO m² 6.60 1.34 8.84 - - 0.00% 2.20 2.95 33.37% 2.20 2.95 33.37% 4.40 5.90 66.74%
1.9.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 2.94 21.37 62.83 - - 0.00% 1.68 35.90 57.14% 1.68 35.90 57.14% 1.26 26.93 42.86%
1.9.1.4 PERFILADO Y COMPACTADO MANUAL m² 6.03 1.49 8.98 - - 0.00% 0.54 0.80 8.91% 0.54 0.80 8.91% 5.49 8.18 91.09%
1.9.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 2.94 17.81 52.36 - - 0.00% 0.84 14.96 28.57% 0.84 14.96 28.57% 2.10 37.40 71.43%
1.9.1.6 ENCOFRADO Y DESENCOFRADO m² 37.80 40.29 1,522.96 - - 0.00% - - 0.00% - - 0.00% 37.80 1,522.96 100.00%
1.9.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 107.18 7.64 818.86 - - 0.00% - - 0.00% - - 0.00% 107.18 818.86 100.00%
1.9.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 0.30 265.80 79.74 - - 0.00% - - 0.00% - - 0.00% 0.30 79.74 100.00%
1.9.1.9 CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 0.04 294.44 11.78 - - 0.00% - - 0.00% - - 0.00% 0.04 11.78 100.00%
1.9.1.10 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 3.36 371.80 1,249.25 - - 0.00% - - 0.00% - - 0.00% 3.36 1,249.25 100.00%
1.9.1.11 CURADO DE CONCRETO m² 44.31 0.50 22.16 - - 0.00% - - 0.00% - - 0.00% 44.31 22.16 100.00%
1.9.1.12 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 13.32 56.20 748.58 - - 0.00% - - 0.00% - - 0.00% 13.32 748.58 100.00%
1.9.1.13 TARRAJEO EN MUROS E=1.5 CM m² 23.67 18.94 448.31 - - 0.00% - - 0.00% - - 0.00% 23.67 448.31 100.00%
1.9.1.14 PINTADO DE ESTRUCTURAS HIDRAULICAS m² 23.67 6.55 155.04 - - 0.00% - - 0.00% - - 0.00% 23.67 155.04 100.00%

F-9.3(27/57)
9. VALORIZACIÓNES DE AVANCE DE OBRA
9.3. VALORIZACIÓN PROGRAMADA
OBRA "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO" LUGAR MARANURA
ENTIDAD MUNICIPALIDAD DISTRITAL DE MARANURA DIV. FUNC. 040
U. EJECUTORSUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL PROGRAMA 0083
RESIDENTE DING. Jorge Luis Valencia Cordova GRUPO FUNC. 0089
INSPECTOR DING. Edgar Viamonte Calla FUNCIÓN 18
FECHA August-2022 CODIGO UNIFICADO 2350362
PRESUPUESTO BASE AVANCE
METRADO COSTOS
MES ANTERIOR EN EL MES ACUMULADO SALDO
ITEMS DESCRIPCION PARTIDA
U.M. CANT P.U. PARCIAL METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ %
1.9.1.15 EMBOQUILLADO DE PIEDRA Y CONCRETO F´C=140 KG/CM2 (MEZCLA m³ 0.30 173.96 52.19 - - 0.00% - - 0.00% - - 0.00% 0.30 52.19 100.00%
1.9.2 MANUAL)
TUBERÍA Y ACCESORIOS 1,736.75
1.9.2.1 VÁLVULA COMPUERTA DE 3/4" INCL. ACCESORIOS und 2.00 97.43 194.86 - - 0.00% - - 0.00% - - 0.00% 2.00 194.86 100.00%
1.9.2.2 CANASTILLA PVC DE 3/4" INCL. ACCESORIOS und 2.00 23.33 46.66 - - 0.00% - - 0.00% - - 0.00% 2.00 46.66 100.00%
1.9.2.3 VÁLVULA COMPUERTA DE 1" INCL. ACCESORIOS und 1.00 125.97 125.97 - - 0.00% - - 0.00% - - 0.00% 1.00 125.97 100.00%
1.9.2.4 CANASTILLA PVC DE 1" INCL. ACCESORIOS und 1.00 39.81 39.81 - - 0.00% - - 0.00% - - 0.00% 1.00 39.81 100.00%
1.9.2.5 TUBERÍA DE LIMPIA Y REBOSE DE 2" und 3.00 146.25 438.75 - - 0.00% - - 0.00% - - 0.00% 3.00 438.75 100.00%
1.9.2.6 TUBO DE VENTILACIÓN DE F°G° DE 2" und 3.00 213.90 641.70 - - 0.00% - - 0.00% - - 0.00% 3.00 641.70 100.00%
1.9.2.7 TAPA METÁLICA DE 0.60X0.60 INCL ACCESORIOS und 1.00 96.21 96.21 - - 0.00% - - 0.00% - - 0.00% 1.00 96.21 100.00%
1.9.2.8 TAPA METÁLICA DE 0.50X0.40 INCL ACCESORIOS und 1.00 152.79 152.79 - - 0.00% - - 0.00% - - 0.00% 1.00 152.79 100.00%
1.10 RESERVORIO 5 M3 17,328.35
1.10.1 ESTRUCTURA Y ACABADOS 13,607.09
1.10.1.1 TRAZO, NIVELES Y REPLANTEO m² 19.60 1.62 31.75 - - 0.00% - - 0.00% - - 0.00% 19.60 31.75 100.00%
1.10.1.2 LIMPIEZA MANUAL DE TERRENO m² 19.60 1.34 26.26 - - 0.00% - - 0.00% - - 0.00% 19.60 26.26 100.00%
1.10.1.3 CORTE MANUAL EN TERRENO NORMAL m³ 5.53 21.37 118.18 - - 0.00% - - 0.00% - - 0.00% 5.53 118.18 100.00%
1.10.1.4 PERFILADO Y COMPACTADO MANUAL m² 21.17 1.49 31.54 - - 0.00% - - 0.00% - - 0.00% 21.17 31.54 100.00%
1.10.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 5.53 17.81 98.49 - - 0.00% - - 0.00% - - 0.00% 5.53 98.49 100.00%
1.10.1.6 ENCOFRADO Y DESENCOFRADO m² 55.39 40.29 2,231.66 29.70 1,196.61 53.62% - - 0.00% 29.70 1,196.61 53.62% 25.69 1,035.05 46.38%
1.10.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 492.58 7.64 3,763.31 94.22 719.84 19.13% - - 0.00% 94.22 719.84 19.13% 398.36 3,043.47 80.87%
1.10.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 0.49 265.80 130.24 - - 0.00% - - 0.00% - - 0.00% 0.49 130.24 100.00%
1.10.1.9 EMPEDRADO E=12.5CM m² 12.00 13.95 167.40 - - 0.00% - - 0.00% - - 0.00% 12.00 167.40 100.00%
1.10.1.10 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 2.08 371.80 773.34 - - 0.00% - - 0.00% - - 0.00% 2.08 773.34 100.00%
1.10.1.11 CONCRETO F´C=280 KG/CM2 (MEZCLA MANUAL) C/IMPERMEABILIZANTE m³ 5.20 813.92 4,232.38 5.20 4,232.38 100.00% - - 0.00% 5.20 4,232.38 100.00% - - 0.00%
1.10.1.12 CURADO DE CONCRETO m² 55.66 0.50 27.83 29.70 14.85 53.36% - - 0.00% 29.70 14.85 53.36% 25.96 12.98 46.64%
1.10.1.13 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 18.27 56.20 1,026.77 18.27 1,026.77 100.00% - - 0.00% 18.27 1,026.77 100.00% - - 0.00%
1.10.1.14 TARRAJEO EN MUROS E=1.5 CM m² 37.79 18.94 715.74 37.79 715.74 100.00% - - 0.00% 37.79 715.74 100.00% - - 0.00%
1.10.1.15 PINTADO DE ESTRUCTURAS HIDRAULICAS m² 35.45 6.55 232.20 - - 0.00% - - 0.00% - - 0.00% 35.45 232.20 100.00%
1.10.2 TUBERÍA Y ACCESORIOS 2,556.02
1.10.2.1 ACCESORIOS DE CAJA DE VÁLVULAS PARA RESERVORIO DE 5 M3 gbl 1.00 1,932.29 1,932.29 - - 0.00% - - 0.00% - - 0.00% 1.00 1,932.29 100.00%
1.10.2.2 TUBO DE VENTILACIÓN DE F°G° DE 2" und 1.00 213.90 213.90 - - 0.00% - - 0.00% - - 0.00% 1.00 213.90 100.00%
1.10.2.3 SISTEMA DE CLORACIÓN DE 60 LITROS und 1.00 217.41 217.41 - - 0.00% - - 0.00% - - 0.00% 1.00 217.41 100.00%
1.10.2.4 TAPA METÁLICA DE 0.60X0.60 INCL ACCESORIOS und 2.00 96.21 192.42 - - 0.00% - - 0.00% - - 0.00% 2.00 192.42 100.00%
1.10.3 CERCO PERIMÉTRICO DE PROTECCIÓN 1,165.24
1.10.3.1 POSTES DE TUBO F°G° DE 2" CON GANCHOS und 9.00 90.00 810.00 - - 0.00% - - 0.00% - - 0.00% 9.00 810.00 100.00%
1.10.3.2 ALAMBRE DE PUES PARA CERCO PERIMÉTRICO m 210.00 0.84 176.40 - - 0.00% - - 0.00% - - 0.00% 210.00 176.40 100.00%
1.10.3.3 PUERTA METÁLICA DE ACCESO und 1.00 178.84 178.84 - - 0.00% - - 0.00% - - 0.00% 1.00 178.84 100.00%
1.11 RESERVORIO 2.5 M3 12,871.67
1.11.1 ESTRUCTURA Y ACABADOS 9,384.30
1.11.1.1 TRAZO, NIVELES Y REPLANTEO m² 11.36 1.62 18.40 - - 0.00% - - 0.00% - - 0.00% 11.36 18.40 100.00%
1.11.1.2 LIMPIEZA MANUAL DE TERRENO m² 11.36 1.34 15.22 - - 0.00% - - 0.00% - - 0.00% 11.36 15.22 100.00%
1.11.1.3 CORTE MANUAL EN TERRENO NORMAL m³ 3.58 21.37 76.50 - - 0.00% - - 0.00% - - 0.00% 3.58 76.50 100.00%
1.11.1.4 PERFILADO Y COMPACTADO MANUAL m² 13.44 1.49 20.03 13.44 20.03 100.00% - - 0.00% 13.44 20.03 100.00% - - 0.00%
1.11.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 3.58 17.81 63.76 3.58 63.76 100.00% - - 0.00% 3.58 63.76 100.00% - - 0.00%
1.11.1.6 ENCOFRADO Y DESENCOFRADO m² 40.80 40.29 1,643.83 21.12 850.92 51.76% - - 0.00% 21.12 850.92 51.76% 19.68 792.91 48.24%
1.11.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 328.04 7.64 2,506.23 220.14 1,681.87 67.11% - - 0.00% 220.14 1,681.87 67.11% 107.90 824.36 32.89%
1.11.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 0.29 265.80 77.08 0.29 77.08 100.00% - - 0.00% 0.29 77.08 100.00% - - 0.00%
1.11.1.9 EMPEDRADO E=12.5CM m² 7.59 13.95 105.88 7.59 105.88 100.00% - - 0.00% 7.59 105.88 100.00% - - 0.00%

F-9.3(28/57)
9. VALORIZACIÓNES DE AVANCE DE OBRA
9.3. VALORIZACIÓN PROGRAMADA
OBRA "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO" LUGAR MARANURA
ENTIDAD MUNICIPALIDAD DISTRITAL DE MARANURA DIV. FUNC. 040
U. EJECUTORSUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL PROGRAMA 0083
RESIDENTE DING. Jorge Luis Valencia Cordova GRUPO FUNC. 0089
INSPECTOR DING. Edgar Viamonte Calla FUNCIÓN 18
FECHA August-2022 CODIGO UNIFICADO 2350362
PRESUPUESTO BASE AVANCE
METRADO COSTOS
MES ANTERIOR EN EL MES ACUMULADO SALDO
ITEMS DESCRIPCION PARTIDA
U.M. CANT P.U. PARCIAL METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ %
1.11.1.10 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 1.54 371.80 572.57 - - 0.00% - - 0.00% - - 0.00% 1.54 572.57 100.00%
1.11.1.11 CONCRETO F´C=280 KG/CM2 (MEZCLA MANUAL) C/IMPERMEABILIZANTE m³ 3.50 813.92 2,848.72 3.50 2,848.72 100.00% - - 0.00% 3.50 2,848.72 100.00% - - 0.00%
1.11.1.12 CURADO DE CONCRETO m² 40.80 0.50 20.40 21.12 10.56 51.76% - - 0.00% 21.12 10.56 51.76% 19.68 9.84 48.24%
1.11.1.13 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 11.67 56.20 655.85 11.67 655.85 100.00% - - 0.00% 11.67 655.85 100.00% - - 0.00%
1.11.1.14 TARRAJEO EN MUROS E=1.5 CM m² 30.41 18.94 575.97 30.41 575.97 100.00% - - 0.00% 30.41 575.97 100.00% - - 0.00%
1.11.1.15 PINTADO DE ESTRUCTURAS HIDRAULICAS m² 28.07 6.55 183.86 - - 0.00% - - 0.00% - - 0.00% 28.07 183.86 100.00%
1.11.2 TUBERÍA Y ACCESORIOS 2,462.53
1.11.2.1 ACCESORIOS DE CAJA DE VÁLVULAS PARA RESERVORIO DE 2.5 M3 gbl 1.00 1,844.80 1,844.80 - - 0.00% - - 0.00% - - 0.00% 1.00 1,844.80 100.00%
1.11.2.2 TUBO DE VENTILACIÓN DE F°G° DE 2" und 1.00 213.90 213.90 - - 0.00% - - 0.00% - - 0.00% 1.00 213.90 100.00%
1.11.2.3 SISTEMA DE CLORACIÓN DE 30 LITROS und 1.00 211.41 211.41 - - 0.00% - - 0.00% - - 0.00% 1.00 211.41 100.00%
1.11.2.4 TAPA METÁLICA DE 0.60X0.60 INCL ACCESORIOS und 2.00 96.21 192.42 - - 0.00% - - 0.00% - - 0.00% 2.00 192.42 100.00%
1.11.3 CERCO PERIMÉTRICO DE PROTECCIÓN 1,024.84
1.11.3.1 POSTES DE TUBO F°G° DE 2" CON GANCHOS und 8.00 90.00 720.00 - - 0.00% - - 0.00% - - 0.00% 8.00 720.00 100.00%
1.11.3.2 ALAMBRE DE PUES PARA CERCO PERIMÉTRICO m 150.00 0.84 126.00 - - 0.00% - - 0.00% - - 0.00% 150.00 126.00 100.00%
1.11.3.3 PUERTA METÁLICA DE ACCESO und 1.00 178.84 178.84 - - 0.00% - - 0.00% - - 0.00% 1.00 178.84 100.00%
1.12 TANQUE DE POLIETILENO 11,039.53
1.12.1 ESTRUCTURA Y ACABADOS 10,351.89
1.12.1.1 TRAZO, NIVELES Y REPLANTEO m² 11.25 1.62 18.23 - - 0.00% - - 0.00% - - 0.00% 11.25 18.23 100.00%
1.12.1.2 LIMPIEZA MANUAL DE TERRENO m² 11.25 1.34 15.08 - - 0.00% - - 0.00% - - 0.00% 11.25 15.08 100.00%
1.12.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 1.13 21.37 24.15 - - 0.00% - - 0.00% - - 0.00% 1.13 24.15 100.00%
1.12.1.4 PERFILADO Y COMPACTADO MANUAL m² 11.25 1.49 16.76 - - 0.00% - - 0.00% - - 0.00% 11.25 16.76 100.00%
1.12.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 1.13 17.81 20.13 - - 0.00% - - 0.00% - - 0.00% 1.13 20.13 100.00%
1.12.1.6 ENCOFRADO Y DESENCOFRADO m² 6.00 40.29 241.74 - - 0.00% - - 0.00% - - 0.00% 6.00 241.74 100.00%
1.12.1.7 EMPEDRADO E=12.5CM m² 11.25 13.95 156.94 - - 0.00% - - 0.00% - - 0.00% 11.25 156.94 100.00%
1.12.1.8 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 1.13 371.80 420.13 - - 0.00% - - 0.00% - - 0.00% 1.13 420.13 100.00%
1.12.1.9 CURADO DE CONCRETO m² 11.25 0.50 5.63 - - 0.00% - - 0.00% - - 0.00% 11.25 5.63 100.00%
1.12.1.10 TANQUE DE POLIETILENO DE 600 LT INCL. ACCESORIOS und 3.00 568.54 1,705.62 - - 0.00% - - 0.00% - - 0.00% 3.00 1,705.62 100.00%
1.12.1.11 TANQUE DE POLIETILENO DE 1100 LT INCL. ACCESORIOS und 1.00 918.54 918.54 - - 0.00% - - 0.00% - - 0.00% 1.00 918.54 100.00%
1.12.1.12 TANQUE DE POLIETILENO DE 1500 LT INCL. ACCESORIOS und 1.00 1,283.54 1,283.54 - - 0.00% - - 0.00% - - 0.00% 1.00 1,283.54 100.00%
1.12.1.13 COBERTURA DE TANQUES DE POLIETILENO und 5.00 1,105.08 5,525.40 - - 0.00% - - 0.00% - - 0.00% 5.00 5,525.40 100.00%
1.12.2 CERCO PERIMÉTRICO DE PROTECCIÓN 687.64
1.12.2.1 POSTES DE TUBO F°G° DE 2" CON GANCHOS und 5.00 90.00 450.00 - - 0.00% - - 0.00% - - 0.00% 5.00 450.00 100.00%
1.12.2.2 ALAMBRE DE PUES PARA CERCO PERIMÉTRICO m 70.00 0.84 58.80 - - 0.00% - - 0.00% - - 0.00% 70.00 58.80 100.00%
1.12.2.3 PUERTA METÁLICA DE ACCESO und 1.00 178.84 178.84 - - 0.00% - - 0.00% - - 0.00% 1.00 178.84 100.00%
1.13 LINEA DE ADUCCIÓN 107,577.36
1.13.1 TRAZO, NIVELES Y REPLANTEO m² 2,127.19 1.62 3,446.05 58.00 93.96 2.73% 24.00 38.88 1.13% 82.00 132.84 3.85% 2,045.19 3,313.21 96.15%
1.13.2 LIMPIEZA MANUAL DE TERRENO m² 2,127.19 1.34 2,850.43 58.00 77.72 2.73% 24.00 32.16 1.13% 82.00 109.88 3.85% 2,045.19 2,740.55 96.15%
1.13.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 1,276.32 21.37 27,274.96 34.80 743.68 2.73% 14.40 307.73 1.13% 49.20 1,051.40 3.85% 1,227.12 26,223.55 96.15%
1.13.4 PERFILADO Y COMPACTADO MANUAL m² 2,127.19 1.49 3,169.51 58.00 86.42 2.73% 344.00 512.56 16.17% 402.00 598.98 18.90% 1,725.19 2,570.53 81.10%
1.13.5 CAMA DE APOYO CON MATERIAL PROPIO SELECCIONADO E=0.10 m m² 2,127.19 3.38 7,189.90 58.00 196.04 2.73% 280.00 946.40 13.16% 338.00 1,142.44 15.89% 1,789.19 6,047.46 84.11%
1.13.6 TUBO PVC NTP 399.002 DN 30 MM C-10 m 201.32 12.59 2,534.62 - - 0.00% 38.00 478.42 18.88% 38.00 478.42 18.88% 163.32 2,056.20 81.12%
1.13.7 TUBO PVC NTP 399.002 DN 26.5 MM C-10 m 1,841.64 10.49 19,318.80 - - 0.00% 680.00 7,133.20 36.92% 680.00 7,133.20 36.92% 1,161.64 12,185.60 63.08%
1.13.8 TUBO PVC NTP 399.002 DN 21 MM C-15 und 674.11 8.08 5,446.81 - - 0.00% - - 0.00% - - 0.00% 674.11 5,446.81 100.00%
1.13.9 TUBO PVC NTP 399.002 DN 21 MM C-10 m 2,600.91 6.56 17,061.97 180.00 1,180.80 6.92% 115.00 754.40 4.42% 295.00 1,935.20 11.34% 2,305.91 15,126.77 88.66%
1.13.10 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO EN CAPAS DE m³ 1,169.96 14.54 17,011.22 350.24 5,092.49 29.94% 154.00 2,239.16 13.16% 504.24 7,331.65 43.10% 665.72 9,679.57 56.90%
1.13.11 E=0.20M
ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 127.63 17.81 2,273.09 100.00 1,781.00 78.35% - - 0.00% 100.00 1,781.00 78.35% 27.63 492.09 21.65%
1.14 CAMARA DE DISTRIBUCIÓN DE CAUDALES 19,249.52

F-9.3(29/57)
9. VALORIZACIÓNES DE AVANCE DE OBRA
9.3. VALORIZACIÓN PROGRAMADA
OBRA "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO" LUGAR MARANURA
ENTIDAD MUNICIPALIDAD DISTRITAL DE MARANURA DIV. FUNC. 040
U. EJECUTORSUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL PROGRAMA 0083
RESIDENTE DING. Jorge Luis Valencia Cordova GRUPO FUNC. 0089
INSPECTOR DING. Edgar Viamonte Calla FUNCIÓN 18
FECHA August-2022 CODIGO UNIFICADO 2350362
PRESUPUESTO BASE AVANCE
METRADO COSTOS
MES ANTERIOR EN EL MES ACUMULADO SALDO
ITEMS DESCRIPCION PARTIDA
U.M. CANT P.U. PARCIAL METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ %
1.14.1 ESTRUCTURA Y ACABADOS 11,232.00
1.14.1.1 TRAZO, NIVELES Y REPLANTEO m² 17.28 1.62 27.99 - - 0.00% - - 0.00% - - 0.00% 17.28 27.99 100.00%
1.14.1.2 LIMPIEZA MANUAL DE TERRENO m² 17.28 1.34 23.16 - - 0.00% - - 0.00% - - 0.00% 17.28 23.16 100.00%
1.14.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 4.51 21.37 96.38 - - 0.00% - - 0.00% - - 0.00% 4.51 96.38 100.00%
1.14.1.4 PERFILADO Y COMPACTADO MANUAL m² 17.28 1.49 25.75 - - 0.00% - - 0.00% - - 0.00% 17.28 25.75 100.00%
1.14.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 4.51 17.81 80.32 - - 0.00% - - 0.00% - - 0.00% 4.51 80.32 100.00%
1.14.1.6 ENCOFRADO Y DESENCOFRADO m² 71.22 40.29 2,869.45 - - 0.00% - - 0.00% - - 0.00% 71.22 2,869.45 100.00%
1.14.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 360.35 7.64 2,753.07 - - 0.00% - - 0.00% - - 0.00% 360.35 2,753.07 100.00%
1.14.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 0.76 265.80 202.01 - - 0.00% - - 0.00% - - 0.00% 0.76 202.01 100.00%
1.14.1.9 CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 0.07 294.44 20.61 - - 0.00% - - 0.00% - - 0.00% 0.07 20.61 100.00%
1.14.1.10 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 5.33 371.80 1,981.69 - - 0.00% - - 0.00% - - 0.00% 5.33 1,981.69 100.00%
1.14.1.11 CURADO DE CONCRETO m² 89.70 0.50 44.85 - - 0.00% - - 0.00% - - 0.00% 89.70 44.85 100.00%
1.14.1.12 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 26.10 56.20 1,466.82 - - 0.00% - - 0.00% - - 0.00% 26.10 1,466.82 100.00%
1.14.1.13 TARRAJEO EN MUROS E=1.5 CM m² 60.24 18.94 1,140.95 - - 0.00% - - 0.00% - - 0.00% 60.24 1,140.95 100.00%
1.14.1.14 PINTADO DE ESTRUCTURAS HIDRAULICAS m² 60.24 6.55 394.57 - - 0.00% - - 0.00% - - 0.00% 60.24 394.57 100.00%
1.14.1.15 EMBOQUILLADO DE PIEDRA Y CONCRETO F´C=140 KG/CM2 (MEZCLA m³ 0.60 173.96 104.38 - - 0.00% - - 0.00% - - 0.00% 0.60 104.38 100.00%
1.14.2 MANUAL)
TUBERÍA Y ACCESORIOS 8,017.52
1.14.2.1 TAPA METÁLICA DE 0.60X0.60 INCL ACCESORIOS und 12.00 96.21 1,154.52 - - 0.00% - - 0.00% - - 0.00% 12.00 1,154.52 100.00%
1.14.2.2 ACCESORIOS CAMARA DE DISTRIBUCIÓN DE CAUDALES TIPO gbl 2.00 1,480.56 2,961.12 - - 0.00% - - 0.00% - - 0.00% 2.00 2,961.12 100.00%
1.14.2.3 ACCESORIOS CAMARA DE DISTRIBUCIÓN DE CAUDALES LUYCHO ALTO gbl 1.00 2,618.48 2,618.48 - - 0.00% - - 0.00% - - 0.00% 1.00 2,618.48 100.00%
1.14.2.4 TUBO DE VENTILACIÓN DE F°G° DE 2" und 6.00 213.90 1,283.40 - - 0.00% - - 0.00% - - 0.00% 6.00 1,283.40 100.00%
1.15 CAMARA ROMPE PRESIÓN TIPO 7 62,224.90
1.15.1 ESTRUCTURA Y ACABADOS 36,719.68
1.15.1.1 TRAZO, NIVELES Y REPLANTEO m² 50.40 1.62 81.65 - - 0.00% - - 0.00% - - 0.00% 50.40 81.65 100.00%
1.15.1.2 LIMPIEZA MANUAL DE TERRENO m² 50.40 1.34 67.54 - - 0.00% - - 0.00% - - 0.00% 50.40 67.54 100.00%
1.15.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 35.28 21.37 753.93 - - 0.00% - - 0.00% - - 0.00% 35.28 753.93 100.00%
1.15.1.4 PERFILADO Y COMPACTADO MANUAL m² 50.40 1.49 75.10 - - 0.00% - - 0.00% - - 0.00% 50.40 75.10 100.00%
1.15.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 35.28 17.81 628.34 - - 0.00% - - 0.00% - - 0.00% 35.28 628.34 100.00%
1.15.1.6 ENCOFRADO Y DESENCOFRADO m² 253.60 40.29 10,217.54 - - 0.00% - - 0.00% - - 0.00% 253.60 10,217.54 100.00%
1.15.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 1,121.72 7.64 8,569.94 - - 0.00% - - 0.00% - - 0.00% 1,121.72 8,569.94 100.00%
1.15.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 2.64 265.80 701.71 - - 0.00% - - 0.00% - - 0.00% 2.64 701.71 100.00%
1.15.1.9 CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 0.26 294.44 76.55 - - 0.00% - - 0.00% - - 0.00% 0.26 76.55 100.00%
1.15.1.10 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 16.80 371.80 6,246.24 - - 0.00% - - 0.00% - - 0.00% 16.80 6,246.24 100.00%
1.15.1.11 CURADO DE CONCRETO m² 306.40 0.50 153.20 - - 0.00% - - 0.00% - - 0.00% 306.40 153.20 100.00%
1.15.1.12 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 84.00 56.20 4,720.80 - - 0.00% - - 0.00% - - 0.00% 84.00 4,720.80 100.00%
1.15.1.13 TARRAJEO EN MUROS E=1.5 CM m² 173.60 18.94 3,287.98 - - 0.00% - - 0.00% - - 0.00% 173.60 3,287.98 100.00%
1.15.1.14 PINTADO DE ESTRUCTURAS HIDRAULICAS m² 120.80 6.55 791.24 - - 0.00% - - 0.00% - - 0.00% 120.80 791.24 100.00%
1.15.1.15 EMBOQUILLADO DE PIEDRA Y CONCRETO F´C=140 KG/CM2 (MEZCLA m³ 2.00 173.96 347.92 - - 0.00% - - 0.00% - - 0.00% 2.00 347.92 100.00%
1.15.2 MANUAL)
TUBERÍA Y ACCESORIOS 25,505.22
1.15.2.1 TAPA METÁLICA DE 0.60X0.60 INCL ACCESORIOS und 20.00 96.21 1,924.20 - - 0.00% - - 0.00% - - 0.00% 20.00 1,924.20 100.00%
1.15.2.2 TAPA METÁLICA DE 0.80X0.80 INCL. ACCESORIOS und 20.00 127.22 2,544.40 - - 0.00% - - 0.00% - - 0.00% 20.00 2,544.40 100.00%
1.15.2.3 ACCESORIOS DE DIAMETRO DE 3/4" PARA CAMARA ROMPE PRESION TIPO und 4.00 923.05 3,692.20 - - 0.00% - - 0.00% - - 0.00% 4.00 3,692.20 100.00%
1.15.2.4 7ACCESORIOS DE DIAMETRO DE 1/2" PARA CAMARA ROMPE PRESION TIPO und 16.00 815.02 13,040.32 - - 0.00% - - 0.00% - - 0.00% 16.00 13,040.32 100.00%
1.15.2.5 7REDUCCIÓN PVC DE 3/4" A 1/2" und 6.00 4.35 26.10 - - 0.00% - - 0.00% - - 0.00% 6.00 26.10 100.00%
1.15.2.6 TUBO DE VENTILACIÓN DE F°G° DE 2" und 20.00 213.90 4,278.00 - - 0.00% - - 0.00% - - 0.00% 20.00 4,278.00 100.00%
1.16 LINEA DE DISTRIBUCIÓN 46,809.58
1.16.1 TRAZO, NIVELES Y REPLANTEO m² 1,302.58 1.62 2,110.18 420.00 680.40 32.24% 136.00 220.32 10.44% 556.00 900.72 42.68% 746.58 1,209.46 57.32%

F-9.3(30/57)
9. VALORIZACIÓNES DE AVANCE DE OBRA
9.3. VALORIZACIÓN PROGRAMADA
OBRA "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO" LUGAR MARANURA
ENTIDAD MUNICIPALIDAD DISTRITAL DE MARANURA DIV. FUNC. 040
U. EJECUTORSUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL PROGRAMA 0083
RESIDENTE DING. Jorge Luis Valencia Cordova GRUPO FUNC. 0089
INSPECTOR DING. Edgar Viamonte Calla FUNCIÓN 18
FECHA August-2022 CODIGO UNIFICADO 2350362
PRESUPUESTO BASE AVANCE
METRADO COSTOS
MES ANTERIOR EN EL MES ACUMULADO SALDO
ITEMS DESCRIPCION PARTIDA
U.M. CANT P.U. PARCIAL METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ %
1.16.2 LIMPIEZA MANUAL DE TERRENO m² 1,302.58 1.34 1,745.46 420.00 562.80 32.24% 136.00 182.24 10.44% 556.00 745.04 42.68% 746.58 1,000.42 57.32%
1.16.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 781.55 21.37 16,701.72 25.20 538.52 3.22% 81.60 1,743.79 10.44% 106.80 2,282.32 13.67% 674.75 14,419.41 86.33%
1.16.4 PERFILADO Y COMPACTADO MANUAL m² 1,302.58 1.49 1,940.84 42.00 62.58 3.22% 236.00 351.64 18.12% 278.00 414.22 21.34% 1,024.58 1,526.62 78.66%
1.16.5 CAMA DE APOYO CON MATERIAL PROPIO SELECCIONADO E=0.10 m m² 1,302.58 3.38 4,402.72 42.00 141.96 3.22% 230.00 777.40 17.66% 272.00 919.36 20.88% 1,030.58 3,483.36 79.12%
1.16.6 TUBO PVC NTP 399.002 DN 21 MM C-10 m 1,302.58 6.56 8,544.92 18.00 118.08 1.38% 524.00 3,437.44 40.23% 542.00 3,555.52 41.61% 760.58 4,989.40 58.39%
1.16.7 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO EN CAPAS DE m³ 781.55 14.54 11,363.74 10.80 157.03 1.38% 134.40 1,954.18 17.20% 145.20 2,111.21 18.58% 636.35 9,252.53 81.42%
1.17 E=0.20M
VÁVULAS DE CONTROL, PURGA Y PURGA DE AIRE 13,280.65
1.17.1 ESTRUCTURA Y ACABADOS 4,712.98
1.17.1.1 TRAZO, NIVELES Y REPLANTEO m² 18.36 1.62 29.74 - - 0.00% - - 0.00% - - 0.00% 18.36 29.74 100.00%
1.17.1.2 LIMPIEZA MANUAL DE TERRENO m² 18.36 1.34 24.60 - - 0.00% - - 0.00% - - 0.00% 18.36 24.60 100.00%
1.17.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 7.34 21.37 156.86 - - 0.00% - - 0.00% - - 0.00% 7.34 156.86 100.00%
1.17.1.4 PERFILADO Y COMPACTADO MANUAL m² 18.36 1.49 27.36 - - 0.00% - - 0.00% - - 0.00% 18.36 27.36 100.00%
1.17.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 7.34 17.81 130.73 - - 0.00% - - 0.00% - - 0.00% 7.34 130.73 100.00%
1.17.1.6 ENCOFRADO Y DESENCOFRADO m² 81.60 40.29 3,287.66 - - 0.00% - - 0.00% - - 0.00% 81.60 3,287.66 100.00%
1.17.1.7 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 2.71 371.80 1,007.58 - - 0.00% - - 0.00% - - 0.00% 2.71 1,007.58 100.00%
1.17.1.8 CURADO DE CONCRETO m² 96.90 0.50 48.45 - - 0.00% - - 0.00% - - 0.00% 96.90 48.45 100.00%
1.17.2 TUBERÍA Y ACCESORIOS 8,567.67
1.17.2.1 VÁLVULA GLOBO DE 1/2" INCL. ACCESORIOS und 61.00 25.95 1,582.95 - - 0.00% - - 0.00% - - 0.00% 61.00 1,582.95 100.00%
1.17.2.2 VÁLVULA GLOBO DE 3/4" INCL. ACCESORIOS und 27.00 37.25 1,005.75 - - 0.00% - - 0.00% - - 0.00% 27.00 1,005.75 100.00%
1.17.2.3 VÁLVULA GLOBO DE 1" INCL. ACCESORIOS und 8.00 47.57 380.56 - - 0.00% - - 0.00% - - 0.00% 8.00 380.56 100.00%
1.17.2.4 TAPA METÁLICA DE 0.40X0.40 INCL ACCESORIOS und 68.00 75.57 5,138.76 - - 0.00% - - 0.00% - - 0.00% 68.00 5,138.76 100.00%
1.17.2.5 VÁLVULA DE PURGA DE AIRE DE 1" INCL. ACCESORIOS und 1.00 99.11 99.11 - - 0.00% - - 0.00% - - 0.00% 1.00 99.11 100.00%
1.17.2.6 VÁLVULA DE PURGA DE AIRE DE 3/4" INCL. ACCESORIOS und 3.00 79.50 238.50 - - 0.00% - - 0.00% - - 0.00% 3.00 238.50 100.00%
1.17.2.7 VÁLVULA DE PURGA DE AIRE DE 1/2" INCL. ACCESORIOS und 2.00 61.02 122.04 - - 0.00% - - 0.00% - - 0.00% 2.00 122.04 100.00%
1.18 PASE AEREO DE 5 M 4,594.52
1.18.1 OBRAS DE CONCRETO ARMADO 3,521.70
1.18.1.1 TRAZO, NIVELES Y REPLANTEO m² 48.00 1.62 77.76 - - 0.00% - - 0.00% - - 0.00% 48.00 77.76 100.00%
1.18.1.2 LIMPIEZA MANUAL DE TERRENO m² 48.00 1.34 64.32 - - 0.00% - - 0.00% - - 0.00% 48.00 64.32 100.00%
1.18.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 5.28 21.37 112.83 - - 0.00% - - 0.00% - - 0.00% 5.28 112.83 100.00%
1.18.1.4 PERFILADO Y COMPACTADO MANUAL m² 5.96 1.49 8.88 - - 0.00% - - 0.00% - - 0.00% 5.96 8.88 100.00%
1.18.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 2.88 17.81 51.29 - - 0.00% - - 0.00% - - 0.00% 2.88 51.29 100.00%
1.18.1.6 ENCOFRADO Y DESENCOFRADO m² 10.56 40.29 425.46 - - 0.00% - - 0.00% - - 0.00% 10.56 425.46 100.00%
1.18.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 160.06 7.64 1,222.86 - - 0.00% - - 0.00% - - 0.00% 160.06 1,222.86 100.00%
1.18.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 0.20 265.80 53.16 - - 0.00% - - 0.00% - - 0.00% 0.20 53.16 100.00%
1.18.1.9 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 1.08 371.80 401.54 - - 0.00% - - 0.00% - - 0.00% 1.08 401.54 100.00%
1.18.1.10 CONCRETO F´C=210KG/CM2 (MEZCLA MANUAL) m³ 2.39 458.30 1,095.34 - - 0.00% - - 0.00% - - 0.00% 2.39 1,095.34 100.00%
1.18.1.11 CURADO DE CONCRETO m² 16.52 0.50 8.26 - - 0.00% - - 0.00% - - 0.00% 16.52 8.26 100.00%
1.18.2 TUBERÍA Y ACCESORIOS 1,072.82
1.18.2.1 TUBO HDPE NTP-ISO 4427:2008 DN 32 MM INCL ACCESORIOS m 11.05 2.55 28.18 - - 0.00% - - 0.00% - - 0.00% 11.05 28.18 100.00%
1.18.2.2 ENLACE ROSCADO TIPO MACHO HDPE DN 32 MM INCL ACCESORIOS und 2.00 17.09 34.18 - - 0.00% - - 0.00% - - 0.00% 2.00 34.18 100.00%
1.18.2.3 TUBO HDPE NTP-ISO 4427:2008 DN 25 MM INCL ACCESORIOS m 11.05 1.97 21.77 - - 0.00% - - 0.00% - - 0.00% 11.05 21.77 100.00%
1.18.2.4 ENLACE ROSCADO TIPO MACHO HDPE DN 25 MM INCL ACCESORIOS und 2.00 11.67 23.34 - - 0.00% - - 0.00% - - 0.00% 2.00 23.34 100.00%
1.18.2.5 ABRAZADERA DE PLATINA DE 1/8" INCL ACCESORIOS und 10.00 9.71 97.10 - - 0.00% - - 0.00% - - 0.00% 10.00 97.10 100.00%
1.18.2.6 ABRAZADERA DE PLATINA DE 1/2" INCL. ACCESORIOS und 10.00 15.61 156.10 - - 0.00% - - 0.00% - - 0.00% 10.00 156.10 100.00%
1.18.2.7 CABLE TIPO BOA DE 1/2" m 25.70 7.18 184.53 - - 0.00% - - 0.00% - - 0.00% 25.70 184.53 100.00%
1.18.2.8 PÉNDOLAS DE ACERO DE 1/4" SERIE 6x19 TIPO BOA m 7.00 5.35 37.45 - - 0.00% - - 0.00% - - 0.00% 7.00 37.45 100.00%
1.18.2.9 GRAPA GROSBY DE 1/2" und 24.00 7.83 187.92 - - 0.00% - - 0.00% - - 0.00% 24.00 187.92 100.00%

F-9.3(31/57)
9. VALORIZACIÓNES DE AVANCE DE OBRA
9.3. VALORIZACIÓN PROGRAMADA
OBRA "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO" LUGAR MARANURA
ENTIDAD MUNICIPALIDAD DISTRITAL DE MARANURA DIV. FUNC. 040
U. EJECUTORSUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL PROGRAMA 0083
RESIDENTE DING. Jorge Luis Valencia Cordova GRUPO FUNC. 0089
INSPECTOR DING. Edgar Viamonte Calla FUNCIÓN 18
FECHA August-2022 CODIGO UNIFICADO 2350362
PRESUPUESTO BASE AVANCE
METRADO COSTOS
MES ANTERIOR EN EL MES ACUMULADO SALDO
ITEMS DESCRIPCION PARTIDA
U.M. CANT P.U. PARCIAL METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ %
1.18.2.10 TEMPLADOR DE DOS ESPIGAS DE 1/2" CON GUADACABO und 4.00 15.08 60.32 - - 0.00% - - 0.00% - - 0.00% 4.00 60.32 100.00%
1.18.2.11 CARRITO DE DILATACIÓN DE 0.30X0.30 INCL. ACCESORIOS und 4.00 52.28 209.12 - - 0.00% - - 0.00% - - 0.00% 4.00 209.12 100.00%
1.18.2.12 RIEL DE ACERO PARA FIJADO 2"x3"x1/2 m 0.80 41.01 32.81 - - 0.00% - - 0.00% - - 0.00% 0.80 32.81 100.00%
1.19 PASE AREO DE 10 M 6,229.08
1.19.1 OBRAS DE CONCRETO ARMADO 4,756.37
1.19.1.1 TRAZO, NIVELES Y REPLANTEO m² 100.00 1.62 162.00 - - 0.00% - - 0.00% - - 0.00% 100.00 162.00 100.00%
1.19.1.2 LIMPIEZA MANUAL DE TERRENO m² 100.00 1.34 134.00 - - 0.00% - - 0.00% - - 0.00% 100.00 134.00 100.00%
1.19.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 9.61 21.37 205.37 - - 0.00% - - 0.00% - - 0.00% 9.61 205.37 100.00%
1.19.1.4 PERFILADO Y COMPACTADO MANUAL m² 7.69 1.49 11.46 - - 0.00% - - 0.00% - - 0.00% 7.69 11.46 100.00%
1.19.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 5.05 17.81 89.94 - - 0.00% - - 0.00% - - 0.00% 5.05 89.94 100.00%
1.19.1.6 ENCOFRADO Y DESENCOFRADO m² 13.44 40.29 541.50 - - 0.00% - - 0.00% - - 0.00% 13.44 541.50 100.00%
1.19.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 181.69 7.64 1,388.11 - - 0.00% - - 0.00% - - 0.00% 181.69 1,388.11 100.00%
1.19.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 0.24 265.80 63.79 - - 0.00% - - 0.00% - - 0.00% 0.24 63.79 100.00%
1.19.1.9 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 2.17 371.80 806.81 - - 0.00% - - 0.00% - - 0.00% 2.17 806.81 100.00%
1.19.1.10 CONCRETO F´C=210KG/CM2 (MEZCLA MANUAL) m³ 2.93 458.30 1,342.82 - - 0.00% - - 0.00% - - 0.00% 2.93 1,342.82 100.00%
1.19.1.11 CURADO DE CONCRETO m² 21.13 0.50 10.57 - - 0.00% - - 0.00% - - 0.00% 21.13 10.57 100.00%
1.19.2 TUBERÍA Y ACCESORIOS 1,472.71
1.19.2.1 TUBO HDPE NTP-ISO 4427:2008 DN 32 MM INCL INSTALACIÓN m 17.50 3.14 54.95 - - 0.00% - - 0.00% - - 0.00% 17.50 54.95 100.00%
1.19.2.2 ENLACE ROSCADO TIPO MACHO HDPE DN 32 MM INCL ACCESORIOS und 2.00 17.25 34.50 - - 0.00% - - 0.00% - - 0.00% 2.00 34.50 100.00%
1.19.2.3 TUBO HDPE NTP-ISO 4427:2008 DN 25 MM INCL INSTALACIÓN m 17.50 2.56 44.80 - - 0.00% - - 0.00% - - 0.00% 17.50 44.80 100.00%
1.19.2.4 ENLACE ROSCADO TIPO MACHO HDPE DN 25 MM INCL ACCESORIOS und 2.00 12.00 24.00 - - 0.00% - - 0.00% - - 0.00% 2.00 24.00 100.00%
1.19.2.5 ABRAZADERA DE PLATINA DE 1/8" INCL ACCESORIOS und 18.00 9.71 174.78 - - 0.00% - - 0.00% - - 0.00% 18.00 174.78 100.00%
1.19.2.6 ABRAZADERA DE PLATINA DE 1/2" INCL. ACCESORIOS und 18.00 15.61 280.98 - - 0.00% - - 0.00% - - 0.00% 18.00 280.98 100.00%
1.19.2.7 CABLE TIPO BOA DE 1/2" m 40.30 7.18 289.35 - - 0.00% - - 0.00% - - 0.00% 40.30 289.35 100.00%
1.19.2.8 PÉNDOLAS DE ACERO DE 1/4" SERIE 6x19 TIPO BOA m 14.80 5.35 79.18 - - 0.00% - - 0.00% - - 0.00% 14.80 79.18 100.00%
1.19.2.9 GRAPA GROSBY DE 1/2" und 24.00 7.83 187.92 - - 0.00% - - 0.00% - - 0.00% 24.00 187.92 100.00%
1.19.2.10 TEMPLADOR DE DOS ESPIGAS DE 1/2" CON GUADACABO und 4.00 15.08 60.32 - - 0.00% - - 0.00% - - 0.00% 4.00 60.32 100.00%
1.19.2.11 CARRITO DE DILATACIÓN DE 0.30X0.30 INCL. ACCESORIOS und 4.00 52.28 209.12 - - 0.00% - - 0.00% - - 0.00% 4.00 209.12 100.00%
1.19.2.12 RIEL DE ACERO PARA FIJADO 2"x3"x1/2 m 0.80 41.01 32.81 - - 0.00% - - 0.00% - - 0.00% 0.80 32.81 100.00%
1.20 PASE AEREO LINEA DE CONDUCCIÓN LUYCHO ALTO 1,558.79
1.20.1 TUBO HDPE NTP-ISO 4427:2008 DN 63 MM INCL INSTALACIÓN m 166.60 5.71 951.29 - - 0.00% - - 0.00% - - 0.00% 166.60 951.29 100.00%
1.20.2 ENLACE ROSCADO TIPO MACHO HDPE DN 63 MM INCL ACCESORIOS und 10.00 60.75 607.50 - - 0.00% - - 0.00% - - 0.00% 10.00 607.50 100.00%
1.21 CONTROL DE CALIDAD 14,435.19
1.21.1 PRUEBA HIDRÁULICA m 9,623.46 1.50 14,435.19 - - 0.00% - - 0.00% - - 0.00% 9,623.46 14,435.19 100.00%
2 COMPONENTE 2: ADECUADO SISTEMA DE ELIMINACION DE EXCRETAS
856,906.14

2.1 TRABAJOS PRELIMINARES 86,623.85


2.1.1 TRANSPORTE DE MATERIALES A OBRA CON MAQUINARIA COMPONENTE 2 gbl 1.00 12,443.96 12,443.96 0.14 1,742.15 14.00% - - 0.00% 0.14 1,742.15 14.00% 0.86 10,701.81 86.00%
2.1.2 TRANSPORTE MANUAL DE MATERIALES DE PIE DE CARRETERA gbl 1.00 74,179.89 74,179.89 0.26 19,286.77 26.00% - - 0.00% 0.26 19,286.77 26.00% 0.74 54,893.12 74.00%
2.2 COMPONENTE
LETRINAS 2 459,057.68
2.2.1 OBRAS PRELIMINARES 2,908.26
2.2.1.1 LIMPIEZA MANUAL DE TERRENO m² 615.68 1.34 825.01 99.84 133.79 16.22% 83.20 111.49 13.51% 183.04 245.27 29.73% 432.64 579.74 70.27%
2.2.1.2 TRAZO, NIVELES Y REPLANTEO EN LETRINAS m² 532.80 3.91 2,083.25 86.40 337.82 16.22% 72.00 281.52 13.51% 158.40 619.34 29.73% 374.40 1,463.90 70.27%
2.2.2 MOVIMIENTO DE TIERRAS 8,652.06
2.2.2.1 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 199.27 21.37 4,258.40 52.68 1,125.77 26.44% 43.42 927.89 21.79% 96.10 2,053.66 48.23% 103.17 2,204.74 51.77%
2.2.2.2 PERFILADO Y COMPACTADO MANUAL m² 635.85 1.49 947.42 236.41 352.25 37.18% 66.61 99.25 10.48% 303.02 451.50 47.66% 332.83 495.92 52.34%
2.2.2.3 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 193.50 17.81 3,446.24 47.35 843.30 24.47% 49.43 880.35 25.55% 96.78 1,723.65 50.02% 96.72 1,722.58 49.98%

F-9.3(32/57)
9. VALORIZACIÓNES DE AVANCE DE OBRA
9.3. VALORIZACIÓN PROGRAMADA
OBRA "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO" LUGAR MARANURA
ENTIDAD MUNICIPALIDAD DISTRITAL DE MARANURA DIV. FUNC. 040
U. EJECUTORSUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL PROGRAMA 0083
RESIDENTE DING. Jorge Luis Valencia Cordova GRUPO FUNC. 0089
INSPECTOR DING. Edgar Viamonte Calla FUNCIÓN 18
FECHA August-2022 CODIGO UNIFICADO 2350362
PRESUPUESTO BASE AVANCE
METRADO COSTOS
MES ANTERIOR EN EL MES ACUMULADO SALDO
ITEMS DESCRIPCION PARTIDA
U.M. CANT P.U. PARCIAL METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ %
2.2.3 CIMIENTOS Y SOBRECIMIENTOS 41,189.43
2.2.3.1 CIMIENTO CORRIDO C:H 1:10+60%P.G. (MEZCLA MANUAL) m³ 115.44 190.24 21,961.31 20.28 3,858.07 17.57% 10.92 2,077.42 9.46% 31.20 5,935.49 27.03% 84.24 16,025.82 72.97%
2.2.3.2 ENCOFRADO Y DESENCOFRADO m² 307.47 40.29 12,387.97 53.18 2,142.62 17.30% 26.49 1,067.28 8.62% 79.67 3,209.90 25.91% 227.80 9,178.06 74.09%
2.2.3.3 SOBRECIMIENTO C:H 1:6+25%P..M. (MEZCLA MANUAL) m³ 22.31 293.66 6,551.55 3.90 1,145.27 17.48% 2.10 616.69 9.41% 6.00 1,761.96 26.89% 16.31 4,789.59 73.11%
2.2.3.4 CURADO DE CONCRETO m² 577.20 0.50 288.60 91.26 45.63 15.81% 49.14 24.57 8.51% 140.40 70.20 24.32% 436.80 218.40 75.68%
2.2.4 MUROS Y TABIQUES DE ALBAÑILERÍA 53,110.79
2.2.4.1 MURO DE BLOQUETA DE 15X20X40CM m² 1,093.94 48.55 53,110.79 287.58 13,962.01 26.29% 173.90 8,442.85 15.90% 461.48 22,404.85 42.19% 632.46 30,705.93 57.81%
2.2.5 CONCRETO ARMADO 20,778.84
2.2.5.1 ENCOFRADO Y DESENCOFRADO DE VIGUETAS m² 173.16 41.68 7,217.31 35.10 1,462.97 20.27% 49.14 2,048.16 28.38% 84.24 3,511.12 48.65% 88.92 3,706.19 51.35%
2.2.5.2 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 920.86 7.64 7,035.37 186.60 1,425.62 20.26% 261.38 1,996.94 28.38% 447.98 3,422.57 48.65% 472.88 3,612.80 51.35%
2.2.5.3 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 17.32 371.80 6,439.58 3.45 1,282.71 19.92% 4.88 1,814.38 28.18% 8.33 3,097.09 48.09% 8.99 3,342.48 51.91%
2.2.5.4 CURADO DE CONCRETO m² 173.16 0.50 86.58 35.10 17.55 20.27% 49.14 24.57 28.38% 84.24 42.12 48.65% 88.92 44.46 51.35%
2.2.6 PISOS Y PAVIMENTOS 35,192.83
2.2.6.1 EMPEDRADO E=12.5CM m² 431.42 13.95 6,018.31 49.76 694.15 11.53% 100.66 1,404.21 23.33% 150.42 2,098.36 34.87% 281.00 3,919.95 65.13%
2.2.6.2 ENCOFRADO Y DESENCOFRADO m² 28.86 40.29 1,162.77 6.24 251.41 21.62% - - 0.00% 6.24 251.41 21.62% 22.62 911.36 78.38%
2.2.6.3 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 36.68 371.80 13,637.62 4.00 1,487.20 10.91% 8.54 3,175.17 23.28% 12.54 4,662.37 34.19% 24.14 8,975.25 65.81%
2.2.6.4 CURADO DE CONCRETO m² 460.28 0.50 230.14 49.76 24.88 10.81% 106.12 53.06 23.06% 155.88 77.94 33.87% 304.40 152.20 66.13%
2.2.6.5 ENCHAPADO DE PISOS 0.45X0.45M m² 259.00 54.61 14,143.99 7.00 382.27 2.70% 78.32 4,277.06 30.24% 85.32 4,659.33 32.94% 173.68 9,484.66 67.06%
2.2.7 REVOQUES, ENLUCIDOS Y MOLDURAS 60,343.63
2.2.7.1 TARRAJEO EN MUROS E=1.5 CM m² 2,465.42 18.94 46,695.05 1,122.86 21,266.97 45.54% 448.72 8,498.76 18.20% 1,571.58 29,765.73 63.74% 893.84 16,929.33 36.26%
2.2.7.2 DERRAMES A=0.15 M MORTERO 1:5 m 73.26 14.65 1,073.26 22.20 325.23 30.30% 43.99 644.45 60.05% 66.19 969.68 90.35% 7.07 103.58 9.65%
2.2.7.3 ENCHAPADO CON CERÁMICO 0.30X0.40 m² 364.08 34.54 12,575.32 9.84 339.87 2.70% 135.43 4,677.75 37.20% 145.27 5,017.63 39.90% 218.81 7,557.70 60.10%
2.2.8 ZOCALOS Y CONTRAZOCALOS 5,106.00
2.2.8.1 ZOCALO CERÁMICO m 255.30 20.00 5,106.00 3.45 69.00 1.35% 69.00 1,380.00 27.03% 72.45 1,449.00 28.38% 182.85 3,657.00 71.62%
2.2.9 COBERTURA TECHO 44,867.98
2.2.9.1 CORREA P/TECHO CON MADERA TRATADA m 1,398.60 23.41 32,741.23 491.40 11,503.67 35.14% 434.70 10,176.33 31.08% 926.10 21,680.00 66.22% 472.50 11,061.23 33.78%
2.2.9.2 COBERTURA CON PLANCHA DE CALAMINA m² 555.00 21.85 12,126.75 195.00 4,260.75 35.14% 172.50 3,769.13 31.08% 367.50 8,029.88 66.22% 187.50 4,096.88 33.78%
2.2.10 CARPINTERÍA EN MADERA 42,535.20
2.2.10.1 PUERTA DE MADERA TIPO PERSIANA und 74.00 574.80 42,535.20 74.00 42,535.20 100.00% - - 0.00% 74.00 42,535.20 100.00% - - 0.00%
2.2.11 CERRAJERÍA 2,535.98
2.2.11.1 CERRADURA TIPO POMO DE ACERO und 74.00 34.27 2,535.98 - - 0.00% - - 0.00% - - 0.00% 74.00 2,535.98 100.00%
2.2.12 PINTURA 15,055.50
2.2.12.1 PINTURA LATEX EN MUROS m² 2,066.56 6.68 13,804.62 - - 0.00% - - 0.00% - - 0.00% 2,066.56 13,804.62 100.00%
2.2.12.2 PINTURA LATEX EN DERRAMES m 73.26 1.22 89.38 - - 0.00% - - 0.00% - - 0.00% 73.26 89.38 100.00%
2.2.12.3 PINTURA EN PUERTAS C/BARNIZ 2 MANOS m² 118.40 9.81 1,161.50 - - 0.00% - - 0.00% - - 0.00% 118.40 1,161.50 100.00%
2.2.13 INSTALACIONES SANITARIAS 44,197.18
2.2.13.1 TRAZO, NIVELES Y REPLANTEO m² 694.12 1.62 1,124.47 318.92 516.65 45.95% 225.12 364.69 32.43% 544.04 881.34 78.38% 150.08 243.13 21.62%
2.2.13.2 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 297.18 21.37 6,350.74 136.68 2,920.85 45.99% 96.48 2,061.78 32.47% 233.16 4,982.63 78.46% 64.02 1,368.11 21.54%

F-9.3(33/57)
9. VALORIZACIÓNES DE AVANCE DE OBRA
9.3. VALORIZACIÓN PROGRAMADA
OBRA "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO" LUGAR MARANURA
ENTIDAD MUNICIPALIDAD DISTRITAL DE MARANURA DIV. FUNC. 040
U. EJECUTORSUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL PROGRAMA 0083
RESIDENTE DING. Jorge Luis Valencia Cordova GRUPO FUNC. 0089
INSPECTOR DING. Edgar Viamonte Calla FUNCIÓN 18
FECHA August-2022 CODIGO UNIFICADO 2350362
PRESUPUESTO BASE AVANCE
METRADO COSTOS
MES ANTERIOR EN EL MES ACUMULADO SALDO
ITEMS DESCRIPCION PARTIDA
U.M. CANT P.U. PARCIAL METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ %
2.2.13.3 PERFILADO Y COMPACTADO MANUAL m² 694.12 1.49 1,034.24 328.30 489.17 47.30% 225.12 335.43 32.43% 553.42 824.60 79.73% 140.70 209.64 20.27%
2.2.13.4 CAMA DE APOYO CON MATERIAL PROPIO SELECCIONADO E=0.10 m m² 694.12 3.38 2,346.13 328.30 1,109.65 47.30% 225.12 760.91 32.43% 553.42 1,870.56 79.73% 140.70 475.57 20.27%
2.2.13.5 TUBO PVC SAP C-10 DE1/2" m 688.20 5.95 4,094.79 325.50 1,936.73 47.30% 223.20 1,328.04 32.43% 548.70 3,264.77 79.73% 139.50 830.02 20.27%
2.2.13.6 TUBO PVC SAL DE 2" m 828.80 7.97 6,605.54 392.00 3,124.24 47.30% 268.80 2,142.34 32.43% 660.80 5,266.58 79.73% 168.00 1,338.96 20.27%
2.2.13.7 TUBO PVC SAL DE 4" m 499.50 15.56 7,772.22 236.25 3,676.05 47.30% 162.00 2,520.72 32.43% 398.25 6,196.77 79.73% 101.25 1,575.45 20.27%
2.2.13.8 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO EN CAPAS DE m³ 263.00 14.54 3,824.02 124.25 1,806.60 47.24% 85.20 1,238.81 32.40% 209.45 3,045.40 79.64% 53.55 778.62 20.36%
2.2.13.9 E=0.20M
ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 34.19 17.81 608.92 11.90 211.94 34.81% 8.16 145.33 23.87% 20.06 357.27 58.67% 14.13 251.66 41.33%
2.2.13.10 ENCOFRADO Y DESENCOFRADO m² 149.67 40.29 6,030.20 - - 0.00% - - 0.00% - - 0.00% 149.67 6,030.20 100.00%
2.2.13.11 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 278.43 7.64 2,127.21 - - 0.00% - - 0.00% - - 0.00% 278.43 2,127.21 100.00%
2.2.13.12 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 5.94 371.80 2,208.49 - - 0.00% - - 0.00% - - 0.00% 5.94 2,208.49 100.00%
2.2.13.13 CURADO DE CONCRETO m² 140.42 0.50 70.21 - - 0.00% - - 0.00% - - 0.00% 140.42 70.21 100.00%
2.2.14 APARATOS Y ACCESORIOS SANITARIOS 82,584.00
2.2.14.1 SUMINISTRO E INSTALACIÓN DE SANITARIO und 74.00 403.32 29,845.68 - - 0.00% - - 0.00% - - 0.00% 74.00 29,845.68 100.00%
2.2.14.2 SUMINISTRO E INSTALACIÓN DE LAVATORIO und 74.00 200.95 14,870.30 - - 0.00% - - 0.00% - - 0.00% 74.00 14,870.30 100.00%
2.2.14.3 SALIDA DE DUCHA TIPO ROCIADOR und 74.00 60.27 4,459.98 - - 0.00% - - 0.00% - - 0.00% 74.00 4,459.98 100.00%
2.2.14.4 LLAVE PARA DUCHA und 74.00 59.73 4,420.02 21.00 1,254.33 28.38% 24.00 1,433.52 32.43% 45.00 2,687.85 60.81% 29.00 1,732.17 39.19%
2.2.14.5 LLAVE PARA LAVATORIO und 74.00 38.92 2,880.08 - - 0.00% - - 0.00% - - 0.00% 74.00 2,880.08 100.00%
2.2.14.6 CODO F°G° DE 1/2" und 222.00 4.88 1,083.36 84.00 409.92 37.84% 72.00 351.36 32.43% 156.00 761.28 70.27% 66.00 322.08 29.73%
2.2.14.7 CODO PVC SAP 1/2" und 74.00 4.04 298.96 42.00 169.68 56.76% 24.00 96.96 32.43% 66.00 266.64 89.19% 8.00 32.32 10.81%
2.2.14.8 TEE PVC SAP DE 1/2" und 148.00 6.01 889.48 42.00 252.42 28.38% 48.00 288.48 32.43% 90.00 540.90 60.81% 58.00 348.58 39.19%
2.2.14.9 MANGUERA DE ABASTOS DE 1/2" und 148.00 29.17 4,317.16 - - 0.00% - - 0.00% - - 0.00% 148.00 4,317.16 100.00%
2.2.14.10 VÁLVULA GLOBO DE 1/2" INCL. ACCESORIOS und 148.00 25.95 3,840.60 42.00 1,089.90 28.38% 48.00 1,245.60 32.43% 90.00 2,335.50 60.81% 58.00 1,505.10 39.19%
2.2.14.11 SUMIDERO DE BRONCE DE 2" und 148.00 16.15 2,390.20 - - 0.00% - - 0.00% - - 0.00% 148.00 2,390.20 100.00%
2.2.14.12 REGISTRO ROSACADO DE 4" und 74.00 1.51 111.74 - - 0.00% - - 0.00% - - 0.00% 74.00 111.74 100.00%
2.2.14.13 KIT DE TRAMPA PVC PARA LAVATORIO 2" und 74.00 26.57 1,966.18 - - 0.00% - - 0.00% - - 0.00% 74.00 1,966.18 100.00%
2.2.14.14 CODO PVC SAL 4" und 148.00 15.83 2,342.84 42.00 664.86 28.38% 48.00 759.84 32.43% 90.00 1,424.70 60.81% 58.00 918.14 39.19%
2.2.14.15 CODO PVC SAL 2" und 740.00 8.07 5,971.80 210.00 1,694.70 28.38% 240.00 1,936.80 32.43% 450.00 3,631.50 60.81% 290.00 2,340.30 39.19%
2.2.14.16 YEE PVC SAL DE 2" und 74.00 7.14 528.36 21.00 149.94 28.38% 24.00 171.36 32.43% 45.00 321.30 60.81% 29.00 207.06 39.19%
2.2.14.17 TEE PVC SAL DE 4" C/R 2" und 74.00 12.85 950.90 22.00 282.70 29.73% 24.00 308.40 32.43% 46.00 591.10 62.16% 28.00 359.80 37.84%
2.2.14.18 TEE PVC SAL 2" und 74.00 9.51 703.74 21.00 199.71 28.38% 24.00 228.24 32.43% 45.00 427.95 60.81% 29.00 275.79 39.19%
2.2.14.19 SOMBRERO DE VENTILACIÓN DE 2" und 74.00 9.63 712.62 21.00 202.23 28.38% 24.00 231.12 32.43% 45.00 433.35 60.81% 29.00 279.27 39.19%
2.3 PILETAS DOMICILIARIAS 58,723.04
2.3.1 ESTRUCTURA DE PILETA 42,524.35
2.3.1.1 TRAZO, NIVELES Y REPLANTEO EN CONEXIONES DOMICILIARIAS m² 146.52 1.23 180.22 - - 0.00% 35.64 43.84 24.33% 35.64 43.84 24.33% 110.88 136.38 75.67%
2.3.1.2 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 29.30 21.37 626.14 - - 0.00% 7.20 153.86 24.57% 7.20 153.86 24.57% 22.10 472.28 75.43%
2.3.1.3 PERFILADO Y COMPACTADO MANUAL m² 146.52 1.49 218.31 - - 0.00% 35.64 53.10 24.32% 35.64 53.10 24.32% 110.88 165.21 75.68%
2.3.1.4 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 29.30 17.81 521.83 - - 0.00% 7.20 128.23 24.57% 7.20 128.23 24.57% 22.10 393.60 75.43%
2.3.1.5 ENCOFRADO Y DESENCOFRADO m² 483.89 40.29 19,495.93 - - 0.00% 117.72 4,742.94 24.33% 117.72 4,742.94 24.33% 366.17 14,752.99 75.67%
2.3.1.6 EMPEDRADO E=12.5CM m² 146.52 13.95 2,043.95 - - 0.00% 35.64 497.18 24.32% 35.64 497.18 24.32% 110.88 1,546.78 75.68%
2.3.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 700.97 7.64 5,355.41 - - 0.00% 170.46 1,302.31 24.32% 170.46 1,302.31 24.32% 530.51 4,053.10 75.68%
2.3.1.8 CONCRETO F´C=175KG/CM2 +30% PM (MEZCLA MANUAL) m³ 18.20 303.15 5,517.33 - - 0.00% 4.50 1,364.18 24.73% 4.50 1,364.18 24.73% 13.70 4,153.16 75.27%
2.3.1.9 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 22.27 371.80 8,279.99 - - 0.00% 5.40 2,007.72 24.25% 5.40 2,007.72 24.25% 16.87 6,272.27 75.75%
2.3.1.10 CURADO DE CONCRETO m² 570.47 0.50 285.24 - - 0.00% 153.18 76.59 26.85% 153.18 76.59 26.85% 417.29 208.65 73.15%
2.3.2 TUBERÍAS Y ACCESORIOS 16,198.69
2.3.2.1 SUMIDERO DE BRONCE DE 2" und 74.00 16.15 1,195.10 - - 0.00% - - 0.00% - - 0.00% 74.00 1,195.10 100.00%
2.3.2.2 TUBO PVC SAL DE 2" m 222.00 7.97 1,769.34 - - 0.00% - - 0.00% - - 0.00% 222.00 1,769.34 100.00%
2.3.2.3 TRAMPA PARA LAVATORIO und 74.00 32.64 2,415.36 - - 0.00% - - 0.00% - - 0.00% 74.00 2,415.36 100.00%

F-9.3(34/57)
9. VALORIZACIÓNES DE AVANCE DE OBRA
9.3. VALORIZACIÓN PROGRAMADA
OBRA "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO" LUGAR MARANURA
ENTIDAD MUNICIPALIDAD DISTRITAL DE MARANURA DIV. FUNC. 040
U. EJECUTORSUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL PROGRAMA 0083
RESIDENTE DING. Jorge Luis Valencia Cordova GRUPO FUNC. 0089
INSPECTOR DING. Edgar Viamonte Calla FUNCIÓN 18
FECHA August-2022 CODIGO UNIFICADO 2350362
PRESUPUESTO BASE AVANCE
METRADO COSTOS
MES ANTERIOR EN EL MES ACUMULADO SALDO
ITEMS DESCRIPCION PARTIDA
U.M. CANT P.U. PARCIAL METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ %
2.3.2.4 CODO PVC SAL 2" und 148.00 8.07 1,194.36 - - 0.00% - - 0.00% - - 0.00% 148.00 1,194.36 100.00%
2.3.2.5 CODO F°G° DE 1/2" und 74.00 4.88 361.12 - - 0.00% - - 0.00% - - 0.00% 74.00 361.12 100.00%
2.3.2.6 CODO PVC SAP 1/2" und 74.00 4.04 298.96 - - 0.00% - - 0.00% - - 0.00% 74.00 298.96 100.00%
2.3.2.7 TEE PVC SAP DE 1/2" und 74.00 6.01 444.74 - - 0.00% - - 0.00% - - 0.00% 74.00 444.74 100.00%
2.3.2.8 GRIFO DE 1/2" INCL. ACCESORIOS und 74.00 42.17 3,120.58 - - 0.00% - - 0.00% - - 0.00% 74.00 3,120.58 100.00%
2.3.2.9 VÁLVULA GLOBO DE 1/2" INCL. ACCESORIOS und 74.00 25.95 1,920.30 - - 0.00% - - 0.00% - - 0.00% 74.00 1,920.30 100.00%
2.3.2.10 TUBO PVC SAP C-10 DE1/2" m 207.20 5.95 1,232.84 - - 0.00% - - 0.00% - - 0.00% 207.20 1,232.84 100.00%
2.3.2.11 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 48.54 21.37 1,037.30 - - 0.00% - - 0.00% - - 0.00% 48.54 1,037.30 100.00%
2.3.2.12 PERFILADO Y COMPACTADO MANUAL m² 121.36 1.49 180.83 - - 0.00% - - 0.00% - - 0.00% 121.36 180.83 100.00%
2.3.2.13 CAMA DE APOYO CON MATERIAL PROPIO SELECCIONADO E=0.10 m m² 121.36 3.38 410.20 - - 0.00% - - 0.00% - - 0.00% 121.36 410.20 100.00%
2.3.2.14 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO EN CAPAS DE m³ 42.48 14.54 617.66 - - 0.00% - - 0.00% - - 0.00% 42.48 617.66 100.00%
2.4 E=0.20M
SISTEMA DE TRATAMIENTO DE AGUAS RESIDUALES 252,501.57
2.4.1 BIODIGESTOR PREFABRICADO DE 600 L 165,197.23
2.4.1.1 ESTRUCTURA DE BIODIGESTOR 146,374.63
2.4.1.1.1 TRAZO, NIVELES Y REPLANTEO DE POZO SEPTICO m² 62.90 1.23 77.37 - - 0.00% - - 0.00% - - 0.00% 62.90 77.37 100.00%
2.4.1.1.2 LIMPIEZA MANUAL DE TERRENO m² 62.90 1.34 84.29 - - 0.00% - - 0.00% - - 0.00% 62.90 84.29 100.00%
2.4.1.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 113.22 21.37 2,419.51 - - 0.00% - - 0.00% - - 0.00% 113.22 2,419.51 100.00%
2.4.1.1.4 PERFILADO Y COMPACTADO MANUAL m² 62.90 1.49 93.72 - - 0.00% - - 0.00% - - 0.00% 62.90 93.72 100.00%
2.4.1.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 113.22 17.81 2,016.45 - - 0.00% - - 0.00% - - 0.00% 113.22 2,016.45 100.00%
2.4.1.1.6 BIODIGESTOR PREFABRICADO DE 600 L und 74.00 1,875.64 138,797.36 - - 0.00% - - 0.00% - - 0.00% 74.00 138,797.36 100.00%
2.4.1.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 55.50 7.64 424.02 - - 0.00% - - 0.00% - - 0.00% 55.50 424.02 100.00%
2.4.1.1.8 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 1.04 371.80 386.67 - - 0.00% - - 0.00% - - 0.00% 1.04 386.67 100.00%
2.4.1.1.9 CURADO DE CONCRETO m² 20.72 0.50 10.36 - - 0.00% - - 0.00% - - 0.00% 20.72 10.36 100.00%
2.4.1.1.10 CAMA DE APOYO DE BIODIGESTOR m³ 12.58 126.87 1,596.02 - - 0.00% - - 0.00% - - 0.00% 12.58 1,596.02 100.00%
2.4.1.1.11 RELLENO Y COMPACTADO MANUAL CON MATERIAL SELECCIONADO EN m³ 26.64 17.60 468.86 - - 0.00% - - 0.00% - - 0.00% 26.64 468.86 100.00%
2.4.1.2 CAPAS
CAMARADEDEE=0.20M
LODOS 18,822.60
2.4.1.2.1 TRAZO, NIVELES Y REPLANTEO DE CAMARA DE LODOS m² 26.64 2.64 70.33 - - 0.00% - - 0.00% - - 0.00% 26.64 70.33 100.00%
2.4.1.2.2 LIMPIEZA MANUAL DE TERRENO m² 26.64 1.34 35.70 - - 0.00% - - 0.00% - - 0.00% 26.64 35.70 100.00%
2.4.1.2.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 15.98 21.37 341.49 - - 0.00% - - 0.00% - - 0.00% 15.98 341.49 100.00%
2.4.1.2.4 PERFILADO Y COMPACTADO MANUAL m² 26.64 1.49 39.69 - - 0.00% - - 0.00% - - 0.00% 26.64 39.69 100.00%
2.4.1.2.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 15.98 17.81 284.60 - - 0.00% - - 0.00% - - 0.00% 15.98 284.60 100.00%
2.4.1.2.6 ENCOFRADO Y DESENCOFRADO m² 267.14 40.29 10,763.07 - - 0.00% - - 0.00% - - 0.00% 267.14 10,763.07 100.00%
2.4.1.2.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 388.50 7.64 2,968.14 - - 0.00% - - 0.00% - - 0.00% 388.50 2,968.14 100.00%
2.4.1.2.8 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 11.21 371.80 4,167.88 - - 0.00% - - 0.00% - - 0.00% 11.21 4,167.88 100.00%
2.4.1.2.9 CURADO DE CONCRETO m² 303.40 0.50 151.70 - - 0.00% - - 0.00% - - 0.00% 303.40 151.70 100.00%
2.4.2 ZANJAS DE INFILTRACIÓN 87,304.34
2.4.2.1 TRAZO, NIVELES Y REPLANTEO DE ZANJAS DE INFILTRACIÓN m² 568.32 2.64 1,500.36 - - 0.00% - - 0.00% - - 0.00% 568.32 1,500.36 100.00%
2.4.2.2 LIMPIEZA MANUAL DE TERRENO m² 568.32 1.34 761.55 - - 0.00% - - 0.00% - - 0.00% 568.32 761.55 100.00%
2.4.2.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 681.98 21.37 14,573.91 - - 0.00% - - 0.00% - - 0.00% 681.98 14,573.91 100.00%
2.4.2.4 PERFILADO Y COMPACTADO MANUAL m² 568.32 1.49 846.80 - - 0.00% - - 0.00% - - 0.00% 568.32 846.80 100.00%
2.4.2.5 CAMA DE APOYO E=0.15 PIEDRA CHANCADA m² 568.32 6.83 3,881.63 - - 0.00% - - 0.00% - - 0.00% 568.32 3,881.63 100.00%
2.4.2.6 TUBO PVC SAL PESADO DE 4" m 310.80 29.10 9,044.28 - - 0.00% - - 0.00% - - 0.00% 310.80 9,044.28 100.00%
2.4.2.7 TUBO CRIBADO PVC SAL PESADO DE 4" m 1,110.00 29.40 32,634.00 - - 0.00% - - 0.00% - - 0.00% 1,110.00 32,634.00 100.00%
2.4.2.8 TEE DOBLE PVC SAL PESADO 4" und 74.00 32.67 2,417.58 - - 0.00% - - 0.00% - - 0.00% 74.00 2,417.58 100.00%
2.4.2.9 CODO PVC SAL PESADO 4" und 296.00 5.34 1,580.64 - - 0.00% - - 0.00% - - 0.00% 296.00 1,580.64 100.00%

F-9.3(35/57)
9. VALORIZACIÓNES DE AVANCE DE OBRA
9.3. VALORIZACIÓN PROGRAMADA
OBRA "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO" LUGAR MARANURA
ENTIDAD MUNICIPALIDAD DISTRITAL DE MARANURA DIV. FUNC. 040
U. EJECUTORSUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL PROGRAMA 0083
RESIDENTE DING. Jorge Luis Valencia Cordova GRUPO FUNC. 0089
INSPECTOR DING. Edgar Viamonte Calla FUNCIÓN 18
FECHA August-2022 CODIGO UNIFICADO 2350362
PRESUPUESTO BASE AVANCE
METRADO COSTOS
MES ANTERIOR EN EL MES ACUMULADO SALDO
ITEMS DESCRIPCION PARTIDA
U.M. CANT P.U. PARCIAL METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ %
2.4.2.10 TAPON PVC SAL 4" und 222.00 13.68 3,036.96 - - 0.00% - - 0.00% - - 0.00% 222.00 3,036.96 100.00%
2.4.2.11 RELLENO CON MATERIAL PÉTREO m³ 310.80 38.00 11,810.40 - - 0.00% - - 0.00% - - 0.00% 310.80 11,810.40 100.00%
2.4.2.12 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO EN CAPAS DE m³ 358.75 14.54 5,216.23 - - 0.00% - - 0.00% - - 0.00% 358.75 5,216.23 100.00%
3 E=0.20M
COMPONENTE 3: ACCIONES DE PROMOCION, CAPACITACION EN JASS,
SEGURIDAD Y SALUD 108,426.22

3.1 DIAGNÓSTICO COMUNITARIO 2,891.60


3.1.1 COSTO DIAGNOSTICO COMUNITARIO gbl 1.00 2,891.60 2,891.60 - - 0.00% - - 0.00% - - 0.00% 1.00 2,891.60 100.00%
3.2 ACCIONES DE PROMOCIÓN 10,302.90
3.2.1 MATERIALES ACCIONES DE PROMOCIÓN 1,724.90
3.2.1.1 MATERIAL DE PROMOCIÓN ENTREGADO POR EL PROYECTO gbl 1.00 1,500.00 1,500.00 0.25 375.00 25.00% - - 0.00% 0.25 375.00 25.00% 0.75 1,125.00 75.00%
3.2.1.2 MATERIAL PARA TALLERES PROMOCIÓN (ANTES Y DURANTE) gbl 1.00 224.90 224.90 0.12 26.99 12.00% - - 0.00% 0.12 26.99 12.00% 0.88 197.91 88.00%
3.2.2 ACCIONES DE PROMOCIÓN EN EL ANTES 1,815.60
3.2.2.1 PAGO POR PROMOCIÓN EN EL ANTES mes 1.00 1,815.60 1,815.60 - - 0.00% - - 0.00% - - 0.00% 1.00 1,815.60 100.00%
3.2.3 ACCIONES DE PROMOCIÓN EN EL DURANTE 1,815.60
3.2.3.1 PAGO POR PROMOCIÓN EN EL DURANTE mes 1.00 1,815.60 1,815.60 - - 0.00% - - 0.00% - - 0.00% 1.00 1,815.60 100.00%
3.2.4 ACCIONES DE PROMOCIÓN Y EDUCACIÓN PARA LA HIGIENE EN EL 4,946.80
3.2.4.1 DESPUES
ACCIONES DE PROMOCIÓN Y SEGUIMIENTO A LA JASS (DESPUÉS) mes 2.00 1,815.60 3,631.20 - - 0.00% - - 0.00% - - 0.00% 2.00 3,631.20 100.00%
3.2.4.2 MATERIAL PARA LA EJECUCIÓN DE LA PROMOCIÓN (DESPUÉS) gbl 1.00 22.00 22.00 - - 0.00% - - 0.00% - - 0.00% 1.00 22.00 100.00%
3.2.4.3 CONCURSO COMUNIDAD SALUDABLE gbl 1.00 1,200.00 1,200.00 - - 0.00% - - 0.00% - - 0.00% 1.00 1,200.00 100.00%
3.2.4.4 CAMPAÑAS DE SALUD E HIGIENE EN COMUNIDAD gbl 1.00 93.60 93.60 - - 0.00% - - 0.00% - - 0.00% 1.00 93.60 100.00%
3.3 ACCIONES DE CAPACITACIÓN 6,491.40
3.3.1 MATERIALES ACCIONES DE CAPACITACIÓN 1,375.80
3.3.1.1 MATERIAL PARA TALLERES DE CAPACITACIÓN A JASS gbl 1.00 250.80 250.80 0.12 30.10 12.00% - - 0.00% 0.12 30.10 12.00% 0.88 220.70 88.00%
3.3.1.2 MATERIAL DE CAPACITACIÓN ENTREGADO POR EL PROYECTO gbl 1.00 1,125.00 1,125.00 0.12 135.00 12.00% - - 0.00% 0.12 135.00 12.00% 0.88 990.00 88.00%
3.3.2 ACCIONES DE CAPACITACIÓN 1,815.60
3.3.2.1 PAGO POR HONORARIOS TALLERES DE CAPACITACIÓN JASS gbl 1.00 1,815.60 1,815.60 0.12 217.87 12.00% - - 0.00% 0.12 217.87 12.00% 0.88 1,597.73 88.00%
3.3.3 ACCIONES DE CAPACITACIÓN EN EL DESPUES 3,300.00
3.3.3.1 CONCURSO DE JASS (DESPUÉS) gbl 1.00 3,300.00 3,300.00 - - 0.00% - - 0.00% - - 0.00% 1.00 3,300.00 100.00%
3.4 SEGURIDAD, BIOSEGURIDAD Y SALUD 41,998.16
3.4.1 EQUIPOS DE PROTECCIÓN PERSONAL und 60.00 235.40 14,124.00 - - 0.00% - - 0.00% - - 0.00% 60.00 14,124.00 100.00%
3.4.2 EQUIPO DE PROTECCIÓN COLECTIVA gbl 1.00 1,140.00 1,140.00 0.12 136.80 12.00% - - 0.00% 0.12 136.80 12.00% 0.88 1,003.20 88.00%
3.4.3 SEÑALIZACIÓN TEMPORAL DE SEGURIDAD Y BIOSEGURIDAD gbl 1.00 1,625.76 1,625.76 0.12 195.09 12.00% - - 0.00% 0.12 195.09 12.00% 0.88 1,430.67 88.00%
3.4.4 MONITOREO Y SENSIBILIZACIÓN DE SEGURIDAD Y BIOSEGURIDAD SEGÚN mes 8.00 3,000.00 24,000.00 1.00 3,000.00 12.50% - - 0.00% 1.00 3,000.00 12.50% 7.00 21,000.00 87.50%
3.4.5 PROTOCOLOS
RECURSOS CONTRA
PARA COVID 19ANTE EMERGENCIAS EN SEGURIDAD Y
RESPUESTAS gbl 1.00 294.10 294.10 0.15 44.12 15.00% - - 0.00% 0.15 44.12 15.00% 0.85 249.99 85.00%
3.4.6 SALUD DURANTE
IMPLEMENTOS DEEL TRABAJO SEGÚN PROTOCOLOS COVID 19
SEGURIDAD gbl 1.00 814.30 814.30 0.15 122.15 15.00% - - 0.00% 0.15 122.15 15.00% 0.85 692.16 85.00%
3.5 MITIGACIÓN DE IMPACTO AMBIENTAL 46,742.16
3.5.1 PLAN DE GESTIÓN AMBIENTAL gbl 1.00 46,742.16 46,742.16 - - 0.00% - - 0.00% - - 0.00% 1.00 46,742.16 100.00%
1,491,337.80 203,382.40 121,288.03 324,670.41 0.02 1,166,667.39
COSTOS DIRECTOS S/. 1,491,337.80 203,382.40 13.64% 121,288.03 8.13% 324,670.43 21.77% 1,166,667.37 78.23%
GASTOS GENERALES S/. 14.84% 221,334.80 30,184.71 13.64% 18,000.79 8.13% 48,185.50 21.77% 173,149.30 78.23%
GASTOS DE SUPERVISIÓN S/. 3.94% 58,726.08 8,008.82 13.64% 4,776.09 8.13% 12,784.91 21.77% 45,941.17 78.23%
ELABORACIÓN DE EXPEDIENTE TÉCNICO S/. 1.58% 23,511.91 3,206.46 13.64% 1,912.18 8.13% 5,118.64 21.77% 18,393.27 78.23%
LIQUIDACIÓN DE OBRA S/. 0.98% 14,606.82 1,992.02 13.64% 1,187.95 8.13% 3,179.97 21.77% 11,426.85 78.23%
TOTAL VALORIZADO S/. 1,809,517.41 246,774.41 13.64% 147,165.04 8.13% 393,939.45 21.77% 1,415,577.96 78.23%

F-9.3(36/57)
9. VALORIZACIÓNES DE AVANCE DE OBRA
9.3. VALORIZACIÓN PROGRAMADA
DESAGREGADO
OBRA "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO"
ENTIDAD MUNICIPALIDAD DISTRITAL DE MARANURA
U. EJECUTORA SUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL
RESIDENTE DE ING. Jorge Luis Valencia Cordova
INSPECTOR DEING. Edgar Viamonte Calla
FECHA August-2022

PRESUPUESTO BASE AVANCE


METRADO COSTOS
ANALISIS DE PRECIOS UNIT. MONTO
ITEMS DESCRIPCION PARTIDA
U.M. CANT P.U. PARCIAL METRADO MES M.O. MAT. SERV. M.O. MAT. SERV.

1 COMPONENTE 1: ADECUADO SISTEMA DE ABASTECIMENTO DE AGUA 526,005.44


1.1 TRABAJOS PRELIMINARES 47,083.31
1.1.1 CARTEL DE OBRA (3.60X2.40M) und 3.00 659.57 1,978.71 0.00 0.00 0.00 0.00
1.1.2 TRANSPORTE DE MATERIALES A OBRA CON MAQUINARIA COMPONENTE 1 gbl 1.00 6,134.73 6,134.73 0.00 41.07 64.10 1.23 0.00 0.00 0.00
1.1.3 TRANSPORTE MANUAL DE MATERIALES DE PIE DE CARRETERA COMPONENTE 1 gbl 1.00 36,569.87 36,569.87 0.00 20.54 45.35 0.62 0.00 0.00 0.00
1.1.4 ALQUILER DE ALMACEN DE OBRA Y OFICINA mes 8.00 300.00 2,400.00 1.00 122.84 201.71 3.69 122.84 201.71 3.69
1.2 CAPTACIÓN SUPERFICIAL INSIENSUYOC 25,918.32 49.13 55.90 1.47
1.2.1 ESTRUCTURA Y ACABADOS 23,588.94 20.54 36.47 0.62
1.2.1.1 TRAZO, NIVELES Y REPLANTEO m² 37.86 1.62 61.33 0.00 152.00 403.52 4.58 0.00 0.00 0.00
1.2.1.2 LIMPIEZA MANUAL DE TERRENO m² 37.86 1.34 50.73 0.00 3.71 16.86 0.11 0.00 0.00 0.00
1.2.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 29.93 21.37 639.60 0.00 0.00 0.00 0.00
1.2.1.4 PERFILADO Y COMPACTADO MANUAL m² 30.30 1.49 45.15 0.00 29.25 349.75 0.88 0.00 0.00 0.00
1.2.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 29.93 17.81 533.05 0.00 0.00 250.00 0.00 0.00 0.00 0.00
1.2.1.6 ENCOFRADO Y DESENCOFRADO m² 64.32 40.29 2,591.45 64.32 0.00 450.00 0.00 0.00 28,944.00 0.00
1.2.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 595.38 7.64 4,548.70 595.38 0.00 0.00 0.00
1.2.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 25.12 265.80 6,676.90 1.76 0.00 0.00 6,549.00 0.00 0.00 11,526.24
1.2.1.9 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 2.23 371.80 829.11 0.00 0.00 0.00 0.00
1.2.1.10 CONCRETO F´C=210KG/CM2 (MEZCLA MANUAL) m³ 8.33 458.30 3,817.64 0.00 0.00 0.00 0.00
1.2.1.11 CURADO DE CONCRETO m² 91.74 0.50 45.87 0.00 0.47 0.00 0.01 0.00 0.00 0.00
1.2.1.12 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 51.01 56.20 2,866.76 0.00 1.12 1.19 0.52 0.00 0.00 0.00
1.2.1.13 TARRAJEO EN MUROS E=1.5 CM m² 25.96 18.94 491.68 0.00 0.00 0.00 0.00
1.2.1.14 PINTADO DE ESTRUCTURAS HIDRAULICAS m² 25.96 6.55 170.04 0.00 30.26 0.00 67.58 0.00 0.00 0.00
1.2.1.15 EMBOQUILLADO DE PIEDRA Y CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 1.27 173.96 220.93 1.27 0.00 0.00 0.00
1.2.2 TUBERÍA Y ACCESORIOS 1,394.54 0.71 1.68 5.46
1.2.2.1 COMPUERTA METÁLICA DE 0.50X0.90M und 1.00 151.07 151.07 0.00 20.05 0.00 0.60 0.00 0.00 0.00
1.2.2.2 REJILLA METÁLICA DE 0.20X0.10 M und 1.00 28.58 28.58 0.00 0.67 2.80 9.16 0.00 0.00 0.00
1.2.2.3 ACCESORIOS CAPTACIÓN INSIENSUYOC gbl 1.00 960.45 960.45 0.00 3.81 1.40 2.61 0.00 0.00 0.00
1.2.2.4 TAPA METÁLICA DE 0.80X0.80 INCL. ACCESORIOS und 2.00 127.22 254.44 0.00 0.00 0.00 0.00
1.2.3 CERCO PERIMÉTRICO DE PROTECCIÓN 934.84 0.00 204.00 0.00
1.2.3.1 POSTES DE TUBO F°G° DE 2" CON GANCHOS und 7.00 90.00 630.00 0.00 0.00 600.00 0.00 0.00 0.00 0.00
1.2.3.2 ALAMBRE DE PUES PARA CERCO PERIMÉTRICO m 150.00 0.84 126.00 0.00 19.08 1,200.00 0.00 0.00 0.00 0.00
1.2.3.3 PUERTA METÁLICA DE ACCESO und 1.00 178.84 178.84 0.00 1,500.00 0.00 0.00 0.00 0.00 0.00
1.3 CAPTACIÓN DE LADERA HUERTO DEL EDEN 6,667.46 0.00 420.00 0.00
1.3.1 ESTRUCTURA Y ACABADOS 5,340.12
1.3.1.1 TRAZO, NIVELES Y REPLANTEO m² 13.34 1.62 21.61 0.00 0.00 0.00 0.00
1.3.1.2 LIMPIEZA MANUAL DE TERRENO m² 13.34 1.34 17.88 0.00 0.00 0.00 0.00
1.3.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 12.01 21.37 256.65 0.00 1.87 0.28 1.43 0.00 0.00 0.00
1.3.1.4 PERFILADO Y COMPACTADO MANUAL m² 13.34 1.49 19.88 0.00 0.00 0.00 0.00
1.3.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 12.01 17.81 213.90 0.00 28.06 0.00 0.84 0.00 0.00 0.00
1.3.1.6 ENCOFRADO Y DESENCOFRADO m² 25.78 40.29 1,038.68 0.00 91.82 0.00 4.59 0.00 0.00 0.00
1.3.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 87.29 7.64 666.90 0.00 15.59 0.00 0.47 0.00 0.00 0.00
1.3.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 2.33 265.80 619.31 0.00 3.05 1.40 2.09 0.00 0.00 0.00
1.3.1.9 CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL)+30% PIEDRA MEDIANA m³ 1.40 238.58 334.01 0.00 0.00 0.00 0.00
1.3.1.10 CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 1.26 294.44 370.99 0.00 0.00 0.00 0.00
1.3.1.11 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 1.31 371.80 487.06 0.00 13.91 16.63 0.42 0.00 0.00 0.00
1.3.1.12 CURADO DE CONCRETO m² 31.12 0.50 15.56 0.00 78.08 194.81 10.34 0.00 0.00 0.00
1.3.1.13 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 12.35 56.20 694.07 0.00 0.00 0.00 0.00
1.3.1.14 TARRAJEO EN MUROS E=1.5 CM m² 14.79 18.94 280.12 0.00 7.81 22.69 1.83 0.00 0.00 0.00
1.3.1.15 PINTADO DE ESTRUCTURAS HIDRAULICAS m² 13.25 6.55 86.79 0.00 0.00 0.00 0.00
1.3.1.16 EMBOQUILLADO DE PIEDRA Y CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 0.05 173.96 8.70 0.00 78.08 194.81 10.34 0.00 0.00 0.00
1.3.1.17 RELLENO DE ZONA DE INFILTRACIÓN CON GRAVA m³ 2.38 87.40 208.01 0.00 15.65 13.09 0.47 0.00 0.00 0.00
1.3.2 TUBERÍA Y ACCESORIOS 572.50
1.3.2.1 TAPA METÁLICA DE 0.60X0.60 INCL ACCESORIOS und 2.00 96.21 192.42 0.00 0.00 0.00 0.00
1.3.2.2 ACCESORIOS CAPTACIÓN HUERTO DEL EDEN gbl 1.00 380.08 380.08 0.00 62.47 437.21 12.54 0.00 0.00 0.00
1.3.3 CERCO PERIMÉTRICO DE PROTECCIÓN 754.84 13.42 24.11 0.40
1.3.3.1 POSTES DE TUBO F°G° DE 2" CON GANCHOS und 5.00 90.00 450.00 0.00 1.06 6.51 0.19 0.00 0.00 0.00
1.3.3.2 ALAMBRE DE PUES PARA CERCO PERIMÉTRICO m 150.00 0.84 126.00 0.00 0.00 0.00 0.00
1.3.3.3 PUERTA METÁLICA DE ACCESO und 1.00 178.84 178.84 0.00 62.47 437.21 12.54 0.00 0.00 0.00
1.4 CAPTACIÓN SUPERFICIAL ROCOTOCHAYOC 21,579.81 13.42 24.11 0.40
1.4.1 ESTRUCTURA Y ACABADOS 19,343.83 1.06 6.51 0.19
1.4.1.1 TRAZO, NIVELES Y REPLANTEO m² 26.19 1.62 42.43 0.00 0.00 0.00 0.00
1.4.1.2 LIMPIEZA MANUAL DE TERRENO m² 26.19 1.34 35.09 0.00 93.70 437.21 18.81 0.00 0.00 0.00
1.4.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 21.55 21.37 460.52 0.00 21.50 18.60 0.65 0.00 0.00 0.00
1.4.1.4 PERFILADO Y COMPACTADO MANUAL m² 26.19 1.49 39.02 0.00 1.06 6.51 0.19 0.00 0.00 0.00
1.4.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 21.55 17.81 383.81 0.00 0.00 0.00 0.00
1.4.1.6 ENCOFRADO Y DESENCOFRADO m² 61.08 40.29 2,460.91 0.00 0.00 0.00 0.00
1.4.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 513.34 7.64 3,921.92 0.00 0.00 0.00 0.00
1.4.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 18.49 265.80 4,914.64 0.00 0.00 0.00 0.00
1.4.1.9 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 2.23 371.80 829.11 0.00 0.00 0.00 0.00
1.4.1.10 CONCRETO F´C=210KG/CM2 (MEZCLA MANUAL) m³ 6.61 458.30 3,029.36 0.00 0.00 0.00 0.00
1.4.1.11 CURADO DE CONCRETO m² 80.94 0.50 40.47 0.00 0.00 0.00 0.00
1.4.1.12 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 42.14 56.20 2,368.27 0.00 0.00 0.00 0.00
1.4.1.13 TARRAJEO EN MUROS E=1.5 CM m² 25.96 18.94 491.68 0.00 0.00 0.00 0.00
1.4.1.14 PINTADO DE ESTRUCTURAS HIDRAULICAS m² 25.96 6.55 170.04 0.00 0.00 0.00 0.00
1.4.1.15 EMBOQUILLADO DE PIEDRA Y CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 0.90 173.96 156.56 0.00 0.00 0.00 0.00
1.4.2 TUBERÍA Y ACCESORIOS 1,301.14
1.4.2.1 COMPUERTA METÁLICA DE 0.50X0.90M und 1.00 151.07 151.07 0.00 0.00 0.00 0.00
1.4.2.2 REJILLA METÁLICA DE 0.20X0.10 M und 1.00 28.58 28.58 0.00 0.00 0.00 0.00
1.4.2.3 ACCESORIOS CAPTACIÓN ROCOTOCHAYOC gbl 1.00 867.05 867.05 0.00 0.00 0.00 0.00
1.4.2.4 TAPA METÁLICA DE 0.80X0.80 INCL. ACCESORIOS und 2.00 127.22 254.44 0.00 0.00 0.00 0.00
1.4.3 CERCO PERIMÉTRICO DE PROTECCIÓN 934.84
1.4.3.1 POSTES DE TUBO F°G° DE 2" CON GANCHOS und 7.00 90.00 630.00 0.00 0.00 0.00 0.00
1.4.3.2 ALAMBRE DE PUES PARA CERCO PERIMÉTRICO m 150.00 0.84 126.00 0.00 0.00 0.00 0.00
1.4.3.3 PUERTA METÁLICA DE ACCESO und 1.00 178.84 178.84 0.00 0.00 0.00 0.00
1.5 DESARENADOR 7,050.88
1.5.1 ESTRUCTURA Y ACABADOS 4,111.28
1.5.1.1 TRAZO, NIVELES Y REPLANTEO m² 8.67 1.62 14.05 0.00 0.00 0.00 0.00
1.5.1.2 LIMPIEZA MANUAL DE TERRENO m² 8.67 1.34 11.62 0.00 0.00 0.00 0.00
1.5.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 7.80 21.37 166.69 0.00 0.00 0.00 0.00
1.5.1.4 PERFILADO Y COMPACTADO MANUAL m² 8.67 1.49 12.92 0.00 0.00 0.00 0.00
1.5.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 7.80 17.81 138.92 0.00 0.00 0.00 0.00
1.5.1.6 ENCOFRADO Y DESENCOFRADO m² 17.62 40.29 709.91 0.00 0.00 0.00 0.00
1.5.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 150.05 7.64 1,146.38 0.00 0.00 0.00 0.00
1.5.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 0.42 265.80 111.64 0.00 0.00 0.00 0.00
1.5.1.9 CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 0.04 294.44 11.78 0.00 0.00 0.00 0.00
1.5.1.10 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 1.73 371.80 643.21 0.00 0.00 0.00 0.00
1.5.1.11 CURADO DE CONCRETO m² 25.55 0.50 12.78 0.00 0.00 0.00 0.00
1.5.1.12 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 14.48 56.20 813.78 0.00 0.00 0.00 0.00
1.5.1.13 TARRAJEO EN MUROS E=1.5 CM m² 9.73 18.94 184.29 0.00 0.00 0.00 0.00
1.5.1.14 PINTADO DE ESTRUCTURAS HIDRAULICAS m² 9.73 6.55 63.73 0.00 0.00 0.00 0.00
1.5.1.15 EMBOQUILLADO DE PIEDRA Y CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 0.40 173.96 69.58 0.00 0.00 0.00 0.00

F-8.2(37/57)
9. VALORIZACIÓNES DE AVANCE DE OBRA
9.3. VALORIZACIÓN PROGRAMADA
DESAGREGADO
OBRA "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO"
ENTIDAD MUNICIPALIDAD DISTRITAL DE MARANURA
U. EJECUTORA SUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL
RESIDENTE DE ING. Jorge Luis Valencia Cordova
INSPECTOR DEING. Edgar Viamonte Calla
FECHA August-2022

PRESUPUESTO BASE AVANCE


METRADO COSTOS
ANALISIS DE PRECIOS UNIT. MONTO
ITEMS DESCRIPCION PARTIDA
U.M. CANT P.U. PARCIAL METRADO MES M.O. MAT. SERV. M.O. MAT. SERV.
1.5.2 TUBERÍA Y ACCESORIOS 1,429.92
1.5.2.1 TAPA METÁLICA DE 0.40X0.40 INCL ACCESORIOS und 2.00 75.57 151.14 0.00 0.00 0.00 0.00
1.5.2.2 ACCESORIOS TIPICOS PARA DESARENADORES gbl 1.00 1,094.70 1,094.70 0.00 0.00 0.00 0.00
1.5.2.3 BRIDA ROMPE AGUA DE F°G° 1" INCL. ACCESORIOS und 2.00 48.77 97.54 0.00 0.00 0.00 0.00
1.5.2.4 BRIDA ROMPE AGUA DE F°G° 3/4" INCL. ACCESORIOS und 2.00 43.27 86.54 0.00 0.00 0.00 0.00
1.5.3 CERCO PERIMÉTRICO DE PROTECCIÓN 1,509.68
1.5.3.1 POSTES DE TUBO F°G° DE 2" CON GANCHOS und 10.00 90.00 900.00 0.00 0.00 0.00 0.00
1.5.3.2 ALAMBRE DE PUES PARA CERCO PERIMÉTRICO m 300.00 0.84 252.00 0.00 0.00 0.00 0.00
1.5.3.3 PUERTA METÁLICA DE ACCESO und 2.00 178.84 357.68 0.00 0.00 0.00 0.00
1.6 FILTRO LENTO DE ARENA 15,749.53
1.6.1 ESTRUCTURA Y ACABADOS 13,959.38
1.6.1.1 TRAZO, NIVELES Y REPLANTEO m² 15.48 1.62 25.08 15.48 0.00 0.00 0.00
1.6.1.2 LIMPIEZA MANUAL DE TERRENO m² 15.48 1.34 20.74 15.48 0.00 0.00 0.00
1.6.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 18.58 21.37 397.05 18.58 0.00 0.00 0.00
1.6.1.4 PERFILADO Y COMPACTADO MANUAL m² 15.48 1.49 23.07 15.48 0.00 0.00 0.00
1.6.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 18.58 17.81 330.91 18.58 0.00 0.00 0.00
1.6.1.6 ENCOFRADO Y DESENCOFRADO m² 80.61 40.29 3,247.78 80.61 0.00 0.00 0.00
1.6.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 395.25 7.64 3,019.71 0.00 0.00 0.00 0.00
1.6.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 0.48 265.80 127.58 0.48 0.00 0.00 0.00
1.6.1.9 CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 0.04 294.44 11.78 0.00 0.00 0.00 0.00
1.6.1.10 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 1.58 371.80 587.44 0.00 0.00 0.00 0.00
1.6.1.11 CONCRETO F´C=210KG/CM2 (MEZCLA MANUAL) m³ 4.15 458.30 1,901.95 0.00 0.00 0.00 0.00
1.6.1.12 CURADO DE CONCRETO m² 85.53 0.50 42.77 0.00 0.00 0.00 0.00
1.6.1.13 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 43.60 56.20 2,450.32 0.00 0.00 0.00 0.00
1.6.1.14 TARRAJEO EN MUROS E=1.5 CM m² 35.67 18.94 675.59 0.00 0.00 0.00 0.00
1.6.1.15 PINTADO DE ESTRUCTURAS HIDRAULICAS m² 35.67 6.55 233.64 0.00 0.00 0.00 0.00
1.6.1.16 EMBOQUILLADO DE PIEDRA Y CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 0.30 173.96 52.19 0.00 0.00 0.00 0.00
1.6.1.17 COLOCADO DE SOPORTE BASE CON LADRILLO TIPO KING KONG m² 6.36 34.22 217.64 0.00 0.00 0.00 0.00
1.6.1.18 RELLENO DE ZONA DE INFILTRACIÓN CON GRAVA m³ 1.59 87.40 138.97 0.00 0.00 0.00 0.00
1.6.1.19 RELLENO DE ZONA DE INFILTRACIÓN CON ARENA GRUESA LAVADA m³ 5.08 89.60 455.17 0.00 0.00 0.00 0.00
1.6.2 TUBERÍA Y ACCESORIOS 1,790.15
1.6.2.1 TAPA METÁLICA DE 0.60X0.60 INCL ACCESORIOS und 1.00 96.21 96.21 0.00 0.00 0.00 0.00
1.6.2.2 COMPUERTA METÁLICA DE 0.20X0.35 und 2.00 84.40 168.80 0.00 0.00 0.00 0.00
1.6.2.3 ACCESORIOS PARA FILTRO LENTO gbl 1.00 1,525.14 1,525.14 0.00 0.00 0.00 0.00
1.7 LINEA DE CONDUCCIÓN 71,000.04
1.7.1 TRAZO, NIVELES Y REPLANTEO m² 1,201.16 1.62 1,945.88 20.00 0.00 0.00 0.00
1.7.2 LIMPIEZA MANUAL DE TERRENO m² 1,201.16 1.34 1,609.55 20.00 0.00 0.00 0.00
1.7.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 720.70 21.37 15,401.36 12.00 0.00 0.00 0.00
1.7.4 PERFILADO Y COMPACTADO MANUAL m² 1,201.16 1.49 1,789.73 20.00 0.00 0.00 0.00
1.7.5 CAMA DE APOYO CON MATERIAL PROPIO SELECCIONADO E=0.10 m m² 1,201.16 3.38 4,059.92 0.00 0.00 0.00 0.00
1.7.6 TUBO PVC NTP 399.002 DN 30 MM C-15 m 839.92 13.88 11,658.09 0.00 0.00 0.00 0.00
1.7.7 TUBO PVC NTP 399.002 DN 30 MM C-10 m 319.33 12.59 4,020.36 0.00 0.00 0.00 0.00
1.7.8 TUBO PVC NTP 399.002 DN 26.5 MM C-15 m 571.96 10.99 6,285.84 0.00 0.00 0.00 0.00
1.7.9 TUBO PVC NTP 399.002 DN 26.5 MM C-10 m 1,271.69 10.49 13,340.03 50.00 0.00 0.00 0.00
1.7.10 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO EN CAPAS DE E=0.20M m³ 660.64 14.54 9,605.71 11.00 0.00 0.00 0.00
1.7.11 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 72.07 17.81 1,283.57 0.00 0.00 0.00 0.00
1.8 CAMARA DE REUNIÓN 6,767.63
1.8.1 ESTRUCTURA Y ACABADOS 3,800.87
1.8.1.1 TRAZO, NIVELES Y REPLANTEO m² 5.04 1.62 8.16 0.00 0.00 0.00 0.00
1.8.1.2 LIMPIEZA MANUAL DE TERRENO m² 5.04 1.34 6.75 0.00 0.00 0.00 0.00
1.8.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 1.01 21.37 21.58 0.00 0.00 0.00 0.00
1.8.1.4 PERFILADO Y COMPACTADO MANUAL m² 5.04 1.49 7.51 0.00 0.00 0.00 0.00
1.8.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 1.01 17.81 17.99 0.00 0.00 0.00 0.00
1.8.1.6 ENCOFRADO Y DESENCOFRADO m² 22.84 40.29 920.22 0.00 0.00 0.00 0.00
1.8.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 121.92 7.64 931.47 0.00 0.00 0.00 0.00
1.8.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 0.25 265.80 66.45 0.00 0.00 0.00 0.00
1.8.1.9 CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 0.02 294.44 5.89 0.00 0.00 0.00 0.00
1.8.1.10 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 1.77 371.80 658.09 0.00 0.00 0.00 0.00
1.8.1.11 CURADO DE CONCRETO m² 29.12 0.50 14.56 0.00 0.00 0.00 0.00
1.8.1.12 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 12.72 56.20 714.86 0.00 0.00 0.00 0.00
1.8.1.13 TARRAJEO EN MUROS E=1.5 CM m² 15.40 18.94 291.68 0.00 0.00 0.00 0.00
1.8.1.14 PINTADO DE ESTRUCTURAS HIDRAULICAS m² 15.40 6.55 100.87 0.00 0.00 0.00 0.00
1.8.1.15 EMBOQUILLADO DE PIEDRA Y CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 0.20 173.96 34.79 0.00 0.00 0.00 0.00
1.8.2 TUBERÍA Y ACCESORIOS 2,966.76
1.8.2.1 TAPA METÁLICA DE 0.60X0.60 INCL ACCESORIOS und 2.00 96.21 192.42 0.00 0.00 0.00 0.00
1.8.2.2 TAPA METÁLICA DE 0.80X0.80 INCL. ACCESORIOS und 2.00 127.22 254.44 0.00 0.00 0.00 0.00
1.8.2.3 ACCESORIOS CAMARA DE REUNIÓN INSIENSUYOC gbl 1.00 973.22 973.22 0.00 0.00 0.00 0.00
1.8.2.4 ACCESORIOS CAMARA DE REUNIO SISTEMA PIÑALPATA gbl 1.00 1,118.88 1,118.88 0.00 0.00 0.00 0.00
1.8.2.5 TUBO DE VENTILACIÓN DE F°G° DE 2" und 2.00 213.90 427.80 0.00 0.00 0.00 0.00
1.9 CAMARA ROMPE PRESIÓN TIPO 6 6,989.32
1.9.1 ESTRUCTURA Y ACABADOS 5,252.57
1.9.1.1 TRAZO, NIVELES Y REPLANTEO m² 6.60 1.62 10.69 2.20 0.00 0.00 0.00
1.9.1.2 LIMPIEZA MANUAL DE TERRENO m² 6.60 1.34 8.84 2.20 0.00 0.00 0.00
1.9.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 2.94 21.37 62.83 1.68 0.00 0.00 0.00
1.9.1.4 PERFILADO Y COMPACTADO MANUAL m² 6.03 1.49 8.98 0.54 0.00 0.00 0.00
1.9.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 2.94 17.81 52.36 0.84 0.00 0.00 0.00
1.9.1.6 ENCOFRADO Y DESENCOFRADO m² 37.80 40.29 1,522.96 0.00 0.00 0.00 0.00
1.9.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 107.18 7.64 818.86 0.00 0.00 0.00 0.00
1.9.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 0.30 265.80 79.74 0.00 0.00 0.00 0.00
1.9.1.9 CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 0.04 294.44 11.78 0.00 0.00 0.00 0.00
1.9.1.10 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 3.36 371.80 1,249.25 0.00 0.00 0.00 0.00
1.9.1.11 CURADO DE CONCRETO m² 44.31 0.50 22.16 0.00 0.00 0.00 0.00
1.9.1.12 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 13.32 56.20 748.58 0.00 0.00 0.00 0.00
1.9.1.13 TARRAJEO EN MUROS E=1.5 CM m² 23.67 18.94 448.31 0.00 0.00 0.00 0.00
1.9.1.14 PINTADO DE ESTRUCTURAS HIDRAULICAS m² 23.67 6.55 155.04 0.00 0.00 0.00 0.00
1.9.1.15 EMBOQUILLADO DE PIEDRA Y CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 0.30 173.96 52.19 0.00 0.00 0.00 0.00
1.9.2 TUBERÍA Y ACCESORIOS 1,736.75
1.9.2.1 VÁLVULA COMPUERTA DE 3/4" INCL. ACCESORIOS und 2.00 97.43 194.86 0.00 0.00 0.00 0.00
1.9.2.2 CANASTILLA PVC DE 3/4" INCL. ACCESORIOS und 2.00 23.33 46.66 0.00 0.00 0.00 0.00
1.9.2.3 VÁLVULA COMPUERTA DE 1" INCL. ACCESORIOS und 1.00 125.97 125.97 0.00 0.00 0.00 0.00
1.9.2.4 CANASTILLA PVC DE 1" INCL. ACCESORIOS und 1.00 39.81 39.81 0.00 0.00 0.00 0.00
1.9.2.5 TUBERÍA DE LIMPIA Y REBOSE DE 2" und 3.00 146.25 438.75 0.00 0.00 0.00 0.00
1.9.2.6 TUBO DE VENTILACIÓN DE F°G° DE 2" und 3.00 213.90 641.70 0.00 0.00 0.00 0.00
1.9.2.7 TAPA METÁLICA DE 0.60X0.60 INCL ACCESORIOS und 1.00 96.21 96.21 0.00 0.00 0.00 0.00
1.9.2.8 TAPA METÁLICA DE 0.50X0.40 INCL ACCESORIOS und 1.00 152.79 152.79 0.00 0.00 0.00 0.00
1.10 RESERVORIO 5 M3 17,328.35
1.10.1 ESTRUCTURA Y ACABADOS 13,607.09
1.10.1.1 TRAZO, NIVELES Y REPLANTEO m² 19.60 1.62 31.75 0.00 0.00 0.00 0.00
1.10.1.2 LIMPIEZA MANUAL DE TERRENO m² 19.60 1.34 26.26 0.00 0.00 0.00 0.00
1.10.1.3 CORTE MANUAL EN TERRENO NORMAL m³ 5.53 21.37 118.18 0.00 0.00 0.00 0.00
1.10.1.4 PERFILADO Y COMPACTADO MANUAL m² 21.17 1.49 31.54 0.00 0.00 0.00 0.00
1.10.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 5.53 17.81 98.49 0.00 0.00 0.00 0.00

F-8.2(38/57)
9. VALORIZACIÓNES DE AVANCE DE OBRA
9.3. VALORIZACIÓN PROGRAMADA
DESAGREGADO
OBRA "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO"
ENTIDAD MUNICIPALIDAD DISTRITAL DE MARANURA
U. EJECUTORA SUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL
RESIDENTE DE ING. Jorge Luis Valencia Cordova
INSPECTOR DEING. Edgar Viamonte Calla
FECHA August-2022

PRESUPUESTO BASE AVANCE


METRADO COSTOS
ANALISIS DE PRECIOS UNIT. MONTO
ITEMS DESCRIPCION PARTIDA
U.M. CANT P.U. PARCIAL METRADO MES M.O. MAT. SERV. M.O. MAT. SERV.
1.10.1.6 ENCOFRADO Y DESENCOFRADO m² 55.39 40.29 2,231.66 0.00 0.00 0.00 0.00
1.10.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 492.58 7.64 3,763.31 0.00 0.00 0.00 0.00
1.10.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 0.49 265.80 130.24 0.00 0.00 0.00 0.00
1.10.1.9 EMPEDRADO E=12.5CM m² 12.00 13.95 167.40 0.00 0.00 0.00 0.00
1.10.1.10 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 2.08 371.80 773.34 0.00 0.00 0.00 0.00
1.10.1.11 CONCRETO F´C=280 KG/CM2 (MEZCLA MANUAL) C/IMPERMEABILIZANTE m³ 5.20 813.92 4,232.38 0.00 0.00 0.00 0.00
1.10.1.12 CURADO DE CONCRETO m² 55.66 0.50 27.83 0.00 0.00 0.00 0.00
1.10.1.13 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 18.27 56.20 1,026.77 0.00 0.00 0.00 0.00
1.10.1.14 TARRAJEO EN MUROS E=1.5 CM m² 37.79 18.94 715.74 0.00 0.00 0.00 0.00
1.10.1.15 PINTADO DE ESTRUCTURAS HIDRAULICAS m² 35.45 6.55 232.20 0.00 0.00 0.00 0.00
1.10.2 TUBERÍA Y ACCESORIOS 2,556.02
1.10.2.1 ACCESORIOS DE CAJA DE VÁLVULAS PARA RESERVORIO DE 5 M3 gbl 1.00 1,932.29 1,932.29 0.00 0.00 0.00 0.00
1.10.2.2 TUBO DE VENTILACIÓN DE F°G° DE 2" und 1.00 213.90 213.90 0.00 0.00 0.00 0.00
1.10.2.3 SISTEMA DE CLORACIÓN DE 60 LITROS und 1.00 217.41 217.41 0.00 0.00 0.00 0.00
1.10.2.4 TAPA METÁLICA DE 0.60X0.60 INCL ACCESORIOS und 2.00 96.21 192.42 0.00 0.00 0.00 0.00
1.10.3 CERCO PERIMÉTRICO DE PROTECCIÓN 1,165.24
1.10.3.1 POSTES DE TUBO F°G° DE 2" CON GANCHOS und 9.00 90.00 810.00 0.00 0.00 0.00 0.00
1.10.3.2 ALAMBRE DE PUES PARA CERCO PERIMÉTRICO m 210.00 0.84 176.40 0.00 0.00 0.00 0.00
1.10.3.3 PUERTA METÁLICA DE ACCESO und 1.00 178.84 178.84 0.00 0.00 0.00 0.00
1.11 RESERVORIO 2.5 M3 12,871.67
1.11.1 ESTRUCTURA Y ACABADOS 9,384.30
1.11.1.1 TRAZO, NIVELES Y REPLANTEO m² 11.36 1.62 18.40 0.00 0.00 0.00 0.00
1.11.1.2 LIMPIEZA MANUAL DE TERRENO m² 11.36 1.34 15.22 0.00 0.00 0.00 0.00
1.11.1.3 CORTE MANUAL EN TERRENO NORMAL m³ 3.58 21.37 76.50 0.00 0.00 0.00 0.00
1.11.1.4 PERFILADO Y COMPACTADO MANUAL m² 13.44 1.49 20.03 0.00 0.00 0.00 0.00
1.11.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 3.58 17.81 63.76 0.00 0.00 0.00 0.00
1.11.1.6 ENCOFRADO Y DESENCOFRADO m² 40.80 40.29 1,643.83 0.00 0.00 0.00 0.00
1.11.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 328.04 7.64 2,506.23 0.00 0.00 0.00 0.00
1.11.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 0.29 265.80 77.08 0.00 0.00 0.00 0.00
1.11.1.9 EMPEDRADO E=12.5CM m² 7.59 13.95 105.88 0.00 0.00 0.00 0.00
1.11.1.10 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 1.54 371.80 572.57 0.00 0.00 0.00 0.00
1.11.1.11 CONCRETO F´C=280 KG/CM2 (MEZCLA MANUAL) C/IMPERMEABILIZANTE m³ 3.50 813.92 2,848.72 0.00 0.00 0.00 0.00
1.11.1.12 CURADO DE CONCRETO m² 40.80 0.50 20.40 0.00 0.00 0.00 0.00
1.11.1.13 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 11.67 56.20 655.85 0.00 0.00 0.00 0.00
1.11.1.14 TARRAJEO EN MUROS E=1.5 CM m² 30.41 18.94 575.97 0.00 0.00 0.00 0.00
1.11.1.15 PINTADO DE ESTRUCTURAS HIDRAULICAS m² 28.07 6.55 183.86 0.00 0.00 0.00 0.00
1.11.2 TUBERÍA Y ACCESORIOS 2,462.53
1.11.2.1 ACCESORIOS DE CAJA DE VÁLVULAS PARA RESERVORIO DE 2.5 M3 gbl 1.00 1,844.80 1,844.80 0.00 0.00 0.00 0.00
1.11.2.2 TUBO DE VENTILACIÓN DE F°G° DE 2" und 1.00 213.90 213.90 0.00 0.00 0.00 0.00
1.11.2.3 SISTEMA DE CLORACIÓN DE 30 LITROS und 1.00 211.41 211.41 0.00 0.00 0.00 0.00
1.11.2.4 TAPA METÁLICA DE 0.60X0.60 INCL ACCESORIOS und 2.00 96.21 192.42 0.00 0.00 0.00 0.00
1.11.3 CERCO PERIMÉTRICO DE PROTECCIÓN 1,024.84
1.11.3.1 POSTES DE TUBO F°G° DE 2" CON GANCHOS und 8.00 90.00 720.00 0.00 0.00 0.00 0.00
1.11.3.2 ALAMBRE DE PUES PARA CERCO PERIMÉTRICO m 150.00 0.84 126.00 0.00 0.00 0.00 0.00
1.11.3.3 PUERTA METÁLICA DE ACCESO und 1.00 178.84 178.84 0.00 0.00 0.00 0.00
1.12 TANQUE DE POLIETILENO 11,039.53
1.12.1 ESTRUCTURA Y ACABADOS 10,351.89
1.12.1.1 TRAZO, NIVELES Y REPLANTEO m² 11.25 1.62 18.23 0.00 0.00 0.00 0.00
1.12.1.2 LIMPIEZA MANUAL DE TERRENO m² 11.25 1.34 15.08 0.00 0.00 0.00 0.00
1.12.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 1.13 21.37 24.15 0.00 0.00 0.00 0.00
1.12.1.4 PERFILADO Y COMPACTADO MANUAL m² 11.25 1.49 16.76 0.00 0.00 0.00 0.00
1.12.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 1.13 17.81 20.13 0.00 0.00 0.00 0.00
1.12.1.6 ENCOFRADO Y DESENCOFRADO m² 6.00 40.29 241.74 0.00 0.00 0.00 0.00
1.12.1.7 EMPEDRADO E=12.5CM m² 11.25 13.95 156.94 0.00 0.00 0.00 0.00
1.12.1.8 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 1.13 371.80 420.13 0.00 0.00 0.00 0.00
1.12.1.9 CURADO DE CONCRETO m² 11.25 0.50 5.63 0.00 0.00 0.00 0.00
1.12.1.10 TANQUE DE POLIETILENO DE 600 LT INCL. ACCESORIOS und 3.00 568.54 1,705.62 0.00 0.00 0.00 0.00
1.12.1.11 TANQUE DE POLIETILENO DE 1100 LT INCL. ACCESORIOS und 1.00 918.54 918.54 0.00 0.00 0.00 0.00
1.12.1.12 TANQUE DE POLIETILENO DE 1500 LT INCL. ACCESORIOS und 1.00 1,283.54 1,283.54 0.00 0.00 0.00 0.00
1.12.1.13 COBERTURA DE TANQUES DE POLIETILENO und 5.00 1,105.08 5,525.40 0.00 0.00 0.00 0.00
1.12.2 CERCO PERIMÉTRICO DE PROTECCIÓN 687.64
1.12.2.1 POSTES DE TUBO F°G° DE 2" CON GANCHOS und 5.00 90.00 450.00 0.00 0.00 0.00 0.00
1.12.2.2 ALAMBRE DE PUES PARA CERCO PERIMÉTRICO m 70.00 0.84 58.80 0.00 0.00 0.00 0.00
1.12.2.3 PUERTA METÁLICA DE ACCESO und 1.00 178.84 178.84 0.00 0.00 0.00 0.00
1.13 LINEA DE ADUCCIÓN 107,577.36
1.13.1 TRAZO, NIVELES Y REPLANTEO m² 2,127.19 1.62 3,446.05 24.00 0.00 0.00 0.00
1.13.2 LIMPIEZA MANUAL DE TERRENO m² 2,127.19 1.34 2,850.43 24.00 0.00 0.00 0.00
1.13.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 1,276.32 21.37 27,274.96 14.40 0.00 0.00 0.00
1.13.4 PERFILADO Y COMPACTADO MANUAL m² 2,127.19 1.49 3,169.51 344.00 0.00 0.00 0.00
1.13.5 CAMA DE APOYO CON MATERIAL PROPIO SELECCIONADO E=0.10 m m² 2,127.19 3.38 7,189.90 280.00 0.00 0.00 0.00
1.13.6 TUBO PVC NTP 399.002 DN 30 MM C-10 m 201.32 12.59 2,534.62 38.00 0.00 0.00 0.00
1.13.7 TUBO PVC NTP 399.002 DN 26.5 MM C-10 m 1,841.64 10.49 19,318.80 680.00 0.00 0.00 0.00
1.13.8 TUBO PVC NTP 399.002 DN 21 MM C-15 und 674.11 8.08 5,446.81 0.00 0.00 0.00 0.00
1.13.9 TUBO PVC NTP 399.002 DN 21 MM C-10 m 2,600.91 6.56 17,061.97 115.00 0.00 0.00 0.00
1.13.10 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO EN CAPAS DE E=0.20M m³ 1,169.96 14.54 17,011.22 154.00 0.00 0.00 0.00
1.13.11 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 127.63 17.81 2,273.09 0.00 0.00 0.00 0.00
1.14 CAMARA DE DISTRIBUCIÓN DE CAUDALES 19,249.52
1.14.1 ESTRUCTURA Y ACABADOS 11,232.00
1.14.1.1 TRAZO, NIVELES Y REPLANTEO m² 17.28 1.62 27.99 0.00 0.00 0.00 0.00
1.14.1.2 LIMPIEZA MANUAL DE TERRENO m² 17.28 1.34 23.16 0.00 0.00 0.00 0.00
1.14.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 4.51 21.37 96.38 0.00 0.00 0.00 0.00
1.14.1.4 PERFILADO Y COMPACTADO MANUAL m² 17.28 1.49 25.75 0.00 0.00 0.00 0.00
1.14.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 4.51 17.81 80.32 0.00 0.00 0.00 0.00
1.14.1.6 ENCOFRADO Y DESENCOFRADO m² 71.22 40.29 2,869.45 0.00 0.00 0.00 0.00
1.14.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 360.35 7.64 2,753.07 0.00 0.00 0.00 0.00
1.14.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 0.76 265.80 202.01 0.00 0.00 0.00 0.00
1.14.1.9 CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 0.07 294.44 20.61 0.00 0.00 0.00 0.00
1.14.1.10 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 5.33 371.80 1,981.69 0.00 0.00 0.00 0.00
1.14.1.11 CURADO DE CONCRETO m² 89.70 0.50 44.85 0.00 0.00 0.00 0.00
1.14.1.12 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 26.10 56.20 1,466.82 0.00 0.00 0.00 0.00
1.14.1.13 TARRAJEO EN MUROS E=1.5 CM m² 60.24 18.94 1,140.95 0.00 0.00 0.00 0.00
1.14.1.14 PINTADO DE ESTRUCTURAS HIDRAULICAS m² 60.24 6.55 394.57 0.00 0.00 0.00 0.00
1.14.1.15 EMBOQUILLADO DE PIEDRA Y CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 0.60 173.96 104.38 0.00 0.00 0.00 0.00
1.14.2 TUBERÍA Y ACCESORIOS 8,017.52
1.14.2.1 TAPA METÁLICA DE 0.60X0.60 INCL ACCESORIOS und 12.00 96.21 1,154.52 0.00 0.00 0.00 0.00
1.14.2.2 ACCESORIOS CAMARA DE DISTRIBUCIÓN DE CAUDALES TIPO gbl 2.00 1,480.56 2,961.12 0.00 0.00 0.00 0.00
1.14.2.3 ACCESORIOS CAMARA DE DISTRIBUCIÓN DE CAUDALES LUYCHO ALTO gbl 1.00 2,618.48 2,618.48 0.00 0.00 0.00 0.00
1.14.2.4 TUBO DE VENTILACIÓN DE F°G° DE 2" und 6.00 213.90 1,283.40 0.00 0.00 0.00 0.00
1.15 CAMARA ROMPE PRESIÓN TIPO 7 62,224.90
1.15.1 ESTRUCTURA Y ACABADOS 36,719.68
1.15.1.1 TRAZO, NIVELES Y REPLANTEO m² 50.40 1.62 81.65 0.00 0.00 0.00 0.00
1.15.1.2 LIMPIEZA MANUAL DE TERRENO m² 50.40 1.34 67.54 0.00 0.00 0.00 0.00

F-8.2(39/57)
9. VALORIZACIÓNES DE AVANCE DE OBRA
9.3. VALORIZACIÓN PROGRAMADA
DESAGREGADO
OBRA "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO"
ENTIDAD MUNICIPALIDAD DISTRITAL DE MARANURA
U. EJECUTORA SUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL
RESIDENTE DE ING. Jorge Luis Valencia Cordova
INSPECTOR DEING. Edgar Viamonte Calla
FECHA August-2022

PRESUPUESTO BASE AVANCE


METRADO COSTOS
ANALISIS DE PRECIOS UNIT. MONTO
ITEMS DESCRIPCION PARTIDA
U.M. CANT P.U. PARCIAL METRADO MES M.O. MAT. SERV. M.O. MAT. SERV.
1.15.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 35.28 21.37 753.93 0.00 0.00 0.00 0.00
1.15.1.4 PERFILADO Y COMPACTADO MANUAL m² 50.40 1.49 75.10 0.00 0.00 0.00 0.00
1.15.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 35.28 17.81 628.34 0.00 0.00 0.00 0.00
1.15.1.6 ENCOFRADO Y DESENCOFRADO m² 253.60 40.29 10,217.54 0.00 0.00 0.00 0.00
1.15.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 1,121.72 7.64 8,569.94 0.00 0.00 0.00 0.00
1.15.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 2.64 265.80 701.71 0.00 0.00 0.00 0.00
1.15.1.9 CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 0.26 294.44 76.55 0.00 0.00 0.00 0.00
1.15.1.10 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 16.80 371.80 6,246.24 0.00 0.00 0.00 0.00
1.15.1.11 CURADO DE CONCRETO m² 306.40 0.50 153.20 0.00 0.00 0.00 0.00
1.15.1.12 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 84.00 56.20 4,720.80 0.00 0.00 0.00 0.00
1.15.1.13 TARRAJEO EN MUROS E=1.5 CM m² 173.60 18.94 3,287.98 0.00 0.00 0.00 0.00
1.15.1.14 PINTADO DE ESTRUCTURAS HIDRAULICAS m² 120.80 6.55 791.24 0.00 0.00 0.00 0.00
1.15.1.15 EMBOQUILLADO DE PIEDRA Y CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 2.00 173.96 347.92 0.00 0.00 0.00 0.00
1.15.2 TUBERÍA Y ACCESORIOS 25,505.22
1.15.2.1 TAPA METÁLICA DE 0.60X0.60 INCL ACCESORIOS und 20.00 96.21 1,924.20 0.00 0.00 0.00 0.00
1.15.2.2 TAPA METÁLICA DE 0.80X0.80 INCL. ACCESORIOS und 20.00 127.22 2,544.40 0.00 0.00 0.00 0.00
1.15.2.3 ACCESORIOS DE DIAMETRO DE 3/4" PARA CAMARA ROMPE PRESION TIPO 7 und 4.00 923.05 3,692.20 0.00 0.00 0.00 0.00
1.15.2.4 ACCESORIOS DE DIAMETRO DE 1/2" PARA CAMARA ROMPE PRESION TIPO 7 und 16.00 815.02 13,040.32 0.00 0.00 0.00 0.00
1.15.2.5 REDUCCIÓN PVC DE 3/4" A 1/2" und 6.00 4.35 26.10 0.00 0.00 0.00 0.00
1.15.2.6 TUBO DE VENTILACIÓN DE F°G° DE 2" und 20.00 213.90 4,278.00 0.00 0.00 0.00 0.00
1.16 LINEA DE DISTRIBUCIÓN 46,809.58
1.16.1 TRAZO, NIVELES Y REPLANTEO m² 1,302.58 1.62 2,110.18 136.00 0.00 0.00 0.00
1.16.2 LIMPIEZA MANUAL DE TERRENO m² 1,302.58 1.34 1,745.46 136.00 0.00 0.00 0.00
1.16.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 781.55 21.37 16,701.72 81.60 0.00 0.00 0.00
1.16.4 PERFILADO Y COMPACTADO MANUAL m² 1,302.58 1.49 1,940.84 236.00 0.00 0.00 0.00
1.16.5 CAMA DE APOYO CON MATERIAL PROPIO SELECCIONADO E=0.10 m m² 1,302.58 3.38 4,402.72 230.00 0.00 0.00 0.00
1.16.6 TUBO PVC NTP 399.002 DN 21 MM C-10 m 1,302.58 6.56 8,544.92 524.00 0.00 0.00 0.00
1.16.7 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO EN CAPAS DE E=0.20M m³ 781.55 14.54 11,363.74 134.40 0.00 0.00 0.00
1.17 VÁVULAS DE CONTROL, PURGA Y PURGA DE AIRE 13,280.65
1.17.1 ESTRUCTURA Y ACABADOS 4,712.98
1.17.1.1 TRAZO, NIVELES Y REPLANTEO m² 18.36 1.62 29.74 0.00 0.00 0.00 0.00
1.17.1.2 LIMPIEZA MANUAL DE TERRENO m² 18.36 1.34 24.60 0.00 0.00 0.00 0.00
1.17.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 7.34 21.37 156.86 0.00 0.00 0.00 0.00
1.17.1.4 PERFILADO Y COMPACTADO MANUAL m² 18.36 1.49 27.36 0.00 0.00 0.00 0.00
1.17.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 7.34 17.81 130.73 0.00 0.00 0.00 0.00
1.17.1.6 ENCOFRADO Y DESENCOFRADO m² 81.60 40.29 3,287.66 0.00 0.00 0.00 0.00
1.17.1.7 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 2.71 371.80 1,007.58 0.00 0.00 0.00 0.00
1.17.1.8 CURADO DE CONCRETO m² 96.90 0.50 48.45 0.00 0.00 0.00 0.00
1.17.2 TUBERÍA Y ACCESORIOS 8,567.67
1.17.2.1 VÁLVULA GLOBO DE 1/2" INCL. ACCESORIOS und 61.00 25.95 1,582.95 0.00 0.00 0.00 0.00
1.17.2.2 VÁLVULA GLOBO DE 3/4" INCL. ACCESORIOS und 27.00 37.25 1,005.75 0.00 0.00 0.00 0.00
1.17.2.3 VÁLVULA GLOBO DE 1" INCL. ACCESORIOS und 8.00 47.57 380.56 0.00 0.00 0.00 0.00
1.17.2.4 TAPA METÁLICA DE 0.40X0.40 INCL ACCESORIOS und 68.00 75.57 5,138.76 0.00 0.00 0.00 0.00
1.17.2.5 VÁLVULA DE PURGA DE AIRE DE 1" INCL. ACCESORIOS und 1.00 99.11 99.11 0.00 0.00 0.00 0.00
1.17.2.6 VÁLVULA DE PURGA DE AIRE DE 3/4" INCL. ACCESORIOS und 3.00 79.50 238.50 0.00 0.00 0.00 0.00
1.17.2.7 VÁLVULA DE PURGA DE AIRE DE 1/2" INCL. ACCESORIOS und 2.00 61.02 122.04 0.00 0.00 0.00 0.00
1.18 PASE AEREO DE 5 M 4,594.52
1.18.1 OBRAS DE CONCRETO ARMADO 3,521.70
1.18.1.1 TRAZO, NIVELES Y REPLANTEO m² 48.00 1.62 77.76 0.00 0.00 0.00 0.00
1.18.1.2 LIMPIEZA MANUAL DE TERRENO m² 48.00 1.34 64.32 0.00 0.00 0.00 0.00
1.18.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 5.28 21.37 112.83 0.00 0.00 0.00 0.00
1.18.1.4 PERFILADO Y COMPACTADO MANUAL m² 5.96 1.49 8.88 0.00 0.00 0.00 0.00
1.18.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 2.88 17.81 51.29 0.00 0.00 0.00 0.00
1.18.1.6 ENCOFRADO Y DESENCOFRADO m² 10.56 40.29 425.46 0.00 0.00 0.00 0.00
1.18.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 160.06 7.64 1,222.86 0.00 0.00 0.00 0.00
1.18.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 0.20 265.80 53.16 0.00 0.00 0.00 0.00
1.18.1.9 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 1.08 371.80 401.54 0.00 0.00 0.00 0.00
1.18.1.10 CONCRETO F´C=210KG/CM2 (MEZCLA MANUAL) m³ 2.39 458.30 1,095.34 0.00 0.00 0.00 0.00
1.18.1.11 CURADO DE CONCRETO m² 16.52 0.50 8.26 0.00 0.00 0.00 0.00
1.18.2 TUBERÍA Y ACCESORIOS 1,072.82
1.18.2.1 TUBO HDPE NTP-ISO 4427:2008 DN 32 MM INCL ACCESORIOS m 11.05 2.55 28.18 0.00 0.00 0.00 0.00
1.18.2.2 ENLACE ROSCADO TIPO MACHO HDPE DN 32 MM INCL ACCESORIOS und 2.00 17.09 34.18 0.00 0.00 0.00 0.00
1.18.2.3 TUBO HDPE NTP-ISO 4427:2008 DN 25 MM INCL ACCESORIOS m 11.05 1.97 21.77 0.00 0.00 0.00 0.00
1.18.2.4 ENLACE ROSCADO TIPO MACHO HDPE DN 25 MM INCL ACCESORIOS und 2.00 11.67 23.34 0.00 0.00 0.00 0.00
1.18.2.5 ABRAZADERA DE PLATINA DE 1/8" INCL ACCESORIOS und 10.00 9.71 97.10 0.00 0.00 0.00 0.00
1.18.2.6 ABRAZADERA DE PLATINA DE 1/2" INCL. ACCESORIOS und 10.00 15.61 156.10 0.00 0.00 0.00 0.00
1.18.2.7 CABLE TIPO BOA DE 1/2" m 25.70 7.18 184.53 0.00 0.00 0.00 0.00
1.18.2.8 PÉNDOLAS DE ACERO DE 1/4" SERIE 6x19 TIPO BOA m 7.00 5.35 37.45 0.00 0.00 0.00 0.00
1.18.2.9 GRAPA GROSBY DE 1/2" und 24.00 7.83 187.92 0.00 0.00 0.00 0.00
1.18.2.10 TEMPLADOR DE DOS ESPIGAS DE 1/2" CON GUADACABO und 4.00 15.08 60.32 0.00 0.00 0.00 0.00
1.18.2.11 CARRITO DE DILATACIÓN DE 0.30X0.30 INCL. ACCESORIOS und 4.00 52.28 209.12 0.00 0.00 0.00 0.00
1.18.2.12 RIEL DE ACERO PARA FIJADO 2"x3"x1/2 m 0.80 41.01 32.81 0.00 0.00 0.00 0.00
1.19 PASE AREO DE 10 M 6,229.08
1.19.1 OBRAS DE CONCRETO ARMADO 4,756.37
1.19.1.1 TRAZO, NIVELES Y REPLANTEO m² 100.00 1.62 162.00 0.00 0.00 0.00 0.00
1.19.1.2 LIMPIEZA MANUAL DE TERRENO m² 100.00 1.34 134.00 0.00 0.00 0.00 0.00
1.19.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 9.61 21.37 205.37 0.00 0.00 0.00 0.00
1.19.1.4 PERFILADO Y COMPACTADO MANUAL m² 7.69 1.49 11.46 0.00 0.00 0.00 0.00
1.19.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 5.05 17.81 89.94 0.00 0.00 0.00 0.00
1.19.1.6 ENCOFRADO Y DESENCOFRADO m² 13.44 40.29 541.50 0.00 0.00 0.00 0.00
1.19.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 181.69 7.64 1,388.11 0.00 0.00 0.00 0.00
1.19.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 0.24 265.80 63.79 0.00 0.00 0.00 0.00
1.19.1.9 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 2.17 371.80 806.81 0.00 0.00 0.00 0.00
1.19.1.10 CONCRETO F´C=210KG/CM2 (MEZCLA MANUAL) m³ 2.93 458.30 1,342.82 0.00 0.00 0.00 0.00
1.19.1.11 CURADO DE CONCRETO m² 21.13 0.50 10.57 0.00 0.00 0.00 0.00
1.19.2 TUBERÍA Y ACCESORIOS 1,472.71
1.19.2.1 TUBO HDPE NTP-ISO 4427:2008 DN 32 MM INCL INSTALACIÓN m 17.50 3.14 54.95 0.00 0.00 0.00 0.00
1.19.2.2 ENLACE ROSCADO TIPO MACHO HDPE DN 32 MM INCL ACCESORIOS und 2.00 17.25 34.50 0.00 0.00 0.00 0.00
1.19.2.3 TUBO HDPE NTP-ISO 4427:2008 DN 25 MM INCL INSTALACIÓN m 17.50 2.56 44.80 0.00 0.00 0.00 0.00
1.19.2.4 ENLACE ROSCADO TIPO MACHO HDPE DN 25 MM INCL ACCESORIOS und 2.00 12.00 24.00 0.00 0.00 0.00 0.00
1.19.2.5 ABRAZADERA DE PLATINA DE 1/8" INCL ACCESORIOS und 18.00 9.71 174.78 0.00 0.00 0.00 0.00
1.19.2.6 ABRAZADERA DE PLATINA DE 1/2" INCL. ACCESORIOS und 18.00 15.61 280.98 0.00 0.00 0.00 0.00
1.19.2.7 CABLE TIPO BOA DE 1/2" m 40.30 7.18 289.35 0.00 0.00 0.00 0.00
1.19.2.8 PÉNDOLAS DE ACERO DE 1/4" SERIE 6x19 TIPO BOA m 14.80 5.35 79.18 0.00 0.00 0.00 0.00
1.19.2.9 GRAPA GROSBY DE 1/2" und 24.00 7.83 187.92 0.00 0.00 0.00 0.00
1.19.2.10 TEMPLADOR DE DOS ESPIGAS DE 1/2" CON GUADACABO und 4.00 15.08 60.32 0.00 0.00 0.00 0.00
1.19.2.11 CARRITO DE DILATACIÓN DE 0.30X0.30 INCL. ACCESORIOS und 4.00 52.28 209.12 0.00 0.00 0.00 0.00
1.19.2.12 RIEL DE ACERO PARA FIJADO 2"x3"x1/2 m 0.80 41.01 32.81 0.00 0.00 0.00 0.00
1.20 PASE AEREO LINEA DE CONDUCCIÓN LUYCHO ALTO 1,558.79
1.20.1 TUBO HDPE NTP-ISO 4427:2008 DN 63 MM INCL INSTALACIÓN m 166.60 5.71 951.29 0.00 0.00 0.00 0.00
1.20.2 ENLACE ROSCADO TIPO MACHO HDPE DN 63 MM INCL ACCESORIOS und 10.00 60.75 607.50 0.00 0.00 0.00 0.00
1.21 CONTROL DE CALIDAD 14,435.19

F-8.2(40/57)
9. VALORIZACIÓNES DE AVANCE DE OBRA
9.3. VALORIZACIÓN PROGRAMADA
DESAGREGADO
OBRA "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO"
ENTIDAD MUNICIPALIDAD DISTRITAL DE MARANURA
U. EJECUTORA SUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL
RESIDENTE DE ING. Jorge Luis Valencia Cordova
INSPECTOR DEING. Edgar Viamonte Calla
FECHA August-2022

PRESUPUESTO BASE AVANCE


METRADO COSTOS
ANALISIS DE PRECIOS UNIT. MONTO
ITEMS DESCRIPCION PARTIDA
U.M. CANT P.U. PARCIAL METRADO MES M.O. MAT. SERV. M.O. MAT. SERV.
1.21.1 PRUEBA HIDRÁULICA m 9,623.46 1.50 14,435.19 0.00 0.00 0.00 0.00

2 COMPONENTE 2: ADECUADO SISTEMA DE ELIMINACION DE EXCRETAS 856,906.14


2.1 TRABAJOS PRELIMINARES 86,623.85
2.1.1 TRANSPORTE DE MATERIALES A OBRA CON MAQUINARIA COMPONENTE 2 gbl 1.00 12,443.96 12,443.96 0.00 0.00 0.00 0.00
2.1.2 TRANSPORTE MANUAL DE MATERIALES DE PIE DE CARRETERA COMPONENTE 2 gbl 1.00 74,179.89 74,179.89 0.00 0.00 0.00 0.00
2.2 LETRINAS 459,057.68
2.2.1 OBRAS PRELIMINARES 2,908.26
2.2.1.1 LIMPIEZA MANUAL DE TERRENO m² 615.68 1.34 825.01 83.20 0.00 0.00 0.00
2.2.1.2 TRAZO, NIVELES Y REPLANTEO EN LETRINAS m² 532.80 3.91 2,083.25 72.00 0.00 0.00 0.00
2.2.2 MOVIMIENTO DE TIERRAS 8,652.06
2.2.2.1 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 199.27 21.37 4,258.40 43.42 0.00 0.00 0.00
2.2.2.2 PERFILADO Y COMPACTADO MANUAL m² 635.85 1.49 947.42 66.61 0.00 0.00 0.00
2.2.2.3 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 193.50 17.81 3,446.24 49.43 0.00 0.00 0.00
2.2.3 CIMIENTOS Y SOBRECIMIENTOS 41,189.43
2.2.3.1 CIMIENTO CORRIDO C:H 1:10+60%P.G. (MEZCLA MANUAL) m³ 115.44 190.24 21,961.31 10.92 0.00 0.00 0.00
2.2.3.2 ENCOFRADO Y DESENCOFRADO m² 307.47 40.29 12,387.97 26.49 0.00 0.00 0.00
2.2.3.3 SOBRECIMIENTO C:H 1:6+25%P..M. (MEZCLA MANUAL) m³ 22.31 293.66 6,551.55 2.10 0.00 0.00 0.00
2.2.3.4 CURADO DE CONCRETO m² 577.20 0.50 288.60 49.14 0.00 0.00 0.00
2.2.4 MUROS Y TABIQUES DE ALBAÑILERÍA 53,110.79
2.2.4.1 MURO DE BLOQUETA DE 15X20X40CM m² 1,093.94 48.55 53,110.79 173.90 0.00 0.00 0.00
2.2.5 CONCRETO ARMADO 20,778.84
2.2.5.1 ENCOFRADO Y DESENCOFRADO DE VIGUETAS m² 173.16 41.68 7,217.31 49.14 0.00 0.00 0.00
2.2.5.2 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 920.86 7.64 7,035.37 261.38 0.00 0.00 0.00
2.2.5.3 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 17.32 371.80 6,439.58 4.88 0.00 0.00 0.00
2.2.5.4 CURADO DE CONCRETO m² 173.16 0.50 86.58 49.14 0.00 0.00 0.00
2.2.6 PISOS Y PAVIMENTOS 35,192.83
2.2.6.1 EMPEDRADO E=12.5CM m² 431.42 13.95 6,018.31 100.66 0.00 0.00 0.00
2.2.6.2 ENCOFRADO Y DESENCOFRADO m² 28.86 40.29 1,162.77 0.00 0.00 0.00 0.00
2.2.6.3 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 36.68 371.80 13,637.62 8.54 0.00 0.00 0.00
2.2.6.4 CURADO DE CONCRETO m² 460.28 0.50 230.14 106.12 0.00 0.00 0.00
2.2.6.5 ENCHAPADO DE PISOS 0.45X0.45M m² 259.00 54.61 14,143.99 78.32 0.00 0.00 0.00
2.2.7 REVOQUES, ENLUCIDOS Y MOLDURAS 60,343.63
2.2.7.1 TARRAJEO EN MUROS E=1.5 CM m² 2,465.42 18.94 46,695.05 448.72 0.00 0.00 0.00
2.2.7.2 DERRAMES A=0.15 M MORTERO 1:5 m 73.26 14.65 1,073.26 43.99 0.00 0.00 0.00
2.2.7.3 ENCHAPADO CON CERÁMICO 0.30X0.40 m² 364.08 34.54 12,575.32 135.43 0.00 0.00 0.00
2.2.8 ZOCALOS Y CONTRAZOCALOS 5,106.00
2.2.8.1 ZOCALO CERÁMICO m 255.30 20.00 5,106.00 69.00 0.00 0.00 0.00
2.2.9 COBERTURA TECHO 44,867.98
2.2.9.1 CORREA P/TECHO CON MADERA TRATADA m 1,398.60 23.41 32,741.23 434.70 0.00 0.00 0.00
2.2.9.2 COBERTURA CON PLANCHA DE CALAMINA m² 555.00 21.85 12,126.75 172.50 0.00 0.00 0.00
2.2.10 CARPINTERÍA EN MADERA 42,535.20
2.2.10.1 PUERTA DE MADERA TIPO PERSIANA und 74.00 574.80 42,535.20 0.00 0.00 0.00 0.00
2.2.11 CERRAJERÍA 2,535.98
2.2.11.1 CERRADURA TIPO POMO DE ACERO und 74.00 34.27 2,535.98 0.00 0.00 0.00 0.00
2.2.12 PINTURA 15,055.50
2.2.12.1 PINTURA LATEX EN MUROS m² 2,066.56 6.68 13,804.62 0.00 0.00 0.00 0.00
2.2.12.2 PINTURA LATEX EN DERRAMES m 73.26 1.22 89.38 0.00 0.00 0.00 0.00
2.2.12.3 PINTURA EN PUERTAS C/BARNIZ 2 MANOS m² 118.40 9.81 1,161.50 0.00 0.00 0.00 0.00
2.2.13 INSTALACIONES SANITARIAS 44,197.18
2.2.13.1 TRAZO, NIVELES Y REPLANTEO m² 694.12 1.62 1,124.47 225.12 0.00 0.00 0.00
2.2.13.2 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 297.18 21.37 6,350.74 96.48 0.00 0.00 0.00
2.2.13.3 PERFILADO Y COMPACTADO MANUAL m² 694.12 1.49 1,034.24 225.12 0.00 0.00 0.00
2.2.13.4 CAMA DE APOYO CON MATERIAL PROPIO SELECCIONADO E=0.10 m m² 694.12 3.38 2,346.13 225.12 0.00 0.00 0.00
2.2.13.5 TUBO PVC SAP C-10 DE1/2" m 688.20 5.95 4,094.79 223.20 0.00 0.00 0.00
2.2.13.6 TUBO PVC SAL DE 2" m 828.80 7.97 6,605.54 268.80 0.00 0.00 0.00
2.2.13.7 TUBO PVC SAL DE 4" m 499.50 15.56 7,772.22 162.00 0.00 0.00 0.00
2.2.13.8 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO EN CAPAS DE E=0.20M m³ 263.00 14.54 3,824.02 85.20 0.00 0.00 0.00
2.2.13.9 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 34.19 17.81 608.92 8.16 0.00 0.00 0.00
2.2.13.10 ENCOFRADO Y DESENCOFRADO m² 149.67 40.29 6,030.20 0.00 0.00 0.00 0.00
2.2.13.11 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 278.43 7.64 2,127.21 0.00 0.00 0.00 0.00
2.2.13.12 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 5.94 371.80 2,208.49 0.00 0.00 0.00 0.00
2.2.13.13 CURADO DE CONCRETO m² 140.42 0.50 70.21 0.00 0.00 0.00 0.00
2.2.14 APARATOS Y ACCESORIOS SANITARIOS 82,584.00
2.2.14.1 SUMINISTRO E INSTALACIÓN DE SANITARIO und 74.00 403.32 29,845.68 0.00 0.00 0.00 0.00
2.2.14.2 SUMINISTRO E INSTALACIÓN DE LAVATORIO und 74.00 200.95 14,870.30 0.00 0.00 0.00 0.00
2.2.14.3 SALIDA DE DUCHA TIPO ROCIADOR und 74.00 60.27 4,459.98 0.00 0.00 0.00 0.00
2.2.14.4 LLAVE PARA DUCHA und 74.00 59.73 4,420.02 24.00 0.00 0.00 0.00
2.2.14.5 LLAVE PARA LAVATORIO und 74.00 38.92 2,880.08 0.00 0.00 0.00 0.00
2.2.14.6 CODO F°G° DE 1/2" und 222.00 4.88 1,083.36 72.00 0.00 0.00 0.00
2.2.14.7 CODO PVC SAP 1/2" und 74.00 4.04 298.96 24.00 0.00 0.00 0.00
2.2.14.8 TEE PVC SAP DE 1/2" und 148.00 6.01 889.48 48.00 0.00 0.00 0.00
2.2.14.9 MANGUERA DE ABASTOS DE 1/2" und 148.00 29.17 4,317.16 0.00 0.00 0.00 0.00
2.2.14.10 VÁLVULA GLOBO DE 1/2" INCL. ACCESORIOS und 148.00 25.95 3,840.60 48.00 0.00 0.00 0.00
2.2.14.11 SUMIDERO DE BRONCE DE 2" und 148.00 16.15 2,390.20 0.00 0.00 0.00 0.00
2.2.14.12 REGISTRO ROSACADO DE 4" und 74.00 1.51 111.74 0.00 0.00 0.00 0.00
2.2.14.13 KIT DE TRAMPA PVC PARA LAVATORIO 2" und 74.00 26.57 1,966.18 0.00 0.00 0.00 0.00
2.2.14.14 CODO PVC SAL 4" und 148.00 15.83 2,342.84 48.00 0.00 0.00 0.00
2.2.14.15 CODO PVC SAL 2" und 740.00 8.07 5,971.80 240.00 0.00 0.00 0.00
2.2.14.16 YEE PVC SAL DE 2" und 74.00 7.14 528.36 24.00 0.00 0.00 0.00
2.2.14.17 TEE PVC SAL DE 4" C/R 2" und 74.00 12.85 950.90 24.00 0.00 0.00 0.00
2.2.14.18 TEE PVC SAL 2" und 74.00 9.51 703.74 24.00 0.00 0.00 0.00
2.2.14.19 SOMBRERO DE VENTILACIÓN DE 2" und 74.00 9.63 712.62 24.00 0.00 0.00 0.00
2.3 PILETAS DOMICILIARIAS 58,723.04
2.3.1 ESTRUCTURA DE PILETA 42,524.35
2.3.1.1 TRAZO, NIVELES Y REPLANTEO EN CONEXIONES DOMICILIARIAS m² 146.52 1.23 180.22 35.64 0.00 0.00 0.00
2.3.1.2 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 29.30 21.37 626.14 7.20 0.00 0.00 0.00
2.3.1.3 PERFILADO Y COMPACTADO MANUAL m² 146.52 1.49 218.31 35.64 0.00 0.00 0.00
2.3.1.4 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 29.30 17.81 521.83 7.20 0.00 0.00 0.00
2.3.1.5 ENCOFRADO Y DESENCOFRADO m² 483.89 40.29 19,495.93 117.72 0.00 0.00 0.00
2.3.1.6 EMPEDRADO E=12.5CM m² 146.52 13.95 2,043.95 35.64 0.00 0.00 0.00
2.3.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 700.97 7.64 5,355.41 170.46 0.00 0.00 0.00
2.3.1.8 CONCRETO F´C=175KG/CM2 +30% PM (MEZCLA MANUAL) m³ 18.20 303.15 5,517.33 4.50 0.00 0.00 0.00
2.3.1.9 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 22.27 371.80 8,279.99 5.40 0.00 0.00 0.00
2.3.1.10 CURADO DE CONCRETO m² 570.47 0.50 285.24 153.18 0.00 0.00 0.00
2.3.2 TUBERÍAS Y ACCESORIOS 16,198.69
2.3.2.1 SUMIDERO DE BRONCE DE 2" und 74.00 16.15 1,195.10 0.00 0.00 0.00 0.00
2.3.2.2 TUBO PVC SAL DE 2" m 222.00 7.97 1,769.34 0.00 0.00 0.00 0.00
2.3.2.3 TRAMPA PARA LAVATORIO und 74.00 32.64 2,415.36 0.00 0.00 0.00 0.00
2.3.2.4 CODO PVC SAL 2" und 148.00 8.07 1,194.36 0.00 0.00 0.00 0.00
2.3.2.5 CODO F°G° DE 1/2" und 74.00 4.88 361.12 0.00 0.00 0.00 0.00
2.3.2.6 CODO PVC SAP 1/2" und 74.00 4.04 298.96 0.00 0.00 0.00 0.00

F-8.2(41/57)
9. VALORIZACIÓNES DE AVANCE DE OBRA
9.3. VALORIZACIÓN PROGRAMADA
DESAGREGADO
OBRA "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO"
ENTIDAD MUNICIPALIDAD DISTRITAL DE MARANURA
U. EJECUTORA SUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL
RESIDENTE DE ING. Jorge Luis Valencia Cordova
INSPECTOR DEING. Edgar Viamonte Calla
FECHA August-2022

PRESUPUESTO BASE AVANCE


METRADO COSTOS
ANALISIS DE PRECIOS UNIT. MONTO
ITEMS DESCRIPCION PARTIDA
U.M. CANT P.U. PARCIAL METRADO MES M.O. MAT. SERV. M.O. MAT. SERV.
2.3.2.7 TEE PVC SAP DE 1/2" und 74.00 6.01 444.74 0.00 0.00 0.00 0.00
2.3.2.8 GRIFO DE 1/2" INCL. ACCESORIOS und 74.00 42.17 3,120.58 0.00 0.00 0.00 0.00
2.3.2.9 VÁLVULA GLOBO DE 1/2" INCL. ACCESORIOS und 74.00 25.95 1,920.30 0.00 0.00 0.00 0.00
2.3.2.10 TUBO PVC SAP C-10 DE1/2" m 207.20 5.95 1,232.84 0.00 0.00 0.00 0.00
2.3.2.11 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 48.54 21.37 1,037.30 0.00 0.00 0.00 0.00
2.3.2.12 PERFILADO Y COMPACTADO MANUAL m² 121.36 1.49 180.83 0.00 0.00 0.00 0.00
2.3.2.13 CAMA DE APOYO CON MATERIAL PROPIO SELECCIONADO E=0.10 m m² 121.36 3.38 410.20 0.00 0.00 0.00 0.00
2.3.2.14 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO EN CAPAS DE E=0.20M m³ 42.48 14.54 617.66 0.00 0.00 0.00 0.00
2.4 SISTEMA DE TRATAMIENTO DE AGUAS RESIDUALES 252,501.57
2.4.1 BIODIGESTOR PREFABRICADO DE 600 L 165,197.23
2.4.1.1 ESTRUCTURA DE BIODIGESTOR 146,374.63
2.4.1.1.1 TRAZO, NIVELES Y REPLANTEO DE POZO SEPTICO m² 62.90 1.23 77.37 0.00 0.00 0.00 0.00
2.4.1.1.2 LIMPIEZA MANUAL DE TERRENO m² 62.90 1.34 84.29 0.00 0.00 0.00 0.00
2.4.1.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 113.22 21.37 2,419.51 0.00 0.00 0.00 0.00
2.4.1.1.4 PERFILADO Y COMPACTADO MANUAL m² 62.90 1.49 93.72 0.00 0.00 0.00 0.00
2.4.1.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 113.22 17.81 2,016.45 0.00 0.00 0.00 0.00
2.4.1.1.6 BIODIGESTOR PREFABRICADO DE 600 L und 74.00 1,875.64 138,797.36 0.00 0.00 0.00 0.00
2.4.1.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 55.50 7.64 424.02 0.00 0.00 0.00 0.00
2.4.1.1.8 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 1.04 371.80 386.67 0.00 0.00 0.00 0.00
2.4.1.1.9 CURADO DE CONCRETO m² 20.72 0.50 10.36 0.00 0.00 0.00 0.00
2.4.1.1.10 CAMA DE APOYO DE BIODIGESTOR m³ 12.58 126.87 1,596.02 0.00 0.00 0.00 0.00
2.4.1.1.11 RELLENO Y COMPACTADO MANUAL CON MATERIAL SELECCIONADO EN CAPAS DE E=0.20M m³ 26.64 17.60 468.86 0.00 0.00 0.00 0.00
2.4.1.2 CAMARA DE LODOS 18,822.60
2.4.1.2.1 TRAZO, NIVELES Y REPLANTEO DE CAMARA DE LODOS m² 26.64 2.64 70.33 0.00 0.00 0.00 0.00
2.4.1.2.2 LIMPIEZA MANUAL DE TERRENO m² 26.64 1.34 35.70 0.00 0.00 0.00 0.00
2.4.1.2.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 15.98 21.37 341.49 0.00 0.00 0.00 0.00
2.4.1.2.4 PERFILADO Y COMPACTADO MANUAL m² 26.64 1.49 39.69 0.00 0.00 0.00 0.00
2.4.1.2.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 15.98 17.81 284.60 0.00 0.00 0.00 0.00
2.4.1.2.6 ENCOFRADO Y DESENCOFRADO m² 267.14 40.29 10,763.07 0.00 0.00 0.00 0.00
2.4.1.2.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 388.50 7.64 2,968.14 0.00 0.00 0.00 0.00
2.4.1.2.8 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 11.21 371.80 4,167.88 0.00 0.00 0.00 0.00
2.4.1.2.9 CURADO DE CONCRETO m² 303.40 0.50 151.70 0.00 0.00 0.00 0.00
2.4.2 ZANJAS DE INFILTRACIÓN 87,304.34
2.4.2.1 TRAZO, NIVELES Y REPLANTEO DE ZANJAS DE INFILTRACIÓN m² 568.32 2.64 1,500.36 0.00 0.00 0.00 0.00
2.4.2.2 LIMPIEZA MANUAL DE TERRENO m² 568.32 1.34 761.55 0.00 0.00 0.00 0.00
2.4.2.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 681.98 21.37 14,573.91 0.00 0.00 0.00 0.00
2.4.2.4 PERFILADO Y COMPACTADO MANUAL m² 568.32 1.49 846.80 0.00 0.00 0.00 0.00
2.4.2.5 CAMA DE APOYO E=0.15 PIEDRA CHANCADA m² 568.32 6.83 3,881.63 0.00 0.00 0.00 0.00
2.4.2.6 TUBO PVC SAL PESADO DE 4" m 310.80 29.10 9,044.28 0.00 0.00 0.00 0.00
2.4.2.7 TUBO CRIBADO PVC SAL PESADO DE 4" m 1,110.00 29.40 32,634.00 0.00 0.00 0.00 0.00
2.4.2.8 TEE DOBLE PVC SAL PESADO 4" und 74.00 32.67 2,417.58 0.00 0.00 0.00 0.00
2.4.2.9 CODO PVC SAL PESADO 4" und 296.00 5.34 1,580.64 0.00 0.00 0.00 0.00
2.4.2.10 TAPON PVC SAL 4" und 222.00 13.68 3,036.96 0.00 0.00 0.00 0.00
2.4.2.11 RELLENO CON MATERIAL PÉTREO m³ 310.80 38.00 11,810.40 0.00 0.00 0.00 0.00
2.4.2.12 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO EN CAPAS DE E=0.20M m³ 358.75 14.54 5,216.23 0.00 0.00 0.00 0.00
COMPONENTE 3: ACCIONES DE PROMOCION, CAPACITACION EN JASS, SEGURIDAD Y
3 108,426.22
SALUD
3.1 DIAGNÓSTICO COMUNITARIO 2,891.60
3.1.1 COSTO DIAGNOSTICO COMUNITARIO gbl 1.00 2,891.60 2,891.60 0.00 0.00 0.00 0.00
3.2 ACCIONES DE PROMOCIÓN 10,302.90
3.2.1 MATERIALES ACCIONES DE PROMOCIÓN 1,724.90
3.2.1.1 MATERIAL DE PROMOCIÓN ENTREGADO POR EL PROYECTO gbl 1.00 1,500.00 1,500.00 0.00 0.00 0.00 0.00
3.2.1.2 MATERIAL PARA TALLERES PROMOCIÓN (ANTES Y DURANTE) gbl 1.00 224.90 224.90 0.00 0.00 0.00 0.00
3.2.2 ACCIONES DE PROMOCIÓN EN EL ANTES 1,815.60
3.2.2.1 PAGO POR PROMOCIÓN EN EL ANTES mes 1.00 1,815.60 1,815.60 0.00 0.00 0.00 0.00
3.2.3 ACCIONES DE PROMOCIÓN EN EL DURANTE 1,815.60
3.2.3.1 PAGO POR PROMOCIÓN EN EL DURANTE mes 1.00 1,815.60 1,815.60 0.00 0.00 0.00 0.00
3.2.4 ACCIONES DE PROMOCIÓN Y EDUCACIÓN PARA LA HIGIENE EN EL DESPUES 4,946.80
3.2.4.1 ACCIONES DE PROMOCIÓN Y SEGUIMIENTO A LA JASS (DESPUÉS) mes 2.00 1,815.60 3,631.20 0.00 0.00 0.00 0.00
3.2.4.2 MATERIAL PARA LA EJECUCIÓN DE LA PROMOCIÓN (DESPUÉS) gbl 1.00 22.00 22.00 0.00 0.00 0.00 0.00
3.2.4.3 CONCURSO COMUNIDAD SALUDABLE gbl 1.00 1,200.00 1,200.00 0.00 0.00 0.00 0.00
3.2.4.4 CAMPAÑAS DE SALUD E HIGIENE EN COMUNIDAD gbl 1.00 93.60 93.60 0.00 0.00 0.00 0.00
3.3 ACCIONES DE CAPACITACIÓN 6,491.40
3.3.1 MATERIALES ACCIONES DE CAPACITACIÓN 1,375.80
3.3.1.1 MATERIAL PARA TALLERES DE CAPACITACIÓN A JASS gbl 1.00 250.80 250.80 0.00 0.00 0.00 0.00
3.3.1.2 MATERIAL DE CAPACITACIÓN ENTREGADO POR EL PROYECTO gbl 1.00 1,125.00 1,125.00 0.00 0.00 0.00 0.00
3.3.2 ACCIONES DE CAPACITACIÓN 1,815.60
3.3.2.1 PAGO POR HONORARIOS TALLERES DE CAPACITACIÓN JASS gbl 1.00 1,815.60 1,815.60 0.00 0.00 0.00 0.00
3.3.3 ACCIONES DE CAPACITACIÓN EN EL DESPUES 3,300.00
3.3.3.1 CONCURSO DE JASS (DESPUÉS) gbl 1.00 3,300.00 3,300.00 0.00 0.00 0.00 0.00
3.4 SEGURIDAD, BIOSEGURIDAD Y SALUD 41,998.16
3.4.1 EQUIPOS DE PROTECCIÓN PERSONAL und 60.00 235.40 14,124.00 0.00 0.00 0.00 0.00
3.4.2 EQUIPO DE PROTECCIÓN COLECTIVA gbl 1.00 1,140.00 1,140.00 0.00 0.00 0.00 0.00
3.4.3 SEÑALIZACIÓN TEMPORAL DE SEGURIDAD Y BIOSEGURIDAD gbl 1.00 1,625.76 1,625.76 0.00 0.00 0.00 0.00
3.4.4 MONITOREO Y SENSIBILIZACIÓN DE SEGURIDAD Y BIOSEGURIDAD SEGÚN PROTOCOLOS CONT mes 8.00 3,000.00 24,000.00 0.00 0.00 0.00 0.00
3.4.5 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL TR gbl 1.00 294.10 294.10 0.00 0.00 0.00 0.00
3.4.6 IMPLEMENTOS DE SEGURIDAD SEGÚN PROTOCOLOS COVID 19 gbl 1.00 814.30 814.30 0.00 0.00 0.00 0.00
3.5 MITIGACIÓN DE IMPACTO AMBIENTAL 46,742.16
3.5.1 PLAN DE GESTIÓN AMBIENTAL gbl 1.00 46,742.16 46,742.16 0.00 0.00 0.00 0.00

COSTOS DIRECTOS S/. 1,491,337.80 TOTAL COSTO DIRECTO 40,798.48


TOTAL COSTO MANO DE OBRA 122.84
TOTAL COSTO MATERIALES 29,145.71
TOTAL COSTO SERVICIOS 11,529.93

F-8.2(42/57)
9. EJECUCION FISICA
9.4. METRADOS DIARIOS - PROGRAMADO
Metrados Diarios
OBRA "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO" LUGAR : MARANURA
ENTIDAD MUNICIPALIDAD DISTRITAL DE MARANURA DIV. FUNC. : 040
U. EJECUTORA SUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL PROGRAMA : 0083
RESIDENTE DE OBRA ING. Jorge Luis Valencia Cordova GRUPO FUNC. : 0089
INSPECTOR DE OBRA ING. Edgar Viamonte Calla FUNCIÓN : 18
FECHA August-2022 CODIGO UNIFICADO : 2350362
August-2022
PRESUPUESTO BASE EJEC ACUM. SALDO AVANCE AVANCE SALDO

U.M.
METRADO Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
ANTERIOR ANTERIOR MES ACUM METRADO
ITEMS PARTIDA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1 COMPONENTE 1: ADECUADO SISTEMA DE ABASTECIMENTO DE AGUA
1.1 TRABAJOS PRELIMINARES
1.1.1 CARTEL DE OBRA (3.60X2.40M) und 3.00 0.00 3.00 0.00 0.00 3.00
1.1.2 TRANSPORTE DE MATERIALES A OBRA CON MAQUINARIA COMPONENTE 1 gbl 1.00 0.14 0.86 0.00 0.14 0.86
1.1.3 TRANSPORTE MANUAL DE MATERIALES DE PIE DE CARRETERA COMPONENTE 1 gbl 1.00 0.24 0.76 0.00 0.24 0.76
1.1.4 ALQUILER DE ALMACEN DE OBRA Y OFICINA mes 8.00 1.00 7.00 1.00 1.00 2.00 6.00
1.2 CAPTACIÓN SUPERFICIAL INSIENSUYOC
1.2.1 ESTRUCTURA Y ACABADOS
1.2.1.1 TRAZO, NIVELES Y REPLANTEO m² 37.86 37.86 0.00 0.00 37.86 0.00
1.2.1.2 LIMPIEZA MANUAL DE TERRENO m² 37.86 37.86 0.00 0.00 37.86 0.00
1.2.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 29.93 29.93 0.00 0.00 29.93 0.00
1.2.1.4 PERFILADO Y COMPACTADO MANUAL m² 30.30 30.30 0.00 0.00 30.30 0.00
1.2.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 29.93 29.93 0.00 0.00 29.93 0.00
1.2.1.6 ENCOFRADO Y DESENCOFRADO m² 64.32 0.00 64.32 16.08 16.08 16.08 16.08 64.32 64.32 0.00
1.2.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 595.38 0.00 595.38 148.85 148.85 148.85 148.85 595.38 595.38 0.00
1.2.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 25.12 1.76 23.36 1.76 1.76 3.52 21.60
1.2.1.9 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 2.23 0.00 2.23 0.00 0.00 2.23
1.2.1.10 CONCRETO F´C=210KG/CM2 (MEZCLA MANUAL) m³ 8.33 0.00 8.33 0.00 0.00 8.33
1.2.1.11 CURADO DE CONCRETO m² 91.74 0.00 91.74 0.00 0.00 91.74
1.2.1.12 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 51.01 0.00 51.01 0.00 0.00 51.01
1.2.1.13 TARRAJEO EN MUROS E=1.5 CM m² 25.96 0.00 25.96 0.00 0.00 25.96
1.2.1.14 PINTADO DE ESTRUCTURAS HIDRAULICAS m² 25.96 0.00 25.96 0.00 0.00 25.96
1.2.1.15 EMBOQUILLADO DE PIEDRA Y CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 1.27 0.00 1.27 1.27 1.27 1.27 0.00
1.2.2 TUBERÍA Y ACCESORIOS
1.2.2.1 COMPUERTA METÁLICA DE 0.50X0.90M und 1.00 0.00 1.00 0.00 0.00 1.00
1.2.2.2 REJILLA METÁLICA DE 0.20X0.10 M und 1.00 0.00 1.00 0.00 0.00 1.00
1.2.2.3 ACCESORIOS CAPTACIÓN INSIENSUYOC gbl 1.00 0.00 1.00 0.00 0.00 1.00
1.2.2.4 TAPA METÁLICA DE 0.80X0.80 INCL. ACCESORIOS und 2.00 0.00 2.00 0.00 0.00 2.00
1.2.3 CERCO PERIMÉTRICO DE PROTECCIÓN
1.2.3.1 POSTES DE TUBO F°G° DE 2" CON GANCHOS und 7.00 0.00 7.00 0.00 0.00 7.00
1.2.3.2 ALAMBRE DE PUES PARA CERCO PERIMÉTRICO m 150.00 0.00 150.00 0.00 0.00 150.00
1.2.3.3 PUERTA METÁLICA DE ACCESO und 1.00 0.00 1.00 0.00 0.00 1.00
1.3 CAPTACIÓN DE LADERA HUERTO DEL EDEN
1.3.1 ESTRUCTURA Y ACABADOS
1.3.1.1 TRAZO, NIVELES Y REPLANTEO m² 13.34 0.00 13.34 0.00 0.00 13.34
1.3.1.2 LIMPIEZA MANUAL DE TERRENO m² 13.34 0.00 13.34 0.00 0.00 13.34
1.3.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 12.01 0.00 12.01 0.00 0.00 12.01
1.3.1.4 PERFILADO Y COMPACTADO MANUAL m² 13.34 0.00 13.34 0.00 0.00 13.34
1.3.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 12.01 0.00 12.01 0.00 0.00 12.01
1.3.1.6 ENCOFRADO Y DESENCOFRADO m² 25.78 0.00 25.78 0.00 0.00 25.78
1.3.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 87.29 0.00 87.29 0.00 0.00 87.29
1.3.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 2.33 0.00 2.33 0.00 0.00 2.33
1.3.1.9 CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL)+30% PIEDRA MEDIANA m³ 1.40 0.00 1.40 0.00 0.00 1.40
1.3.1.10 CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 1.26 0.00 1.26 0.00 0.00 1.26
1.3.1.11 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 1.31 0.00 1.31 0.00 0.00 1.31
1.3.1.12 CURADO DE CONCRETO m² 31.12 0.00 31.12 0.00 0.00 31.12
1.3.1.13 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 12.35 0.00 12.35 0.00 0.00 12.35
1.3.1.14 TARRAJEO EN MUROS E=1.5 CM m² 14.79 0.00 14.79 0.00 0.00 14.79
1.3.1.15 PINTADO DE ESTRUCTURAS HIDRAULICAS m² 13.25 0.00 13.25 0.00 0.00 13.25
1.3.1.16 EMBOQUILLADO DE PIEDRA Y CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 0.05 0.00 0.05 0.00 0.00 0.05
1.3.1.17 RELLENO DE ZONA DE INFILTRACIÓN CON GRAVA m³ 2.38 0.00 2.38 0.00 0.00 2.38
1.3.2 TUBERÍA Y ACCESORIOS
1.3.2.1 TAPA METÁLICA DE 0.60X0.60 INCL ACCESORIOS und 2.00 0.00 2.00 0.00 0.00 2.00
1.3.2.2 ACCESORIOS CAPTACIÓN HUERTO DEL EDEN gbl 1.00 0.00 1.00 0.00 0.00 1.00
1.3.3 CERCO PERIMÉTRICO DE PROTECCIÓN
1.3.3.1 POSTES DE TUBO F°G° DE 2" CON GANCHOS und 5.00 0.00 5.00 0.00 0.00 5.00
1.3.3.2 ALAMBRE DE PUES PARA CERCO PERIMÉTRICO m 150.00 0.00 150.00 0.00 0.00 150.00
1.3.3.3 PUERTA METÁLICA DE ACCESO und 1.00 0.00 1.00 0.00 0.00 1.00
1.4 CAPTACIÓN SUPERFICIAL ROCOTOCHAYOC
1.4.1 ESTRUCTURA Y ACABADOS
1.4.1.1 TRAZO, NIVELES Y REPLANTEO m² 26.19 0.00 26.19 0.00 0.00 26.19
1.4.1.2 LIMPIEZA MANUAL DE TERRENO m² 26.19 0.00 26.19 0.00 0.00 26.19
1.4.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 21.55 0.00 21.55 0.00 0.00 21.55
1.4.1.4 PERFILADO Y COMPACTADO MANUAL m² 26.19 0.00 26.19 0.00 0.00 26.19
1.4.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 21.55 0.00 21.55 0.00 0.00 21.55
1.4.1.6 ENCOFRADO Y DESENCOFRADO m² 61.08 0.00 61.08 0.00 0.00 61.08
1.4.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 513.34 0.00 513.34 0.00 0.00 513.34
1.4.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 18.49 0.00 18.49 0.00 0.00 18.49
1.4.1.9 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 2.23 0.00 2.23 0.00 0.00 2.23

F-9.4.(43/57)
9. EJECUCION FISICA
9.4. METRADOS DIARIOS - PROGRAMADO
Metrados Diarios
OBRA "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO" LUGAR : MARANURA
ENTIDAD MUNICIPALIDAD DISTRITAL DE MARANURA DIV. FUNC. : 040
U. EJECUTORA SUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL PROGRAMA : 0083
RESIDENTE DE OBRA ING. Jorge Luis Valencia Cordova GRUPO FUNC. : 0089
INSPECTOR DE OBRA ING. Edgar Viamonte Calla FUNCIÓN : 18
FECHA August-2022 CODIGO UNIFICADO : 2350362
August-2022
PRESUPUESTO BASE EJEC ACUM. SALDO AVANCE AVANCE SALDO

U.M.
METRADO Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
ANTERIOR ANTERIOR MES ACUM METRADO
ITEMS PARTIDA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1.4.1.10 CONCRETO F´C=210KG/CM2 (MEZCLA MANUAL) m³ 6.61 0.00 6.61 0.00 0.00 6.61
1.4.1.11 CURADO DE CONCRETO m² 80.94 0.00 80.94 0.00 0.00 80.94
1.4.1.12 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 42.14 0.00 42.14 0.00 0.00 42.14
1.4.1.13 TARRAJEO EN MUROS E=1.5 CM m² 25.96 0.00 25.96 0.00 0.00 25.96
1.4.1.14 PINTADO DE ESTRUCTURAS HIDRAULICAS m² 25.96 0.00 25.96 0.00 0.00 25.96
1.4.1.15 EMBOQUILLADO DE PIEDRA Y CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 0.90 0.00 0.90 0.00 0.00 0.90
1.4.2 TUBERÍA Y ACCESORIOS
1.4.2.1 COMPUERTA METÁLICA DE 0.50X0.90M und 1.00 0.00 1.00 0.00 0.00 1.00
1.4.2.2 REJILLA METÁLICA DE 0.20X0.10 M und 1.00 0.00 1.00 0.00 0.00 1.00
1.4.2.3 ACCESORIOS CAPTACIÓN ROCOTOCHAYOC gbl 1.00 0.00 1.00 0.00 0.00 1.00
1.4.2.4 TAPA METÁLICA DE 0.80X0.80 INCL. ACCESORIOS und 2.00 0.00 2.00 0.00 0.00 2.00
1.4.3 CERCO PERIMÉTRICO DE PROTECCIÓN
1.4.3.1 POSTES DE TUBO F°G° DE 2" CON GANCHOS und 7.00 0.00 7.00 0.00 0.00 7.00
1.4.3.2 ALAMBRE DE PUES PARA CERCO PERIMÉTRICO m 150.00 0.00 150.00 0.00 0.00 150.00
1.4.3.3 PUERTA METÁLICA DE ACCESO und 1.00 0.00 1.00 0.00 0.00 1.00
1.5 DESARENADOR
1.5.1 ESTRUCTURA Y ACABADOS
1.5.1.1 TRAZO, NIVELES Y REPLANTEO m² 8.67 0.00 8.67 0.00 0.00 8.67
1.5.1.2 LIMPIEZA MANUAL DE TERRENO m² 8.67 0.00 8.67 0.00 0.00 8.67
1.5.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 7.80 0.00 7.80 0.00 0.00 7.80
1.5.1.4 PERFILADO Y COMPACTADO MANUAL m² 8.67 0.00 8.67 0.00 0.00 8.67
1.5.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 7.80 0.00 7.80 0.00 0.00 7.80
1.5.1.6 ENCOFRADO Y DESENCOFRADO m² 17.62 0.00 17.62 0.00 0.00 17.62
1.5.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 150.05 0.00 150.05 0.00 0.00 150.05
1.5.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 0.42 0.00 0.42 0.00 0.00 0.42
1.5.1.9 CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 0.04 0.00 0.04 0.00 0.00 0.04
1.5.1.10 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 1.73 0.00 1.73 0.00 0.00 1.73
1.5.1.11 CURADO DE CONCRETO m² 25.55 0.00 25.55 0.00 0.00 25.55
1.5.1.12 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 14.48 0.00 14.48 0.00 0.00 14.48
1.5.1.13 TARRAJEO EN MUROS E=1.5 CM m² 9.73 0.00 9.73 0.00 0.00 9.73
1.5.1.14 PINTADO DE ESTRUCTURAS HIDRAULICAS m² 9.73 0.00 9.73 0.00 0.00 9.73
1.5.1.15 EMBOQUILLADO DE PIEDRA Y CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 0.40 0.00 0.40 0.00 0.00 0.40
1.5.2 TUBERÍA Y ACCESORIOS
1.5.2.1 TAPA METÁLICA DE 0.40X0.40 INCL ACCESORIOS und 2.00 0.00 2.00 0.00 0.00 2.00
1.5.2.2 ACCESORIOS TIPICOS PARA DESARENADORES gbl 1.00 0.00 1.00 0.00 0.00 1.00
1.5.2.3 BRIDA ROMPE AGUA DE F°G° 1" INCL. ACCESORIOS und 2.00 0.00 2.00 0.00 0.00 2.00
1.5.2.4 BRIDA ROMPE AGUA DE F°G° 3/4" INCL. ACCESORIOS und 2.00 0.00 2.00 0.00 0.00 2.00
1.5.3 CERCO PERIMÉTRICO DE PROTECCIÓN
1.5.3.1 POSTES DE TUBO F°G° DE 2" CON GANCHOS und 10.00 0.00 10.00 0.00 0.00 10.00
1.5.3.2 ALAMBRE DE PUES PARA CERCO PERIMÉTRICO m 300.00 0.00 300.00 0.00 0.00 300.00
1.5.3.3 PUERTA METÁLICA DE ACCESO und 2.00 0.00 2.00 0.00 0.00 2.00
1.6 FILTRO LENTO DE ARENA
1.6.1 ESTRUCTURA Y ACABADOS
1.6.1.1 TRAZO, NIVELES Y REPLANTEO m² 15.48 0.00 15.48 15.48 15.48 15.48 0.00
1.6.1.2 LIMPIEZA MANUAL DE TERRENO m² 15.48 0.00 15.48 15.48 15.48 15.48 0.00
1.6.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 18.58 0.00 18.58 4.65 4.65 4.65 4.65 18.58 18.58 0.00
1.6.1.4 PERFILADO Y COMPACTADO MANUAL m² 15.48 0.00 15.48 7.74 7.74 15.48 15.48 0.00
1.6.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 18.58 0.00 18.58 4.65 4.65 4.65 4.65 18.58 18.58 0.00
1.6.1.6 ENCOFRADO Y DESENCOFRADO m² 80.61 0.00 80.61 20.15 20.15 20.15 20.16 80.61 80.61 0.00
1.6.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 395.25 0.00 395.25 0.00 0.00 395.25
1.6.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 0.48 0.00 0.48 0.48 0.48 0.48 0.00
1.6.1.9 CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 0.04 0.00 0.04 0.00 0.00 0.04
1.6.1.10 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 1.58 0.00 1.58 0.00 0.00 1.58
1.6.1.11 CONCRETO F´C=210KG/CM2 (MEZCLA MANUAL) m³ 4.15 0.00 4.15 0.00 0.00 4.15
1.6.1.12 CURADO DE CONCRETO m² 85.53 0.00 85.53 0.00 0.00 85.53
1.6.1.13 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 43.60 0.00 43.60 0.00 0.00 43.60
1.6.1.14 TARRAJEO EN MUROS E=1.5 CM m² 35.67 0.00 35.67 0.00 0.00 35.67
1.6.1.15 PINTADO DE ESTRUCTURAS HIDRAULICAS m² 35.67 0.00 35.67 0.00 0.00 35.67
1.6.1.16 EMBOQUILLADO DE PIEDRA Y CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 0.30 0.00 0.30 0.00 0.00 0.30
1.6.1.17 COLOCADO DE SOPORTE BASE CON LADRILLO TIPO KING KONG m² 6.36 0.00 6.36 0.00 0.00 6.36
1.6.1.18 RELLENO DE ZONA DE INFILTRACIÓN CON GRAVA m³ 1.59 0.00 1.59 0.00 0.00 1.59
1.6.1.19 RELLENO DE ZONA DE INFILTRACIÓN CON ARENA GRUESA LAVADA m³ 5.08 0.00 5.08 0.00 0.00 5.08
1.6.2 TUBERÍA Y ACCESORIOS
1.6.2.1 TAPA METÁLICA DE 0.60X0.60 INCL ACCESORIOS und 1.00 0.00 1.00 0.00 0.00 1.00
1.6.2.2 COMPUERTA METÁLICA DE 0.20X0.35 und 2.00 0.00 2.00 0.00 0.00 2.00
1.6.2.3 ACCESORIOS PARA FILTRO LENTO gbl 1.00 0.00 1.00 0.00 0.00 1.00
1.7 LINEA DE CONDUCCIÓN
1.7.1 TRAZO, NIVELES Y REPLANTEO m² 1,201.16 0.00 1,201.16 20.00 20.00 20.00 1,181.16
1.7.2 LIMPIEZA MANUAL DE TERRENO m² 1,201.16 0.00 1,201.16 20.00 20.00 20.00 1,181.16

F-9.4.(44/57)
9. EJECUCION FISICA
9.4. METRADOS DIARIOS - PROGRAMADO
Metrados Diarios
OBRA "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO" LUGAR : MARANURA
ENTIDAD MUNICIPALIDAD DISTRITAL DE MARANURA DIV. FUNC. : 040
U. EJECUTORA SUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL PROGRAMA : 0083
RESIDENTE DE OBRA ING. Jorge Luis Valencia Cordova GRUPO FUNC. : 0089
INSPECTOR DE OBRA ING. Edgar Viamonte Calla FUNCIÓN : 18
FECHA August-2022 CODIGO UNIFICADO : 2350362
August-2022
PRESUPUESTO BASE EJEC ACUM. SALDO AVANCE AVANCE SALDO

U.M.
METRADO Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
ANTERIOR ANTERIOR MES ACUM METRADO
ITEMS PARTIDA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1.7.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 720.70 0.00 720.70 12.00 12.00 12.00 708.70
1.7.4 PERFILADO Y COMPACTADO MANUAL m² 1,201.16 0.00 1,201.16 20.00 20.00 20.00 1,181.16
1.7.5 CAMA DE APOYO CON MATERIAL PROPIO SELECCIONADO E=0.10 m m² 1,201.16 0.00 1,201.16 0.00 0.00 1,201.16
1.7.6 TUBO PVC NTP 399.002 DN 30 MM C-15 m 839.92 0.00 839.92 0.00 0.00 839.92
1.7.7 TUBO PVC NTP 399.002 DN 30 MM C-10 m 319.33 0.00 319.33 0.00 0.00 319.33
1.7.8 TUBO PVC NTP 399.002 DN 26.5 MM C-15 m 571.96 0.00 571.96 0.00 0.00 571.96
1.7.9 TUBO PVC NTP 399.002 DN 26.5 MM C-10 m 1,271.69 500.00 771.69 50.00 50.00 550.00 721.69
1.7.10 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO EN CAPAS DE E=0.20M m³ 660.64 92.40 568.24 11.00 11.00 103.40 557.24
1.7.11 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 72.07 0.00 72.07 0.00 0.00 72.07
1.8 CAMARA DE REUNIÓN
1.8.1 ESTRUCTURA Y ACABADOS
1.8.1.1 TRAZO, NIVELES Y REPLANTEO m² 5.04 0.00 5.04 0.00 0.00 5.04
1.8.1.2 LIMPIEZA MANUAL DE TERRENO m² 5.04 0.00 5.04 0.00 0.00 5.04
1.8.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 1.01 0.00 1.01 0.00 0.00 1.01
1.8.1.4 PERFILADO Y COMPACTADO MANUAL m² 5.04 0.00 5.04 0.00 0.00 5.04
1.8.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 1.01 0.00 1.01 0.00 0.00 1.01
1.8.1.6 ENCOFRADO Y DESENCOFRADO m² 22.84 0.00 22.84 0.00 0.00 22.84
1.8.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 121.92 0.00 121.92 0.00 0.00 121.92
1.8.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 0.25 0.00 0.25 0.00 0.00 0.25
1.8.1.9 CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 0.02 0.00 0.02 0.00 0.00 0.02
1.8.1.10 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 1.77 0.00 1.77 0.00 0.00 1.77
1.8.1.11 CURADO DE CONCRETO m² 29.12 0.00 29.12 0.00 0.00 29.12
1.8.1.12 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 12.72 0.00 12.72 0.00 0.00 12.72
1.8.1.13 TARRAJEO EN MUROS E=1.5 CM m² 15.40 0.00 15.40 0.00 0.00 15.40
1.8.1.14 PINTADO DE ESTRUCTURAS HIDRAULICAS m² 15.40 0.00 15.40 0.00 0.00 15.40
1.8.1.15 EMBOQUILLADO DE PIEDRA Y CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 0.20 0.00 0.20 0.00 0.00 0.20
1.8.2 TUBERÍA Y ACCESORIOS
1.8.2.1 TAPA METÁLICA DE 0.60X0.60 INCL ACCESORIOS und 2.00 0.00 2.00 0.00 0.00 2.00
1.8.2.2 TAPA METÁLICA DE 0.80X0.80 INCL. ACCESORIOS und 2.00 0.00 2.00 0.00 0.00 2.00
1.8.2.3 ACCESORIOS CAMARA DE REUNIÓN INSIENSUYOC gbl 1.00 0.00 1.00 0.00 0.00 1.00
1.8.2.4 ACCESORIOS CAMARA DE REUNIO SISTEMA PIÑALPATA gbl 1.00 0.00 1.00 0.00 0.00 1.00
1.8.2.5 TUBO DE VENTILACIÓN DE F°G° DE 2" und 2.00 0.00 2.00 0.00 0.00 2.00
1.9 CAMARA ROMPE PRESIÓN TIPO 6
1.9.1 ESTRUCTURA Y ACABADOS
1.9.1.1 TRAZO, NIVELES Y REPLANTEO m² 6.60 0.00 6.60 1.10 1.10 2.20 2.20 4.40
1.9.1.2 LIMPIEZA MANUAL DE TERRENO m² 6.60 0.00 6.60 1.10 1.10 2.20 2.20 4.40
1.9.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 2.94 0.00 2.94 0.42 0.42 0.42 0.42 1.68 1.68 1.26
1.9.1.4 PERFILADO Y COMPACTADO MANUAL m² 6.03 0.00 6.03 0.54 0.54 0.54 5.49
1.9.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 2.94 0.00 2.94 0.42 0.42 0.84 0.84 2.10
1.9.1.6 ENCOFRADO Y DESENCOFRADO m² 37.80 0.00 37.80 0.00 0.00 37.80
1.9.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 107.18 0.00 107.18 0.00 0.00 107.18
1.9.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 0.30 0.00 0.30 0.00 0.00 0.30
1.9.1.9 CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 0.04 0.00 0.04 0.00 0.00 0.04
1.9.1.10 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 3.36 0.00 3.36 0.00 0.00 3.36
1.9.1.11 CURADO DE CONCRETO m² 44.31 0.00 44.31 0.00 0.00 44.31
1.9.1.12 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 13.32 0.00 13.32 0.00 0.00 13.32
1.9.1.13 TARRAJEO EN MUROS E=1.5 CM m² 23.67 0.00 23.67 0.00 0.00 23.67
1.9.1.14 PINTADO DE ESTRUCTURAS HIDRAULICAS m² 23.67 0.00 23.67 0.00 0.00 23.67
1.9.1.15 EMBOQUILLADO DE PIEDRA Y CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 0.30 0.00 0.30 0.00 0.00 0.30
1.9.2 TUBERÍA Y ACCESORIOS
1.9.2.1 VÁLVULA COMPUERTA DE 3/4" INCL. ACCESORIOS und 2.00 0.00 2.00 0.00 0.00 2.00
1.9.2.2 CANASTILLA PVC DE 3/4" INCL. ACCESORIOS und 2.00 0.00 2.00 0.00 0.00 2.00
1.9.2.3 VÁLVULA COMPUERTA DE 1" INCL. ACCESORIOS und 1.00 0.00 1.00 0.00 0.00 1.00
1.9.2.4 CANASTILLA PVC DE 1" INCL. ACCESORIOS und 1.00 0.00 1.00 0.00 0.00 1.00
1.9.2.5 TUBERÍA DE LIMPIA Y REBOSE DE 2" und 3.00 0.00 3.00 0.00 0.00 3.00
1.9.2.6 TUBO DE VENTILACIÓN DE F°G° DE 2" und 3.00 0.00 3.00 0.00 0.00 3.00
1.9.2.7 TAPA METÁLICA DE 0.60X0.60 INCL ACCESORIOS und 1.00 0.00 1.00 0.00 0.00 1.00
1.9.2.8 TAPA METÁLICA DE 0.50X0.40 INCL ACCESORIOS und 1.00 0.00 1.00 0.00 0.00 1.00
1.10 RESERVORIO 5 M3
1.10.1 ESTRUCTURA Y ACABADOS
1.10.1.1 TRAZO, NIVELES Y REPLANTEO m² 19.60 0.00 19.60 0.00 0.00 19.60
1.10.1.2 LIMPIEZA MANUAL DE TERRENO m² 19.60 0.00 19.60 0.00 0.00 19.60
1.10.1.3 CORTE MANUAL EN TERRENO NORMAL m³ 5.53 0.00 5.53 0.00 0.00 5.53
1.10.1.4 PERFILADO Y COMPACTADO MANUAL m² 21.17 0.00 21.17 0.00 0.00 21.17
1.10.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 5.53 0.00 5.53 0.00 0.00 5.53
1.10.1.6 ENCOFRADO Y DESENCOFRADO m² 55.39 29.70 25.69 0.00 29.70 25.69
1.10.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 492.58 94.22 398.36 0.00 94.22 398.36
1.10.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 0.49 0.00 0.49 0.00 0.00 0.49
1.10.1.9 EMPEDRADO E=12.5CM m² 12.00 0.00 12.00 0.00 0.00 12.00

F-9.4.(45/57)
9. EJECUCION FISICA
9.4. METRADOS DIARIOS - PROGRAMADO
Metrados Diarios
OBRA "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO" LUGAR : MARANURA
ENTIDAD MUNICIPALIDAD DISTRITAL DE MARANURA DIV. FUNC. : 040
U. EJECUTORA SUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL PROGRAMA : 0083
RESIDENTE DE OBRA ING. Jorge Luis Valencia Cordova GRUPO FUNC. : 0089
INSPECTOR DE OBRA ING. Edgar Viamonte Calla FUNCIÓN : 18
FECHA August-2022 CODIGO UNIFICADO : 2350362
August-2022
PRESUPUESTO BASE EJEC ACUM. SALDO AVANCE AVANCE SALDO

U.M.
METRADO Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
ANTERIOR ANTERIOR MES ACUM METRADO
ITEMS PARTIDA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1.10.1.10 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 2.08 0.00 2.08 0.00 0.00 2.08
1.10.1.11 CONCRETO F´C=280 KG/CM2 (MEZCLA MANUAL) C/IMPERMEABILIZANTE m³ 5.20 5.20 0.00 0.00 5.20 0.00
1.10.1.12 CURADO DE CONCRETO m² 55.66 29.70 25.96 0.00 29.70 25.96
1.10.1.13 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 18.27 18.27 0.00 0.00 18.27 0.00
1.10.1.14 TARRAJEO EN MUROS E=1.5 CM m² 37.79 37.79 0.00 0.00 37.79 0.00
1.10.1.15 PINTADO DE ESTRUCTURAS HIDRAULICAS m² 35.45 0.00 35.45 0.00 0.00 35.45
1.10.2 TUBERÍA Y ACCESORIOS
1.10.2.1 ACCESORIOS DE CAJA DE VÁLVULAS PARA RESERVORIO DE 5 M3 gbl 1.00 0.00 1.00 0.00 0.00 1.00
1.10.2.2 TUBO DE VENTILACIÓN DE F°G° DE 2" und 1.00 0.00 1.00 0.00 0.00 1.00
1.10.2.3 SISTEMA DE CLORACIÓN DE 60 LITROS und 1.00 0.00 1.00 0.00 0.00 1.00
1.10.2.4 TAPA METÁLICA DE 0.60X0.60 INCL ACCESORIOS und 2.00 0.00 2.00 0.00 0.00 2.00
1.10.3 CERCO PERIMÉTRICO DE PROTECCIÓN
1.10.3.1 POSTES DE TUBO F°G° DE 2" CON GANCHOS und 9.00 0.00 9.00 0.00 0.00 9.00
1.10.3.2 ALAMBRE DE PUES PARA CERCO PERIMÉTRICO m 210.00 0.00 210.00 0.00 0.00 210.00
1.10.3.3 PUERTA METÁLICA DE ACCESO und 1.00 0.00 1.00 0.00 0.00 1.00
1.11 RESERVORIO 2.5 M3
1.11.1 ESTRUCTURA Y ACABADOS
1.11.1.1 TRAZO, NIVELES Y REPLANTEO m² 11.36 0.00 11.36 0.00 0.00 11.36
1.11.1.2 LIMPIEZA MANUAL DE TERRENO m² 11.36 0.00 11.36 0.00 0.00 11.36
1.11.1.3 CORTE MANUAL EN TERRENO NORMAL m³ 3.58 0.00 3.58 0.00 0.00 3.58
1.11.1.4 PERFILADO Y COMPACTADO MANUAL m² 13.44 13.44 0.00 0.00 13.44 0.00
1.11.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 3.58 3.58 0.00 0.00 3.58 0.00
1.11.1.6 ENCOFRADO Y DESENCOFRADO m² 40.80 21.12 19.68 0.00 21.12 19.68
1.11.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 328.04 220.14 107.90 0.00 220.14 107.90
1.11.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 0.29 0.29 0.00 0.00 0.29 0.00
1.11.1.9 EMPEDRADO E=12.5CM m² 7.59 7.59 0.00 0.00 7.59 0.00
1.11.1.10 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 1.54 0.00 1.54 0.00 0.00 1.54
1.11.1.11 CONCRETO F´C=280 KG/CM2 (MEZCLA MANUAL) C/IMPERMEABILIZANTE m³ 3.50 3.50 0.00 0.00 3.50 0.00
1.11.1.12 CURADO DE CONCRETO m² 40.80 21.12 19.68 0.00 21.12 19.68
1.11.1.13 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 11.67 11.67 0.00 0.00 11.67 0.00
1.11.1.14 TARRAJEO EN MUROS E=1.5 CM m² 30.41 30.41 0.00 0.00 30.41 0.00
1.11.1.15 PINTADO DE ESTRUCTURAS HIDRAULICAS m² 28.07 0.00 28.07 0.00 0.00 28.07
1.11.2 TUBERÍA Y ACCESORIOS
1.11.2.1 ACCESORIOS DE CAJA DE VÁLVULAS PARA RESERVORIO DE 2.5 M3 gbl 1.00 0.00 1.00 0.00 0.00 1.00
1.11.2.2 TUBO DE VENTILACIÓN DE F°G° DE 2" und 1.00 0.00 1.00 0.00 0.00 1.00
1.11.2.3 SISTEMA DE CLORACIÓN DE 30 LITROS und 1.00 0.00 1.00 0.00 0.00 1.00
1.11.2.4 TAPA METÁLICA DE 0.60X0.60 INCL ACCESORIOS und 2.00 0.00 2.00 0.00 0.00 2.00
1.11.3 CERCO PERIMÉTRICO DE PROTECCIÓN
1.11.3.1 POSTES DE TUBO F°G° DE 2" CON GANCHOS und 8.00 0.00 8.00 0.00 0.00 8.00
1.11.3.2 ALAMBRE DE PUES PARA CERCO PERIMÉTRICO m 150.00 0.00 150.00 0.00 0.00 150.00
1.11.3.3 PUERTA METÁLICA DE ACCESO und 1.00 0.00 1.00 0.00 0.00 1.00
1.12 TANQUE DE POLIETILENO
1.12.1 ESTRUCTURA Y ACABADOS
1.12.1.1 TRAZO, NIVELES Y REPLANTEO m² 11.25 0.00 11.25 0.00 0.00 11.25
1.12.1.2 LIMPIEZA MANUAL DE TERRENO m² 11.25 0.00 11.25 0.00 0.00 11.25
1.12.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 1.13 0.00 1.13 0.00 0.00 1.13
1.12.1.4 PERFILADO Y COMPACTADO MANUAL m² 11.25 0.00 11.25 0.00 0.00 11.25
1.12.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 1.13 0.00 1.13 0.00 0.00 1.13
1.12.1.6 ENCOFRADO Y DESENCOFRADO m² 6.00 0.00 6.00 0.00 0.00 6.00
1.12.1.7 EMPEDRADO E=12.5CM m² 11.25 0.00 11.25 0.00 0.00 11.25
1.12.1.8 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 1.13 0.00 1.13 0.00 0.00 1.13
1.12.1.9 CURADO DE CONCRETO m² 11.25 0.00 11.25 0.00 0.00 11.25
1.12.1.10 TANQUE DE POLIETILENO DE 600 LT INCL. ACCESORIOS und 3.00 0.00 3.00 0.00 0.00 3.00
1.12.1.11 TANQUE DE POLIETILENO DE 1100 LT INCL. ACCESORIOS und 1.00 0.00 1.00 0.00 0.00 1.00
1.12.1.12 TANQUE DE POLIETILENO DE 1500 LT INCL. ACCESORIOS und 1.00 0.00 1.00 0.00 0.00 1.00
1.12.1.13 COBERTURA DE TANQUES DE POLIETILENO und 5.00 0.00 5.00 0.00 0.00 5.00
1.12.2 CERCO PERIMÉTRICO DE PROTECCIÓN
1.12.2.1 POSTES DE TUBO F°G° DE 2" CON GANCHOS und 5.00 0.00 5.00 0.00 0.00 5.00
1.12.2.2 ALAMBRE DE PUES PARA CERCO PERIMÉTRICO m 70.00 0.00 70.00 0.00 0.00 70.00
1.12.2.3 PUERTA METÁLICA DE ACCESO und 1.00 0.00 1.00 0.00 0.00 1.00
1.13 LINEA DE ADUCCIÓN
1.13.1 TRAZO, NIVELES Y REPLANTEO m² 2,127.19 58.00 2,069.19 24.00 24.00 82.00 2,045.19
1.13.2 LIMPIEZA MANUAL DE TERRENO m² 2,127.19 58.00 2,069.19 24.00 24.00 82.00 2,045.19
1.13.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 1,276.32 34.80 1,241.52 14.40 14.40 49.20 1,227.12
1.13.4 PERFILADO Y COMPACTADO MANUAL m² 2,127.19 58.00 2,069.19 38.00 46.00 50.00 50.00 30.00 66.00 64.00 344.00 402.00 1,725.19
1.13.5 CAMA DE APOYO CON MATERIAL PROPIO SELECCIONADO E=0.10 m m² 2,127.19 58.00 2,069.19 38.00 46.00 50.00 50.00 30.00 66.00 280.00 338.00 1,789.19
1.13.6 TUBO PVC NTP 399.002 DN 30 MM C-10 m 201.32 0.00 201.32 38.00 38.00 38.00 163.32
1.13.7 TUBO PVC NTP 399.002 DN 26.5 MM C-10 m 1,841.64 0.00 1,841.64 95.00 115.00 125.00 125.00 75.00 145.00 680.00 680.00 1,161.64
1.13.8 TUBO PVC NTP 399.002 DN 21 MM C-15 und 674.11 0.00 674.11 0.00 0.00 674.11

F-9.4.(46/57)
9. EJECUCION FISICA
9.4. METRADOS DIARIOS - PROGRAMADO
Metrados Diarios
OBRA "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO" LUGAR : MARANURA
ENTIDAD MUNICIPALIDAD DISTRITAL DE MARANURA DIV. FUNC. : 040
U. EJECUTORA SUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL PROGRAMA : 0083
RESIDENTE DE OBRA ING. Jorge Luis Valencia Cordova GRUPO FUNC. : 0089
INSPECTOR DE OBRA ING. Edgar Viamonte Calla FUNCIÓN : 18
FECHA August-2022 CODIGO UNIFICADO : 2350362
August-2022
PRESUPUESTO BASE EJEC ACUM. SALDO AVANCE AVANCE SALDO

U.M.
METRADO Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
ANTERIOR ANTERIOR MES ACUM METRADO
ITEMS PARTIDA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1.13.9 TUBO PVC NTP 399.002 DN 21 MM C-10 m 2,600.91 180.00 2,420.91 115.00 115.00 295.00 2,305.91
1.13.10 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO EN CAPAS DE E=0.20M m³ 1,169.96 350.24 819.72 20.90 25.30 27.50 27.50 16.50 36.30 154.00 504.24 665.72
1.13.11 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 127.63 100.00 27.63 0.00 100.00 27.63
1.14 CAMARA DE DISTRIBUCIÓN DE CAUDALES
1.14.1 ESTRUCTURA Y ACABADOS
1.14.1.1 TRAZO, NIVELES Y REPLANTEO m² 17.28 0.00 17.28 0.00 0.00 17.28
1.14.1.2 LIMPIEZA MANUAL DE TERRENO m² 17.28 0.00 17.28 0.00 0.00 17.28
1.14.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 4.51 0.00 4.51 0.00 0.00 4.51
1.14.1.4 PERFILADO Y COMPACTADO MANUAL m² 17.28 0.00 17.28 0.00 0.00 17.28
1.14.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 4.51 0.00 4.51 0.00 0.00 4.51
1.14.1.6 ENCOFRADO Y DESENCOFRADO m² 71.22 0.00 71.22 0.00 0.00 71.22
1.14.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 360.35 0.00 360.35 0.00 0.00 360.35
1.14.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 0.76 0.00 0.76 0.00 0.00 0.76
1.14.1.9 CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 0.07 0.00 0.07 0.00 0.00 0.07
1.14.1.10 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 5.33 0.00 5.33 0.00 0.00 5.33
1.14.1.11 CURADO DE CONCRETO m² 89.70 0.00 89.70 0.00 0.00 89.70
1.14.1.12 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 26.10 0.00 26.10 0.00 0.00 26.10
1.14.1.13 TARRAJEO EN MUROS E=1.5 CM m² 60.24 0.00 60.24 0.00 0.00 60.24
1.14.1.14 PINTADO DE ESTRUCTURAS HIDRAULICAS m² 60.24 0.00 60.24 0.00 0.00 60.24
1.14.1.15 EMBOQUILLADO DE PIEDRA Y CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 0.60 0.00 0.60 0.00 0.00 0.60
1.14.2 TUBERÍA Y ACCESORIOS
1.14.2.1 TAPA METÁLICA DE 0.60X0.60 INCL ACCESORIOS und 12.00 0.00 12.00 0.00 0.00 12.00
1.14.2.2 ACCESORIOS CAMARA DE DISTRIBUCIÓN DE CAUDALES TIPO gbl 2.00 0.00 2.00 0.00 0.00 2.00
1.14.2.3 ACCESORIOS CAMARA DE DISTRIBUCIÓN DE CAUDALES LUYCHO ALTO gbl 1.00 0.00 1.00 0.00 0.00 1.00
1.14.2.4 TUBO DE VENTILACIÓN DE F°G° DE 2" und 6.00 0.00 6.00 0.00 0.00 6.00
1.15 CAMARA ROMPE PRESIÓN TIPO 7
1.15.1 ESTRUCTURA Y ACABADOS
1.15.1.1 TRAZO, NIVELES Y REPLANTEO m² 50.40 0.00 50.40 0.00 0.00 50.40
1.15.1.2 LIMPIEZA MANUAL DE TERRENO m² 50.40 0.00 50.40 0.00 0.00 50.40
1.15.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 35.28 0.00 35.28 0.00 0.00 35.28
1.15.1.4 PERFILADO Y COMPACTADO MANUAL m² 50.40 0.00 50.40 0.00 0.00 50.40
1.15.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 35.28 0.00 35.28 0.00 0.00 35.28
1.15.1.6 ENCOFRADO Y DESENCOFRADO m² 253.60 0.00 253.60 0.00 0.00 253.60
1.15.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 1,121.72 0.00 1,121.72 0.00 0.00 1,121.72
1.15.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 2.64 0.00 2.64 0.00 0.00 2.64
1.15.1.9 CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 0.26 0.00 0.26 0.00 0.00 0.26
1.15.1.10 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 16.80 0.00 16.80 0.00 0.00 16.80
1.15.1.11 CURADO DE CONCRETO m² 306.40 0.00 306.40 0.00 0.00 306.40
1.15.1.12 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE m² 84.00 0.00 84.00 0.00 0.00 84.00
1.15.1.13 TARRAJEO EN MUROS E=1.5 CM m² 173.60 0.00 173.60 0.00 0.00 173.60
1.15.1.14 PINTADO DE ESTRUCTURAS HIDRAULICAS m² 120.80 0.00 120.80 0.00 0.00 120.80
1.15.1.15 EMBOQUILLADO DE PIEDRA Y CONCRETO F´C=140 KG/CM2 (MEZCLA MANUAL) m³ 2.00 0.00 2.00 0.00 0.00 2.00
1.15.2 TUBERÍA Y ACCESORIOS
1.15.2.1 TAPA METÁLICA DE 0.60X0.60 INCL ACCESORIOS und 20.00 0.00 20.00 0.00 0.00 20.00
1.15.2.2 TAPA METÁLICA DE 0.80X0.80 INCL. ACCESORIOS und 20.00 0.00 20.00 0.00 0.00 20.00
1.15.2.3 ACCESORIOS DE DIAMETRO DE 3/4" PARA CAMARA ROMPE PRESION TIPO 7 und 4.00 0.00 4.00 0.00 0.00 4.00
1.15.2.4 ACCESORIOS DE DIAMETRO DE 1/2" PARA CAMARA ROMPE PRESION TIPO 7 und 16.00 0.00 16.00 0.00 0.00 16.00
1.15.2.5 REDUCCIÓN PVC DE 3/4" A 1/2" und 6.00 0.00 6.00 0.00 0.00 6.00
1.15.2.6 TUBO DE VENTILACIÓN DE F°G° DE 2" und 20.00 0.00 20.00 0.00 0.00 20.00
1.16 LINEA DE DISTRIBUCIÓN
1.16.1 TRAZO, NIVELES Y REPLANTEO m² 1,302.58 420.00 882.58 12.00 6.00 6.00 22.00 20.00 16.00 14.00 40.00 136.00 556.00 746.58
1.16.2 LIMPIEZA MANUAL DE TERRENO m² 1,302.58 420.00 882.58 12.00 6.00 6.00 22.00 20.00 16.00 14.00 40.00 136.00 556.00 746.58
1.16.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 781.55 25.20 756.35 7.20 3.60 3.60 13.20 12.00 9.60 8.40 24.00 81.60 106.80 674.75
1.16.4 PERFILADO Y COMPACTADO MANUAL m² 1,302.58 42.00 1,260.58 12.00 6.00 50.00 6.00 22.00 20.00 16.00 14.00 40.00 50.00 236.00 278.00 1,024.58
1.16.5 CAMA DE APOYO CON MATERIAL PROPIO SELECCIONADO E=0.10 m m² 1,302.58 42.00 1,260.58 12.00 6.00 50.00 22.00 20.00 16.00 14.00 40.00 50.00 230.00 272.00 1,030.58
1.16.6 TUBO PVC NTP 399.002 DN 21 MM C-10 m 1,302.58 18.00 1,284.58 4.00 15.00 125.00 55.00 50.00 40.00 35.00 75.00 125.00 524.00 542.00 760.58
1.16.7 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO EN CAPAS DE E=0.20M m³ 781.55 10.80 770.75 2.40 3.60 30.00 13.20 13.20 9.60 8.40 24.00 30.00 134.40 145.20 636.35
1.17 VÁVULAS DE CONTROL, PURGA Y PURGA DE AIRE
1.17.1 ESTRUCTURA Y ACABADOS
1.17.1.1 TRAZO, NIVELES Y REPLANTEO m² 18.36 0.00 18.36 0.00 0.00 18.36
1.17.1.2 LIMPIEZA MANUAL DE TERRENO m² 18.36 0.00 18.36 0.00 0.00 18.36
1.17.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 7.34 0.00 7.34 0.00 0.00 7.34
1.17.1.4 PERFILADO Y COMPACTADO MANUAL m² 18.36 0.00 18.36 0.00 0.00 18.36
1.17.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 7.34 0.00 7.34 0.00 0.00 7.34
1.17.1.6 ENCOFRADO Y DESENCOFRADO m² 81.60 0.00 81.60 0.00 0.00 81.60
1.17.1.7 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 2.71 0.00 2.71 0.00 0.00 2.71
1.17.1.8 CURADO DE CONCRETO m² 96.90 0.00 96.90 0.00 0.00 96.90
1.17.2 TUBERÍA Y ACCESORIOS
1.17.2.1 VÁLVULA GLOBO DE 1/2" INCL. ACCESORIOS und 61.00 0.00 61.00 0.00 0.00 61.00

F-9.4.(47/57)
9. EJECUCION FISICA
9.4. METRADOS DIARIOS - PROGRAMADO
Metrados Diarios
OBRA "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO" LUGAR : MARANURA
ENTIDAD MUNICIPALIDAD DISTRITAL DE MARANURA DIV. FUNC. : 040
U. EJECUTORA SUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL PROGRAMA : 0083
RESIDENTE DE OBRA ING. Jorge Luis Valencia Cordova GRUPO FUNC. : 0089
INSPECTOR DE OBRA ING. Edgar Viamonte Calla FUNCIÓN : 18
FECHA August-2022 CODIGO UNIFICADO : 2350362
August-2022
PRESUPUESTO BASE EJEC ACUM. SALDO AVANCE AVANCE SALDO

U.M.
METRADO Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
ANTERIOR ANTERIOR MES ACUM METRADO
ITEMS PARTIDA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1.17.2.2 VÁLVULA GLOBO DE 3/4" INCL. ACCESORIOS und 27.00 0.00 27.00 0.00 0.00 27.00
1.17.2.3 VÁLVULA GLOBO DE 1" INCL. ACCESORIOS und 8.00 0.00 8.00 0.00 0.00 8.00
1.17.2.4 TAPA METÁLICA DE 0.40X0.40 INCL ACCESORIOS und 68.00 0.00 68.00 0.00 0.00 68.00
1.17.2.5 VÁLVULA DE PURGA DE AIRE DE 1" INCL. ACCESORIOS und 1.00 0.00 1.00 0.00 0.00 1.00
1.17.2.6 VÁLVULA DE PURGA DE AIRE DE 3/4" INCL. ACCESORIOS und 3.00 0.00 3.00 0.00 0.00 3.00
1.17.2.7 VÁLVULA DE PURGA DE AIRE DE 1/2" INCL. ACCESORIOS und 2.00 0.00 2.00 0.00 0.00 2.00
1.18 PASE AEREO DE 5 M
1.18.1 OBRAS DE CONCRETO ARMADO
1.18.1.1 TRAZO, NIVELES Y REPLANTEO m² 48.00 0.00 48.00 0.00 0.00 48.00
1.18.1.2 LIMPIEZA MANUAL DE TERRENO m² 48.00 0.00 48.00 0.00 0.00 48.00
1.18.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 5.28 0.00 5.28 0.00 0.00 5.28
1.18.1.4 PERFILADO Y COMPACTADO MANUAL m² 5.96 0.00 5.96 0.00 0.00 5.96
1.18.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 2.88 0.00 2.88 0.00 0.00 2.88
1.18.1.6 ENCOFRADO Y DESENCOFRADO m² 10.56 0.00 10.56 0.00 0.00 10.56
1.18.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 160.06 0.00 160.06 0.00 0.00 160.06
1.18.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 0.20 0.00 0.20 0.00 0.00 0.20
1.18.1.9 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 1.08 0.00 1.08 0.00 0.00 1.08
1.18.1.10 CONCRETO F´C=210KG/CM2 (MEZCLA MANUAL) m³ 2.39 0.00 2.39 0.00 0.00 2.39
1.18.1.11 CURADO DE CONCRETO m² 16.52 0.00 16.52 0.00 0.00 16.52
1.18.2 TUBERÍA Y ACCESORIOS
1.18.2.1 TUBO HDPE NTP-ISO 4427:2008 DN 32 MM INCL ACCESORIOS m 11.05 0.00 11.05 0.00 0.00 11.05
1.18.2.2 ENLACE ROSCADO TIPO MACHO HDPE DN 32 MM INCL ACCESORIOS und 2.00 0.00 2.00 0.00 0.00 2.00
1.18.2.3 TUBO HDPE NTP-ISO 4427:2008 DN 25 MM INCL ACCESORIOS m 11.05 0.00 11.05 0.00 0.00 11.05
1.18.2.4 ENLACE ROSCADO TIPO MACHO HDPE DN 25 MM INCL ACCESORIOS und 2.00 0.00 2.00 0.00 0.00 2.00
1.18.2.5 ABRAZADERA DE PLATINA DE 1/8" INCL ACCESORIOS und 10.00 0.00 10.00 0.00 0.00 10.00
1.18.2.6 ABRAZADERA DE PLATINA DE 1/2" INCL. ACCESORIOS und 10.00 0.00 10.00 0.00 0.00 10.00
1.18.2.7 CABLE TIPO BOA DE 1/2" m 25.70 0.00 25.70 0.00 0.00 25.70
1.18.2.8 PÉNDOLAS DE ACERO DE 1/4" SERIE 6x19 TIPO BOA m 7.00 0.00 7.00 0.00 0.00 7.00
1.18.2.9 GRAPA GROSBY DE 1/2" und 24.00 0.00 24.00 0.00 0.00 24.00
1.18.2.10 TEMPLADOR DE DOS ESPIGAS DE 1/2" CON GUADACABO und 4.00 0.00 4.00 0.00 0.00 4.00
1.18.2.11 CARRITO DE DILATACIÓN DE 0.30X0.30 INCL. ACCESORIOS und 4.00 0.00 4.00 0.00 0.00 4.00
1.18.2.12 RIEL DE ACERO PARA FIJADO 2"x3"x1/2 m 0.80 0.00 0.80 0.00 0.00 0.80
1.19 PASE AREO DE 10 M
1.19.1 OBRAS DE CONCRETO ARMADO
1.19.1.1 TRAZO, NIVELES Y REPLANTEO m² 100.00 0.00 100.00 0.00 0.00 100.00
1.19.1.2 LIMPIEZA MANUAL DE TERRENO m² 100.00 0.00 100.00 0.00 0.00 100.00
1.19.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 9.61 0.00 9.61 0.00 0.00 9.61
1.19.1.4 PERFILADO Y COMPACTADO MANUAL m² 7.69 0.00 7.69 0.00 0.00 7.69
1.19.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 5.05 0.00 5.05 0.00 0.00 5.05
1.19.1.6 ENCOFRADO Y DESENCOFRADO m² 13.44 0.00 13.44 0.00 0.00 13.44
1.19.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 181.69 0.00 181.69 0.00 0.00 181.69
1.19.1.8 CONCRETO F´C=100 KG/CM2 (MEZCLA MANUAL) m³ 0.24 0.00 0.24 0.00 0.00 0.24
1.19.1.9 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 2.17 0.00 2.17 0.00 0.00 2.17
1.19.1.10 CONCRETO F´C=210KG/CM2 (MEZCLA MANUAL) m³ 2.93 0.00 2.93 0.00 0.00 2.93
1.19.1.11 CURADO DE CONCRETO m² 21.13 0.00 21.13 0.00 0.00 21.13
1.19.2 TUBERÍA Y ACCESORIOS
1.19.2.1 TUBO HDPE NTP-ISO 4427:2008 DN 32 MM INCL INSTALACIÓN m 17.50 0.00 17.50 0.00 0.00 17.50
1.19.2.2 ENLACE ROSCADO TIPO MACHO HDPE DN 32 MM INCL ACCESORIOS und 2.00 0.00 2.00 0.00 0.00 2.00
1.19.2.3 TUBO HDPE NTP-ISO 4427:2008 DN 25 MM INCL INSTALACIÓN m 17.50 0.00 17.50 0.00 0.00 17.50
1.19.2.4 ENLACE ROSCADO TIPO MACHO HDPE DN 25 MM INCL ACCESORIOS und 2.00 0.00 2.00 0.00 0.00 2.00
1.19.2.5 ABRAZADERA DE PLATINA DE 1/8" INCL ACCESORIOS und 18.00 0.00 18.00 0.00 0.00 18.00
1.19.2.6 ABRAZADERA DE PLATINA DE 1/2" INCL. ACCESORIOS und 18.00 0.00 18.00 0.00 0.00 18.00
1.19.2.7 CABLE TIPO BOA DE 1/2" m 40.30 0.00 40.30 0.00 0.00 40.30
1.19.2.8 PÉNDOLAS DE ACERO DE 1/4" SERIE 6x19 TIPO BOA m 14.80 0.00 14.80 0.00 0.00 14.80
1.19.2.9 GRAPA GROSBY DE 1/2" und 24.00 0.00 24.00 0.00 0.00 24.00
1.19.2.10 TEMPLADOR DE DOS ESPIGAS DE 1/2" CON GUADACABO und 4.00 0.00 4.00 0.00 0.00 4.00
1.19.2.11 CARRITO DE DILATACIÓN DE 0.30X0.30 INCL. ACCESORIOS und 4.00 0.00 4.00 0.00 0.00 4.00
1.19.2.12 RIEL DE ACERO PARA FIJADO 2"x3"x1/2 m 0.80 0.00 0.80 0.00 0.00 0.80
1.20 PASE AEREO LINEA DE CONDUCCIÓN LUYCHO ALTO
1.20.1 TUBO HDPE NTP-ISO 4427:2008 DN 63 MM INCL INSTALACIÓN m 166.60 0.00 166.60 0.00 0.00 166.60
1.20.2 ENLACE ROSCADO TIPO MACHO HDPE DN 63 MM INCL ACCESORIOS und 10.00 0.00 10.00 0.00 0.00 10.00
1.21 CONTROL DE CALIDAD
1.21.1 PRUEBA HIDRÁULICA m 9,623.46 0.00 9,623.46 0.00 0.00 9,623.46
2 COMPONENTE 2: ADECUADO SISTEMA DE ELIMINACION DE EXCRETAS
2.1 TRABAJOS PRELIMINARES
2.1.1 TRANSPORTE DE MATERIALES A OBRA CON MAQUINARIA COMPONENTE 2 gbl 1.00 0.14 0.86 0.00 0.14 0.86
2.1.2 TRANSPORTE MANUAL DE MATERIALES DE PIE DE CARRETERA COMPONENTE 2 gbl 1.00 0.26 0.74 0.00 0.26 0.74
2.2 LETRINAS
2.2.1 OBRAS PRELIMINARES

F-9.4.(48/57)
9. EJECUCION FISICA
9.4. METRADOS DIARIOS - PROGRAMADO
Metrados Diarios
OBRA "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO" LUGAR : MARANURA
ENTIDAD MUNICIPALIDAD DISTRITAL DE MARANURA DIV. FUNC. : 040
U. EJECUTORA SUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL PROGRAMA : 0083
RESIDENTE DE OBRA ING. Jorge Luis Valencia Cordova GRUPO FUNC. : 0089
INSPECTOR DE OBRA ING. Edgar Viamonte Calla FUNCIÓN : 18
FECHA August-2022 CODIGO UNIFICADO : 2350362
August-2022
PRESUPUESTO BASE EJEC ACUM. SALDO AVANCE AVANCE SALDO

U.M.
METRADO Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
ANTERIOR ANTERIOR MES ACUM METRADO
ITEMS PARTIDA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
2.2.1.1 LIMPIEZA MANUAL DE TERRENO m² 615.68 99.84 515.84 33.28 16.64 8.32 8.32 16.64 83.20 183.04 432.64
2.2.1.2 TRAZO, NIVELES Y REPLANTEO EN LETRINAS m² 532.80 86.40 446.40 28.80 14.40 7.20 7.20 14.40 72.00 158.40 374.40
2.2.2 MOVIMIENTO DE TIERRAS
2.2.2.1 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 199.27 52.68 146.59 6.03 3.02 8.59 8.59 17.19 43.42 96.10 103.17
2.2.2.2 PERFILADO Y COMPACTADO MANUAL m² 635.85 236.41 399.44 21.49 10.75 8.59 8.59 17.19 66.61 303.02 332.83
2.2.2.3 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 193.50 47.35 146.15 5.88 2.94 10.15 10.15 20.31 49.43 96.78 96.72
2.2.3 CIMIENTOS Y SOBRECIMIENTOS
2.2.3.1 CIMIENTO CORRIDO C:H 1:10+60%P.G. (MEZCLA MANUAL) m³ 115.44 20.28 95.16 3.12 1.56 1.56 1.56 3.12 10.92 31.20 84.24
2.2.3.2 ENCOFRADO Y DESENCOFRADO m² 307.47 53.18 254.29 6.57 3.29 4.16 4.16 8.31 26.49 79.67 227.80
2.2.3.3 SOBRECIMIENTO C:H 1:6+25%P..M. (MEZCLA MANUAL) m³ 22.31 3.90 18.41 0.60 0.30 0.30 0.30 0.60 2.10 6.00 16.31
2.2.3.4 CURADO DE CONCRETO m² 577.20 91.26 485.94 14.04 7.02 7.02 7.02 14.04 49.14 140.40 436.80
2.2.4 MUROS Y TABIQUES DE ALBAÑILERÍA
2.2.4.1 MURO DE BLOQUETA DE 15X20X40CM m² 1,093.94 287.58 806.36 14.18 14.18 21.74 7.56 28.35 15.12 28.35 22.68 14.18 7.56 173.90 461.48 632.46
2.2.5 CONCRETO ARMADO
2.2.5.1 ENCOFRADO Y DESENCOFRADO DE VIGUETAS m² 173.16 35.10 138.06 2.34 2.34 2.34 2.34 2.34 2.34 2.34 2.34 4.68 2.34 4.68 4.68 4.68 4.68 2.34 2.34 49.14 84.24 88.92
2.2.5.2 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 920.86 186.60 734.26 12.44 12.44 12.44 12.44 12.44 12.44 12.44 12.44 24.89 12.44 24.89 24.89 24.89 24.98 12.44 12.44 261.38 447.98 472.88
2.2.5.3 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 17.32 3.45 13.87 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.47 0.23 0.47 0.47 0.47 0.47 0.23 0.23 4.88 8.33 8.99
2.2.5.4 CURADO DE CONCRETO m² 173.16 35.10 138.06 2.34 2.34 2.34 2.34 2.34 2.34 2.34 2.34 4.68 2.34 4.68 4.68 4.68 4.68 2.34 2.34 49.14 84.24 88.92
2.2.6 PISOS Y PAVIMENTOS
2.2.6.1 EMPEDRADO E=12.5CM m² 431.42 49.76 381.66 5.44 6.22 5.44 5.44 5.44 6.22 6.22 5.44 5.44 6.22 5.44 8.94 11.66 2.72 6.22 2.72 2.72 2.72 100.66 150.42 281.00
2.2.6.2 ENCOFRADO Y DESENCOFRADO m² 28.86 6.24 22.62 0.00 6.24 22.62
2.2.6.3 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 36.68 4.00 32.68 0.44 0.56 0.44 0.44 0.44 0.56 0.56 0.44 0.44 0.56 0.44 0.78 1.00 0.22 0.56 0.22 0.22 0.22 8.54 12.54 24.14
2.2.6.4 CURADO DE CONCRETO m² 460.28 49.76 410.52 5.44 7.00 5.44 5.44 5.44 7.00 7.00 5.44 5.44 7.00 5.44 9.72 12.44 2.72 7.00 2.72 2.72 2.72 106.12 155.88 304.40
2.2.6.5 ENCHAPADO DE PISOS 0.45X0.45M m² 259.00 7.00 252.00 3.50 4.92 7.00 3.50 3.50 3.50 3.50 3.50 7.00 6.90 3.50 7.00 3.50 3.50 3.50 3.50 3.50 3.50 78.32 85.32 173.68
2.2.7 REVOQUES, ENLUCIDOS Y MOLDURAS
2.2.7.1 TARRAJEO EN MUROS E=1.5 CM m² 2,465.42 1,122.86 1,342.56 15.39 46.16 30.79 30.79 46.18 51.24 30.79 66.64 66.64 33.31 30.79 448.72 1,571.58 893.84
2.2.7.2 DERRAMES A=0.15 M MORTERO 1:5 m 73.26 22.20 51.06 2.22 2.22 2.22 1.98 1.11 1.98 1.98 1.98 1.11 1.98 0.99 22.00 2.22 43.99 66.19 7.07
2.2.7.3 ENCHAPADO CON CERÁMICO 0.30X0.40 m² 364.08 9.84 354.24 9.84 4.92 9.84 4.92 9.84 4.92 4.92 4.92 9.84 4.92 4.92 14.76 7.89 9.84 4.90 4.92 4.92 4.92 9.48 135.43 145.27 218.81
2.2.8 ZOCALOS Y CONTRAZOCALOS
2.2.8.1 ZOCALO CERÁMICO m 255.30 3.45 251.85 3.45 6.90 3.45 3.45 3.45 3.45 3.45 6.90 6.90 6.90 6.90 3.45 3.45 3..45 3.45 3.45 69.00 72.45 182.85
2.2.9 COBERTURA TECHO
2.2.9.1 CORREA P/TECHO CON MADERA TRATADA m 1,398.60 491.40 907.20 18.90 18.90 37.80 18.90 75.60 18.90 18.90 37.80 56.70 37.80 37.80 37.80 18.90 434.70 926.10 472.50
2.2.9.2 COBERTURA CON PLANCHA DE CALAMINA m² 555.00 195.00 360.00 7.50 7.50 15.00 7.50 30.00 7.50 7.50 15.00 22.50 15.00 15.00 15.00 7.50 172.50 367.50 187.50
2.2.10 CARPINTERÍA EN MADERA
2.2.10.1 PUERTA DE MADERA TIPO PERSIANA und 74.00 74.00 0.00 0.00 74.00 0.00
2.2.11 CERRAJERÍA
2.2.11.1 CERRADURA TIPO POMO DE ACERO und 74.00 0.00 74.00 0.00 0.00 74.00
2.2.12 PINTURA
2.2.12.1 PINTURA LATEX EN MUROS m² 2,066.56 0.00 2,066.56 0.00 0.00 2,066.56
2.2.12.2 PINTURA LATEX EN DERRAMES m 73.26 0.00 73.26 0.00 0.00 73.26
2.2.12.3 PINTURA EN PUERTAS C/BARNIZ 2 MANOS m² 118.40 0.00 118.40 0.00 0.00 118.40
2.2.13 INSTALACIONES SANITARIAS
2.2.13.1 TRAZO, NIVELES Y REPLANTEO m² 694.12 318.92 375.20 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 225.12 544.04 150.08
2.2.13.2 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 297.18 136.68 160.50 4.02 4.02 4.02 4.02 4.02 4.02 4.02 4.02 4.02 4.02 4.02 4.02 4.02 4.02 4.02 4.02 4.02 4.02 4.02 4.02 4.02 4.02 4.02 4.02 96.48 233.16 64.02
2.2.13.3 PERFILADO Y COMPACTADO MANUAL m² 694.12 328.30 365.82 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 225.12 553.42 140.70
2.2.13.4 CAMA DE APOYO CON MATERIAL PROPIO SELECCIONADO E=0.10 m m² 694.12 328.30 365.82 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 9.38 225.12 553.42 140.70
2.2.13.5 TUBO PVC SAP C-10 DE1/2" m 688.20 325.50 362.70 9.30 9.30 9.30 9.30 9.30 9.30 9.30 9.30 9.30 9.30 9.30 9.30 9.30 9.30 9.30 9.30 9.30 9.30 9.30 9.30 9.30 9.30 9.30 9.30 223.20 548.70 139.50
2.2.13.6 TUBO PVC SAL DE 2" m 828.80 392.00 436.80 11.20 11.20 11.20 11.20 11.20 11.20 11.20 11.20 11.20 11.20 11.20 11.20 11.20 11.20 11.20 11.20 11.20 11.20 11.20 11.20 11.20 11.20 11.20 11.20 268.80 660.80 168.00
2.2.13.7 TUBO PVC SAL DE 4" m 499.50 236.25 263.25 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 6.75 162.00 398.25 101.25
2.2.13.8 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO EN CAPAS DE E=0.20M m³ 263.00 124.25 138.75 3.55 3.55 3.55 3.55 3.55 3.55 3.55 3.55 3.55 3.55 3.55 3.55 3.55 3.55 3.55 3.55 3.55 3.55 3.55 3.55 3.55 3.55 3.55 3.55 85.20 209.45 53.55
2.2.13.9 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 34.19 11.90 22.29 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 8.16 20.06 14.13
2.2.13.10 ENCOFRADO Y DESENCOFRADO m² 149.67 0.00 149.67 0.00 0.00 149.67
2.2.13.11 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 278.43 0.00 278.43 0.00 0.00 278.43
2.2.13.12 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 5.94 0.00 5.94 0.00 0.00 5.94
2.2.13.13 CURADO DE CONCRETO m² 140.42 0.00 140.42 0.00 0.00 140.42
2.2.14 APARATOS Y ACCESORIOS SANITARIOS
2.2.14.1 SUMINISTRO E INSTALACIÓN DE SANITARIO und 74.00 0.00 74.00 0.00 0.00 74.00
2.2.14.2 SUMINISTRO E INSTALACIÓN DE LAVATORIO und 74.00 0.00 74.00 0.00 0.00 74.00
2.2.14.3 SALIDA DE DUCHA TIPO ROCIADOR und 74.00 0.00 74.00 0.00 0.00 74.00
2.2.14.4 LLAVE PARA DUCHA und 74.00 21.00 53.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 24.00 45.00 29.00
2.2.14.5 LLAVE PARA LAVATORIO und 74.00 0.00 74.00 0.00 0.00 74.00
2.2.14.6 CODO F°G° DE 1/2" und 222.00 84.00 138.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 72.00 156.00 66.00
2.2.14.7 CODO PVC SAP 1/2" und 74.00 42.00 32.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 24.00 66.00 8.00
2.2.14.8 TEE PVC SAP DE 1/2" und 148.00 42.00 106.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 48.00 90.00 58.00
2.2.14.9 MANGUERA DE ABASTOS DE 1/2" und 148.00 0.00 148.00 0.00 0.00 148.00
2.2.14.10 VÁLVULA GLOBO DE 1/2" INCL. ACCESORIOS und 148.00 42.00 106.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 48.00 90.00 58.00
2.2.14.11 SUMIDERO DE BRONCE DE 2" und 148.00 0.00 148.00 0.00 0.00 148.00
2.2.14.12 REGISTRO ROSACADO DE 4" und 74.00 0.00 74.00 0.00 0.00 74.00
2.2.14.13 KIT DE TRAMPA PVC PARA LAVATORIO 2" und 74.00 0.00 74.00 0.00 0.00 74.00

F-9.4.(49/57)
9. EJECUCION FISICA
9.4. METRADOS DIARIOS - PROGRAMADO
Metrados Diarios
OBRA "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO" LUGAR : MARANURA
ENTIDAD MUNICIPALIDAD DISTRITAL DE MARANURA DIV. FUNC. : 040
U. EJECUTORA SUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL PROGRAMA : 0083
RESIDENTE DE OBRA ING. Jorge Luis Valencia Cordova GRUPO FUNC. : 0089
INSPECTOR DE OBRA ING. Edgar Viamonte Calla FUNCIÓN : 18
FECHA August-2022 CODIGO UNIFICADO : 2350362
August-2022
PRESUPUESTO BASE EJEC ACUM. SALDO AVANCE AVANCE SALDO

U.M.
METRADO Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
ANTERIOR ANTERIOR MES ACUM METRADO
ITEMS PARTIDA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
2.2.14.14 CODO PVC SAL 4" und 148.00 42.00 106.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 48.00 90.00 58.00
2.2.14.15 CODO PVC SAL 2" und 740.00 210.00 530.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 240.00 450.00 290.00
2.2.14.16 YEE PVC SAL DE 2" und 74.00 21.00 53.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 24.00 45.00 29.00
2.2.14.17 TEE PVC SAL DE 4" C/R 2" und 74.00 22.00 52.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 24.00 46.00 28.00
2.2.14.18 TEE PVC SAL 2" und 74.00 21.00 53.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 24.00 45.00 29.00
2.2.14.19 SOMBRERO DE VENTILACIÓN DE 2" und 74.00 21.00 53.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 24.00 45.00 29.00
2.3 PILETAS DOMICILIARIAS
2.3.1 ESTRUCTURA DE PILETA
2.3.1.1 TRAZO, NIVELES Y REPLANTEO EN CONEXIONES DOMICILIARIAS m² 146.52 0.00 146.52 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 35.64 35.64 110.88
2.3.1.2 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 29.30 0.00 29.30 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 7.20 7.20 22.10
2.3.1.3 PERFILADO Y COMPACTADO MANUAL m² 146.52 0.00 146.52 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 35.64 35.64 110.88
2.3.1.4 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 29.30 0.00 29.30 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 7.20 7.20 22.10
2.3.1.5 ENCOFRADO Y DESENCOFRADO m² 483.89 0.00 483.89 6.54 6.54 6.54 6.54 6.54 6.54 6.54 6.54 6.54 6.54 6.54 6.54 6.54 6.54 6.54 6.54 6.54 6.54 117.72 117.72 366.17
2.3.1.6 EMPEDRADO E=12.5CM m² 146.52 0.00 146.52 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 35.64 35.64 110.88
2.3.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 700.97 0.00 700.97 9.47 9.47 9.47 9.47 9.47 9.47 9.47 9.47 9.47 9.47 9.47 9.47 9.47 9.47 9.47 9.47 9.47 9.47 170.46 170.46 530.51
2.3.1.8 CONCRETO F´C=175KG/CM2 +30% PM (MEZCLA MANUAL) m³ 18.20 0.00 18.20 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 4.50 4.50 13.70
2.3.1.9 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 22.27 0.00 22.27 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 5.40 5.40 16.87
2.3.1.10 CURADO DE CONCRETO m² 570.47 0.00 570.47 8.51 8.51 8.51 8.51 8.51 8.51 8.51 8.51 8.51 8.51 8.51 8.51 8.51 8.51 8.51 8.51 8.51 8.51 153.18 153.18 417.29
2.3.2 TUBERÍAS Y ACCESORIOS
2.3.2.1 SUMIDERO DE BRONCE DE 2" und 74.00 0.00 74.00 0.00 0.00 74.00
2.3.2.2 TUBO PVC SAL DE 2" m 222.00 0.00 222.00 0.00 0.00 222.00
2.3.2.3 TRAMPA PARA LAVATORIO und 74.00 0.00 74.00 0.00 0.00 74.00
2.3.2.4 CODO PVC SAL 2" und 148.00 0.00 148.00 0.00 0.00 148.00
2.3.2.5 CODO F°G° DE 1/2" und 74.00 0.00 74.00 0.00 0.00 74.00
2.3.2.6 CODO PVC SAP 1/2" und 74.00 0.00 74.00 0.00 0.00 74.00
2.3.2.7 TEE PVC SAP DE 1/2" und 74.00 0.00 74.00 0.00 0.00 74.00
2.3.2.8 GRIFO DE 1/2" INCL. ACCESORIOS und 74.00 0.00 74.00 0.00 0.00 74.00
2.3.2.9 VÁLVULA GLOBO DE 1/2" INCL. ACCESORIOS und 74.00 0.00 74.00 0.00 0.00 74.00
2.3.2.10 TUBO PVC SAP C-10 DE1/2" m 207.20 0.00 207.20 0.00 0.00 207.20
2.3.2.11 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 48.54 0.00 48.54 0.00 0.00 48.54
2.3.2.12 PERFILADO Y COMPACTADO MANUAL m² 121.36 0.00 121.36 0.00 0.00 121.36
2.3.2.13 CAMA DE APOYO CON MATERIAL PROPIO SELECCIONADO E=0.10 m m² 121.36 0.00 121.36 0.00 0.00 121.36
2.3.2.14 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO EN CAPAS DE E=0.20M m³ 42.48 0.00 42.48 0.00 0.00 42.48
2.4 SISTEMA DE TRATAMIENTO DE AGUAS RESIDUALES
2.4.1 BIODIGESTOR PREFABRICADO DE 600 L
2.4.1.1 ESTRUCTURA DE BIODIGESTOR
2.4.1.1.1 TRAZO, NIVELES Y REPLANTEO DE POZO SEPTICO m² 62.90 0.00 62.90 0.00 0.00 62.90
2.4.1.1.2 LIMPIEZA MANUAL DE TERRENO m² 62.90 0.00 62.90 0.00 0.00 62.90
2.4.1.1.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 113.22 0.00 113.22 0.00 0.00 113.22
2.4.1.1.4 PERFILADO Y COMPACTADO MANUAL m² 62.90 0.00 62.90 0.00 0.00 62.90
2.4.1.1.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 113.22 0.00 113.22 0.00 0.00 113.22
2.4.1.1.6 BIODIGESTOR PREFABRICADO DE 600 L und 74.00 0.00 74.00 0.00 0.00 74.00
2.4.1.1.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 55.50 0.00 55.50 0.00 0.00 55.50
2.4.1.1.8 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 1.04 0.00 1.04 0.00 0.00 1.04
2.4.1.1.9 CURADO DE CONCRETO m² 20.72 0.00 20.72 0.00 0.00 20.72
2.4.1.1.10 CAMA DE APOYO DE BIODIGESTOR m³ 12.58 0.00 12.58 0.00 0.00 12.58
2.4.1.1.11 RELLENO Y COMPACTADO MANUAL CON MATERIAL SELECCIONADO EN CAPAS DE E=0.20M m³ 26.64 0.00 26.64 0.00 0.00 26.64
2.4.1.2 CAMARA DE LODOS
2.4.1.2.1 TRAZO, NIVELES Y REPLANTEO DE CAMARA DE LODOS m² 26.64 0.00 26.64 0.00 0.00 26.64
2.4.1.2.2 LIMPIEZA MANUAL DE TERRENO m² 26.64 0.00 26.64 0.00 0.00 26.64
2.4.1.2.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 15.98 0.00 15.98 0.00 0.00 15.98
2.4.1.2.4 PERFILADO Y COMPACTADO MANUAL m² 26.64 0.00 26.64 0.00 0.00 26.64
2.4.1.2.5 ELIMINACIÓN MANUAL DE MATERIAL EXCEDENTE m³ 15.98 0.00 15.98 0.00 0.00 15.98
2.4.1.2.6 ENCOFRADO Y DESENCOFRADO m² 267.14 0.00 267.14 0.00 0.00 267.14
2.4.1.2.7 ACERO CORRUGADO f´y=4200 KG/CM2 GRADO 60 kg 388.50 0.00 388.50 0.00 0.00 388.50
2.4.1.2.8 CONCRETO F´C=175KG/CM2 (MEZCLA MANUAL) m³ 11.21 0.00 11.21 0.00 0.00 11.21
2.4.1.2.9 CURADO DE CONCRETO m² 303.40 0.00 303.40 0.00 0.00 303.40
2.4.2 ZANJAS DE INFILTRACIÓN
2.4.2.1 TRAZO, NIVELES Y REPLANTEO DE ZANJAS DE INFILTRACIÓN m² 568.32 0.00 568.32 0.00 0.00 568.32
2.4.2.2 LIMPIEZA MANUAL DE TERRENO m² 568.32 0.00 568.32 0.00 0.00 568.32
2.4.2.3 EXCAVACIÓN MANUAL DE ZANJAS EN TERRENO NORMAL m³ 681.98 0.00 681.98 0.00 0.00 681.98
2.4.2.4 PERFILADO Y COMPACTADO MANUAL m² 568.32 0.00 568.32 0.00 0.00 568.32
2.4.2.5 CAMA DE APOYO E=0.15 PIEDRA CHANCADA m² 568.32 0.00 568.32 0.00 0.00 568.32
2.4.2.6 TUBO PVC SAL PESADO DE 4" m 310.80 0.00 310.80 0.00 0.00 310.80
2.4.2.7 TUBO CRIBADO PVC SAL PESADO DE 4" m 1,110.00 0.00 1,110.00 0.00 0.00 1,110.00
2.4.2.8 TEE DOBLE PVC SAL PESADO 4" und 74.00 0.00 74.00 0.00 0.00 74.00
2.4.2.9 CODO PVC SAL PESADO 4" und 296.00 0.00 296.00 0.00 0.00 296.00
2.4.2.10 TAPON PVC SAL 4" und 222.00 0.00 222.00 0.00 0.00 222.00
2.4.2.11 RELLENO CON MATERIAL PÉTREO m³ 310.80 0.00 310.80 0.00 0.00 310.80

F-9.4.(50/57)
9. EJECUCION FISICA
9.4. METRADOS DIARIOS - PROGRAMADO
Metrados Diarios
OBRA "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO" LUGAR : MARANURA
ENTIDAD MUNICIPALIDAD DISTRITAL DE MARANURA DIV. FUNC. : 040
U. EJECUTORA SUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL PROGRAMA : 0083
RESIDENTE DE OBRA ING. Jorge Luis Valencia Cordova GRUPO FUNC. : 0089
INSPECTOR DE OBRA ING. Edgar Viamonte Calla FUNCIÓN : 18
FECHA August-2022 CODIGO UNIFICADO : 2350362
August-2022
PRESUPUESTO BASE EJEC ACUM. SALDO AVANCE AVANCE SALDO

U.M.
METRADO Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed
ANTERIOR ANTERIOR MES ACUM METRADO
ITEMS PARTIDA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
2.4.2.12 RELLENO Y COMPACTADO MANUAL CON MATERIAL PROPIO EN CAPAS DE E=0.20M m³ 358.75 0.00 358.75 0.00 0.00 358.75
3 COMPONENTE 3: ACCIONES DE PROMOCION, CAPACITACION EN JASS, SEGURIDAD Y SALUD
3.1 DIAGNÓSTICO COMUNITARIO
3.1.1 COSTO DIAGNOSTICO COMUNITARIO gbl 1.00 0.00 1.00 0.00 0.00 1.00
3.2 ACCIONES DE PROMOCIÓN
3.2.1 MATERIALES ACCIONES DE PROMOCIÓN
3.2.1.1 MATERIAL DE PROMOCIÓN ENTREGADO POR EL PROYECTO gbl 1.00 0.25 0.75 0.00 0.25 0.75
3.2.1.2 MATERIAL PARA TALLERES PROMOCIÓN (ANTES Y DURANTE) gbl 1.00 0.12 0.88 0.00 0.12 0.88
3.2.2 ACCIONES DE PROMOCIÓN EN EL ANTES
3.2.2.1 PAGO POR PROMOCIÓN EN EL ANTES mes 1.00 0.00 1.00 0.00 0.00 1.00
3.2.3 ACCIONES DE PROMOCIÓN EN EL DURANTE
3.2.3.1 PAGO POR PROMOCIÓN EN EL DURANTE mes 1.00 0.00 1.00 0.00 0.00 1.00
3.2.4 ACCIONES DE PROMOCIÓN Y EDUCACIÓN PARA LA HIGIENE EN EL DESPUES
3.2.4.1 ACCIONES DE PROMOCIÓN Y SEGUIMIENTO A LA JASS (DESPUÉS) mes 2.00 0.00 2.00 0.00 0.00 2.00
3.2.4.2 MATERIAL PARA LA EJECUCIÓN DE LA PROMOCIÓN (DESPUÉS) gbl 1.00 0.00 1.00 0.00 0.00 1.00
3.2.4.3 CONCURSO COMUNIDAD SALUDABLE gbl 1.00 0.00 1.00 0.00 0.00 1.00
3.2.4.4 CAMPAÑAS DE SALUD E HIGIENE EN COMUNIDAD gbl 1.00 0.00 1.00 0.00 0.00 1.00
3.3 ACCIONES DE CAPACITACIÓN
3.3.1 MATERIALES ACCIONES DE CAPACITACIÓN
3.3.1.1 MATERIAL PARA TALLERES DE CAPACITACIÓN A JASS gbl 1.00 0.12 0.88 0.00 0.12 0.88
3.3.1.2 MATERIAL DE CAPACITACIÓN ENTREGADO POR EL PROYECTO gbl 1.00 0.12 0.88 0.00 0.12 0.88
3.3.2 ACCIONES DE CAPACITACIÓN
3.3.2.1 PAGO POR HONORARIOS TALLERES DE CAPACITACIÓN JASS gbl 1.00 0.12 0.88 0.00 0.12 0.88
3.3.3 ACCIONES DE CAPACITACIÓN EN EL DESPUES
3.3.3.1 CONCURSO DE JASS (DESPUÉS) gbl 1.00 0.00 1.00 0.00 0.00 1.00
3.4 SEGURIDAD, BIOSEGURIDAD Y SALUD
3.4.1 EQUIPOS DE PROTECCIÓN PERSONAL und 60.00 0.00 60.00 0.00 0.00 60.00
3.4.2 EQUIPO DE PROTECCIÓN COLECTIVA gbl 1.00 0.12 0.88 0.00 0.12 0.88
3.4.3 SEÑALIZACIÓN TEMPORAL DE SEGURIDAD Y BIOSEGURIDAD gbl 1.00 0.12 0.88 0.00 0.12 0.88
3.4.4 MONITOREO Y SENSIBILIZACIÓN DE SEGURIDAD Y BIOSEGURIDAD SEGÚN PROTOCOLOS CONTRA COVID 19 mes 8.00 1.00 7.00 0.00 1.00 7.00
3.4.5 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL TRABAJO gbl 1.00 0.15 0.85 0.00 0.15 0.85
3.4.6 IMPLEMENTOS DE SEGURIDAD SEGÚN PROTOCOLOS COVID 19 gbl 1.00 0.15 0.85 0.00 0.15 0.85
3.5 MITIGACIÓN DE IMPACTO AMBIENTAL
3.5.1 PLAN DE GESTIÓN AMBIENTAL gbl 1.00 0.00 1.00 0.00 0.00 1.00

F-9.4.(51/57)
PLANILLA DE TAREO DEL PERSONAL - VALORIZADO
OBRA "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO"
ENTIDAD MUNICIPALIDAD DISTRITAL DE MARANURA
U. EJECUTORA SUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL
RESIDENTE DE OBRA ING. Jorge Luis Valencia Cordova
INSPECTOR DE OBRA ING. Edgar Viamonte Calla
FECHA 8/1/2022
COSTO TOTAL DEL MES S/. 50,987.06
August-2022
FECHA DE
ITEM

APELLIDOS Y NOMBRES D.N.I. SEXO DEN. CAT. OCUP. CAT. OCUP Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed TOTAL COSTO
INGRESO
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 DIAS S/.
1 M OPERADOR MAQ. 2/19/2019 O O O X X X X X X X X X X X X X X X X X X X X X X X X X X X X 28 2,639.30
2 M OPERADOR MAQ. 2/19/2019 O O O X X X X X X X X X X X X X X X X X X X X X X X X X X X X 28 2,639.30
3 M OPERADOR MAQ. 2/19/2019 O O O X X X X X X X X X X X X X X X X X X X X X X X X X X X X 28 2,639.30
4 M OPERADOR MAQ. 2/19/2019 O O O X X X X X X X X X X X X X X X X X X X X X X X X X X X X 28 2,639.30
5 M OPERADOR MAQ. 2/19/2019 O O O X X X X X X X X X X X X X X X X X X X X X X X X X X X X 28 2,639.30
6 M OPERARIO 2/19/2019 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 31 2,003.72
7 M PEON 2/19/2019 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 31 2,003.72
8 M PEON 2/19/2019 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 31 2,003.72
9 M PEON 2/19/2019 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 31 2,003.72
10 M PEON 2/19/2019 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 31 2,003.72
11 M PEON 2/19/2019 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 31 2,003.72
12 M PEON 2/19/2019 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 31 2,003.72
13 M PEON 2/19/2019 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 31 2,003.72
14 M PEON 2/19/2019 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 31 2,003.72
15 M GUARDIAN 2/19/2019 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 31 1,586.28
16 M MAESTRO DE OBRA 2/19/2019 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 31 2,802.40
17 M TOPOGRAFO - I 2/19/2019 O O O O O X X X X X X X X X X X X X X X X X X X X X X X X X X 26 2,350.40
9. EJECUCION FISICA
9.4. METRADOS DIARIOS - PROGRAMADO
Sustento de Metrados - Programado
OBRA : "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTA LUGAR : MARANURA
ENTIDAD : MUNICIPALIDAD DISTRITAL DE MARANURA DIV. FUNC. : 040
U. EJECUTORA : SUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL PROGRAMA : 0083
RESIDENTE DE OBRA GRUPO FUNC. : 0089
INSPECTOR DE OBRA FUNCIÓN : 18
FECHA : 1-Aug-22 PLANILLA DE METRADOS POST CONSTRUCION CODIGO UNIFICADO : 2350362

N- MEDIDAS VANOS O DISMINUCIONES


Nº Descripcion PARCIAL PARCIAL TOTAL UNIDAD
ELEM N-VECES LARGO(m) ANCHO(m) ALTURA(m) N-VECES LARGO(m) ANCHO(m) ALTURA(m)
01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
01.01 OBRAS PROVISIONALES
01.01.01 CONSTRUCCIONES PROVISIONALES
01.01.01.01 OFICINA DE RESIDENCIA 15.00 m2
1 1.00 3.00 5.00 15.00 - 15.00

01.01.01.02 ALMACEN DE OBRA 25.00 m2


1 1.00 5.00 5.00 25.00 - 25.00

01.01.01.03 SERVICIOS HIGIENICOS 1.20 m2


1 1.00 1.20 1.00 1.20 - 1.20

01.01.01.05 TALLER DE FIERRO Y VESTUARIO 54.00 m2


1 1.00 9.00 6.00 54.00 - 54.00

01.01.01.07 CERCO PROVISIONAL DE OBRA 50.00 m


Colocado de pies derechos 1 1.00 50.00 50.00 - 50.00
colindante con la I.E. Primaria

01.02 TRABAJOS PRELIMINARES


01.02.01 TRAZO NIVELES Y REPLANTEO
01.02.01.01 LIMPIEZA MANUAL DE TERRENO CON PRESENC
1417.97 1,417.97 m2
Todo en Area a Intervenir 1 1.00 81.92 17.31 1,417.97 - 1,417.97

01.02.01.02 TRAZO Y REPLANTEO PRELIMINAR 708.00 m2


Bloque 1 1 1.00 40.90 17.31 708.00 - 708.00

01.03 SEGURIDAD Y SALUD


9. EJECUCION FISICA
9.4. METRADOS DIARIOS - PROGRAMADO
Sustento de Metrados - Programado
OBRA : "AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTA LUGAR : MARANURA
ENTIDAD : MUNICIPALIDAD DISTRITAL DE MARANURA DIV. FUNC. : 040
U. EJECUTORA : SUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL PROGRAMA : 0083
RESIDENTE DE OBRA GRUPO FUNC. : 0089
INSPECTOR DE OBRA FUNCIÓN : 18
FECHA : 1-Aug-22 PLANILLA DE METRADOS POST CONSTRUCION CODIGO UNIFICADO : 2350362

N- MEDIDAS VANOS O DISMINUCIONES


Nº Descripcion PARCIAL PARCIAL TOTAL UNIDAD
ELEM N-VECES LARGO(m) ANCHO(m) ALTURA(m) N-VECES LARGO(m) ANCHO(m) ALTURA(m)
01.03.04 CAPACITACION EN SEGURIDAD Y SALUD 1.00 mes
Charlas de Induccion y Seguridad 1 1.00 1.00 - 1.00
13.00 CONTROL DE CALIDAD
CONTROL DE CALIDAD
CONCRETO HIDRAULICO
OBRA:"AMPLIACION Y MEJORAMIENTO DEL SANEAMIENTO BASICO INTEGRAL DEL SECTOR DE PIÑALPATA DEL DISTRITO DE MARANURA - PROVINCIA DE LA CONVENCION - DEPARTAMENTO DE CUSCO"
ENTIDAD:MUNICIPALIDAD DISTRITAL DE MARANURA
U. EJECUTORA:SUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO TERRITORIAL
RESIDENTE DE OBRA:ING. Jorge Luis Valencia Cordova
INSPECTOR DE OBRA:ING. Edgar Viamonte Calla
LUGAR:MARANURA
DIV. FUNC.:040
PROGRAMA:0083
GRUPO FUNC.:0089
FUNCIÓN:18
CODIGO UNIFICADO:2350362
CORRESPONDIENTE AL MES : agosto 01 AL 31

CERTIF RESISTENCIA ESPECIMEN RESISTENCIA DEL CONCRETO


ELEMENTO - UBICACIÓN BLOQUE NIVEL
DISEÑO %
Nº FECHA SLUMP FECHA EDAD KG/CM2
1 BRIQUETA DE LA ZAPATA DE BLOQUE PEDAGOGICO - C-12 210 Kg/cm2 PEDAGOGICO 1.00 12-06-19 3.00 Pulg. 12-12-19 183 Dias 178 Kg/cm2 84.76%
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

REGISTRO FOTOGRAFICO

También podría gustarte