PRECIO DE MATERIALES - JULIO 2019
ACERO CORRUGADO
03 Fy=4200 Kg/cm2 GRADO kg 2.89 110 553.4 527.67 2.76 2.36 0307 533.28 527.67 2.33 2.49 12282 2.33
60
ACERO ESTRUCTURAL A-
56 kg 2.72 95 533.84 527.11 2.69 2.08 6505 532.72 527.11 2.06 2.40 16539 2.06
36
ACERO LISO EN
02 m 4.28 020304 553.89 548.06 4.23 2.99 3505 may-18 2.99
VARILLAS DE 1/2"
30 ACETILENO kg 30.52 Stgo.Chuco - Mollepata 478.04 491.24 31.36 31.36
ADITIVO
29 (INCORPORADOR DE gln 16.81 3001201 496.36 491.24 16.64 28.35 2859 16.64
AIRE)
ADITIVO CURADOR DE
29 gln 17.50 95 496.36 491.24 17.32 15.55 300186 496.36 491.24 15.39 14.85 2841 14.85
CONCRETO
ADITIVO MEJORADOR DE
29 kg 18.00 95 496.36 491.24 17.81 22.47 130601 496.36 491.24 22.24 17.81
ADHERENCIA
02 ALAMBRE NEGRO # 16 kg 3.03 110 555.05 548.06 2.99 3.15 020102 553.89 548.06 3.12 2.52 2515 2.52
02 ALAMBRE NEGRO # 8 kg 3.03 110 555.05 548.06 2.99 3.15 020101 553.89 548.06 3.12 2.87 4888 2.87
ALCANTARILLA TMC
09 m 493.10 0904 279.39 276.46 487.93 487.93
D=48"
13 ASFALTO DILUIDO MC-30 lt PETROPERU 2.12 2.12
30 BARRENO 7/8" X 5' und 300.21 280404 496.36 491.24 297.11 780.43 5733 mar-17 297.11
BARRERA DE
61 SEGURIDAD NIVEL DE m 112.64 Calemar - Abra el Naranjillo 231.02 227.7 111.02 111.02
CONTECION P2, TIPO N2
CABLE DE MONTAJE CON
02 m 40.00 40.00
ALMA DE ACERO
CEMENTO PORTLAND
21 bls 18.90 110 471.42 471.42 18.90 18.94 2103 471.42 471.42 18.94 15.13 8430 15.13
TIPO I (42.5 Kg)
CHALECO DE
39 und PROMART 21.10 21.10
SEGURIDAD
CLAVOS CON CABEZA
02 kg 3.16 110 555.05 548.06 3.12 3.30 020202 553.89 548.06 3.27 3.81 9141 3.12
PROMEDIO
34 CONO DE SEGURIDAD und PROMART 16.86 16.86
30 DERECHO DE CANTERA m3 Acta 4.00 4.00
TIPO DE CAMBIO (MAYO 2019) S/. : 3.363
TIPO DE CAMBIO (JULIO 2019) S/. : 3.300
PRECIO DE MATERIALES - JULIO 2019
PRECIO PRECIO
PESO ALM.MAN. MERMAS VIATICO
DESCRIPCION UND PROCEDENCIA BASE FLETE S
(kg / u ) (S/.) 2.00% 5.00% 40.00% (S/.)
05 AGREGADO GRUESO
DERECHO DE CANTERA m3 0.00 OBRA 4.00 4.00
09 ALCANTARILLA METÁLICA
ALCANTARILLA TMC D=48" m 90.92 LIMA 487.93 32.277 9.76 529.97
13 ASFALTO
ASFALTO DILUIDO MC-30 lt 1.00 LIMA2 2.12 0.500 0.04 0.11 2.77
EMULSION ASFALTICA CON POLIMERO gln 3.79 LIMA2 7.80 1.893 0.16 0.39 10.24
EMULSION ASFALTICA DE ROTURA LENTA gln 3.79 LIMA2 6.93 1.893 0.14 0.35 9.31
30 DÓLAR
ACETILENO kg 1.00 LIMA2 31.36 0.500 0.63 1.57 34.06
ADITIVO (INCORPORADOR DE AIRE) gln 4.54 LIMA2 16.64 2.270 0.33 0.83 20.07
ADITIVO CURADOR DE CONCRETO gln 4.54 LIMA2 14.85 2.270 0.30 0.74 18.16
ADITIVO MEJORADOR DE ADHERENCIA kg 1.00 LIMA2 17.81 0.500 0.36 0.89 19.56
BARRENO 7/8" X 5' und 4.32 LIMA 297.11 1.534 5.94 304.59
CONO DE SEGURIDAD und 1.50 LIMA 16.86 0.533 0.34 17.74
DESMOLDADOR PARA ENCOFRADO gln 3.67 LIMA2 29.83 1.835 0.60 1.49 33.76
DISCO DE DESBASTE 1/4" x 7" und 1.20 LIMA 67.23 0.426 1.34 69.00
FIBRA DE VIDRIO DE 4 MM. ACABADO m2 1.00 LIMA 215.74 0.355 4.31 220.40
FILLER MINERAL kg 1.00 LIMA 0.36 0.355 0.01 0.02 0.74
FORMALETA ESTRUCTURAL RECTANGULAR PERM und 5.50 LIMA 177.87 1.953 3.56 183.38
GEOCOMPUESTO DE DRENAJE m2 7.25 LIMA 10.43 2.574 0.21 13.21
GEOESTERA DE POLIESTER m3 1.20 LIMA 230.55 0.426 4.61 235.58
GEOMALLA DE REFUERZO UX 50 m2 0.20 LIMA 5.94 0.071 0.12 6.13
GEOMALLA DE REFUERZO UX 75 m2 0.20 LIMA 7.29 0.071 0.15 7.51
GEOTEXTIL NO TEJIDO CLASE 2 m2 0.20 LIMA 8.55 0.071 0.17 8.79
GEOTEXTIL TEJIDO DE POLIESTER 44/41 KN/m m2 0.20 LIMA 5.21 0.071 0.10 5.39
COSTO DE MATERIALES
PRECIO PRECIO
PESO ALM.MAN. MERMAS VIATICO
DESCRIPCION UND PROCEDENCIA BASE FLETE S
(kg / u ) (S/.) 2.00% 5.00% 40.00% (S/.)
IMPRIMANTE PARA SELLANTE ELASTICO gln 4.00 LIMA2 189.03 2.000 3.78 9.45 204.26
LAMINA REFLECTANTE A.I. AMARILLA p2 0.25 LIMA 9.58 0.089 0.19 9.86
LAMINA REFLECTANTE A.I. BLANCA p2 0.25 LIMA 9.58 0.089 0.19 9.86
MATERIAL DE RESPALDO PARA SELLADORES 5/8" m 0.01 LIMA 0.55 0.004 0.01 0.03 0.59
MICROESFERAS DE VIDRIO kg 1.00 LIMA 3.40 0.355 0.07 0.17 4.00
OXIGENO m3 1.23 LIMA 10.45 0.437 0.21 0.52 11.62
PEGAMENTO EPOXICO UNIVERSAL gln 6.36 LIMA2 196.95 3.180 3.94 9.85 213.92
PISO DE JEBE CAUCHO e=4.00 mm m2 4.00 LIMA 42.37 1.420 0.85 44.64
SELLANTE ELASTICO DE POLIURETANO gln 8.50 LIMA2 100.45 4.250 2.01 5.02 111.73
SEÑAL PALETA PARE/SIGA und 0.50 LIMA 16.86 0.178 0.34 17.38
SOLDADURA CELLOCORD 1/8" kg 1.00 LIMA 10.52 0.355 0.21 0.53 11.62
THINNER gln 3.78 LIMA2 15.00 1.890 0.30 0.75 17.94
TUBERIA HDPE DE 4" PERFORADA m 0.82 LIMA 9.06 0.291 0.18 9.53
YESO bls 20.00 LIMA 9.50 7.100 0.19 0.48 17.27
32 FLETE TERRESTRE
FLETE TERRESTRE kg LIMA 0.50 0.50
SEGURO DE TRANSPORTE ton LIMA 100.00 100.00
34 GASOLINA
GASOLINA 84 OCTANOS gln 2.78 BAGUA2 13.94 0.334 0.28 0.70 15.25
51 PERFIL DE ACERO
PERFIL "T" 1 1/2" x 3/16" m 4.28 LIMA 7.22 1.519 0.14 8.87
PLATINA 2" X 1/8" m 1.27 LIMA 3.50 0.451 0.07 4.02
PLATINA 3" x 3/16" m 2.85 LIMA 7.18 1.012 0.14 8.33
53 PETROLEO DIESSEL
PETROLEO gln 3.21 BAGUA2 13.66 0.385 0.27 0.68 14.99
54 PINTURA LATEX
PINTURA ANTICORROSIVA gln 5.07 LIMA 35.55 1.800 0.71 38.06
PINTURA ESMALTE gln 5.07 LIMA 35.55 1.800 0.71 38.06
PINTURA IMPRIMANTE gln 5.07 LIMA 3.60 1.800 0.07 5.47
PINTURA PARA TRAFICO gln 5.07 LIMA 56.41 1.800 1.13 59.34
SOLVENTE XILOL gln 5.07 LIMA 33.68 1.800 0.67 36.15
COSTO DE MATERIALES
PRECIO PRECIO
PESO ALM.MAN. MERMAS VIATICO
DESCRIPCION UND PROCEDENCIA BASE FLETE S
(kg / u ) (S/.) 2.00% 5.00% 40.00% (S/.)
TINTA SERIGRAFICA gln 5.07 LIMA 1,962.41 1.800 39.25 2,003.46
60 PLANCHA DE POLIURETANO
POLIESTIRENO EXPANDIDO e=1" m2 0.25 LIMA 3.42 0.089 0.07 0.17 3.75
61 PLANCHA GALVANIZADA
BARRERA DE SEGURIDAD NIVEL DE CONTECION P m 24.55 LIMA 111.02 8.715 2.22 121.96
72 TUBERIA DE PVC
TUBO PVC-SAP AGUA D=3/8" m 0.17 LIMA 1.22 0.060 0.02 0.06 1.36
TUBO PVC DESAGUE Ø3" m 0.92 LIMA 3.70 0.325 0.07 4.09
TUBO PVC DESAGUE Ø6" m 3.24 LIMA 25.79 1.151 0.52 27.46