TABLA DE PRECIOS UNITARIOS


CONCEPTO

COSTO
MATERIALES UNIDAD CANTIDAD IMPORTE
UNITARIO
$0.00
$0.00
$0.00
$0.00
$0.00

SUMA DE MATERIALES $0.00

MANO DE OBRA
COSTO
UNIDAD CANTIDAD IMPORTE
CATEGORIA UNITARIO
$0.00
$0.00
$0.00
$0.00
$0.00

SUMA DE MANO DE OBRA $0.00

HERRAMIENTA, EQUIPO DE SEGURIDAD


BASE PORCENTAJE IMPORTE
Y MANDOS INTERMEDIOS

HERRAMIENTA MENOR (% M.O) $0.00 3% $0.00


EQUIPO DE SEGURIDAD (%M.O) $0.00
MANDOS INTERMEDIOS (% M.O) $0.00 10% $0.00

SUMA DE HERR. Y EQ. $0.00

COSTO DIRECTO TOTAL $0.00

FACTORES DE INDIRECTOS, FINANCIAMIENTO Y


BASE PORCENTAJE IMPORTE
UTILIDAD

COSTO INDERECTO [%C.I*(C.D)] $0.00 20.00% $0.00


COSTO POR FINANCIAMIENTO [%C.F.*(C.D + C.I.)] $0.00 1.00% $0.00
CARGO POR UTILIDAD [%C.U.*(C.D + C.I + C.F.)] $0.00 10.00% $0.00
CARGO ADICIONAL [C.D.+ C.I + C.F+ C.U.)] $0.00 0.50% $0.00

PRECIO UNITARIO (C.D + C.I + C.F + C.U + C.A) UNIDAD


$0.00
OBRA: PROPIETARIO
DIRECCION: AV. MORELOS ESQ. CON GUIE SHUBA GRUPO:
INFONAVIT ZAPANDU SEGUNDA SECCIÓN 6° "F"
NL: 20
TURNO:
ELABORÓ: MORALES LÓPEZ ARIADNA MATUTINO

PARTIDA:
FECHA DE ELABORACIÓN:

TABLA DE PRECIOS UNITARIOS


CONCEPTO LIMPIEZA:
Limpieza del terreno por medio manual, usando herramientas convencionales

COSTO
MATERIALES UNIDAD CANTIDAD IMPORTE
UNITARIO
$0.00
$0.00
$0.00
$0.00
$0.00

SUMA DE MATERIALES $0.00

MANO DE OBRA
COSTO
CATEGORIA UNIDAD CANTIDAD IMPORTE
UNITARIO
Cuadrilla #1 Jornada 0.0083 $358.64 $2.98
$0.00
$0.00
$0.00
$0.00

SUMA DE MANO DE OBRA $2.98

HERRAMIENTA, EQUIPO DE SEGURIDAD


BASE PORCENTAJE IMPORTE
Y MANDOS INTERMEDIOS

HERRAMIENTA MENOR (% M.O) $2.98 3% $0.09


EQUIPO DE SEGURIDAD (%M.O) $0.00
MANDOS INTERMEDIOS (% M.O) $2.98 10% $0.30

SUMA DE HERR. Y EQ. $0.39

COSTO DIRECTO TOTAL $3.37

FACTORES DE INDIRECTOS, FINANCIAMIENTO Y


BASE PORCENTAJE IMPORTE
UTILIDAD

COSTO INDERECTO [%C.I*(C.D)] $3.37 20.00% $0.67


COSTO POR FINANCIAMIENTO [%C.F.*(C.D + C.I.)] $4.05 1.00% $0.04
CARGO POR UTILIDAD [%C.U.*(C.D + C.I + C.F.)] $4.09 10.00% $0.41
CARGO ADICIONAL [C.D.+ C.I + C.F+ C.U.)] $4.50 0.50% $0.02

PRECIO UNITARIO (C.D + C.I + C.F + C.U + C.A) UNIDAD


$4.52
m2
B C D E F G
2 OBRA: PROPIETARIO
DIRECCION: AV. MORELOS ESQ. CON GUIE SHUBA GRUPO:
3 INFONAVIT ZAPANDU SEGUNDA SECCIÓN 6° "F"
4 NL: 20
TURNO:
ELABORÓ: MORALES LÓPEZ ARIADNA MATUTINO
5
6 PARTIDA:
7 FECHA DE ELABORACIÓN:
8

9 TABLA DE PRECIOS UNITARIOS


10
CONCEPTO: TRAZO Y NIVELACIÓN:
Trazo y nivelación en terreno plano con una superficie de 120.08 m2, por medios manuales, con hilo y nivel
de manguera.
11
12

COSTO
MATERIALES UNIDAD CANTIDAD IMPORTE
UNITARIO
13
14 cal bulto 0.0083 $80.00 $0.66
15 hilo carrete 0.0166 $65.00 $1.08
16 estacas lote 0.0249 $95.00 $2.37
17 clavos kg 0.0166 $45.00 $0.75
18 $0.00
19
20 SUMA DE MATERIALES $4.86
21
22 MANO DE OBRA
COSTO
CATEGORIA UNIDAD CANTIDAD IMPORTE
23 UNITARIO
24 cuadrilla #1 jornada 0.0083 $358.64 $2.98
25 Topografo hora 4.0000 $75.00 $300.00
26 $0.00
27 $0.00
28 $0.00
29
30 SUMA DE MANO DE OBRA $302.98
31

HERRAMIENTA, EQUIPO DE SEGURIDAD


BASE PORCENTAJE IMPORTE
Y MANDOS INTERMEDIOS
32
33 HERRAMIENTA MENOR (% M.O) $302.98 3% $9.09
34 EQUIPO DE SEGURIDAD (%M.O) $0.00
35 MANDOS INTERMEDIOS (% M.O) $302.98 10% $30.30
36
37 SUMA DE HERR. Y EQ. $39.39
38
39 COSTO DIRECTO TOTAL $347.23
40
41
FACTORES DE INDIRECTOS, FINANCIAMIENTO
BASE PORCENTAJE IMPORTE
42 Y UTILIDAD
43 COSTO INDERECTO [%C.I*(C.D)] $347.23 20.00% $69.45
44 COSTO POR FINANCIAMIENTO [%C.F.*(C.D + C.I.)] $416.67 1.00% $4.17
45 CARGO POR UTILIDAD [%C.U.*(C.D + C.I + C.F.)] $420.84 10.00% $42.08
46 CARGO ADICIONAL [C.D.+ C.I + C.F+ C.U.)] $462.92 0.50% $2.31
47
48 PRECIO UNITARIO (C.D + C.I + C.F + C.U + C.A) UNIDAD
$465.24
49 m2
OBRA: PROPIETARIO
DIRECCION: AV. MORELOS ESQ. CON GUIE SHUBA GRUPO:
INFONAVIT ZAPANDU SEGUNDA SECCIÓN 6° "F"
NL: 20
TURNO:
ELABORÓ: MORALES LÓPEZ ARIADNA MATUTINO

PARTIDA:
FECHA DE ELABORACIÓN:

TABLA DE PRECIOS UNITARIOS


CONCEPTO: EXCAVACIÓN:
Excavación a mano en cepas en terreno de clase 1 con un material 1000-0 (100% tierra,0 tepetate, 0%roca)
de 0,00mts a 1.50 mts de profundidad con herramientas manual sin considerar acarreo

COSTO
MATERIALES UNIDAD CANTIDAD IMPORTE
UNITARIO
$0.00
$0.00
$0.00
$0.00
$0.00

SUMA DE MATERIALES $0.00

MANO DE OBRA
COSTO
CATEGORIA UNIDAD CANTIDAD IMPORTE
UNITARIO
Cuadrilla #1 jornada 0.0195 $358.64 $6.99
$0.00
$0.00
$0.00
$0.00

SUMA DE MANO DE OBRA $6.99

HERRAMIENTA, EQUIPO DE SEGURIDAD


BASE PORCENTAJE IMPORTE
Y MANDOS INTERMEDIOS

HERRAMIENTA MENOR (% M.O) $6.99 3% $0.21


EQUIPO DE SEGURIDAD (%M.O) $0.00
MANDOS INTERMEDIOS (% M.O) $6.99 10% $0.70

SUMA DE HERR. Y EQ. $0.91

COSTO DIRECTO TOTAL $7.90

FACTORES DE INDIRECTOS, FINANCIAMIENTO Y


BASE PORCENTAJE IMPORTE
UTILIDAD

COSTO INDERECTO [%C.I*(C.D)] $7.90 20.00% $1.58


COSTO POR FINANCIAMIENTO [%C.F.*(C.D + C.I.)] $9.48 1.00% $0.09
CARGO POR UTILIDAD [%C.U.*(C.D + C.I + C.F.)] $9.58 10.00% $0.96
CARGO ADICIONAL [C.D.+ C.I + C.F+ C.U.)] $10.54 0.50% $0.05

PRECIO UNITARIO (C.D + C.I + C.F + C.U + C.A) UNIDAD


$10.59
m3
OBRA: PROPIETARIO
DIRECCION: AV. MORELOS ESQ. CON GUIE SHUBA GRUPO:
INFONAVIT ZAPANDU SEGUNDA SECCIÓN 6° "F"
NL: 20
TURNO:
ELABORÓ: MORALES LÓPEZ ARIADNA MATUTINO

PARTIDA:
FECHA DE ELABORACIÓN:

TABLA DE PRECIOS UNITARIOS


CONCEPTO PLANTILLA:
Plantilla de 0.10m con conreto armado con una resistencia de F ́C=100Kg/Cm2

COSTO
MATERIALES UNIDAD CANTIDAD IMPORTE
UNITARIO
concreto f'c:100 kg/cm2 m3 0.1000 $1,278.44 $127.84
$0.00
$0.00
$0.00
$0.00

SUMA DE MATERIALES $127.84

MANO DE OBRA
COSTO
CATEGORIA UNIDAD CANTIDAD IMPORTE
UNITARIO
cuadrilla #2 jornada 0.0667 $1,305.94 $87.06
cuadrilla #3 jornada 0.0714 $716.02 $51.14
$0.00
$0.00
$0.00

SUMA DE MANO DE OBRA $138.21

HERRAMIENTA, EQUIPO DE SEGURIDAD


BASE PORCENTAJE IMPORTE
Y MANDOS INTERMEDIOS

HERRAMIENTA MENOR (% M.O) $138.21 3% $4.15


EQUIPO DE SEGURIDAD (%M.O) $0.00
MANDOS INTERMEDIOS (% M.O) $138.21 10% $13.82

SUMA DE HERR. Y EQ. $17.97

COSTO DIRECTO TOTAL $284.02

FACTORES DE INDIRECTOS, FINANCIAMIENTO Y


BASE PORCENTAJE IMPORTE
UTILIDAD

COSTO INDERECTO [%C.I*(C.D)] $284.02 20.00% $56.80


COSTO POR FINANCIAMIENTO [%C.F.*(C.D + C.I.)] $340.82 1.00% $3.41
CARGO POR UTILIDAD [%C.U.*(C.D + C.I + C.F.)] $344.23 10.00% $34.42
CARGO ADICIONAL [C.D.+ C.I + C.F+ C.U.)] $378.65 0.50% $1.89

PRECIO UNITARIO (C.D + C.I + C.F + C.U + C.A) UNIDAD


$380.55
m3
OBRA: PROPIETARIO
DIRECCION: AV. MORELOS ESQ. CON GUIE SHUBA GRUPO:
INFONAVIT ZAPANDU SEGUNDA SECCIÓN 6° "F"
NL: 20
TURNO:
ELABORÓ: MORALES LÓPEZ ARIADNA MATUTINO

PARTIDA:
FECHA DE ELABORACIÓN:

TABLA DE PRECIOS UNITARIOS


CONCEPTO: ZAPATA TIPO 1
Zapatas aisladas con varilla de 1/2"y concreto con resistencia F´C= 200 Kg/Cm2
Medidas: 1.60 ancho x 1.50 de largo x 0.50 de alto

COSTO
MATERIALES UNIDAD CANTIDAD IMPORTE
UNITARIO
Concreto f´c= 200kg/cm2 m3 1.2000 $1,732.55 $2,079.06
varilla de 1/2" ton 0.0232 $300.00 $6.96
alambre recocido kg 0.2402 $40.00 $9.61
$0.00
$0.00

SUMA DE MATERIALES $2,095.63

MANO DE OBRA
COSTO
CATEGORIA UNIDAD CANTIDAD IMPORTE
UNITARIO
cuadrilla #2 jornada 0.8000 $1,305.94 $1,044.75
cuadrilla #3 jornada 0.0857 $716.02 $61.37
cuadrilla #5 jornada 0.1379 $726.66 $100.19
$0.00
$0.00

SUMA DE MANO DE OBRA $1,206.32

HERRAMIENTA, EQUIPO DE SEGURIDAD


BASE PORCENTAJE IMPORTE
Y MANDOS INTERMEDIOS

HERRAMIENTA MENOR (% M.O) $1,206.32 3% $36.19


EQUIPO DE SEGURIDAD (%M.O) $0.00
MANDOS INTERMEDIOS (% M.O) $1,206.32 10% $120.63

SUMA DE HERR. Y EQ. $156.82

COSTO DIRECTO TOTAL $3,458.77

FACTORES DE INDIRECTOS, FINANCIAMIENTO Y


BASE PORCENTAJE IMPORTE
UTILIDAD

COSTO INDERECTO [%C.I*(C.D)] $3,458.77 20.00% $691.75


COSTO POR FINANCIAMIENTO [%C.F.*(C.D + C.I.)] $4,150.52 1.00% $41.51
CARGO POR UTILIDAD [%C.U.*(C.D + C.I + C.F.)] $4,192.03 10.00% $419.20
CARGO ADICIONAL [C.D.+ C.I + C.F+ C.U.)] $4,611.23 0.50% $23.06

PRECIO UNITARIO (C.D + C.I + C.F + C.U + C.A) UNIDAD


$4,634.29
Piezas
OBRA: PROPIETARIO
DIRECCION: AV. MORELOS ESQ. CON GUIE SHUBA GRUPO:
INFONAVIT ZAPANDU SEGUNDA SECCIÓN 6° "F"
NL: 20
TURNO:
ELABORÓ: MORALES LÓPEZ ARIADNA MATUTINO

PARTIDA:
FECHA DE ELABORACIÓN:

TABLA DE PRECIOS UNITARIOS


CONCEPTO: ZAPATA TIPO 2
Zapatas aisladas con varilla de 1/2"y concreto con resistencia F´C= 200 Kg/Cm2
Medidas: 1.60 ancho x 1.10 de largo x 0.50 de alto

COSTO
MATERIALES UNIDAD CANTIDAD IMPORTE
UNITARIO
Concreto f´c= 200kg/cm2 m3 0.8800 $1,732.55 $1,524.64
varilla de 1/2" ton 0.0184 $32,900.00 $605.36
alambre recocido kg 0.2059 $40.00 $8.24
$0.00
$0.00

SUMA DE MATERIALES $2,138.24

MANO DE OBRA
COSTO
CATEGORIA UNIDAD CANTIDAD IMPORTE
UNITARIO
cuadrilla #2 jornada 0.5867 $1,305.94 $766.15
cuadrilla #3 jornada 0.0629 $716.02 $45.01
cuadrilla #5 jornada 0.1094 $726.66 $79.53

$0.00

SUMA DE MANO DE OBRA $890.69

HERRAMIENTA, EQUIPO DE SEGURIDAD


BASE PORCENTAJE IMPORTE
Y MANDOS INTERMEDIOS

HERRAMIENTA MENOR (% M.O) $890.69 3% $26.72


EQUIPO DE SEGURIDAD (%M.O) $0.00
MANDOS INTERMEDIOS (% M.O) $890.69 10% $89.07

SUMA DE HERR. Y EQ. $115.79

COSTO DIRECTO TOTAL $3,144.72

FACTORES DE INDIRECTOS, FINANCIAMIENTO Y


BASE PORCENTAJE IMPORTE
UTILIDAD

COSTO INDERECTO [%C.I*(C.D)] $3,144.72 20.00% $628.94


COSTO POR FINANCIAMIENTO [%C.F.*(C.D + C.I.)] $3,773.66 1.00% $37.74
CARGO POR UTILIDAD [%C.U.*(C.D + C.I + C.F.)] $3,811.40 10.00% $381.14
CARGO ADICIONAL [C.D.+ C.I + C.F+ C.U.)] $4,192.54 0.50% $20.96

PRECIO UNITARIO (C.D + C.I + C.F + C.U + C.A) UNIDAD


$4,213.50
Piezas
OBRA: PROPIETARIO
DIRECCION: AV. MORELOS ESQ. CON GUIE SHUBA GRUPO:
INFONAVIT ZAPANDU SEGUNDA SECCIÓN 6° "F"
NL: 20
TURNO:
ELABORÓ: MORALES LÓPEZ ARIADNA MATUTINO

PARTIDA:
FECHA DE ELABORACIÓN:

TABLA DE PRECIOS UNITARIOS


CONCEPTO: ZAPATA TIPO 3
Zapatas aisladas con varilla de 1/2"y concreto con resistencia F´C= 200 Kg/Cm2
Medidas: 1.50 ancho x 1.10 de largo x 0.50 de alto

COSTO
MATERIALES UNIDAD CANTIDAD IMPORTE
UNITARIO
Concreto f´c= 200kg/cm2 m3 0.8250 $1,732.55 $1,429.35
varilla de 1/2" ton 0.0178 $32,900.00 $585.62
alambre recocido kg 0.2059 $40.00 $8.24
$0.00
$0.00

SUMA DE MATERIALES $2,023.21

MANO DE OBRA
COSTO
CATEGORIA UNIDAD CANTIDAD IMPORTE
UNITARIO
cuadrilla #2 jornada 0.5500 $1,305.94 $718.27
cuadrilla #3 jornada 0.0589 $716.02 $42.19
cuadrilla #5 jornada 0.1059 $726.66 $76.97
$0.00
$0.00

SUMA DE MANO DE OBRA $837.43

HERRAMIENTA, EQUIPO DE SEGURIDAD


BASE PORCENTAJE IMPORTE
Y MANDOS INTERMEDIOS

HERRAMIENTA MENOR (% M.O) $837.43 3% $25.12


EQUIPO DE SEGURIDAD (%M.O) $0.00
MANDOS INTERMEDIOS (% M.O) $837.43 10% $83.74

SUMA DE HERR. Y EQ. $108.87

COSTO DIRECTO TOTAL $2,969.50

FACTORES DE INDIRECTOS, FINANCIAMIENTO Y


BASE PORCENTAJE IMPORTE
UTILIDAD

COSTO INDERECTO [%C.I*(C.D)] $2,969.50 20.00% $593.90


COSTO POR FINANCIAMIENTO [%C.F.*(C.D + C.I.)] $3,563.40 1.00% $35.63
CARGO POR UTILIDAD [%C.U.*(C.D + C.I + C.F.)] $3,599.04 10.00% $359.90
CARGO ADICIONAL [C.D.+ C.I + C.F+ C.U.)] $3,958.94 0.50% $19.79

PRECIO UNITARIO (C.D + C.I + C.F + C.U + C.A) UNIDAD


$3,978.74
Piezas
OBRA: PROPIETARIO
DIRECCION: AV. MORELOS ESQ. CON GUIE SHUBA GRUPO:
INFONAVIT ZAPANDU SEGUNDA SECCIÓN 6° "F"
NL: 20
TURNO:
ELABORÓ: MORALES LÓPEZ ARIADNA MATUTINO

PARTIDA:
FECHA DE ELABORACIÓN:

TABLA DE PRECIOS UNITARIOS


CONCEPTO: ZAPATA TIPO 4
Zapatas aisladas con varilla de 1/2"y concreto con resistencia F´C= 200 Kg/Cm2
Medidas: 1.10 ancho x 1.00 de largo x 0.50 de alto

COSTO
MATERIALES UNIDAD CANTIDAD IMPORTE
UNITARIO
Concreto f´c= 200kg/cm2 m3 0.5500 $1,732.55 $952.90
varilla de 1/2" ton 0.0115 $32,900.00 $378.35
alambre recocido kg 0.1287 $40.00 $5.15
$0.00
$0.00

SUMA DE MATERIALES $1,336.40

MANO DE OBRA
COSTO
CATEGORIA UNIDAD CANTIDAD IMPORTE
UNITARIO
cuadrilla #2 jornada 0.3667 $1,305.94 $478.84
cuadrilla #3 jornada 0.0393 $716.02 $28.13
cuadrilla #5 jornada 0.0684 $726.66 $49.71
$0.00
$0.00

SUMA DE MANO DE OBRA $556.68

HERRAMIENTA, EQUIPO DE SEGURIDAD


BASE PORCENTAJE IMPORTE
Y MANDOS INTERMEDIOS

HERRAMIENTA MENOR (% M.O) $556.68 3% $16.70


EQUIPO DE SEGURIDAD (%M.O) $0.00
MANDOS INTERMEDIOS (% M.O) $556.68 10% $55.67

SUMA DE HERR. Y EQ. $72.37

COSTO DIRECTO TOTAL $1,965.45

FACTORES DE INDIRECTOS, FINANCIAMIENTO Y


BASE PORCENTAJE IMPORTE
UTILIDAD

COSTO INDERECTO [%C.I*(C.D)] $1,965.45 20.00% $393.09


COSTO POR FINANCIAMIENTO [%C.F.*(C.D + C.I.)] $2,358.54 1.00% $23.59
CARGO POR UTILIDAD [%C.U.*(C.D + C.I + C.F.)] $2,382.12 10.00% $238.21
CARGO ADICIONAL [C.D.+ C.I + C.F+ C.U.)] $2,620.34 0.50% $13.10

PRECIO UNITARIO (C.D + C.I + C.F + C.U + C.A) UNIDAD


$2,633.44
Piezas
OBRA: PROPIETARIO
DIRECCION: AV. MORELOS ESQ. CON GUIE SHUBA GRUPO:
INFONAVIT ZAPANDU SEGUNDA SECCIÓN 6° "F"
NL: 20
TURNO:
ELABORÓ: MORALES LÓPEZ ARIADNA MATUTINO

PARTIDA:
FECHA DE ELABORACIÓN:

TABLA DE PRECIOS UNITARIOS


CONCEPTO: ZAPATA TIPO 5
Zapatas aisladas con varilla de 1/2"y concreto con resistencia F´C= 200 Kg/Cm2
Medidas: 1.10 ancho x 1.93 de largo x 0.50 de alto

COSTO
MATERIALES UNIDAD CANTIDAD IMPORTE
UNITARIO
Concreto f´c= 200kg/cm2 m3 1.0615 $1,732.55 $1,839.10
varilla de 1/2" ton 0.0226 $32,900.00 $742.88
alambre recocido kg 0.2574 $40.00 $10.30
$0.00
$0.00

SUMA DE MATERIALES $2,592.28

MANO DE OBRA
COSTO
CATEGORIA UNIDAD CANTIDAD IMPORTE
UNITARIO
cuadrilla #2 jornada 0.7077 $1,305.94 $924.17
cuadrilla #3 jornada 0.0758 $716.02 $54.29
cuadrilla #5 jornada 0.1345 $726.66 $97.70
$0.00
$0.00

SUMA DE MANO DE OBRA $1,076.16

HERRAMIENTA, EQUIPO DE SEGURIDAD


BASE PORCENTAJE IMPORTE
Y MANDOS INTERMEDIOS

HERRAMIENTA MENOR (% M.O) $1,076.16 3% $32.28


EQUIPO DE SEGURIDAD (%M.O) $0.00
MANDOS INTERMEDIOS (% M.O) $1,076.16 10% $107.62

SUMA DE HERR. Y EQ. $139.90

COSTO DIRECTO TOTAL $3,808.34

FACTORES DE INDIRECTOS, FINANCIAMIENTO Y


BASE PORCENTAJE IMPORTE
UTILIDAD

COSTO INDERECTO [%C.I*(C.D)] $3,808.34 20.00% $761.67


COSTO POR FINANCIAMIENTO [%C.F.*(C.D + C.I.)] $4,570.01 1.00% $45.70
CARGO POR UTILIDAD [%C.U.*(C.D + C.I + C.F.)] $4,615.71 10.00% $461.57
CARGO ADICIONAL [C.D.+ C.I + C.F+ C.U.)] $5,077.28 0.50% $25.39

PRECIO UNITARIO (C.D + C.I + C.F + C.U + C.A) UNIDAD


$5,102.67
Piezas
OBRA: PROPIETARIO
DIRECCION: AV. MORELOS ESQ. CON GUIE SHUBA GRUPO:
INFONAVIT ZAPANDU SEGUNDA SECCIÓN 6° "F"
NL: 20
TURNO:
ELABORÓ: MORALES LÓPEZ ARIADNA MATUTINO

PARTIDA:
FECHA DE ELABORACIÓN:

TABLA DE PRECIOS UNITARIOS


CONCEPTO: CIMIENTOS CORRIDOS
Cimiento corrido tipo cc-1 usando concreto f´c 100kg/cm2

COSTO
MATERIALES UNIDAD CANTIDAD IMPORTE
UNITARIO
concreto f´c 100kg/cm2 m3 0.2500 $1,347.10 $336.78
$0.00
$0.00
$0.00
$0.00

SUMA DE MATERIALES $336.78

MANO DE OBRA
COSTO
CATEGORIA UNIDAD CANTIDAD IMPORTE
UNITARIO
cuadrilla #2 jornada 0.1667 $1,305.94 $217.66
cuadrilla #3 jornada 0.1667 $716.02 $119.34
$0.00
$0.00
$0.00

SUMA DE MANO DE OBRA $336.99

HERRAMIENTA, EQUIPO DE SEGURIDAD


BASE PORCENTAJE IMPORTE
Y MANDOS INTERMEDIOS

HERRAMIENTA MENOR (% M.O) $336.99 3% $10.11


EQUIPO DE SEGURIDAD (%M.O) $0.00
MANDOS INTERMEDIOS (% M.O) $336.99 10% $33.70

SUMA DE HERR. Y EQ. $43.81

COSTO DIRECTO TOTAL $717.58

FACTORES DE INDIRECTOS, FINANCIAMIENTO Y


BASE PORCENTAJE IMPORTE
UTILIDAD

COSTO INDERECTO [%C.I*(C.D)] $717.58 20.00% $143.52


COSTO POR FINANCIAMIENTO [%C.F.*(C.D + C.I.)] $861.09 1.00% $8.61
CARGO POR UTILIDAD [%C.U.*(C.D + C.I + C.F.)] $869.70 10.00% $86.97
CARGO ADICIONAL [C.D.+ C.I + C.F+ C.U.)] $956.67 0.50% $4.78

PRECIO UNITARIO (C.D + C.I + C.F + C.U + C.A) UNIDAD


$961.46
M3
OBRA: PROPIETARIO
DIRECCION: AV. MORELOS ESQ. CON GUIE SHUBA GRUPO:
INFONAVIT ZAPANDU SEGUNDA SECCIÓN 6° "F"
NL: 20
TURNO:
ELABORÓ: MORALES LÓPEZ ARIADNA MATUTINO

PARTIDA:
FECHA DE ELABORACIÓN:

TABLA DE PRECIOS UNITARIOS


CONCEPTO: CIMIENTOS CORRIDOS
Cimiento corrido tipo cc-2 usando concreto f´c 100kg/cm2

COSTO
MATERIALES UNIDAD CANTIDAD IMPORTE
UNITARIO
concreto f´c 100kg/cm2 m3 0.3000 $1,327.10 $398.13
$0.00
$0.00
$0.00
$0.00

SUMA DE MATERIALES $398.13

MANO DE OBRA
COSTO
UNIDAD CANTIDAD IMPORTE
CATEGORIA UNITARIO
cuadrilla #2 jornada 0.2000 $1,305.94 $261.19
cuadrilla #3 jornada 0.2000 $716.02 $143.20
$0.00
$0.00
$0.00

SUMA DE MANO DE OBRA $404.39

HERRAMIENTA, EQUIPO DE SEGURIDAD


BASE PORCENTAJE IMPORTE
Y MANDOS INTERMEDIOS

HERRAMIENTA MENOR (% M.O) $404.39 3% $12.13


EQUIPO DE SEGURIDAD (%M.O) $0.00
MANDOS INTERMEDIOS (% M.O) $404.39 10% $40.44

SUMA DE HERR. Y EQ. $52.57

COSTO DIRECTO TOTAL $855.09

FACTORES DE INDIRECTOS, FINANCIAMIENTO Y


BASE PORCENTAJE IMPORTE
UTILIDAD

COSTO INDERECTO [%C.I*(C.D)] $855.09 20.00% $171.02


COSTO POR FINANCIAMIENTO [%C.F.*(C.D + C.I.)] $1,026.11 1.00% $10.26
CARGO POR UTILIDAD [%C.U.*(C.D + C.I + C.F.)] $1,036.37 10.00% $103.64
CARGO ADICIONAL [C.D.+ C.I + C.F+ C.U.)] $1,140.01 0.50% $5.70

PRECIO UNITARIO (C.D + C.I + C.F + C.U + C.A) UNIDAD


$1,145.71
M3
OBRA: PROPIETARIO
DIRECCION: AV. MORELOS ESQ. CON GUIE SHUBA GRUPO:
INFONAVIT ZAPANDU SEGUNDA SECCIÓN 6° "F"
NL: 20
TURNO:
ELABORÓ: MORALES LÓPEZ ARIADNA MATUTINO

PARTIDA:
FECHA DE ELABORACIÓN:

TABLA DE PRECIOS UNITARIOS


CONCEPTO: SOBRECIMIENTOS
Sobrecimiento tipo sc-1 de concreto F ́C ́=140kg/cm2 hecho en obra con resistencia f ́y =4200kg/cm,

COSTO
MATERIALES UNIDAD CANTIDAD IMPORTE
UNITARIO
concreto F ́C ́=140kg/cm2 m3 0.0900 $1,496.41 $134.68
$0.00
$0.00
$0.00
$0.00

SUMA DE MATERIALES $134.68

MANO DE OBRA
COSTO
CATEGORIA UNIDAD CANTIDAD IMPORTE
UNITARIO
cuadrilla #2 jornada 0.0600 $1,305.94 $78.36
cuadrilla #3 jornada 0.0600 $716.02 $42.96
$0.00
$0.00
$0.00

SUMA DE MANO DE OBRA $121.32

HERRAMIENTA, EQUIPO DE SEGURIDAD


BASE PORCENTAJE IMPORTE
Y MANDOS INTERMEDIOS
HERRAMIENTA MENOR (% M.O) $121.32 3% $3.64
EQUIPO DE SEGURIDAD (%M.O) $0.00
MANDOS INTERMEDIOS (% M.O) $121.32 10% $12.13

SUMA DE HERR. Y EQ. $15.77

COSTO DIRECTO TOTAL $271.77

FACTORES DE INDIRECTOS, FINANCIAMIENTO Y


BASE PORCENTAJE IMPORTE
UTILIDAD

COSTO INDERECTO [%C.I*(C.D)] $271.77 20.00% $54.35


COSTO POR FINANCIAMIENTO [%C.F.*(C.D + C.I.)] $326.12 1.00% $3.26
CARGO POR UTILIDAD [%C.U.*(C.D + C.I + C.F.)] $329.38 10.00% $32.94
CARGO ADICIONAL [C.D.+ C.I + C.F+ C.U.)] $362.32 0.50% $1.81

PRECIO UNITARIO (C.D + C.I + C.F + C.U + C.A) UNIDAD


$364.13
M3
OBRA: PROPIETARIO
DIRECCION: AV. MORELOS ESQ. CON GUIE SHUBA GRUPO:
INFONAVIT ZAPANDU SEGUNDA SECCIÓN 6° "F"
NL: 20
TURNO:
ELABORÓ: MORALES LÓPEZ ARIADNA MATUTINO

PARTIDA:
FECHA DE ELABORACIÓN:

TABLA DE PRECIOS UNITARIOS


CONCEPTO: SOBRECIMIENTOS
Sobrecimiento tipo sc-2 de concreto F ́C ́=140kg/cm2 hecho en obra con resistencia f ́y =4200kg/cm

COSTO
MATERIALES UNIDAD CANTIDAD IMPORTE
UNITARIO
concreto F ́C ́=140kg/cm2 m3 0.7500 $1,496.41 $1,122.31
$0.00
$0.00
$0.00
$0.00

SUMA DE MATERIALES $1,122.31

MANO DE OBRA
COSTO
UNIDAD CANTIDAD IMPORTE
CATEGORIA UNITARIO
cuadrilla #2 jornada 0.0500 $1,305.94 $65.30
cuadrilla #3 jornada 0.0500 $716.02 $35.80
$0.00
$0.00
$0.00

SUMA DE MANO DE OBRA $101.10

HERRAMIENTA, EQUIPO DE SEGURIDAD


BASE PORCENTAJE IMPORTE
Y MANDOS INTERMEDIOS

HERRAMIENTA MENOR (% M.O) $101.10 3% $3.03


EQUIPO DE SEGURIDAD (%M.O) $0.00
MANDOS INTERMEDIOS (% M.O) $101.10 10% $10.11

SUMA DE HERR. Y EQ. $13.14

COSTO DIRECTO TOTAL $1,236.55

FACTORES DE INDIRECTOS, FINANCIAMIENTO Y


BASE PORCENTAJE IMPORTE
UTILIDAD

COSTO INDERECTO [%C.I*(C.D)] $1,236.55 20.00% $247.31


COSTO POR FINANCIAMIENTO [%C.F.*(C.D + C.I.)] $1,483.86 1.00% $14.84
CARGO POR UTILIDAD [%C.U.*(C.D + C.I + C.F.)] $1,498.70 10.00% $149.87
CARGO ADICIONAL [C.D.+ C.I + C.F+ C.U.)] $1,648.57 0.50% $8.24

PRECIO UNITARIO (C.D + C.I + C.F + C.U + C.A) UNIDAD


$1,656.81
M3
OBRA: PROPIETARIO
DIRECCION: AV. MORELOS ESQ. CON GUIE SHUBA GRUPO:
INFONAVIT ZAPANDU SEGUNDA SECCIÓN 6° "F"
NL: 20
TURNO:
ELABORÓ: MORALES LÓPEZ ARIADNA MATUTINO

PARTIDA:
FECHA DE ELABORACIÓN:

TABLA DE PRECIOS UNITARIOS


CONCEPTO: MUROS
Muro de ladrillo KK tipo III de 15 cm de espesor, junteado con mezcla mortero cemento-arena 1:4 de
proporción, con espesor promedio de 1.6cm hasta una altura de 2.50cm

COSTO
MATERIALES UNIDAD CANTIDAD IMPORTE
UNITARIO
mortero m3 0.0240 $1,884.00 $45.22
ladrillo kk po III de 15 cm de espesor pieza 35.0000 $9.00 $315.00
$0.00
$0.00
$0.00

SUMA DE MATERIALES $360.22

MANO DE OBRA
COSTO
UNIDAD CANTIDAD IMPORTE
CATEGORIA UNITARIO
cuadrilla #2 jornada 0.0160 $1,305.94 $20.90
cuadrilla #3 jornada 0.1000 $716.02 $71.60
$0.00
$0.00
$0.00

SUMA DE MANO DE OBRA $92.50

HERRAMIENTA, EQUIPO DE SEGURIDAD


BASE PORCENTAJE IMPORTE
Y MANDOS INTERMEDIOS

HERRAMIENTA MENOR (% M.O) $92.50 3% $2.77


EQUIPO DE SEGURIDAD (%M.O) $0.00
MANDOS INTERMEDIOS (% M.O) $92.50 10% $9.25

SUMA DE HERR. Y EQ. $12.02

COSTO DIRECTO TOTAL $464.74

FACTORES DE INDIRECTOS, FINANCIAMIENTO Y


BASE PORCENTAJE IMPORTE
UTILIDAD

COSTO INDERECTO [%C.I*(C.D)] $464.74 20.00% $92.95


COSTO POR FINANCIAMIENTO [%C.F.*(C.D + C.I.)] $557.69 1.00% $5.58
CARGO POR UTILIDAD [%C.U.*(C.D + C.I + C.F.)] $563.26 10.00% $56.33
CARGO ADICIONAL [C.D.+ C.I + C.F+ C.U.)] $619.59 0.50% $3.10

PRECIO UNITARIO (C.D + C.I + C.F + C.U + C.A) UNIDAD


$622.69
m2
OBRA: PROPIETARIO
DIRECCION: AV. MORELOS ESQ. CON GUIE SHUBA GRUPO:
INFONAVIT ZAPANDU SEGUNDA SECCIÓN 6° "F"
NL: 20
TURNO:
ELABORÓ: MORALES LÓPEZ ARIADNA MATUTINO

PARTIDA:
FECHA DE ELABORACIÓN:

TABLA DE PRECIOS UNITARIOS


CONCEPTO: COLUMNAS
Columnas de 2.50m de altura, usando varillas de 1/2". Con estribos de 1/4" @20cm y vaciado de concreto F
́C=210Kg/cm2 con recubrimiento de 3.5cm. MEDIDAS: 0.35x0.15

COSTO
MATERIALES UNIDAD CANTIDAD IMPORTE
UNITARIO
Varilla de 1/2" toneladas 0.0210 $32,900.00 $690.90
alambrón de 1/4" toneladas 0.0033 $39,000.00 $130.37
concreto f´c=210 kg/cm2 m3 0.1313 $2,001.62 $262.71
alambre recocido kg 0.2600 $40.00 $10.40
$0.00

SUMA DE MATERIALES $1,094.38

MANO DE OBRA
COSTO
CATEGORIA UNIDAD CANTIDAD IMPORTE
UNITARIO
cuadrilla #2 jornada 0.0875 $1,305.94 $114.31
cuadrilla #3 jornada 0.0875 $716.02 $62.68
cuadrilla #5 jornada 0.1335 $726.66 $96.99
$0.00
$0.00

SUMA DE MANO DE OBRA $273.98

HERRAMIENTA, EQUIPO DE SEGURIDAD


BASE PORCENTAJE IMPORTE
Y MANDOS INTERMEDIOS

HERRAMIENTA MENOR (% M.O) $273.98 3% $8.22


EQUIPO DE SEGURIDAD (%M.O) $0.00
MANDOS INTERMEDIOS (% M.O) $273.98 10% $27.40

SUMA DE HERR. Y EQ. $35.62

COSTO DIRECTO TOTAL $1,403.98

FACTORES DE INDIRECTOS, FINANCIAMIENTO Y


BASE PORCENTAJE IMPORTE
UTILIDAD

COSTO INDERECTO [%C.I*(C.D)] $1,403.98 20.00% $280.80


COSTO POR FINANCIAMIENTO [%C.F.*(C.D + C.I.)] $1,684.77 1.00% $16.85
CARGO POR UTILIDAD [%C.U.*(C.D + C.I + C.F.)] $1,701.62 10.00% $170.16
CARGO ADICIONAL [C.D.+ C.I + C.F+ C.U.)] $1,871.78 0.50% $9.36

PRECIO UNITARIO (C.D + C.I + C.F + C.U + C.A) UNIDAD


$1,881.14
pieza
OBRA: PROPIETARIO
DIRECCION: AV. MORELOS ESQ. CON GUIE SHUBA GRUPO:
INFONAVIT ZAPANDU SEGUNDA SECCIÓN 6° "F"
NL: 20
TURNO:
ELABORÓ: MORALES LÓPEZ ARIADNA MATUTINO

PARTIDA:
FECHA DE ELABORACIÓN:

TABLA DE PRECIOS UNITARIOS


CONCEPTO: COLUMNAS
Columnas de 2.50m de altura, usando varillas de 1/2". Con estribos de 1/4" @20cm y vaciado de concreto F
́C=210Kg/cm2 con recubrimiento de 3.5cm MEDIDAS: 0.35x0.15

COSTO
MATERIALES UNIDAD CANTIDAD IMPORTE
UNITARIO
Varilla de 1/2" toneladas 0.0140 $32,900.00 $460.60
alambrón de 1/4" toneladas 0.0033 $39,000.00 $130.37
concreto f´c=210 kg/cm2 m3 0.1313 $2,001.62 $262.71
alambre recocido kg 0.1733 $40.00 $6.93
$0.00

SUMA DE MATERIALES $860.61

MANO DE OBRA
COSTO
CATEGORIA UNIDAD CANTIDAD IMPORTE
UNITARIO
cuadrilla #2 jornada 0.0875 $1,305.94 $114.27
cuadrilla #3 jornada 0.0875 $716.02 $62.68
cuadrilla #5 jornada 0.1092 $726.66 $79.35
$0.00
$0.00

SUMA DE MANO DE OBRA $256.30

HERRAMIENTA, EQUIPO DE SEGURIDAD


BASE PORCENTAJE IMPORTE
Y MANDOS INTERMEDIOS

HERRAMIENTA MENOR (% M.O) $256.30 3% $7.69


EQUIPO DE SEGURIDAD (%M.O) $0.00
MANDOS INTERMEDIOS (% M.O) $256.30 10% $25.63

SUMA DE HERR. Y EQ. $33.32

COSTO DIRECTO TOTAL $1,150.23

FACTORES DE INDIRECTOS, FINANCIAMIENTO Y


BASE PORCENTAJE IMPORTE
UTILIDAD

COSTO INDERECTO [%C.I*(C.D)] $1,150.23 20.00% $230.05


COSTO POR FINANCIAMIENTO [%C.F.*(C.D + C.I.)] $1,380.27 1.00% $13.80
CARGO POR UTILIDAD [%C.U.*(C.D + C.I + C.F.)] $1,394.08 10.00% $139.41
CARGO ADICIONAL [C.D.+ C.I + C.F+ C.U.)] $1,533.49 0.50% $7.67

PRECIO UNITARIO (C.D + C.I + C.F + C.U + C.A) UNIDAD


$1,541.15
Piezas
OBRA: PROPIETARIO
DIRECCION: AV. MORELOS ESQ. CON GUIE SHUBA GRUPO:
INFONAVIT ZAPANDU SEGUNDA SECCIÓN 6° "F"
NL: 20
TURNO:
ELABORÓ: MORALES LÓPEZ ARIADNA MATUTINO

PARTIDA:
FECHA DE ELABORACIÓN:

TABLA DE PRECIOS UNITARIOS


CONCEPTO: COLUMNAS
Columnas de 2.50m de altura, usando varillas de 1/2". Con estribos de 1/4" @20cm y vaciado de concreto F
́C=210Kg/cm2 con recubrimiento de 3.5cm MEDIDAS: Una sección de 0.35x0.15 y otra de 0.35x0.15

COSTO
MATERIALES UNIDAD CANTIDAD IMPORTE
UNITARIO
Varilla de 1/2" toneladas 0.0280 $32,900.00 $921.20
alambrón de 1/4" toneladas 0.0033 $39,000.00 $130.37
concreto f´c=210 kg/cm2 m3 0.2063 $2,001.62 $412.83
alambre recocido kg 0.3466 $40.00 $13.86
$0.00

SUMA DE MATERIALES $1,478.27

MANO DE OBRA
COSTO
CATEGORIA UNIDAD CANTIDAD IMPORTE
UNITARIO
cuadrilla #2 jornada 0.1375 $1,305.94 $179.57
cuadrilla #3 jornada 0.1375 $716.02 $98.48
cuadrilla #5 jornada 0.1978 $726.66 $143.73
$0.00
$0.00

SUMA DE MANO DE OBRA $421.77

HERRAMIENTA, EQUIPO DE SEGURIDAD


BASE PORCENTAJE IMPORTE
Y MANDOS INTERMEDIOS

HERRAMIENTA MENOR (% M.O) $421.77 3% $12.65


EQUIPO DE SEGURIDAD (%M.O) $0.00
MANDOS INTERMEDIOS (% M.O) $421.77 10% $42.18

SUMA DE HERR. Y EQ. $54.83

COSTO DIRECTO TOTAL $1,954.87

FACTORES DE INDIRECTOS, FINANCIAMIENTO Y


BASE PORCENTAJE IMPORTE
UTILIDAD

COSTO INDERECTO [%C.I*(C.D)] $1,954.87 20.00% $390.97


COSTO POR FINANCIAMIENTO [%C.F.*(C.D + C.I.)] $2,345.84 1.00% $23.46
CARGO POR UTILIDAD [%C.U.*(C.D + C.I + C.F.)] $2,369.30 10.00% $236.93
CARGO ADICIONAL [C.D.+ C.I + C.F+ C.U.)] $2,606.23 0.50% $13.03

PRECIO UNITARIO (C.D + C.I + C.F + C.U + C.A) UNIDAD


$2,619.26
pieza
OBRA: PROPIETARIO
DIRECCION: AV. MORELOS ESQ. CON GUIE SHUBA GRUPO:
INFONAVIT ZAPANDU SEGUNDA SECCIÓN 6° "F"
NL: 20
TURNO:
ELABORÓ: MORALES LÓPEZ ARIADNA MATUTINO

PARTIDA:
FECHA DE ELABORACIÓN:

TABLA DE PRECIOS UNITARIOS


CONCEPTO; COLUMNAS
Columnas de 2.50m de altura, usando varillas de 1/2". Con estribos de 1/4" @20cm y vaciado de concreto F
́C=210Kg/cm2 con recubrimiento de 3.5cm MEDIDAS: 0.40x0.20

COSTO
MATERIALES UNIDAD CANTIDAD IMPORTE
UNITARIO
Varilla de 1/2" toneladas 0.0210 $32,900.00 $690.90
alambrón de 1/4" toneladas 0.0040 $39,000.00 $156.00
concreto f´c=210 kg/cm2 m3 0.2000 $2,001.62 $400.32
alambre recocido kg 0.2600 $40.00 $10.40
$0.00

SUMA DE MATERIALES $1,257.62

MANO DE OBRA
COSTO
CATEGORIA UNIDAD CANTIDAD IMPORTE
UNITARIO
cuadrilla #2 jornada 0.1333 $1,305.94 $174.08
cuadrilla #3 jornada 0.1333 $716.02 $95.47
cuadrilla #5 jornada 0.1579 $726.66 $114.72
$0.00
$0.00

SUMA DE MANO DE OBRA $384.27

HERRAMIENTA, EQUIPO DE SEGURIDAD


BASE PORCENTAJE IMPORTE
Y MANDOS INTERMEDIOS

HERRAMIENTA MENOR (% M.O) $384.27 3% $11.53


EQUIPO DE SEGURIDAD (%M.O) $0.00
MANDOS INTERMEDIOS (% M.O) $384.27 10% $38.43

SUMA DE HERR. Y EQ. $49.95

COSTO DIRECTO TOTAL $1,691.85

FACTORES DE INDIRECTOS, FINANCIAMIENTO Y


BASE PORCENTAJE IMPORTE
UTILIDAD

COSTO INDERECTO [%C.I*(C.D)] $1,691.85 20.00% $338.37


COSTO POR FINANCIAMIENTO [%C.F.*(C.D + C.I.)] $2,030.22 1.00% $20.30
CARGO POR UTILIDAD [%C.U.*(C.D + C.I + C.F.)] $2,050.52 10.00% $205.05
CARGO ADICIONAL [C.D.+ C.I + C.F+ C.U.)] $2,255.57 0.50% $11.28

PRECIO UNITARIO (C.D + C.I + C.F + C.U + C.A) UNIDAD


$2,266.85
pieza
OBRA: PROPIETARIO
DIRECCION: AV. MORELOS ESQ. CON GUIE SHUBA GRUPO:
INFONAVIT ZAPANDU SEGUNDA SECCIÓN 6° "F"
NL: 20
TURNO:
ELABORÓ: MORALES LÓPEZ ARIADNA MATUTINO

PARTIDA:
FECHA DE ELABORACIÓN:

TABLA DE PRECIOS UNITARIOS


CONCEPTO: COLUMNAS
Columnas de 2.50m de altura, usando varillas de 1/2". Con estribos de 1/4" @20cm y vaciado de concreto F
́C=210Kg/cm2 con recubrimiento de 3.5cm MEDIDAS: 0.50x0.15

COSTO
MATERIALES UNIDAD CANTIDAD IMPORTE
UNITARIO
Varilla de 1/2" toneladas 0.0280 $32,900.00 $921.20
alambrón de 1/4" toneladas 0.0043 $39,000.00 $167.70
concreto f´c=210 kg/cm2 m3 0.1875 $2,001.62 $375.30
alambre recocido kg 0.3466 $40.00 $13.86
$0.00

SUMA DE MATERIALES $1,478.07

MANO DE OBRA
COSTO
CATEGORIA UNIDAD CANTIDAD IMPORTE
UNITARIO
cuadrilla #2 jornada 0.1250 $1,305.94 $163.24
cuadrilla #3 jornada 0.1250 $716.02 $89.50
cuadrilla #5 jornada 0.2040 $726.66 $148.27
$0.00
$0.00

SUMA DE MANO DE OBRA $401.01

HERRAMIENTA, EQUIPO DE SEGURIDAD


BASE PORCENTAJE IMPORTE
Y MANDOS INTERMEDIOS

HERRAMIENTA MENOR (% M.O) $401.01 3% $12.03


EQUIPO DE SEGURIDAD (%M.O) $0.00
MANDOS INTERMEDIOS (% M.O) $401.01 10% $40.10

SUMA DE HERR. Y EQ. $52.13

COSTO DIRECTO TOTAL $1,931.21

FACTORES DE INDIRECTOS, FINANCIAMIENTO Y


BASE PORCENTAJE IMPORTE
UTILIDAD

COSTO INDERECTO [%C.I*(C.D)] $1,931.21 20.00% $386.24


COSTO POR FINANCIAMIENTO [%C.F.*(C.D + C.I.)] $2,317.45 1.00% $23.17
CARGO POR UTILIDAD [%C.U.*(C.D + C.I + C.F.)] $2,340.63 10.00% $234.06
CARGO ADICIONAL [C.D.+ C.I + C.F+ C.U.)] $2,574.69 0.50% $12.87

PRECIO UNITARIO (C.D + C.I + C.F + C.U + C.A) UNIDAD


$2,587.57
piezas
OBRA: PROPIETARIO
DIRECCION: AV. MORELOS ESQ. CON GUIE SHUBA GRUPO:
INFONAVIT ZAPANDU SEGUNDA SECCIÓN 6° "F"
NL: 20
TURNO:
ELABORÓ: MORALES LÓPEZ ARIADNA MATUTINO

PARTIDA:
FECHA DE ELABORACIÓN:

TABLA DE PRECIOS UNITARIOS


CONCEPTO; COLUMNAS
Columnas de 2.50m de altura, usando varillas de 1/2". Con estribos de 1/4" @20cm y vaciado de concreto F
́C=210Kg/cm2 con recubrimiento de 3.5cm MEDIDAS: 0.35x0.20

COSTO
MATERIALES UNIDAD CANTIDAD IMPORTE
UNITARIO
Varilla de 1/2" toneladas 0.0280 $32,900.00 $921.20
alambrón de 1/4" toneladas 0.0046 $39,000.00 $179.40
concreto f´c=210 kg/cm2 m3 0.2500 $2,001.62 $500.41
alambre recocido kg 0.3466 $40.00 $13.86
$0.00

SUMA DE MATERIALES $1,614.87

MANO DE OBRA
COSTO
CATEGORIA UNIDAD CANTIDAD IMPORTE
UNITARIO
cuadrilla #2 jornada 0.1667 $1,305.94 $217.70
cuadrilla #3 jornada 0.1667 $716.02 $119.34
cuadrilla #5 jornada 0.2059 $726.66 $149.63
$0.00
$0.00

SUMA DE MANO DE OBRA $486.67

HERRAMIENTA, EQUIPO DE SEGURIDAD


BASE PORCENTAJE IMPORTE
Y MANDOS INTERMEDIOS

HERRAMIENTA MENOR (% M.O) $486.67 3% $14.60


EQUIPO DE SEGURIDAD (%M.O) $0.00
MANDOS INTERMEDIOS (% M.O) $486.67 10% $48.67

SUMA DE HERR. Y EQ. $63.27

COSTO DIRECTO TOTAL $2,164.80

FACTORES DE INDIRECTOS, FINANCIAMIENTO Y


BASE PORCENTAJE IMPORTE
UTILIDAD

COSTO INDERECTO [%C.I*(C.D)] $2,164.80 20.00% $432.96


COSTO POR FINANCIAMIENTO [%C.F.*(C.D + C.I.)] $2,597.76 1.00% $25.98
CARGO POR UTILIDAD [%C.U.*(C.D + C.I + C.F.)] $2,623.74 10.00% $262.37
CARGO ADICIONAL [C.D.+ C.I + C.F+ C.U.)] $2,886.12 0.50% $14.43

PRECIO UNITARIO (C.D + C.I + C.F + C.U + C.A) UNIDAD


$2,900.55
piezas
OBRA: PROPIETARIO
DIRECCION: AV. MORELOS ESQ. CON GUIE SHUBA GRUPO:
INFONAVIT ZAPANDU SEGUNDA SECCIÓN 6° "F"
NL: 20
TURNO:
ELABORÓ: MORALES LÓPEZ ARIADNA MATUTINO

PARTIDA:
FECHA DE ELABORACIÓN:

TABLA DE PRECIOS UNITARIOS


CONCEPTO; COLUMNAS
Columnas de 2.50m de altura, usando varillas de 1/2" Y 5/8". Con estribos de 1/4" @20cm y vaciado de
concreto F ́C=210Kg/cm2 con recubrimiento de 3.5cm MEDIDAS: 0.40x0.20

COSTO
MATERIALES UNIDAD CANTIDAD IMPORTE
UNITARIO
Varilla de 1/2" toneladas 0.0070 $32,900.00 $230.30
Varilla de 5/8" toneladas 0.0140 $40,000.00 $560.00
alambrón de 1/4" toneladas 0.0040 $39,000.00 $156.00
concreto f´c=210 kg/cm2 m3 0.2000 $2,001.62 $400.32
alambre recocido kg 0.2600 $40.00 $10.40

SUMA DE MATERIALES $1,357.02

MANO DE OBRA
COSTO
CATEGORIA UNIDAD CANTIDAD IMPORTE
UNITARIO
cuadrilla #2 jornada 0.1333 $1,305.94 $174.08
cuadrilla #3 jornada 0.1333 $716.02 $95.47
cuadrilla #5 jornada 0.1579 $726.66 $114.72
$0.00
$0.00

SUMA DE MANO DE OBRA $384.27

HERRAMIENTA, EQUIPO DE SEGURIDAD


BASE PORCENTAJE IMPORTE
Y MANDOS INTERMEDIOS

HERRAMIENTA MENOR (% M.O) $384.27 3% $11.53


EQUIPO DE SEGURIDAD (%M.O) $0.00
MANDOS INTERMEDIOS (% M.O) $384.27 10% $38.43

SUMA DE HERR. Y EQ. $49.95

COSTO DIRECTO TOTAL $1,791.25

FACTORES DE INDIRECTOS, FINANCIAMIENTO Y


BASE PORCENTAJE IMPORTE
UTILIDAD

COSTO INDERECTO [%C.I*(C.D)] $1,791.25 20.00% $358.25


COSTO POR FINANCIAMIENTO [%C.F.*(C.D + C.I.)] $2,149.50 1.00% $21.49
CARGO POR UTILIDAD [%C.U.*(C.D + C.I + C.F.)] $2,170.99 10.00% $217.10
CARGO ADICIONAL [C.D.+ C.I + C.F+ C.U.)] $2,388.09 0.50% $11.94

PRECIO UNITARIO (C.D + C.I + C.F + C.U + C.A) UNIDAD


$2,400.03
m3
OBRA: PROPIETARIO
DIRECCION: AV. MORELOS ESQ. CON GUIE SHUBA GRUPO:
INFONAVIT ZAPANDU SEGUNDA SECCIÓN 6° "F"
NL: 20
TURNO:
ELABORÓ: MORALES LÓPEZ ARIADNA MATUTINO

PARTIDA:
FECHA DE ELABORACIÓN:

TABLA DE PRECIOS UNITARIOS


CONCEPTO: VIGA DE AMARRE
Viga de amarre:De 0.20 x 0.20 m con 4 varillas de 1/2" y concreto con f´c=200kg/cm2

COSTO
MATERIALES UNIDAD CANTIDAD IMPORTE
UNITARIO
Varilla de 1/2" ton 0.0800 $32,900.00 $2,632.00
concreto f´c=200kg/cm2 m3 1.0000 $1,732.55 $1,732.55
varilla de 3/8" ton 0.0857 $32,900.00 $2,818.87
alambre recocido kg 3.0476 $40.00 $121.90
$0.00

SUMA DE MATERIALES $7,305.33

MANO DE OBRA
COSTO
CATEGORIA UNIDAD CANTIDAD IMPORTE
UNITARIO
cuadrilla #2 jornada 0.6667 $1,305.94 $870.62
cuadrilla #3 jornada 0.6667 $716.02 $477.35
cuadrilla #5 jornada $726.66 $0.00
$0.00
$0.00

SUMA DE MANO DE OBRA $1,347.96

HERRAMIENTA, EQUIPO DE
SEGURIDAD BASE PORCENTAJE IMPORTE
Y MANDOS INTERMEDIOS
HERRAMIENTA MENOR (% M.O) $1,347.96 3% $40.44
EQUIPO DE SEGURIDAD (%M.O) $0.00
MANDOS INTERMEDIOS (% M.O) $1,347.96 10% $134.80

SUMA DE HERR. Y EQ. $175.24

COSTO DIRECTO TOTAL $8,828.53

FACTORES DE INDIRECTOS, FINANCIAMIENTO Y


BASE PORCENTAJE IMPORTE
UTILIDAD

COSTO INDERECTO [%C.I*(C.D)] $8,828.53 20.00% $1,765.71


COSTO POR FINANCIAMIENTO [%C.F.*(C.D + C.I.)] $10,594.23 1.00% $105.94
CARGO POR UTILIDAD [%C.U.*(C.D + C.I + C.F.)] $10,700.17 10.00% $1,070.02
CARGO ADICIONAL [C.D.+ C.I + C.F+ C.U.)] $11,770.19 0.50% $58.85

PRECIO UNITARIO (C.D + C.I + C.F + C.U + C.A) UNIDAD


$11,829.04
m3
OBRA: PROPIETARIO
DIRECCION: AV. MORELOS ESQ. CON GUIE SHUBA GRUPO:
INFONAVIT ZAPANDU SEGUNDA SECCIÓN 6° "F"
NL: 20
TURNO:
ELABORÓ: MORALES LÓPEZ ARIADNA MATUTINO

PARTIDA:
FECHA DE ELABORACIÓN:

TABLA DE PRECIOS UNITARIOS


CONCEPTO: VIGA PRINCIPAL
Viga principal: De 5/8" y un tramo de varilla de 1/2" con un a fy=4200kg/cm2 y un
concreto con fc=210 kg/cm2, sección transversal de 0.40 x 0.25m

COSTO
MATERIALES UNIDAD CANTIDAD IMPORTE
UNITARIO
varrilla de 5/8" toneladas 0.0621 $40,000.00 $2,483.20
varilla de 1/2" pieza 0.0108 $32,900.00 $356.13
cocnreto f´c:210 kg/cm2 m3 1.0000 $1,732.55 $1,732.55
alambrón de 1/4" toneladas 0.0324 $39,000.00 $1,262.43
alambre recocido kg 0.6667 $40.00 $26.67

SUMA DE MATERIALES $5,860.98

MANO DE OBRA
COSTO
CATEGORIA UNIDAD CANTIDAD IMPORTE
UNITARIO
cuadrilla #2 jornada 0.6667 $1,305.94 $870.67
cuadrilla #3 jornada 0.6667 $716.02 $477.35
cuadrilla #5 jornada 0.6623 $726.66 $481.26
$0.00
$0.00

SUMA DE MANO DE OBRA $1,829.28

HERRAMIENTA, EQUIPO DE SEGURIDAD


BASE PORCENTAJE IMPORTE
Y MANDOS INTERMEDIOS

HERRAMIENTA MENOR (% M.O) $1,829.28 3% $54.88


EQUIPO DE SEGURIDAD (%M.O) $0.00
MANDOS INTERMEDIOS (% M.O) $1,829.28 10% $182.93

SUMA DE HERR. Y EQ. $237.81

COSTO DIRECTO TOTAL $7,928.06

FACTORES DE INDIRECTOS, FINANCIAMIENTO Y


BASE PORCENTAJE IMPORTE
UTILIDAD

COSTO INDERECTO [%C.I*(C.D)] $7,928.06 20.00% $1,585.61


COSTO POR FINANCIAMIENTO [%C.F.*(C.D + C.I.)] $9,513.67 1.00% $95.14
CARGO POR UTILIDAD [%C.U.*(C.D + C.I + C.F.)] $9,608.81 10.00% $960.88
CARGO ADICIONAL [C.D.+ C.I + C.F+ C.U.)] $10,569.69 0.50% $52.85

PRECIO UNITARIO (C.D + C.I + C.F + C.U + C.A) UNIDAD


$10,622.54
m3
OBRA: PROPIETARIO
DIRECCION: AV. MORELOS ESQ. CON GUIE SHUBA GRUPO:
INFONAVIT ZAPANDU SEGUNDA SECCIÓN 6° "F"
NL: 20
TURNO:
ELABORÓ: MORALES LÓPEZ ARIADNA MATUTINO

PARTIDA:
FECHA DE ELABORACIÓN:

TABLA DE PRECIOS UNITARIOS


CONCEPTO: LOSA ALIGERADA
Losa aligerada: Hecha con concreto armado con resistencia de 210kg/cm2, acero, usando malla de refuerzo
con acero de 3/8" con un f ́y=4200kg/m2 con un volado de 0.50m

COSTO
MATERIALES UNIDAD CANTIDAD IMPORTE
UNITARIO
concreto f´c= 210kg/cm2 m3 0.6350 $1,667.24 $1,058.70
varillas de 3/8" ton 0.0071 $32,900.00 $233.59
block ligero de 10x20x30 pieza 6.5000 $10.00 $65.00
malla electrosoldada m2 1.0000 $90.00 $90.00
alambre recocido kg 0.3150 $40.00 $12.60

SUMA DE MATERIALES $1,459.89

MANO DE OBRA
COSTO
CATEGORIA UNIDAD CANTIDAD IMPORTE
UNITARIO
cuadrilla #2 jornada 0.4233 $1,305.94 $552.80
cuadrilla #3 jornada 0.4233 $716.02 $303.12
cuadrilla #5 jornada 0.0463 $726.66 $33.67
$0.00
$0.00

SUMA DE MANO DE OBRA $889.59

HERRAMIENTA, EQUIPO DE SEGURIDAD


BASE PORCENTAJE IMPORTE
Y MANDOS INTERMEDIOS

HERRAMIENTA MENOR (% M.O) $889.59 3% $26.69


EQUIPO DE SEGURIDAD (%M.O) $0.00
MANDOS INTERMEDIOS (% M.O) $889.59 10% $88.96

SUMA DE HERR. Y EQ. $115.65

COSTO DIRECTO TOTAL $2,465.13

FACTORES DE INDIRECTOS, FINANCIAMIENTO Y


BASE PORCENTAJE IMPORTE
UTILIDAD

COSTO INDERECTO [%C.I*(C.D)] $2,465.13 20.00% $493.03


COSTO POR FINANCIAMIENTO [%C.F.*(C.D + C.I.)] $2,958.15 1.00% $29.58
CARGO POR UTILIDAD [%C.U.*(C.D + C.I + C.F.)] $2,987.73 10.00% $298.77
CARGO ADICIONAL [C.D.+ C.I + C.F+ C.U.)] $3,286.51 0.50% $16.43

PRECIO UNITARIO (C.D + C.I + C.F + C.U + C.A) UNIDAD


$3,302.94
m3