FICHA DE IDENTIFICACION DE OBRA

ENTIDAD : UNIVERSIDAD CATOLICA SANTO TORIBIO DE MOGROVEJO


EJECUTA : FUERZA CONSTRUCTORES S.A.C.
FUENTE DE FINANCIAMIENTO : RECURSOS PROPIOS
SISTEMA DE CONTRATACION : A PRECIOS UNITARIOS
OBRA : CONSTRUCCION DEL SISTEMA DE DRENAJE PLUVIAL CAMPUS USAT
UBICACIÓN : CHICLAYO - CHICLAYO - LAMBAYEQUE
PRESUPUESTO REFERENCIAL (S/IGV) : S/. 3,199,246.79
FECHA DE PRESUPUESTO REFERENCIAL : 1/31/2021
PRESUPUESTO CONTRATADO : S/. 3,199,246.79
FACTOR DE RELACION : 1.00000
PLAZO DE EJEC.OFERTADO : 150 DIAS CALENDARIOS
FECHA FIRMA DE CONTRATO : 10/15/2021
FECHA ENTREGA DE TERRENO : 10/25/2021
MONTO AD. EN EFECTIVO : S/ 959,774.04
MONTO AD.DE MATERIALES : S/ -
FECHA ENTREGA DE AD.EFECTIVO : -
FECHA ENTREGA DE AD.MATERIALES : -
FECHA DE INICIO CONTRACTUAL DE OBRA : 10/27/2021
FECHA DE TERMINO CONTRACTUAL DE OBRA : 3/25/2022
INCIO AMPLIACION DE PLAZO N°01 : 3/26/2022
FIN AMPLIACION DE PLAZO N°01 : 4/22/2022
INCIO AMPLIACION DE PLAZO N°02 : 4/23/2022
FIN AMPLIACION DE PLAZO N°02 : 6/3/2022
AMPLIACION DE PLAZO N°01 : 28 dc
AMPLIACION DE PLAZO N°02 : 42 dc
FECHA DE CORTE VALORIZACION Nº 07 (MES DE MAYO) : 5/28/2022

ADICIONAL DE OBRA N°01: MEJORAMIENTO DE TERRENO CON : S/30,793.16


PIEDRA BASE Y FILTROS DE PERCOLACIÓN

ADICIONAL DE OBRA N°02: LÍNEAS DE AGUA POTABLE DE TANQUE


ELEVADO Y POZO : S/108,133.65

ADICIONAL DE OBRA N°03: CONSTRUCCIÓN DE CÁMARA DE


: S/24,452.88
BOMBEO REPLANTEADAS

ADICIONAL DE OBRA N°04: CONSTRUCCIÓN DE CANAL DE DRENAJE : S/45,713.72


REPLANTEADO EN PASAJE CENTRAL

ADICIONAL DE OBRA N°05: MAYORES METRADOS DE PERFIL : S/77,141.70


25MMX25MM
DEDUCTIVO DE OBRA N°01: CONSTRUCCIÓN DE CÁMARA DE : S/1,170.88
BOMBEO REPLANTEADAS

DEDUCTIVO DE OBRA N°02: MENORES METRADOS DE PERFIL


38MMX38MM : S/98,073.67

ADICIONAL DE OBRA N°06: MENORES METRADOS DE PERFIL


: #REF!
38MMX38MM

ACTA DE RECEPCION DE OBRA :


RESIDENTE DE OBRA : ING. ERNESTO VLADIMIR SANCHEZ LA TORRE
SUPERVISOR DE OBRA : ING. LUIS ALBERTO BAYLON DEZA
N DE OBRA
O TORIBIO DE MOGROVEJO

DE DRENAJE PLUVIAL CAMPUS USAT


HEZ LA TORRE
OBRA : #REF!
ENTIDAD : #REF!
EJECUTOR : #REF!
RESIDENTE DE OBRA : #REF!
SUPERVISOR DE OBRA : #REF!

CUADRO RESUMEN ADICIONAL - DEDU


GASTOS
GENERALES UTILIDADES
DESCRIPCION COSTO DIRECTO
(15.00%) (7.00%)

ADICIONAL-DEDUCTIVO #REF! #REF! #REF!

TOTAL ADICIONAL #REF! #REF! #REF!


DICIONAL - DEDUCTIVO
SUB TOTAL CON TOTAL
SUB TOTAL IGV (18%) %
F.R (1) PRESUPUESTADO

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!


ADICIONAL Y DEDUCTI
OBRA : #REF!
ENTIDAD : #REF!
EJECUTOR : #REF!
RESIDENTE DE OBRA : #REF!
SUPERVISOR DE OBRA : #REF!
MONTO REFERENCIAL : #REF! ( VR )
MONTO EJECUCION : #REF! ( VE)
ESPECIALIDAD : ELECTROMECANICAS

PRESUPUE

ITEM DESCRIPCION DE PARTIDAS METRADO

UND.
CONSTRUCCION DE CAMARA DE BOMBEO PARA DRENAJE PLUVIAL
01.07
CBDP-01
01.07.07.05 VARIOS
TABLERO ELECTRICO GENERAL ARRANQUE Y PARADA P/MOTOR INCL.
01.07.07.05.02 U
ARRANCADOR
01.07.07.05.03 TABLERO CONTROL PROGRAMABLE FUNCIONAMIENTO LOCAL U
01.07.07.05.04 TABLERO GENERAL EN SUB A U
01.07.07.05.05 MONTAJE E INSTALACIONES DEL TABLERO DE SUB A
ALIMENTACION SUBTERRANEA DE CABLE ELECTRICO SUB ESTACION A
01.07.08
EXISTENTE (220V 3Ø) - CBDP01
01.07.08.05 CABLE ELECTRICO THW DE 35 mm2 (7 alambres) M
01.07.08.06 CABLE ELECTRICO THW DE 4 mm2 M
01.07.08.07 SUMIISTRO E INST.CABLE N2XOH 3x70+1x25(T)mm2 M

01.07.08.08 SUMIISTRO E INST.CABLE N2XOH 3x35+1x25(T)mm2 M

01.07.08.09 TABLERO DE CONTROL ARRANQUE Y PARADA CBDP-01 U

01.07.08.10 MONTAJE E INSTALACIONES DEL TABLERO CBDP-01

01.07.08.11 SUMINISTRO E INSTALACION DE PUESTA A TIERRA 01 U


01.07.09 VARIOS
01.08.07 EQUIPAMIENTO E INSTALACIONES HIDRAULICAS CBDP-02
01.08.07.01 TRABAJOS PRELIMINARES
TABLERO ELECTRICO GENERAL ARRANQUE Y PARADA P/MOTOR INCL.
01.08.07.05.02 U
ARRANCADOR
01.08.07.05.03 TABLERO CONTROL PROGRAMABLE FUNCIONAMIENTO LOCAL U
01.08.07.05.04 TABLERO DE CONTROL ARRANQUE Y PARADA CBDP-02 U

01.08.07.05.05 MONTAJE E INSTALACIONES DEL TABLERO CBDP-02

ALIMENTACION SUBTERRANEA DE CABLE ELECTRICO SUB ESTACION C


01.08.08
EXISTENTE (380V 3Ø) - PUNTO DE DERIVACION

01.08.08.05 CABLE ELECTRICO THW DE 10 mm2 (7 alambres) M


01.08.08.06 CABLE ELECTRICO THW DE 4 mm2 M
01.08.08.07 SUMIISTRO E INST.CABLE N2XOH 3x70+70(N)1x25mm2 M
01.08.08.08 SUMIISTRO E INST.CABLE N2XOH 3x25+25(N)+16(T)mm2 M
01.08.08.09 TABLERO GENERAL DE SALIDA DE LA SUBESTACION C U
01.08.08.10 MONTAJE E INSTALACIONES DEL TABLERO C
01.08.08.11 SUMINISTRO E INSTALACION DE PUESTA A TIERRA U
01.08.08.12 SUMIISTRO E INST.CABLE N2XOH 3x95+95(N)1x25mm2 U
ALIMENTACION SUBTERRANEA DE CABLE ELECTRICO PUNTO DE
01.08.09
DERIVACION - CBDP02
01.08.09.05 CABLE ELECTRICO THW DE 10 mm2 (7 alambres) M
01.08.09.06 CABLE ELECTRICO THW DE 4 mm2 M
01.08.09.07 SUMIISTRO E INST. CABLE N2XOH 3x25+25(N)+16(T)mm2 M

01.08.09.08 SUMIISTRO E INST. CABLE N2XOH 3x10+10(N)+6(T)mm2 M


01.09.07.05 VARIOS
TABLERO ELECTRICO GENERAL ARRANQUE Y PARADA P/MOTOR INCL.
01.09.07.05.02 U
ARRANCADOR
01.09.07.05.03 TABLERO CONTROL PROGRAMABLE FUNCIONAMIENTO LOCAL U
01.09.07.05.04 TABLERO DE CONTROL ARRANQUE Y PARADA CBDP-03 U

01.09.07.05.05 MONTAJE E INSTALACIONES DEL TABLERO CBDP-03

01.09.07.05.06 SUMINISTRO E INSTALACION DE PUESTA A TIERRA PT2 Y PT3 U


ALIMENTACION SUBTERRANEA DE CABLE ELECTRICO SUB ESTACION C
01.09.08
EXISTENTE (380V 3Ø) - PUNTO DE DERIVACION
01.09.08.01 CABLE ELECTRICO THW DE 6-1X35 MM2 + 25 MM2 (T) M
01.09.08.02 CABLE ELECTRICO THW DE 3-1X4 MM2 + 4 MM2 (T) M
01.09.08.03 SUMIISTRO E INST. CABLE N2XOH 3x70+70(N)1x25mm2 M
ALIMENTACION SUBTERRANEA DE CABLE ELECTRICO PUNTO DE
01.09.09
DERIVACION - CBDP03
01.09.09.05 CABLE ELECTRICO THW DE 6-1X35 MM2 + 25 MM2 (T) M
01.09.09.06 CABLE ELECTRICO THW DE 3-1X4 MM2 + 4 MM2 M
01.09.09.07 SUMIISTRO E INST. CABLE N2XOH 3x70+70(N)1x25mm2 M
01.09.09.08 SUMIISTRO E INST. CABLE N2XOH 3x35+35(N)+25(T)mm2 M
01.09.10 VARIOS
01.09.10.10 PROGRAMACION DE TABLEROS DE CONTROL CBDP 1,2,3 UND.

01.09.10.11 PROTOCOLO DE PRUEBAS Y PUESTA EN FUNCIONAMIENTO GLOB


NAL Y DEDUCTIVO N° 06 PARTE ELECTRICA
FECHA DE INICIO DE OBRA :
PLAZO DE EJECUCIÓN ( D.C. ) :

ADICIONAL Y DEDUCTIVO

PRESUPUESTO ADICIONAL Y DEDUCTIVO


ADICIONAL DEDUCTIVO
METRADO COSTO
COSTO PARCIAL VALORIZADO
UNITARIO METRADO METRADO
CANTIDAD S/.

1.00 7,246.86 7,246.86 1.00


1.00 4,746.86 4,746.86 1.00
1.00 1,250.00 1.00 1,250.00
800.00 1.00 800.00

90.41 13.19 1,192.51 90.41


90.41 1.42 128.38 90.41
313.38 103.00 32,277.63

168.09 36.00 6,051.15

25,611.29 1.00 25,611.29

4,000.00 1.00 4,000.00

2,200.00 1.00 2,200.00

1.00 7,246.86 7,246.86 1.00


1.00 4,746.86 4,746.86 1.00
18,994.00 1.00 18,994.00

4,000.00 1.00 4,000.00

102.78 3.43 352.54 102.78


102.78 1.42 145.95 102.78
405.88 104.00 42,211.00
168.38 104.00 17,511.00
2,500.00 1.00 2,500.00
1,000.00 1.00 1,000.00
2,200.00 1.00 2,200.00
546.16 15.00 8,192.44

58.45 3.43 200.48 58.45


58.45 1.42 83.00 58.45
168.38 55.00 9,260.63

72.20 36.00 2,599.20

1.00 7,246.86 7,246.86 1.00


1.00 4,746.86 4,746.86 1.00
23,911.00 1.00 23,911.00

4,000.00 1.00 4,000.00

2,200.00 2.00 4,400.00

102.78 13.19 1,355.67 102.78


102.78 1.42 145.95 102.78
405.88 104.00 42,211.00

101.93 13.19 1,344.46 101.93


101.93 1.42 144.74 101.93
405.88 114.00 46,269.75
228.55 36.00 8,227.80

2,000.00 3.00 6,000.00

6,000.00 1.00 6,000.00

#REF! 30.00% 321,677.88


#REF! ADICIONAL

UTI

9.36 ST

4,340.95
PUENTE
GG
UTI

ST

TOTAL
#REF!
#REF!

UCTIVO
TOTAL
DEDUCTIVO
VALORIZADO VALORIZADO
METRADO
S/. S/.
-
-
S/. 7,246.86 1.00 S/. (7,246.86) ###
S/. 4,746.86 1.00 S/. (4,746.86) 9,493.72
1.00 S/. 1,250.00
1.00 S/. 800.00
#VALUE!

S/. 1,192.51 90.41 S/. (1,192.51) 2,385.02


S/. 128.38 90.41 S/. (128.38) 256.76
103.00 S/. 32,277.63

36.00 S/. 6,051.15

1.00 S/. 25,611.29

1.00 S/. 4,000.00

1.00 S/. 2,200.00


- 72,190.07
-
-
S/. 7,246.86 1.00 S/. (7,246.86) ###
S/. 4,746.86 1.00 S/. (4,746.86) 9,493.72

1.00 S/. 18,994.00

1.00 S/. 4,000.00

S/. 352.54 102.78 S/. (352.54) 705.08


S/. 145.95 102.78 S/. (145.95) 291.90
104.00 S/. 42,211.00
104.00 S/. 17,511.00
1.00 S/. 2,500.00
1.00 S/. 1,000.00
1.00 S/. 2,200.00
15.00 S/. 8,192.44
-

S/. 200.48 58.45 S/. (200.48) 400.96


S/. 83.00 58.45 S/. (83.00) 166.00

55.00 S/. 9,260.63

36.00 S/. 2,599.20


-
S/. 7,246.86 1.00 S/. (7,246.86) ###
S/. 4,746.86 1.00 S/. (4,746.86) 9,493.72
1.00 S/. 23,911.00

1.00 S/. 4,000.00

2.00 S/. 4,400.00

S/. 1,355.67 102.78 S/. (1,355.67) 2,711.34


S/. 145.95 102.78 S/. (145.95) 291.90
104.00 S/. 42,211.00
-

S/. 1,344.46 101.93 S/. (1,344.46) 2,688.92


S/. 144.74 101.93 S/. (144.74) 289.48
114.00 S/. 46,269.75
36.00 S/. 8,227.80
-

3.00 S/. 6,000.00 -6,000.00

1.00 S/. 6,000.00 -6,000.00

41,074.84 280,603.04
DEDUCTIVO TOTAL
ADICIONAL N°06 PARTE E
OBRA : #REF!
ENTIDAD : #REF!
EJECUTOR : #REF!
RESIDENTE DE OBRA : #REF!
SUPERVISOR DE OBRA : #REF!
#REF! : #REF!
#REF! : #REF!
ESPECIALIDAD : ELECTROMECANICAS

ITEM DESCRIPCION DE PARTIDAS

01.07 CONSTRUCCION DE CAMARA DE BOMBEO PARA DRENAJE PLUVIAL CBDP-01


01.07.07.05 VARIOS
TABLERO GENERAL EN SUB A
MONTAJE E INSTALACIONES DEL TABLERO DE SUB A
ALIMENTACION SUBTERRANEA DE CABLE ELECTRICO SUB ESTACION A
01.07.08
EXISTENTE (220V 3Ø) - CBDP01
CABLE N2XOH 3x70+1x25(T)mm2
CABLE N2XOH 3x35+1x25(T)mm2
TABLERO DE CONTROL ARRANQUE Y PARADA CBDP-01
MONTAJE E INSTALACIONES DEL TABLERO CBDP-01
SUMINISTRO E INSTALACION DE PUESTA A TIERRA

01.07.09 VARIOS
01.08.07 EQUIPAMIENTO E INSTALACIONES HIDRAULICAS CBDP-02
01.08.07.01 TRABAJOS PRELIMINARES
TABLERO DE CONTROL ARRANQUE Y PARADA CBDP-02
MONTAJE E INSTALACIONES DEL TABLERO CBDP-02
ALIMENTACION SUBTERRANEA DE CABLE ELECTRICO SUB ESTACION C
01.08.08
EXISTENTE (380V 3Ø) - PUNTO DE DERIVACION
CABLE N2XOH 3x70+70(N)1x25mm2
CABLE N2XOH 3x25+25(N)+16(T)mm2
TABLERO GENERAL DE SALIDA DE LA SUBESTACION C
MONTAJE E INSTALACIONES DEL TABLERO CBDP-02
SUMINISTRO E INSTALACION DE PUESTA A TIERRA
CABLE N2XOH 3x70+70(N)1x25mm2
ALIMENTACION SUBTERRANEA DE CABLE ELECTRICO PUNTO DE DERIVACION -
01.08.09
CBDP02
CABLE N2XOH 3x25+25(N)+16(T)mm2
CABLE N2XOH 3x10+10(N)+6(T)mm2
01.09.07.05 VARIOS
TABLERO DE CONTROL ARRANQUE Y PARADA CBDP-03
MONTAJE E INSTALACIONES DEL TABLERO CBDP-03
SUMINISTRO E INSTALACION DE PUESTA A TIERRA
ALIMENTACION SUBTERRANEA DE CABLE ELECTRICO SUB ESTACION C
01.09.08
EXISTENTE (380V 3Ø) - PUNTO DE DERIVACION
CABLE N2XOH 3x70+70(N)1x25mm2
ALIMENTACION SUBTERRANEA DE CABLE ELECTRICO PUNTO DE DERIVACION -
01.09.09
CBDP03
CABLE N2XOH 3x70+70(N)1x25mm2
CABLE N2XOH 3x35+35(N)+25(T)mm2
01.09.10 VARIOS
01.09.10.10 PROGRAMACION DE TABLEROS DE CONTROL CBDP 1,2,3
01.09.10.11 PROTOCOLO DE PRUEBAS Y PUESTA EN FUNCIONAMIENTO
L N°06 PARTE ELECTRICA
FECHA DE INICI : #REF!
PLAZO DE EJECUC : #REF!

ADICIONAL Y DEDUCTIVO
( VR )
( VE)

PRESUPUESTO
ADICIONAL
METRADO COSTO COSTO
UNITARIO PARCIAL VALORIZADO
METRADO
UND. CANTIDAD S/.

U 1.00 1,250.00 1.00 1,250.00


800.00 1.00 800.00

M 313.38 103.00 32,277.63


M 168.09 36.00 6,051.15
U 25,611.29 1.00 25,611.29
4,000.00 1.00 4,000.00
U 2,200.00 1.00 2,200.00

U 18,994.00 1.00 18,994.00


4,000.00 1.00 4,000.00

M 405.88 104.00 42,211.00


M 168.38 104.00 17,511.00
U 2,500.00 1.00 2,500.00
1,000.00 1.00 1,000.00
U 2,200.00 1.00 2,200.00
M #REF! 15.00 #REF!

M 168.38 55.00 9,260.63


M 72.20 36.00 2,599.20
U 23,911.00 1.00 23,911.00
4,000.00 1.00 4,000.00
U 2,200.00 2.00 4,400.00

M 405.88 104.00 42,211.00

M 405.88 114.00 46,269.75


M 228.55 36.00 8,227.80

U 2,000.00 3.00 6,000.00


GLOB 6000.00 1.00 6,000.00

#REF! 30.00% #REF!


DEDUCTIVO N° 06 PARTE ELECTRICA
OBRA : #REF!
ENTIDAD : #REF!
EJECUTOR : #REF!
RESIDENTE DE OBRA : #REF!
SUPERVISOR DE OBRA : #REF!
#REF! : #REF! ( VR )
#REF! : #REF! ( VE)
ESPECIALIDAD : ELECTROMECANICAS

PRESUPUESTO

ITEM DESCRIPCION DE PARTIDAS METRADO COSTO


UNITARIO
UND. CANTIDAD
CONSTRUCCION DE CAMARA DE BOMBEO
01.07
PARA DRENAJE PLUVIAL CBDP-01
01.07.07.05 VARIOS
01.07.07.05.0 TABLERO ELECTRICO GENERAL ARRANQUE
U 1.00 7,246.86
2
01.07.07.05.0 Y PARADACONTROL
TABLERO P/MOTOR PROGRAMABLE
INCL. ARRANCADOR
ALIMENTACION SUBTERRANEA DE CABLE U 1.00 4,746.86
3 FUNCIONAMIENTO LOCAL
01.07.08 ELECTRICO SUB ESTACION A EXISTENTE
(220V 3Ø)
01.07.08.05 CABLE - CBDP01 THW DE 35 mm2 (7
ELECTRICO M 90.41 13.19
01.07.08.06 alambres)
CABLE ELECTRICO THW DE 4 mm2 M 90.41 1.42
01.07.09 VARIOS
EQUIPAMIENTO E INSTALACIONES
01.08.07
HIDRAULICAS CBDP-02
01.08.07.01 TRABAJOS PRELIMINARES
01.08.07.05.0 TABLERO ELECTRICO GENERAL ARRANQUE
U 1.00 7,246.86
2
01.08.07.05.0 Y PARADACONTROL
TABLERO P/MOTOR PROGRAMABLE
INCL. ARRANCADOR
ALIMENTACION SUBTERRANEA DE CABLE U 1.00 4,746.86
3 FUNCIONAMIENTO LOCAL
01.08.08 ELECTRICO SUB ESTACION C EXISTENTE
(380V 3Ø)
01.08.08.05 CABLE - PUNTO DE
ELECTRICO THWDERIVACION
DE 10 mm2 (7 M 102.78 3.43
01.08.08.06 alambres)
CABLE ELECTRICO
ALIMENTACION THW DE 4 mm2
SUBTERRANEA DE CABLE M 102.78 1.42
01.08.09 ELECTRICO PUNTO DE DERIVACION -
01.08.09.05 CBDP02
CABLE ELECTRICO THW DE 10 mm2 (7 M 58.45 3.43
01.08.09.06 alambres)
CABLE ELECTRICO THW DE 4 mm2 M 58.45 1.42
01.09.07.05 VARIOS
01.09.07.05.0 TABLERO ELECTRICO GENERAL ARRANQUE
U 1.00 7,246.86
2
01.09.07.05.0 Y PARADACONTROL
TABLERO P/MOTOR PROGRAMABLE
INCL. ARRANCADOR
ALIMENTACION SUBTERRANEA DE CABLE U 1.00 4,746.86
3 FUNCIONAMIENTO LOCAL
01.09.08 ELECTRICO SUB ESTACION C EXISTENTE
CABLE ELECTRICO THW DE 6-1X35 MM2 + 25
01.09.08.01 (380V 3Ø) - PUNTO DE DERIVACION M 102.78 13.19
MM2 (T)ELECTRICO THW DE 3-1X4 MM2 + 4
CABLE
01.09.08.02 M 102.78 1.42
MM2 (T)
CABLE N2XOH 3x70+70(N)1x25mm2
ALIMENTACION SUBTERRANEA DE CABLE M 324.70
01.09.09 ELECTRICO PUNTO DE DERIVACION -
CABLE ELECTRICO THW DE 6-1X35 MM2 + 25
01.09.09.05 CBDP03 M 101.93 13.19
MM2 (T)
CABLE ELECTRICO THW DE 3-1X4 MM2 + 4
01.09.09.06 M 101.93 1.42
MM2
TE ELECTRICA
FECHA DE INICI : #REF!
PLAZO DE EJECUC : #REF!

ADICIONAL Y DEDUCTIVO

UESTO
DEDUCTIVO
COSTO VALORIZADO
PARCIAL METRADO
S/.

7,246.86 1.00 S/. 7,246.86


4,746.86 1.00 S/. 4,746.86

1,192.51 90.41 S/. 1,192.51


128.38 90.41 S/. 128.38

7,246.86 1.00 S/. 7,246.86


4,746.86 1.00 S/. 4,746.86

352.54 102.78 S/. 352.54


145.95 102.78 S/. 145.95

200.48 58.45 S/. 200.48


83.00 58.45 S/. 83.00

7,246.86 1.00 S/. 7,246.86


4,746.86 1.00 S/. 4,746.86

1,355.67 102.78 S/. 1,355.67


145.95 102.78 S/. 145.95

1,344.46 101.93 S/. 1,344.46


144.74 101.93 S/. 144.74

#REF! 41,074.84