2.6.2 3.5 4 60 COMPRAS 3,667,486.60 658,306.82 3,506,111.57 10,450.54 36,699.64 62,866.59 51,358.26
603 Materiales auxiliares, suministros y repuestos 3,667,486.60 658,306.82 3,506,111.57 10,450.54 36,699.64 62,866.59 51,358.26
6032 Suministros 3,667,486.60 658,306.82 3,506,111.57 10,450.54 36,699.64 62,866.59 51,358.26
603206 Otros Materiales de Construcción 3,648,460.33 656,722.86 3,495,266.49 8,405.24 34,654.34 60,821.29 49,312.96
LUBRICANTE PARA PVC gln 132.55 38.00 4,268.09 768.26 132.55 4,268.09 - - - -
CLAVOS DE 4" kg 116.60 4.00 395.26 71.15 116.60 395.26 - - - -
CLAVOS PARA MADERA C/C 3" kg 1.00 4.00 3.39 0.61 1.00 3.39 - - - -
CASETA ADICIONAL TECHADA m2 60.00 50.85 2,585.40 465.37 60.00 2,585.40 - - - -
DESVIO DE AGUA RESIDUALES GLB 1.00 10,000.00 8,474.58 1,525.42 1.00 8,474.58 - - - -
CLAVOS ACERO GALVANIZADO DE 4" kg 1,048.95 3.02 2,684.60 483.23 1,048.95 2,684.60 - - - -
ALAMBRE NEGRO N°8 kg 190.80 4.00 646.78 116.42 76.32 258.71 76.32 258.71 38.16 129.36 - -
FIERRO CORRUGADO PROMEDIO kg 2,319.60 3.35 6,585.31 1,185.35 2,319.60 6,585.31 - - - -
ARENA FINA (PUESTO EN OBRA) m3 57.22 50.00 2,424.22 436.36 17.16 727.27 17.16 727.27 17.16 727.27 5.72 242.42 -
ALAMBRE NEGRO RECOCIDO N° 8 kg 572.16 3.55 1,721.31 309.84 572.16 1,721.31 - - - -
ARENILLA (PUESTO EN OBRA) m3 3,242.21 28.00 76,933.86 13,848.10 - - 972.66 23,080.16 1,296.89 30,773.55 972.66 23,080.16
PIEDRA CHANCADA DE 1/2" m3 58.30 70.00 3,458.35 622.50 58.30 3,458.35 - - - -
AFIRMADO m3 843.17 50.00 35,725.21 6,430.54 - - 252.95 10,717.56 337.27 14,290.08 252.95 10,717.56
ARENA GRUESA (PUESTO EN OBRA) m3 72.23 40.00 2,448.38 440.71 - - - 36.11 1,224.19 36.11 1,224.19
MATERIAL CLASIFICADO PARA SUB BASE m3 843.17 40.00 28,582.11 5,144.78 - - - 421.59 14,291.05 421.59 14,291.05
ASFALTO LIQUIDO MC-30 gln 1,167.47 15.00 14,838.53 2,670.94 583.73 7,419.27 583.73 7,419.27 - - -
MEZCLA ASFALTICA (PUESTA EN OBRA) m3 279.87 450.00 106,729.44 19,211.30 279.87 106,729.44 - - - -
CEMENTO PORTLAND TIPO IP (42.5KG) BOL 1,098.39 21.50 20,012.58 3,602.27 1,098.39 20,012.58 - - - -
YESO DE 12 KG BOL 500.64 7.00 2,968.77 534.38 500.64 2,968.77 - - - -
CONO REFLECTIVO DE SEGURIDAD und 70.00 40.00 2,372.88 427.12 70.00 2,372.88 - - - -
CINTA DE SEGURIDAD C/AMARILLO X100M rll 80.00 42.00 2,847.20 512.50 80.00 2,847.20 - - - -
CORDEL DE NYLON Nº 80 x 100m und 23.84 10.00 202.03 36.37 23.84 202.03 - - - -
BANNER und 2.00 423.73 718.18 129.27 2.00 718.18 - - - -
CARTELES DE SEÑALIZACION und 10.00 200.00 1,694.90 305.08 10.00 1,694.90 - - - -
TRANQUERA DE MADERA PINTADO und 6.00 350.00 1,779.66 320.34 6.00 1,779.66 - - - -
COSTO DE
ANTORCHA ILUMINACION NOCTURNA (PETROLEO+TRAPO INDUSTRIAL) und 5.00 50.00 211.85 38.13 5.00 211.85 - - - -
CONSTRUCCIO
N POR PUENTE DE MADERA P/PASE PEATONAL und 8.00 150.00 1,016.95 183.05 8.00 1,016.95 - - - -
ADMINISTRACI MADERA ROLLIZA EUCALIPTO D=4" m 4,767.96 1.95 7,867.13 1,416.08 4,767.96 7,867.13 - - - -
ON DIRECTA -
TRIPLAY LUPUNA 4 x 8 x 4 mm pln 3.00 32.00 81.36 14.64 3.00 81.36 - - - -
BIENES
HORMIGON (PUESTO EN OBRA) m3 2.23 50.00 94.61 17.03 2.23 94.61 - - - -
AGUA m3 10,492.34 7.00 62,219.55 11,199.52 10,492.34 62,219.55 - - - -
MADERA TORNILLO p2 52,906.64 1.95 87,295.96 15,713.27 52,906.64 87,295.96 - - - -
MARCO Y TAPA HIERRO DUCTIL CLASE D-400, EN 124 und 53.00 740.00 33,237.29 5,982.71 53.00 33,237.29 - - - -
PINTURA ESMALTE SINTETICO gln 23.96 37.00 751.44 135.26 23.96 751.44 - - - -
PROTECTOR AUDITIVO TIPO COPA und 11.25 35.00 333.68 60.06 11.25 333.68 - - - -
TUBERIA PVC UF SN 4 D=900 mm X 6 mt con anillo und 794.82 4,594.92 3,095,024.80 557,104.46 794.82 3,095,024.80 - - - -
MALLA DE SEGURIDAD m 4,000.00 6.00 20,338.98 3,661.02 4,000.00 20,338.98 - - - -
POSTE DE APOYO DE MADERA CON BASE DE CONCRETO pza 80.00 75.00 5,084.75 915.25 80.00 5,084.75
SEÑALES PREVENTIVAS, DE PELIGRO, SEGURIDAD Y OTROS und 15.00 8.90 113.10 20.36 15.00 113.10
CAPACITACION SOBRE SALUD Y SEGURIDAD GLB 1.00 3,300.00 2,796.61 503.39 1.00 2,796.61
RASTRILLOS und 32.43 32.43 891.26 160.43 32.43 891.26
2.6.2 3.5 3 62 CARGAS DE PERSONAL 353,068.42 - 70,739.56 88,267.10 70,739.56 70,739.56 52,582.62
621 Remuneraciones 309,805.18 - 62,071.49 77,451.30 62,071.49 62,071.49 46,139.41
6211 Sueldos y Salarios 254,199.38 - 50,930.51 63,549.84 50,930.51 50,930.51 37,858.01
62112 Salarios 254,199.38 - 50,930.51 63,549.84 50,930.51 50,930.51 37,858.01
6211202 Jornal Básico (Contratados) 254,199.38 - 50,930.51 63,549.84 50,930.51 50,930.51 37,858.01
TOPÓGRAFO HH 116.29 21.65 1,812.62 - 29.07 453.15 29.07 453.15 29.07 453.15 29.07 453.15 -
OPERARIO HH 2,982.16 20.12 43,199.09 - 596.43 8,639.82 745.54 10,799.77 596.43 8,639.82 596.43 8,639.82 447.32 6,479.86
OFICIAL HH 5,670.51 16.52 67,444.71 - 1,134.10 13,488.94 1,417.63 16,861.18 1,134.10 13,488.94 1,134.10 13,488.94 850.58 10,116.71
PEON HH 13,257.43 14.85 141,742.96 - 2,651.49 28,348.59 3,314.36 35,435.74 2,651.49 28,348.59 2,651.49 28,348.59 1,988.61 21,261.44
- - - - - - -
6214 Gratificaciones 41,574.51 - 8,329.73 10,393.63 8,329.73 8,329.73 6,191.71
621412 Gratificaciones Obreros 41,574.51 - 8,329.73 10,393.63 8,329.73 8,329.73 6,191.71
TOPÓGRAFO HH 116.29 21.65 296.46 - 29.07 74.11 29.07 74.11 29.07 74.11 29.07 74.11 - -
OPERARIO HH 2,982.16 20.12 7,065.25 - 596.43 1,413.05 745.54 1,766.31 596.43 1,413.05 596.43 1,413.05 447.32 1,059.79
OFICIAL HH 5,670.51 16.52 11,030.64 - 1,134.10 2,206.13 1,417.63 2,757.66 1,134.10 2,206.13 1,134.10 2,206.13 850.58 1,654.60
PEON HH 13,257.43 14.85 23,182.18 - 2,651.49 4,636.44 3,314.36 5,795.54 2,651.49 4,636.44 2,651.49 4,636.44 1,988.61 3,477.33
6215 Vacaciones 14,031.29 - 2,811.26 3,507.82 2,811.26 2,811.26 2,089.69
62151 Vacaciones 14,031.29 - 2,811.26 3,507.82 2,811.26 2,811.26 2,089.69
621514 Vacaciones Pagadas Obreros C. 14,031.29 - 2,811.26 3,507.82 2,811.26 2,811.26 2,089.69
TOPÓGRAFO HH 116.29 21.65 100.05 - 29.07 25.01 29.07 25.01 29.07 25.01 29.07 25.01 - -
OPERARIO HH 2,982.16 20.12 2,384.50 - 596.43 476.90 745.54 596.13 596.43 476.90 596.43 476.90 447.32 357.68
OFICIAL HH 5,670.51 16.52 3,722.81 - 1,134.10 744.56 1,417.63 930.70 1,134.10 744.56 1,134.10 744.56 850.58 558.42
PEON HH 13,257.43 14.85 7,823.93 - 2,651.49 1,564.79 3,314.36 1,955.98 2,651.49 1,564.79 2,651.49 1,564.79 1,988.61 1,173.59
- - - - - - - -
62152 Bonificación Vacacional - - - - -
621521 Bonificación Vacacional Empledos P. - - - - -
- - - - -
621522 Bonificación Vacacional Obreros P. - - - - -
- - - - -
COSTO DE 622 Otras Remuneraciones - - - - -
CONSTRUCCIO 6221 Otras Remuneraciones - - - - -
N POR
622103 Asignación por Escolaridad - - - - -
ADMINISTRACI
ON DIRECTA - - - - - -
PERSONAL 622105 Bonificación extraordinaria temporal - - - - -
- - - - -
622109 BUC - - - - -
- - - - -
EPS TACNA S.A. 3 de 14
624 Capacitación - - - - -
6241 Capacitación - - - - -
624104 Capacitación-Personal - - - - -
- - - - -
627 Seguridad, previsión social y otras contribuciones 22,216.12 - 4,451.15 5,554.03 4,451.15 4,451.15 3,308.66
62701 Seguridad y Previsión Social 19,910.59 - 3,989.22 4,977.65 3,989.22 3,989.22 2,965.29
627101 Regimen de Prestación Social 19,910.59 - 3,989.22 4,977.65 3,989.22 3,989.22 2,965.29
TOPÓGRAFO HH 116.29 21.65 141.98 - 29.07 35.49 29.07 35.49 29.07 35.49 29.07 35.49 - -
OPERARIO HH 2,982.16 20.12 3,383.64 - 596.43 676.73 745.54 845.91 596.43 676.73 596.43 676.73 447.32 507.55
OFICIAL HH 5,670.51 16.52 5,282.72 - 1,134.10 1,056.54 1,417.63 1,320.68 1,134.10 1,056.54 1,134.10 1,056.54 850.58 792.41
PEON HH 13,257.43 14.85 11,102.25 - 2,651.49 2,220.45 3,314.36 2,775.56 2,651.49 2,220.45 2,651.49 2,220.45 1,988.61 1,665.34
6273 Seguro complementario de Trabajo de riesgo, accidentes de trabajo y enfermedades profesionales 2,305.54 - 461.93 576.38 461.93 461.93 343.36
627301 Seguro Complementario por Riesgo 2,305.54 - 461.93 576.38 461.93 461.93 343.36
TOPÓGRAFO HH 116.29 21.65 16.44 - 29.07 4.11 29.07 4.11 29.07 4.11 29.07 4.11 - -
OPERARIO HH 2,982.16 20.12 391.81 - 596.43 78.36 745.54 97.95 596.43 78.36 596.43 78.36 447.32 58.77
OFICIAL HH 5,670.51 16.52 611.71 - 1,134.10 122.34 1,417.63 152.93 1,134.10 122.34 1,134.10 122.34 850.58 91.76
PEON HH 13,257.43 14.85 1,285.58 - 2,651.49 257.12 3,314.36 321.39 2,651.49 257.12 2,651.49 257.12 1,988.61 192.84
629 Beneficios sociales de los trabajadores 21,047.11 - 4,216.93 5,261.78 4,216.93 4,216.93 3,134.56
6291 Compensación por tiempo de servicio 21,047.11 - 4,216.93 5,261.78 4,216.93 4,216.93 3,134.56
629102 Obreros 21,047.11 - 4,216.93 5,261.78 4,216.93 4,216.93 3,134.56
TOPÓGRAFO HH 116.29 21.65 150.08 - 29.07 37.52 29.07 37.52 29.07 37.52 29.07 37.52 - -
OPERARIO HH 2,982.16 20.12 3,576.78 - 596.43 715.36 745.54 894.20 596.43 715.36 596.43 715.36 447.32 536.52
OFICIAL HH 5,670.51 16.52 5,584.26 - 1,134.10 1,116.85 1,417.63 1,396.07 1,134.10 1,116.85 1,134.10 1,116.85 850.58 837.64
PEON HH 13,257.43 14.85 11,735.99 - 2,651.49 2,347.20 3,314.36 2,934.00 2,651.49 2,347.20 2,651.49 2,347.20 1,988.61 1,760.40
- - - - - - - - - -
2.6.2 3.5 5 63 GASTOS DE SERVICIOS PRESTADOS POR TERCEROS 277,778.59 50,000.15 62,517.42 62,888.68 56,976.68 65,200.92 30,194.89
632 Asesoría y consultoría 20,805.50 3,744.99 8,093.22 4,640.86 4,471.36 2,456.00 1,144.07
6329 Otros 20,805.50 3,744.99 8,093.22 4,640.86 4,471.36 2,456.00 1,144.07
632902 Servicios Especializados 20,805.50 3,744.99 8,093.22 4,640.86 4,471.36 2,456.00 1,144.07
CAPACITADOR SOCIAL mes 5.00 1,350.00 5,720.35 1,029.66 1.00 1,144.07 1.00 1,144.07 1.00 1,144.07 1.00 1,144.07 1.00 1,144.07
DENSIDAD DE CAMPO und 10.00 40.00 339.00 61.02 5.00 169.50 5.00 169.50 - - - - -
ROTURA DE BRIQUETAS und 258.00 20.00 4,373.10 787.16 - 90.30 1,530.59 90.30 1,530.59 77.40 1,311.93 -
ENSAYO DE ROTURA DE BRIQUETA und 212.00 20.00 3,593.40 646.81 - 106.00 1,796.70 106.00 1,796.70 - -
EVENTOS, TALLERES Y DIFUSIÓN (RADIAL Y TELEVISIVO) GLB 1.00 2,500.00 2,118.64 381.36 1.00 2,118.64 - - - -
PREPARACION DE AFICHES, CARTILLAS Y TRIPTICOS GLB 1.00 3,000.00 2,542.37 457.63 1.00 2,542.37 - - - -
SC ELABORACION DEL PLAN DE SEGURIDAD GLB 1.00 2,500.00 2,118.64 381.36 1.00 2,118.64 -
- - - - - - -
635 Alquileres 256,973.09 46,255.16 54,424.20 58,247.82 52,505.32 62,744.92 29,050.82
6353 Maquinarias y equipos de explotación - - - - - - -
635301 Maquinarias y equipos de explotación - - - - - - -
- - - - - - -
COSTO DE 6356 Equipos Diversos 5,348.55 256,973.09 46,255.16 54,424.20 58,247.82 52,505.32 62,744.92 29,050.82
CONSTRUCCIO 635601 Equipos Diversos 256,973.09 46,255.16 54,424.20 58,247.82 52,505.32 62,744.92 29,050.82
N POR
MEZCLADORA DE CONCRETO TAMBOR 11 P3-18 HP hm 420.00 17.00 6,052.20 1,089.40 210.00 3,026.10 210.00 3,026.10 - - -
ADMINISTRACI
ON DIRECTA - VIBRADORA DE CONCRETO hm 420.00 10.40 3,700.20 666.04 210.00 1,850.10 210.00 1,850.10 - - -
SERVICIOS ENCOFRADO METALICO und 132.50 38.40 4,311.55 776.08 66.25 2,155.78 66.25 2,155.78 - - -
CAMION VOLQUETE 15 M3. hm 109.19 140.00 12,953.86 2,331.70 21.84 2,590.77 21.84 2,590.77 21.84 2,590.77 21.84 2,590.77 21.84 2,590.77
CAMION CISTERNA 4x2 (AGUA) 1500 GL. hm 260.72 119.99 26,512.45 4,772.24 52.14 5,302.49 52.14 5,302.49 52.14 5,302.49 52.14 5,302.49 52.14 5,302.49
RODILLO LISO VIBRATORIO 1.5 TON hm 172.85 119.99 17,577.15 3,163.89 - - - 86.43 8,788.57 86.43 8,788.57
EPS TACNA S.A. 4 de 14
COMPRESORA NEUMATICA 250-330 PCM, 87 HP hm 14.27 119.99 1,451.02 261.18 - - - 14.27 1,451.02 -
COMPACTADOR VIBR. TIPO PLANCHA 7 HP hm 573.90 15.00 7,294.31 1,312.98 - - 191.30 2,431.44 191.30 2,431.44 191.30 2,431.44
APISONADORA VIBR. TIPO CANGURO 5.5 HP hm 1,559.05 20.00 26,425.97 4,756.68 - 389.76 6,606.49 389.76 6,606.49 389.76 6,606.49 389.76 6,606.49
RETROEXCAVADOR S/LLANTA 80-110HP 0.5-1.3Y hm 762.87 140.00 90,507.32 16,291.32 190.72 22,626.83 190.72 22,626.83 190.72 22,626.83 190.72 22,626.83 -
CARGADOR FRONTAL 3.0 M3 hm 109.19 180.00 16,655.28 2,997.95 21.84 3,331.06 21.84 3,331.06 21.84 3,331.06 21.84 3,331.06 21.84 3,331.06
MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPO DE CONSTRUCCIÓN GLB 1.00 2,500.00 2,118.64 381.36 1.00 2,118.64 - - - -
MINICARGADOR MULTIPROPOSITOS hm 432.29 105.00 38,464.98 6,923.70 108.07 9,616.24 108.07 9,616.24 108.07 9,616.24 108.07 9,616.24 -
CORTADOR DE PAVIMENTO hm 259.44 7.30 1,605.92 289.07 129.72 802.96 129.72 802.96 - - -
NIVEL HE 76.29 7.00 452.38 81.43 76.29 452.38 - - - -
ESTACION TOTAL hm 40.00 20.00 678.00 122.04 20.00 339.00 20.00 339.00 - - -
WINCHA DE 50 m pza 5.00 50.00 211.85 38.13 5.00 211.85 - - - -
TOTAL COSTO DIRECTO 4,298,333.61 708,306.97 3,639,368.56 161,606.32 164,415.88 198,807.07 134,135.77
EPS TACNA S.A. 5 de 14
2.6.2 3.5 4 60 COMPRAS 78,608.90 14,149.60 40,156.36 5,805.08 5,805.08 5,805.08 5,805.08 -
603 Materiales auxiliares, suministros y repuestos 35,512.71 6,392.29 33,596.19 - - - - -
6032 Suministros 35,512.71 6,392.29 33,596.19 - - - - -
603210 Utiles de Escritorio 3,715.25 668.75 3,092.80 - - - - -
FILE FORMATO A-4 X 25UND PQTE 15.00 6.00 76.27 13.73 10.00 50.85 - - - - -
CUADERNO ESPIRAL 200 HOJAS REFORZADO UND 10.00 35.00 296.61 53.39 8.00 237.29 - - - - -
CUADERNO EMPASTADO 100 HOJAS A-5 UND 8.00 30.00 203.39 36.61 5.00 127.12 - - - - -
LIBRETA DE CAMPO (TOPOGRAFICO) UND 8.00 10.00 67.80 12.20 4.00 33.90 - - - - -
DISCO EN FORMATO DVD CJA 3.00 50.00 127.12 22.88 2.00 84.75 - - - - -
LAPIZ HB UND 25.00 1.50 31.78 5.72 20.00 25.42 - - - - -
BOLIGRAFO 033 C/AZUL CJA 5.00 30.00 127.12 22.88 4.00 101.69 - - - - -
PERFORADOR GRANDE TIPO ALICATE UND 6.00 40.00 203.39 36.61 4.00 135.59 - - - - -
PAPEL FORMATO A4 80GR MLL 40.00 22.00 745.76 134.24 35.00 652.54 - - - - -
CUADERNO DE OBRA DE 100 FOLIOS C/3 COPIAS (AUTOCOPIATIVO) UND 5.00 50.00 211.86 38.14 5.00 211.86 - - - - -
TARJETA DE CONTROL VISIBLE MLL 3.00 100.00 254.24 45.76 3.00 254.24 - - - - -
ARCHIVADORES GRANDE UND 32.00 5.00 135.59 24.41 25.00 105.93 - - - - -
ARCHIVADORES CHICO UND 17.00 2.00 28.81 5.19 10.00 16.95 - - - - -
ENGRAMPADOR TIPO ALICATE UND 4.00 50.00 169.49 30.51 4.00 169.49 - - - - -
FASTENER CJA 5.00 5.00 21.19 3.81 5.00 21.19 - - - - -
POST IT PQTE 5.00 5.00 21.19 3.81 5.00 21.19 - - - - -
ESCALIMETRO PROFESIONAL UND 3.00 25.00 63.56 11.44 2.00 42.37 - - - - -
JUEGO DE ESCUADRA GRANDES UND 2.00 30.00 50.85 9.15 2.00 50.85 - - - - -
FOLIADOR METALICO 06 DIGITOS UND 2.00 50.00 84.75 15.25 2.00 84.75 - - - - -
PAPEL LUSTRE UND 60.00 0.30 15.25 2.75 60.00 15.25 - - - - -
GRAPAS CJA 6.00 3.00 15.25 2.75 4.00 10.17 - - - - -
CLIPS PEQUEÑOS X 100 UND CJA 5.00 1.00 4.24 0.76 2.00 1.69 - - - - -
VINIFAN TAMAÑO OFICIO UND 15.00 5.00 63.56 11.44 12.00 50.85 - - - - -
TABLERO DE CAMPO DE PLASTICO UND 5.00 3.00 12.71 2.29 10.00 25.42 - - - - -
CUTTER GRANDE UND 4.00 35.00 118.64 21.36 3.00 88.98 - - - - -
SACAGRAPAS UND 5.00 3.00 12.71 2.29 5.00 12.71 - - - - -
BORRADEX LIQUIDO T/ LAPICERO UND 10.00 2.50 21.19 3.81 10.00 21.19 - - - - -
PLUMON GRUESO COLOR NEGRO UND 10.00 1.50 12.71 2.29 10.00 12.71 - - - - -
RESALTADOR LUMINOSO UND 10.00 2.50 21.19 3.81 10.00 21.19 - - - - -
PORTAMINAS PUNTA METALICA 0.5 MM UND 10.00 5.00 42.37 7.63 10.00 42.37 - - - - -
MINAS P/ PORTAMINAS 0.5 HB X CJA UND 10.00 1.00 8.47 1.53 10.00 8.47 - - - - -
CINTA ADHESIVA 1" X 72 YARDAS UND 7.00 2.00 11.86 2.14 5.00 8.47 - - - - -
GOMA BISONA PELIKAN UND 5.00 2.50 10.59 1.91 3.00 6.36 - - - - -
PARTES DIARIOS DE MAQUINARIA BL 25.00 20.00 423.73 76.27 20.00 338.98 - - - - -
- - - - - - - -
COSTO DE
CONSTRUCCIO 603211 Materiales de Impresión 2,344.07 421.93 1,050.00 - - - - -
N POR TINTA P/IMPRESORA EPSON N° T6641 BLACK UND 27.00 45.00 1,029.66 185.34 15.00 572.03
ADMINISTRACI TINTA P/IMPRESORA EPSON N° T6642 CYAN UND 11.00 47.00 438.14 78.86 4.00 159.32
ON DIRECTA - TINTA P/IMPRESORA EPSON N° T6643 MAGENTA UND 11.00 47.00 438.14 78.86 4.00 159.32
BIENES
TINTA P/IMPRESORA EPSON N° T6644 YELLOW UND 11.00 47.00 438.14 78.86 4.00 159.32
COSTO DE
CONSTRUCCIO
N POR
ADMINISTRACI PRESUPUESTO ANALÍTICO DE GASTOS GENERALES - RED DE ALCANTARILLADO
ON DIRECTA -
BIENES
PROYECTO : REUBICACIÓN Y RENOVACIÓN DEL INTERCEPTOR DE LA AV. JORGE BASADRE GROHMANN (EX CIRCUNVALACION) TRAMOS AV. EJERCITO Y AV. COLLPA
ENTIDAD : ENTIDAD PRESTADORA DE SERVICIOS DE SANEAMIENTO TACNA S.A.
ELABORADO : GERENCIA DE INGENIERÍA - DIVISIÓN DE ESTUDIOS Y PROYECTOS
LUGAR : TACNA - TACNA - TACNA
FECHA : SEPTIEMBRE 2017
IGV 18%
COSTO DE
CONSTRUCCIO
N POR
ADMINISTRACI
ON DIRECTA -
PERSONAL
EPS TACNA S.A. 7 de 14
PREVENCIONISTA DE RIESGO MES 5.00 2,975.00 919.47 - 1.00 183.89 1.00 183.89 1.00 183.89 1.00 183.89 1.00 183.89 - -
GUARDIÁN MES 5.00 2,580.00 797.39 - 1.00 159.48 1.00 159.48 1.00 159.48 1.00 159.48 1.00 159.48 - -
COSTO DE
CONSTRUCCIO ALMACENERO MES 5.00 2,580.00 797.39 - 1.00 159.48 1.00 159.48 1.00 159.48 1.00 159.48 1.00 159.48 - -
N POR CHOFER MES 5.00 2,580.00 797.39 - 1.00 159.48 1.00 159.48 1.00 159.48 1.00 159.48 1.00 159.48 - -
ADMINISTRACI 627 Seguridad, previsión social y otras contribuciones 8,854.92 - 1,624.69 1,624.69 1,624.69 1,624.69 1,624.69 731.48
ON DIRECTA - 62701 Seguridad y Previsión Social 7,935.75 - 1,456.04 1,456.04 1,456.04 1,456.04 1,456.04 655.55
PERSONAL
627101 Regimen de Prestación Social 7,935.75 - 1,456.04 1,456.04 1,456.04 1,456.04 1,456.04 655.55
RESIDENTE DE OBRA MES 6.00 3,450.00 1,546.43 - 1.00 257.74 1.00 257.74 1.00 257.74 1.00 257.74 1.00 257.74 1.00 257.74
ASISTENTE TÉCNICO MES 6.00 2,975.00 1,333.52 - 1.00 222.25 1.00 222.25 1.00 222.25 1.00 222.25 1.00 222.25 1.00 222.25
ASISTENTE ADMINISTRATIVO MES 6.00 2,350.00 1,053.37 - 1.00 175.56 1.00 175.56 1.00 175.56 1.00 175.56 1.00 175.56 1.00 175.56
PREVENCIONISTA DE RIESGO MES 5.00 2,975.00 1,111.27 - 1.00 222.25 1.00 222.25 1.00 222.25 1.00 222.25 1.00 222.25 - -
GUARDIÁN MES 5.00 2,580.00 963.72 - 1.00 192.74 1.00 192.74 1.00 192.74 1.00 192.74 1.00 192.74 - -
ALMACENERO MES 5.00 2,580.00 963.72 - 1.00 192.74 1.00 192.74 1.00 192.74 1.00 192.74 1.00 192.74 - -
CHOFER MES 5.00 2,580.00 963.72 - 1.00 192.74 1.00 192.74 1.00 192.74 1.00 192.74 1.00 192.74 - -
- - - - - - - -
6273 Seguro complementario de Trabajo de riesgo, accidentes de trabajo y enfermedades profesionales 919.16 - 168.65 168.65 168.65 168.65 168.65 75.93
627301 Seguro Complementario por Riesgo 919.16 - 168.65 168.65 168.65 168.65 168.65 75.93
RESIDENTE DE OBRA MES 6.00 3,450.00 179.12 - 1.00 29.85 1.00 29.85 1.00 29.85 1.00 29.85 1.00 29.85 1.00 29.85
ASISTENTE TÉCNICO MES 6.00 2,975.00 154.46 - 1.00 25.74 1.00 25.74 1.00 25.74 1.00 25.74 1.00 25.74 1.00 25.74
ASISTENTE ADMINISTRATIVO MES 6.00 2,350.00 122.01 - 1.00 20.33 1.00 20.33 1.00 20.33 1.00 20.33 1.00 20.33 1.00 20.33
PREVENCIONISTA DE RIESGO MES 5.00 2,975.00 128.71 - 1.00 25.74 1.00 25.74 1.00 25.74 1.00 25.74 1.00 25.74 - -
GUARDIÁN MES 5.00 2,580.00 111.62 - 1.00 22.32 1.00 22.32 1.00 22.32 1.00 22.32 1.00 22.32 - -
ALMACENERO MES 5.00 2,580.00 111.62 - 1.00 22.32 1.00 22.32 1.00 22.32 1.00 22.32 1.00 22.32 - -
CHOFER MES 5.00 2,580.00 111.62 - 1.00 22.32 1.00 22.32 1.00 22.32 1.00 22.32 1.00 22.32 - -
629 Beneficios sociales de los trabajadores 6,566.09 - 1,204.74 1,204.74 1,204.74 1,204.74 1,204.74 542.41
6291 Compensación por tiempo de servicio 6,566.09 - 1,204.74 1,204.74 1,204.74 1,204.74 1,204.74 542.41
629101 Empleados 6,566.09 - 1,204.74 1,204.74 1,204.74 1,204.74 1,204.74 542.41
RESIDENTE DE OBRA MES 6.00 3,450.00 1,279.53 - 1.00 213.25 1.00 213.25 1.00 213.25 1.00 213.25 1.00 213.25 1.00 213.25
ASISTENTE TÉCNICO MES 6.00 2,975.00 1,103.36 - 1.00 183.89 1.00 183.89 1.00 183.89 1.00 183.89 1.00 183.89 1.00 183.89
ASISTENTE ADMINISTRATIVO MES 6.00 2,350.00 871.56 - 1.00 145.26 1.00 145.26 1.00 145.26 1.00 145.26 1.00 145.26 1.00 145.26
PREVENCIONISTA DE RIESGO MES 5.00 2,975.00 919.47 - 1.00 183.89 1.00 183.89 1.00 183.89 1.00 183.89 1.00 183.89 - -
GUARDIÁN MES 5.00 2,580.00 797.39 - 1.00 159.48 1.00 159.48 1.00 159.48 1.00 159.48 1.00 159.48 - -
ALMACENERO MES 5.00 2,580.00 797.39 - 1.00 159.48 1.00 159.48 1.00 159.48 1.00 159.48 1.00 159.48 - -
CHOFER MES 5.00 2,580.00 797.39 - 1.00 159.48 1.00 159.48 1.00 159.48 1.00 159.48 1.00 159.48 - -
2.6.2 3.5 5 63 GASTOS DE SERVICIOS PRESTADOS POR TERCEROS 94,550.51 16,317.09 38,569.15 12,721.70 12,721.70 12,721.70 12,721.70 8,060.68
632 Asesoría y consultoría 55,142.04 9,925.57 26,308.98 7,241.19 7,241.19 7,241.19 7,241.19 2,834.41
6329 Otros 55,142.04 9,925.57 26,308.98 7,241.19 7,241.19 7,241.19 7,241.19 2,834.41
632902 Servicios Especializados 55,142.04 9,925.57 26,308.98 7,241.19 7,241.19 7,241.19 7,241.19 2,834.41
SERVICIOS VARIOS SER 1.00 20,067.60 17,006.44 3,061.16 0.17 2,834.41 0.17 2,834.41 0.17 2,834.41 0.17 2,834.41 0.17 2,834.41 0.17 2,834.41
SERVICIO DE PLAN DE MONITOREO ARQUEOLOGICO SER 5.00 5,200.00 22,033.90 3,966.10 1.00 4,406.78 1.00 4,406.78 1.00 4,406.78 1.00 4,406.78 1.00 4,406.78 -
SERVICIO DE ELABORACION DE EXPEDIENTE DE ESTUDIO IMPACTO AMBIENTAL
SER 1.00 12,000.00 10,169.49 1,830.51 1.00 10,169.49 - - - - -
SERVICIO DE EXAMEN OCUPACIONAL SER 1.00 7,000.00 5,932.20 1,067.80 1.00 5,932.20 - - - - -
SERVICO DE AUTORIZACION DE PROVIAS SER 1.00 3,500.00 2,966.10 533.90 1.00 2,966.10 - - - - -
634 Mantenimiento y Reparación 6,779.66 1,220.34 6,779.66 - - - - -
6343 Inmuebles, maquinaria y equipo 6,779.66 1,220.34 6,779.66 - - - - -
COSTO DE
CONSTRUCCIO 634306 M. Equipos de Cómputo y Periféricos 6,779.66 1,220.34 6,779.66 - - - - -
N POR 635 Alquileres 27,457.63 4,942.37 4,576.27 4,576.27 4,576.27 4,576.27 4,576.27 4,576.27
ADMINISTRACI 6356 Equipos Diversos 27,457.63 4,942.37 4,576.27 4,576.27 4,576.27 4,576.27 4,576.27 4,576.27
ON DIRECTA - 635601 Equipos Diversos 27,457.63 4,942.37 4,576.27 4,576.27 4,576.27 4,576.27 4,576.27 4,576.27
SERVICIOS
SERVICIO DE ALQUILER DE CAMIONETA 4x4 DOBLE CABINA DIA 180.00 180.00 27,457.63 4,942.37 30.00 4,576.27 30.00 4,576.27 30.00 4,576.27 30.00 4,576.27 30.00 4,576.27 30.00 4,576.27
636 Servicios Básicos 1,271.19 228.81 254.24 254.24 254.24 254.24 254.24 -
6361 Energía Eléctrica 1,271.19 228.81 254.24 254.24 254.24 254.24 254.24 -
636101 Energía Eléctrica MES 5.00 300.00 1,271.19 228.81 1.00 254.24 1.00 254.24 1.00 254.24 1.00 254.24 1.00 254.24 -
EPS TACNA S.A. 8 de 14
639 Otros servicios prestados por terceros 3,900.00 - 650.00 650.00 650.00 650.00 650.00 650.00
6394 Gastos de prácticas 3,900.00 - 650.00 650.00 650.00 650.00 650.00 650.00
639401 Estipendio Practicantes 3,900.00 - 650.00 650.00 650.00 650.00 650.00 650.00
PRACTICANTE DE INGENIERIA MES 6.00 650.00 3,900.00 - 1.00 650.00 1.00 650.00 1.00 650.00 1.00 650.00 1.00 650.00 1.00 650.00
- - - - - - - -
TOTAL GASTOS GENERALES 279,384.41 30,466.69 98,215.51 38,016.78 38,016.78 38,016.78 38,016.78 16,835.68
EPS TACNA S.A. 9 de 14
COSTO DE
CONSTRUCCIO ASISTENTE TÉCNICO MES 0.50 2,975.00 91.95 - 0.50 91.95 - - - - - -
N POR TOPÓGRAFO MES 0.50 2,350.00 72.63 - 0.50 72.63 - - - - - -
ADMINISTRACI 627 Seguridad, previsión social y otras contribuciones 509.54 - 509.54 - - -
ON DIRECTA - 62701 Seguridad y Previsión Social 456.65 - 456.65 - - -
PERSONAL
627101 Regimen de Prestación Social 456.65 - 456.65 - - -
PROYECTISTA MES 1.00 3,450.00 257.74 - 1.00 257.74 - - - - - -
ASISTENTE TÉCNICO MES 0.50 2,975.00 111.13 - 0.50 111.13 - - - - - -
TOPÓGRAFO MES 0.50 2,350.00 87.78 - 0.50 87.78 - - - - - -
- - - - - -
6273 Seguro complementario de Trabajo de riesgo, accidentes de trabajo y enfermedades profesionales 52.89 - 52.89 - - -
627301 Seguro Complementario por Riesgo 52.89 - 52.89 - - -
PROYECTISTA MES 1.00 3,450.00 29.85 - 1.00 29.85 - - - - - -
ASISTENTE TÉCNICO MES 0.50 2,975.00 12.87 - 0.50 12.87 - - - - - -
TOPÓGRAFO MES 0.50 2,350.00 10.17 - 0.50 10.17 - - - - - -
629 Beneficios sociales de los trabajadores 377.83 - 377.83 - - -
6291 Compensación por tiempo de servicio 377.83 - 377.83 - - -
629101 Empleados 377.83 - 377.83 - - -
PROYECTISTA MES 1.00 3,450.00 213.25 - 1.00 213.25 - - - - - -
ASISTENTE TÉCNICO MES 0.50 2,975.00 91.95 - 0.50 91.95 - - - - - -
TOPÓGRAFO MES 0.50 2,350.00 72.63 - 0.50 72.63 - - - - - -
2.6.2 3.5 5 63 GASTOS DE SERVICIOS PRESTADOS POR TERCEROS 4,035.97 726.47 2,966.10 - - -
632 Asesoría y consultoría 2,764.78 497.66 1,694.92 - - -
632902 Servicios Especializados 2,764.78 497.66 1,694.92 - - -
COSTO DE
CONSTRUCCIO SERVICIO DE ELABORACIÓN DE ESTUDIO DE SUELOS SER 1.00 2,000.00 1,694.92 305.08 1.00 1,694.92 - - -
N POR SERVICIOS DIVERSOS SER 1.00 1,262.44 1,069.86 192.58 - - - -
ADMINISTRACI 634 Mantenimiento y Reparación 1,271.19 228.81 1,271.19 - - -
ON DIRECTA - 6343 Inmuebles, maquinaria y equipo 1,271.19 228.81 1,271.19 - - -
SERVICIOS
634306 M. Equipos de Cómputo y Periféricos 1,271.19 228.81 1,271.19 - - -
SERVICIO DE MANTENIMIENTO Y REPARACIÓN DE EQUIPO DE COMPUTO GLB 1.00 1,500.00 1,271.19 228.81 1.00 1,271.19 - - -
TOTAL GASTOS DE ESTUDIO 11,838.08 1,030.61 10,698.52 - - -
EPS TACNA S.A. 11 de 14
2.6.2 3.5 4 60 COMPRAS 21,577.12 3,883.88 15,648.31 1,080.51 1,606.78 1,080.51 1,080.51 1,080.51
603 Materiales auxiliares, suministros y repuestos 15,094.07 2,716.93 14,567.80 - 526.27 - - -
6032 Suministros 15,094.07 2,716.93 14,567.80 - 526.27 - - -
603210 Utiles de Escritorio 600.85 108.15 600.85 - - - - -
FILE FORMATO A-4 X 25UND PQTE 4.00 5.00 16.95 3.05 4.00 16.95 - - - - -
BOLIGRAFO 033 C/AZUL CJA 4.00 30.00 101.69 18.31 4.00 101.69 - - - - -
PAPEL FORMATO A4 80GR MLL 12.00 22.00 223.73 40.27 12.00 223.73 - - - - -
ARCHIVADORES GRANDE UND 15.00 5.00 63.56 11.44 15.00 63.56 - - - - -
ARCHIVADORES CHICO UND 10.00 2.00 16.95 3.05 10.00 16.95 - - - - -
ENGRAMPADOR TIPO ALICATE UND 2.00 50.00 84.75 15.25 2.00 84.75 - - - - -
FASTENER CJA 4.00 5.00 16.95 3.05 4.00 16.95 - - - - -
POST IT PQTE 5.00 5.00 21.19 3.81 5.00 21.19 - - - - -
CLIPS PEQUEÑOS X 100 UND CJA 3.00 2.00 5.08 0.92 3.00 5.08 - - - - -
GRAPAS CJA 3.00 3.00 7.63 1.37 3.00 7.63 - - - - -
FOLIADOR METALICO 06 DIGITOS UND 1.00 50.00 42.37 7.63 1.00 42.37 - - - - -
- - - - - - - -
603211 Materiales de Impresión 1,052.54 189.46 526.27 - 526.27 - - -
TONER PARA FOTOCOPIADORA UND 2.00 300.00 508.47 91.53 1.00 254.24 - 1.00 254.24 - - -
TINTA P/IMPRESORA EPSON N° T6641 BLACK UND 8.00 45.00 305.08 54.92 4.00 152.54 - 4.00 152.54 - - -
TINTA P/IMPRESORA EPSON N° T6642 CYAN UND 2.00 47.00 79.66 14.34 1.00 39.83 - 1.00 39.83 - - -
COSTO DE
CONSTRUCCIO TINTA P/IMPRESORA EPSON N° T6643 MAGENTA UND 2.00 47.00 79.66 14.34 1.00 39.83 - 1.00 39.83 - - -
N POR TINTA P/IMPRESORA EPSON N° T6644 YELLOW UND 2.00 47.00 79.66 14.34 1.00 39.83 - 1.00 39.83 - - -
ADMINISTRACI - - - - - - - -
ON DIRECTA -
603218 Otros Materiales Diversos 10,711.86 1,928.14 8.00 10,711.86 - - - - -
BIENES
LAPTOT TOSHIBA CORE i7 MEMORIA RAM 4 gb UND 1.00 4,500.00 3,813.56 686.44 1.00 3,813.56 - - - - -
IMPRESORA EPSON L555 MULTIFUNCIONAL (COP/IMP/SCANEA) UND 1.00 690.00 584.75 105.25 1.00 584.75 - - - - -
ESCRITORIO UND 2.00 600.00 1,016.95 183.05 2.00 1,016.95 - - - - -
SILLA GIRATORIA UND 2.00 150.00 254.24 45.76 2.00 254.24 - - - - -
ARMARIO 2 PUERTAS UND 1.00 850.00 720.34 129.66 1.00 720.34 - - - - -
PLOTER HP DESIGNJET 110 PLUS UND 1.00 5,100.00 4,322.03 777.97 1.00 4,322.03 - - - - -
- - - - - - - -
603219 Vestuario 2,728.81 491.19 2,728.81 - - - - -
ZAPATOS DE SEGURIDAD PAR 4.00 450.00 1,525.42 274.58 4.00 1,525.42 - - - - -
LENTES DE SEGURIDAD OSCUROS GX20 (UV) 3M UND 4.00 35.00 118.64 21.36 4.00 118.64 - - - - -
CHALECOS DE SEGURIDAD UND 4.00 75.00 254.24 45.76 4.00 254.24 - - - - -
CASCO DE SEGURIDAD COLOR BLANCO 3M UND 4.00 35.00 118.64 21.36 4.00 118.64 - - - - -
PANTALONES JEANS DE SEGURIDAD UND 4.00 140.00 474.58 85.42 4.00 474.58 - - - - -
CAMISA MANGA LARGA UND 4.00 70.00 237.29 42.71 4.00 237.29 - - - - -
- - - - - - - -
607 Combustible 6,483.05 1,166.95 1,080.51 1,080.51 1,080.51 1,080.51 1,080.51 1,080.51
607101 Combustibles 6,483.05 1,166.95 1,080.51 1,080.51 1,080.51 1,080.51 1,080.51 1,080.51
607103 Gasolina 6,483.05 1,166.95 1,080.51 1,080.51 1,080.51 1,080.51 1,080.51 1,080.51
GASOLINA 90 OCTANOS GLN 600.00 12.75 6,483.05 1,166.95 100.00 1,080.51 100.00 1,080.51 100.00 1,080.51 100.00 1,080.51 100.00 1,080.51 100.00 1,080.51
2.6.2 3.5 3 62 CARGAS DE PERSONAL 68,130.00 - 11,355.00 11,355.00 11,355.00 11,355.00 11,355.00 11,355.00
621 Remuneraciones 58,239.36 - 9,706.56 9,706.56 9,706.56 9,706.56 9,706.56 9,706.56
6211 Sueldos y Salarios 52,624.29 - 8,770.72 8,770.72 8,770.72 8,770.72 8,770.72 8,770.72
62111 Sueldos 52,624.29 - 8,770.72 8,770.72 8,770.72 8,770.72 8,770.72 8,770.72
6211102 Remuneración Básica (Contratados) 52,624.29 - 8,770.72 8,770.72 8,770.72 8,770.72 8,770.72 8,770.72
SUPERVISOR DE OBRA MES 6.00 3,450.00 15,988.89 - 1.00 2,664.81 1.00 2,664.81 1.00 2,664.81 1.00 2,664.81 1.00 2,664.81 1.00 2,664.81
ASISTENTE TÉCNICO MES 6.00 2,975.00 13,787.52 - 1.00 2,297.92 1.00 2,297.92 1.00 2,297.92 1.00 2,297.92 1.00 2,297.92 1.00 2,297.92
ASISTENTE ADMINISTRATIVO MES 6.00 2,350.00 10,890.98 - 1.00 1,815.16 1.00 1,815.16 1.00 1,815.16 1.00 1,815.16 1.00 1,815.16 1.00 1,815.16
CHOFER MES 6.00 2,580.00 11,956.91 - 1.00 1,992.82 1.00 1,992.82 1.00 1,992.82 1.00 1,992.82 1.00 1,992.82 1.00 1,992.82
6214 Gratificaciones 1,403.75 - 233.96 233.96 233.96 233.96 233.96 233.96
621411 Gratificaciones Empleados 1,403.75 - 233.96 233.96 233.96 233.96 233.96 233.96
SUPERVISOR DE OBRA MES 6.00 3,450.00 426.50 - 1.00 71.08 1.00 71.08 1.00 71.08 1.00 71.08 1.00 71.08 1.00 71.08
ASISTENTE TÉCNICO MES 6.00 2,975.00 367.78 - 1.00 61.30 1.00 61.30 1.00 61.30 1.00 61.30 1.00 61.30 1.00 61.30
ASISTENTE ADMINISTRATIVO MES 6.00 2,350.00 290.52 - 1.00 48.42 1.00 48.42 1.00 48.42 1.00 48.42 1.00 48.42 1.00 48.42
CHOFER MES 6.00 2,580.00 318.95 - 1.00 53.16 1.00 53.16 1.00 53.16 1.00 53.16 1.00 53.16 1.00 53.16
6215 Vacaciones 4,211.32 - 701.89 701.89 701.89 701.89 701.89 701.89
COSTO DE
CONSTRUCCIO
N POR
ADMINISTRACI
ON DIRECTA -