Ejercicio 4 - Valor Neto de Block - Elias Aguilar - 17160234
Ejercicio 4 - Valor Neto de Block - Elias Aguilar - 17160234
A B
CALIZA ANDESITA
PROPONER UN PLAN DE MINADO QUE TENGA COMO
DO QUE TENGA COMO OBJETIVO
Figura 02 TALADROS e INTERPRETACIÓN GEOLOGICA / CONSTRU RECURSOS
A
B
20
20
20
Figura 03 TONELAJES DE CADA BLOCK
15,360 17,280 15,360 19,200 24,000 16,800 19,200 19,200 19,200 24,000 24,000
19,200 19,200 19,200 24,000 24,000 24,000 24,000 19,200 24,000 24,000 24,000
19,200 19,200 19,200 24,000 24,000 24,000 24,000 19,200 24,000 24,000 24,000
19,200 19,200 19,200 24,000 24,000 24,000 19,200 19,200 24,000 24,000 24,000
19,200 19,200 19,200 19,200 19,200 19,200 19,200 24,000 24,000 24,000 24,000
19,200 19,200 19,200 19,200 19,200 19,200 19,200 19,200 19,200 19,200 19,200
FACTOR D
FACTOR D
FACTOR DE AREA (desmonte)
1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1
Dimensiones de los Block
largo alto ancho m3
20 20 20 8000
5,760 20
20
24,000 19,200 19,200 19,200
20
24,000 19,200 19,200 19,200
DENSIDAD t/m3
24,000 19,200 19,200 19,200
MINERAL 3.0
24,000 19,200 19,200 19,200
DESMONTE 2.4
19,200 19,200 19,200 19,200
0.3
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
Figura 04 LEYES DILUIDAS GEOLOGIA (%Pb)
A B
0 0 0 0
0 0 0 0 0 0 0 0 0 0
Rango de Leyes
Equiv. Pb 0 - 0.9 1 - 1.9 2 - 2.9 3 - 3.9
Dimensiones de los Block
B largo alto ancho m3
20 20 20 8000
0 0 20
20
1.9 2.1 0 0 0
20
5.0 1 0 0 0
5.1 1.2 0 0 0
4.9 1.3 0 0 0
2.6 0 0 0 0
0 0 0 0 0
4 - 4.9 5 - 5.9
COSTOS UNITARIOS
Para una Mina que produce Concentrados de Plomo
SUBTERRÁNEA
COSTOS DIRECTOS MINA US$/ton Material
Costo de Perforación 5.9 Mineral
Costo de Voladura 5.5 Mineral
Costo de Carguío 3.9 Mineral
Costo de Transporte 9.6 Mineral
Costo de Servicios Auxiliares 6.6 Mineral
Total costos directos mina 31.5 Mineral
Depreciación de los Equipos 3.5 Mineral
Total Costos Mina 35.0 Mineral
COSTOS DIRECTOS PLANTA
Costo de Tratamiento de Mineral 6.8 Mineral
Costo Servicios Aux. Relaves 0.2 Mineral Se ha elegido el método a cielo abierto
costos, siendo más económica su explo
Total Costos Planta 7 Mineral condiciones geométricas para su explot
GASTOS INDIRECTOS cercano a la superficie)
OPERATIVOS (GIOs)
Costo de Administración Mina (*) 2.4 Mineral
Costos de Administración Lima 1.1 Mineral
COSTOS DE COMERCIALIZACIÓN
Transp. Mina - Punto Venta (Callao) 2.6 Mineral
Gastos Comercialización CC 0.4 Mineral
COSTOS FINANCIEROS
DEPRECIACIÓN
Depreciación activos 0.5 Mineral
OPERATIVOS
Recuperación Metalurgica Planta 71% Porcentaje
CIELO ABIERTO
COSTOS DIRECTOS MINERAL US$/ton Material
Costo de Perforación 0.9 Mineral
Costo de Voladura 0.6 Mineral
Costo de Carguío 0.5 Mineral
Costo de Transporte 1 Mineral
Costo de Servicio 0.4 Mineral
Total costos directos mina 3.4 Mineral
Depreciación de los Equipos 0.6 Mineral
Total Costos Mina 4.0 Mineral
COSTOS DIRECTOS DESMONTE US$/ton Material
Costo de Perforación 0.8 Desmonte
Costo de Voladura 0.3 Desmonte
Costo de Carguío 0.3 Desmonte
Costo de Transporte 0.4 Desmonte
Costo de Servicio 0.2 Desmonte
Total Costos Desmonte 2.00 Desmonte
COSTOS DIRECTOS PLANTA
Costo de Tratamiento de Mineral 6.8 Mineral
Costo Servicios Aux. Relaves 0.2 Mineral
Total Costos Planta 7.00 Mineral
GASTOS INDIRECTOS OPERATIVOS (GIOs)
(US$/t)
Costo de Administración Mina (*) 2.4 Mineral
Costos de Aministración Lima 1.1 Mineral
COSTOS DE COMERCIALIZACIÓN
Transp. Mina - Punto Venta (Callao) 2.6 Mineral
Gastos Comercialización CC 0.4 Mineral
COSTOS FINANCIEROS
Intereses, comisiones, pagares, etc. 0.8 Mineral
DEPRECIACIÓN
Depreciación activos 0.5 Mineral
Figura 04 LEYES DILUIDAS GEOLOGIA (%Pb)
A B
0 0 0 0
0 0 0 0 0 0 0 0 0 0
Parámetros de Ingreso
0 0
Precio 1500
1.9 2.1 0 0 0
Recuperación M. 0.71
5.0 1.0 0 0 0
Leyes de Corte
0 0 0 0 0
%Pb
Figura 05 VALOR DE MINERAL UNITARIO (US$/t) VALOR MINERAL:
VALOR DE MINERAL
Recuperación 71%
17.20 19.01
46.17 10.86
44.36 11.77
23.54
N° TAJO N° TAJO
A B
564.9 0 2,064
SUMA
9,479 13,861
TOTAL 23,340 US$
Figura 06 COSTOS UNITARIOS (US$/t)
2.00 2.00 2.00 2.00 18.00 18.00 18.00 2.00 2.00 18.00
2.00 2.00 2.00 18.00 18.00 18.00 18.00 2.00 18.00 18.00
2.00 2.00 2.00 18.00 18.00 18.00 18.00 2.00 18.00 18.00
2.00 2.00 2.00 18.00 18.00 18.00 2.00 2.00 18.00 18.00
2.00 2.00 2.00 2.00 2.00 2.00 2.00 18.00 18.00 18.00
2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
30.7 34.6 30.7 38.4 432.0 302.4 345.6 38.4 38.4 432.0
38.4 38.4 38.4 432.0 432.0 432.0 432.0 38.4 432.0 432.0
38.4 38.4 38.4 432.0 432.0 432.0 432.0 38.4 432.0 432.0
38.4 38.4 38.4 432.0 432.0 432.0 38.4 38.4 432.0 432.0
38.4 38.4 38.4 38.4 38.4 38.4 38.4 432.0 432.0 432.0
38.4 38.4 38.4 38.4 38.4 38.4 38.4 38.4 38.4 38.4
COSTOS
MINADO MINERAL
2.00 2.00 4.0 US$/t
MINADO DESMONTE
18.00 18.00 2.00 2.00 2.00 2.0 US$/t
TRATAMIENTO
18.00 18.00 2.00 2.00 2.00 7.0 US$/t
UTILIDAD
18.00 18.00 2.00 2.00 2.00 2.0 US$/t
N° TAJO N° TAJO
A B
19.2 11.5
SUMA
38.4 38.4 38.4 38.4 38.4 5,947 8,208
TOTAL 14,155 US$
Mineral
Desmonte
Mineral
Mineral
Mineral
Mineral
Figura 06 VALOR ECONOMICO DEL BLOCK UNITARIO (US$/t) INGRESOS - COSTOS
-2.00 -2.00 -2.00 -2.00 10.97 20.93 12.78 -2.00 -2.00 26.36
-2.00 -2.00 -2.00 3.73 16.40 29.98 19.12 -2.00 10.97 35.41
-2.00 -2.00 -2.00 -3.52 9.16 20.02 2.82 -2.00 20.02 26.36
-2.00 -2.00 -2.00 5.54 17.30 -4.42 -2.00 -2.00 13.68 29.07
-2.00 -2.00 -2.00 -2.00 -2.00 -2.00 -2.00 0.10 18.21 -9.85
-2.00 -2.00 -2.00 -2.00 -2.00 -2.00 -2.00 -2.00 -2.00 -2.00
-2.00 -2.00 -2.00 -2.00 10.97 20.93 12.78 -2.00 -2.00 26.36
-2.00 -2.00 -2.00 3.73 16.40 29.98 19.12 -2.00 10.97 35.41
-2.00 -2.00 -2.00 -2.00 9.16 20.02 2.82 -2.00 20.02 26.36
-2.00 -2.00 -2.00 5.54 17.30 -2.00 -2.00 -2.00 13.68 29.07
-2.00 -2.00 -2.00 -2.00 -2.00 -2.00 -2.00 0.10 18.21 -2.00
-2.00 -2.00 -2.00 -2.00 -2.00 -2.00 -2.00 -2.00 -2.00 -2.00
Nv 1 -30.7 -34.6 -30.7 -38.4 263.2 351.6 245.3 -38.4 -38.4 632.6
Nv 2 -38.4 -38.4 -38.4 89.4 393.6 719.5 458.8 -38.4 263.2 849.8
Nv 3 -38.4 -38.4 -38.4 -48.0 219.8 480.5 67.7 -38.4 480.5 632.6
Nv 4 -38.4 -38.4 -38.4 132.9 415.3 -48.0 -38.4 -38.4 328.4 697.8
-38.4 -38.4 -38.4 -38.4 -38.4 -38.4 -38.4 2.5 437.0 -48.0
-38.4 -38.4 -38.4 -38.4 -38.4 -38.4 -38.4 -38.4 -38.4 -38.4
INGRESOS - COSTOS US$/t
-2.00 -2.00
-19.2 -11.5
1 AIRE AIRE AIRE DESMONTE DESMONTE AIRE AIRE AIRE DESMONTE DESMONTE
2 DESMONTE DESMONTE DESMONTE DESMONTE MINERAL MINERAL MINERAL DESMONTE DESMONTE MINERAL
3 DESMONTE DESMONTE DESMONTE MINERAL MINERAL MINERAL MINERAL DESMONTE MINERAL MINERAL
4 DESMONTE DESMONTE DESMONTE DESMONTE MINERAL MINERAL MINERAL DESMONTE MINERAL MINERAL
5 DESMONTE DESMONTE DESMONTE MINERAL MINERAL DESMONTE DESMONTE DESMONTE MINERAL MINERAL
6 DESMONTE DESMONTE DESMONTE DESMONTE DESMONTE DESMONTE DESMONTE MINERAL MINERAL DESMONTE
7 DESMONTE DESMONTE DESMONTE DESMONTE DESMONTE DESMONTE DESMONTE DESMONTE DESMONTE DESMONTE
1 2 3 4 5 6 7 8 9 10
1 0.00 0.00 0.00 -19.20 -23.04 0.00 0.00 0.00 -15.36 -26.88
2 -30.72 -34.56 -30.72 -38.40 263.23 351.55 245.35 -38.40 -38.40 632.57
3 -38.40 -38.40 -38.40 89.42 393.59 719.48 458.77 -38.40 263.23 849.83
4 -38.40 -38.40 -38.40 -48.00 219.78 480.49 67.70 -38.40 480.49 632.57
5 -38.40 -38.40 -38.40 132.88 415.31 -48.00 -38.40 -38.40 328.41 697.75
6 -38.40 -38.40 -38.40 -38.40 -38.40 -38.40 -38.40 2.52 437.04 -48.00
7 -38.40 -38.40 -38.40 -38.40 -38.40 -38.40 -38.40 -38.40 -38.40 -38.40
1 2 3 4 5 6 7 8 9 10
1 0.00 0.00 0.00 -19.20 -23.04 0.00 0.00 0.00 -15.36 -26.88
2 -30.72 -34.56 -30.72 -57.60 240.19 351.55 245.35 -38.40 -53.76 605.69
3 -69.12 -72.96 -69.12 31.82 633.78 1071.03 704.11 -76.80 209.47 1455.53
4 -107.52 -111.36 -107.52 -16.18 853.56 1551.52 771.81 -115.20 689.96 2088.10
5 -145.92 -149.76 -145.92 116.70 1268.87 1503.52 733.41 -153.60 1018.37 2785.85
6 -184.32 -188.16 -184.32 78.30 1230.47 1465.12 695.01 -151.08 1455.41 2737.85
7 -222.72 -226.56 -222.72 39.90 1192.07 1426.72 656.61 -189.48 1417.01 2699.45
1 2 3 4 5 6 7 8 9 10
0 0 0 0 0 0 0 0 0 0 0
1 0 0.00 0.00 0.00 -19.20 -42.24 240.19 351.55 245.35 -15.36 -42.24
2 0 -30.72 -34.56 -30.72 -57.60 272.02 985.33 1316.38 665.71 -53.76 815.17
3 0 -69.12 -103.68 -103.68 1.10 665.60 1924.59 2255.64 695.01 171.07 2145.49
4 0 -107.52 -180.48 -180.48 -85.30 970.26 2820.40 2323.33 656.61 613.16 3106.48
5 0 -145.92 -257.28 -257.28 9.18 1385.57 2772.40 2284.93 618.21 903.17 4241.27
6 0 -184.32 -334.08 -334.08 -67.62 1347.17 2734.00 2198.53 582.33 1304.33 4193.27
7 0 -222.72 -410.88 -410.88 -144.42 1270.37 2657.20 2121.73 505.53 1265.93 4154.87
1 2 3 4 5 6 7 8 9 10
1 0 0 0 0 0 0 0 0 0 0
2 1 0 0 0 0 0 0 0 0 1
3 0 3 0 0 0 0 0 1 2 0
4 0 0 3 0 0 1 2 0 0 0
5 0 0 0 3 2 0 0 0 0 0
6 0 0 0 0 0 0 0 0 0 0
7 0 0 0 0 0 0 0 0 0 0
Optimización del pit mediante algoritmo de Lerchs and Grossman
11 12 13 14 15 1 2
11 12 13 14 15 1 2
11 12 13 14 15 1 2
11 12 13 14 15 1 2
0 0 0 0 0
586.49 -30.72 12.73 0.00 0.00 1 + +
1417.12 628.62 -25.67 -38.40 -38.40 2 0 0
2704.00 1256.65 -64.07 -115.20 -115.20 Leyes (%) 3 - 0
4077.77 1841.22 -150.47 -192.00 -192.00 Consideradas para 4 - -
4710.35 1926.10 -236.87 -268.80 -268.80 la Explotación 5 - -
4843.22 1887.70 -323.27 -345.60 -345.60 6 - -
4756.82 1849.30 -400.07 -422.40 -422.40 7 - -
11 12 13 14 15 1 2
1 0 0 0 0 1 + +
0 0 0 0 0 2 0 0
0 0 0 0 0 3 - 0
Contenido Metálico
0 0 0 0 0 4 - -
de Plomo (tPb)
0 0 0 0 0 5 - -
0 0 0 0 0 6 - -
0 0 0 0 0 7 - -
nd Grossman
3 4 5 6 7 8 9 10 11 12 13
0 1 1 0 0 0 1 1 1 -1 0
1 1 1 1 1 1 1 1 -1 -1 -1
1 1 1 1 1 1 1 -1 -1 -1 -1
1 1 1 1 1 -1 -1 -1 -1 -1 -1
-1 1 1 -1 -1 -1 -1 -1 -1 -1 -1
-1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1
-1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1
3 4 5 6 7 8 9 10 11 12 13
3 4 5 6 7 8 9 10 11 12 13
3 4 5 6 7 8 9 10 11 12 13
+ 0 0 + + + 0 0 0 - +
0 0 3.2 4.3 3.4 0 0 4.9 - - -
0 2.4 3.8 5.3 4.1 0 3.2 - - - -
0 0 3 4.2 2.3 - - - - - -
- 2.6 3.9 - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
3 4 5 6 7 8 9 10 11 12 13
+ 0 0 + + + 0 0 0 - +
0 0 76,800 72,240 65,280 0 0 117,600 - - -
0 57,600 91,200 127,200 98,400 0 76,800 - - - -
0 0 72,000 100,800 55,200 - - - - - -
- 62,400 93,600 - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
14 15
0 0
-1 -1
-1 -1
-1 -1
-1 -1
-1 -1
-1 -1
14 15
+ +
- -
- -
- -
- -
- -
- -
14 15
+ +
- -
- -
- -
- -
- -
- -
14 15
+ +
- -
- -
- -
- -
- -
- -
14 15
+ +
- -
- -
- -
- -
- -
- -
PLAN DE MINADO
-15,360 -17,280 -15,360 -19,200 24,000 16,800 19,200 -19,200 -19,200 24,000 -
- - - 24,000 24,000 - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
AÑO 1
O
A B
+ + + -9,600 -11,520 + + + -7,680 -13,440 -9,600
-15,360 -17,280 -15,360 -19,200 24,000 16,800 19,200 -19,200 -19,200 24,000 -
NIVEL 1
- -19,200 -19,200 24,000 24,000 24,000 24,000 -19,200 24,000 - -
NIVEL 2
- - -19,200 -24,000 24,000 24,000 24,000 - - - -
NIVEL 3
- - - 24,000 24,000 - - - - - -
NIVEL 4
- - - - - - - - - - -
- - - - - - - - - - -
AÑO 2
O
A B
+ + + 0 0 + + + 0 -13,440 -9,600
- - - - - - - - - - -
AÑO 3
O
A B
+ + + 0 0 + + + 0 0 -9,600
- - - - - - - - - - -
AÑO 4
O
A B
+ + + 0 0 + + + 0 0 0
- - - - - - - - - - -
AÑO 5
O
A B
+ + + 0 0 + + + 0 0 0
0 0 0 0 24,000 0 0 0 0 24,000 -
NIVEL 1
- -19,200 -19,200 24,000 24,000 24,000 24,000 -19,200 24,000 - -
NIVEL 2
- - -19,200 -24,000 24,000 24,000 24,000 - - - -
NIVEL 3
- - - 24,000 24,000 - - - - - -
NIVEL 4
- - - - - - - - - - -
- - - - - - - - - - -
AÑO 6
O
A B
+ + + 0 0 + + + 0 0 0
0 0 0 0 24,000 0 0 0 0 0 -
NIVEL 1
- -19,200 -19,200 24,000 24,000 24,000 24,000 0 24,000 - -
NIVEL 2
- - -19,200 -24,000 24,000 24,000 24,000 - - - -
NIVEL 3
- - - 24,000 24,000 - - - - - -
NIVEL 4
- - - - - - - - - - -
- - - - - - - - - - -
AÑO 7
O
A B
+ + + 0 0 + + + 0 0 0
0 0 0 0 24,000 0 0 0 0 0 -
NIVEL 1
- 0 -19,200 24,000 24,000 24,000 0 0 24,000 - -
NIVEL 2
- - -19,200 -24,000 24,000 24,000 24,000 - - - -
NIVEL 3
- - - 24,000 24,000 - - - - - -
NIVEL 4
- - - - - - - - - - -
- - - - - - - - - - -
4%
582,240 t
13.00 t
O
A
- + + + + + + 0 0 + + +
- - - - - - - 2.6 3.9 - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
AÑO 8
E
A
- + + + + + + 0 0 + + +
- - - - 0 0 0 0 0 0 0 0
- - - - - - - 24,000 24,000 - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
AÑO 9
E
A
- + + + + + + 0 0 + + +
- - - - 0 0 0 0 0 0 0 0
- - - - - 0 0 0 24,000 0 0 0
- - - - - - - 24,000 24,000 - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
AÑO 10
E
A
- + + + + + + 0 0 + + +
- - - - 0 0 0 0 0 0 0 0
- - - - - 0 0 0 0 0 0 0
- - - - - - - 24,000 24,000 - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
AÑO 11
E
A
- + + + + + + 0 0 + + +
- - - - 0 0 0 0 0 0 0 0
- - - - - 0 0 0 0 0 0 0
- - - - - - - 24,000 24,000 - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
AÑO 12
E
A
- + + + + + + 0 0 + + +
- - - - 0 0 0 0 0 0 0 0
- - - - - 0 0 0 0 0 0 0
- - - - - - 0 0 24,000 0 0 -
- - - - - - - 24,000 24,000 - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
AÑO 13
E
A
- + + + + + + 0 0 + + +
- - - - 0 0 0 0 0 0 0 0
- - - - - 0 0 0 0 0 0 0
- - - - - - 0 0 0 0 0 -
- - - - - - - 24,000 0 - - -
- - - - - - - - - - - -
- - - - - - - - - - - -
- + +
E
+
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
E
B
0 0 0 - + + +
0.0 4.9 - - - - -
3.2 - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
AÑO 8
E
B
0 0 0 - + + +
0 0 - - - - -
24,000 - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
AÑO 9
E
B
0 0 0 - + + +
0 0 - - - - -
24,000 - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
AÑO 10
E
B
0 0 0 - + + +
0 0 - - - - -
24,000 - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
AÑO 11
E
B
0 0 0 - + + +
0 0 - - - - -
0 - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
AÑO 12
E
B
0 0 0 - + + +
0 0 - - - - -
0 - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
AÑO 13
E
B
0 0 0 - + + +
0 0 - - - - -
0 - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
PLAN DE MINADO - CIELO ABIERTO
Plan de Minado 1 2 3
Mineral Block 1 (TM/año) 19,200
Mineral Block 2 (TM/año)
Total Mineral (TM/año) 0 0 19,200
Desmonte Block 1 (TM/año) 7,680 13,440 9,600
Desmonte Block 2 (TM/año) 11,520 19,200 19,200
Desmonte Block 2 (TM/año) 9,600 15,360
Desmonte Block 2 (TM/año) 17,280
Total Desmonte (TM/año) 46,080 48,000 28,800
Relación Desmonte/Mineral (D/M) 0.00 0.00 1.50
Ley Zona Block 1 (%Pb) 3.40%
Ley Zona Block 2 (%Pb)
Ley Media Anual (%Pb) 0.00% 0.00% 3.40%
4 5 6 7 8 9 10 11
16,800 24,000 24,000 24,000 24,000 24,000 24,000 24,000
24,000 24,000
16,800 24,000 24,000 24,000 48,000 24,000 24,000 48,000
15,360 19,200 19,200 19,200 24,000 19,200
19,200