HABILITADO CUBIKA
G- 42 Hoja de Trabajo: No. OBRA: OBRA:
No. PAQ NIVEL ELEMENTO#ELEMENTO LARGO ANCHO ALTO ALTO COLUMNA 3 V# G1 R G2 Ø @ A1 A2 V B x H + T C1 # C2 ## DES PZAS TOT.
PZAS 09 ALBERCA KG
KG PAQ
KG
VAR TOTAL
01 2 CIM LOSA TRANSV 2540 505 128 L. S Y L. I 3 8 490 8 20 506 131 262 8 490 8 2.83 371.20 742.40
02 2 CIM LOSA LONG 2540 505 2534 27 L. S Y L. I 3 8 1192 20 1200 27 54 8 1,192 6.72 181.44 362.88
03 2 CIM LOSA LONG 2540 505 27 L. S Y L. I 3 1200 20 1200 27 54 1,200 6.72 181.44 362.88
04 2 CIM LOSA LONG 2540 505 27 L. S Y L. I 3 8 242 20 250 27 54 8 242 1.40 37.80 75.60
MURO 60
05 2 CIM LOSA
CORTO
2540 505 183 27 VERTICAL 1 4 60 170 8 ANGU 20 0 90 ° 238 27 54
170
8 2.37 63.87 127.75
MURO
06 2 CIM LOSA
CORTO
2540 505 183 27 VERTICAL 2 4 60 170 8 20 238 27 54 60 170 8 2.37 63.87 127.75
MURO
07 2 CIM LOSA
CORTO
2540 505 183 9 TEMP 1 3 60 490 60 20 610 9 18 60 490 60 3.42 30.74 61.49
MURO
08 2 CIM LOSA
CORTO
2540 505 183 9 TEMP 2 3 60 490 60 20 610 9 18 60 490 60 3.42 30.74 61.49
MURO 60
09 2 CIM LOSA
LARGO
2540 505 183 127 VERTICAL 1 4 60 170 8 ANGU 20 0 90 ° 238 127 254
170
8 2.37 300.45 600.89
MURO
10 2 CIM LOSA
LARGO
2540 505 183 127 VERTICAL 2 4 60 170 8 20 238 127 254 60 170 8 2.37 300.45 600.89
MURO
11 2 CIM LOSA
LARGO
2540 505 183 9 TEMP. 1 3 8 1192 20 1200 9 18 8 1,192 6.72 60.48 120.96
MURO
12 2 CIM LOSA
LARGO
2540 505 183 9 TEMP. 1 3 1200 20 1200 9 18 1,200 6.72 60.48 120.96
MURO
13 2 CIM LOSA
LARGO
2540 505 183 9 TEMP. 1 3 8 242 20 250 9 18 8 242 1.40 12.60 25.20
MURO
14 2 CIM LOSA
LARGO
2540 505 183 9 TEMP. 2 3 8 1192 20 1200 9 18 8 1,192 6.72 60.48 120.96
MURO
15 2 CIM LOSA
LARGO
2540 505 183 9 TEMP. 2 3 1200 20 1200 9 18 1,200 6.72 60.48 120.96
MURO
16 2 CIM LOSA
LARGO
2540 505 183 9 TEMP. 2 3 8 242 20 250 9 18 8 242 1.40 12.60 25.20
17 4 CIM LOSA REFUERZOS 2590 505 183 9 CHAFLAN 4 50 50 50 ANGU 20 45 45 ° 150 9 36 50 45 50 45 50 1.49 13.42 53.68
10
18 1 CIM LOSA SILLETAS TIPO 3 SILLETA 5 x 10 + 10.0 40 400 400 5.0 0.22 89.60 89.60
10.0
19 0 CIM LOSA REFUERZOS 2590 505 183 9 REF. ESQUINA 4 50 50 20 100 9 0 50 50 0.99 8.95 0.00
1 8 8 0 0 0 0 0 0 42 Roll 2 0
2 8 10 0 0 0 0 0 0 42 Roll 2.5 0
3 8 12 0 0 0 0 0 0 42 Roll 3 90
4 10 8 0 0 0 0 0 0 42 Roll 4 0
UNA VEZ RECIBIDO EL MATERIAL SE CONSIDERA COMO REVISADO Y ACEPTADO LAS CANTIDADES ENTREGADAS.
5 10 10 0 0 0 0 0 0 42 3 2201
RECIBIO TRANSPORTE: 6 10 12 0 0 0 0 0 0 42 4 1511
FERRALLA 7 12 8 0 0 0 0 0 0 42 5 0
ENTREGO FERRALLA NOMBRE 8 12 10 0 0 0 0 0 0 42 6 0
9 12 12 0 0 0 0 0 0 42 8 0
10 TOTAL 0 0 0 0 0 42 10 0
11 42 12 0
12
PONCHADO GTM GTF BG FR SL Σ
ENTREGA EN OBRA: REMISIÓN: EN PLANTA 0
EN OBRA 0
FIRMA FIRMA RECIBIDO TOTAL 0 0 0 0 0 TOTAL (Kgs) G- 42 3,802
ENTREGA: SERVICIO: CLIENTE:
HABILITADO CUBIKA
G- 42 Hoja de Trabajo: No. OBRA: OBRA:
10
03 10 1180 10 ANGULOS 0 90 ° 1200 0 10 #N/A #N/A #N/A
1180
135°
07 3 ESTRIBO 100 X 100 + 20 420 0 100 100 2.35 0.00 0.00
90° 80
08 4 ESTRIBO INT= 40 80 X 20 + 20 340 0 40 20 3.38 0.00 0.00
60
135° 80
09 4 ESTRIBO INT= 40 80 X 20 + 22 342 0 40 20 3.40 0.00 0.00
60
90° 80
10 3 ESTRIBO INT= 43 80 X 22 + 18 394 0 42.985 22 2.21 0.00 0.00
135° 80
11 3 ESTRIBO INT= 43 80 X 22 + 20 396 0 42.985 22 2.22 0.00 0.00
15 3 DES 1210 FIGURA ESPECIAL 1210 0 VARILLA RECTA FIGURA = 1 6.78 0.00 0.00
16 3 DES 132 ESTRIBO ESPECIAL 132 0 ESTRIBO FIGURA = 1 0.74 0.00 0.00
8 9 10 12
8/8" 9/8" 10/8" 12/8"
1" 9/8" 1 1/4" 1 1/2"
8 9 10 12
70 80 90 105
105 115 130 155
8 9 10 12
120 135 150 180
155 175 195 230
8 9 10 12
37.0
25.0
23.0
8 9 10 12
4 5 6 6
8 9 10 12
3.973 5.037 6.225 8.938
5.10 6.45 8.19 11.40
2.54 2.87 3.18 3.81
36.35 46.30 58.60 81.78
47.68 60.72 76.85 107.26
8 9 10 12 No. Varilla
2.54 2.87 3.18 3.81 Diametro (cm)
25.4 28.65 31.8 38.1 Diametro (mm)
25 29 32 32 No. Barra
15.24 22.92 25.44 30.48 Diam. Interno
30.48 34.38 38.16 45.72 Circunferencia Diam. Interno
42.4495 52.3813 58.1405 69.6589 L ext
40 52 60 70 90° Longitud Gancho Planta 90°
20 25 25 Long. Estándar Gancho Planta
L ext
135° Longitud Gancho Planta 135°
Long. Estándar Gancho Planta
L ext
180° Longitud Gancho Planta 180°
Long. Estándar Gancho Planta
1 2 3 4 5
TRANSICION GTM GTF BG FR SL
1 32 8 8 188 288 388 488 588
3 36 8 10 1810 2810 3810 4810 5810
5 40 8 12 1812 2812 3812 4812 5812
9 45 10 8 1108 2108 3108 4108 5108
11 50 10 10 11010 21010 31010 41010 51010
14 55 10 12 11012 21021 21021 21021 21021
21 12 8 1128 2128 3128 4128 5128
32 12 10 11210 21210 31210 41210 51210
45 12 12 11212 21212 31212 41212 51212
03.- Longitud de Desarrollo
2 2.5 3 4 5 6 7 8
0.64 0.80 0.95 1.27 1.59 1.91 2.22 2.54
6.35 8 9.52 12.7 15.88 19.05 22.22 25.4
6 8 10 13 16 19 22 25
2.54 3.20 3.81 5.08 6.35 11.43 13.33 15.24
7.98 10.05 11.96 15.96 19.96 35.91 41.88 47.88
7.50 7.50 7.50 7.62 9.53 22.86 26.66 30.48
8.50 8.76 9.00 9.61 12.02 27.35 31.90 36.46
9.0 9.0 9.0 11.0 14.0 28.0 32.0 37.0
7.50 7.50 7.50 7.62 9.53 11.43 13.33 15.24
9.00 9.38 9.74 10.61 13.27 18.16 21.19 24.22
9.0 10.0 10.0 11.0 16.0 19.0 22.0 25.0
6.50 6.50 6.50 6.50 6.50 7.62 8.89 10.16
8.49 9.01 9.49 10.49 11.49 16.60 19.36 22.13
9.0 9.0 10.0 12.0 14.0 17.0 20.0 23.0
tud de Desarrollo
F'C 25
FY 420
No. Varilla 2
Diametro (cm) 0.64
Diametro (mm) 6.35
No. Barra 6
Ld (Factores = 1) 25.4
06.- Longitud de Anclaje para el Gancho Estándar
Factores 1 F'C 25
Var 5 FY 420
Diam 1.588
a) 7.308 cm Ldh 15
b) 12.704 cm
c) 15 cm
MPA
MPA
2.5 3 4 5 6 7 8 9 10
0.80 0.95 1.27 1.59 1.91 2.22 2.54 2.87 3.18
8 9.52 12.7 15.88 19.05 22.22 25.4 28.65 31.8
8 10 13 16 19 22 25 29 32
32 38.08 50.8 63.52 76.2 109.7929 125.5059 141.5647 157.1294
07.- Traslape en Estribo Espiral
MPA
MPA
cm
ENTREGA: SERVICIO: CLIENTE:
01 HABILITADO CUBIKA
G- 52 Hoja de Trabajo: No. OBRA: OBRA:
% DESPERDICIO STATUS:
NOTA: XXX Total (Kgs): 0
0.0% PRODUCIR
ENTREGA: SERVICIO: CLIENTE:
01 HABILITADO CUBIKA
G- 52 Hoja de Trabajo: No. OBRA: OBRA:
REVISION PESO
DESPIEZO: ING/ARQ. NOMBRE PLANO(S) DONDE SE DESPIEZO
DE PLANO
TRANSICIÓN GTM GTF BG FR SL Σ GRADO V# (Kgs)
V8.2019 1 8 8 0 42 Roll 2 0
2 8 10 0 42 Roll 2.5 0
3 8 12 0 42 Roll 3 0
UNA VEZ RECIBIDO EL MATERIAL SE CONSIDERA COMO REVISADO Y 4 10 8 0 52 Roll 4 0
ACEPTADO LAS CANTIDADES ENTREGADAS. 5 10 10 0 52 3 0
RECIBIO TRANSPORTE: 6 10 12 0 52 4 0
FERRALLA 7 12 8 0 52 5 0
ENTREGO FERRALLA NOMBRE 8 12 10 0 52 6 0
9 12 12 0 52 8 0
10 TOTAL 0 0 0 0 0 52 10 0
11 52 12 0
12
PONCHADO GTM GTF BG FR SL Σ
ENTREGA EN OBRA: REMISION: EN PLANTA 0
EN OBRA 0
FIRMA FIRMA RECIBIDO
00/00/2019 12354
TOTAL 0 0 0 0 0 TOTAL (Kgs) G- 52 0