CURVA S
Curva S de Avance de Obra
100% 97.01%
100.00%
90%
81.15%
80%
70%
60%
% Avance
50% 57.38%
40%
38.65%
30%
20% 21.05%
10% 1.45%
6.48%
0%
MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07 MES 08
INICIO DE OBRA
MES 01 PROGRAMADO 155,825.41 1.45% 1.45%
EJECUTADO 0.00 0.00% 0.00%
VALORIZACION N°01 July, 2013 NORMAL
MES 02 PROGRAMADO 697,968.93 5.03% 6.48%
EJECUTADO 14,187.25 0.00% 0.00%
VALORIZACION N°02 July, 2012
MES 03 PROGRAMADO 2,268,421.82 14.57% 21.05% NORMAL
EJECUTADO 72,840.27 0.00% 0.00%
VALORIZACION N°07 August, 2012
MES 04 PROGRAMADO 4,165,977.00 17.60% 38.65% ATRASADO
EJECUTADO 142,711.86 0.00% 0.00%
VALORIZACION N°04 July, 2013 NORMAL
MES 05 PROGRAMADO 6,185,539.11 18.73% 57.38%
EJECUTADO 14,187.25 0.00% 0.00%
CRONOGRAMA VALORIZADO DE AVANCE DE OBRA
P "MEJORAMIENTO Y AMPLIACIÓN DEL SERVICIO DE SANEAMIENTO BASICO EN LA LOCALIDAD DE ANTAUTA, DISTRITO DE ANTAUTA - MELGAR - PUNO"
EMUNICIPALIDAD DISTRITAL DE ANTAUTA DURACION 240 DIAS CALENDARIOS
ITEM DESCRIPCION DURACION PARCIAL (S/.) MES 1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8
COSTO DIRECTO 7,945,402.87 114,830.81 399,516.22 1,157,297.64 1,398,345.75 1,488,255.06 1,888,983.08 1,260,170.24 238,004.07
GASTOS GENERALES (8%) 8.00% 635,632.23 9,186.46 31,961.30 92,583.81 111,867.66 119,060.40 151,118.65 100,813.62 19,040.33
UTILIDAD (7%) 7.00% 556,178.20 8,038.16 27,966.14 81,010.83 97,884.20 104,177.85 132,228.82 88,211.92 16,660.28
SUB TOTAL 1 9,137,213.30 132,055.43 459,443.66 1,330,892.28 1,608,097.61 1,711,493.31 2,172,330.55 1,449,195.78 273,704.68
SUBTOTAL 1 9,137,213.30 132,055.43 459,443.66 1,330,892.28 1,608,097.61 1,711,493.31 2,172,330.55 1,449,195.78 273,704.68
IGV (18%) 18.00% 1,644,698.39 23,769.98 82,699.86 239,560.61 289,457.57 308,068.80 391,019.50 260,855.24 49,266.83
VALORIZACION MENSUAL DE OBRA 10,781,911.69 155,825.41 542,143.52 1,570,452.89 1,897,555.18 2,019,562.11 2,563,350.05 1,710,051.02 322,971.51
PORCENTAJE DE AVANCE MENSUAL ( % ) 1.45% 5.03% 14.57% 17.60% 18.73% 23.77% 15.86% 2.99%
PORCENTAJE DE AVANCE ACUMULADO ( % ) 1.45% 6.48% 21.05% 38.65% 57.38% 81.15% 97.01% 100.00%
AVANCE PROGRAMADO
AVANCE PROGRAMADO
NUMERO ACUMULADO
DE MES
En Nuevos soles % porcentual En Nuevos soles % porcentual
MES 01 S/. 155,825.41 1.45% S/. 155,825.41 1.45%
MES 02 S/. 542,143.52 5.03% S/. 697,968.93 6.48%
MES 03 S/. 1,570,452.89 14.57% S/. 2,268,421.82 21.05%
MES 04 S/. 1,897,555.18 17.60% S/. 4,165,977.00 38.65%
MES 05 S/. 2,019,562.11 18.73% S/. 6,185,539.11 57.38%
MES 06 S/. 2,563,350.05 23.77% S/. 8,748,889.16 81.15%
MES 07 S/. 1,710,051.02 15.86% ### 97.01%
MES 08 S/. 322,971.51 2.99% ### 100.00%
2 de 7
CRONOGRAMA DE ADQUISICIÓN DE MATERIALES
Proyecto: "MEJORAMIENTO Y AMPLIACIÓN DEL SERVICIO DE SANEAMIENTO BASICO EN LA LOCALIDAD DE ANTAUTA, DISTRITO DE ANTAUTA - MELGAR - PUNO"
Duracion: 270 Dias Calendarios
1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES
DESCRIPCION (MATERIALES) UND CANT. P.U PARCIAL TOTAL
% CANT. SUBTOTAL % CANT. SUBTOTAL % CANT. SUBTOTAL % CANT. SUBTOTAL % CANT. SUBTOTAL % CANT. SUBTOTAL % CANT. SUBTOTAL % CANT. SUBTOTAL
CEMENTO PORTLAND TIPO I (BLS: 42.5 KG) PUESTO EN OBRA bls 16,960.7474 21.40 362,959.99 1.45% 245.93 5262.90 5.03% 853.13 18256.98 14.57% 2471.18 52883.25 17.60% 2985.09 63880.93 18.73% 3176.75 67982.45 23.77% 4031.57 86275.60 15.86% 2689.97 57565.36 2.99% 507.13 10852.52 362959.99
CEMENTO PORTLAND TIPO V, HS O SIMILAR (BLS: 42.5 KG) (PUESTO EN bls 3,124.3304 24.46 76,421.12 1.45% 45.30 1108.04 5.03% 157.15 3843.89 14.57% 455.21 11134.44 17.60% 549.88 13450.06 18.73% 585.19 14313.75 23.77% 742.65 18165.22 15.86% 495.52 12120.42 2.99% 93.42 2285.30 76421.12
YESO DE 25 KG bls 11.1202 6.00 66.72 1.45% 0.16 0.96 5.03% 0.56 3.36 14.57% 1.62 9.72 17.60% 1.96 11.76 18.73% 2.08 12.48 23.77% 2.64 15.84 15.86% 1.76 10.56 2.99% 0.33 2.04 66.72
CAL HIDRAULICA bls 58.6304 2.90 170.03 1.45% 0.85 2.47 5.03% 2.95 8.56 14.57% 8.54 24.77 17.60% 10.32 29.93 18.73% 10.98 31.84 23.77% 13.94 40.43 15.86% 9.30 26.97 2.99% 1.75 5.06 170.03
CAL DE OBRA bls 0.1303 2.90 0.37 1.45% 0.00 0.00 5.03% 0.01 0.03 14.57% 0.02 0.06 17.60% 0.02 0.06 18.73% 0.02 0.06 23.77% 0.03 0.09 15.86% 0.02 0.06 2.99% 0.00 0.01 0.37
ARENA GRUESA PUESTO EN OBRA m3 5,628.0228 78.81 443,544.48 1.45% 81.61 6431.68 5.03% 283.09 22310.32 14.57% 820.00 64624.20 17.60% 990.53 78063.67 18.73% 1054.13 83075.99 23.77% 1337.78 105430.44 15.86% 892.60 70345.81 2.99% 168.28 13262.37 443544.48
ARENA FINA PUESTO EN OBRA m3 50.2134 80.51 4,042.68 1.45% 0.73 58.77 5.03% 2.53 203.69 14.57% 7.32 589.33 17.60% 8.84 711.71 18.73% 9.40 756.79 23.77% 11.94 961.29 15.86% 7.96 640.86 2.99% 1.50 120.24 4042.68
MATERIAL GRANULAR S.A1A-A1B AASHTO m3 430.6309 150.00 64,594.64 1.45% 6.24 936.00 5.03% 21.66 3249.00 14.57% 62.74 9411.00 17.60% 75.79 11368.50 18.73% 80.66 12099.00 23.77% 102.36 15354.00 15.86% 68.30 10245.00 2.99% 12.88 1932.14 64594.64
HORMIGON m3 284.4595 37.50 10,667.23 1.45% 4.12 154.50 5.03% 14.31 536.63 14.57% 41.45 1554.38 17.60% 50.06 1877.25 18.73% 53.28 1998.00 23.77% 67.62 2535.75 15.86% 45.12 1692.00 2.99% 8.51 318.72 10667.23
PIEDRA MEDIANA DE 6" PUESTO EN OBRA m3 8.4842 50.00 424.21 1.45% 0.12 6.00 5.03% 0.43 21.50 14.57% 1.24 62.00 17.60% 1.49 74.50 18.73% 1.59 79.50 23.77% 2.02 101.00 15.86% 1.35 67.50 2.99% 0.25 12.21 424.21
PIEDRA GRANDE DE 8" PUESTO EN OBRA m3 46.5027 50.00 2,325.14 1.45% 0.67 33.50 5.03% 2.34 117.00 14.57% 6.78 339.00 17.60% 8.18 409.00 18.73% 8.71 435.50 23.77% 11.05 552.50 15.86% 7.38 369.00 2.99% 1.39 69.64 2325.14
PIEDRA CHANCADA DE 1/2" A 3/4" PUESTO EN OBRA m3 1,081.6695 101.69 109,994.97 1.45% 15.68 1594.50 5.03% 54.41 5532.95 14.57% 157.60 16026.34 17.60% 190.37 19358.73 18.73% 202.60 20602.39 23.77% 257.11 26145.52 15.86% 171.55 17444.92 2.99% 32.34 3289.62 109994.97
GRAVA PUESTO EN OBRA m3 461.7383 90.00 41,556.45 1.45% 6.70 603.00 5.03% 23.23 2090.70 14.57% 67.28 6055.20 17.60% 81.27 7314.30 18.73% 86.48 7783.20 23.77% 109.76 9878.40 15.86% 73.23 6590.70 2.99% 13.81 1240.95 41556.45
MATERIAL DE PRESTAMO TIPO HORMIGON PUESTO EN OBRA m3 4,260.4511 127.12 541,588.55 1.45% 61.78 7853.47 5.03% 214.30 27241.82 14.57% 620.75 78909.74 17.60% 749.84 95319.66 18.73% 797.98 101439.22 23.77% 1012.71 128735.70 15.86% 675.71 85896.26 2.99% 127.39 16192.68 541588.55
ARCILLA PUESTO EN OBRA m3 4,068.0960 50.00 203,404.80 1.45% 58.99 2949.50 5.03% 204.63 10231.50 14.57% 592.72 29636.00 17.60% 715.98 35799.00 18.73% 761.95 38097.50 23.77% 966.99 48349.50 15.86% 645.20 32260.00 2.99% 121.64 6081.80 203404.80
GRAVA PARA FILTRO 1" - 2" PUESTO EN OBRA m3 28.1295 100.00 2,812.95 1.45% 0.41 41.00 5.03% 1.41 141.00 14.57% 4.10 410.00 17.60% 4.95 495.00 18.73% 5.27 527.00 23.77% 6.69 669.00 15.86% 4.46 446.00 2.99% 0.84 83.95 2812.95
GRAVA PARA FILTRO 1/2" - 1" PUESTO EN OBRA m3 22.6695 100.00 2,266.95 1.45% 0.33 33.00 5.03% 1.14 114.00 14.57% 3.30 330.00 17.60% 3.99 399.00 18.73% 4.25 425.00 23.77% 5.39 539.00 15.86% 3.60 360.00 2.99% 0.68 66.95 2266.95
GRAVA PARA FILTRO 1/4" - 1/2" PUESTO EN OBRA m3 11.2560 120.00 1,350.72 1.45% 0.16 19.20 5.03% 0.57 68.40 14.57% 1.64 196.80 17.60% 1.98 237.60 18.73% 2.11 253.20 23.77% 2.68 321.60 15.86% 1.79 214.80 2.99% 0.34 39.12 1350.72
GRAVA PARA FILTRO LENTO 1/8" - 1/4" PUESTO EN OBRA m3 11.2560 250.00 2,814.00 1.45% 0.16 40.00 5.03% 0.57 142.50 14.57% 1.64 410.00 17.60% 1.98 495.00 18.73% 2.11 527.50 23.77% 2.68 670.00 15.86% 1.79 447.50 2.99% 0.34 81.50 2814.00
ARENA PARA FILTRO LENTO CU=2 PUESTO EN OBRA m3 230.4225 350.00 80,647.88 1.45% 3.34 1169.00 5.03% 11.59 4056.50 14.57% 33.57 11749.50 17.60% 40.55 14192.50 18.73% 43.16 15106.00 23.77% 54.77 19169.50 15.86% 36.55 12792.50 2.99% 6.89 2412.38 80647.88
ADITIVO ACELERANTE DE FRAGUA gln 132.7672 14.00 1,858.74 1.45% 1.93 27.02 5.03% 6.68 93.52 14.57% 19.34 270.76 17.60% 23.37 327.18 18.73% 24.87 348.18 23.77% 31.56 441.84 15.86% 21.06 294.84 2.99% 3.97 55.40 1858.74
ADITIVO INCORPORADOR DE AIRE gln 64.3914 14.00 901.48 1.45% 0.93 13.02 5.03% 3.24 45.36 14.57% 9.38 131.32 17.60% 11.33 158.62 18.73% 12.06 168.84 23.77% 15.31 214.34 15.86% 10.21 142.94 2.99% 1.93 27.04 901.48
ADITIVO PLASTIMENT HE-98 (BALDE 20 KG.) und 27.0463 47.50 1,284.70 1.45% 0.39 18.53 5.03% 1.36 64.60 14.57% 3.94 187.15 17.60% 4.76 226.10 18.73% 5.07 240.83 23.77% 6.43 305.43 15.86% 4.29 203.78 2.99% 0.81 38.28 1284.70
ADITIVO PLASTIFICANTE Y REDUCTOR DE AGUA gln 507.6304 14.00 7,106.82 1.45% 7.36 103.04 5.03% 25.53 357.42 14.57% 73.96 1035.44 17.60% 89.34 1250.76 18.73% 95.08 1331.12 23.77% 120.66 1689.24 15.86% 80.51 1127.14 2.99% 15.18 212.66 7106.82
ADITIVO CURADOR DE CONCRETO PARA CLIMAS FRIOS gln 165.9691 14.00 2,323.57 1.45% 2.41 33.74 5.03% 8.35 116.90 14.57% 24.18 338.52 17.60% 29.21 408.94 18.73% 31.09 435.26 23.77% 39.45 552.30 15.86% 26.32 368.48 2.99% 4.96 69.43 2323.57
CILINDRO DE CONCRETO 5 CM DIAM. x 10CM ALTO und 724.0000 0.50 362.00 1.45% 10.50 5.25 5.03% 36.42 18.21 14.57% 105.49 52.75 17.60% 127.42 63.71 18.73% 135.61 67.81 23.77% 172.09 86.05 15.86% 114.83 57.42 2.99% 21.65 10.80 362.00
ANGULO 1/8¨ X 1¨ X 1¨ X 20´ und 21.0900 8.00 168.72 1.45% 0.31 2.48 5.03% 1.06 8.48 14.57% 3.07 24.56 17.60% 3.71 29.68 18.73% 3.95 31.60 23.77% 5.01 40.08 15.86% 3.34 26.72 2.99% 0.63 5.12 168.72
ANGULO 1/4¨ X 2¨ X 2¨ X 20´ und 26.9162 48.77 1,312.70 1.45% 0.39 19.02 5.03% 1.35 65.84 14.57% 3.92 191.18 17.60% 4.74 231.17 18.73% 5.04 245.80 23.77% 6.40 312.13 15.86% 4.27 208.25 2.99% 0.80 39.31 1312.70
ANGULO 2" x2" x 1/4¨ und 0.4002 35.00 14.01 1.45% 0.01 0.35 5.03% 0.02 0.70 14.57% 0.06 2.10 17.60% 0.07 2.45 18.73% 0.07 2.45 23.77% 0.10 3.50 15.86% 0.06 2.10 2.99% 0.01 0.36 14.01
ANGULO 1/8¨ X 1¨ X 1¨ m 18.7060 5.00 93.53 1.45% 0.27 1.35 5.03% 0.94 4.70 14.57% 2.73 13.65 17.60% 3.29 16.45 18.73% 3.50 17.50 23.77% 4.45 22.25 15.86% 2.97 14.85 2.99% 0.56 2.78 93.53
ANGULO "L" DE 3¨ X 3" X 1/4" m 12.8000 5.20 66.56 1.45% 0.19 0.99 5.03% 0.64 3.33 14.57% 1.86 9.67 17.60% 2.25 11.70 18.73% 2.40 12.48 23.77% 3.04 15.81 15.86% 2.03 10.56 2.99% 0.38 2.02 66.56
ANGULO "L" DE 3/4¨ X 3/4" X 3/16" m 0.1600 4.00 0.64 1.45% 0.00 0.00 5.03% 0.01 0.04 14.57% 0.02 0.08 17.60% 0.03 0.12 18.73% 0.03 0.12 23.77% 0.04 0.16 15.86% 0.03 0.12 2.99% 0.00 0.00 0.64
PLATINA DE ACERO DE 1/8¨ X 1¨ X 20´ L=6MTS. und 2.2200 8.00 17.76 1.45% 0.03 0.24 5.03% 0.11 0.88 14.57% 0.32 2.56 17.60% 0.39 3.12 18.73% 0.42 3.36 23.77% 0.53 4.24 15.86% 0.35 2.80 2.99% 0.07 0.56 17.76
PLATINA DE ACERO DE 1/8¨ X 1 1/2¨ X 20´ L=6MTS. und 2.8840 56.00 161.50 1.45% 0.04 2.24 5.03% 0.15 8.40 14.57% 0.42 23.52 17.60% 0.51 28.56 18.73% 0.54 30.24 23.77% 0.69 38.64 15.86% 0.46 25.76 2.99% 0.09 4.14 161.50
PLATINA DE ACERO DE 1/4¨ X 1/2¨ X 20´ L=6MTS. und 3.3300 8.00 26.64 1.45% 0.05 0.40 5.03% 0.17 1.36 14.57% 0.49 3.92 17.60% 0.59 4.72 18.73% 0.62 4.96 23.77% 0.79 6.32 15.86% 0.53 4.24 2.99% 0.10 0.72 26.64
PLATINA DE ACERO DE 1 1/2¨ X 1 1/2"X 1/4" und 0.4998 49.00 24.49 1.45% 0.01 0.49 5.03% 0.03 1.47 14.57% 0.07 3.43 17.60% 0.09 4.41 18.73% 0.09 4.41 23.77% 0.12 5.88 15.86% 0.08 3.92 2.99% 0.01 0.48 24.49
PLATINA DE ACERO DE 1/4¨ X 2 1/2¨ X 20´ L=6MTS. und 0.2220 8.00 1.78 1.45% 0.00 0.00 5.03% 0.01 0.08 14.57% 0.03 0.24 17.60% 0.04 0.32 18.73% 0.04 0.32 23.77% 0.05 0.40 15.86% 0.04 0.32 2.99% 0.01 0.10 1.78
PLATINA DE ACERO DE 1/4¨ X 3¨ X 20´ L=6MTS. und 6.1050 8.00 48.84 1.45% 0.09 0.72 5.03% 0.31 2.48 14.57% 0.89 7.12 17.60% 1.07 8.56 18.73% 1.14 9.12 23.77% 1.45 11.60 15.86% 0.97 7.76 2.99% 0.18 1.48 48.84
PLATINA DE ACERO DE 1/4¨ X 4¨ X 20´ L=6MTS. und 5.5500 8.00 44.40 1.45% 0.08 0.64 5.03% 0.28 2.24 14.57% 0.81 6.48 17.60% 0.98 7.84 18.73% 1.04 8.32 23.77% 1.32 10.56 15.86% 0.88 7.04 2.99% 0.17 1.28 44.40
PLATINA DE ACERO DE 1/4¨ X 1¨ L=6MTS. und 5.4000 22.00 118.80 1.45% 0.08 1.76 5.03% 0.27 5.94 14.57% 0.79 17.38 17.60% 0.95 20.90 18.73% 1.01 22.22 23.77% 1.28 28.16 15.86% 0.86 18.92 2.99% 0.16 3.52 118.80
PLATINA DE FIERRO 1/8" X 1" m 26.3200 50.00 1,316.00 1.45% 0.38 19.00 5.03% 1.32 66.00 14.57% 3.83 191.50 17.60% 4.63 231.50 18.73% 4.93 246.50 23.77% 6.26 313.00 15.86% 4.17 208.50 2.99% 0.79 40.00 1316.00
PLATINA DE FIERRO 1 1/2" X 1/4" m 2.0000 4.25 8.50 1.45% 0.03 0.13 5.03% 0.10 0.43 14.57% 0.29 1.23 17.60% 0.35 1.49 18.73% 0.37 1.57 23.77% 0.48 2.04 15.86% 0.32 1.36 2.99% 0.06 0.25 8.50
PLATINA DE FIERRO 4" X 1/2" m 0.4540 10.00 4.54 1.45% 0.01 0.10 5.03% 0.02 0.20 14.57% 0.07 0.70 17.60% 0.08 0.80 18.73% 0.09 0.90 23.77% 0.11 1.10 15.86% 0.07 0.70 2.99% 0.01 0.04 4.54
TEE 1/8¨ X 1 1/2¨ X 1 1/2¨ X 20´ und 573.4420 5.00 2,867.21 1.45% 8.31 41.55 5.03% 28.84 144.20 14.57% 83.55 417.75 17.60% 100.93 504.65 18.73% 107.41 537.05 23.77% 136.31 681.55 15.86% 90.95 454.75 2.99% 17.15 85.71 2867.21
TEE 1/8¨ X 3/4¨ X 3/4¨ m 43.0520 57.00 2,453.96 1.45% 0.62 35.34 5.03% 2.17 123.69 14.57% 6.27 357.39 17.60% 7.58 432.06 18.73% 8.06 459.42 23.77% 10.23 583.11 15.86% 6.83 389.31 2.99% 1.29 73.64 2453.96
TEE 1/8¨ X 1¨ X 1¨ m 33.4639 72.00 2,409.40 1.45% 0.49 35.28 5.03% 1.68 120.96 14.57% 4.88 351.36 17.60% 5.89 424.08 18.73% 6.27 451.44 23.77% 7.95 572.40 15.86% 5.31 382.32 2.99% 1.00 71.56 2409.40
VIGAS H DE 5" X 3" X 5" E=3/4" m 19.8000 251.43 4,978.31 1.45% 0.29 72.91 5.03% 1.00 251.43 14.57% 2.88 724.12 17.60% 3.48 874.98 18.73% 3.71 932.81 23.77% 4.71 1184.24 15.86% 3.14 789.49 2.99% 0.59 148.33 4978.31
PERFIL DE ACERO "U" 2" X 1" e=3.0MM X 6M und 13.2000 16.00 211.20 1.45% 0.19 3.04 5.03% 0.66 10.56 14.57% 1.92 30.72 17.60% 2.32 37.12 18.73% 2.47 39.52 23.77% 3.14 50.24 15.86% 2.09 33.44 2.99% 0.39 6.56 211.20
REJILLA METALICA SOBRE PLATAFORMA P/ESCURRIMIENTO DE SOLID und 0.0800 80.00 6.40 1.45% 0.00 0.00 5.03% 0.00 0.00 14.57% 0.01 0.80 17.60% 0.01 0.80 18.73% 0.01 0.80 23.77% 0.02 1.60 15.86% 0.01 0.80 2.99% 0.00 1.60 6.40
REJILLA FIJA 1.20 x 0.50M. und 1.0000 450.00 450.00 1.45% 0.01 4.50 5.03% 0.05 22.50 14.57% 0.15 67.50 17.60% 0.18 81.00 18.73% 0.19 85.50 23.77% 0.24 108.00 15.86% 0.16 72.00 2.99% 0.03 9.00 450.00
TUBO DE ACERO SCH40 DN 150mm m 99.0926 72.96 7,229.80 1.45% 1.44 105.06 5.03% 4.98 363.34 14.57% 14.44 1053.54 17.60% 17.44 1272.42 18.73% 18.56 1354.14 23.77% 23.55 1718.21 15.86% 15.72 1146.93 2.99% 2.96 216.16 7229.80
TUBO DE ACERO SCH40 DN 100mm m 36.3110 40.80 1,481.49 1.45% 0.53 21.62 5.03% 1.83 74.66 14.57% 5.29 215.83 17.60% 6.39 260.71 18.73% 6.80 277.44 23.77% 8.63 352.10 15.86% 5.76 235.01 2.99% 1.09 44.12 1481.49
TUBO NEGRO SCH 40 ASTM-A120 DE 3¨ X 6.10MT m 187.6648 28.60 5,367.21 1.45% 2.72 77.79 5.03% 9.44 269.98 14.57% 27.34 781.92 17.60% 33.03 944.66 18.73% 35.15 1005.29 23.77% 44.61 1275.85 15.86% 29.76 851.14 2.99% 5.61 160.58 5367.21
TUBO DE ACERO NEGRO SCH 40 DN 100MM (4¨) m 28.2800 40.80 1,153.82 1.45% 0.41 16.73 5.03% 1.42 57.94 14.57% 4.12 168.10 17.60% 4.98 203.18 18.73% 5.30 216.24 23.77% 6.72 274.18 15.86% 4.49 183.19 2.99% 0.85 34.26 1153.82
TUBO DE ACERO NEGRO SCH 40 DN 150MM (6¨) m 1.0100 71.60 72.32 1.45% 0.01 0.72 5.03% 0.05 3.58 14.57% 0.15 10.74 17.60% 0.18 12.89 18.73% 0.19 13.60 23.77% 0.24 17.18 15.86% 0.16 11.46 2.99% 0.03 2.15 72.32
TUBO DE ACERO NEGRO SCH 40 DN 200MM (8") m 25.7550 112.92 2,908.25 1.45% 0.37 41.78 5.03% 1.30 146.80 14.57% 3.75 423.45 17.60% 4.53 511.53 18.73% 4.82 544.27 23.77% 6.12 691.07 15.86% 4.08 460.71 2.99% 0.77 88.64 2908.25
TUBO GALVANIZADO STANDARD ISO I 2 "¨X6.10M m 97.1902 16.29 1,583.23 1.45% 1.41 22.97 5.03% 4.89 79.66 14.57% 14.16 230.67 17.60% 17.11 278.72 18.73% 18.20 296.48 23.77% 23.10 376.30 15.86% 15.41 251.03 2.99% 2.91 47.40 1583.23
TUBO GALVANIZADO STANDARD ISO I 1¨X6.10M m 47.6700 7.84 373.73 1.45% 0.69 5.41 5.03% 2.40 18.82 14.57% 6.95 54.49 17.60% 8.39 65.78 18.73% 8.93 70.01 23.77% 11.33 88.83 15.86% 7.56 59.27 2.99% 1.43 11.12 373.73
TUBO GALVANIZADO STANDARD ISO I 1 1/2¨X6.10M m 149.6044 14.06 2,103.44 1.45% 2.17 30.51 5.03% 7.53 105.87 14.57% 21.80 306.51 17.60% 26.33 370.20 18.73% 28.02 393.96 23.77% 35.56 499.97 15.86% 23.73 333.64 2.99% 4.47 62.78 2103.44
TUBO GALVANIZADO STANDARD ISO I DN Ø3¨ m 91.6290 19.00 1,740.95 1.45% 1.33 25.27 5.03% 4.61 87.59 14.57% 13.35 253.65 17.60% 16.13 306.47 18.73% 17.16 326.04 23.77% 21.78 413.82 15.86% 14.53 276.07 2.99% 2.74 52.04 1740.95
TUBO GALVANIZADO STANDARD ISO I 4¨X6.10M m 7.7700 5.00 38.85 1.45% 0.11 0.55 5.03% 0.39 1.95 14.57% 1.13 5.65 17.60% 1.37 6.85 18.73% 1.46 7.30 23.77% 1.85 9.25 15.86% 1.23 6.15 2.99% 0.23 1.15 38.85
TUBO CUADRADO DE ACERO A-36 DE 1" m 889.7900 12.00 10,677.48 1.45% 12.90 154.80 5.03% 44.76 537.12 14.57% 129.64 1555.68 17.60% 156.60 1879.20 18.73% 166.66 1999.92 23.77% 211.50 2538.00 15.86% 141.12 1693.44 2.99% 26.60 319.32 10677.48
BRIDA DE ACERO P/SOLDAR 150LBS DN 100MM (4¨) und 87.0000 114.50 9,961.50 1.45% 1.26 144.27 5.03% 4.38 501.51 14.57% 12.68 1451.86 17.60% 15.31 1753.00 18.73% 16.30 1866.35 23.77% 20.68 2367.86 15.86% 13.80 1580.10 2.99% 2.60 296.55 9961.50
BRIDA DE ACERO P/SOLDAR 150LBS DN 150MM (6¨) und 92.0000 162.34 14,935.28 1.45% 1.33 215.91 5.03% 4.63 751.63 14.57% 13.40 2175.36 17.60% 16.19 2628.28 18.73% 17.23 2797.12 23.77% 21.87 3550.38 15.86% 14.59 2368.54 2.99% 2.75 448.06 14935.28
BRIDA DE ACERO P/SOLDAR 150LBS DE 200MM (8¨) und 42.0000 216.48 9,092.16 1.45% 0.61 132.05 5.03% 2.11 456.77 14.57% 6.12 1324.86 17.60% 7.39 1599.79 18.73% 7.87 1703.70 23.77% 9.98 2160.47 15.86% 6.66 1441.76 2.99% 1.26 272.76 9092.16
BRIDA DE ACERO P/SOLDAR 150LBS DE 250MM (10¨) und 9.0000 323.16 2,908.44 1.45% 0.13 42.01 5.03% 0.45 145.42 14.57% 1.31 423.34 17.60% 1.58 510.59 18.73% 1.69 546.14 23.77% 2.14 691.56 15.86% 1.43 462.12 2.99% 0.27 87.26 2908.44
BRIDA DE ACERO SLIP ON (ANILLO) 150LBS DN 100MM (4¨) und 4.0000 29.64 118.56 1.45% 0.06 1.78 5.03% 0.20 5.93 14.57% 0.58 17.19 17.60% 0.70 20.75 18.73% 0.75 22.23 23.77% 0.95 28.16 15.86% 0.63 18.67 2.99% 0.12 3.85 118.56
BRIDA DE ACERO SLIP ON (ANILLO) 150LBS DN 150MM (6¨) und 20.0000 41.46 829.20 1.45% 0.29 12.02 5.03% 1.01 41.87 14.57% 2.91 120.65 17.60% 3.52 145.94 18.73% 3.75 155.48 23.77% 4.75 196.94 15.86% 3.17 131.43 2.99% 0.60 24.87 829.20
BRIDA DE ACERO SLIP ON (ANILLO) 150LBS DN 200MM (8¨) und 7.0000 65.76 460.32 1.45% 0.10 6.58 5.03% 0.35 23.02 14.57% 1.02 67.08 17.60% 1.23 80.88 18.73% 1.31 86.15 23.77% 1.66 109.16 15.86% 1.11 72.99 2.99% 0.21 14.46 460.32
BRIDA DE ACERO SLIP ON (ANILLO) 150LBS DN 250MM (10¨) und 3.0000 148.29 444.87 1.45% 0.04 5.93 5.03% 0.15 22.24 14.57% 0.44 65.25 17.60% 0.53 78.59 18.73% 0.56 83.04 23.77% 0.71 105.29 15.86% 0.48 71.18 2.99% 0.09 13.35 444.87
TEE DE HFD BRIDADO DE 100MM X 100MM (4¨ X 4¨) und 7.0000 280.44 1,963.08 1.45% 0.10 28.04 5.03% 0.35 98.15 14.57% 1.02 286.05 17.60% 1.23 344.94 18.73% 1.31 367.38 23.77% 1.66 465.53 15.86% 1.11 311.29 2.99% 0.21 61.70 1963.08
TEE DE HFD BRIDADO DE 150MM X 150MM (6¨ X 6¨) und 10.0000 516.60 5,166.00 1.45% 0.15 77.49 5.03% 0.50 258.30 14.57% 1.46 754.24 17.60% 1.76 909.22 18.73% 1.87 966.04 23.77% 2.38 1229.51 15.86% 1.59 821.39 2.99% 0.30 149.81 5166.00
TEE DE HFD BRIDADO DE 200 x 150MM (8" X 6") und 1.0000 550.00 550.00 1.45% 0.01 5.50 5.03% 0.05 27.50 14.57% 0.15 82.50 17.60% 0.18 99.00 18.73% 0.19 104.50 23.77% 0.24 132.00 15.86% 0.16 88.00 2.99% 0.03 11.00 550.00
TEE DE HFD BRIDADO DE 200 x 200MM (8" X 8") und 2.0000 609.30 1,218.60 1.45% 0.03 18.28 5.03% 0.10 60.93 14.57% 0.29 176.70 17.60% 0.35 213.26 18.73% 0.37 225.44 23.77% 0.48 292.46 15.86% 0.32 194.98 2.99% 0.06 36.55 1218.60
TEE DE FIERRO FUNDIDO BRIDADO DE 250 X 250MM (10" X 10") und 1.0000 785.00 785.00 1.45% 0.01 7.85 5.03% 0.05 39.25 14.57% 0.15 117.75 17.60% 0.18 141.30 18.73% 0.19 149.15 23.77% 0.24 188.40 15.86% 0.16 125.60 2.99% 0.03 15.70 785.00
TRANSICION DE HFD CAMPANA BRIDA DN 100MM (4") und 4.0000 75.00 300.00 1.45% 0.06 4.50 5.03% 0.20 15.00 14.57% 0.58 43.50 17.60% 0.70 52.50 18.73% 0.75 56.25 23.77% 0.95 71.25 15.86% 0.63 47.25 2.99% 0.12 9.75 300.00
TRANSICION DE HFD CAMPANA BRIDA DN 150MM (6") und 18.0000 127.90 2,302.20 1.45% 0.26 33.25 5.03% 0.91 116.39 14.57% 2.62 335.10 17.60% 3.17 405.44 18.73% 3.37 431.02 23.77% 4.28 547.41 15.86% 2.85 364.52 2.99% 0.54 69.07 2302.20
TRANSICION DE HFD CAMPANA BRIDA DN 200MM (8") und 5.0000 196.60 983.00 1.45% 0.07 13.76 5.03% 0.25 49.15 14.57% 0.73 143.52 17.60% 0.88 173.01 18.73% 0.94 184.80 23.77% 1.19 233.95 15.86% 0.79 155.31 2.99% 0.15 29.50 983.00
TRANSICION DE HFD CAMPANA BRIDA DN 250MM (10") und 2.0000 245.00 490.00 1.45% 0.03 7.35 5.03% 0.10 24.50 14.57% 0.29 71.05 17.60% 0.35 85.75 18.73% 0.37 90.65 23.77% 0.48 117.60 15.86% 0.32 78.40 2.99% 0.06 14.70 490.00
TRANSICION DE HFD CAMPANA BRIDA DN 50MM (2") und 5.0000 49.20 246.00 1.45% 0.07 3.44 5.03% 0.25 12.30 14.57% 0.73 35.92 17.60% 0.88 43.30 18.73% 0.94 46.25 23.77% 1.19 58.55 15.86% 0.79 38.87 2.99% 0.15 7.37 246.00
TAPON HEMBRA DE FIERRO GALVANIZADO 1/2" und 3.6464 1.50 5.47 1.45% 0.05 0.08 5.03% 0.18 0.27 14.57% 0.53 0.80 17.60% 0.64 0.96 18.73% 0.68 1.02 23.77% 0.87 1.31 15.86% 0.58 0.87 2.99% 0.11 0.16 5.47
3 de 7
CRONOGRAMA DE ADQUISICIÓN DE MATERIALES
Proyecto: "MEJORAMIENTO Y AMPLIACIÓN DEL SERVICIO DE SANEAMIENTO BASICO EN LA LOCALIDAD DE ANTAUTA, DISTRITO DE ANTAUTA - MELGAR - PUNO"
Duracion: 270 Dias Calendarios
1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES
DESCRIPCION (MATERIALES) UND CANT. P.U PARCIAL TOTAL
% CANT. SUBTOTAL % CANT. SUBTOTAL % CANT. SUBTOTAL % CANT. SUBTOTAL % CANT. SUBTOTAL % CANT. SUBTOTAL % CANT. SUBTOTAL % CANT. SUBTOTAL
TAPON ACERO NEGRO DE 3" und 5.0772 50.00 253.86 1.45% 0.07 3.50 5.03% 0.26 13.00 14.57% 0.74 37.00 17.60% 0.89 44.50 18.73% 0.95 47.50 23.77% 1.21 60.50 15.86% 0.81 40.50 2.99% 0.15 7.36 253.86
TAPON ACERO NEGRO DE 4" und 13.3119 78.22 1,041.26 1.45% 0.19 14.86 5.03% 0.67 52.41 14.57% 1.94 151.75 17.60% 2.34 183.03 18.73% 2.49 194.77 23.77% 3.16 247.18 15.86% 2.11 165.04 2.99% 0.40 32.22 1041.26
TAPON ACERO NEGRO DE 6" und 6.4065 112.83 722.84 1.45% 0.09 10.15 5.03% 0.32 36.11 14.57% 0.93 104.93 17.60% 1.13 127.50 18.73% 1.20 135.40 23.77% 1.52 171.50 15.86% 1.02 115.09 2.99% 0.19 22.16 722.84
TAPON ACERO NEGRO DE 8" und 14.5176 230.00 3,339.05 1.45% 0.21 48.30 5.03% 0.73 167.90 14.57% 2.12 487.60 17.60% 2.56 588.80 18.73% 2.72 625.60 23.77% 3.45 793.50 15.86% 2.30 529.00 2.99% 0.43 98.35 3339.05
TAPON ACERO NEGRO DE 10" und 0.4400 340.00 149.60 1.45% 0.01 3.40 5.03% 0.02 6.80 14.57% 0.06 20.40 17.60% 0.08 27.20 18.73% 0.08 27.20 23.77% 0.10 34.00 15.86% 0.07 23.80 2.99% 0.01 6.80 149.60
TAPON ACERO NEGRO DE 12" und 2.0716 321.00 664.98 1.45% 0.03 9.63 5.03% 0.10 32.10 14.57% 0.30 96.30 17.60% 0.36 115.56 18.73% 0.39 125.19 23.77% 0.49 157.29 15.86% 0.33 105.93 2.99% 0.06 22.98 664.98
VENTILACION CON TUBERIA DE FIERRO PINTADA DN 100MM und 5.0000 500.00 2,500.00 1.45% 0.07 35.00 5.03% 0.25 125.00 14.57% 0.73 365.00 17.60% 0.88 440.00 18.73% 0.94 470.00 23.77% 1.19 595.00 15.86% 0.79 395.00 2.99% 0.15 75.00 2500.00
VENTILACION CON TUBERIA DE FIERRO PINTADA DN 150MM und 22.0000 25.00 550.00 1.45% 0.32 8.00 5.03% 1.11 27.75 14.57% 3.21 80.25 17.60% 3.87 96.75 18.73% 4.12 103.00 23.77% 5.23 130.75 15.86% 3.49 87.25 2.99% 0.66 16.25 550.00
FIERRO CORRUGADO DE CONSTRUCCION Fy=4200Kg/CM2 kg 62,681.9674 2.88 180,524.07 1.45% 908.89 2617.60 5.03% 3152.90 9080.35 14.57% 9132.76 26302.35 17.60% 11032.03 31772.25 18.73% 11740.33 33812.15 23.77% 14899.50 42910.56 15.86% 9941.36 28631.12 2.99% 1874.19 5397.69 180524.07
ALAMBRE NEGRO Nº 8 kg 976.9606 3.80 3,712.45 1.45% 14.17 53.85 5.03% 49.14 186.73 14.57% 142.34 540.89 17.60% 171.95 653.41 18.73% 182.98 695.32 23.77% 232.22 882.44 15.86% 154.95 588.81 2.99% 29.21 111.00 3712.45
ALAMBRE NEGRO Nº 16 kg 2,974.1590 3.80 11,301.80 1.45% 43.13 163.89 5.03% 149.60 568.48 14.57% 433.33 1646.65 17.60% 523.45 1989.11 18.73% 557.06 2116.83 23.77% 706.96 2686.45 15.86% 471.70 1792.46 2.99% 88.93 337.93 11301.80
FIERRO LISO DE 1/2" m 84.4140 4.00 337.66 1.45% 1.22 4.88 5.03% 4.25 17.00 14.57% 12.30 49.20 17.60% 14.86 59.44 18.73% 15.81 63.24 23.77% 20.07 80.28 15.86% 13.39 53.56 2.99% 2.52 10.06 337.66
CABLE DE ACERO T/BOA 6 X 19 ALMA ACERO 1/2¨ m 45.9000 12.00 550.80 1.45% 0.67 8.04 5.03% 2.31 27.72 14.57% 6.69 80.28 17.60% 8.08 96.96 18.73% 8.60 103.20 23.77% 10.91 130.92 15.86% 7.28 87.36 2.99% 1.37 16.32 550.80
GRILLETE PARA CABLES DE 1/2¨ und 8.0000 10.00 80.00 1.45% 0.12 1.20 5.03% 0.40 4.00 14.57% 1.17 11.70 17.60% 1.41 14.10 18.73% 1.50 15.00 23.77% 1.90 19.00 15.86% 1.27 12.70 2.99% 0.24 2.30 80.00
GRAPAS PARA CABLES DE 1/2¨ und 8.0000 10.00 80.00 1.45% 0.12 1.20 5.03% 0.40 4.00 14.57% 1.17 11.70 17.60% 1.41 14.10 18.73% 1.50 15.00 23.77% 1.90 19.00 15.86% 1.27 12.70 2.99% 0.24 2.30 80.00
TEMPLADOR GALVANIZADO DE 3/4" × 12" und 4.0000 5.00 20.00 1.45% 0.06 0.30 5.03% 0.20 1.00 14.57% 0.58 2.90 17.60% 0.70 3.50 18.73% 0.75 3.75 23.77% 0.95 4.75 15.86% 0.63 3.15 2.99% 0.12 0.65 20.00
GUARDACABOS REFORZADOS P/CABLE 1" TIPO SS-414 O SIM. UN. 12.0000 2.00 24.00 1.45% 0.17 0.34 5.03% 0.60 1.20 14.57% 1.75 3.50 17.60% 2.11 4.22 18.73% 2.25 4.50 23.77% 2.85 5.70 15.86% 1.90 3.80 2.99% 0.36 0.74 24.00
MALLA DE ALAMBRE # 12 COCADA DE 1 1/2" m2 10.3400 42.00 434.28 1.45% 0.15 6.30 5.03% 0.52 21.84 14.57% 1.51 63.42 17.60% 1.82 76.44 18.73% 1.94 81.48 23.77% 2.46 103.32 15.86% 1.64 68.88 2.99% 0.31 12.60 434.28
MALLA DE ALAMBRE # 10 COCADA DE 2" m2 1,223.8950 14.00 17,134.53 1.45% 17.75 248.50 5.03% 61.56 861.84 14.57% 178.32 2496.48 17.60% 215.41 3015.74 18.73% 229.24 3209.36 23.77% 290.92 4072.88 15.86% 194.11 2717.54 2.99% 36.59 512.19 17134.53
CLAVO CON CABEZA PROMEDIO kg 1,289.1189 4.50 5,801.04 1.45% 18.69 84.11 5.03% 64.84 291.78 14.57% 187.82 845.19 17.60% 226.88 1020.96 18.73% 241.45 1086.53 23.77% 306.42 1378.89 15.86% 204.45 920.03 2.99% 38.54 173.55 5801.04
PERNO INC. TUERCA PARA BRIDA DE 50MM" und 40.0000 1.50 60.00 1.45% 0.58 0.87 5.03% 2.01 3.02 14.57% 5.83 8.75 17.60% 7.04 10.56 18.73% 7.49 11.24 23.77% 9.51 14.27 15.86% 6.34 9.51 2.99% 1.20 1.78 60.00
PERNO INC. TUERCA PARA BRIDA DN 100MM und 912.0000 4.00 3,648.00 1.45% 13.22 52.88 5.03% 45.87 183.48 14.57% 132.88 531.52 17.60% 160.51 642.04 18.73% 170.82 683.28 23.77% 216.78 867.12 15.86% 144.64 578.56 2.99% 27.27 109.12 3648.00
PERNO INC. TUERCA PARA BRIDA DN 150MM und 792.0000 4.20 3,326.40 1.45% 11.48 48.22 5.03% 39.84 167.33 14.57% 115.39 484.64 17.60% 139.39 585.44 18.73% 148.34 623.03 23.77% 188.26 790.69 15.86% 125.61 527.56 2.99% 23.68 99.49 3326.40
PERNO INC. TUERCA PARA BRIDA DN 200MM und 336.0000 5.00 1,680.00 1.45% 4.87 24.35 5.03% 16.90 84.50 14.57% 48.96 244.80 17.60% 59.14 295.70 18.73% 62.93 314.65 23.77% 79.87 399.35 15.86% 53.29 266.45 2.99% 10.05 50.20 1680.00
PERNO INC. TUERCA PARA BRIDA DN 250MM und 80.0000 6.00 480.00 1.45% 1.16 6.96 5.03% 4.02 24.12 14.57% 11.66 69.96 17.60% 14.08 84.48 18.73% 14.98 89.88 23.77% 19.02 114.12 15.86% 12.69 76.14 2.99% 2.39 14.34 480.00
PERNO INCLUYE TUERCA 1/2" X 6" und 20.0000 1.70 34.00 1.45% 0.29 0.49 5.03% 1.01 1.72 14.57% 2.91 4.95 17.60% 3.52 5.98 18.73% 3.75 6.38 23.77% 4.75 8.08 15.86% 3.17 5.39 2.99% 0.60 1.01 34.00
PERNO INCLUYE TUERCA 3/4" X 4" und 20.0000 3.25 65.00 1.45% 0.29 0.94 5.03% 1.01 3.28 14.57% 2.91 9.46 17.60% 3.52 11.44 18.73% 3.75 12.19 23.77% 4.75 15.44 15.86% 3.17 10.30 2.99% 0.60 1.95 65.00
PERNO ARADO DE 7/16" × 2" und 58.0000 2.00 116.00 1.45% 0.84 1.68 5.03% 2.92 5.84 14.57% 8.45 16.90 17.60% 10.21 20.42 18.73% 10.86 21.72 23.77% 13.79 27.58 15.86% 9.20 18.40 2.99% 1.73 3.46 116.00
SOLDADURA E-6010 3/16 CELLOCORD P LATA 20KG. kg 78.8400 8.50 670.14 1.45% 1.14 9.69 5.03% 3.97 33.75 14.57% 11.49 97.67 17.60% 13.88 117.98 18.73% 14.77 125.55 23.77% 18.74 159.29 15.86% 12.50 106.25 2.99% 2.36 19.96 670.14
SOLDADURA CELLOCORD A.P. kg 86.8376 8.58 745.07 1.45% 1.26 10.81 5.03% 4.37 37.49 14.57% 12.65 108.54 17.60% 15.28 131.10 18.73% 16.26 139.51 23.77% 20.64 177.09 15.86% 13.77 118.15 2.99% 2.60 22.38 745.07
SOLDADURA OVERCORD E-6013 3/32 LATA 20KG. kg 13.5000 12.00 162.00 1.45% 0.20 2.40 5.03% 0.68 8.16 14.57% 1.97 23.64 17.60% 2.38 28.56 18.73% 2.53 30.36 23.77% 3.21 38.52 15.86% 2.14 25.68 2.99% 0.40 4.68 162.00
SOLDADURA OVERCORD M E-6012 3/16 LATA 20KG. kg 13.5150 9.50 128.39 1.45% 0.20 1.90 5.03% 0.68 6.46 14.57% 1.97 18.72 17.60% 2.38 22.61 18.73% 2.53 24.04 23.77% 3.21 30.50 15.86% 2.14 20.33 2.99% 0.40 3.83 128.39
PLANCHAS LAC 1/16" X 4" X 8" pza 11.0169 85.00 936.44 1.45% 0.16 13.60 5.03% 0.55 46.75 14.57% 1.61 136.85 17.60% 1.94 164.90 18.73% 2.06 175.10 23.77% 2.62 222.70 15.86% 1.75 148.75 2.99% 0.33 27.79 936.44
PLANCHA NEGRA LAC ESTRIADA 4' X 8' e=1/8" pza 1.2000 95.00 114.00 1.45% 0.02 1.90 5.03% 0.06 5.70 14.57% 0.17 16.15 17.60% 0.21 19.95 18.73% 0.22 20.90 23.77% 0.29 27.55 15.86% 0.19 18.05 2.99% 0.04 3.80 114.00
PLANCHA FIERRO NEGRO LAC 4' X 8' e=1/4" pza 3.2000 95.00 304.00 1.45% 0.05 4.75 5.03% 0.16 15.20 14.57% 0.47 44.65 17.60% 0.56 53.20 18.73% 0.60 57.00 23.77% 0.76 72.20 15.86% 0.51 48.45 2.99% 0.10 8.55 304.00
PLANCHA DE FIERRO CON ORIFICIOS und 1.0000 300.00 300.00 1.45% 0.01 3.00 5.03% 0.05 15.00 14.57% 0.15 45.00 17.60% 0.18 54.00 18.73% 0.19 57.00 23.77% 0.24 72.00 15.86% 0.16 48.00 2.99% 0.03 6.00 300.00
PUERTA CORREDIZA DE PLANCHA ESTRIADA 1/8" INCLUYE CANDADO und 2.0000 350.00 700.00 1.45% 0.03 10.50 5.03% 0.10 35.00 14.57% 0.29 101.50 17.60% 0.35 122.50 18.73% 0.37 129.50 23.77% 0.48 168.00 15.86% 0.32 112.00 2.99% 0.06 21.00 700.00
TAPA PLANCHA LAC S/DISEÑO PARA ING.RESERVORIO O SIMILAR und 10.0000 185.00 1,850.00 1.45% 0.15 27.75 5.03% 0.50 92.50 14.57% 1.46 270.10 17.60% 1.76 325.60 18.73% 1.87 345.95 23.77% 2.38 440.30 15.86% 1.59 294.15 2.99% 0.30 53.65 1850.00
REJILLA DESMONTABLE und 1.0000 1,500.00 1,500.00 1.45% 0.01 15.00 5.03% 0.05 75.00 14.57% 0.15 225.00 17.60% 0.18 270.00 18.73% 0.19 285.00 23.77% 0.24 360.00 15.86% 0.16 240.00 2.99% 0.03 30.00 1500.00
REGLA DE MADERA TIPO TORNILLO ESPECIAL und 23.3866 45.00 1,052.40 1.45% 0.34 15.30 5.03% 1.18 53.10 14.57% 3.41 153.45 17.60% 4.12 185.40 18.73% 4.38 197.10 23.77% 5.56 250.20 15.86% 3.71 166.95 2.99% 0.70 30.90 1052.40
MADERA NACIONAL P/ENCOFRADO p2 30,554.6062 4.50 137,495.73 1.45% 443.04 1993.68 5.03% 1536.90 6916.05 14.57% 4451.81 20033.15 17.60% 5377.61 24199.25 18.73% 5722.88 25752.96 23.77% 7262.83 32682.74 15.86% 4845.96 21806.82 2.99% 913.58 4111.08 137495.73
TRIPLAY DE 4´X 8´X 18MM P/ENCOFRADO m2 6.5315 65.00 424.55 1.45% 0.09 5.85 5.03% 0.33 21.45 14.57% 0.95 61.75 17.60% 1.15 74.75 18.73% 1.22 79.30 23.77% 1.55 100.75 15.86% 1.04 67.60 2.99% 0.20 13.10 424.55
PINTURA ESMALTE gln 1.2000 35.00 42.00 1.45% 0.02 0.70 5.03% 0.06 2.10 14.57% 0.17 5.95 17.60% 0.21 7.35 18.73% 0.22 7.70 23.77% 0.29 10.15 15.86% 0.19 6.65 2.99% 0.04 1.40 42.00
PINTURA ESMALTE SINTETICO ST. gln 52.9111 60.00 3,174.67 1.45% 0.77 46.20 5.03% 2.66 159.60 14.57% 7.71 462.60 17.60% 9.31 558.60 18.73% 9.91 594.60 23.77% 12.58 754.80 15.86% 8.39 503.40 2.99% 1.58 94.87 3174.67
PINTURA ESMALTE PARA TRAFICO gln 15.2667 65.80 1,004.55 1.45% 0.22 14.48 5.03% 0.77 50.67 14.57% 2.22 146.08 17.60% 2.69 177.00 18.73% 2.86 188.19 23.77% 3.63 238.85 15.86% 2.42 159.24 2.99% 0.46 30.04 1004.55
PINTURA LATEX gln 33.0282 53.00 1,750.49 1.45% 0.48 25.44 5.03% 1.66 87.98 14.57% 4.81 254.93 17.60% 5.81 307.93 18.73% 6.19 328.07 23.77% 7.85 416.05 15.86% 5.24 277.72 2.99% 0.99 52.37 1750.49
PINTURA ANTICORROSIVA gln 1.2000 22.00 26.40 1.45% 0.02 0.44 5.03% 0.06 1.32 14.57% 0.17 3.74 17.60% 0.21 4.62 18.73% 0.22 4.84 23.77% 0.29 6.38 15.86% 0.19 4.18 2.99% 0.04 0.88 26.40
PINTURA ANTICORROSIVA EPOXICA - USO NAVAL gln 26.8394 22.40 601.20 1.45% 0.39 8.74 5.03% 1.35 30.24 14.57% 3.91 87.58 17.60% 4.72 105.73 18.73% 5.03 112.67 23.77% 6.38 142.91 15.86% 4.26 95.42 2.99% 0.80 17.91 601.20
IMPRIMANTE PARA PINTURA AL AGUA kg 6.8460 22.75 155.75 1.45% 0.10 2.28 5.03% 0.34 7.74 14.57% 1.00 22.75 17.60% 1.20 27.30 18.73% 1.28 29.12 23.77% 1.63 37.08 15.86% 1.09 24.80 2.99% 0.20 4.68 155.75
IMPRIMANTE PARA PINTURA LATEX gln 7.2894 65.00 473.81 1.45% 0.11 7.15 5.03% 0.37 24.05 14.57% 1.06 68.90 17.60% 1.28 83.20 18.73% 1.37 89.05 23.77% 1.73 112.45 15.86% 1.16 75.40 2.99% 0.22 13.61 473.81
PINTURA IMPRIMANTE PARA MUROS gln 16.5920 15.50 257.18 1.45% 0.24 3.72 5.03% 0.83 12.87 14.57% 2.42 37.51 17.60% 2.92 45.26 18.73% 3.11 48.21 23.77% 3.94 61.07 15.86% 2.63 40.77 2.99% 0.50 7.77 257.18
SELLADOR PARA MUROS gln 6.4274 53.00 340.65 1.45% 0.09 4.77 5.03% 0.32 16.96 14.57% 0.94 49.82 17.60% 1.13 59.89 18.73% 1.20 63.60 23.77% 1.53 81.09 15.86% 1.02 54.06 2.99% 0.19 10.46 340.65
ARENADO, LABOR DE PINTADO TUB.FO. DN 100MM m 49.5910 2.81 139.35 1.45% 0.72 2.02 5.03% 2.49 7.00 14.57% 7.23 20.32 17.60% 8.73 24.53 18.73% 9.29 26.10 23.77% 11.79 33.13 15.86% 7.87 22.11 2.99% 1.48 4.14 139.35
ARENADO, LABOR DE PINTADO TUB.FO. DN 200MM m 25.7566 4.10 105.60 1.45% 0.37 1.52 5.03% 1.30 5.33 14.57% 3.75 15.38 17.60% 4.53 18.57 18.73% 4.82 19.76 23.77% 6.12 25.09 15.86% 4.08 16.73 2.99% 0.77 3.22 105.60
ARENADO, LABOR DE PINTADO TUB.FO. DN 150MM m 86.1025 3.80 327.19 1.45% 1.25 4.75 5.03% 4.33 16.45 14.57% 12.55 47.69 17.60% 15.15 57.57 18.73% 16.13 61.29 23.77% 20.47 77.79 15.86% 13.66 51.91 2.99% 2.57 9.74 327.19
TEKNOPOR DE 1¨ X 4´ X 8´ pln 4.0560 15.00 60.84 1.45% 0.06 0.90 5.03% 0.20 3.00 14.57% 0.59 8.85 17.60% 0.71 10.65 18.73% 0.76 11.40 23.77% 0.96 14.40 15.86% 0.64 9.60 2.99% 0.12 2.04 60.84
TEKNOPOR DE 3/4¨ m2 5.9340 5.00 29.67 1.45% 0.09 0.45 5.03% 0.30 1.50 14.57% 0.86 4.30 17.60% 1.04 5.20 18.73% 1.11 5.55 23.77% 1.41 7.05 15.86% 0.94 4.70 2.99% 0.18 0.92 29.67
WATER STOP JUNTA SELLADORA m 173.3500 28.50 4,940.48 1.45% 2.51 71.54 5.03% 8.72 248.52 14.57% 25.26 719.91 17.60% 30.51 869.54 18.73% 32.47 925.40 23.77% 41.21 1174.49 15.86% 27.49 783.47 2.99% 5.18 147.61 4940.48
EMPAQUETADURA DE JEBE ENLONADO DE 1/2" und 676.0000 0.25 169.00 1.45% 9.80 2.45 5.03% 34.00 8.50 14.57% 98.49 24.62 17.60% 118.98 29.75 18.73% 126.61 31.65 23.77% 160.69 40.17 15.86% 107.21 26.80 2.99% 20.21 5.06 169.00
EMPAQUETADURA DE JEBE ENLONADO DE 50MM (2") und 10.0000 2.58 25.80 1.45% 0.15 0.39 5.03% 0.50 1.29 14.57% 1.46 3.77 17.60% 1.76 4.54 18.73% 1.87 4.82 23.77% 2.38 6.14 15.86% 1.59 4.10 2.99% 0.30 0.75 25.80
EMPAQUETADURA DE JEBE ENLONADO DN 100MM und 114.0000 6.15 701.10 1.45% 1.65 10.15 5.03% 5.73 35.24 14.57% 16.61 102.15 17.60% 20.06 123.37 18.73% 21.35 131.30 23.77% 27.10 166.67 15.86% 18.08 111.19 2.99% 3.41 21.03 701.10
EMPAQUETADURA DE JEBE ENLONADO DN 150MM und 109.0000 7.14 778.26 1.45% 1.58 11.28 5.03% 5.48 39.13 14.57% 15.88 113.38 17.60% 19.18 136.95 18.73% 20.42 145.80 23.77% 25.91 185.00 15.86% 17.29 123.45 2.99% 3.26 23.27 778.26
EMPAQUETADURA DE JEBE ENLONADO DN 200MM und 42.0000 8.20 344.40 1.45% 0.61 5.00 5.03% 2.11 17.30 14.57% 6.12 50.18 17.60% 7.39 60.60 18.73% 7.87 64.53 23.77% 9.98 81.84 15.86% 6.66 54.61 2.99% 1.26 10.34 344.40
EMPAQUETADURA DE JEBE ENLONADO DN 250MM und 10.0000 9.50 95.00 1.45% 0.15 1.43 5.03% 0.50 4.75 14.57% 1.46 13.87 17.60% 1.76 16.72 18.73% 1.87 17.77 23.77% 2.38 22.61 15.86% 1.59 15.11 2.99% 0.30 2.74 95.00
PEGAMENTO PARA PVC 1/4 GLN und 16.7176 31.95 534.12 1.45% 0.24 7.67 5.03% 0.84 26.84 14.57% 2.44 77.96 17.60% 2.94 93.93 18.73% 3.13 100.00 23.77% 3.97 126.84 15.86% 2.65 84.67 2.99% 0.50 16.21 534.12
LUBRICANTE PARA PVC gln 17.0465 80.00 1,363.72 1.45% 0.25 20.00 5.03% 0.86 68.80 14.57% 2.48 198.40 17.60% 3.00 240.00 18.73% 3.19 255.20 23.77% 4.05 324.00 15.86% 2.70 216.00 2.99% 0.51 41.32 1363.72
LUBRICANTE PARA TUBERÍA HFD gln 0.3300 150.00 49.50 1.45% 0.00 0.00 5.03% 0.02 3.00 14.57% 0.05 7.50 17.60% 0.06 9.00 18.73% 0.06 9.00 23.77% 0.08 12.00 15.86% 0.05 7.50 2.99% 0.01 1.50 49.50
BREA INDUSTRIAL gln 5.9500 30.24 179.93 1.45% 0.09 2.72 5.03% 0.30 9.07 14.57% 0.87 26.31 17.60% 1.05 31.75 18.73% 1.11 33.57 23.77% 1.41 42.64 15.86% 0.94 28.43 2.99% 0.18 5.44 179.93
CHEMA 1 (POLVO) IMPERMEABILIZANTE kg 63.7815 7.12 454.12 1.45% 0.92 6.55 5.03% 3.21 22.86 14.57% 9.29 66.14 17.60% 11.23 79.96 18.73% 11.95 85.08 23.77% 15.16 107.94 15.86% 10.12 72.05 2.99% 1.91 13.54 454.12
IMPERMEABILIZANTE PARA MORTERO kg 117.6610 17.33 2,039.06 1.45% 1.71 29.63 5.03% 5.92 102.59 14.57% 17.14 297.04 17.60% 20.71 358.90 18.73% 22.04 381.95 23.77% 27.97 484.72 15.86% 18.66 323.38 2.99% 3.52 60.85 2039.06
XYPEX: XYPEX CONCENTRADO, CUBETA x 27.2KG(NETO 25KG) kg 3,073.7434 17.20 52,868.39 1.45% 44.57 766.60 5.03% 154.61 2659.29 14.57% 447.84 7702.85 17.60% 540.98 9304.86 18.73% 575.71 9902.21 23.77% 730.63 12566.84 15.86% 487.50 8385.00 2.99% 91.90 1580.74 52868.39
GEOTEXTIL m2 25,130.1330 2.61 65,589.65 1.45% 364.39 951.06 5.03% 1264.05 3299.17 14.57% 3661.46 9556.41 17.60% 4422.90 11543.77 18.73% 4706.87 12284.93 23.77% 5973.43 15590.65 15.86% 3985.64 10402.52 2.99% 751.39 1961.14 65589.65
AGUA, INCLUYE TRANSPORTE A PIE DE OBRA (CAMION CISTERNA Y M m3 7,220.8479 6.00 43,325.09 1.45% 104.70 628.20 5.03% 363.21 2179.26 14.57% 1052.08 6312.48 17.60% 1270.87 7625.22 18.73% 1352.46 8114.76 23.77% 1716.40 10298.40 15.86% 1145.23 6871.38 2.99% 215.90 1295.39 43325.09
HIPOCLORITO DE CALCIO AL 70% kg 15.0038 18.90 283.57 1.45% 0.22 4.16 5.03% 0.75 14.18 14.57% 2.19 41.39 17.60% 2.64 49.90 18.73% 2.81 53.11 23.77% 3.57 67.47 15.86% 2.38 44.98 2.99% 0.45 8.38 283.57
LIJA PARA MADERA und 67.8798 1.00 67.88 1.45% 0.98 0.98 5.03% 3.41 3.41 14.57% 9.89 9.89 17.60% 11.95 11.95 18.73% 12.71 12.71 23.77% 16.14 16.14 15.86% 10.77 10.77 2.99% 2.03 2.03 67.88
LIJA PARA FIERRO und 1,045.3650 5.00 5,226.83 1.45% 15.16 75.80 5.03% 52.58 262.90 14.57% 152.31 761.55 17.60% 183.98 919.90 18.73% 195.80 979.00 23.77% 248.48 1242.40 15.86% 165.79 828.95 2.99% 31.26 156.33 5226.83
PAPEL COPIA XEROX A-4 und 904.0000 0.10 90.40 1.45% 13.11 1.31 5.03% 45.47 4.55 14.57% 131.71 13.17 17.60% 159.10 15.91 18.73% 169.32 16.93 23.77% 214.88 21.49 15.86% 143.37 14.34 2.99% 27.03 2.70 90.40
CINTA PLASTICA PARA SEÑAL DE SEGURIDAD DE OBRA m 13,369.5345 0.12 1,604.35 1.45% 193.86 23.26 5.03% 672.49 80.70 14.57% 1947.94 233.75 17.60% 2353.04 282.36 18.73% 2504.11 300.49 23.77% 3177.94 381.35 15.86% 2120.41 254.45 2.99% 399.75 47.99 1604.35
COPIAS OZALID m2 380.8422 4.35 1,656.67 1.45% 5.52 24.01 5.03% 19.16 83.35 14.57% 55.49 241.38 17.60% 67.03 291.58 18.73% 71.33 310.29 23.77% 90.53 393.81 15.86% 60.40 262.74 2.99% 11.39 49.51 1656.67
SEGUNDOS ORIGINALES DE PLANOS m2 76.5506 8.00 612.40 1.45% 1.11 8.88 5.03% 3.85 30.80 14.57% 11.15 89.20 17.60% 13.47 107.76 18.73% 14.34 114.72 23.77% 18.20 145.60 15.86% 12.14 97.12 2.99% 2.29 18.32 612.40
MALLA HDP COLOR NARANJA DE 1M ALTURA P/CERCO m 1,254.3866 1.95 2,446.06 1.45% 18.19 35.47 5.03% 63.10 123.05 14.57% 182.76 356.38 17.60% 220.77 430.50 18.73% 234.95 458.15 23.77% 298.17 581.43 15.86% 198.95 387.95 2.99% 37.51 73.13 2446.06
4 de 7
CRONOGRAMA DE ADQUISICIÓN DE MATERIALES
Proyecto: "MEJORAMIENTO Y AMPLIACIÓN DEL SERVICIO DE SANEAMIENTO BASICO EN LA LOCALIDAD DE ANTAUTA, DISTRITO DE ANTAUTA - MELGAR - PUNO"
Duracion: 270 Dias Calendarios
1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES
DESCRIPCION (MATERIALES) UND CANT. P.U PARCIAL TOTAL
% CANT. SUBTOTAL % CANT. SUBTOTAL % CANT. SUBTOTAL % CANT. SUBTOTAL % CANT. SUBTOTAL % CANT. SUBTOTAL % CANT. SUBTOTAL % CANT. SUBTOTAL
DISCO DE CORTE PC 300 DE 18" und 4.5812 30.00 137.44 1.45% 0.07 2.10 5.03% 0.23 6.90 14.57% 0.67 20.10 17.60% 0.81 24.30 18.73% 0.86 25.80 23.77% 1.09 32.70 15.86% 0.73 21.90 2.99% 0.14 3.64 137.44
ENERGIA PARA EQUIPOS ESTIMADO POR KW (LABORATORIO DE PRUEB est 11.6250 1.45 16.86 1.45% 0.17 0.25 5.03% 0.58 0.84 14.57% 1.69 2.45 17.60% 2.05 2.97 18.73% 2.18 3.16 23.77% 2.76 4.00 15.86% 1.84 2.67 2.99% 0.35 0.52 16.86
INDECOPI - CERTIFICACIÓN DE EQUIPO BANCO DE PRUEBAS PARA MEDIest 125.0000 0.64 80.00 1.45% 1.81 1.16 5.03% 6.29 4.03 14.57% 18.21 11.65 17.60% 22.00 14.08 18.73% 23.41 14.98 23.77% 29.71 19.01 15.86% 19.83 12.69 2.99% 3.74 2.40 80.00
CORDEL m 181.5450 0.50 90.77 1.45% 2.63 1.32 5.03% 9.13 4.57 14.57% 26.45 13.23 17.60% 31.95 15.98 18.73% 34.00 17.00 23.77% 43.15 21.58 15.86% 28.79 14.40 2.99% 5.43 2.69 90.77
VALVULA DE CONTROL DE NIVEL DN 200MM CON FLOTADOR VERTICAL und 2.0000 14,371.60 28,743.20 1.45% 0.03 431.15 5.03% 0.10 1437.16 14.57% 0.29 4167.76 17.60% 0.35 5030.06 18.73% 0.37 5317.49 23.77% 0.48 6898.37 15.86% 0.32 4598.91 2.99% 0.06 862.30 28743.20
ENCOFRADO METALICO PARA BUZON m2 1,232.9886 2.32 2,860.53 1.45% 17.88 41.48 5.03% 62.02 143.89 14.57% 179.65 416.79 17.60% 217.01 503.46 18.73% 230.94 535.78 23.77% 293.08 679.95 15.86% 195.55 453.68 2.99% 36.87 85.50 2860.53
LADRILLO "KING KONG" 18 HUECOS 9 X 12 X 24 CM und 1,498.3800 1.05 1,573.30 1.45% 21.73 22.82 5.03% 75.37 79.14 14.57% 218.31 229.23 17.60% 263.71 276.90 18.73% 280.65 294.68 23.77% 356.16 373.97 15.86% 237.64 249.52 2.99% 44.80 47.04 1573.30
LADRILLO P/TECHO K.K 15 X 30 X 30 CM, 8 HUECOS und 390.9780 3.20 1,251.13 1.45% 5.67 18.14 5.03% 19.67 62.94 14.57% 56.97 182.30 17.60% 68.81 220.19 18.73% 73.23 234.34 23.77% 92.94 297.41 15.86% 62.01 198.43 2.99% 11.69 37.38 1251.13
LADRILLO "KING KONG" 18 HUECOS 9 X 13.5 X 23.5 CM und 38,362.4000 1.05 40,280.52 1.45% 556.25 584.06 5.03% 1929.63 2026.11 14.57% 5589.40 5868.87 17.60% 6751.78 7089.37 18.73% 7185.28 7544.54 23.77% 9118.74 9574.68 15.86% 6084.28 6388.49 2.99% 1147.04 1204.40 40280.52
GEOMEMBRANA DE HDPE 1.5MM m2 22,405.4040 12.59 282,084.03 1.45% 324.88 4090.24 5.03% 1126.99 14188.80 14.57% 3264.47 41099.68 17.60% 3943.35 49646.78 18.73% 4196.53 52834.31 23.77% 5325.76 67051.32 15.86% 3553.50 44738.57 2.99% 669.92 8434.33 282084.03
FIBRA DE VIDRIO m2 3.5000 88.44 309.54 1.45% 0.05 4.42 5.03% 0.18 15.92 14.57% 0.51 45.10 17.60% 0.62 54.83 18.73% 0.66 58.37 23.77% 0.83 73.41 15.86% 0.56 49.53 2.99% 0.10 7.96 309.54
CERRADURA DE DOS GOLPE T/PARCHE und 5.0000 41.15 205.75 1.45% 0.07 2.88 5.03% 0.25 10.29 14.57% 0.73 30.04 17.60% 0.88 36.21 18.73% 0.94 38.68 23.77% 1.19 48.97 15.86% 0.79 32.51 2.99% 0.15 6.17 205.75
CANDADO DE 60MM und 20.0000 20.50 410.00 1.45% 0.29 5.95 5.03% 1.01 20.71 14.57% 2.91 59.66 17.60% 3.52 72.16 18.73% 3.75 76.88 23.77% 4.75 97.38 15.86% 3.17 64.99 2.99% 0.60 12.27 410.00
MANIJA DE 4" PARA PUERTA und 5.0000 12.90 64.50 1.45% 0.07 0.90 5.03% 0.25 3.23 14.57% 0.73 9.42 17.60% 0.88 11.35 18.73% 0.94 12.13 23.77% 1.19 15.35 15.86% 0.79 10.19 2.99% 0.15 1.93 64.50
BISAGRA CAPUCHINA ALUMINIZADA DE 3 1/2" X 3 1/2" und 18.0000 15.00 270.00 1.45% 0.26 3.90 5.03% 0.91 13.65 14.57% 2.62 39.30 17.60% 3.17 47.55 18.73% 3.37 50.55 23.77% 4.28 64.20 15.86% 2.85 42.75 2.99% 0.54 8.10 270.00
ANILLO DE CAUCHO P/TUB. PVC U.F. ALCANT. DN 160MM (6") und 1,977.9207 3.95 7,812.79 1.45% 28.68 113.29 5.03% 99.49 392.99 14.57% 288.18 1138.31 17.60% 348.11 1375.03 18.73% 370.46 1463.32 23.77% 470.15 1857.09 15.86% 313.70 1239.12 2.99% 59.14 233.64 7812.79
ANILLO DE CAUCHO P/TUB. PVC U.F. ALCANT. DN 200MM (8") und 525.2779 4.68 2,458.30 1.45% 7.62 35.66 5.03% 26.42 123.65 14.57% 76.53 358.16 17.60% 92.45 432.67 18.73% 98.38 460.42 23.77% 124.86 584.34 15.86% 83.31 389.89 2.99% 15.71 73.51 2458.30
ANILLO DE CAUCHO TUB.PVC U.F. ALCANT. 315 MM (12") und 88.0464 14.98 1,318.94 1.45% 1.28 19.17 5.03% 4.43 66.36 14.57% 12.83 192.19 17.60% 15.50 232.19 18.73% 16.49 247.02 23.77% 20.93 313.53 15.86% 13.96 209.12 2.99% 2.63 39.36 1318.94
TUBERIA DE PVC ALCANT. UF ISO 4435 SN 2 DN 160MM m 2,305.9242 12.23 28,201.45 1.45% 33.44 408.97 5.03% 115.99 1418.56 14.57% 335.97 4108.91 17.60% 405.84 4963.42 18.73% 431.90 5282.14 23.77% 548.12 6703.51 15.86% 365.72 4472.76 2.99% 68.95 843.18 28201.45
TUBERIA DE PVC ALCANT. UF ISO 4435 SN 2 DN 200MM m 2,486.3622 18.54 46,097.16 1.45% 36.05 668.37 5.03% 125.06 2318.61 14.57% 362.26 6716.30 17.60% 437.60 8113.10 18.73% 465.70 8634.08 23.77% 591.01 10957.33 15.86% 394.34 7311.06 2.99% 74.34 1378.31 46097.16
TUBERIA DE PVC ALCANT. UF ISO 4435 SN 2 DN 250MM m 665.3052 28.97 19,273.89 1.45% 9.65 279.56 5.03% 33.46 969.34 14.57% 96.93 2808.06 17.60% 117.09 3392.10 18.73% 124.61 3609.95 23.77% 158.14 4581.32 15.86% 105.52 3056.91 2.99% 19.89 576.65 19273.89
TUBERIA DE PVC ALCANT. UF ISO 4435 SN 2 DN 315MM m 528.2784 46.35 24,485.70 1.45% 7.66 355.04 5.03% 26.57 1231.52 14.57% 76.97 3567.56 17.60% 92.98 4309.62 18.73% 98.95 4586.33 23.77% 125.57 5820.17 15.86% 83.78 3883.20 2.99% 15.80 732.26 24485.70
YEE (CONEXION A RED) PVC U.F. 250/200 MM und 5.0000 260.00 1,300.00 1.45% 0.07 18.20 5.03% 0.25 65.00 14.57% 0.73 189.80 17.60% 0.88 228.80 18.73% 0.94 244.40 23.77% 1.19 309.40 15.86% 0.79 205.40 2.99% 0.15 39.00 1300.00
CODO DE PVC-U UF PARA AGUA DE 45° DN 90MM und 3.0000 21.08 63.24 1.45% 0.04 0.84 5.03% 0.15 3.16 14.57% 0.44 9.28 17.60% 0.53 11.17 18.73% 0.56 11.80 23.77% 0.71 14.97 15.86% 0.48 10.12 2.99% 0.09 1.90 63.24
CODO DE PVC-U UF PARA AGUA DE 45º DN 200 MM (8") und 4.0000 232.80 931.20 1.45% 0.06 13.97 5.03% 0.20 46.56 14.57% 0.58 135.02 17.60% 0.70 162.96 18.73% 0.75 174.60 23.77% 0.95 221.16 15.86% 0.63 146.66 2.99% 0.12 30.27 931.20
CODO DE PVC-U UF PARA AGUA DE 90° DN 90MM und 10.0000 52.14 521.40 1.45% 0.15 7.82 5.03% 0.50 26.07 14.57% 1.46 76.12 17.60% 1.76 91.77 18.73% 1.87 97.50 23.77% 2.38 124.09 15.86% 1.59 82.90 2.99% 0.30 15.13 521.40
CODO 90º PVC U.F. 160 MM und 1.0000 202.30 202.30 1.45% 0.01 2.02 5.03% 0.05 10.12 14.57% 0.15 30.35 17.60% 0.18 36.41 18.73% 0.19 38.44 23.77% 0.24 48.55 15.86% 0.16 32.37 2.99% 0.03 4.04 202.30
CODO DE PVC-U UF PARA AGUA DE 90º DN 200 MM (8") und 3.0000 206.39 619.17 1.45% 0.04 8.26 5.03% 0.15 30.96 14.57% 0.44 90.81 17.60% 0.53 109.39 18.73% 0.56 115.58 23.77% 0.71 146.54 15.86% 0.48 99.07 2.99% 0.09 18.56 619.17
CODO DE PVC-U UF PARA AGUA DE 22.50° DN 90MM und 2.0000 21.08 42.16 1.45% 0.03 0.63 5.03% 0.10 2.11 14.57% 0.29 6.11 17.60% 0.35 7.38 18.73% 0.37 7.80 23.77% 0.48 10.12 15.86% 0.32 6.75 2.99% 0.06 1.26 42.16
CACHIMBA PVC PARA CONEXIÓN DOMICILIARIA U.F. 160 MM und 279.0000 18.87 5,264.73 1.45% 4.05 76.42 5.03% 14.03 264.75 14.57% 40.65 767.07 17.60% 49.10 926.52 18.73% 52.26 986.15 23.77% 66.32 1251.46 15.86% 44.25 835.00 2.99% 8.34 157.36 5264.73
CODO DE PVC-U UF PARA AGUA DE 22.50º DN 200MM (8") und 6.0000 232.80 1,396.80 1.45% 0.09 20.95 5.03% 0.30 69.84 14.57% 0.87 202.54 17.60% 1.06 246.77 18.73% 1.12 260.74 23.77% 1.43 332.90 15.86% 0.95 221.16 2.99% 0.18 41.90 1396.80
CODO DE PVC-U UF PARA AGUA DE 11.25º DN 200 MM (8") und 14.0000 232.80 3,259.20 1.45% 0.20 46.56 5.03% 0.70 162.96 14.57% 2.04 474.91 17.60% 2.46 572.69 18.73% 2.62 609.94 23.77% 3.33 775.22 15.86% 2.22 516.82 2.99% 0.42 100.10 3259.20
TAPA DE CONCRETO (CEMENTO PV) P/CAJA PARA DESAGUE .30 X .60M und 240.0000 20.00 4,800.00 1.45% 3.48 69.60 5.03% 12.07 241.40 14.57% 34.97 699.40 17.60% 42.24 844.80 18.73% 44.95 899.00 23.77% 57.05 1141.00 15.86% 38.06 761.20 2.99% 7.18 143.60 4800.00
TAPA CONCRETO AR. PERFIL FF 0.6M / BZ und 84.0000 90.00 7,560.00 1.45% 1.22 109.80 5.03% 4.23 380.70 14.57% 12.24 1101.60 17.60% 14.78 1330.20 18.73% 15.73 1415.70 23.77% 19.97 1797.30 15.86% 13.32 1198.80 2.99% 2.51 225.90 7560.00
CAJA DE CONCRETO (CEMENTO PV) 0.30x0.60M PARA DESAGUE INCL. und 240.0000 44.50 10,680.00 1.45% 3.48 154.86 5.03% 12.07 537.12 14.57% 34.97 1556.17 17.60% 42.24 1879.68 18.73% 44.95 2000.28 23.77% 57.05 2538.73 15.86% 38.06 1693.67 2.99% 7.18 319.49 10680.00
MARCO DE FIERRO FUNDIDO DIAMETRO 0.60M. INTER. und 84.0000 190.00 15,960.00 1.45% 1.22 231.80 5.03% 4.23 803.70 14.57% 12.24 2325.60 17.60% 14.78 2808.20 18.73% 15.73 2988.70 23.77% 19.97 3794.30 15.86% 13.32 2530.80 2.99% 2.51 476.90 15960.00
MARCO Y TAPA DE HO.FDO.DUCTIL DI=0.60M C/MECANISMO SEGUR. und 20.0000 150.00 3,000.00 1.45% 0.29 43.50 5.03% 1.01 151.50 14.57% 2.91 436.50 17.60% 3.52 528.00 18.73% 3.75 562.50 23.77% 4.75 712.50 15.86% 3.17 475.50 2.99% 0.60 90.00 3000.00
CAJA PREFABRICADA DE CONCRETO PORTAMEDIDOR DE AGUA und 212.0000 14.00 2,968.00 1.45% 3.07 42.98 5.03% 10.66 149.24 14.57% 30.89 432.46 17.60% 37.31 522.34 18.73% 39.71 555.94 23.77% 50.39 705.46 15.86% 33.62 470.68 2.99% 6.34 88.90 2968.00
MARCO Y TAPA TERMOPLASTICO DE 1/2 - 3/4 CON BISAGRA und 212.0000 37.00 7,844.00 1.45% 3.07 113.59 5.03% 10.66 394.42 14.57% 30.89 1142.93 17.60% 37.31 1380.47 18.73% 39.71 1469.27 23.77% 50.39 1864.43 15.86% 33.62 1243.94 2.99% 6.34 234.95 7844.00
CANALETA PARSHALL DE W 15.1 FIBRA DE VIDRIO und 1.0000 2,736.00 2,736.00 1.45% 0.01 27.36 5.03% 0.05 136.80 14.57% 0.15 410.40 17.60% 0.18 492.48 18.73% 0.19 519.84 23.77% 0.24 656.64 15.86% 0.16 437.76 2.99% 0.03 54.72 2736.00
CURVA DE PVC SP 90° DN 15MM und 212.0000 1.02 216.24 1.45% 3.07 3.13 5.03% 10.66 10.87 14.57% 30.89 31.51 17.60% 37.31 38.06 18.73% 39.71 40.50 23.77% 50.39 51.40 15.86% 33.62 34.29 2.99% 6.34 6.48 216.24
TUBERIA PVC ISO 1452 PN 10 U.F. DN 160MM L=6.00M m 613.9790 28.07 17,234.39 1.45% 8.90 249.82 5.03% 30.88 866.80 14.57% 89.46 2511.14 17.60% 108.06 3033.24 18.73% 115.00 3228.05 23.77% 145.94 4096.54 15.86% 97.38 2733.46 2.99% 18.36 515.34 17234.39
TUBERIA PVC ISO 1452 PN 10 U.F. DN 200MM L=6.00M m 1,354.3356 43.87 59,414.70 1.45% 19.64 861.61 5.03% 68.12 2988.42 14.57% 197.33 8656.87 17.60% 238.36 10456.85 18.73% 253.67 11128.50 23.77% 321.93 14123.07 15.86% 214.80 9423.28 2.99% 40.49 1776.10 59414.70
TUBERIA PVC ISO 1452 CLASE 10 U.F. DN 90MM L=6.00M m 1,294.6452 8.91 11,535.29 1.45% 18.77 167.24 5.03% 65.12 580.22 14.57% 188.63 1680.69 17.60% 227.86 2030.23 18.73% 242.49 2160.59 23.77% 307.74 2741.96 15.86% 205.33 1829.49 2.99% 38.71 344.87 11535.29
TUBERIA PVC ISO 1452 PN 10 U.F. DN 110MM L=6.00M m 6,621.5654 13.36 88,464.11 1.45% 96.01 1282.69 5.03% 333.06 4449.68 14.57% 964.76 12889.19 17.60% 1165.40 15569.74 18.73% 1240.22 16569.34 23.77% 1573.95 21027.97 15.86% 1050.18 14030.40 2.99% 197.98 2645.10 88464.11
ANILLO DE CAUCHO P/TUB. PVC U.F. AGUA DN 90MM und 215.7742 1.63 351.71 1.45% 3.13 5.10 5.03% 10.85 17.69 14.57% 31.44 51.25 17.60% 37.98 61.91 18.73% 40.41 65.87 23.77% 51.29 83.60 15.86% 34.22 55.78 2.99% 6.45 10.51 351.71
ANILLO DE CAUCHO P/TUB. PVC U.F. AGUA DN 110MM und 1,126.9621 2.20 2,479.32 1.45% 16.34 35.95 5.03% 56.69 124.72 14.57% 164.20 361.24 17.60% 198.35 436.37 18.73% 211.08 464.38 23.77% 267.88 589.34 15.86% 178.74 393.23 2.99% 33.70 74.09 2479.32
ANILLO DE CAUCHO P/TUB. PVC U.F. AGUA DN 200MM und 225.7226 4.68 1,056.38 1.45% 3.27 15.30 5.03% 11.35 53.12 14.57% 32.89 153.93 17.60% 39.73 185.94 18.73% 42.28 197.87 23.77% 53.65 251.08 15.86% 35.80 167.54 2.99% 6.75 31.60 1056.38
ANILLO DE CAUCHO P/TUB. PVC U.F. AGUA DN 160MM und 102.3298 3.95 404.20 1.45% 1.48 5.85 5.03% 5.15 20.34 14.57% 14.91 58.89 17.60% 18.01 71.14 18.73% 19.17 75.72 23.77% 24.32 96.06 15.86% 16.23 64.11 2.99% 3.06 12.09 404.20
TUBERIA PVC ISO 1452 PN 15 U.F. DN 110MM L=6.00M m 142.1880 18.85 2,680.24 1.45% 2.06 38.83 5.03% 7.15 134.78 14.57% 20.72 390.57 17.60% 25.03 471.82 18.73% 26.63 501.98 23.77% 33.80 637.13 15.86% 22.55 425.07 2.99% 4.25 80.06 2680.24
TUBERIA PVC S/P AGUA CLASE 10 DN 1/2" m 929.8320 1.38 1,283.17 1.45% 13.48 18.60 5.03% 46.77 64.54 14.57% 135.48 186.96 17.60% 163.65 225.84 18.73% 174.16 240.34 23.77% 221.02 305.01 15.86% 147.47 203.51 2.99% 27.80 38.37 1283.17
CODO 45º PVC P/AGUA S.P. DE DN 1/2" und 424.0000 0.92 390.08 1.45% 6.15 5.66 5.03% 21.33 19.62 14.57% 61.78 56.84 17.60% 74.62 68.65 18.73% 79.42 73.07 23.77% 100.78 92.72 15.86% 67.25 61.87 2.99% 12.68 11.65 390.08
CURVA A 90º PVC P/AGUA EMP. ESPIGA CAMP.DN1/2" und 252.0000 1.02 257.04 1.45% 3.65 3.72 5.03% 12.68 12.93 14.57% 36.72 37.45 17.60% 44.35 45.24 18.73% 47.20 48.14 23.77% 59.90 61.10 15.86% 39.97 40.77 2.99% 7.53 7.69 257.04
TEE DE PVC-U UF PARA AGUA DN 160MM x 160MM und 4.0000 197.92 791.68 1.45% 0.06 11.88 5.03% 0.20 39.58 14.57% 0.58 114.79 17.60% 0.70 138.54 18.73% 0.75 148.44 23.77% 0.95 188.02 15.86% 0.63 124.69 2.99% 0.12 25.74 791.68
REDUCCION DE PVC P/AGUA UF DE DN 160MM x 90MM und 2.0000 28.95 57.90 1.45% 0.03 0.87 5.03% 0.10 2.90 14.57% 0.29 8.40 17.60% 0.35 10.13 18.73% 0.37 10.71 23.77% 0.48 13.90 15.86% 0.32 9.26 2.99% 0.06 1.73 57.90
UNION PVC P/AGUA EMP.CAMPANA ROSCADO DN1/2" und 424.0000 0.59 250.16 1.45% 6.15 3.63 5.03% 21.33 12.58 14.57% 61.78 36.45 17.60% 74.62 44.03 18.73% 79.42 46.86 23.77% 100.78 59.46 15.86% 67.25 39.68 2.99% 12.68 7.47 250.16
TAPON DE PVC-U UF DN 90MM und 5.0000 33.23 166.15 1.45% 0.07 2.33 5.03% 0.25 8.31 14.57% 0.73 24.26 17.60% 0.88 29.24 18.73% 0.94 31.24 23.77% 1.19 39.54 15.86% 0.79 26.25 2.99% 0.15 4.98 166.15
TAPON PVC UF P/AGUA DN 160MM und 13.6064 97.28 1,323.63 1.45% 0.20 19.46 5.03% 0.68 66.15 14.57% 1.98 192.61 17.60% 2.39 232.50 18.73% 2.55 248.06 23.77% 3.23 314.21 15.86% 2.16 210.12 2.99% 0.41 40.52 1323.63
TAPON PVC UF P/AGUA DN 110MM und 0.9093 35.27 32.07 1.45% 0.01 0.35 5.03% 0.05 1.76 14.57% 0.13 4.59 17.60% 0.16 5.64 18.73% 0.17 6.00 23.77% 0.22 7.76 15.86% 0.14 4.94 2.99% 0.03 1.03 32.07
LLAVE CORPORATION RESINA TERMP 1/2" und 252.0000 3.23 813.96 1.45% 3.65 11.79 5.03% 12.68 40.96 14.57% 36.72 118.61 17.60% 44.35 143.25 18.73% 47.20 152.46 23.77% 59.90 193.48 15.86% 39.97 129.10 2.99% 7.53 24.31 813.96
NIPLE DE PVC PESTAÑA-TRANSICION DE 1/2" und 252.0000 0.50 126.00 1.45% 3.65 1.83 5.03% 12.68 6.34 14.57% 36.72 18.36 17.60% 44.35 22.18 18.73% 47.20 23.60 23.77% 59.90 29.95 15.86% 39.97 19.99 2.99% 7.53 3.75 126.00
NIPLE DE PVC PESTAÑA-ROSCA DE 1/2" und 424.0000 0.56 237.44 1.45% 6.15 3.44 5.03% 21.33 11.94 14.57% 61.78 34.60 17.60% 74.62 41.79 18.73% 79.42 44.48 23.77% 100.78 56.44 15.86% 67.25 37.66 2.99% 12.68 7.09 237.44
NIPLE DE PVC ROSCADO 3/4" X 7 1/2" (R.MEDIDOR) und 212.0000 1.30 275.60 1.45% 3.07 3.99 5.03% 10.66 13.86 14.57% 30.89 40.16 17.60% 37.31 48.50 18.73% 39.71 51.62 23.77% 50.39 65.51 15.86% 33.62 43.71 2.99% 6.34 8.25 275.60
TUERCA DE PVC P/CONEX.DOMIC.DE 1/2" und 676.0000 0.53 358.28 1.45% 9.80 5.19 5.03% 34.00 18.02 14.57% 98.49 52.20 17.60% 118.98 63.06 18.73% 126.61 67.10 23.77% 160.69 85.17 15.86% 107.21 56.82 2.99% 20.21 10.72 358.28
VALVULA PASO RESIN.TERMOPL.DN 15 C/NIPLE TEL.,TUERCA+EMP. und 212.0000 12.36 2,620.32 1.45% 3.07 37.95 5.03% 10.66 131.76 14.57% 30.89 381.80 17.60% 37.31 461.15 18.73% 39.71 490.82 23.77% 50.39 622.82 15.86% 33.62 415.54 2.99% 6.34 78.48 2620.32
VALVULA PASO RESIN.TERMOPL.DN 15 C/SALIDA AUX.,TUERCA+EMP. und 212.0000 12.36 2,620.32 1.45% 3.07 37.95 5.03% 10.66 131.76 14.57% 30.89 381.80 17.60% 37.31 461.15 18.73% 39.71 490.82 23.77% 50.39 622.82 15.86% 33.62 415.54 2.99% 6.34 78.48 2620.32
MEDIDOR PARA CONEXIÓN DOM. DN 15MM TIPO CHORRO MÚLTIPLE SE und 724.0000 38.14 27,613.36 1.45% 10.50 400.47 5.03% 36.42 1389.06 14.57% 105.49 4023.39 17.60% 127.42 4859.80 18.73% 135.61 5172.17 23.77% 172.09 6563.51 15.86% 114.83 4379.62 2.99% 21.65 825.34 27613.36
ABRAZADERA DE PVC DN 150MM X 15MM und 148.4000 19.25 2,856.70 1.45% 2.15 41.39 5.03% 7.46 143.61 14.57% 21.62 416.19 17.60% 26.12 502.81 18.73% 27.80 535.15 23.77% 35.27 678.95 15.86% 23.54 453.15 2.99% 4.44 85.45 2856.70
ABRAZADERA COLGADOR FO.GO. P/TUB. PVC 6" und 29.0000 15.00 435.00 1.45% 0.42 6.30 5.03% 1.46 21.90 14.57% 4.23 63.45 17.60% 5.10 76.50 18.73% 5.43 81.45 23.77% 6.89 103.35 15.86% 4.60 69.00 2.99% 0.87 13.05 435.00
DISPOSITIVO DE SEGURIDAD ACERO-TIPO ARGOLLA P/MEDIDOR DN 15 und 724.0000 15.00 10,860.00 1.45% 10.50 157.50 5.03% 36.42 546.30 14.57% 105.49 1582.35 17.60% 127.42 1911.30 18.73% 135.61 2034.15 23.77% 172.09 2581.35 15.86% 114.83 1722.45 2.99% 21.65 324.60 10860.00
CODO DE PVC-U UF PARA AGUA DE 45° DN 160MM und 5.0000 112.75 563.75 1.45% 0.07 7.89 5.03% 0.25 28.19 14.57% 0.73 82.31 17.60% 0.88 99.22 18.73% 0.94 105.99 23.77% 1.19 134.17 15.86% 0.79 89.07 2.99% 0.15 16.91 563.75
CODO DE PVC-U UF PARA AGUA DE 90° DN 110MM und 6.0000 58.47 350.82 1.45% 0.09 5.26 5.03% 0.30 17.54 14.57% 0.87 50.87 17.60% 1.06 61.98 18.73% 1.12 65.49 23.77% 1.43 83.61 15.86% 0.95 55.55 2.99% 0.18 10.52 350.82
CODO DE PVC-U UF PARA AGUA DE 11.25° DN 160MM und 7.0000 91.78 642.46 1.45% 0.10 9.18 5.03% 0.35 32.12 14.57% 1.02 93.62 17.60% 1.23 112.89 18.73% 1.31 120.23 23.77% 1.66 152.35 15.86% 1.11 101.88 2.99% 0.21 20.19 642.46
CODO DE PVC-U UF PARA AGUA DE 11.25° DN 110MM und 8.0000 64.88 519.04 1.45% 0.12 7.79 5.03% 0.40 25.95 14.57% 1.17 75.91 17.60% 1.41 91.48 18.73% 1.50 97.32 23.77% 1.90 123.27 15.86% 1.27 82.40 2.99% 0.24 14.92 519.04
TEE DE PVC-U UF PARA AGUA DN 90MM x 90MM und 1.0000 87.01 87.01 1.45% 0.01 0.87 5.03% 0.05 4.35 14.57% 0.15 13.05 17.60% 0.18 15.66 18.73% 0.19 16.53 23.77% 0.24 20.88 15.86% 0.16 13.92 2.99% 0.03 1.75 87.01
CRUZ DE PVC P/AGUA UF DE DN 90MM X 90MM (3" X 3") und 6.0000 66.56 399.36 1.45% 0.09 5.99 5.03% 0.30 19.97 14.57% 0.87 57.91 17.60% 1.06 70.55 18.73% 1.12 74.55 23.77% 1.43 95.18 15.86% 0.95 63.23 2.99% 0.18 11.98 399.36
CRUZ DE PVC P/AGUA UF DE DN 110MM X 110MM (4" X 4") und 4.0000 103.57 414.28 1.45% 0.06 6.21 5.03% 0.20 20.71 14.57% 0.58 60.07 17.60% 0.70 72.50 18.73% 0.75 77.68 23.77% 0.95 98.39 15.86% 0.63 65.25 2.99% 0.12 13.47 414.28
REDUCCION DE PVC P/AGUA UF DE DN 110MM x 90MM und 3.0000 17.63 52.89 1.45% 0.04 0.71 5.03% 0.15 2.64 14.57% 0.44 7.76 17.60% 0.53 9.34 18.73% 0.56 9.87 23.77% 0.71 12.52 15.86% 0.48 8.46 2.99% 0.09 1.59 52.89
REDUCCION DE PVC P/AGUA UF DE DN 160MM x 110MM und 1.0000 32.70 32.70 1.45% 0.01 0.33 5.03% 0.05 1.64 14.57% 0.15 4.91 17.60% 0.18 5.89 18.73% 0.19 6.21 23.77% 0.24 7.85 15.86% 0.16 5.23 2.99% 0.03 0.64 32.70
CODO DE PVC-U UF PARA AGUA DE 22.50° DN 110MM und 38.0000 60.27 2,290.26 1.45% 0.55 33.15 5.03% 1.91 115.12 14.57% 5.54 333.90 17.60% 6.69 403.21 18.73% 7.12 429.12 23.77% 9.03 544.24 15.86% 6.03 363.43 2.99% 1.14 68.09 2290.26
TEE DE PVC-U UF PARA AGUA DN 110MM x 110MM und 7.0000 96.89 678.23 1.45% 0.10 9.69 5.03% 0.35 33.91 14.57% 1.02 98.83 17.60% 1.23 119.17 18.73% 1.31 126.93 23.77% 1.66 160.84 15.86% 1.11 107.55 2.99% 0.21 21.31 678.23
5 de 7
CRONOGRAMA DE ADQUISICIÓN DE MATERIALES
Proyecto: "MEJORAMIENTO Y AMPLIACIÓN DEL SERVICIO DE SANEAMIENTO BASICO EN LA LOCALIDAD DE ANTAUTA, DISTRITO DE ANTAUTA - MELGAR - PUNO"
Duracion: 270 Dias Calendarios
1 MES 2 MES 3 MES 4 MES 5 MES 6 MES 7 MES 8 MES
DESCRIPCION (MATERIALES) UND CANT. P.U PARCIAL TOTAL
% CANT. SUBTOTAL % CANT. SUBTOTAL % CANT. SUBTOTAL % CANT. SUBTOTAL % CANT. SUBTOTAL % CANT. SUBTOTAL % CANT. SUBTOTAL % CANT. SUBTOTAL
CODO DE PVC-U UF PARA AGUA DE 45° DN 110MM und 48.0000 60.27 2,892.96 1.45% 0.70 42.19 5.03% 2.41 145.25 14.57% 6.99 421.29 17.60% 8.45 509.28 18.73% 8.99 541.83 23.77% 11.41 687.68 15.86% 7.61 458.65 2.99% 1.44 86.79 2892.96
CODO DE PVC-U UF PARA AGUA DE 22.50° DN 160MM und 4.0000 112.75 451.00 1.45% 0.06 6.77 5.03% 0.20 22.55 14.57% 0.58 65.40 17.60% 0.70 78.93 18.73% 0.75 84.56 23.77% 0.95 107.11 15.86% 0.63 71.03 2.99% 0.12 14.65 451.00
TEE DE PVC-U UF PARA AGUA DN 110MM x 90MM und 3.0000 106.77 320.31 1.45% 0.04 4.27 5.03% 0.15 16.02 14.57% 0.44 46.98 17.60% 0.53 56.59 18.73% 0.56 59.79 23.77% 0.71 75.81 15.86% 0.48 51.25 2.99% 0.09 9.60 320.31
CODO DE PVC-U UF PARA AGUA DE 11.25° DN 90MM und 5.0000 21.08 105.40 1.45% 0.07 1.48 5.03% 0.25 5.27 14.57% 0.73 15.39 17.60% 0.88 18.55 18.73% 0.94 19.82 23.77% 1.19 25.09 15.86% 0.79 16.65 2.99% 0.15 3.15 105.40
SUMINISTRO DE TUBERIA DE HIERRO DUCTIL ACERROJADA K-9 DN 100 m 27.3360 115.00 3,143.64 1.45% 0.40 46.00 5.03% 1.38 158.70 14.57% 3.98 457.70 17.60% 4.81 553.15 18.73% 5.12 588.80 23.77% 6.50 747.50 15.86% 4.34 499.10 2.99% 0.82 92.69 3143.64
TUBERIA DE HFD K-9 STANDARD DN 200MM (L=6M) m 111.1000 150.00 16,665.00 1.45% 1.61 241.50 5.03% 5.59 838.50 14.57% 16.19 2428.50 17.60% 19.55 2932.50 18.73% 20.81 3121.50 23.77% 26.41 3961.50 15.86% 17.62 2643.00 2.99% 3.32 498.00 16665.00
TUBERIA DE HFD K-9 STANDARD DN 250MM (L=6M) m 222.2000 190.00 42,218.00 1.45% 3.22 611.80 5.03% 11.18 2124.20 14.57% 32.37 6150.30 17.60% 39.11 7430.90 18.73% 41.62 7907.80 23.77% 52.82 10035.80 15.86% 35.24 6695.60 2.99% 6.64 1261.60 42218.00
TUBERIA DE HFD K-9 STAND.ACERROJ DN 200MM (L=6M) m 10.2000 252.91 2,579.68 1.45% 0.15 37.94 5.03% 0.51 128.98 14.57% 1.49 376.84 17.60% 1.80 455.24 18.73% 1.91 483.06 23.77% 2.42 612.04 15.86% 1.62 409.71 2.99% 0.30 75.87 2579.68
CODO DE HFD 90º BRIDADA DN 100MM und 14.0000 108.50 1,519.00 1.45% 0.20 21.70 5.03% 0.70 75.95 14.57% 2.04 221.34 17.60% 2.46 266.91 18.73% 2.62 284.27 23.77% 3.33 361.31 15.86% 2.22 240.87 2.99% 0.42 46.65 1519.00
CODO DE HFD 90º BRIDADA DN 150MM und 13.0000 211.50 2,749.50 1.45% 0.19 40.19 5.03% 0.65 137.48 14.57% 1.89 399.74 17.60% 2.29 484.34 18.73% 2.43 513.95 23.77% 3.09 653.54 15.86% 2.06 435.69 2.99% 0.39 84.57 2749.50
CODO DE HFD 90º BRIDADA DN 200MM und 7.0000 325.00 2,275.00 1.45% 0.10 32.50 5.03% 0.35 113.75 14.57% 1.02 331.50 17.60% 1.23 399.75 18.73% 1.31 425.75 23.77% 1.66 539.50 15.86% 1.11 360.75 2.99% 0.21 71.50 2275.00
CODO DE HFD 90º BRIDADA DN 250MM und 1.0000 450.00 450.00 1.45% 0.01 4.50 5.03% 0.05 22.50 14.57% 0.15 67.50 17.60% 0.18 81.00 18.73% 0.19 85.50 23.77% 0.24 108.00 15.86% 0.16 72.00 2.99% 0.03 9.00 450.00
CODO DE HFD 45º BRIDADA DN 100MM und 14.0000 96.50 1,351.00 1.45% 0.20 19.30 5.03% 0.70 67.55 14.57% 2.04 196.86 17.60% 2.46 237.39 18.73% 2.62 252.83 23.77% 3.33 321.35 15.86% 2.22 214.23 2.99% 0.42 41.49 1351.00
CODO DE HFD 45º BRIDADA DN 150MM und 17.0000 191.80 3,260.60 1.45% 0.25 47.95 5.03% 0.86 164.95 14.57% 2.48 475.66 17.60% 2.99 573.48 18.73% 3.18 609.92 23.77% 4.04 774.87 15.86% 2.70 517.86 2.99% 0.51 95.91 3260.60
CODO DE HFD 45º BRIDADA DN 200MM und 9.0000 325.00 2,925.00 1.45% 0.13 42.25 5.03% 0.45 146.25 14.57% 1.31 425.75 17.60% 1.58 513.50 18.73% 1.69 549.25 23.77% 2.14 695.50 15.86% 1.43 464.75 2.99% 0.27 87.75 2925.00
CODO DE HFD 22.5º BRIDADA DN 150MM und 8.0000 339.48 2,715.84 1.45% 0.12 40.74 5.03% 0.40 135.79 14.57% 1.17 397.19 17.60% 1.41 478.67 18.73% 1.50 509.22 23.77% 1.90 645.01 15.86% 1.27 431.14 2.99% 0.24 78.08 2715.84
TEE DE HFD EXPRESS DERIV BRIDADA DN 100x100MM und 5.0000 280.44 1,402.20 1.45% 0.07 19.63 5.03% 0.25 70.11 14.57% 0.73 204.72 17.60% 0.88 246.79 18.73% 0.94 263.61 23.77% 1.19 333.72 15.86% 0.79 221.55 2.99% 0.15 42.07 1402.20
TEE DE HFD EXPRESS DERIV BRIDADA DN 150x50MM und 5.0000 407.56 2,037.80 1.45% 0.07 28.53 5.03% 0.25 101.89 14.57% 0.73 297.52 17.60% 0.88 358.65 18.73% 0.94 383.11 23.77% 1.19 485.00 15.86% 0.79 321.97 2.99% 0.15 61.13 2037.80
REDUCCION HFD BRIDADA DN 100x50MM und 5.0000 125.00 625.00 1.45% 0.07 8.75 5.03% 0.25 31.25 14.57% 0.73 91.25 17.60% 0.88 110.00 18.73% 0.94 117.50 23.77% 1.19 148.75 15.86% 0.79 98.75 2.99% 0.15 18.75 625.00
REDUCCION HFD BRIDADA DN 150x100MM und 4.0000 350.00 1,400.00 1.45% 0.06 21.00 5.03% 0.20 70.00 14.57% 0.58 203.00 17.60% 0.70 245.00 18.73% 0.75 262.50 23.77% 0.95 332.50 15.86% 0.63 220.50 2.99% 0.12 45.50 1400.00
REDUCCION HFD BRIDADA DN 200x150MM und 1.0000 325.00 325.00 1.45% 0.01 3.25 5.03% 0.05 16.25 14.57% 0.15 48.75 17.60% 0.18 58.50 18.73% 0.19 61.75 23.77% 0.24 78.00 15.86% 0.16 52.00 2.99% 0.03 6.50 325.00
REDUCCION HFD BRIDADA DN 250x150MM und 1.0000 280.00 280.00 1.45% 0.01 2.80 5.03% 0.05 14.00 14.57% 0.15 42.00 17.60% 0.18 50.40 18.73% 0.19 53.20 23.77% 0.24 67.20 15.86% 0.16 44.80 2.99% 0.03 5.60 280.00
ACOPLE DE AMPLIO RANGO MAXI FIT P/TUB DN 110MM und 4.0000 24.32 97.28 1.45% 0.06 1.46 5.03% 0.20 4.86 14.57% 0.58 14.11 17.60% 0.70 17.02 18.73% 0.75 18.24 23.77% 0.95 23.10 15.86% 0.63 15.32 2.99% 0.12 3.17 97.28
ACOPLE DE AMPLIO RANGO MAXI FIT P/TUB DN 90MM und 5.0000 52.46 262.30 1.45% 0.07 3.67 5.03% 0.25 13.12 14.57% 0.73 38.30 17.60% 0.88 46.16 18.73% 0.94 49.31 23.77% 1.19 62.43 15.86% 0.79 41.44 2.99% 0.15 7.87 262.30
MANGA DE POLIETILENO P/TUB HFD DN 250MM m2 299.2000 6.15 1,840.08 1.45% 4.34 26.69 5.03% 15.05 92.56 14.57% 43.59 268.08 17.60% 52.66 323.86 18.73% 56.04 344.65 23.77% 71.12 437.39 15.86% 47.45 291.82 2.99% 8.95 55.03 1840.08
MANGA DE POLIETILENO P/TUB HFD DN 200MM m2 138.9300 5.80 805.79 1.45% 2.01 11.66 5.03% 6.99 40.54 14.57% 20.24 117.39 17.60% 24.45 141.81 18.73% 26.02 150.92 23.77% 33.02 191.52 15.86% 22.03 127.77 2.99% 4.15 24.18 805.79
CINTA TEFLON rll 71.1120 1.23 87.47 1.45% 1.03 1.27 5.03% 3.58 4.40 14.57% 10.36 12.74 17.60% 12.52 15.40 18.73% 13.32 16.38 23.77% 16.90 20.79 15.86% 11.28 13.87 2.99% 2.13 2.62 87.47
UNION DE DESMONTAJE AUTOPORTANTE DN 100MM und 20.0000 214.30 4,286.00 1.45% 0.29 62.15 5.03% 1.01 216.44 14.57% 2.91 623.61 17.60% 3.52 754.34 18.73% 3.75 803.63 23.77% 4.75 1017.93 15.86% 3.17 679.33 2.99% 0.60 128.57 4286.00
UNION DE DESMONTAJE AUTOPORTANTE DN 150MM und 13.0000 346.10 4,499.30 1.45% 0.19 65.76 5.03% 0.65 224.97 14.57% 1.89 654.13 17.60% 2.29 792.57 18.73% 2.43 841.02 23.77% 3.09 1069.45 15.86% 2.06 712.97 2.99% 0.39 138.43 4499.30
UNION DE DESMONTAJE AUTOPORTANTE DN 200MM und 5.0000 450.00 2,250.00 1.45% 0.07 31.50 5.03% 0.25 112.50 14.57% 0.73 328.50 17.60% 0.88 396.00 18.73% 0.94 423.00 23.77% 1.19 535.50 15.86% 0.79 355.50 2.99% 0.15 67.50 2250.00
UNION DE DESMONTAJE AUTOPORTANTE DN 250MM und 2.0000 800.00 1,600.00 1.45% 0.03 24.00 5.03% 0.10 80.00 14.57% 0.29 232.00 17.60% 0.35 280.00 18.73% 0.37 296.00 23.77% 0.48 384.00 15.86% 0.32 256.00 2.99% 0.06 48.00 1600.00
COMPUERTA DE FIERRO CON VOLANTE 0.30x0.30M. und 12.0000 658.00 7,896.00 1.45% 0.17 111.86 5.03% 0.60 394.80 14.57% 1.75 1151.50 17.60% 2.11 1388.38 18.73% 2.25 1480.50 23.77% 2.85 1875.30 15.86% 1.90 1250.20 2.99% 0.36 243.46 7896.00
VALVULA COMPUERTA HFD C/ASIENTO ELASTICO BRIDADO 50MM und 5.0000 329.28 1,646.40 1.45% 0.07 23.05 5.03% 0.25 82.32 14.57% 0.73 240.37 17.60% 0.88 289.77 18.73% 0.94 309.52 23.77% 1.19 391.84 15.86% 0.79 260.13 2.99% 0.15 49.40 1646.40
VALVULA COMPUERTA HFD C/ASIENTO ELASTICO BRIDADO 100MM und 22.0000 274.80 6,045.60 1.45% 0.32 87.94 5.03% 1.11 305.03 14.57% 3.21 882.11 17.60% 3.87 1063.48 18.73% 4.12 1132.18 23.77% 5.23 1437.20 15.86% 3.49 959.05 2.99% 0.66 178.61 6045.60
VALVULA COMPUERTA HFD C/ASIENTO ELASTICO BRIDADO 150MM und 13.0000 496.80 6,458.40 1.45% 0.19 94.39 5.03% 0.65 322.92 14.57% 1.89 938.95 17.60% 2.29 1137.67 18.73% 2.43 1207.22 23.77% 3.09 1535.11 15.86% 2.06 1023.41 2.99% 0.39 198.73 6458.40
VALVULA COMPUERTA HFD C/ASIENTO ELASTICO BRIDADO 200MM und 5.0000 912.40 4,562.00 1.45% 0.07 63.87 5.03% 0.25 228.10 14.57% 0.73 666.05 17.60% 0.88 802.91 18.73% 0.94 857.66 23.77% 1.19 1085.76 15.86% 0.79 720.80 2.99% 0.15 136.85 4562.00
VALVULA COMPUERTA HFD C/ASIENTO ELASTICO BRIDADO 250MM und 2.0000 1,250.00 2,500.00 1.45% 0.03 37.50 5.03% 0.10 125.00 14.57% 0.29 362.50 17.60% 0.35 437.50 18.73% 0.37 462.50 23.77% 0.48 600.00 15.86% 0.32 400.00 2.99% 0.06 75.00 2500.00
VALVULA COMPUERTA HFD C/ASIENTO ELAST. E/ENCHUFE 90MM und 1.0000 189.95 189.95 1.45% 0.01 1.90 5.03% 0.05 9.50 14.57% 0.15 28.49 17.60% 0.18 34.19 18.73% 0.19 36.09 23.77% 0.24 45.59 15.86% 0.16 30.39 2.99% 0.03 3.80 189.95
VALVULA COMPUERTA HFD C/ASIENTO ELAST. E/ENCHUFE 110MM und 4.0000 219.65 878.60 1.45% 0.06 13.18 5.03% 0.20 43.93 14.57% 0.58 127.40 17.60% 0.70 153.76 18.73% 0.75 164.74 23.77% 0.95 208.67 15.86% 0.63 138.38 2.99% 0.12 28.54 878.60
VALVULA COMPUERTA HFD C/ASIENTO ELAST. E/ENCHUFE 160MM und 2.0000 429.06 858.12 1.45% 0.03 12.87 5.03% 0.10 42.91 14.57% 0.29 124.43 17.60% 0.35 150.17 18.73% 0.37 158.75 23.77% 0.48 205.95 15.86% 0.32 137.30 2.99% 0.06 25.74 858.12
VALVULA DE AIRE TRIPLE EFECTO BRIDADA PN 16 DN 50MM und 5.0000 890.00 4,450.00 1.45% 0.07 62.30 5.03% 0.25 222.50 14.57% 0.73 649.70 17.60% 0.88 783.20 18.73% 0.94 836.60 23.77% 1.19 1059.10 15.86% 0.79 703.10 2.99% 0.15 133.50 4450.00
VALVULA REDUCTORA DE PRESION DE FO FDO DN 150MM CONTROL P und 4.0000 4,715.00 18,860.00 1.45% 0.06 282.90 5.03% 0.20 943.00 14.57% 0.58 2734.70 17.60% 0.70 3300.50 18.73% 0.75 3536.25 23.77% 0.95 4479.25 15.86% 0.63 2970.45 2.99% 0.12 612.95 18860.00
MEDIDOR DE CAUDAL TUBULAR BRIDADO 4" (100MM) und 2.0000 2,500.00 5,000.00 1.45% 0.03 75.00 5.03% 0.10 250.00 14.57% 0.29 725.00 17.60% 0.35 875.00 18.73% 0.37 925.00 23.77% 0.48 1200.00 15.86% 0.32 800.00 2.99% 0.06 150.00 5000.00
MANOMETRO DE 0 A 300 LBS/PULG2 INC.ACCESORIOS und 11.0000 66.85 735.35 1.45% 0.16 10.70 5.03% 0.55 36.77 14.57% 1.60 106.96 17.60% 1.94 129.69 18.73% 2.06 137.71 23.77% 2.61 174.48 15.86% 1.74 116.32 2.99% 0.33 22.72 735.35
CANASTILLA DE BRONCE BRIDADA DN 200MM (8") und 1.0000 350.00 350.00 1.45% 0.01 3.50 5.03% 0.05 17.50 14.57% 0.15 52.50 17.60% 0.18 63.00 18.73% 0.19 66.50 23.77% 0.24 84.00 15.86% 0.16 56.00 2.99% 0.03 7.00 350.00
CANASTILLA DE BRONCE BRIDADA DN 100MM (4") und 2.0000 210.00 420.00 1.45% 0.03 6.30 5.03% 0.10 21.00 14.57% 0.29 60.90 17.60% 0.35 73.50 18.73% 0.37 77.70 23.77% 0.48 100.80 15.86% 0.32 67.20 2.99% 0.06 12.60 420.00
COMPUERTA METALICA MANUAL DE 0.50x0.82 und 2.0000 1,000.00 2,000.00 1.45% 0.03 30.00 5.03% 0.10 100.00 14.57% 0.29 290.00 17.60% 0.35 350.00 18.73% 0.37 370.00 23.77% 0.48 480.00 15.86% 0.32 320.00 2.99% 0.06 60.00 2000.00
TUBO PVC SAP DE 100MM (4¨) m 16.8000 15.95 267.96 1.45% 0.24 3.83 5.03% 0.85 13.56 14.57% 2.45 39.08 17.60% 2.96 47.21 18.73% 3.15 50.24 23.77% 3.99 63.64 15.86% 2.66 42.43 2.99% 0.50 7.97 267.96
TUBO PVC SP PN 5 DN 200MM m 41.2685 35.00 1,444.40 1.45% 0.60 21.00 5.03% 2.08 72.80 14.57% 6.01 210.35 17.60% 7.26 254.10 18.73% 7.73 270.55 23.77% 9.81 343.35 15.86% 6.55 229.25 2.99% 1.23 43.00 1444.40
PERNO OJO ANGULAR DE 16MM DE DIAMx254,0MM DE LONG (5/8"x10") und 8.0000 4.00 32.00 1.45% 0.12 0.48 5.03% 0.40 1.60 14.57% 1.17 4.68 17.60% 1.41 5.64 18.73% 1.50 6.00 23.77% 1.90 7.60 15.86% 1.27 5.08 2.99% 0.24 0.92 32.00
VALVULA DE CONTROL DE NIVEL DN 100MM CON FLOTADOR VERTICAL und 1.0000 7,595.00 7,595.00 1.45% 0.01 75.95 5.03% 0.05 379.75 14.57% 0.15 1139.25 17.60% 0.18 1367.10 18.73% 0.19 1443.05 23.77% 0.24 1822.80 15.86% 0.16 1215.20 2.99% 0.03 151.90 7595.00
CARTEL DE OBRA DE 5.40X3.60M und 1.0000 750.00 750.00 1.45% 0.01 7.50 5.03% 0.05 37.50 14.57% 0.15 112.50 17.60% 0.18 135.00 18.73% 0.19 142.50 23.77% 0.24 180.00 15.86% 0.16 120.00 2.99% 0.03 15.00 750.00
ESCALERA MARINERA C/TUB FO.GO. DE 2"X3/4" m 10.0000 85.00 850.00 1.45% 0.15 12.75 5.03% 0.50 42.50 14.57% 1.46 124.10 17.60% 1.76 149.60 18.73% 1.87 158.95 23.77% 2.38 202.30 15.86% 1.59 135.15 2.99% 0.30 24.65 850.00
ESCALERA MARINERA C/TUB FO.GO. DE 1 1/2"X3/4" m 18.0250 50.00 901.25 1.45% 0.26 13.00 5.03% 0.91 45.50 14.57% 2.63 131.50 17.60% 3.17 158.50 18.73% 3.38 169.00 23.77% 4.28 214.00 15.86% 2.86 143.00 2.99% 0.54 26.75 901.25
SUB-TOTAL 3,631,258.22 1.45% 52,603.44 5.03% 182,610.31 14.57% 529,103.18 17.60% 639,092.00 18.73% 680,095.81 23.77% 863,286.98 15.86% 575,967.91 2.99% 108,498.59 3,631,258.22
TOTALES 3,631,258.22 1.45% 52,603.44 6.48% 235,213.75 21.05% 764,316.93 38.65% 1,403,408.93 57.38% 2,083,504.74 81.15% 2,946,791.72 97.01% 3,522,759.63 100.00% 3,631,258.22 3,631,258.22
6 de 7
CRONOGRAMA DE DESEMBOLSOS MENSUALES
"MEJORAMIENTO Y AMPLIACIÓN DEL SERVICIO DE SANEAMIENTO BASICO EN LA LOCALIDAD DE ANTAUTA, DISTRITO DE ANTAUTA -
Proyecto : MELGAR - PUNO"