Implementacion-Creacion de Change-Task V1.0
Implementacion-Creacion de Change-Task V1.0
También, tenemos la opción de Open ( ver CHG ya abiertos) y la de Closed ( CHG ya resueltos)
1
Autor: Elio Arancibe
Grupo Adquirencia Web; LTAM.2.WebDev Adquirencia-LAS
8/4/2021 – Versión 1.0
Inicio
Planning
Change Execution Plan =
Follow the instructions in the README.txt file found in the reporhel path:
/catalogaciones/PRD/FDcomar/2021/04-ABRIL/12042021/CHG000540083
AÑO MES FECHA CODIGO DEL CHG
2
Autor: Elio Arancibe
Grupo Adquirencia Web; LTAM.2.WebDev Adquirencia-LAS
8/4/2021 – Versión 1.0
Backout/Roll forward plan = Backout Plan
Backout plan =
Re-deploy the .war files located in the backup folder located in reporhel:
/catalogaciones/PRD/FDcomar/2021/04-ABRIL/12042021/CHG000540083/Backup
AÑO MES FECHA CODIGO DEL CHG
Backout plan duration = Less than 30 minutes
Validation plan = Validate the general functionalities of the application, verifying that the
transactions are correctly displayed in each section.
Client post-implementation validation = YES Inside Maintenance window
Escalation contact = (En caso de error, a quien escalar? ) Dario Flores / Mail o
Telefeono
What functionality is impacted during the change implementation? = Para que
funcionalidad es el cambio? Ej Liquidaciones diarias ( En ingles )
Schedule
Las fechas se planifican solas una vez creadas y rellenadas las tareas
3) Crear tareas
Bajando en la misma pagina del CHG hay una opción con las tareas, por defecto se crean dos
tareas (Execution task y Validation Task)
Es importante que todas las tareas entren en el mismo periodo de 24hrs como máximo
Las tareas pueden superponerse si se pueden realizar en paralelo pero tareas como execution
y validation no se pueden superponer por ejemplo
Execution Task:
Scheduled start/end date = Primeras 23hrs (Ej : Del lunes 12 a las 21hrs hasta el Martes 13
a las 20hrs)
Data Center = Parque patricios
Maintenance window = AppMap Maintenance Window
Environment = Production
Short description = Execution Task
3
Autor: Elio Arancibe
Grupo Adquirencia Web; LTAM.2.WebDev Adquirencia-LAS
8/4/2021 – Versión 1.0
Description = Validate correct implementation of the .war files
Acceptance Criteria = Validate correct implementation of the .war file
Type = Execution
Assignment group = LTAM.3.Middleware-LAT
Roll back = Take the .war file included in the backup folder.
Validation Task:
Scheduled start/end date = Ultima Hora (Ej : Del martes 13 a las 20hrs hasta el Martes 13
a las 21hrs)
Data Center = Parque patricios
Maintenance window = AppMap Maintenance Window
Environment = None
Short description = Validation Task
Description = Validate that the daily settlements are displayed and downloaded
correctly.
Acceptance Criteria = Validate that the daily settlements are displayed and downloaded
correctly.
Type = Validation
Assignment group = LTAM.2.WebDev Adquirencia-LAS
Roll back = Validate that the movement transactions are displayed correctly.
4) IPLAN
En este documento deberíamos rellenar con casi lo mismo que las tareas
No hace falta poner los nros de task solamente con poner el grupo y un estimado de horas esta
bien, buscar ejemplos en CHG anteriores o pedirlos
Una vez rellenado con los datos de contacto y un estimado de la horas hay que adjuntarlo en el
CHG ( Arriba en el CHG hay un botón de un clip como en los incidentes )
4
Autor: Elio Arancibe
Grupo Adquirencia Web; LTAM.2.WebDev Adquirencia-LAS
8/4/2021 – Versión 1.0
2. Reference CMDB: Apretar este botón y es otra verificación por tema de horarios ( por
si un grupo tiene una implementación en el mismo horario etc )
Request Approval