CALCULO TRANSICION PERALTE C.C.

CASO NORMAL PARA VELOCIDADES > 80 KMPH

Camino :
Sector :
Tramo :

VERTICE N° 14 INICIO TRANS. ENTR. 15,122.79 VERTICE N° 16 INICIO TRANS. ENTR. 16,853.50
ALFA 205.23 g BOMB. = 0 15,142.79 ALFA 206.25 g BOMB. = 0 16,873.50
VEL. ESPECIFICA 130.00 Km/h BOMBEO A PERALTE 15,162.79 VEL. ESPECIFICA 130.00 Km/h BOMBEO A PERALTE 16,893.50
RADIO 3,000.00 m FIN TRANS. ENTR. 15,172.79 RADIO 3,000.00 m FIN TRANS. ENTR. 16,903.50
BOMBEO (2.00) % Km FC 15,410.39 BOMBEO (2.00) % Km FC 17,189.12
PISTAS 1.00 N° INICIO TRANS. SALIDA 15,401.39 PISTAS 1.00 N° INICIO TRANS. SALIDA 17,180.12
ANCHO PISTA 3.50 m PERALTE A BOMBEO 15,411.39 ANCHO PISTA 3.50 m PERALTE A BOMBEO 17,190.12
Km PC 15,163.79 m BOMB. = 0 15,431.39 Km PC 16,894.50 m BOMB. = 0 17,210.12
PERALTE 3.203.303 (1) 2.80 % FIN TRANS. SALIDA 15,451.39 PERALTE 3.203.303 (1) 2.80 % FIN TRANS. SALIDA 17,230.12
PERALTE 3.203.303 (2) 3.00 % PERALTE 3.203.303 (2) 3.00 %
P.R.B. A USAR (N-M) n P.R.B. A USAR (N-M) n
PEND. R. B. 0.35 % Des. Mínimo Peralte‗V/3.6 228.60 PEND. R. B. 0.35 % Des. Mínimo Peralte‗V/3.6 276.62
L DESARR. 50.00 m L DESARR. 50.00 m
TASA GIRO 10.00 m TASA GIRO 10.00 m
Km Peralte Deseado 15,180.00 Km Peralte Deseado
Peralte Pista Der. -3.00 % Peralte Pista Der. -2.00 %
Peralte Pista Izq. 3.00 % Peralte Pista Izq. -2.00 %

VERTICE N° 19 INICIO TRANS. ENTR. 18,927.69 VERTICE N° 23 INICIO TRANS. ENTR. 21,458.85
ALFA 194.69 g BOMB. = 0 18,947.69 ALFA 203.87 g BOMB. = 0 21,478.85
VEL. ESPECIFICA 130.00 Km/h BOMBEO A PERALTE 18,967.69 VEL. ESPECIFICA 130.00 Km/h BOMBEO A PERALTE 21,498.85
RADIO 5,000.00 m FIN TRANS. ENTR. 18,967.69 RADIO 5,000.00 m FIN TRANS. ENTR. 21,498.85
BOMBEO (2.00) % Km FC 19,378.50 BOMBEO (2.00) % Km FC 21,797.11
PISTAS 1.00 N° INICIO TRANS. SALIDA 19,372.50 PISTAS 1.00 N° INICIO TRANS. SALIDA 21,791.11
ANCHO PISTA 3.50 m PERALTE A BOMBEO 19,372.50 ANCHO PISTA 3.50 m PERALTE A BOMBEO 21,791.11
Km PC 18,961.69 m BOMB. = 0 19,392.50 Km PC 21,492.85 m BOMB. = 0 21,811.11
PERALTE 3.203.303 (1) 2.00 % FIN TRANS. SALIDA 19,412.50 PERALTE 3.203.303 (1) 2.00 % FIN TRANS. SALIDA 21,831.11
PERALTE 3.203.303 (2) 2.00 % PERALTE 3.203.303 (2) 2.00 %
P.R.B. A USAR (N-M) N P.R.B. A USAR (N-M) N
PEND. R. B. 0.35 % Des. Mínimo Peralte‗V/3.6 404.81 PEND. R. B. 0.35 % Des. Mínimo Peralte‗V/3.6 292.26
L DESARR. 40.00 m L DESARR. 40.00 m
TASA GIRO 10.00 m TASA GIRO 10.00 m
Km Peralte Deseado 6,270.00 Km Peralte Deseado
Peralte Pista Der. -2.00 % Peralte Pista Der. -2.00 %
Peralte Pista Izq. -2.00 % Peralte Pista Izq. -2.00 %

VERTICE N° 26 INICIO TRANS. ENTR. 23,921.65 VERTICE N° 28 INICIO TRANS. ENTR. 25,503.01
ALFA 193.27 g BOMB. = 0 23,941.65 ALFA 194.82 g BOMB. = 0 25,523.01
VEL. ESPECIFICA 130.00 Km/h BOMBEO A PERALTE 23,961.65 VEL. ESPECIFICA 130.00 Km/h BOMBEO A PERALTE 25,543.01
RADIO 3,000.00 m FIN TRANS. ENTR. 23,971.65 RADIO 3,000.00 m FIN TRANS. ENTR. 25,553.01
BOMBEO (2.00) % Km FC 24,279.79 BOMBEO (2.00) % Km FC 25,788.21
PISTAS 1.00 N° INICIO TRANS. SALIDA 24,270.79 PISTAS 1.00 N° INICIO TRANS. SALIDA 25,779.21
ANCHO PISTA 3.50 m PERALTE A BOMBEO 24,280.79 ANCHO PISTA 3.50 m PERALTE A BOMBEO 25,789.21
Km PC 23,962.65 m BOMB. = 0 24,300.79 Km PC 25,544.01 m BOMB. = 0 25,809.21
PERALTE 3.203.303 (1) 2.80 % FIN TRANS. SALIDA 24,320.79 PERALTE 3.203.303 (1) 2.80 % FIN TRANS. SALIDA 25,829.21
PERALTE 3.203.303 (2) 3.00 % PERALTE 3.203.303 (2) 3.00 %
P.R.B. A USAR (N-M) N P.R.B. A USAR (N-M) N
PEND. R. B. 0.35 % Des. Mínimo Peralte‗V/3.6 299.14 PEND. R. B. 0.35 % Des. Mínimo Peralte‗V/3.6 226.20
L DESARR. 50.00 m L DESARR. 50.00 m
TASA GIRO 10.00 m TASA GIRO 10.00 m
CALCULO TRANSICION PERALTE C.C. CASO NORMAL PARA VELOCIDADES > 80 KMPH

Camino :
Sector :
Tramo :
Km Peralte Deseado 23,940.00 Km Peralte Deseado 25,540.00
Peralte Pista Der. -0.17 % Peralte Pista Der. 1.70 %
Peralte Pista Izq. -2.00 % Peralte Pista Izq. -2.00 %