INFORME MENSUAL N° 10
SETIEMBRE DEL 2021
OBRA: "MEJORAMIENTO DE LA
TRANSITABILIDAD VEHICULAR Y PEATONAL DE
LAS CALLES SIN NOMBRE Y ARCANGELES
ENTRE LAS APVS SANTA ROSA COMITÉ 04,
TRES CRUCES Y URB. SAN GABRIEL, DISTRITO
."DE SAN SEBASTIAN - CUSCO - CUSCO
2,021
UNIDAD DE EJECUCIÓN DE OBRAS
SETIEMBRE - 2021
SETIEMBRE - 2021
SETIEMBRE - 2021
FORMATO - 1
CONTENIDO
INFORME TECNICO MENSUAL NRO. 10
SETIEMBRE DEL 2021
"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL DE LAS CALLES SIN NOMBRE Y ARCANGELES ENTRE LAS
NOMBRE DEL PROYECTO: APVS SANTA ROSA COMITÉ 04, TRES CRUCES Y URB. SAN GABRIEL, DISTRITO DE SAN SEBASTIAN - CUSCO - CUSCO"
01
13 PRESUPUESTO DEL EXPEDIENTE TECNICO APROBADO S/. 2,749,287.34 RESOL. DE APROBACION RES. ALC. N° 399-2018-A-MDSS-SG
14 PRESUPUESTO EXPEDIENTE TECNICO MODIFICADO 1 S/. 2,749,288.34 Res.Nº 013-2021-GI-MDSSS
17 PRESUPUESTO EXPEDIENTE TECNICO MODIFICADO 2 S/. 1,097,775.66 RES. Nº 075-2021-GI-MDSS FECHA 7 JUNIO 2021
COSTO DIRECTO EXPEDIENTE TECNICO S/. 2,318,467.23
COSTO DIRECTO EXPEDIENTE TECNICO MODIFICADO N1 C.D. S/. 2,318,467.23
COSTO DIRECTO EXPEDIENTE TECNICO MODIFICADO N2 C.D. S/. 770,937.46
17 MODALIDAD DE EJECUCION: Administracion Directa
18 FINANCIAMIENTO
CANON Y SOBRECANON
19 TIEMPO DE EJECUCION SEGÚN EXPEDIENTE TECNICO 300 (DIAS CALENDARIO)
20 AMPLIACION DE PLAZO 1: 300 (DIAS CALENDARIO)
21 AMPLIACION DE PLAZO 2: 59 (DIAS CALENDARIO)
24 FECHA DE INICIO DE LA EJECUCION: 1-Dec-18
25 FECHA DE CULMINACION PROGRAMADA: 26-Sep-19
26 FECHA DE PARALIZACION N° 1
27 FECHA DE REINICIO DE LA EJECUCION:
28 FECHA DE CULMINACION REPROGRAMADA: 30-Nov-21 Res. Nº116-2021-GI-MDSS
B. AVANCE FISICO
VALORIZACION DE PARTIDAS PROGRAMADAS TOTAL VALORIZACION
SETIEMBRE 2021 10.00 71,967.31 6.56% 71,967.31 6.56% 71,967.31 6.56% 581,631.12 52.98%
TOTAL VALORIZ. 11.00 71,967.31 6.56% 71,967.31 6.56% 71,967.31 6.56% 581,631.12 52.98%
FORMATO - 2
FICHA RESUMEN
RESIDENTE DE OBRA ING. EDWARD OLIVERA VILLANUEVA A partir del 01 de setiembre del 2021
Especialidad : INGENIERO CIVIL
Colegiatura 121435
INSPECTOR DE OBRA ING. RENATO ESPINOZA CACERES A partir del 01 de Noviembre del 2020
Especialidad : INGENIERO CIVIL
Colegiatura 64691
"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL DE LAS CALLES SIN NOMBRE Y ARCANGELES ENTRE LAS APVS
SANTA ROSA COMITÉ 04, TRES CRUCES Y URB. SAN GABRIEL, DISTRITO DE SAN SEBASTIAN - CUSCO - CUSCO"
META (DESCRIPCIÓN):
FOTOGRAFÍA
:
D E S C R IP C IÓ N :
C R O Q UIS D E UB IC A C IÓN : A C C E S O
P R IN C IP A L P O R E L P A R A D E R O
S A N T A R O S A D E LA A V. LA C ULT UR A
A LA UR B S A N GA B R IEL
Urb . Sa n G a b rie l
..................................
RECOMENDACIONES Y OBSERVACIONES:
Se realizó el metrado de todos los trabajos que fueron realizados hasta el 31/08/2021, obteniéndose una valorización de:
· S/ 361,264.89 Soles que representa el 46.86 % (Costo Directo)
· S/ 509,663.80 Soles que representa el 46.43 % (Presupuesto Total)
Es necesario indicar que las valorizaciones (informes mensuales), presentadas hasta el mes pasado, fueron hechas usando una mezcla de dos formatos:
Uno de ellos, el último presupuesto aprobado (Modificación N° 2)
Y otro formato que consideraba a algunos trabajos como mayor metrado
Esta forma de valorizar el avance debió ser actualizado o corregido una vez que se contó con la resolución correspondiente.
Para el presente informe y de ahora en adelante se utilizará el presupuesto aprobado en la segunda modificación, la cual cuenta con Resolución de Gerencia de
Infraestructura Nº 075 – 2021 – GI – 2021
· En diciembre del año 2017 se realizó gasto por un monto de S/ 9,570.00 Soles, de acuerdo al SSI, este dinero fue usado para pagar la elaboración del expediente
técnico. Luego en agosto del año 2018 el SSI muestra que se realizó otro pago por este concepto. Esta vez el pago se hizo por un monto de S/22,330.00 Soles.
Haciendo un total de S/31,900.00 Soles (treinta y un mil novecientos soles) por este concepto.
· En diciembre del año 2017 se realizó gasto por un monto de S/ 9,570.00 Soles, de acuerdo al SSI, este dinero fue usado para pagar la elaboración del expediente
técnico. Luego en agosto del año 2018 el SSI muestra que se realizó otro pago por este concepto. Esta vez el pago se hizo por un monto de S/22,330.00 Soles.
Haciendo un total de S/31,900.00 Soles (treinta y un mil novecientos soles) por este concepto.
· Además del pago de S/22,330.00 Soles, por concepto de elaboración de Expediente Técnico, el 2018 se realizó el pago de una factura del Grupo MEGATELEG
SRL por un monto de S/14,470.00 soles y se pagó planilla por un monto de S/23,994.14 soles, de ambos pagos no se encontró documentación alguna, que serviría de
sustento. Este año (2018) en total se usó S/ 60,794.14 soles. Hecho que no sería observado por el suscrito, de ser el caso que existiera la documentación o vestigio de
que se realizó algún avance en la obra (NO EXISTE REGISTRO DEL INICIO DE OBRA) que indique que se debiera pagar planillas de personal o pagar facturas
El año 2019 se tuvo gasto por un monto total de S/ 44,818.11 Soles, usados para el pago de personal (guardián y almacenero). Que, de acuerdo a la información
brindada por los beneficiarios, custodiaban solo algunos materiales y equipos (de los cuales no existe documentación, tan solo un acta firmada por el almacenero de
obra y algunos beneficiarios).
· En total durante los años 2017, 2018 y 2019 se ejecutó un gasto de S/115,182.25 soles, de los cuales no se encontró documentación de sustento o registro de
avance en obra. Se solicita a la Gerencia de Infraestructura de la MDSS, exigir a los responsables de ejecutar este gasto dar cuentas y entregar la documentación
correspondiente. El suscrito no se responsabiliza por los gastos hechos antes del 02/09/2021
· La obra se reinició el 07 de diciembre del 2020, siendo el Residente de obra el Ing. Julio sarmiento. Quien realizó las modificaciones del expediente técnico.
Modificaciones que redujeron considerablemente el presupuesto de obra, al disminuir metrados y quitar partidas vitales, que garantizaban la calidad de los trabajos y el
producto final
· A la fecha se tiene un avance de
o Físico del 46.43 %
o Financiero del 70 %
Existiendo un desfase entre el avance físico y la ejecución financiera del 25.49 %, lo que hace necesario solicitar una ampliación presupuestal, teniendo como causales
probables la ejecución de partidas nuevas, mayores metrados y que la obra empezó en diciembre del 2020, contando a esa fecha, con una ejecución financiera
acumulada de S/115,182.25 soles
· El plazo de ejecución de obra, vence el 02/10/2021, se solicitó la Ampliación en el Plazo de Ejecución de Obra Nº 2
· Se tiene próxima la temporada de lluvias, hecho de mucha relevancia que no permitirá trabajar con la rapidez necesaria, para alcanzar los objetivos programados,
por lo que debe ser considerada como causal de ampliación de plazo en la ejecución de la obra
· Se puede notar apatía por parte de los beneficiarios. Quienes suscribieron actas de compromiso, para realizar aporte voluntario
· Parte de la maquinaria pesada de la MDSS, se encuentra inoperativa. Este debido a la falta de asignación presupuestal para las diferentes obras, lo que ocasiona
que no se puedan adquirir los repuestos necesarios. Generando retraso en la ejecución oportuna de las partidas programadas
· Se cuenta con la presencia de la Gerente de Infraestructura y Sub gerente de Ejecución de Obras, de manera constante en la obra, vienen monitoreando los
avances
· Hasta el viernes 17/09/2021 se nos había asignado S/ 150,000 soles, a partir de esa fecha se cuenta con el total del saldo presupuestal de obra. Se viene
elaborando los requerimientos de materiales necesarios para la conclusión de los trabajos. Las especificaciones técnicas son formatos preestablecidos, el tiempo entre
la elaboración del requerimiento y el ingreso para su atención a la gerencia de Administración, demora entre dos a tres días.
· La calle San Gabriel se encuentra a nivel de sub rasante en un 68 %, esto se debe a que es necesario profundizar las tuberías matrices de agua, este trabajo será
realizado por los beneficiarios de este sector, el expediente técnico no incluye la ejecución de estos trabajos, se cursó el oficio correspondiente y se viene coordinando
con los dirigentes de las APV beneficiadas, este trabajo pudo ser realizado con anterioridad
· Es necesario que el residente y asistente administrativo anteriores entreguen la documentación de acuerdo a lo que corresponde
· Es necesaria la participación de un especialista, que realice un estudio de estabilidad de taludes
· Es necesario que se autorice una ampliación presupuestal para concluir con todas las metas previstas.
· La losa de rodadura en la calle San Gabriel, será construida siguiendo los alineamientos encontrados (muros de contención) lo que hará necesario solicitar una
tercera modificación en fase de inversión ya que los metrados con los que se cuenta son insuficientes
De acuerdo a lo verificado en obra el suscrito debe manifestar que, la reducción del presupuesto de S/. 2´749,287.34 soles a S/.1´097,775.66 soles, NO DEBIÓ SER
SOLICITADA, esto debido a que eliminaron o suprimieron trabajos y metrados importantes, dejando a la obra sin respaldo técnico
Se ejecutaron mayores metrados por un monto de S/ 5,201.75 soles, en las siguientes partidas
01 Componente I: Infraestructura Vehicular
01.01 Obras Provisionales
01.01.04 Seguridad y Salud
01.01.04.02 Capacit GLB 0.08 31.20
03 Componente III: Infraestructura de Protección y Obras Complementarias
03.02 Muros de Concreto Ciclópeo
03.02.09 Encofra m2 89.26 1,604.89
03.02.10 Concreto Ciclópeo F'c=175 Kg/
m3cm2 + 30% P.G. 10.49 3,565.66
5,201.75 soles
Fueron ejecutados trabajos complementarios, con el proposito de salvaguardar la inversion realizada hasta el 31/08/2021
Almacenes
Adecuacion de Almacen glb 1.00
Adecuacion de SSHH glb 1.00
Tuberias de 8"
Excavacion Manual para tuberias m3 3.60
cama de apoyo m2 3.60
tendido de tuberia PVC UF 8" m 6.00
relleno y comp. En zanja c/mat selecciondo m3 4.68
Anclajes de estructuras
excavacion manual para anclaje de muro m3 0.44
eliminacion material excedente m3 0.50
acero de refuerzo anclaje de muro kg 0.00
concreto 175 kg/cm2 m3 0.00
Sumideros
trazo, nivelacion y replanteo para sumideros m2 3.00
excavacion manual para sumideros m3 5.55
eliminacion de material excedente manual m3 4.10
acero de refuerzo fý 4200 kg/cm2 para sumideros kg 178.17
encofrado y dedencofrado en sumideros m2 21.00
concreto 175 en sumidero m3 3.30
rejilla metalico m2 1.25
Tuberia de agua 63 mm
excavacion manual de zanja para tendido de tuberia 63 mm m3 16.21
tendido de tuberia agu 63 mm m3 10.00
Estructuras de confinamiento lateral
trazo, nivele y replanteo estructura confinamiento m2 38.18
excavacion manual para estructura de confinamiento m3 67.30
eliminacion de material excedente m3 87.50
concreto f´ 175 kg/cm2 columna y zapata 19.80
acarreo de materiales m3 40.50
enrocado base de viga de conexión m3 0.64
acero de refuerzo en columans y zapatas kg 231.26
acero de refuerzo en viga de conexión kg 303.97
encofrado y desencofrado m2 163.47
Valvula de purga
reposicion de valvula de purga und 1.00
excavaion manual para caja de valvula m3 0.52
acarreo material excedene manaul m3 0.68
encofrado y desencofrado caja de valvula m2 4.26
acero de refuerzo kg 16.55
concreto 175 m3 0.48
Gradas junto al puente
trazo para grada m3 3.50
excavacion para escalera m3 2.45
acarreo material excedente m2 3.18
empedrado falsa zapata kg 3.50
concreto 175 en cimentaicon m2 2.45
FORMATO - 2
Presupuesto Ejecutado Diciembre 2020 0.00 0.00% 179,671.51 6.54% 179,671.51 6.54%
Presupuesto Ejecutado Enero 2021 0.00 0.00% 0.00 0.00% 0.00 0.00%
Presupuesto Ejecutado Febrero 2021 179,671.51 6.54% 65,327.64 2.38% 244,999.15 8.91%
Presupuesto Ejecutado Marzo 2021 244,999.15 8.91% 113,083.19 4.11% 358,082.34 13.02%
Presupuesto Ejecutado Abril 2021 358,082.34 13.02% 91,986.05 3.35% 450,068.39 16.37%
Presupuesto Ejecutado Mayo 2021 450,068.39 16.37% 7,200.00 0.26% 457,268.39 16.63%
Presupuesto Ejecutado Junio 2021 457,268.39 41.65% 129,556.01 11.80% 586,824.40 53.46%
Presupuesto Ejecutado Julio 2021 586,824.40 53.46% 17,850.00 1.63% 604,674.40 55.08%
Presupuesto Ejecutado Agosto 2021 604,674.40 55.08% 145,641.41 13.27% 750,315.81 68.35%
Presupuesto Ejecutado Setiembre 2021 750,315.81 68.35% 64,421.99 5.87% 814,737.80 74.22%
Presupuesto Ejecutado total 750,315.81 68.35% 64,421.99 5.87% 814,737.80 74.22%
6.0 UBICACIÓN
Localidad : Urb. San Gabriel
Distrito : SAN SEBASTIAN
Provincia : CUSCO
Departamento : CUSCO
7.0 OBSERVACIONES:
ESTE INFORME ESTA TRABAJANDOSE CON EL EXPEDIENTE TECNICO MODIFICADO Nº2
CURVA "S" N° 01
OBRA: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL DE LAS CALLES SIN NOMBRE Y ARCANGELES ENTRE LAS APVS SANTA ROSA
COMITÉ 04, TRES CRUCES Y URB. SAN GABRIEL, DISTRITO DE SAN SEBASTIAN - CUSCO - CUSCO"
DICIEMBRE
MES: INICIO 2020 ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTO SEPTIEMBRE OCTUBRE
Del: 12/7/2020 1/1/2021 2/1/2021 3/1/2021 4/1/2021 5/1/2021 6/1/2021 7/1/2021 8/1/2021 9/1/2021 10/1/2021
GENERAL Al: 12/30/2020 1/31/2021 2/28/2021 3/31/2021 4/30/2021 5/31/2021 6/30/2021 7/31/2021 8/31/2021 9/30/2021 10/31/2021
Programado s/. 770,937.44 0.00 85,541.69 78,151.57 S/. 91,586.38 96,767.49 22,881.85 36,624.22 171,670.29 65,825.76 99,430.21 22,194.62 263.35
Avance Programado % 0.00 11.10% 10.14% 11.88% 12.55% 2.97% 4.75% 22.27% 8.54% 12.90% 2.88% 0.03%
Mensual Acumulado Programado s/. 770,937.46 0.00 85,541.69 163,693.26 255,279.64 352,047.13 374,928.98 411,553.20 583,223.49 649,049.25 748,479.46 770,674.08 770,937.46
Acumulado programado % - 0.00% 11.10% 21.23% 33.11% 45.66% 48.63% 53.38% 75.65% 84.19% 97.09% 99.97% 100.00%
Acumulado Modificado % - 0.00% 1.00% 2.99% 17.70% 32.33% 50.15% 56.56% 59.93% 70.50% 88.47% 95.32% 100.00%
Ejecutado s/. 770,937.46 0.00 23,172.93 33,935.65 33,180.53 S/. 54,855.36 25,849.00 190,271.41 51,012.57 0.00 0.00 0.00 0.00
Avance Ejecutado % - 0.00% 3.01% 4.40% 4.30% 7.12% 3.35% 24.68% 6.62% 0.00% 0.00% 0.00% 0.00%
Mensual Acumulado Ejecutado s/. 770,937.46 0.00 23,172.93 57,108.58 90,289.11 145,144.48 170,993.48 361,264.89 412,277.46
Acumulado Ejecutado % - 0.00% 3.01% 7.41% 11.71% 18.83% 22.18% 46.86% 53.48%
CURVAS S
Programado VS Ejecutado
100.00%
80.00%
PORCENTAJE
60.00%
20.00%
0.00%
INICIO DICIEMBRE 2020 ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTO SEPTIEMBRE OCTUBRE
MESES
FORMATO - 2.4
RESUMEN OBRA
INVERSION
Gastos generales 274,034.26
Expediente Técnico 29,166.67
Presupuesto de Obra 2,318,467.23
Supervisión de Obra 108,950.14
Liquidación de Obra 18,669.04
TOTAL 2,749,287.34
PRESUPUESTO DE OBRA
Mano de Obra 300,278.73
Materiales 1,177,496.44
Equipos y Herram 699,783.48
Sub contratos 74,812.53
Costos Indirectos 430,820.11
TOTAL 2,683,191.29
PRESUPUESTO MODIFICADO Nº 2
INVERSION
Gastos generales 217,311.06
Expediente Técnico 29,166.67
Presupuesto de Obra 770,937.46
Supervisión de Obra 70,204.80
Liquidación de Obra 10,155.67
TOTAL 1,097,775.66
PRESUPUESTO ASIGNADO
1,097,775.66
Convenio AF-2017 9,570.00
Convenio AF-2018 60,794.14
Municipalidad: AF-2019 44,818.11
Municipalidad: AF-2020 64,489.26
AF-2021 796,887.80
Saldo Presupuestal 121,216.35
Saldo Materiales 45,807.68
Transferencias 0.00
Beneficiarios 0.00
TOTAL 976,559.31
VIII. ) GRÁFICOS REPRESENTATIVOS DE EJECUCIÓN A COSTO DIRECTO
AVANCE FISICO PROGRAMADO Vs. AVANCE FISICO EJECUTADO
PROGRAMADO EJECUTADO
ITEM PERIODO (S/.) PORCENTAJE (S/.) PORCENTAJE
MENSUAL ACUMULADO MENSUAL ACUMULADO MENSUAL ACUMULADO MENSUAL ACUMULADO
1 DICIEMBRE 142,235.74 142,235.74 6.13% 6.13% 23,172.95 23,172.95 1.00% 1.00%
2 ENERO 257,412.37 399,648.11 11.10% 17.24% 0.00 0.00 0.00% 0.00%
3 FEBRERO 484,908.22 884,556.33 20.92% 38.15% 0.00 0.00 0.00% 0.00%
4 MARZO 346,381.97 1,230,938.30 14.94% 53.09% 0.00 0.00 0.00% 0.00%
5 ABRIL 365,191.62 1,596,129.92 15.75% 68.84% 0.00 0.00 0.00% 0.00%
6 MAYO 162,693.68 1,758,823.60 7.02% 75.86% 0.00 0.00 0.00% 0.00%
7 JUNIO 111,895.26 1,870,718.86 4.83% 80.69% 0.00 0.00 0.00% 0.00%
8 JULIO 195,472.94 2,066,191.80 8.43% 89.12% #REF! 0.00 #REF! #REF!
9 AGOSTO 118,138.71 2,184,330.51 5.10% 94.21% 0.00 1.00 0.00% #REF!
10 SETIEMBRE 134,136.72 2,318,467.23 5.79% 100.00% 0.00 2.00 0.00% #REF!
100.00%
90.00%
80.00%
70.00%
% AVANCE ACUMULADO
60.00%
50.00%
Column H
Column L
40.00%
30.00%
20.00%
10.00%
0.00%
DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTO SETIEMBRE
TIEMPO DE EJECUCION
DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTO SETIEMBRE
TIEMPO DE EJECUCION
CURVA "S" N° 08
OBRA: “'“MEJORAMIENTO SISTEMA DE SANEAMIENTO BASICO URBANO PARA 22 APVS CORRESPONDIENTES A LA JASS PILCHIPIJIO SAN SEBASTIAN - DISTRITO DE SAN
SEBASTIAN - PROVINCIA DE CUSCO - DEPARTAMENTO DE CUSCO”
INFORME MENSUAL DEL MES DE OCTUBRE - 2020
Programado s/. 1,121,841.71 0.00 312,240.56 60,175.60 S/. 211,234.08 251,317.04 219,440.65 67,433.79
Modificado s/. 2,318,467.23 0.00 312,240.56 60,175.60 S/. 211,234.08 251,317.04 219,440.65 67,433.79 42,051.15
Programado % 0.00 27.83% 5.36% 18.83% 22.40% 19.56% 6.01%
Avance
Mensual Modificado % 0.00% 13.47% 2.60% 9.11% 10.84% 9.46% 2.91% 1.81%
Acumulado Programado s/. 1,121,841.71 0.00 312,240.56 372,416.16 583,650.24 834,967.28 1,054,407.92 1,121,841.71
Acumulado Modificado 1,163,892.87 0.00 312,240.56 372,416.16 583,650.24 834,967.28 1,054,407.93 1,121,841.72 1,163,892.87
Acumulado programado % - 0.00% 27.83% 33.20% 52.03% 74.43% 93.99% 100.00%
Acumulado Modificado % - 0.00% 26.83% 32.00% 50.15% 71.74% 90.59% 96.39% 100.00%
Ejecutado s/. 1,121,841.71 0.00 312,240.56 53,217.48 87,590.94 109,720.87 78,627.05 #REF!
Ejecutado % - 0.00% 27.83% 4.74% 7.81% 9.78% 7.01% #REF!
Avance Ejecutado Modificado 2,318,467.23 0.00 312,240.56 53,217.48 87,590.94 109,720.87 78,627.05 #REF!
Mensual Ejecutado Modificado % 0.00% 27.83% 4.74% 7.81% 9.78% 7.01% #REF!
Acumulado Ejecutado s/. 1,121,841.71 0.00 312,240.56 365,458.04 453,048.98 562,769.85 88,697.40 #REF!
Acumulado Ejecutado % - 0.00% 27.83% 32.58% 40.38% 50.16% 7.91% #REF!
CURVAS S
Programado VS Ejecutado
100.00%
80.00%
PORCENTAJE
60.00%
40.00%
20.00%
0.00%
INICIO DICIEMBRE 2019 JULIO AGOSTO SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE
MESES
CURVA DE CONTROL "S"
OBRA: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL DE LAS CALLES SIN NOMBRE Y ARCANGELES ENTRE LAS APVS SANTA ROSA COMITÉ 04, TRES CRUCES Y URB. SAN GABRIEL, DISTRITO DE SAN SEBASTIAN - CUSCO - CUS
110.00%
CURVA DE CONTROL "S"
01.01 OBRAS PROVISIONALES S/. 93,675.38
01.02 AGUA Y DESAGUE PARA OBRA S/. 4,317.70
01.03 ENERGIA ELECTRICA PARA OBRA S/. 4,129.30
01.04 TRABAJOS PRELIMINARES
100.00% S/. 149,119.02
01.05 SEGURIDAD Y SALUD S/. 305,269.87
01.06 MOVIMIENTO DE TIERRAS S/. 6,788,073.52 enero
01.07 ENTIBADO DE ZANJAS S/. 459,497.88
90.00%
01.08 TUBERIAS Y ACCESORIOS S/. 3,346,000.19
01.09 CAMARAS DE INSPECCION S/. 2,058,340.07
01.10 PRUEBA HIDRAULICA S/. 932,702.62
01.11 VARIOS
80.00% S/. 1,046,899.00
01.12 CONTROL DE CALIDAD DE MATERIALES Y METODOS S/. 36,977.71
70.00%
% AVANCE
60.00%
50.00%
40.00%
30.00%
TOTAL COSTO DIRECTO S/. 15,225,002.27
TOTAL COSTO INDIRECTO S/. 1,843,725.31
20.00%
COSTO TOTAL DEL PROYECTO S/. 17,068,727.59
10.00%
0.00%
DIECIEBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTO SE-
2019 TIEM-
BRE
TIEMPO DE EJECUCION
RESUMEN DE VALORIZACIONES DE AVANCE DE OBRA
"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL DE LAS CALLES SIN NOMBRE Y ARCANGELES ENTRE LAS APVS SANTA ROSA COMITÉ 04, TRES CRUCES Y URB. SAN GABRIEL, RESIDENTE ING. EDWARD OLIVERA VILLANUEVA
OBRA DISTRITO DE SAN SEBASTIAN - CUSCO - CUSCO" INSPECTOR ING. RENATO ESPINOZA CACERES
INFORME TECNICO MENSUAL CORRESPONDIENTE AL MES DE: SETIEMBRE DEL 2021
PRESUPUESTO BASE AVANCE
PRESUPUESTO
MES ANTERIOR EN EL MES ACUMULADO SALDO
ITEMS VALORIZACION
S/. VALORIZADO % VALORIZADO % VALORIZADO % VALORIZADO %
01 PROGRAMADO 2,318,467.23 88,697.40 3.83% 0.00 0.00% 88,697.40 3.83% 2,229,769.85 96.17%
2.00 MAYORES METRADOS 0.00 16,314.22 0.70% #REF! 0.00% #REF! #REF! 0.00%
03 PARTIDAS NUEVAS 0.00 #REF! #REF! #REF! #REF! #REF! #REF! 0.00%
OBRA "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL DE LAS CALLES SIN NOMBRE Y ARCANGELES ENTRE LAS APVS SANTA ROSA COMITÉ 04, TRES CRUCES RESIDENTE ING. EDWARD OLIVERA VILLANUEVA
Y URB. SAN GABRIEL, DISTRITO DE SAN SEBASTIAN - CUSCO - CUSCO" INSPECTOR ING. RENATO ESPINOZA CACERES
INFORME TECNICO MENSUAL CORRESPONDIENTE AL MES DE: SETIEMBRE DEL 2021
PRESUPUESTO BASE AVANCE
PRESUPUESTO
MES ANTERIOR EN EL MES ACUMULADO SALDO
ITEMS VALORIZACION
S/. VALORIZADO % VALORIZADO % VALORIZADO % VALORIZADO %
PROGRAMADO S/ 2,318,467.23 S/. 88,697.40 3.83% S/. - 0.00% S/. 88,697.40 3.83% S/. 2,229,769.84 96.17%
MAYORES METRADOS S/ - S/. 16,314.22 0.00% #REF! #REF! #REF! #REF! #REF! #REF!
PARTIDAS NUEVAS S/ - #REF! 0.00% #REF! #REF! #REF! #REF! #REF! #REF!
DEDUCTIVOS S/ - 0.00% S/. - 0.00% S/. - 0.00% S/. - 0.00%
COSTO DIRECTO S/ S/ 2,318,467.233 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
GASTOS GENERALES (11.82%) 11.82% S/. 274,034.26 #REF! 3.83% #REF! #REF! #REF! #REF! #REF! #REF!
SUB TOTAL(GG+CD) S/. 2,592,501.49 #REF! 3.83% #REF! #REF! #REF! #REF! #REF! #REF!
COSTOS INDIRECTOS
GASTOS DE SUPERVISION DE OBRA (4.70%) 4.70% S/ 108,950.14 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
GASTOS DE ELABORACION EXPEDIENTE TECNICO (1.26%) 1.26% S/ 29,166.67 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
GASTOS DE LIQUIDACION DE OBRA (0.81%) 0.81% S/ 18,669.04 S/ - 0.00% S/ - 0.00% S/ - 0.0% S/ 18,669.04 100.0%
SUB TOTAL COSTO INDIRECTO S/. 156,785.85 #REF! #REF! #REF! #REF! #REF!
TOTAL S/. 2,749,287.34 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
EL RESUMEN DE VALORIZACION ES PARA LLENADO DE FORMATO 12B DONDE AL COSTO DIRECTO SE LE INCREMENTA LOS GASTOS GENERALES O GESTION DE PROYECTO.
RESUMEN DE VALORIZACIONES DE AVANCE DE OBRA
"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL DE LAS CALLES SIN NOMBRE Y ARCANGELES ENTRE LAS APVS SANTA ROSA COMITÉ 04, TRES CRUCES Y URB. SAN GABRIEL, RESIDENTE ING. EDWARD OLIVERA VILLANUEVA
OBRA DISTRITO DE SAN SEBASTIAN - CUSCO - CUSCO" INSPECTOR ING. RENATO ESPINOZA CACERES
INFORME TECNICO MENSUAL CORRESPONDIENTE AL MES DE: SETIEMBRE DEL 2021
PRESUPUESTO BASE AVANCE
PRESUPUESTO
MES ANTERIOR EN EL MES ACUMULADO SALDO
ITEMS VALORIZACION
S/. VALORIZADO % VALORIZADO % VALORIZADO % VALORIZADO %
01 PROGRAMADO 2,318,467.23 88,697.40 3.83% 0.00 0.00% 88,697.40 3.83% 2,229,769.85 96.17%
2.00 MAYORES METRADOS 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00%
03 PARTIDAS NUEVAS 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00%
OBRA "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL DE LAS CALLES SIN NOMBRE Y ARCANGELES ENTRE LAS APVS SANTA ROSA COMITÉ 04, TRES CRUCES RESIDENTE ING. EDWARD OLIVERA VILLANUEVA
Y URB. SAN GABRIEL, DISTRITO DE SAN SEBASTIAN - CUSCO - CUSCO" INSPECTOR ING. RENATO ESPINOZA CACERES
INFORME TECNICO MENSUAL CORRESPONDIENTE AL MES DE: SETIEMBRE DEL 2021
PRESUPUESTO BASE AVANCE
PRESUPUESTO
MES ANTERIOR EN EL MES ACUMULADO SALDO
ITEMS VALORIZACION
S/. VALORIZADO % VALORIZADO % VALORIZADO % VALORIZADO %
PROGRAMADO S/ 2,318,467.23 S/. 88,697.40 3.83% S/. - 0.00% S/. 88,697.40 3.83% S/. 2,229,769.84 96.17%
MAYORES METRADOS S/ - S/. - 0.00% S/. - 0.00% S/. - 0.00% S/. 2,318,467.23 100.00%
PARTIDAS NUEVAS S/ - S/. - 0.00% S/. - 0.00% S/. - 0.00% S/. 2,318,467.23 100.00%
DEDUCTIVOS S/ - 0.00% S/. - 0.00% S/. - 0.00% S/. - 0.00%
COSTO DIRECTO S/ S/ 2,318,467.23 S/ 88,697.40 3.83% S/. - 0.00% S/. 88,697.40 3.83% S/. 2,229,769.84 96.17%
GASTOS GENERALES (11.82%) 11.82% S/. 274,034.26 S/. 10,483.70 3.83% S/. - 0.00% S/. 10,483.70 3.83% S/. 263,550.56 96.17%
SUB TOTAL(GG+CD) S/. 2,592,501.49 S/99,181.11 3.83% 0.00 0.00% 99,181.11 3.83% 2,493,320.38 96.17%
COSTOS INDIRECTOS
GASTOS DE SUPERVISION DE OBRA (4.70%) 4.70% S/ 108,950.14 S/ 4,168.10 3.83% S/ - 0.00% S/ 4,168.10 3.83% S/ 104,782.04 96.17%
GASTOS DE ELABORACION EXPEDIENTE TECNICO (1.26%) 1.26% S/ 29,166.67 S/ 1,115.83 3.83% S/ - 0.00% S/ 1,115.83 3.8% S/ 28,050.84 96.2%
GASTOS DE LIQUIDACION DE OBRA (0.81%) 0.81% S/ 18,669.04 S/ - 0.00% S/ - 0.00% S/ - 0.0% S/ 18,669.04 100.0%
SUB TOTAL COSTO INDIRECTO S/. 156,785.85 S/ 5,283.92 S/ - S/ 5,283.92 S/ 151,501.93 96.6%
TOTAL S/. 2,749,287.34 S/104,465.03 3.80% S/0.00 0.00% S/104,465.03 3.80% S/2,644,822.31 96.20%
EL RESUMEN DE VALORIZACION ES PARA LLENADO DE FORMATO 12B DONDE AL COSTO DIRECTO SE LE INCREMENTA LOS GASTOS GENERALES O GESTION DE PROYECTO.
FORMATO - 3.2
OBRA PRINCIPAL
AVANCE DE OBRA VALORIZADO N° 06 MES DE JUNIO 2021
OBRA : #REF! RESIDENTE
INSPECTOR
PRESUPUESTO BASE AVANCE
METRADO COSTOS
MES ANTERIOR EN EL MES ACUMULADO SALDO
ITEMS DESCRIPCION PARTIDA
U.M. CANT UNIT PARCIAL METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ %
01.00 COMPONENTE 1: INFRAESTRUCTURA VEHICULAR
01.10 OBRAS PROVISIONALES 0.00
1.1.1 OBRAS PROVISIONALES
1.1.1.1 CARTEL DE OBRA und 1.00 800.50 800.50 1.00 800.50 100.00% 0.00 0.00 0.00% 1.00 800.50 100.00% 0.00 0.00 0.00%
1.1.1.2 ALQUILER DE LOCAL PARA RESIDENCIA DE OBRA mes 10.00 500.00 5,000.00 5.00 2,500.00 50.00% 0.00 0.00 0.00% 5.00 2,500.00 50.00% 5.00 2,500.00 50.00%
1.1.1.3 ALQUILER DE LOCAL PARA ALMACEN DE OBRA mes 10.00 500.00 5,000.00 5.00 2,500.00 50.00% 0.00 0.00 0.00% 5.00 2,500.00 50.00% 5.00 2,500.00 50.00%
1.1.1.4 SEÑALIZACION TEMPORAL DE SEGURIDAD m 200.00 2.7 540.00 200.00 540.00 100.00% 0.00 0.00 0.00% 200.00 540.00 100.00% 0.00 0.00 0.00%
1.1.1.5 TRANQUERAS und 2.00 318.85 637.70 2.00 637.70 100.00% 0.00 0.00 0.00% 2.00 637.70 100.00% 0.00 0.00 0.00%
1.1.2 AGUA Y DESAGUE PARA OBRA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.1.2.1 AGUA PARA LA CONSTRUCCION pto 1.00 423.73 423.73 1.00 423.73 100.00% 0.00 0.00 0.00% 1.00 423.73 100.00% 0.00 0.00 0.00%
1.1.2.2 DESAGUE PARA LA CONSTRUCCION pto 1.00 350.00 350.00 1.00 350.00 100.00% 0.00 0.00 0.00% 1.00 350.00 100.00% 0.00 0.00 0.00%
1.1.2.3 CONSUMO Y MANTENIMIENTO SEDA mes 10.00 350.00 3,500.00 5.00 1,750.00 50.00% 0.00 0.00 0.00% 5.00 1,750.00 50.00% 5.00 1,750.00 50.00%
1.1.3 ENERGIA ELECTRICA PARA OBRA 0.00 0.00 0.00 0.00 0.00 #DIV/0! 0.00 0.00 0.00 0.00 #DIV/0!
1.1.3.1 CONEXION E INSTALACION DE ENERGIA ELECTRICA pto 1.00 423.73 423.73 1.00 423.73 100.00% 0.00 0.00 0.00% 1.00 423.73 100.00% 0.00 0.00 0.00%
1.1.3.2 CONSUMO Y MANTENIMIENTO ELECTRICO mes 10.00 500.00 5,000.00 5.00 2,500.00 50.00% 0.00 0.00 0.00% 5.00 2,500.00 50.00% 5.00 2,500.00 50.00%
1.1.4 SEGURIDAD Y SALUD 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.1.4.1 ELABORACIÓN, IMPLEMENTACIÓN Y ADMINISTRACIÓN DEL PLAN DE SEGURIDAD Y SAL gbl 1.00 2,044.90 2,044.90 1.00 2,044.90 100.00% 0.00 0.00 0.00% 1.00 2,044.90 100.00% 0.00 0.00 0.00%
1.1.4.2 CAPACITACION EN SEGURIDAD Y SALUD gbl 1.00 5,000.00 5,000.00 1.19 5,970.00 119.40% 0.00 0.00 0.00% 1.19 5,970.00 119.40% 1.00 5,000.00 100.00%
1.1.4.3 SEÑALIZACIÓN TEMPORAL DE SEGURIDAD gbl 1.00 413.14 413.14 1.00 413.14 100.00% 0.00 0.00 0.00% 1.00 413.14 100.00% 0.00 0.00 0.00%
1.1.4.4 SEGURO COMPLEMENTARIO DE ALTO RIESGO - PENSIÓN gbl 1.00 1,500.00 1,500.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 1,500.00 100.00%
1.1.4.5 EQUIPO DE PROTECCIÓN COLECTIVA kit 1.00 1,800.00 1,800.00 0.10 180.00 10.00% 0.00 0.00 0.00% 0.10 180.00 10.00% 0.90 1,620.00 90.00%
1.1.4.6 EQUIPOS DE PROTECCION INDIVIDUAL jgo 60.00 163.03 9,781.80 26.00 4,238.78 43.33% 0.00 0.00 0.00% 26.00 4,238.78 43.33% 34.00 5,543.02 56.67%
1.1.4.7 RECURSOS PARA RESPUESTAS ANTE EMERGENCIA EN SEGURIDAD Y SALUD DURANTE gbl 1.00 1,000.00 1,000.00 0.10 100.00 10.00% 0.00 0.00 0.00% 0.10 100.00 10.00% 0.90 900.00 90.00%
1.1.4.8 INSPECCIÓN PERIÓDICA DE MAQUINARIAS Y/O EQUIPOS und 1.00 211.86 211.86 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 211.86 100.00%
1.1.4.9 MANTENIMIENTO CORRECTIVO DE MAQUINARIAS Y/O EQUIPOS gbl 1.00 423.73 423.73 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 423.73 100.00%
1.1.4.10 CONTROL DE POLVO mes 10.00 423.73 4,237.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.00 4,237.30 100.00%
1.1.4.11 MANEJO DE RESIDUOS SÓLIDOS mes 10.00 423.73 4,237.30 2.00 847.46 20.00% 0.00 0.00 0.00% 2.00 847.46 20.00% 8.00 3,389.84 80.00%
1.1.4.12 KIT CONTRA DERRAMES und 1.00 150.00 150.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 150.00 100.00%
01.20 TRABAJOS PRELIMINARES 0.00 0.00 0.00
1.2.1 MOVILIZACION Y DESMOBILIZACION DE MAQUINARIA PESADA Y HERRAMIENTAS gbl 1.00 4,237.29 4,237.29 0.50 2,118.65 50.00% 0.00 0.00 0.00% 0.50 2,118.65 50.00% 0.50 2,118.65 50.00%
1.2.2 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m² 1980.50 1.03 2,039.92 1,980.50 2,039.92 100.00% 0.00 0.00 0.00% 1,980.50 2,039.92 100.00% 0.00 0.00 0.00%
01.30 MOVIMIENTO DE TIERRA 0.00 0.00 0.00
1.3.1 DESBROCE Y LIMPIEZA EN ZONAS NO BOSCOSAS ha 0.50 3,215.91 1,607.96 0.12 385.91 24.00% 0.00 0.00 0.00% 0.12 385.91 24.00% 0.38 1,222.05 76.00%
1.3.2 EXCAVACIÓN EN EXPLANACIONES CON MAQUINARIA m³ 10581.30 15.43 163,269.46 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10,581.30 163,269.46 100.00%
1.3.3 REMOCIÓN DE DERRUMBES m³ 920.00 4.52 4,158.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 920.00 4,158.40 100.00%
1.3.4 PERFILADO Y COMPACTADO EN ZONA DE CORTE m² 2424.33 13.45 32,607.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,424.33 32,607.24 100.00%
1.3.5 CONFORMACION DE TERRAPLENES m³ 1165.00 9.76 11,370.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,165.00 11,370.40 100.00%
1.3.6 SUMINISTRO DE MATERIAL DE RELLENO PARA ESTRUCTURAS, PUESTO EN OBRA m³ 5898.77 34.33 202,504.77 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5,898.77 202,504.77 100.00%
1.3.7 EXTENDIDO, RIEGO Y COMPACTACION DE MATERIAL A NIVEL DE SUBRASANTE m² 21041.10 4.75 99,945.23 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 21,041.10 99,945.23 100.00%
1.3.8 CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE m³ 13754.00 21.74 299,011.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 13,754.00 299,011.96 100.00%
01.40 CALZADA VEHICULAR 0.00 0.00 0.00
PRESUPUESTO BASE AVANCE
METRADO COSTOS
MES ANTERIOR EN EL MES ACUMULADO SALDO
ITEMS DESCRIPCION PARTIDA
U.M. CANT UNIT PARCIAL METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ %
1.4.1 SUB RASANTE 0.00 0.00 0.00
1.4.1.1 TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO m² 1426.94 1.03 1,469.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,426.94 1,469.75 100.00%
1.4.1.2 PERFILADO, RIEGO Y COMPACTADO DE LA SUB RASANTE m² 2853.88 4.46 12,728.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,853.88 12,728.30 100.00%
1.4.2 CONFORMACION DE BASE E=0.30m 0.00 0.00 0.00
1.4.2.1 TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO m² 1249.58 1.03 1,287.07 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,249.58 1,287.07 100.00%
1.4.2.2 SUMINISTRO DE MATERIAL DE RELLENO PARA ESTRUCTURAS, PUESTO EN OBRA m³ 349.88 49.33 17,259.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 349.88 17,259.58 100.00%
1.4.2.3 EXTENDIDO, RIEGO Y COMPACTACION DE MATERIAL DE BASE m² 1249.58 4.75 5,935.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,249.58 5,935.51 100.00%
1.4.2.4 ACARREO DE MATERIAL D=100MTS m³ 97.47 19.99 1,948.43 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 97.47 1,948.43 100.00%
1.4.3 CARPETA DE RODADURA 0.00 0.00 0.00
1.4.3.1 TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO m² 1249.58 1.03 1,287.07 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,249.58 1,287.07 100.00%
1.4.3.2 ENCOFRADO Y DESENCOFRADO LOSA DE PAVIMENTO m² 131.30 48.56 6,375.93 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 131.30 6,375.93 100.00%
1.4.3.3 ACERO LISO DE 1/4" fy=4200 Kg/cm2 PARA MALLA DE TEMPERATURA kg 2,434.85 3.83 9,325.48 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,434.85 9,325.48 100.00%
1.4.3.4 ACERO CORRUGADO DE 1/2" fy=4200 Kg/cm2 EN JUNTA LONGITUDINAL kg 285.19 3.83 1,092.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 285.19 1,092.28 100.00%
1.4.3.5 ACERO LISO DE 1" fy=4200 Kg/cm2 EN JUNTA DE CONSTRACCION Y CONSTRUCCION kg 938.40 12.16 11,410.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 938.40 11,410.94 100.00%
1.4.3.6 ACERO CORRUGADO DE 5/8" fy=4200 Kg/cm2 EN JUNTA CONTRACCION Y CONSTRUCCI kg 750.72 3.83 2,875.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 750.72 2,875.26 100.00%
1.4.3.7 CONCRETO F'C= 210 KG/CM2 EN PAVIMENTO (INCL ACAB.) m³ 249.92 382.96 95,709.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 249.92 95,709.36 100.00%
1.4.3.8 CURADO DEL CONCRETO m² 1249.58 1.73 2,161.77 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,249.58 2,161.77 100.00%
1.4.3.9 ACARREO DE MATERIAL D=100MTS m³ 124.96 19.99 2,497.95 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 124.96 2,497.95 100.00%
1.4.4 JUNTAS EN LOSAS DE CONCRETO 0.00 0.00 0.00
1.4.4.1 CORTE DE JUNTAS DE CONTRACCION TRANSVERSAL m 360.00 6.21 2,235.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 360.00 2,235.60 100.00%
1.4.4.2 SELLADO DE JUNTAS DE CONTRACCION TRANSVERSAL m 360.00 10.72 3,859.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 360.00 3,859.20 100.00%
1.4.4.3 SELLADO DE JUNTAS LONGITUDINALES m 233.00 10.72 2,497.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 233.00 2,497.76 100.00%
01.50 EVACUACION DE AGUAS PLUVIALES 0.00 0.00 0.00
1.5.1 CANAL DE EVACIACION PLUVIAL 0.00 0.00 0.00
1.5.1.1 OBRAS PRELIMINARES 0.00 0.00 0.00
1.5.1.1.1 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m² 177.36 1.03 182.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 177.36 182.68 100.00%
1.5.1.2 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00
1.5.1.2.1 PERFILADO, NIVELACION Y COMPACTADO MANUAL m² 177.36 4.00 709.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 177.36 709.44 100.00%
1.5.1.3 OBRAS DE CONCRETO ARMADO 0.00 0.00 0.00
1.5.1.3.1 ACERO DE REFUERZO Fy=4200 kg/cm2 EN CANAL kg 2090.30 3.89 8,131.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,090.30 8,131.27 100.00%
1.5.1.3.2 CONCRETO f'c=210 kg/cm2 PARA CANAL m³ 51.43 391.16 20,117.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 51.43 20,117.36 100.00%
1.5.1.3.3 ENCOFRADO Y DESENCOFRADO PARA CANAL m² 461.14 42.56 19,626.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 461.14 19,626.12 100.00%
1.5.1.3.4 ACERO DE REFUERZO Fy=4200 kg/cm2 EN TAPA kg 1491.60 3.89 5,802.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,491.60 5,802.32 100.00%
1.5.1.3.5 ENCOFRADO Y DESENCOFRADO PARA TAPA m² 177.36 44.72 7,931.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 177.36 7,931.54 100.00%
1.5.1.3.6 CONCRETO f'c=210 kg/cm2 PARA TAPA m³ 17.03 391.16 6,661.45 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 17.03 6,661.45 100.00%
1.5.1.3.7 CURADO DEL CONCRETO m² 638.50 1.18 753.43 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 638.50 753.43 100.00%
1.5.2 SUMIDEROS 0.00 0.00 0.00
1.5.2.1 OBRAS PRELIMINARES 0.00 0.00 0.00
1.5.2.1.1 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m² 9.60 1.03 9.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 9.60 9.89 100.00%
1.5.2.2 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00
1.5.2.2.1 PERFILADO, NIVELACION Y COMPACTADO MANUAL m² 9.60 4.00 38.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 9.60 38.40 100.00%
1.5.2.3 OBRAS DE CONCRETO 0.00 0.00 0.00
1.5.2.3.1 CONCRETO SOLADO MEZCLA 1:12 CEMENTO-HORMIGON e=0.10 m. m² 9.60 27.14 260.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 9.60 260.54 100.00%
1.5.2.3.2 ENCOFRADO Y DESENCOFRADO CARAVISTA EN SUMIDEROS m² 33.00 55.45 1,829.85 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 33.00 1,829.85 100.00%
1.5.2.3.3 ACERO CORRUGADO DE 1/2" fy=4200 Kg/cm2 EN SUMIDERO kg 148.48 3.89 577.59 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 148.48 577.59 100.00%
1.5.2.3.4 CONCRETO F'C= 210 KG/CM2 EN SUMIDERO m³ 3.31 391.16 1,294.74 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.31 1,294.74 100.00%
1.5.2.3.5 TARRAJEO CON IMPERMEABILIZANTE m² 11.66 16.09 187.61 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.66 187.61 100.00%
1.5.2.3.6 CURADO DEL CONCRETO m² 46.62 1.73 80.65 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 46.62 80.65 100.00%
1.5.2.4 REJILLA METALICA 0.00 0.00 0.00
PRESUPUESTO BASE AVANCE
METRADO COSTOS
MES ANTERIOR EN EL MES ACUMULADO SALDO
ITEMS DESCRIPCION PARTIDA
U.M. CANT UNIT PARCIAL METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ %
1.5.2.4.1 REJILLA METALICA PARA SUMIDEROS m 12.00 531.81 6,381.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.00 6,381.72 100.00%
1.5.3 TRATAMIENTO DE AREAS VERDES Y JARDINES 0.00 0.00 0.00
1.5.3.1 MOVIMIENTO DE TIERRAS EN TALUDES 0.00 0.00 0.00
1.5.3.1.1 TRAZO, NIVELES Y REPLANTEO m² 1044.07 1.03 1,075.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,044.07 1,075.39 100.00%
1.5.3.1.2 CORTE DE TERRENO m³ 208.81 15.43 3,221.94 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 208.81 3,221.94 100.00%
1.5.3.1.3 CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE m³ 271.45 22.03 5,980.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 271.45 5,980.04 100.00%
1.5.3.1.4 PERFILADO, RIEGO Y COMPACTADO DEL TALUD m² 1044.07 4.46 4,656.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,044.07 4,656.55 100.00%
1.5.3.2 AREAS VERDES 0.00 0.00 0.00
1.5.3.2.1 MEJORAMIENTO DE TERRENO (CON TIERRA AGRÍCOLA) m² 1044.07 5.72 5,972.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,044.07 5,972.08 100.00%
1.5.3.2.2 SEMBRADO DE GRASS m² 1044.07 2.03 2,119.46 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,044.07 2,119.46 100.00%
01.60 ENCIMADO DE BUZONES 0.00 0.00 0.00
1.6.1 DEMOLICION DE BUZONES und 7.00 230.02 1,610.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.00 1,610.14 100.00%
1.6.2 EXCAVACION MANUAL PARA ESTRUCTURAS m³ 28.00 19.99 559.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 28.00 559.72 100.00%
1.6.3 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 M) m³ 36.40 15.00 546.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 36.40 546.00 100.00%
1.6.4 ELIMINACIÓN DE MATERIAL EXCEDENTE CON EQUIPO HASTA 15 Km m³ 36.40 22.28 810.99 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 36.40 810.99 100.00%
1.6.5 ENCOFRADO Y DESENCOFRADO EN TAPA DE BUZONES m² 7.00 67.48 472.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.00 472.36 100.00%
1.6.6 ACERO CORRUGADO FY=4200 KG/CM2 kg 533.89 3.89 2,076.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 533.89 2,076.83 100.00%
1.6.7 CONCRETO f'c=210 kg/cm2 m³ 17.92 391.16 7,009.59 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 17.92 7,009.59 100.00%
1.6.8 TAPA CON MARCO PARA BUZONES und 7.00 190.69 1,334.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7.00 1,334.83 100.00%
1.6.9 CONCRETO F'C=140 Kg/cm2 m³ 2.73 333.99 911.79 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.73 911.79 100.00%
01.70 PUENTE VEHICULAR 5MTS 0.00 0.00 0.00
1.7.1 DESMONTAJE Y ELIMINACION DE PUENTE EXISTENTE 0.00 0.00 0.00
1.7.1.1 DESMONTAJE Y DEMOLICIÓN DE PUENTE EXISTENTE m³ 48.75 132.11 6,440.36 48.75 6,440.36 100.00% 0.00 0.00 0.00% 48.75 6,440.36 100.00% 0.00 0.00 0.00%
1.7.1.2 ELIMINACION CON TRANSPORTE (INC. ACARREO 50M) R=120 m3/día m³ 63.38 37.50 2,376.75 63.38 2,376.75 100.00% 0.00 0.00 0.00% 63.38 2,376.75 100.00% 0.00 0.00 0.00%
1.7.2 SUBESTRUCTURA 0.00 0.00 0.00
1.7.2.1 EXCAVACION MANUAL m³ 241.80 19.99 4,833.58 241.80 4,833.58 100.00% 0.00 0.00 0.00% 241.80 4,833.58 100.00% 0.00 0.00 0.00%
1.7.2.2 SOLADOS CONCRETO f'c=100 kg/cm2 h=0.05 m. m² 120.90 21.80 2,635.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 120.90 2,635.62 100.00%
1.7.2.3 CONCRETO F'C=210 KG/CM2 m³ 134.88 391.16 52,759.66 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 134.88 52,759.66 100.00%
1.7.2.4 ENCOFRADO Y DESENCOFRADO NORMAL m² 400.41 25.50 10,210.46 294.81 7,517.66 73.63% 0.00 0.00 0.00% 294.81 7,517.66 73.63% 105.60 2,692.80 26.37%
1.7.2.5 ACERO DE REFUERZO FY=4200KG/CM2 kg 10097.72 3.89 39,280.13 6,280.01 24,429.25 62.19% 0.00 0.00 0.00% 6,280.01 24,429.25 62.19% 3,817.71 14,850.88 37.81%
1.7.2.6 CURADO DE CONCRETO m² 134.88 5.54 747.24 134.00 742.36 99.35% 0.00 0.00 0.00% 134.00 742.36 99.35% 0.88 4.88 0.65%
1.7.3 SUPERESTRUCTURA 0.00 0.00 0.00
1.7.3.1 CONCRETO f'c=210 kg/cm2 m³ 23.67 391.16 9,258.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 23.67 9,258.76 100.00%
1.7.3.2 ENCOFRADO Y DESENCOFRADO m² 67.77 45.80 3,103.87 67.77 3,103.87 100.00% 0.00 0.00 0.00% 67.77 3,103.87 100.00% 0.00 0.00 0.00%
1.7.3.3 ACERO DE REFUERZO FY=4200KG/CM2 kg 1,574.51 3.89 6,124.84 1,479.50 5,755.25 93.97% 0.00 0.00 0.00% 1,479.50 5,755.25 93.97% 95.01 369.59 6.03%
1.7.3.4 CURADO DE CONCRETO m² 67.77 6.04 409.33 67.77 409.33 100.00% 0.00 0.00 0.00% 67.77 409.33 100.00% 0.00 0.00 0.00%
1.7.4 VARIOS 0.00 0.00 0.00
1.7.4.1 JUNTA DE DILATACIÓN m 17.20 51.29 882.19 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 17.20 882.19 100.00%
1.7.4.2 DISPOSITIVO DE APOYO und 4.00 447.63 1,790.52 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 1,790.52 100.00%
1.7.4.3 TUBOS DE DRENAJE und 6.00 17.83 106.98 6.00 106.98 100.00% 0.00 0.00 0.00% 6.00 106.98 100.00% 0.00 0.00 0.00%
1.7.4.4 BARANDAS METÁLICAS m 10.00 221.76 2,217.60 10.00 2,217.60 100.00% 0.00 0.00 0.00% 10.00 2,217.60 100.00% 0.00 0.00 0.00%
1.8 SEÑALIZACION 0.00 0.00 0.00
1.8.1 DEMARCACIÓN DE CRUCES DE VÍA und 2.00 100.49 200.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 200.98 100.00%
1.8.2 DEMARCACIÓN DE PAVIMENTO (LÍNEA CENTRAL Y SARDINELES) m 699.00 2.84 1,985.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 699.00 1,985.16 100.00%
1.9 OBRAS COMPLEMENTARIAS 0.00 0.00 0.00
1.9.1 REPOSICION DE RED DE DESAGUE 0.00 0.00 0.00
1.9.1.1 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m² 256.30 1.03 263.99 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 256.30 263.99 100.00%
1.9.1.2 EXCAVACION DE ZANJAS PARA TUBERÍAS m³ 192.23 15.00 2,883.45 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 192.23 2,883.45 100.00%
1.9.1.3 REFINE, NIVELADO Y APISONADO DE ZANJA m 256.30 3.19 817.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 256.30 817.60 100.00%
1.9.1.4 CAMA DE APOYO PARA TUBERÍA m² 128.15 7.74 991.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 128.15 991.88 100.00%
PRESUPUESTO BASE AVANCE
METRADO COSTOS
MES ANTERIOR EN EL MES ACUMULADO SALDO
ITEMS DESCRIPCION PARTIDA
U.M. CANT UNIT PARCIAL METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ %
1.9.1.5 RED MATRIZ DE DESAGUE DE 8" m 281.93 42.43 11,962.29 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 281.93 11,962.29 100.00%
1.9.1.6 RELLENO COMPACTADO MANUAL MATERIAL PROPIO m³ 1922.25 37.21 71,526.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,922.25 71,526.92 100.00%
1.9.1.7 PRUEBA HIDRAULICA + ESCORRENTIA DE TUBO 8" (200 mm) A ZANJA TAPADA m 256.30 1.09 279.37 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 256.30 279.37 100.00%
1.9.2 REPOSICION DE RED DE AGUA 0.00 0.00 0.00
1.9.2.1 REFINE, NIVELADO Y APISONADO DE ZANJA m 256.30 3.19 817.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 256.30 817.60 100.00%
1.9.2.2 CAMA DE APOYO PARA TUBERÍA m² 128.15 7.74 991.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 128.15 991.88 100.00%
1.9.2.3 INSTALACION DE TUBERIA HDPE, PE-100 AGUA POTABLE DN 100, INCLUYE PRUEBA HID m 256.30 18.09 4,636.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 256.30 4,636.47 100.00%
1.9.2.4 RELLENO COMPACTADO MANUAL MATERIAL PROPIO m³ 192.23 37.21 7,152.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 192.23 7,152.88 100.00%
1.9.3 BUZONES 0.00 0.00 0.00
1.9.3.1 REPARACIÓN Y ENCIMADO DE BUZONES INCLUYE TAPA und 3.00 694.32 2,082.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3.00 2,082.96 100.00%
1.9.4 CONEXIONES DOMICILIARIAS DE AGUA Y DESAGUE 0.00 0.00 0.00
1.9.4.1 CONEXION DE AGUA 1/2" TERRENO SUELTO DE 8.01-12 m und 27.00 202.86 5,477.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 27.00 5,477.22 100.00%
1.9.4.2 CONEXION DE DESAGUE TUBO UPVC 4", TERRENO SUELTO 8.01-12 m und 27.00 258.48 6,978.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 27.00 6,978.96 100.00%
1.9.5 REUBICACION DE POSTES 0.00 0.00 0.00
1.9.5.1 ESTRUCTURA DE SOPORTE (POSTE) - REUBICACION und 5.00 750.00 3,750.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.00 3,750.00 100.00%
1.9.6 CONTROL DE CALIDAD DE MATERIALES Y METODOS 0.00 0.00 0.00
1.9.6.1 CONCRETO 0.00 0.00 0.00
1.9.6.1.1 DISEÑO DE MEZCLAS PARA VERIFICACION und 2.00 550.00 1,100.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,100.00 100.00%
1.9.6.1.2 CONTROL DE AGREGADOS FINOS und 2.00 400.00 800.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 800.00 100.00%
1.9.6.1.3 CONTROL DE AGREGADOS GRUESOS und 2.00 400.00 800.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 800.00 100.00%
1.9.6.1.4 CONSISTENCIA DE LA MEZCLA und 6.00 5.00 30.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6.00 30.00 100.00%
1.9.6.1.5 ENSAYO PARA DETERMINAR LA RESISTENCIA A LA COMPRESION und 102.00 30.00 3,060.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 102.00 3,060.00 100.00%
1.9.6.2 MATERIAL DE BASE 0.00 0.00 0.00
1.9.6.2.1 CONTROL PARA MATERIALES DE SUB BASE Y BASE GRANULARES und 8.00 550.00 4,400.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 4,400.00 100.00%
1.9.6.2.2 ENSAYO DE RELACIONES DENSIDAD - HUMEDAD und 65.00 50.00 3,250.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 65.00 3,250.00 100.00%
1.9.6.2.3 DISEÑO Y EVALUACION DE MATERIAL CLASIFICADO PARA BASE und 2.00 750.00 1,500.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,500.00 100.00%
PRESUPUESTO BASE AVANCE
METRADO COSTOS
MES ANTERIOR EN EL MES ACUMULADO SALDO
ITEMS DESCRIPCION PARTIDA
U.M. CANT UNIT PARCIAL METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ %
1.9.6.2.4 DISEÑO Y EVALUACION DE MATERIAL CLASIFICADO PARA SUB BASE Y RELLENO ESTR und 2.00 750.00 1,500.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,500.00 100.00%
1.9.7 ENTREGA DE OBRA 0.00 0.00 0.00
1.9.7.1 PLACA RECORDATORIA und 1.00 850.00 850.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 850.00 100.00%
02.00 COMPONENTE 2: INFRAESTRUCTURA PEATONAL 0.00 0.00 0.00
02.10 SARDINELES 0.00 0.00 0.00
2.1.1 TRAZO, NIVELACION Y REPLANTEO m² 240.46 2.43 584.32 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 240.46 584.32 100.00%
2.1.2 EXCAVACION MANUAL DE ZANJAS m³ 14.43 15.00 216.45 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.43 216.45 100.00%
2.1.3 ELIMINACIÓN DE MATERIAL EXCEDENTE EN CARRETILLA (50 m) m³ 18.76 5.99 112.37 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 18.76 112.37 100.00%
2.1.4 ENCOFRADO Y DESENCOFRADO DE VEREDAS m² 96.18 22.52 2,165.97 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 96.18 2,165.97 100.00%
2.1.5 CONCRETO F'C=175 KG/CM2 m³ 14.43 349.93 5,049.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.43 5,049.49 100.00%
2.1.6 CURADO y CUIDADO DE CONCRETO m² 96.18 3.52 338.55 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 96.18 338.55 100.00%
2.1.7 SELLADO DE JUNTAS EN VEREDAS m 79.35 5.38 426.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 79.35 426.90 100.00%
2.2 VEREDAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.2.1 TRAZO, NIVELACION Y REPLANTEO m² 355.75 2.43 864.47 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 355.75 864.47 100.00%
2.2.2 EXCAVACION MANUAL m³ 71.15 15.00 1,067.25 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 71.15 1,067.25 100.00%
2.2.3 ELIMINACIÓN DE MATERIAL EXCEDENTE EN CARRETILLA (50 m) m³ 92.50 5.99 554.08 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 92.50 554.08 100.00%
2.2.4 ELIMINACIÓN DE MATERIAL EXCEDENTE CON EQUIPO HASTA 15 Km m³ 92.50 22.28 2,060.90 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 92.50 2,060.90 100.00%
2.2.5 NIVELACION Y APISONADO MANUAL EMPEDRADO E=0.10M m² 355.75 2.04 725.73 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 355.75 725.73 100.00%
2.2.6 EMPEDRADO E= 0.10 M m² 355.75 11.96 4,254.77 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 355.75 4,254.77 100.00%
2.2.7 ENCOFRADO Y DESENCOFRADO DE VEREDAS m² 11.74 22.52 264.38 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.74 264.38 100.00%
2.2.8 CONCRETO F'C=175 KG/CM2 m³ 35.58 349.93 12,450.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 35.58 12,450.51 100.00%
2.2.9 BRUÑADO EN VEREDAS m 355.75 2.84 1,010.33 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 355.75 1,010.33 100.00%
2.2.10 SELLADO DE JUNTAS EN VEREDAS m 117.40 5.38 631.61 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 117.40 631.61 100.00%
2.2.11 CURADO y CUIDADO DE CONCRETO m² 355.75 3.52 1,252.24 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 355.75 1,252.24 100.00%
02.30 RAMPAS PARA PERSONAS DISCAPACITADAS 0.00 0.00 0.00
2.3.1 TRAZO, NIVELACION Y REPLANTEO m² 12.00 2.43 29.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 12.00 29.16 100.00%
2.3.2 NIVELACION Y APISONADO MANUAL EMPEDRADO E=0.10M m² 9.72 2.04 19.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 9.72 19.83 100.00%
2.3.3 ENCOFRADO Y DESENCOFRADO DE VEREDAS m² 10.80 22.52 243.22 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.80 243.22 100.00%
2.3.4 CONCRETO F'C=175 KG/CM2 m³ 0.97 349.93 339.43 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.97 339.43 100.00%
2.3.5 BRUÑADO EN VEREDAS m 108.00 2.84 306.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 108.00 306.72 100.00%
2.3.6 CURADO y CUIDADO DE CONCRETO m² 9.72 3.52 34.21 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 9.72 34.21 100.00%
02.40 GRADERIAS 0.00 0.00 0.00
2.4.1 TRABAJOS PRELIMINARES 0.00 0.00 0.00 0.00
2.4.1.1 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m² 29.40 1.03 30.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 29.40 30.28 100.00%
2.4.2 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00
2.4.2.1 EXCAVACION MANUAL PARA ESTRUCTURAS m³ 8.82 24.00 211.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.82 211.68 100.00%
2.4.2.2 ACARREO DE MATERIAL EXCEDENTE C/BUGUI D=50m m³ 11.47 24.00 275.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.47 275.28 100.00%
2.4.2.3 CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE m³ 11.47 22.03 252.68 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11.47 252.68 100.00%
2.4.2.4 PERFILADO, NIVELACION Y COMPACTADO MANUAL PARA VEREDAS m² 29.40 4.00 117.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 29.40 117.60 100.00%
2.4.3 OBRAS DE CONCRETO Y MAMPOSTERIA 0.00 0.00 0.00
2.4.3.1 ENCOFRADO Y DESENCOFRADO CARAVISTA EN VEREDAS m² 5.62 55.45 311.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 5.62 311.63 100.00%
2.4.3.2 EMPEDRADO DE e=6" m² 4.41 7.72 34.05 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.41 34.05 100.00%
2.4.3.3 CONCRETO F'C=175 KG/CM2 m³ 2.94 349.93 1,028.79 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.94 1,028.79 100.00%
2.4.3.4 CURADO y CUIDADO DE CONCRETO m² 90.00 3.52 316.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 90.00 316.80 100.00%
2.4.4 BARANDAS 0.00 0.00 0.00
2.4.4.1 BARANDAS METÁLICAS m 14.60 221.76 3,237.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.60 3,237.70 100.00%
02.50 PINTURA 0.00 0.00 0.00
2.5.1 PINTURA EN SARDINELES m 240.46 6.46 1,553.37 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 240.46 1,553.37 100.00%
03.00 COMPONENTE 3: INFRAESTRUCTURA DE PROTECCION Y OBRAS COMPLEMENTARIAS 0.00 0.00 0.00
PRESUPUESTO BASE AVANCE
METRADO COSTOS
MES ANTERIOR EN EL MES ACUMULADO SALDO
ITEMS DESCRIPCION PARTIDA
U.M. CANT UNIT PARCIAL METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ % METRADO VALORIZ %
03.10 MUROS TIPO MESA DE SUELO REFORZADO 0.00 0.00 0.00
3.1.1 TRAZO, NIVELACION Y REPLANTEO PRELIMINAR m² 1084.60 2.43 2,635.58 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,084.60 2,635.58 100.00%
3.1.2 LOSA DE NIVELACION, INCLUYE CONCRETO Y ENCOFRADO 0.00 0.00 0.00
3.1.2.1 CONCRETO f'c=210 kg/cm2 m³ 19.52 391.16 7,635.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 19.52 7,635.44 100.00%
3.1.2.2 ENCOFRADO Y DESENCOFRADO NORMAL m² 65.08 25.50 1,659.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 65.08 1,659.54 100.00%
3.1.3 PANELES Y UNIONES 0.00 0.00 0.00
3.1.3.1 CONECTORES PARA MURO MESA und 7228.00 11.89 85,940.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7,228.00 85,940.92 100.00%
3.1.3.2 BLOQUE DE CONCRETO und 7685.00 23.75 182,518.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 7,685.00 182,518.75 100.00%
3.1.4 GEOMALLAS 0.00 0.00 0.00
3.1.4.1 GEOMALLA UNIAXIAL HDPE TIPO I m² 2109.38 14.09 29,721.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,109.38 29,721.16 100.00%
3.1.4.2 GEOMALLA UNIAXIAL HDPE TIPO II m² 2028.25 10.12 20,525.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,028.25 20,525.89 100.00%
3.1.5 CORONACION 0.00 0.00 0.00
3.1.5.1 RELLENO CON MATERIAL DE PRESTAMO CLASIFICADO m³ 117.14 62.13 7,277.91 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 117.14 7,277.91 100.00%
3.1.5.2 CONCRETO f'c=210 kg/cm2 m³ 18.87 391.16 7,381.19 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 18.87 7,381.19 100.00%
3.1.5.3 ACERO CORRUGADO 1/2" fy=4200 kg/cm2 GRADO 60 kg 2032.37 3.89 7,905.92 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,032.37 7,905.92 100.00%
3.1.5.4 ENCOFRADO Y DESENCOFRADO NORMAL m² 282.00 25.50 7,191.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 282.00 7,191.00 100.00%
3.1.5.5 CONCRETO f'c=210 kg/cm2 EN VIGA DE CORONACION m³ 31.45 391.16 12,301.98 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 31.45 12,301.98 100.00%
3.1.5.6 CURADO DE CONCRETO m² 282.00 6.04 1,703.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 282.00 1,703.28 100.00%
3.1.6 SISTEMA DE DRENAJE 0.00 0.00 0.00
3.1.6.1 GEOCOMPUESTO DE DRENAJE m² 540.00 25.08 13,543.20 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 540.00 13,543.20 100.00%
3.1.6.2 TUBERIA HDPE Ø4" PERFORADA m 238.61 14.96 3,569.61 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 238.61 3,569.61 100.00%
3.1.6.3 TUBERIA HDPE Ø4" NO PERFORADA m 52.14 14.96 780.01 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 52.14 780.01 100.00%
3.1.6.4 GRAVA LIMPIA 3/4" m³ 207.79 93.64 19,457.46 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 207.79 19,457.46 100.00%
03.20 ESTABILIDAD DE TALUDES CON SISTEMA ERDOX 0.00 0.00 0.00
3.2.1 TRAZO, NIVELACION Y REPLANTEO PRELIMINAR m² 284.24 2.43 690.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 284.24 690.70 100.00%
3.2.2 SISTEMA DE ANCLAJE, INCLUYE CONCRETO Y ENCOFRADO 0.00 0.00 0.00
3.2.2.1 CONCRETO f'c=210 kg/cm2 m³ 25.60 391.16 10,013.70 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 25.60 10,013.70 100.00%
3.2.2.2 ENCOFRADO Y DESENCOFRADO NORMAL m² 64.00 25.50 1,632.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 64.00 1,632.00 100.00%
3.2.2.3 PLACAS DE ANCLAJE und 40.00 1,355.99 54,239.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 40.00 54,239.60 100.00%
3.2.2.4 UNION DE PLACAS "L" ERDOX kit 20.00 498.42 9,968.40 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 20.00 9,968.40 100.00%
3.2.3 PANELES Y UNIONES 0.00 0.00 0.00
3.2.3.1 ENSAMBLAJE DE SISTEMA ERDOX CON TIERRA REFORZADA und 20.00 13,786.99 275,739.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 20.00 275,739.80 100.00%
3.3 BARANDAS SOBRE MURO TIPO MESA 0.00 0.00 0.00 0.00
3.3.1 BARANDAS METÁLICAS PARA MURO m 222.80 221.76 49,408.13 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 222.80 49,408.13 100.00%
03.40 MITIGACIÓN DE IMPACTOS 0.00 0.00 0.00 0.00
3.4.1 SERVICIOS HIGIÉNICOS PROVISIONALES und 2.00 500.00 1,000.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,000.00 100.00%
3.4.2 GESTION DE RESIDUOS SOLIDOS und 1.00 847.23 847.23 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 847.23 100.00%
3.4.3 MITIGACION DEL IMPACTO AMBIENTAL gbl 1.00 2,500.00 2,500.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1.00 2,500.00 100.00%
3.4.4 LIMPIEZA FINAL DE OBRA m² 349.50 1.23 429.89 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 349.50 429.89 100.00%
3.4.5 COLOCACION DE PLANTONES und 8.00 15.57 124.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 124.56 100.00%
3.4.6 CONFORMACION Y ACONDICIONAMIENTO DE TALUDES m² 78.00 4.67 364.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 78.00 364.26 100.00%
COSTO DIRECTOS S/. 2,318,467.23 88,697.40 3.83% 0.00 0.00% 88,697.40 3.83% 2,235,739.82 96.43%
GASTOS GENERALES 11.82% 274,034.26 10,483.70 0.00 0.00% 10,483.70 264,256.19
SUBTOTAL 01 2,592,501.49 99,181.10 3.83% 0.00 0.00% 99,181.10 3.83% 2,499,996.00 96.43%
GASTOS DE SUPERVISION 4.70% 108,950.14 4,168.10 0.00 4,168.10 105,062.59
0.00%
EXPEDIENTE TECNICO 1.26% 29,166.67 1,115.83 0.00 1,115.83 28,125.95
0.00%
SUBTOTAL 02 2,730,618.30 104,465.02 3.83% 0.00 0.00% 104,465.02 3.83% 2,633,184.53 96.43%
GASTOS DE LIQUIDACION DE PROYECTO 0.81% 18,669.04 0.00 0.00 0.00% 0.00 18,669.04
TOTAL_PRESUPUESTO 2,749,287.34 104,465.02 3.80% 0.00 0.00% 104,465.02 3.80% 2,651,853.58 96.46%
FORMATO - 4
METRADOS DIARIOS N° 07
#REF!
OBRA :
RESIDENTE ING. EDWARD OLIVERA VILLANUEVA
INFORME TECNICO MENSUAL CORRESPONDIENTE AL MES DE: SETIEMBRE DEL 2021 INSPECTOR ING. RENATO ESPINOZA CACERES
PRESUPUESTO BASE FECHA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
TOTAL
ITEMS DESCRIPCION PARTIDA DIA METRAD M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M
01.00 COMPONENTE 1: INFRAESTRUCTURA VEHICULAR
01.10 OBRAS PROVISIONALES 0.00
1.1.1 OBRAS PROVISIONALES 0.00
1.1.1.1 CARTEL DE OBRA und 1 0.00
1.1.1.2 ALQUILER DE LOCAL PARA RESIDENCIA DE OBRA mes 10 0.00
1.1.1.3 ALQUILER DE LOCAL PARA ALMACEN DE OBRA mes 10 0.00
1.1.1.4 SEÑALIZACION TEMPORAL DE SEGURIDAD m 200 0.00
1.1.1.5 TRANQUERAS und 2 0.00
1.1.2 AGUA Y DESAGUE PARA OBRA 0.00
1.1.2.1 AGUA PARA LA CONSTRUCCION pto 1 0.00
1.1.2.2 DESAGUE PARA LA CONSTRUCCION pto 1 0.00
1.1.2.3 CONSUMO Y MANTENIMIENTO SEDA mes 10 0.00
1.1.3 ENERGIA ELECTRICA PARA OBRA 0.00
1.1.3.1 CONEXION E INSTALACION DE ENERGIA ELECTRICA pto 1 0.00
1.1.3.2 CONSUMO Y MANTENIMIENTO ELECTRICO mes 10 0.00
1.1.4 SEGURIDAD Y SALUD 0.00
1.1.4.1 ELABORACIÓN, IMPLEMENTACIÓN Y ADMINISTRACIÓN DEL PLAN DE SEG gbl 1 0.00
1.1.4.2 CAPACITACION EN SEGURIDAD Y SALUD gbl 1 0.00
1.1.4.3 SEÑALIZACIÓN TEMPORAL DE SEGURIDAD gbl 1 0.00
1.1.4.4 SEGURO COMPLEMENTARIO DE ALTO RIESGO - PENSIÓN gbl 1 0.00
1.1.4.5 EQUIPO DE PROTECCIÓN COLECTIVA kit 1 0.00
1.1.4.6 EQUIPOS DE PROTECCION INDIVIDUAL jgo 60 0.00
1.1.4.7 RECURSOS PARA RESPUESTAS ANTE EMERGENCIA EN SEGURIDAD Y S gbl 1 0.00
1.1.4.8 INSPECCIÓN PERIÓDICA DE MAQUINARIAS Y/O EQUIPOS und 1 0.00
1.1.4.9 MANTENIMIENTO CORRECTIVO DE MAQUINARIAS Y/O EQUIPOS gbl 1 0.00
1.1.4.10 CONTROL DE POLVO mes 10 0.00
1.1.4.11 MANEJO DE RESIDUOS SÓLIDOS mes 10 0.00
1.1.4.12 KIT CONTRA DERRAMES und 1 0.00
01.20 TRABAJOS PRELIMINARES 0.00
1.2.1 MOVILIZACION Y DESMOBILIZACION DE MAQUINARIA PESADA Y HERRAM gbl 1 0.00
1.2.2 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m² 1980.5 0.00
01.30 MOVIMIENTO DE TIERRA 0.00
1.3.1 DESBROCE Y LIMPIEZA EN ZONAS NO BOSCOSAS ha 0.5 0.00
1.3.2 EXCAVACIÓN EN EXPLANACIONES CON MAQUINARIA m³ 10581.3 0.00
1.3.3 REMOCIÓN DE DERRUMBES m³ 920 0.00
1.3.4 PERFILADO Y COMPACTADO EN ZONA DE CORTE m² 2424.33 0.00
1.3.5 CONFORMACION DE TERRAPLENES m³ 1165 0.00
1.3.6 SUMINISTRO DE MATERIAL DE RELLENO PARA ESTRUCTURAS, PUESTO m³ 5898.77 0.00
1.3.7 EXTENDIDO, RIEGO Y COMPACTACION DE MATERIAL A NIVEL DE SUBRA m² 21041.1 0.00
1.3.8 CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE m³ 13754 0.00
01.40 CALZADA VEHICULAR 0.00
1.4.1 SUB RASANTE 0.00
1.4.1.1 TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO m² 1426.94 0.00
1.4.1.2 PERFILADO, RIEGO Y COMPACTADO DE LA SUB RASANTE m² 2853.88 0.00
1.4.2 CONFORMACION DE BASE E=0.30m 0.00
1.4.2.1 TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO m² 1249.58 0.00
1.4.2.2 SUMINISTRO DE MATERIAL DE RELLENO PARA ESTRUCTURAS, PUESTO m³ 349.88 0.00
1.4.2.3 EXTENDIDO, RIEGO Y COMPACTACION DE MATERIAL DE BASE m² 1249.58 0.00
1.4.2.4 ACARREO DE MATERIAL D=100MTS m³ 97.47 0.00
1.4.3 CARPETA DE RODADURA 0.00
1.4.3.1 TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO m² 1249.58 0.00
1.4.3.2 ENCOFRADO Y DESENCOFRADO LOSA DE PAVIMENTO m² 131.3 0.00
FORMATO - 4
METRADOS DIARIOS N° 07
#REF!
OBRA :
RESIDENTE ING. EDWARD OLIVERA VILLANUEVA
INFORME TECNICO MENSUAL CORRESPONDIENTE AL MES DE: SETIEMBRE DEL 2021 INSPECTOR ING. RENATO ESPINOZA CACERES
PRESUPUESTO BASE FECHA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
TOTAL
ITEMS DESCRIPCION PARTIDA DIA METRAD M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M
1.4.3.3 ACERO LISO DE 1/4" fy=4200 Kg/cm2 PARA MALLA DE TEMPERATURA kg 2434.85 0.00
1.4.3.4 ACERO CORRUGADO DE 1/2" fy=4200 Kg/cm2 EN JUNTA LONGITUDINAL kg 285.19 0.00
1.4.3.5 ACERO LISO DE 1" fy=4200 Kg/cm2 EN JUNTA DE CONSTRACCION Y CO kg 938.4 0.00
1.4.3.6 ACERO CORRUGADO DE 5/8" fy=4200 Kg/cm2 EN JUNTA CONTRACCION kg 750.72 0.00
1.4.3.7 CONCRETO F'C= 210 KG/CM2 EN PAVIMENTO (INCL ACAB.) m³ 249.92 0.00
1.4.3.8 CURADO DEL CONCRETO m² 1249.58 0.00
1.4.3.9 ACARREO DE MATERIAL D=100MTS m³ 124.96 0.00
1.4.4 JUNTAS EN LOSAS DE CONCRETO 0.00
1.4.4.1 CORTE DE JUNTAS DE CONTRACCION TRANSVERSAL m 360 0.00
1.4.4.2 SELLADO DE JUNTAS DE CONTRACCION TRANSVERSAL m 360 0.00
1.4.4.3 SELLADO DE JUNTAS LONGITUDINALES m 233 0.00
01.50 EVACUACION DE AGUAS PLUVIALES 0.00
1.5.1 CANAL DE EVACIACION PLUVIAL 0.00
1.5.1.1 OBRAS PRELIMINARES 0.00
1.5.1.1.1 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m² 177.36 0.00
1.5.1.2 MOVIMIENTO DE TIERRAS 0.00
1.5.1.2.1 PERFILADO, NIVELACION Y COMPACTADO MANUAL m² 177.36 0.00
1.5.1.3 OBRAS DE CONCRETO ARMADO 0.00
1.5.1.3.1 ACERO DE REFUERZO Fy=4200 kg/cm2 EN CANAL kg 2090.3 0.00
1.5.1.3.2 CONCRETO f'c=210 kg/cm2 PARA CANAL m³ 51.43 0.00
1.5.1.3.3 ENCOFRADO Y DESENCOFRADO PARA CANAL m² 461.14 0.00
1.5.1.3.4 ACERO DE REFUERZO Fy=4200 kg/cm2 EN TAPA kg 1491.6 0.00
1.5.1.3.5 ENCOFRADO Y DESENCOFRADO PARA TAPA m² 177.36 0.00
1.5.1.3.6 CONCRETO f'c=210 kg/cm2 PARA TAPA m³ 17.03 0.00
1.5.1.3.7 CURADO DEL CONCRETO m² 638.5 0.00
1.5.2 SUMIDEROS 0.00
1.5.2.1 OBRAS PRELIMINARES 0.00
1.5.2.1.1 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m² 9.6 0.00
1.5.2.2 MOVIMIENTO DE TIERRAS 0.00
1.5.2.2.1 PERFILADO, NIVELACION Y COMPACTADO MANUAL m² 9.6 0.00
1.5.2.3 OBRAS DE CONCRETO 0.00
1.5.2.3.1 CONCRETO SOLADO MEZCLA 1:12 CEMENTO-HORMIGON e=0.10 m. m² 9.6 0.00
1.5.2.3.2 ENCOFRADO Y DESENCOFRADO CARAVISTA EN SUMIDEROS m² 33 0.00
1.5.2.3.3 ACERO CORRUGADO DE 1/2" fy=4200 Kg/cm2 EN SUMIDERO kg 148.48 0.00
1.5.2.3.4 CONCRETO F'C= 210 KG/CM2 EN SUMIDERO m³ 3.31 0.00
1.5.2.3.5 TARRAJEO CON IMPERMEABILIZANTE m² 11.66 0.00
1.5.2.3.6 CURADO DEL CONCRETO m² 46.62 0.00
1.5.2.4 REJILLA METALICA 0.00
1.5.2.4.1 REJILLA METALICA PARA SUMIDEROS m 12 0.00
1.5.3 TRATAMIENTO DE AREAS VERDES Y JARDINES 0.00
1.5.3.1 MOVIMIENTO DE TIERRAS EN TALUDES 0.00
1.5.3.1.1 TRAZO, NIVELES Y REPLANTEO m² 1044.07 0.00
1.5.3.1.2 CORTE DE TERRENO m³ 208.81 0.00
1.5.3.1.3 CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE m³ 271.45 0.00
1.5.3.1.4 PERFILADO, RIEGO Y COMPACTADO DEL TALUD m² 1044.07 0.00
1.5.3.2 AREAS VERDES 0.00
1.5.3.2.1 MEJORAMIENTO DE TERRENO (CON TIERRA AGRÍCOLA) m² 1044.07 0.00
1.5.3.2.2 SEMBRADO DE GRASS m² 1044.07 0.00
01.60 ENCIMADO DE BUZONES 0.00
1.6.1 DEMOLICION DE BUZONES und 7 0.00
1.6.2 EXCAVACION MANUAL PARA ESTRUCTURAS m³ 28 0.00
1.6.3 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 M) m³ 36.4 0.00
1.6.4 ELIMINACIÓN DE MATERIAL EXCEDENTE CON EQUIPO HASTA 15 Km m³ 36.4 0.00
1.6.5 ENCOFRADO Y DESENCOFRADO EN TAPA DE BUZONES m² 7 0.00
FORMATO - 4
METRADOS DIARIOS N° 07
#REF!
OBRA :
RESIDENTE ING. EDWARD OLIVERA VILLANUEVA
INFORME TECNICO MENSUAL CORRESPONDIENTE AL MES DE: SETIEMBRE DEL 2021 INSPECTOR ING. RENATO ESPINOZA CACERES
PRESUPUESTO BASE FECHA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
TOTAL
ITEMS DESCRIPCION PARTIDA DIA METRAD M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M
1.6.6 ACERO CORRUGADO FY=4200 KG/CM2 kg 533.89 0.00
1.6.7 CONCRETO f'c=210 kg/cm2 m³ 17.92 0.00
1.6.8 TAPA CON MARCO PARA BUZONES und 7 0.00
1.6.9 CONCRETO F'C=140 Kg/cm2 m³ 2.73 0.00
01.70 PUENTE VEHICULAR 5MTS 0.00
1.7.1 DESMONTAJE Y ELIMINACION DE PUENTE EXISTENTE 0.00
1.7.1.1 DESMONTAJE Y DEMOLICIÓN DE PUENTE EXISTENTE m³ 48.75 0.00
1.7.1.2 ELIMINACION CON TRANSPORTE (INC. ACARREO 50M) R=120 m3/día m³ 63.38 0.00
1.7.2 SUBESTRUCTURA 0.00
1.7.2.1 EXCAVACION MANUAL m³ 241.8 0.00
1.7.2.2 SOLADOS CONCRETO f'c=100 kg/cm2 h=0.05 m. m² 120.9 0.00
1.7.2.3 CONCRETO F'C=210 KG/CM2 m³ 134.88 0.00
1.7.2.4 ENCOFRADO Y DESENCOFRADO NORMAL m² 400.41 0.00
1.7.2.5 ACERO DE REFUERZO FY=4200KG/CM2 kg 10098 0.00
1.7.2.6 CURADO DE CONCRETO m² 134.88 0.00
1.7.3 SUPERESTRUCTURA 0.00
1.7.3.1 CONCRETO f'c=210 kg/cm2 m³ 23.67 0.00
1.7.3.2 ENCOFRADO Y DESENCOFRADO m² 67.77 0.00
1.7.3.3 ACERO DE REFUERZO FY=4200KG/CM2 kg 1574.51 0.00
1.7.3.4 CURADO DE CONCRETO m² 67.77 0.00
1.7.4 VARIOS 0.00
1.7.4.1 JUNTA DE DILATACIÓN m 17.2 0.00
1.7.4.2 DISPOSITIVO DE APOYO und 4 0.00
1.7.4.3 TUBOS DE DRENAJE und 6 0.00
1.7.4.4 BARANDAS METÁLICAS m 10 0.00
01.80 SEÑALIZACION 0.00
1.8.1 DEMARCACIÓN DE CRUCES DE VÍA und 2 0.00
1.8.2 DEMARCACIÓN DE PAVIMENTO (LÍNEA CENTRAL Y SARDINELES) m 699 0.00
01.90 OBRAS COMPLEMENTARIAS 0.00
1.9.1 REPOSICION DE RED DE DESAGUE 0.00
1.9.1.1 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m² 256.3 0.00
1.9.1.2 EXCAVACION DE ZANJAS PARA TUBERÍAS m³ 192.23 0.00
1.9.1.3 REFINE, NIVELADO Y APISONADO DE ZANJA m 256.3 0.00
1.9.1.4 CAMA DE APOYO PARA TUBERÍA m² 128.15 0.00
1.9.1.5 RED MATRIZ DE DESAGUE DE 8" m 281.93 0.00
1.9.1.6 RELLENO COMPACTADO MANUAL MATERIAL PROPIO m³ 1922.25 0.00
1.9.1.7 PRUEBA HIDRAULICA + ESCORRENTIA DE TUBO 8" (200 mm) A ZANJA TA m 256.3 0.00
1.9.2 REPOSICION DE RED DE AGUA 0.00
1.9.2.1 REFINE, NIVELADO Y APISONADO DE ZANJA m 256.3 0.00
1.9.2.2 CAMA DE APOYO PARA TUBERÍA m² 128.15 0.00
1.9.2.3 INSTALACION DE TUBERIA HDPE, PE-100 AGUA POTABLE DN 100, INCLU m 256.3 0.00
1.9.2.4 RELLENO COMPACTADO MANUAL MATERIAL PROPIO m³ 192.23 0.00
1.9.3 BUZONES 0.00
1.9.3.1 REPARACIÓN Y ENCIMADO DE BUZONES INCLUYE TAPA und 3 0.00
1.9.4 CONEXIONES DOMICILIARIAS DE AGUA Y DESAGUE 0.00
1.9.4.1 CONEXION DE AGUA 1/2" TERRENO SUELTO DE 8.01-12 m und 27 0.00
1.9.4.2 CONEXION DE DESAGUE TUBO UPVC 4", TERRENO SUELTO 8.01-12 m und 27 0.00
1.9.5 REUBICACION DE POSTES 0.00
1.9.5.1 ESTRUCTURA DE SOPORTE (POSTE) - REUBICACION und 5 0.00
1.9.6 CONTROL DE CALIDAD DE MATERIALES Y METODOS 0.00
1.9.6.1 CONCRETO 0.00
1.9.6.1.1 DISEÑO DE MEZCLAS PARA VERIFICACION und 2 0.00
1.9.6.1.2 CONTROL DE AGREGADOS FINOS und 2 0.00
1.9.6.1.3 CONTROL DE AGREGADOS GRUESOS und 2 0.00
1.9.6.1.4 CONSISTENCIA DE LA MEZCLA und 6 0.00
FORMATO - 4
METRADOS DIARIOS N° 07
#REF!
OBRA :
RESIDENTE ING. EDWARD OLIVERA VILLANUEVA
INFORME TECNICO MENSUAL CORRESPONDIENTE AL MES DE: SETIEMBRE DEL 2021 INSPECTOR ING. RENATO ESPINOZA CACERES
PRESUPUESTO BASE FECHA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
TOTAL
ITEMS DESCRIPCION PARTIDA DIA METRAD M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M
1.9.6.1.5 ENSAYO PARA DETERMINAR LA RESISTENCIA A LA COMPRESION und 102 0.00
1.9.6.2 MATERIAL DE BASE 0.00
1.9.6.2.1 CONTROL PARA MATERIALES DE SUB BASE Y BASE GRANULARES und 8 0.00
1.9.6.2.2 ENSAYO DE RELACIONES DENSIDAD - HUMEDAD und 65 0.00
1.9.6.2.3 DISEÑO Y EVALUACION DE MATERIAL CLASIFICADO PARA BASE und 2 0.00
1.9.6.2.4 DISEÑO Y EVALUACION DE MATERIAL CLASIFICADO PARA SUB BASE Y und 2 0.00
1.9.7 ENTREGA DE OBRA 0.00
1.9.7.1 PLACA RECORDATORIA und 1 0.00
02.00 COMPONENTE 2: INFRAESTRUCTURA PEATONAL 0.00
02.10 SARDINELES 0.00
2.1.1 TRAZO, NIVELACION Y REPLANTEO m² 240.46 0.00
2.1.2 EXCAVACION MANUAL DE ZANJAS m³ 14.43 0.00
2.1.3 ELIMINACIÓN DE MATERIAL EXCEDENTE EN CARRETILLA (50 m) m³ 18.76 0.00
2.1.4 ENCOFRADO Y DESENCOFRADO DE VEREDAS m² 96.18 0.00
2.1.5 CONCRETO F'C=175 KG/CM2 m³ 14.43 0.00
2.1.6 CURADO y CUIDADO DE CONCRETO m² 96.18 0.00
2.1.7 SELLADO DE JUNTAS EN VEREDAS m 79.35 0.00
02.20 VEREDAS 0.00
2.2.1 TRAZO, NIVELACION Y REPLANTEO m² 355.75 0.00
2.2.2 EXCAVACION MANUAL m³ 71.15 0.00
2.2.3 ELIMINACIÓN DE MATERIAL EXCEDENTE EN CARRETILLA (50 m) m³ 92.5 0.00
2.2.4 ELIMINACIÓN DE MATERIAL EXCEDENTE CON EQUIPO HASTA 15 Km m³ 92.5 0.00
2.2.5 NIVELACION Y APISONADO MANUAL EMPEDRADO E=0.10M m² 355.75 0.00
2.2.6 EMPEDRADO E= 0.10 M m² 355.75 0.00
2.2.7 ENCOFRADO Y DESENCOFRADO DE VEREDAS m² 11.74 0.00
2.2.8 CONCRETO F'C=175 KG/CM2 m³ 35.58 0.00
2.2.9 BRUÑADO EN VEREDAS m 355.75 0.00
2.2.10 SELLADO DE JUNTAS EN VEREDAS m 117.4 0.00
2.2.11 CURADO y CUIDADO DE CONCRETO m² 355.75 0.00
02.30 RAMPAS PARA PERSONAS DISCAPACITADAS 0.00
2.3.1 TRAZO, NIVELACION Y REPLANTEO m² 12 0.00
2.3.2 NIVELACION Y APISONADO MANUAL EMPEDRADO E=0.10M m² 9.72 0.00
2.3.3 ENCOFRADO Y DESENCOFRADO DE VEREDAS m² 10.8 0.00
2.3.4 CONCRETO F'C=175 KG/CM2 m³ 0.97 0.00
2.3.5 BRUÑADO EN VEREDAS m 108 0.00
2.3.6 CURADO y CUIDADO DE CONCRETO m² 9.72 0.00
02.40 GRADERIAS 0.00
2.4.1 TRABAJOS PRELIMINARES 0.00
2.4.1.1 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m² 29.4 0.00
2.4.2 MOVIMIENTO DE TIERRAS 0.00
2.4.2.1 EXCAVACION MANUAL PARA ESTRUCTURAS m³ 8.82 0.00
2.4.2.2 ACARREO DE MATERIAL EXCEDENTE C/BUGUI D=50m m³ 11.47 0.00
2.4.2.3 CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE m³ 11.47 0.00
2.4.2.4 PERFILADO, NIVELACION Y COMPACTADO MANUAL PARA VEREDAS m² 29.4 0.00
2.4.3 OBRAS DE CONCRETO Y MAMPOSTERIA 0.00
2.4.3.1 ENCOFRADO Y DESENCOFRADO CARAVISTA EN VEREDAS m² 5.62 0.00
2.4.3.2 EMPEDRADO DE e=6" m² 4.41 0.00
2.4.3.3 CONCRETO F'C=175 KG/CM2 m³ 2.94 0.00
2.4.3.4 CURADO y CUIDADO DE CONCRETO m² 90 0.00
2.4.4 BARANDAS 0.00
2.4.4.1 BARANDAS METÁLICAS m 14.6 0.00
02.50 PINTURA 0.00
2.5.1 PINTURA EN SARDINELES m 240.46 0.00
03.00 COMPONENTE 3: INFRAESTRUCTURA DE PROTECCION Y OBRAS COMPLEMENTARIAS 0.00
03.10 MUROS TIPO MESA DE SUELO REFORZADO 0.00
3.1.1 TRAZO, NIVELACION Y REPLANTEO PRELIMINAR m² 1084.6 0.00
FORMATO - 4
METRADOS DIARIOS N° 07
#REF!
OBRA :
RESIDENTE ING. EDWARD OLIVERA VILLANUEVA
INFORME TECNICO MENSUAL CORRESPONDIENTE AL MES DE: SETIEMBRE DEL 2021 INSPECTOR ING. RENATO ESPINOZA CACERES
PRESUPUESTO BASE FECHA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
TOTAL
ITEMS DESCRIPCION PARTIDA DIA METRAD M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M
3.1.2 LOSA DE NIVELACION, INCLUYE CONCRETO Y ENCOFRADO 0.00
3.1.2.1 CONCRETO f'c=210 kg/cm2 m³ 19.52 0.00
3.1.2.2 ENCOFRADO Y DESENCOFRADO NORMAL m² 65.08 0.00
3.1.3 PANELES Y UNIONES 0.00
3.1.3.1 CONECTORES PARA MURO MESA und 7228 0.00
3.1.3.2 BLOQUE DE CONCRETO und 7685 0.00
3.1.4 GEOMALLAS 0.00
3.1.4.1 GEOMALLA UNIAXIAL HDPE TIPO I m² 2109.38 0.00
3.1.4.2 GEOMALLA UNIAXIAL HDPE TIPO II m² 2028.25 0.00
3.1.5 CORONACION 0.00
3.1.5.1 RELLENO CON MATERIAL DE PRESTAMO CLASIFICADO m³ 117.14 0.00
3.1.5.2 CONCRETO f'c=210 kg/cm2 m³ 18.87 0.00
3.1.5.3 ACERO CORRUGADO 1/2" fy=4200 kg/cm2 GRADO 60 kg 2032.37 0.00
3.1.5.4 ENCOFRADO Y DESENCOFRADO NORMAL m² 282 0.00
3.1.5.5 CONCRETO f'c=210 kg/cm2 EN VIGA DE CORONACION m³ 31.45 0.00
3.1.5.6 CURADO DE CONCRETO m² 282 0.00
3.1.6 SISTEMA DE DRENAJE 0.00
3.1.6.1 GEOCOMPUESTO DE DRENAJE m² 540 0.00
3.1.6.2 TUBERIA HDPE Ø4" PERFORADA m 238.61 0.00
3.1.6.3 TUBERIA HDPE Ø4" NO PERFORADA m 52.14 0.00
3.1.6.4 GRAVA LIMPIA 3/4" m³ 207.79 0.00
03.20 ESTABILIDAD DE TALUDES CON SISTEMA ERDOX 0.00
3.2.1 TRAZO, NIVELACION Y REPLANTEO PRELIMINAR m² 284.24 0.00
3.2.2 SISTEMA DE ANCLAJE, INCLUYE CONCRETO Y ENCOFRADO 0.00
3.2.2.1 CONCRETO f'c=210 kg/cm2 m³ 25.6 0.00
3.2.2.2 ENCOFRADO Y DESENCOFRADO NORMAL m² 64 0.00
3.2.2.3 PLACAS DE ANCLAJE und 40 0.00
3.2.2.4 UNION DE PLACAS "L" ERDOX kit 20 0.00
3.2.3 PANELES Y UNIONES 0.00
3.2.3.1 ENSAMBLAJE DE SISTEMA ERDOX CON TIERRA REFORZADA und 20 0.00
03.30 BARANDAS SOBRE MURO TIPO MESA 0.00
3.3.1 BARANDAS METÁLICAS PARA MURO m 222.8 0.00
03.40 MITIGACIÓN DE IMPACTOS 0.00
3.4.1 SERVICIOS HIGIÉNICOS PROVISIONALES und 2 0.00
3.4.2 GESTION DE RESIDUOS SOLIDOS und 1 0.00
3.4.3 MITIGACION DEL IMPACTO AMBIENTAL gbl 1 0.00
3.4.4 LIMPIEZA FINAL DE OBRA m² 349.5 0.00
3.4.5 COLOCACION DE PLANTONES und 8 0.00
3.4.6 CONFORMACION Y ACONDICIONAMIENTO DE TALUDES m² 78 0.00
FORMATO - 4
MUNICIPALIDAD DISTRITAL DE SAN SEBASTIAN - CUSCO
SUB GERENCIA DE EJECUCION DE OBRA
OBRA: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL DE LAS CALLES SIN NOMBRE Y ARCANGELES ENTRE LAS APVS SANTA ROSA COMITÉ 04, TRES CRUCES Y URB. SAN GABRIEL, DISTRITO DE SAN SEBASTIAN - CUSCO - CUSCO"
SETIEMBRE DEL 2021 METRADO DIARIO DE PARTIDAS NUEVAS RESIDENTE: ING. EDWARD OLIVERA VILLANUEVA
INSPECTOR: ING. RENATO ESPINOZA CACERES
PRESUPUESTO BASE FECHA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
TOTAL
ITEM DESCRIPCION DE PARTIDA DIA S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L
#REF! PUENTE VEHICULAR 5MTS
#REF! DESMONTAJE Y ELIMINACION DE PUENTE EXISTENTE
#REF! DESMONTAJE Y DEMOLICION PUENTE EXISTENTE m3 0.00
#REF! EXCAVACION Y ELIMINACION CON MAQUINARIA m3 0.00
#REF! SUBESTRUCTURA 0.00
#REF! SOLADOS CONCRETO F'C=100 kg/cm2 h=0.05 m2 0.00
#REF! ENROCADO E=0.30m m3 0.00
#REF! CONCRETO F'C= 210 KG/CM2. CON C° PREMEZCLADO m3 0.00
#REF! CONCRETO F'C= 280 KG/CM2. CON C° PREMEZCLADO m3 0.00
#REF! SUPERESTRUCTURA 0.00
#REF! CONCRETO F'C=280 KG/CM2 CON Cº PREMEZCLADO m3 0.00
#REF! VARIOS 0.00
#REF! DISPOSITIVO DE APOYO und 0.00
#REF! CONTROLES DE CALIDAD und 0.00
#REF! ENTIBADO DE TALUDES m2 0.00
#REF! PERFILADO Y DESQUINCHE DE TALUD m3 0.00
#REF! EMBOQUILLADO CON PIEDRA DE 6"-8" m3 0.00
#REF! RELLENO Y COMPACTADO CON MATERIA PROPIO m3 0.00
#REF! ENCAUSAMIENTO DE CANAL m3 0.00
#REF! ACARREO MANUAL DE MATERIAL EXCEDENTE D=20 M m3 0.00
01.06.04.12 CONCRETO CICLOPEO EN CANAL F'C=175 KG/CM2 + 30% P.G. m3 0.00
01.06.04.13 CONCRETO CICLOPEO EN CALZADURA F'C=175 KG/CM2 + 70% P.G. m3 0.00
01.06.04.14 RELLENO Y COMPACTADO MANUAL MATERIAL SELECTO m3 0.00
01.06.04.15 EMBOQUILLADO CON PIEDRA CONCRETO F´C=210KG/CM2+30% PM m3 6.02 2 1.58 9.60
CURVA "S" N° 01
OBRA: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL DE LAS CALLES SIN NOMBRE Y ARCANGELES ENTRE LAS APVS SANTA ROSA COMITÉ
04, TRES CRUCES Y URB. SAN GABRIEL, DISTRITO DE SAN SEBASTIAN - CUSCO - CUSCO"
DICIEMBRE
MES: INICIO ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTO SEPTIEMBRE OCTUBRE OCTUBRE
2020
Del: 12/7/2020 1/1/2021 2/1/2021 3/1/2021 4/1/2021 5/1/2021 6/1/2021 7/1/2021 8/1/2021 9/1/2021 10/1/2021 10/1/2021
GENERAL Al: 12/30/2020 1/31/2021 2/28/2021 3/31/2021 4/30/2021 5/31/2021 6/30/2021 7/31/2021 8/31/2021 9/30/2021 10/31/2021 10/30/2021
Programado s/. 770,924.81 0.00 23,172.93 33,935.65 S/. 33,180.53 54,855.37 25,849.00 109,679.38 40,961.58 40,961.58 234,452.44 173,876.35
Avance Programado % 0.00 3.01% 4.40% 4.30% 7.12% 3.35% 14.23% 5.31% 5.31% 30.41% 22.55%
Mensual Acumulado Programado s/. 770,924.81 0.00 23,172.93 57,108.57 90,289.11 145,144.47 170,993.47 280,672.86 321,634.44 362,596.02 597,048.47 770,924.81
Acumulado programado % - 0.00% 3.01% 7.41% 11.71% 18.83% 22.18% 36.41% 41.72% 47.03% 77.45% 100.00%
Ejecutado s/. 770,924.81 0.00 23,172.93 33,935.65 33,180.53 S/. 54,855.36 25,849.00 11,861.89 S/. 72,797.03 42,126.04 268,907.20 51,012.57
Avance Ejecutado % - 0.00% 3.01% 4.40% 4.30% 7.12% 3.35% 1.54% 9.44% 5.46% 34.88% 6.62%
Mensual Acumulado Ejecutado s/. 770,924.81 0.00 23,172.93 57,108.57 90,289.11 145,144.47 170,993.47 182,855.38 255,652.38 297,778.41 566,685.61 617,698.18
Acumulado Ejecutado % - 0.00% 3.01% 7.41% 11.71% 18.83% 22.18% 23.72% 33.16% 38.63% 73.51% 80.12%
120.00%
CURVAS S
100.00%
80.00%
Axis Title
60.00%
40.00%
20.00%
0.00%
INICIO DICIEMBRE 2020 ENERO FEBRERO MARZO ABRIL MAYO JUNIO JULIO AGOSTO SEPTIEMBRE
RESUMEN DE VALORIZACIONES DE AVANCE DE OBRA
"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL DE LAS CALLES SIN NOMBRE Y ARCANGELES ENTRE LAS APVS SANTA ROSA COMITÉ 04, TRES CRUCES Y URB. SAN GABRIEL, RESIDENTE ING. EDWARD OLIVERA VILLANUEVA
OBRA DISTRITO DE SAN SEBASTIAN - CUSCO - CUSCO" INSPECTOR ING. RENATO ESPINOZA CACERES
INFORME TECNICO MENSUAL CORRESPONDIENTE AL MES DE: SETIEMBRE DEL 2021
RESUMEN DE VALORIZACION DE AVANCE FISICO DE OBRA SEGÚN FORMATO 12B
COSTO DIRECTO S/ S/ 770,937.458 S/ 361,264.89 46.86% S/. 51,012.57 6.62% S/. 412,277.46 53.48% S/. 358,660.00 46.52%
GASTOS GENERALES (28.19%) 28.19% S/. 217,311.06 S/. 101,832.98 46.86% S/. 14,379.37 6.62% S/. 116,212.35 53.48% S/. 101,098.71 46.52%
SUB TOTAL(GG+CD) S/. 988,248.52 S/463,097.88 46.86% 65,391.94 6.62% 528,489.83 53.48% 459,758.69 46.52%
COSTOS INDIRECTOS
GASTOS DE SUPERVISION DE OBRA (9.11%) 9.11% S/ 70,204.80 S/ 32,898.30 46.86% S/ 4,645.42 6.62% S/ 37,543.72 53.48% S/ 32,661.08 46.52%
GASTOS DE ELABORACION EXPEDIENTE TECNICO (3.78%) 3.78% S/ 29,166.67 S/ 13,667.64 46.86% S/ 1,929.94 6.62% S/ 15,597.58 53.5% S/ 13,569.09 46.5%
GASTOS DE LIQUIDACION DE OBRA (1.32%) 1.32% S/ 10,155.67 S/ - 0.00% S/ - 0.00% S/ - 0.0% S/ 10,155.67 100.0%
SUB TOTAL COSTO INDIRECTO S/. 109,527.14 S/ 46,565.93 S/ 6,575.36 S/ 53,141.30 S/ 56,385.84 51.5%
TOTAL S/. 1,097,775.66 S/509,663.82 46.43% S/71,967.31 6.56% S/581,631.12 52.98% S/516,144.53 47.02%
EL RESUMEN DE VALORIZACION ES PARA LLENADO DE FORMATO 12B DONDE AL COSTO DIRECTO SE LE INCREMENTA LOS GASTOS GENERALES O GESTION DE PROYECTO.
FORMATO - 3.2
OBRA PRINCIPAL
AVANCE DE OBRA VALORIZADO N° 09 MES DE AGOSTO 2021
OBRA : "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL DE LAS CALLES SIN NOMBRE Y ARCANGELES ENTRE LAS APVS SANTA ROSA COMITÉ 04, TRES CRUCES Y URB. SAN GABRIEL, DISTRITO DE SAN SEBASTIAN - CUSCO - CUSCO"
MES JULIO 2021 METRADO DIARIO POR MAYOR METRADO N° 01 RESIDENTE: ING. EDWARD OLIVERA VILLANUEVA
INSPECTOR: ING. RENATO ESPINOZA CACERES
PRESUPUESTO BASE FECH 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
TOTAL
ITEM DESCRIPCION DE PARTIDA DIA J V S D L M M J V S D L M M J V S D L M M J V S D L M M J V S
01.01.04 SEGURIDAD Y SALUD 0.00
01.01.04.02 CAPACITACION EN SEGURIDAD Y SALUD GLB 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.08
03.01 MUROS DE CONCRETO ARMADO 0.00
03.01.02 ENTIBADO DE TALUDES m2 24.00 16.00 16.00 16.00 72.00
03.01.03 CORTE Y PERFILADO DE TERRENO MANUAL m3 48.00 50.00 50.00 36.00 8.00 8.00 25.00 22.20 4.00 251.20
03.01.09 CONCRETO F'C= 210 KG/CM2. EN MUROS m3 6.40 5.72 9.36 16.24 16.24 53.96
03.02.05 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (D=50 M) m3 36.00 45.00 10.00 10.00 31.25 27.75 5.00 30.00 195.00
03.02.06 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 15 Km m3 122.50 37.50 160.00
03.02.14 RELLENO Y COMPACTADO CON MATERIAL PROPIO EN MUROS m3 16.00 13.60 13.60 27.00 36.00 106.20
FORMATO - 3.3
MAYORES METRADOS
AVANCE DE OBRA VALORIZADO
OBRA : “MEJORAMIENTO SISTEMA DE SANEAMIENTO BASICO URBANO PARA 22 APVS CORRESPONDIENTES A LA JASS PILCHIPIJIO SAN SEBASTIAN - RESIDENTE 0
DISTRITO DE SAN SEBASTIAN - PROVINCIA DE CUSCO - DEPARTAMENTO DE CUSCO” INSPECTOR 0
INFORME TECNICO MENSUAL CORRESPONDIENTE AL MES DE: SETIEMBRE DEL 2021
OBRA: "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL DE LAS CALLES SIN NOMBRE Y ARCANGELES ENTRE LAS APVS SANTA ROSA COMITÉ 04, TRES CRUCES Y URB
RESIDENTE : ING. EDWARD OLIVERA VILLANUEVA
INFORME CORRESPONDIENTE AL MES DE: SETIEMBRE DEL 2021 INSPECTOR: ING. RENATO ESPINOZA CACERES
MAYO 2021 METRADO DIARIO POR MAYOR METRADO N° 01 RESIDENTE: ING. EDWARD OLIVERA VILLANUEVA
INSPECTOR: ING. RENATO ESPINOZA CACERES
PRESUPUESTO BASE FECH 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
TOTAL
ITEM DESCRIPCION DE PARTIDA DIA S D L M M J V S D L M M J V S D L M M J V S D L M M J V S D L
01.01.04 SEGURIDAD Y SALUD
01.01.04.02 CAPACITACION EN SEGURIDAD Y SALUD glb
01.02 TRABAJOS PRELIMINARES
01.02.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 21.76 30.00 39.00 25.00 25.00 20.00 40.00 25.00 25.00 25.00 18.50 30.00 30.00 25.00 25.00 50.00 29.50 41.00 524.76
01.06 PUENTE VEHICULAR 0.00
01.06.02.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 0.00
01.06.02.08 CURADO DE CONCRETO m2 0.00
01.06.03 SUPERESTRUCTURA 0.00
01.06.03.02 ENCOFRADO Y DESENCOFRADO m 0.00
01.06.03.03 ACERO DE REFUERZO Fy=4,200 KG/CM2 kg 0.00
01.06.03.04 CURADO DE CONCRETO EN SUPER ESTR m2 0.00
01.06.04 VARIOS
01.06.04.04 BARANDA DE F°G° DE 2" SEGUN DISEÑO INC COLOCACION m 0.00
FORMATO - 3.2
OBRA PRINCIPAL
AVANCE DE OBRA VALORIZADO N° 09 MES DE AGOSTO 2021
OBRA : "MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL DE LAS CALLES SIN NOMBRE Y ARCANGELES ENTRE LAS APVS SANTA ROSA COMITÉ 04, TRES CRUCES Y URB. SAN GABRIEL, DISTRITO DE SAN
SEBASTIAN - CUSCO - CUSCO"
CARGADOR FRONTAL 938G MDSS DIESEL 4.00 11.50 46.00 1.50 2.67 120.30 180.45 CARGUIO Y ELIMIANCION MATERIAL EXCEDENTE
MAQ. PESADA
MOTONIVELADORA CAT 002 MDSS DIESEL 35.00 11.50 402.50 8.00 8.00 141.81 1,134.48 CORTE PERFILADO Y NIVELADO A NIVEL DE BASE
RODILLO VIBRATORIO CAT MDSS DIESEL 15.00 11.50 172.50 8.00 4.65 98.22 785.76 COMPACTADO A NIVEL DE BASE
EXCAVADORA 220 PC MDSS DIESEL 0.00 11.50 0.00 0.00 0.00 100.00 0.00
TRACTOR ORUGA CAT D6G MDSS DIESEL 0.00 11.50 0.00 0.00 0.00 220.00 0.00
MINI CARGADOR CAT 002 MDSS DIESEL 32.50 11.50 373.75 0.00 0.00 43.28 0.00 ACOPIO, CARGUIO Y TRASLADO DE MATERIAL EXCEDENTE Y AGREGADOS
SUB TOTAL 86.50 994.75 2,100.69
VOLQUETE M. B. 1 EGD-037 MDSS DIESEL 0.00 11.50 0.00 0.00 0.00 89.53 0.00
VOLQUETE M. B. 2 EGD-036 MDSS DIESEL 0.00 11.50 0.00 0.00 0.00 89.53 0.00
VOLQUETE VOLVO NL10 EGG-283 MDSS DIESEL 0.00 11.50 0.00 0.00 0.00 89.53 0.00
VOLQUETE F/12 8 M3 EGQ-583 MDSS DIESEL 27.50 11.50 316.25 0.00 0.00 110.00 0.00 TRASLADO DE MATERIALES Y ELIMINACION MATR. EXCEDENTE
VEHICULOS
VOLQUETE M. B. 15 M3 EGP 734 MDSS DIESEL 0.00 11.50 0.00 12.00 0.00 110.00 1,320.00
VOLQUETE MERC BENZ EGG-300 MDSS DIESEL 13.50 11.50 155.25 0.00 0.00 80.00 0.00 TRASLADO DE MATERIALES Y ELIMINACION MATR. EXCEDENTE
CAMION F-6 EGG-283 MDSS DIESEL 0.00 11.50 0.00 4.00 0.00 100.00 400.00
CAMIONETA HILUX EGP-438 MDSS DIESEL 11.00 11.50 126.50 0.00 0.00 80.00 0.00
CAMION CISTERNA EUB642 MDSS DIESEL 5.00 11.50 57.50 6.00 0.83 90.00 540.00 RIEGO DE LASTRE, CONFORMACION DE BASE
MANTENIMIENTO ENCOFRADOS MDSS DIESEL 1.50 12.50 18.75 MANTENIMIENTO DE ENCOFRADOS
SUB TOTAL 58.50 674.25 2,260.00
MEZCLADORA DE CONCRETO DE 9P3 MDSS GASOHOL 12.00 11.60 139.20 35.00 0.34 10.50 367.50 PREPARADO DE CONCRETO EN OBRA PARA ESTRUCTURA CONFINAMIENTO
VIBRADORA DE CONCRETO N°01 MDSS GASOHOL 3.50 11.60 40.60 7.25 0.48 6.00 43.50 VIBRADO DE CONCRETO PREPARADO EN OBRA
VIBRADORA DE CONCRETO N°02 MDSS GASOHOL 0.00 11.60 0.00 0.00 0.00 6.00 0.00
MAQ. LIVIANA
VIBROAPISONADOR MDSS GASOHOL 5.50 11.60 63.80 16.00 0.34 6.00 96.00 COMPACTADO PARA MEJORAR EL SUELO DETRÁS MURO
CORTADORA DE CONCRETO MDSS GASOHOL 0.00 11.60 0.00 0.00 0.00 6.00 0.00
PLANCHA COMPACTADORA MDSS GASOHOL 0.00 11.60 0.00 0.00 0.00 7.00 0.00
MOTOBOMBA1 MDSS GASOHOL 0.00 11.60 0.00 0.00 0.00 8.00 0.00
SUB TOTAL 21.00 243.60 507.00
166.00 TOTAL 1,912.60 4,867.69
FORMATO - 9.2
CONTROL DIARIO DE MOVIMIENTO DE EQUIPO MECANICO
OBRA:
"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL DE LAS CALLES SIN NOMBRE Y ARCANGELES ENTRE LAS APVS SANTA ROSA COMITÉ 04, TRES CRUCES Y URB. SAN GABRIEL, DISTRITO DE SAN SEBASTIAN - CUSCO - CUSCO"
RESIDENTEING. EDWARD OLIVERA VILLANUEVA
CORRESPONDIENTE AL MES DE: SETIEMBRE DEL 2021 INSPECTOR ING. RENATO ESPINOZA CACERES
FECHA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 TOTAL
UNIDAD REG
DIA M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J Horas Comb
Combust
VOLQUETE M. B. 15 M3 EGG-300 0.00 0.00
HM
Combust 10.00 3.50
VOLQUETE MERC BENZ EGG-283 4.00 13.50
HM 3.00 1.00
Combust
CAMION F-6 EGP-438 0.00 0.00
HM
Combust 2.00 3.00 2.00 2.00 2.00
CAMIONETA HILUX EUB642 6.00 11.00
HM 1.00 1.00 1.50 1.50 1.00
Combust 5.00
CAMION CISTERNA EGG-265 2.00 5.00
HM 2.00
1.50
MANTENIMIENTO ENCOFRADOS 0.00 1.50
Combust 1.00 1.00 1.00 0.00 1.00 0.50 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 0.50
MEZCLADORA DE CONCRETO DE 9P3 35.00 12.00
HM 4.00 3.00 0.50 0.50 4.00 0.50 4.00 3.00 4.00 2.00 4.00 2.00 2.00 1.00 0.50
Combust 1.00 0.00 0.00 0.50 0.00 0.00 0.00 1.00 1.00
VIBRADORA DE CONCRETO N°01 7.25 3.50
HM 1.00 0.50 0.50 1.00 0.25 0.50 1.00 0.50 1.00 1.00
Combust
VIBRADORA DE CONCRETO N°02 0.00 0.00
HM
MAQ. LIVIANA
MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL DE LAS CALLES SIN NOMBRE Y ARCANGELES ENTRE LAS APVS. SANTA
OBRA: ROSA COMITÉ 04, TRES CRUCES Y URB. SAN GABRIEL DEL DISTRITO DE SAN SEBASTIAN - CUSCO - CUSCO.
TOTAL INVERSION 2,749,287.34 179,671.51 65,327.64 244,999.15 8.91% MONTO TOTAL FINANCIADO
244,999.15
FORMATO - 8.1
RESUMEN DEL ESTADO FINANCIERO
"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL DE LAS CALLES SIN NOMBRE Y ARCANGELES ENTRE LAS APVS SANTA ROSA COMITÉ 04, TRES CRUCES Y URB. SAN GABRIEL, DISTRITO DE SAN
SEBASTIAN - CUSCO - CUSCO"
VALOR
GASTOS EFECTUADOS (S/.) EJECUCION
ITEM RUBRO FINANCIADO OBSERVACIONES
(S/.) ANTERIOR ACTUAL ACUMULADO (%)
1.0 COSTO DIRECTO 770937.46 538,980.83 44,312.94 583,293.77 75.66%
2,6,2,2,2,3 PERSONAL 385,468.73 400,615.74 31,402.74 432,018.48 112.08%
2,6,2,2,2,4 BIENES 231,281.24 123,153.99 6,540.20 129,694.19 56.08%
2,6,2,2,2,5 SERVICIOS 154,187.49 14,400.00 6,370.00 20,770.00 13.47%
2,6,2,2,2,6 OTROS 0.00 811.10 0.00 811.10
2.0 GASTOS GENERALES DE OBRA 217,311.06 115,670.97 14,249.07 129,920.04 59.79%
2,6,2,2,2,3 PERSONAL 208,179.48 115,356.41 14,015.57 129,371.98 62.14%
2,6,2,2,2,4 BIENES 8,231.58 314.56 233.50 548.06 6.66
2,6,2,2,2,5 SERVICIOS 900.00 0.00 0.00 0.00 0.00
2,6,2,2,2,6 OTROS 0.00 0.00 0.00 0.00
3.0 GASTOS DE SUPERVISION 70,204.80 45,914.01 5,859.98 51,773.99 100.00%
2,6,2,2,2,3 PERSONAL 69,032.50 45,914.01 5,859.98 51,773.99 100.00%
2,6,2,2,2,4 BIENES 1,172.30 0.00 0.00 0.00 0.00
2,6,2,2,2,5 SERVICIOS 0.00 0.00 0.00 0.00 0.00
2,6,2,2,2,6 OTROS 0.00 0.00 0.00 0.00
4.0 GASTOS EXPEDIENTE TECNICO 29,166.67 31,900.00 0.00 31,900.00 109.37%
2,6,2,2,2,3 PERSONAL 25,816.60 0.00 0.00 0.00 0.00
2,6,2,2,2,4 BIENES 1,450.08 0.00 0.00 0.00 0.00
2,6,2,2,2,5 SERVICIOS 1,900.00 31,900.00 0.00 31,900.00 0.00%
2,6,2,2,2,6 OTROS 0.00 0.00 0.00 0.00
5.0 GASTOS DE LIQUIDACION 10,155.67 0.00 0.00 0.00 0.00%
2,6,2,2,2,3 PERSONAL 0.00 0.00 0.00 0.00 0.00%
2,6,2,2,2,4 BIENES 0.00 0.00 0.00 0.00 0.00%
2,6,2,2,2,5 SERVICIOS 10,155.67 0.00 0.00 0.00 0.00%
2,6,2,2,2,6 OTROS 0.00 0.00 0.00 0.00 0.00%
1,097,775.66
TOTAL INVERSION 1,097,775.66 732,465.81 64,421.99 796,887.80 72.59% MONTO TOTAL FINANCIADO
6,540.20
2,6,2,3,5,5 .- SERVICIOS
1 9/2/2021 0/S 252 B Y G SPARE PARTS E.I.R.L. REVISION GENERAL DEL SISTEMA ELECTRICO DEL ARRANADOR Y ALTERNA 5800
2 9/29/2021 MEMO N°908-GA/AMA 570
3 -
6,370.00
2,6,2,3,2,7 .- OTROS
1
0.00
2.0.-GASTOS GENERALES
2,6,2,3,2,4.- PERSONAL
1 PLANILLA PERSONAL PLL PLANILLA PERSONAL TECNICO ADMINISTRATIVO CORRESPONDIENTE MES SETIEMBRE 14015.57
2 -
14,015.57
2,6,2,3,2,5 .- BIENES
1 O/C 1507 COLQUE LIZARASO JUAN DARIO ADQUISICION DE UTILES DE ESCRITORIO 233.5
2
233.50
2,6,2,3,2,6 .- SERVICIOS
0.00
2,6,2,3,2,7 .- OTROS
1
2
0.00
3.0.-GASTOS SUPERVISION
2,6,2,3,2,4.- PERSONAL
1 PLANILLA PERONAL PLL PLANILLA PERSONALSUPERVISION CORRESPONDIENTE MES SETIEMBRE 5859.98
2 -
5,859.98
"MEJORAMIENTO SISTEMA DE SANEAMIENTO BASICO URBANO PARA 22 APVS CORRESPONDIENTES A LA JASS PILCHIPUJIO SAN SEBASTIAN- CLAVE
MUNICIPALIDAD DISTRITAL DE SAN SEBASTIAN GESTION 2019 - 2022 CLASIFICADOR DISTRITO DE SAN SEBASTIAN- PROVINCIA DE CUSCO-DEPARTAMENTO CUSCO" X: 8 Horas Trabaj.
GERENCIA DE INFRAESTRUCTURA META - 0155 PERIODO: SETIEMBRE DEL 2019 O: Inasist.Injust.
DIVISIÓN DE OBRAS 2.6.2.3.2.4 DONACIONES Y TRANSFERENCIAS S: Suspensión
TAREO DE PERSONAL OBRERO DE OBRA ING. MANUEL TIBURCIO JUAREZ SORIA P: Permisos
APELLIDO FECHA V S D L M M J V S D L M M J V S D L M M J V S D L M M J V SL M
Nº APELLIDO PATERNO NOMBRES DNI FECHA NACIM CATEGORIA SEXO
MATERNO INGRESO 1 2 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27### 30
1 OPER 9/2/2019 M 0 X X X X X X X X X X X X X X X X X X X X X X X X X X X X XX X
2 PEON 9/2/2019 M 0 X X X X X X X X X X X X X X X X X X X X X X X X X X X X XX X
3 OFICI 9/2/2019 M 0 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
4 OFICI 9/2/2019 M 0 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
5 OPER 9/2/2019 M 0 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
6 OFICI 9/2/2019 M 0 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
7 R_M_OBRA 9/2/2019 M 0 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
8 R_OFICI 9/2/2019 F 0 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
9 OFICI 9/2/2019 M 0 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
10 OPER 9/2/2019 M 0 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
11 OFICI 9/2/2019 M 0 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
VºBº INGº RESIDENTE VºBº INGº SUPERVISOR V"B" SUB GERENTE DE OBRAS VºBº GERENTE DE INFRAESTRUCTURA
"MEJORAMIENTO SISTEMA DE SANEAMIENTO BASICO URBANO PARA 22 APVS CORRESPONDIENTES A CLAVE
CLASIFICAD LA JASS PILCHIPUJIO SAN SEBASTIAN-DISTRITO DE SAN SEBASTIAN- PROVINCIA DE CUSCO-
MUNICIPALIDAD DISTRITAL DE SAN SEBASTIAN GESTION 2019 - 2022
OR DEPARTAMENTO CUSCO"
X: 8 Horas Trabaj.
GERENCIA DE INFRAESTRUCTURA META - 051 PERIODO: ABRIL O: Inasist.Injust.
DIVISIÓN DE OBRAS 2.6.2.3.2.4 DONACIONES Y TRANSFERENCIAS S: Suspensión DATOS OBLIGATORIOS
TAREO DE PERSONAL ING. MANUEL TIBURCIO JUAREZ SORIA P: Permisos
APELLIDO FECHA FECHA L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M TOTAL
Nº APELLIDO PATERNO NOMBRES DNI CATEGORIA SEXO
MATERNO NACIM INGRESO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 DIAS Nª DE CONTRATO CORREO ELECTRONICO OBLIGATORIO Nª DE CELULAR
1 M X X X X X X X X X X X X X X X X X X X X X X X X X X X 29 X X 29 1224 felizaraso@gmail.com 996083332
2 M X X X X X X X X X X X X X X X X X X X X X X X X X X X 29 X X 29 1225 ramospedro1@gmail.com 973120257
3 M X X X X X X X X X X X X X X X X X X X X X X X X X X X 29 X X 29 1226 condoricornelio16@gmail.com 982755215
4 M X X X X X X X X X X X X X X X X X X X X X X X X X X X 29 X X 29 1227 luisovalletoro@gmail.com 982755215
5 M X X X X X X X X X X X X X X X X X X X X X X X X X X X 29 X X 29 1228 benedictocondorcruz83@gmail.com 953142387
6 M X X X X X X X X X X X X X X X X X X X X X X X X X X X 29 X X 29 1229 hilario.ca.19969@gmail.com 979083032
7 M X X X X X X X X X X X X X X X X X X X X X X X X X X X 29 X X 29 RESOL. N°437-2018 rovichi@hotmail.com 942346755
8 F X X X X X X X X X X X X X X X X X X X X X X X X X X X 29 X X 29 resol. N°389-2017 benitahuamanchillihuani@gmail.com 983859200
9 M X X X X X X X X X X X X X X X X X X X X X X X X X X X 29 X X 29 1230 huamanferroh@gmail.com 940810093
10 M X X X X X X X X X X X X X X X X X X X X X X X X X X X 29 X X 29 1231 palomoccana@gmail.com 973120257
11 M X X X X X X X X X X X X X X X X X X X X X X X X X X X 29 X X 29 1232 timoteotacori1973@gmail.com 926800551
VºBº INGº RESIDENTE VºBº INGº SUPERVISOR V"B" SUB GERENTE DE OBRAS VºBº GERENTE DE INFRAESTRUCTURA
FORMATO - 12
PANEL FOTOGRÁFICO SETIEMBRE DEL 2021
"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL DE LAS CALLES SIN NOMBRE Y ARCANGELES ENTRE LAS
OBRA:
APVS SANTA ROSA COMITÉ 04, TRES CRUCES Y URB. SAN GABRIEL, DISTRITO DE SAN SEBASTIAN - CUSCO - CUSCO"
CHARLA DE SEGURIDAD E
INSTRUCCIÓN DEMOSTRATIVA
ATENCION DE PRIMEROS AUXILIOS
RPC POR PARTE DEL
PREVENCIONISTA DE RIESGOS
TRASLADO Y DESCARGUE DE
MATERIAL GRANULAR PARA
CONFORMACION DE BASE 0.30
EN APV SAN GABRIEL PROG.
0+00 A 0+110 TRAMO II
ACUMULACION DE LASTRES
PARA CONFORMACION A NIVEL
DE BASE ESTRUCTURAL EN L
INTERVENCION DE LA VIA DESDE
LA PROG. 0+00 A 0+110 TRAMO II
EMPEDRADO Y ENCOFRADO EN
VEREDAS EN 1MX0.15X90ML, DESDE
LAPROG. 0+30 A 0+110 TRAMO II EN
LADO IZQUIERDO.
FORMATO - 12
PANEL FOTOGRÁFICO SETIEMBRE DEL 2021
"MEJORAMIENTO DE LA TRANSITABILIDAD VEHICULAR Y PEATONAL DE LAS CALLES SIN NOMBRE Y ARCANGELES ENTRE LAS
OBRA:
APVS SANTA ROSA COMITÉ 04, TRES CRUCES Y URB. SAN GABRIEL, DISTRITO DE SAN SEBASTIAN - CUSCO - CUSCO"
ENCOFRADO EN VEREDAS Y
SARDINEL DESDE LA PROG. 0+35 A
0+110 TRAMO II LADO IZQUIERDO EN
LA APV SAN GABRIEL
PEATONAL DE LAS CALLES SIN NOMBRE Y ARCANGELES ENTRE LAS APVS SANTA ROSA COMITÉ 04, TRES CRUCES Y URB. SAN GABRIEL, DISTRITO DE S
NG. CINTHIA YUREMA ALMANZA PAREDES
NG. RENATO ESPINOZA CACERES 64691
NG. RENATO ESPINOZA CACERES 64691
NG. EDWARD OLIVERA VILLANUEVA 121435
NG. EDWARD OLIVERA VILLANUEVA 121435