SUB GERENCIA DE INFRAESTRUCTURA PUBLICA


DEPARTAMENTO DE EJECUCION DE OBRAS PUBLICAS

INFORME MENSUAL N° ……..


DEL MES DE ………….. DE 2015

:OBRA
............................................................................."
"........................................................................

CODIGO SNIP #REF!


META #REF!
Inspector de Obra #REF!

Residente de Obra #REF!

COPORAQUE - ESPINAR - CUSCO - 2015


MUNICIPALIDAD DISTRITAL DE CAICAY
SUB-GERENCIA DE INFRAESTRUCTURA

Informe Mensual de Obra Nº 16


MARZO - 2022

“MEJORAMIENTO DE LOS SERVICIOS DE SALUD DEL PUESTO DE SALUD DE CAICAY, DISTRITO DE CAICAY -
Obra : PAUCARTAMBO - CUSCO”

Residente : ING. KILDARE JUSSETY ASCUE ESCALANTE

Inspector : ING. ELIO W. CCANQUE CURASI

2022

MUNICIPALIDAD DISTRITAL DE CAICAY


SUB-GERENCIA DE INFRAESTRUCTURA

Informe Mensual de Obra Nº 16


MARZO - 2022

“MEJORAMIENTO DE LOS SERVICIOS DE SALUD DEL PUESTO DE SALUD DE CAICAY, DISTRITO DE CAICAY -
Obra : PAUCARTAMBO - CUSCO”

Residente : ING. KILDARE JUSSETY ASCUE ESCALANTE

Inspector : ING. ELIO W. CCANQUE CURASI

2022
F-A

MUNICIPALIDAD DISTRITAL DE
CAICAY

SUB GERENCIA DE INFRAESTRUCTURA,


DESARROLLO URBANO Y RURAL

INFORME MENSUAL N° 016


MARZO DEL 2022

:OBRA

MEJORAMIENTO DE LOS SERVICIOS DE SALUD DEL PUESTO DE“


SALUD DE CAICAY, DISTRITO DE CAICAY - PAUCARTAMBO -
”CUSCO

META PRESUPUESTARIA 01
Residente de Obra ING. KILDARE JUSSETY ASCUE ESCALANTE
Supervisor de Obra ING. ELIO W. CCANQUE CURASI

CAICAY - PAUCARTAMBO - CUSCO - 2021


F-B
MUNICIPALIDAD DISTRITAL DE CAICAY
SUB GERENCIA DE INFRAESTRUCTURA Y DESARROLLO URBANO Y RURAL
SUB GERENCIA DE OBRAS
CONTENIDO
MARZO 2022
Nº DESCRIPCION FORMATO CONTROL
CARATULA F-A
CONTENIDO F-B
1 DATOS GENERALES DEL PROYECTO F-1
1.1 Ubicación P
1.2 Informacion Estructural Funcional Programatica P
1.3 Informacion Financiera P
1.4 Informacion Administrativa P
2 RESUMEN EJECUTIVO F-2
2.1 Aspecto Tecnico P
2.2 Aspecto Financiero P
2.3 Aspecto Social P
3 MEMORIA DESCRIPTIVA F-3
3.1 Antecedentes P
3.2 Objetivo P
3.3 Metas Fisicas P
3.4 Plazo de Ejecucion P
3.5 Fecha de Inicio P
3.6 Fecha de Culminacion (Previsto) P
4 DESCRIPCION DE PARTIDAS EJECUTADAS DURANTE EL MES F-4 P
5 METRADO DIARIO DE AVANCE DE OBRA F-5
5.1 Cuadro de metrados Ejecutados P
6 INFORMACION RELEVANTE F-6
7 VALORIZACION DE AVANCE DE OBRA F-7
7.1 Control de Costo Según Tiempo P
7.2 Valorizacion Avance de Obra P
7.3 Valorizacion por Mayores Metrados P
7.4 Valorizacion por Partidas Nuevas P
7.5 Valorización Deductivos P
7.6 Resumen de Valorizacion Financiera de la Obra P
8 CRONOGRAMA DE EJECUCION DE OBRA F-8
8.1 Cronograma Fisico de Ejecucion de Obra N
8.2 Cronograma Valorizado de Ejecucion de Obra N
9 CUADRO DE RESUMEN DE GASTO F-9
9.1 Resumen del Estado Financiero P
9.2 Resumen de Ejecucion Financiera por meses P
10 AVANCE FINANCIERO PRESUPUESTAL F-10
10.1 Manifiesto de Gasto 2022 P
10.2 Copias de Comprobante de pago, Ordenes de Servicio , ordenes de compra, N
planillas de pago con sus respectivos documentos
11 MOVIMIENTOS DE MATERIALES F-11 P
12 RESUMEN DE CONTROL DE MAQUINARIAS Y/O EQUIPOS F-12 P
13 RESUMEN DE CONTROL DE RECURSOS HUMANOS F-13 P
13.1 Hoja de Tareo P
13.2 Resumen de Gasto Mensual en Personal Tecnico y Obrero P
15 REGISTRO FOTOGRAFICO F-14 P
16 COPIAS DE CUADERNO DE OBRA F-15 P
17 CONCLUSIONES Y RECOMENDACIONES F-16 P
17.1 Conclusiones P
17.2 Recomendaciones P
18 ANEXOS F-17 P
P=Presentó N=No Presentó X=No corresponde
MUNICIPALIDAD DISTRITAL DE CAICAY

SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO


URBANO Y RURAL
PROYECTO:

“MEJORAMIENTO DE LOS SERVICIOS DE SALUD DEL PUESTO DE SALUD DE CAICAY,


DISTRITO DE CAICAY - PAUCARTAMBO - CUSCO”

INFORME MENSUAL N°016

MARZO 2022

VALORIZACION DE PARTIDAS
NUEVAS

DATOS
RESUMEN
CRONOGRAMA
METRADO GENERALES
DE DE
DIARIO
CONCLUSIONES
DESCRIPCION
VALORIZACION
RESUMEN DE DE DEL
MOVIMIENTOS
EJECUCION
DE AVANCE
Y
PARTIDAS
AVANCE
CONTROL DE
DE
DE DE
DE
COPIAS DE
DE CUADERNO
INFORMACION
CUADRO
MEMORIA
REGISTRORESUMEN DE
RELEVANTE
DE
DESCRIPTIVA
FOTOGRAFICO
PROYECTO OBRA
GASTO
MATERIALES
OBRA
OBRA
RECOMENDACIONES
EJECUTADAS DURANTE
OBRA
MAQUINARIAS EL MES
Y/O EQUIPOS
F-1
MUNICIPALIDAD DISTRITAL DE CAICAY
SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL

1. DATOS GENERALES DEL PROYECTO


1.1 UBICACIÓN

“MEJORAMIENTO DE LOS SERVICIOS DE SALUD DEL PUESTO DE SALUD DE CAICAY, DISTRITO DE CAICAY -
Nombre de la Obra PAUCARTAMBO - CUSCO”

Localidad CAICAY
Distrito CAICAY
Provincia PAUCARTAMBO
Departamento CUSCO
1.2 INFORMACIÓN ESTRUCTURAL FUNCIONAL PROGRAMÁTICA
Código Único de Inversiones 2334017
Meta SIAF 0045
Función 20 SALUD
División Funcional 044 SALUD INDIVIDUAL
Grupo Funcional 0096 ATENCION MEDICA BASICA
Sector GOBIERNOS LOCALES
Pliego MUNICIPALIDAD DISTRITAL DE CAICAY
Proyecto y/o Actividad “MEJORAMIENTO DE LOS SERVICIOS DE SALUD DEL PUESTO DE SALUD DE CAICAY, DISTRITO DE CAICAY -
PAUCARTAMBO - CUSCO”

Población Beneficiaria POBLADORES DE LAS COMUNIDADES DEL DISTRITO DE CAICAY


1.3 INFORMACIÓN FINANCIERA
FUENTE DE FINANCIAMIENTO CANON Y SOBRE CANON TRANSFERENCIAS
ENTIDAD FINANCIERA MUNICIPALIDAD DISTRITAL DE CAICAY
ENTIDAD EJECUTORA MUNICIPALIDAD DISTRITAL DE CAICAY
PRESUPUESTO APROBADO PERFIL DE PROYECTO S/2,876,524.00
INCREMENTO PRESUPUESTAL DEL PERFIL EXP. 1,949,432.70
PRESUPUESTO REFORMULADO : ---
1ER ASIGNACIÓN PRESUPUESTAL (RUBRO 18) - 2019 S/. 9,900.00
2DA ASIGNACIÓN PRESUPUESTAL (RUBRO 13) - 2020 S/. 491,813.00
3RA ASIGNACIÓN PRESUPUESTAL (RUBRO 18) - 2020 S/. 46,600.00
4TA ASIGNACIÓN PRESUPUESTAL (RUBRO 13) - 2021 S/. 379,295.00
5TA ASIGNACIÓN PRESUPUESTAL (RUBRO 13) - 2021 S/. 1,000,000.00
6TA ASIGNACIÓN PRESUPUESTAL (RUBRO 13) - 2021 S/. 745,677.00
7TA ASIGNACIÓN PRESUPUESTAL (RUBRO 13) - 2021 S/. 1,044,501.00
8VA ASIGNACIÓN PRESUPUESTAL (RUBRO 13) - 2021 S/. 868,874.57
PPTO TOTAL ASIGNADO CON RUBRO 13 S/. 4,530,160.57
PPTO TOTAL ASIGNADO CON RUBRO 18 S/. 56,500.00
PPTO TOTAL ASIGNADO S/. 4,586,660.57

PRESUPUESTO DESAGREGADO DE OBRA INICIAL


COSTO DIRECTO S/. 4,097,137.51
GASTOS GENERALES S/. 545,362.94
GASTOS DE SUPERVISIÓN S/. 95,865.09
GASTOS DE EXP. DE LIQUIDACIÓN S/. 31,091.16
EXPEDIENTE TÉCNICO S/. 56,500.00
TOTAL PRESUPUESTO S/. 4,825,956.70

PRESUPUESTO DESAGREGADO MODIFICADO 1


COSTO DIRECTO S/. 4,352,169.37
GASTOS GENERALES S/. 558,199.46
GASTOS DE SUPERVISIÓN S/. 98,121.52
GASTOS DE EXP. DE LIQUIDACIÓN S/. 31,091.16
EXPEDIENTE TÉCNICO S/. 56,500.00
TOTAL PRESUPUESTO S/. 5,096,081.51

PRESUPUESTO DESAGREGADO MODIFICADO 2


COSTO DIRECTO #REF!
GASTOS GENERALES #REF!
F-1
MUNICIPALIDAD DISTRITAL DE CAICAY
SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL

1. DATOS GENERALES DEL PROYECTO


GASTOS DE SUPERVISIÓN #REF!
GASTOS DE EXP. DE LIQUIDACIÓN S/. 31,091.16
EXPEDIENTE TÉCNICO S/. 56,500.00
TOTAL PRESUPUESTO #REF!
F-1
MUNICIPALIDAD DISTRITAL DE CAICAY
SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL

1. DATOS GENERALES DEL PROYECTO

1.4 INFORMACIÓN ADMINISTRATIVA

APROBACIÓN EXPEDIENTE TÉCNICO RESOLUCIÓN DE ALCALDIA N°0126-2020-MDC/P


MODALIDAD DE EJECUCIÓN ADMINISTRACION DIRECTA
PLAZO DE EJECUCIÓN INICIAL 365 DÍAS CALENDARIOS
PLAZO DE EJECUCIÓN MODIFICADO 1 390 DÍAS CALENDARIOS
PLAZO DE EJECUCIÓN MODIFICADO 2 540 DÍAS CALENDARIOS
FECHA ENTREGA DE TERRENO 07 DE DICIEMBRE DEL 2020
FECHA DE INICIO 07 DE DICIEMBRE DEL 2020
DÍAS DE RETRASO --
AMPLIACIÓN DE PLAZO
1ERA AMPLIACIÓN DE OBRA : 25 DÍAS CALENDARIO
2DA AMPLIACIÓN DE OBRA : 150 DÍAS CALENDARIO
REINICIO DE OBRA 17 DE ENERO 2022
FECHA DE CULMINACIÓN PROGRAMADA 30 DE MAYO 2022
FECHA DE CULMINACIÓN REAL
INFORMES MENSUALES EMITIDOS POR LOS EJECUTORES (2020) : 001
INFORMES MENSUALES EMITIDOS POR LOS EJECUTORES (2021) : 012
INFORMES MENSUALES EMITIDOS POR LOS EJECUTORES (2022) : 002
INFORMES MENSUALES EMITIDOS : 015

RESPONSABLE Reg. De Colegiatura/DNI DOCUMENTO DE DESIGNACIÓN FECHA


RESIDENTE DE OBRA 01
Arq. Marco Antonio Vargas Tomayconza MEMORÁNDUM DE DESIGNACIÓN DE RESIDENTE
11/26/2020
ESPECIALIDAD: ARQUITECTO DNI:
RESIDENTE DE OBRA

ING. KILDARE JUSSETY ASCUE ESCALANTE 146343 MEMORÁNDUM DE DESIGNACIÓN DE RESIDENTE


1/2/2021
ESPECIALIDAD: CIVIL DNI: 45246758 MEMORÁNDUM N°034-2020/SGI-GDU/MDC
RESIDENTE DE OBRA ESPECIALIDAD ELECTRICAS
ING. MIGUEL ANGEL LOPEZ NIEVES 228819 MEMORÁNDUM DE DESIGNACIÓN DE RESIDENTE
1/2/2021
ESPECIALIDAD: ELECTRICO DNI: 46764103 ADMINISTRACION DIRECTA
INSPECTOR DE OBRA 1
ING. WALTER OLIVERA RICALDE 145100 MEMORÁNDUM DE DESIGNACIÓN DE INSPECTOR
11/26/2020
ESPECIALIDAD: CIVIL DNI: 80187903 RESOLUCIÓN DE ALCALDIA N°0150-2020-MDC/P
INSPECTOR DE OBRA 2
ING. ADRIANO ORTIZ DE ZEVALLOS CARDENAS 201101 MEMORÁNDUM DE DESIGNACIÓN DE INSPECTOR
3/1/2021
ESPECIALIDAD: CIVIL DNI: 73222866 MEMORÁNDUM N°034-2020/SGI-GDU/MDC
INSPECTOR DE OBRA

ING. ELIO W. CCANQUE CURASI DNI: 44207885 MEMORÁNDUM DE DESIGNACIÓN DE INSPECTOR


8/2/2021
ESPECIALIDAD: CIVIL 210645 MEMORÁNDUM N°23-2021-MDC/GM/RUC
MUNICIPALIDAD DISTRITAL DE CAICAY F-2
SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL
SUB GERENCIA DE OBRAS

2. RESUMEN EJECUTIVO
2.1 ASPECTO TECNICO.-
Fecha de Inicio de Obra 07 DE DICIEMBRE DEL 2020
Fecha de Término Reprogramado 30 DE MAYO 2022
Plazo de ejecución 540 DIAS CALENDARIOS
Ampliación de plazo : 38 DÍAS CALENDARIO

DESCRIPCIÓN DE LA META FÍSICA POR COMPONENTES


CONSTRUCCION DE CERCO PERIMETRICO
CONSTRUCCION DE CAPILLA VELATORIO

EJECUCION FÍSICO
AVANCE DE EJECUCION FISICA PROGRAMADA
AVANCE DE EJECUCION FISICA
PRESUPUESTADO TOTAL SALDO
ANTERIOR ACTUAL ACUMULADO
0.00 #REF! #REF! #REF! #REF! #REF!
#DIV/0! #REF! #REF! #REF! #REF! #REF!

2.2 ASPECTO FINANCIERO.-

Según Aprob. Del Expediente Tecnico con


Con el Monto: : S/. 31,091.16
Con el Desagregado :
COSTO DIRECTO S/. 0.00
GASTOS DIRECCION TECNICA S/. 0.00
GASTOS DE SUPERVISION S/. 4,097,137.51
GASTOS DE EXP. DE LIQUIDACION S/. 545,362.94
GASTOS DE EXP. TECNICO S/. 95,865.09

TOTAL PRESUPESTO S/. 4,738,365.54

EJECUCION FINANCIERA
AVANCE DE EJECUCION FINANCIERA
AVANCE DE EJECUCION FINANCIERA
PRESUPUESTADO TOTAL SALDO
ANTERIOR ACTUAL ACUMULADO
31,091.16 #REF! #REF! #REF! #REF! #REF!
10.53% #REF! #REF! #REF! #REF! #REF!

Valores Referenciales del Proyecto por Componentes


COSTO EXPEDIENTE
DESCRIPCION COSTO SNIP TECNICO
295,348.56
COSTO DIRECTO
Mano de Obra 111,838.74
Materiales 63,236.74
Equipos 20,566.52
TOTAL COSTO DIRECTO 195,642.00

COSTO INDIRECTO
Gastos Generales 62,311.04
Gastos de Supervisión 14,754.18
Gastos de Liquidación 13,203.83
Gastos de Expediente Técnico 9,437.51
TOTAL COSTO INDIRECTO 99,706.56
TOTAL COSTO DEL PROYECTO 295,348.56
2.3 ASPECTO SOCIAL.- F-2

Se realizaron los requerimientos en su totalidad para la culminación del proyecto, se tienen demoras en la atención de los
requerimientos, lo cual afecta en la programación acelerada realizada.

Se menciona reiteradamente la necesidad de agua en la zona, afectando presupuestalmente y ocasionando demoras.

Se tiene una mejora en los rendimientos del personal obrero, aun con la mejora se observa que se tiene bajos rendimientos
a comparación del presupuestado.

Se continuan con las charlas de seguridad en obra, siendo de gran necesidad y de gran trascendencia en la ejecución de
obra.

Se realiza el informe de ejecución a la comunidad a pedido del presidente de la comunidad, aclarando los gastos efectuados,
los trabajos, entre otros.
MUNICIPALIDAD DISTRITAL DE CAICAY F-2
SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL
SUB GERENCIA DE OBRAS

2. RESUMEN EJECUTIVO
2.1 ASPECTO TECNICO.-
Fecha de Inicio de Obra 07 DE DICIEMBRE DEL 2020
Fecha de Término Reprogramado 30 DE MAYO 2022
Plazo de ejecución 540 DIAS CALENDARIOS
Ampliación de plazo 175 DIAS CALENDARIOS

DESCRIPCIÓN DE LA META FÍSICA POR COMPONENTES


1.- Adecuada y Suficiente Infraestructura de Salud
2.- Equipamiento suficiente Y mobiliario de buenas condiciones.

EJECUCION FÍSICO
AVANCE DE EJECUCION FISICA PROGRAMADA
AVANCE DE EJECUCION FISICA
PRESUPUESTADO TOTAL SALDO
ANTERIOR ACTUAL ACUMULADO
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!

2.2 ASPECTO FINANCIERO.-

Según Aprob. Del Expediente Tecnico con Modificaciones por Mayores Metrados y Partidas Nuevas
Con el Monto: : #REF!
Expediente Tecnico Original #REF!
Mayores Metrados Aprobados #REF!
Partidas Nuevas Aprobadas : #REF!
Deductivos IISS y Media Tension #REF!
COSTO DIRECTO #REF!
GASTOS GENERALES #REF!
GASTOS DE SUPERVISION #REF!
GASTOS DE EXP. DE LIQUIDACION S/. 31,091.16
GASTOS DE EXP. TECNICO S/. 56,500.00
TOTAL PRESUPESTO #REF!

EJECUCION FINANCIERA
AVANCE DE EJECUCION FINANCIERA
AVANCE DE EJECUCION FINANCIERA
PRESUPUESTADO TOTAL SALDO
ANTERIOR ACUMULADO ACTUAL ACUMULADO

#REF! #REF! #REF! #REF! #REF! #REF!


#REF! #REF! #REF! #REF! #REF! #REF!

Valores Referenciales del Proyecto por Componentes

COSTO EXPEDIENTE
DESCRIPCION COSTO SNIP TECNICO

#REF!
COSTO DIRECTO
Mano de Obra 1,089,413.88
Materiales 2,216,791.18
Equipos 910,708.49
Servicios 519,464.01
TOTAL COSTO DIRECTO 4,736,377.56

COSTO INDIRECTO
Gastos Generales #REF!
Gastos de Supervisión #REF!
Gastos de Liquidación 31,091.16
Gastos de Expediente Técnico 56,500.00
TOTAL COSTO INDIRECTO #REF!
TOTAL COSTO DEL PROYECTO #REF!
2.3 ASPECTO SOCIAL.- F-2

Se verifica bajos rendimientos en el promedio de avance del personal obrero, verificando que una de las causales es la falta de buenos operarios que
efectúen los trabajos encomendados, teniendo deficiencia en los operarios provenientes de la zona, para la ejecución se requiere operarios fierreros,
encofradores y albañiles. Esto se debe fundamentalmente a la paga que tiene tanto el operario como oficial en vista de que el pago está por debajo del
mercado Regional.

Se vienen efectuando charlas a personal obrero, efectuando la entrega de los formatos de seguridad y salud, mejorando el cuidado del personal obrero e
instruyendo en temas afines al COVID-19 para un mayor cuidado en los trabajos realizados

En fecha 21 de Febrero del 2022 se realiza el proceso de convocatoria AS-SM-2-2022-MD-1 para la CONTRATACION DE INSTALACION DE CUBIERTA,
siendo la fecha de otorgamiento de la buena Pro el 02 de Marzo del 2022, pero esta quedo descierta porque los postores no cumplieron con los requisitos
que indicaban las bases, por lo que se volvio a convocar y se esta a la espera de los resultados de la calificacion. Cabe indicar que es de vital importancia
que ya se ejecute este servicio en vista de que es una partida elemental dentro de la ruta critica del proyecto asi como este generara que se tenga un
avance fisico como tambien financiero
En fecha 21 de Febrero del 2022 se realiza el proceso de convocatoria AS-SM-1-2022-MDC-1 para la CONTRATACION DE MODULO TIPO I
AMBULANCIA RURAL, siendo la fecha de otorgamiento de la buena Pro el 02 de Marzo del 2022, por lo que se esta a la espera de que el area de
contrataciones prosiga con los consentimientos de buena pro y posterior notificacion para firma de contrato.

Causa mucha preocupacion la NO ATENCION OPRTUNA DE LOS REQUERIMIENTOS POR PARTE DEL AREA DE LOGISTICA Y ABASTECIMIENTOS,
como por ejemplo el Requerimiento de bienes N°00086-2022: Transformador Tipo Seco Encapsulado y Transformador de Medida, recepcionado por el área
de logística y abastecimientos en fecha 01 de febrero del 2022. El requerimiento de bienes N°00086-2022: relacionado a Cables, Conductores y Fusibles,
recepcionado por el área de logística y abastecimientos en fecha 01 de febrero del 2022 y sobretodo la DEMORA en el Requerimiento de bienes N°00149–
2022: relacionado a la adquisición de cerámicos, porcelanatos y terrazos para pisos y muros interiores, recepcionado por el área de logística y
abastecimiento en fecha 16 de febrero del 2022. Ya se tienen los falsos pisos y pisos termicos asi como los contrapisos y son ya 45 dias que esta en esta
unidad y a la fecha no se tiene nada concreto respecto al requerimiento de este bien, por lo que se hizo de conocimiento a la Gerencia Municipal para su
conocimiento y tome las acciones respectivas para agilizar dicha contratacion. Estos echos escapan de la responsabilidad de los ejecutores, ya que son
casos que generan retrazos en la obra

Se sigue encontrando mayores metrados y partidas nuevas en el proceso constructivo esto por no tener bien definido los metrados y partidas en el
Expediente Tecnico Original y que viene conllevando al incremento del presupuesto del proyecto
Se recomienda que desde el área de logística y abastecimientos se pueda agilizar los requerimientos y más aún los requerimientos que pasan a ser
procesos de selección, así como el estudio de mercado tanto de compras directas y de procesos se realice de preferencia con tiendas mayoristas de la
ciudad del cusco, ya que estos de alguna forma harán que los costos de los insumos no sean mayores al del precio referencial
MUNICIPALIDAD DISTRITAL DE CAICAY F-3
SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL

3. MEMORIA DESCRITIVA

3.1 ANTECEDENTES
La actual infraestructura instalada a la fecha no abastece la demanda de la población que existe en la zona, ya que la infraestructura
actualmente presta en condiciones no adecuadas los corredores saturados los pacientes en los patios sin protección de las inclemencias
del medio ambiente, se realiza las actividades de atención a la población, en ambientes improvisados, no diseñados para las funciones de
atención en la salud a la población, edificaciones que son de Adobe, no están en lineamientos basados en el marco del Sistema Nacional
de Programación Multianual y Gestión de Inversiones, por su antigüedad está en un proceso de deterioro, se hace necesario incrementar
ambientes para diferentes unidades de atención en las diferentes áreas que la población requiere, en tal razón este centro de salud
requiere de la construcción de un nuevo establecimiento de Centros de Salud, por la ubicación y la población que es atendida.

3.2 OBJETIVOS
3.2.1 GENERALES

Construir la infraestructura de salud para una mejor prestación de servicios de salud a la comunidad y una mejora de los niveles de vida
de la población.
3.2.2 ESPECIFICOS

• “Adecuada prestación de servicios de salud al poblado de Caicay , y comunidades aledaña.


• Dotar de ambientes adecuados en las diferentes especialidades de atención en la salud.
• Dotar de Infraestructura funcional y Complementaria.
• Asegurar la mejor atención de la salud a la población en su conjunto de la zona.
• Incrementar la mejora del nivel de vida de la zona.
• Generar fuentes de trabajo temporal en la industria de la construcción como una forma de dinamizar la economía local.

3.3 METAS FISICAS

Para el logro de los objetivos, se plantea como metas físicas las siguientes:

1 Componente 01: Adecuada y Suficiente Infraestructura de Salud

2 Componente 02: Equipamiento suficiente Y mobiliario de buenas condiciones.

3.4 PLAZO DE EJECUCION

Dias Calendarios 365 Dias


Meses Programados 12 Meses
Dias de Paralizacion 00 Dias
Ampliación de Plazo 1 25 Dias
Ampliación de Plazo 2 150 Dias
Paralizacion 2022 16 Dias
3.5 FECHA DE INICIO

Dia 07 Dias
Mes Diciembre
Año 2020

3.6 FECHA DE CULMINACION

Prog. Exp. Tec. REAL


Dia 6 15
Mes Diciembre Junio
Año 2021 2022
MUNICIPALIDAD DISTRITAL DE CAICAY
SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL

4. DESCRIPCION DE PARTIDAS EJECUTADAS DURANTE EL MES


PARTIDAS EJECUTADAS EN EL MES DE FEBRERO DEL 2022 F-4
01 TRABAJOS DE DESMONTAJE Y DEMOLICION
01.03 PLAN DE SEGURIDAD Y SALUD
01.03.01 ELABORACION E IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
1.00 glb 0.6 0.10 0.70 70.00%
* Se realizo la limpieza de la obra

01.03.05 ACTIVIDADES PARA LA VIGILANCIA, PREVENCIÓN, Y CONTROL DEL COVID-19 EN EL TRABAJO


01.03.05.02 LIMPIEZA Y DESINFECCIÓN EN OBRA
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
12.00 mes 11.75 0.25 12.00 100.00%
* Se tuvo el control de orden y limpieza en los frentes de trabajo asi como tambien el debido control de la desinfeccion

01.03.05.03 EVALUACIÓN DE LA CONDICIÓN DE SALUD DEL TRABAJADOR


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
12.00 mes 11.75 0.25 12.00 100.00%
* Se tuvo el control de temperatura y saturacion al inicio de cada jornada de trabajo

01.03.05.04 LAVADO Y DESINFECCIÓN DE MANOS (OBLIGATORIO)


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
12.00 mes 11.75 0.25 12.00 100.00%

01.03.05.05 SENSIBILIZACIÓN DE LA PREVENCIÓN DEL CONTAGIO COVID-19 EN OBRA


Esta partida consiste en poder consientizar al personal obrero y tecnico a recordar los cuidados y prevencion del Covid-19 en obra y su propagacion.
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
12.00 und 11.75 0.25 12.00 100.00%
* Se proseguio con mas charlas al inicio de cada jornada de trabajo sobre la prevencion del COVID-19

01.03.05.07 MEDIDAS DE PROTECCION PERSONAL


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
12.00 mes 10.7 0.50 11.20 93.33%
* Esta partida consiste en poder recordarles al personal obrero y tecnico las medidas preventivas en el frente de trabajo.

01.03.05.08 VIGILANCIA DE LA SALUD DEL TRABAJADOR EN EL CONTEXTO DEL COVID-19


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
12.00 mes 11.75 0.25 12.00 100.00%
* Se mantiene el control de la salud a todo el personal obrero.

1.04 OBRAS PROVISIONALES


01.04.04 ALQUILER DE SS.HH PROVISIONALES
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
12.00 mes 9 1.00 10.00 83.33%
* Se tuvo la elaboracion del plan de seguridad en la obra

1.05 PLAN DE MANEJO AMBIENTAL


01.05.01 PLAN DE MANEJO AMBIENTAL
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
1.00 SRV 0.95 0.03 0.98 98.00%
* Se tuvo la elaboracion del plan de seguridad en la obra

02 MODULOS 1, MODULO 2 Y MODULO 3


02.01 TRABAJOS PRELIMINARES
02.01.02 LIMPIEZA PERMANENTE DE LA OBRA
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
1.00 glb 0.85 0.10 0.95 95.00%
* Se realizo la limpieza de la obra

02.03 CONCRETO ARMADO


02.05.09 CISTERNA
02.05.09.01 CISTERNA - CONCRETO PREMEZCLADO f'c=210 KG/CM2
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
10.50 m3 6.63 1.48 8.11 77.24%
* Se tiene trazos preliminares de eje en columnas en el bloque 2
MUNICIPALIDAD DISTRITAL DE CAICAY
SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL

4. DESCRIPCION DE PARTIDAS EJECUTADAS DURANTE EL MES


PARTIDAS EJECUTADAS EN EL MES DE FEBRERO DEL 2022 F-4
01 TRABAJOS DE DESMONTAJE Y DEMOLICION
02.05.09.02 CISTERNA - ENCOFRADO Y DESENCOFRADO
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
55.27 m3 54.54 0.73 55.27 100.00%
* Se tiene trazos preliminares de eje en columnas en el bloque 2

02.05.10 TANQUE ALTO


02.05.10.01 TANQUE ALTO - CONCRETO f'c=210 KG/CM2
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
67.80 m3 6.26 7.27 13.53 19.96%
* Se tiene trazos preliminares de eje en columnas en el bloque 2

02.05.10.02 TANQUE ALTO - ENCOFRADO Y DESENCOFRADO


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
174.35 m2 154.57 19.78 174.35 100.00%
* Se tiene trazos preliminares de eje en columnas en el bloque 2

02.05.10.03 TANQUE ALTO - ACERO fy=4200 kg/cm2.


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
1,996.31 kg 1217.28 779.03 1996.31 100.00%
* Se tiene trazos preliminares de eje en columnas en el bloque 2

05 PAVIMENTACION DE PATIO DE MANIOBRAS


05.04 BASE
05.04.04 EXTENDIDO BATIDO Y COMPACTADO DE MAT. BASE
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
93.47 m2 0 93.47 93.47 100.00%
* Se tiene trabajos preliminares

05.05 CARPETA DE RODADURA


05.05.01 LOSA MACIZA - CONCRETO PREMEZCLADO f'c=210 kg/cm2
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
18.65 m3 0 18.65 18.65 100.00%
* Se tiene trabajos preliminares

05.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS MACIZAS


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
12.82 m2 0 12.82 12.82 100.00%
* Se tiene trabajos preliminares

05.05.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
1,292.42 kg 146.88 937.45 1084.33 83.90%
* Se tiene trabajos preliminares

08 MUROS Y TABIQUES DE ALBAÑILERIA


8.01 MURO DE CABEZA LADRILLO CORRIENTE CON CEMENTO-ARENA
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
754.01 m2 575.73 4.55 580.28 76.96%
* Se tiene trabajos preliminares

09 REVOQUES ENLUCIDOS Y MOLDURAS


09.03 TARRAJEO EN EXTERIORES MEZCLA 1:5, C:A.
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
414.58 m2 298.36 5.12 303.48 73.20%
* Se tiene trabajos preliminares

09.04 VESTIDURA DE DERRAMES MEZCLA 1:4, C:A.


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
403.74 m2 394.37 6.40 400.77 99.26%
* Se tiene trabajos preliminares

10 CIELORRASOS
10.01 TARRAJEO DE SUPERFICIE DE CIELO RASO CON 1:4, CEMENTO-ARENA
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
MUNICIPALIDAD DISTRITAL DE CAICAY
SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL

4. DESCRIPCION DE PARTIDAS EJECUTADAS DURANTE EL MES


PARTIDAS EJECUTADAS EN EL MES DE FEBRERO DEL 2022 F-4
01 TRABAJOS DE DESMONTAJE Y DEMOLICION
838.72 m2 754.66 1.09 755.75 90.11%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

11 PISOS Y PAVIMENTOS
11.01 FALSO PISOS
11.01.01 CORTE, NIVELADO Y APIZONADO INTERIOR DE RASANTE
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
614.44 m2 543.94 70.50 614.44 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

11.01.02 EMPEDRADO CON PIEDRA MEDIANA 4".


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
401.67 m2 360.03 41.64 401.67 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

11.01.03 FALSO PISO DE 4" DE CONCRETO 1:10


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
401.67 m2 228.19 173.48 401.67 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

11.01.04 FALSO PISO TERMICO DE e=20 CM. DE CONCRETO Y PLASTOFORMO


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
193.46 m2 142.09 50.82 192.91 99.72%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

11.02 CONTRAPISOS
11.02.01 CONTRAPISO DE 40 mm
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
753.46 m2 397.88 279.22 677.10 89.87%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

11.04 SARDINELES
11.04.01 EXCAVACION MANUAL DE ZANJAS
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
4.11 m3 0.6 3.51 4.11 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

11.04.02 CONCRETO f'c=175 kg/cm2., PARA SARDINELES


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
11.29 m3 1.2 4.06 5.26 46.59%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

11.04.03 ENCOFRADO Y DESENCOFRADO NORMAL EN SARDINELES


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
150.47 m2 19.85 49.97 69.82 46.40%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

11.05 VEREDAS DE CONCRETO


11.05.01 CORTE MANUAL EN TERRENO, DE H = 0.20M.
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
46.73 m3 4.79 30.42 35.21 75.35%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

11.05.02 AFIRMADO Y COMPACTADO DE SUB RASANTE PARA VEREDAS.


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
207.29 m2 15.5 120.98 136.48 65.84%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

11.05.03 EMPEDRADO CON PIEDRA MEDIANA 4".


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
207.29 m2 101.09 88.26 189.35 91.35%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

11.05.04 CONCRETO f'c=140 kg/cm2., PARA VEREDAS


MUNICIPALIDAD DISTRITAL DE CAICAY
SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL

4. DESCRIPCION DE PARTIDAS EJECUTADAS DURANTE EL MES


PARTIDAS EJECUTADAS EN EL MES DE FEBRERO DEL 2022 F-4
01 TRABAJOS DE DESMONTAJE Y DEMOLICION
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
14.51 m3 2.02 11.97 13.99 96.42%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

11.05.05 BRUÑAS EN VEREDAS


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
173.00 m 13.35 88.14 101.49 58.66%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

28 INSTALACIONES ELECTRICAS
28.01 SALIDA DE INSTALACIONES ELECTRICAS
28.01.02 SALIDA DE TOMACORRIENTE DOBLE CON CONEXION A TIERRA EN PLACA METALICA
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
110.00 pto 90 4.00 94.00 85.45%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

28.01.04 SALIDA PARA INTERRUPTOR UNIPOLAR SIMPLE


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
37.00 pto 27 1.00 28.00 75.68%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

28.03 CANALES Y TUBERIAS


28.03.04 TUBERIA EMPOTRADA PARA ALUMBRADO Y TOMACORRIENTES PVC SAP DE 20 mm.
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
1,529.17 m 1460.17 69.00 1529.17 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

28.04 CONDUCTORES Y/O CABLES


28.04.02 CABLE N2XOH 4 mm2, TOMACORRIENTES
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
1,212.75 m 0 1212.75 1212.75 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

28.04.06 CABLE N2XSY 1 X 35 mm2, ALIMENTADOR PRINCIPAL


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
141.75 m 0 141.75 141.75 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

28.04.07 CABLE DE Cu DESNUDOCABLEADO 1 X 25 MM2.


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
57.75 m 27 30.75 57.75 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

28.05 CONDUCTORES Y/O CABLES PARA COMUNICACIONES


28.05.01 CABLE TELEFONICO FLEXIBLE DE 4 HILOS
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
315.00 m 0 315.00 315.00 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

28.05.02 CABLE UTP CATEGORIA 6


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
273.00 m 0 273.00 273.00 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

28.07 CAJAS DE PASO


28.07.03 CAJA DE PASO DE 200 X 200 X 100 mm.
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
15.00 m 14 1.00 15.00 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

´28.10 EQUIPOS ELECTRICOS MECANICOS Y ESPECIALES


28.10.05 PRUEBAS ELECTRICAS (RESISTENCIA PUESTA A TIERRA)
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
MUNICIPALIDAD DISTRITAL DE CAICAY
SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL

4. DESCRIPCION DE PARTIDAS EJECUTADAS DURANTE EL MES


PARTIDAS EJECUTADAS EN EL MES DE FEBRERO DEL 2022 F-4
01 TRABAJOS DE DESMONTAJE Y DEMOLICION
9.00 U 0 9.00 9.00 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

28.10.14 SUMINISTRO E INSTALACION DE AUTOCLAVE INCORPORADO CON GENERADOR DE VAPOR DE AGUA


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
1.00 glb 0 1.00 1.00 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

30 TRABAJOS PRELIMINARES
30.01 TRAZO Y REPLAMTEO PRELIMINAR
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
120.20 m2 94.39 25.81 120.20 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

33 CONCRETO ARMADO
33.02 VIGAS DE AMARRE
33.02.01 CONCRETO f'c=210 kg/cm2 PARA VIGAS
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
5.72 m3 2.87 0.81 3.68 64.34%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

33.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
45.74 m2 20.28 5.98 26.26 57.41%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

37 CERCO PERIMETRICO TIPO REJA


37.01 CONCRETO ARMADO
37.01.02 COLUMNAS
37.01.02.01 CONCRETO f'c=210 kg/cm2 PARA COLUMNAS
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
2.00 m3 0 0.44 0.44 22.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

37.01.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
22.14 m2 0 4.43 4.43 20.01%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

37.01.02.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
264.20 kg 0 61.56 61.56 23.30%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

37.01.03 VIGAS DE AMARRE


37.01.03.01 CONCRETO f'c=210 kg/cm2 PARA VIGAS
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
1.85 m3 0 1.85 1.85 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

37.01.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
18.62 m2 4.41 14.21 18.62 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

37.01.03.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
303.76 kg 100.17 130.95 231.12 76.09%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

37.02 MUROS Y TABIQUES DE ALBAÑILERIA


37.02.01 MURO DE CABEZA LADRILLO MECANIZADO CON CEMENTO-ARENA
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
24.44 m2 0 15.91 15.91 65.10%
MUNICIPALIDAD DISTRITAL DE CAICAY
SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL

4. DESCRIPCION DE PARTIDAS EJECUTADAS DURANTE EL MES


PARTIDAS EJECUTADAS EN EL MES DE FEBRERO DEL 2022 F-4
01 TRABAJOS DE DESMONTAJE Y DEMOLICION
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

37.03 REVOQUES Y ENLUCIDOS


37.03.01 TARRAJEO PRIMARIO RAYADO CON MEZACLA 1:5; CEMENTO-ARENA
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
8.23 m2 0 8.23 8.23 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

37.03.02 TARRAJEO EN EXTERIORES MEZCLA 1:5, C:A.


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
75.90 m2 0 21.80 21.80 28.72%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

42 INSTALACION DE COMUNICACIONES
42.05 EQUIPOS ELECTRICOS MECANICOS
42.05.01 CABLEADO ESTRUCTURADO CATEGORIA 6A Y CONECTIVIDAD NETWORKING
42.05.01.01 SWITCH GIGABIT DE 24 PUERTOS ADMINISTRABLE + 02 PUERTOS SFP DE 10GBE
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
2.00 EQP 0 2.00 2.00 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

42.05.01.05 GABINETE DE COMUNICACIÓN DE PISO 42RU INC.ACC.(ORGZ. HORIZ.C/TAPA 2RU, KIT 02 VENTIL, KIT ATERR, PW RACK 19" 6 TOM)
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
1.00 EQP 0 1.00 1.00 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

42.05.01.06 PATCHPANEL CAT6A DE 24 PUERTOS RJ45, INCLUYE 24 JACK RJ45 CAT6A


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
8.00 und 0 3.00 3.00 37.50%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

42.05.01.08 PATCHCORD CAT6A DE 03 PIES EN GABINETE


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
125.00 und 0 26.00 26.00 20.80%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

42.05.01.12 UPS FUERZA 03 KVA RACQUEABLE EN GABINETE


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
1.00 EQP 0 1.00 1.00 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

42.05.02 SISTEMA DE TELEFONIA


42.05.02.01 CENTRAL TELEFÓNICA IP
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
1.00 EQP 0 1.00 1.00 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

03 MURO DE CONTENCION DE CONCRETO ARMADO


04.07 PRUEBAS DE CALIDAD
04.07.01 ROTURA DE BRIQUETAS
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
120.00 und 90 30.00 120.00 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20 INSTALACIONES SANITARIAS
20.02 SISTEMA DE AGUA FRIA
20.02.01 SALIDAS DE AGUA FRIA
20.02.01.01 Salida de agua fria Ø ½"
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
41.00 pt 13 8.00 21.00 51.22%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.02.01.02 Salida de agua fria Ø 3/4"


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
MUNICIPALIDAD DISTRITAL DE CAICAY
SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL

4. DESCRIPCION DE PARTIDAS EJECUTADAS DURANTE EL MES


PARTIDAS EJECUTADAS EN EL MES DE FEBRERO DEL 2022 F-4
01 TRABAJOS DE DESMONTAJE Y DEMOLICION
3.00 pt 0 3.00 3.00 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.02.02 RED DE DISTRIBUCION


20.02.02.02 Excavación manual en tierra compacta
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
121.52 m 49.31 72.21 121.52 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.02.02.03 Refine, nivelacion y compactacion


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
121.52 m 0 92.60 92.60 76.20%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.02.02.04 Cama de apoyo para tuberia con mismo mat. Zarandeada


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
121.52 m 32.03 50.00 82.03 67.50%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.02.02.05 Picado de muros para la instalacion de tuberias


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
320.00 m 128.3 86.50 214.80 67.13%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.02.02.06 Tubería PVC SAP Clase 10 de 1 1/2"


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
32.03 m 32.03 0.00 32.03 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.02.02.07 Tubería PVC SAP Clase 10 1 1/4"


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
157.95 m 15 5.00 20.00 12.66%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.02.02.08 Tubería PVC SAP Clase 10 de 1"


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
33.33 m 0 10.00 10.00 30.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.02.02.09 Tubería PVC SAP Clase 10 1 1/4"


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
67.40 m 35 25.00 60.00 89.02%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.02.02.10 Sunistro e instalación de TEE de PVC


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
1.00 gbl 0.14 0.33 0.47 47.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.02.02.11 Sunistro e instalación de CODO de PVC


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
1.00 gbl 0.07 0.93 1.00 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.02.02.12 Sunistro e instalación de REDUCCION de PVC


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
1.00 gbl 0.21 0.31 0.52 52.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.02.02.13 Relleno compactado de zanjas para tuberias


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
290.71 m 32.03 88.96 120.99 41.62%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar
MUNICIPALIDAD DISTRITAL DE CAICAY
SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL

4. DESCRIPCION DE PARTIDAS EJECUTADAS DURANTE EL MES


PARTIDAS EJECUTADAS EN EL MES DE FEBRERO DEL 2022 F-4
01 TRABAJOS DE DESMONTAJE Y DEMOLICION

20.02.02.14 Prueba Hidraulica y desinfección


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
290.71 m 42.03 40.00 82.03 28.22%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.02.03 VALVULA DE CONTROL


20.02.03.02 Valvula de control de 1/2"
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
20.00 m 11 9.00 20.00 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.02.04 VALVULA DE CONTROL


20.02.04.02 Codo de Ventilacion
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
1.00 m 0 1.00 1.00 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.04 SISTEMA DE AGUA CALIENTE INTERIOR


20.04.01 Salida de agua caliente Ø ½"
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
17.00 pt 3 3.00 6.00 35.29%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.04.02 Tuberia CPVC Ø ½"


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
84.72 m 0 8.00 8.00 9.44%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.05 SISTEMA DE DESAGÜE Y VENTILACION


20.05.01 SSALIDA DE PUNTO
20.05.01.01 Salida de PVC SAP para Desague de 4"
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
31.00 pt 2 19.00 21.00 67.74%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.05.01.02 Salida de PVC SAP para Desague de 2"


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
71.00 pt 18 8.00 26.00 36.62%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.05.02 RED DE ALCANTARILLADO


20.05.02.02 Excavación manual en tierra compacta
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
69.19 m 69.19 0.00 69.19 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.05.02.03 Refine, nivelacion y compactacion


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
69.19 m 0 69.19 69.19 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.05.02.04 Cama de apoyo para tuberia con mismo mat. Zarandeada


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
69.19 m 69.19 0.00 69.19 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.05.02.06 Tubería PVC SAP Ø 4" para desagüe


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
239.40 m 59 9.00 68.00 28.40%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.05.02.07 Relleno compactado de zanjas para tuberias


MUNICIPALIDAD DISTRITAL DE CAICAY
SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL

4. DESCRIPCION DE PARTIDAS EJECUTADAS DURANTE EL MES


PARTIDAS EJECUTADAS EN EL MES DE FEBRERO DEL 2022 F-4
01 TRABAJOS DE DESMONTAJE Y DEMOLICION
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
117.83 m 0 117.83 117.83 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.05.02.08 PRUEBA HIDRAULICA EN RED DE DESAGUE


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
357.23 m 75 188.00 263.00 73.62%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.05.03 ACCESORIOS DE DESAGÜE


20.05.03.05 Yee PVC SAP de desagüe Ø 4"x2"
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
43.00 pza 29 4.00 33.00 76.74%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.05.03.08 Yee PVC SAP de desagüe Ø 6"x4"


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
3.00 pza 0 2.00 2.00 66.67%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.05.03.09 Yee PVC SAP de desagüe Ø 2"x2"Trampa PVC SAP de desagüe Ø 2"
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
23.00 pza 6 1.00 7.00 30.43%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.05.03.10 Codo Sanitario PVC SAP de desagüe Ø 4"x2"


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
24.00 pza 2 2.00 4.00 16.67%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.05.03.11 Tee PVC SAP de desagüe Ø 2"x2"


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
15.00 pza 8 4.00 12.00 80.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.05.04 CAJA DE REGISTRO Y MONTANTES


20.05.04.01 Caja de registro de desagüe de 12" x 24"
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
11.00 pza 5 1.00 6.00 54.55%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.05.04.02 Montante de C/ Tubería PVC SAP de desagüe Ø 4"


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
12.80 m 6 3.00 9.00 70.31%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.06 SISTEMA DE EVACUACION DE AGUAS PLUVIALES


20.06.01 SUMIDERO PARA EVACUACION DE AGUAS PLUVIALES
20.06.01.01 Trazo, niveles y replanteo de zanjas
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
99.08 m 12 87.08 99.08 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.06.01.03 Eliminación manual de material excedente


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
57.96 m3 0 57.96 57.96 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.06.01.04 Refine, nivelacion y compactacion


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
277.41 m 24.68 90.30 114.98 41.45%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar
MUNICIPALIDAD DISTRITAL DE CAICAY
SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL

4. DESCRIPCION DE PARTIDAS EJECUTADAS DURANTE EL MES


PARTIDAS EJECUTADAS EN EL MES DE FEBRERO DEL 2022 F-4
01 TRABAJOS DE DESMONTAJE Y DEMOLICION

20.06.01.05 Encofrado y Desencofrado


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
118.89 m2 40.68 68.93 109.61 92.19%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.06.01.06 Concreto f'c=140 kg/cm2 para canal


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
21.80 m3 2.41 6.33 8.74 40.09%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.06.01.07 Tarrajeo en interiores con impermeabilizante mezcla C:A - 1:4


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
217.97 m2 22.1 43.08 65.18 29.90%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.06.02 MONTANTE DE EVACUACION DE AGUAS PLUVIALES


20.06.02.01 Tubería PVC SAP Ø 3" PARA MONTANTE
PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
176.00 m 33 99.00 132.00 75.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.06.02.03 Tubería PVC SAP Ø 4"


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
97.59 m 39 48.00 87.00 89.15%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.06.02.04 Tubería PVC SAP Ø 6"


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
108.11 m 41.6 24.00 65.60 60.68%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.06.02.05 Caja de registro de desagüe de 12" x 24"


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
1.00 pza 0 1.00 1.00 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.06.02.06 Caja de registro de desagüe de 24" x 24"


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
7.00 pza 1 2.00 3.00 42.86%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.06.02.07 Codo PVC SAP de desagüe Ø 3"x45°


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
77.00 pza 39 38.00 77.00 100.00%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.06.02.08 Codo PVC SAP de desagüe Ø 3"x90°


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
33.00 pza 13 14.00 27.00 81.82%
* Se tiene trabajos preliminares de acuerdo a la partida a ejecutar

20.06.02.09 Codo PVC SAP de desagüe Ø 6"x90°


PROGRAMADO U.M. ANTERIOR ACTUAL ACUMULADO % AVAN. ACUM.
2.00 pza 1 1.00 2.00 100.00%
MUNICIPALIDAD DISTRITAL DE CAICAY
SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL

5. METRADO DIARIO DEL PRESUPUESTO ORIGINAL


OBRA “MEJORAMIENTO DE LOS SERVICIOS DE SALUD DEL PUESTO DE SALUD DE CAICAY, DISTRITO DE CAICAY - PAUCARTAMBO - CUSCO”
ENTIDAD EJECUTORA MUNICIPALIDAD DISTRITAL DE CAICAY 0.335
EJECUTOR SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL
MODALIDAD ADMINISTRACION DIRECTA F-5

PRESUPUESTO METRADO ANTERIOR MARZO 2022 METRADO MENSUAL METRADO ACUMULADO

ITEM DESCRIPCION METRADO MAYORES M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J S METRADO MAYORES TOTAL


METRADO
UND METRADO MAYOR METRADO TOTAL EJECUTADO
EJECUTADO
EJECUTADO METRADOS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 EJECUTADO METRADOS EJECUTADO

01 TRABAJOS DE DESMONTAJE Y DEMOLICION

01.01 DESMONTAJE Y DEMOLICIONES

01.01.01 DESMONTAJE DE COBERTURA DE CALAMINA m2 541.34 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.01.02 DESMONTAJE DE VENTANAS u 26.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.01.03 DESMONTAJE DE PUERTAS u 17.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.01.04 DESMONTAJE DE PUERTA METALICA DE COCHERA u 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.01.05 DESMONTAJE DE TABLEROS ELECTRICOS e INST. ELECTRICAS(CABLEADO) glb 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.01.06 DESMONTAJE DEL SISTEMA DE PARARRAYOS glb 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02 DEMOLICIONES Err:509 - - Err:509 - Err:509
01.02.01 DEMOLICION DE MURO DE ADOBE m3 594.56 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.02 DEMOLICION DE PISO DE CONCRETO 4" m2 373.78 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.02.03 DEMOLICION DE VEREDAS DE CONCRETO e=0.20 m. m2 84.27 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03 PLAN DE SEGURIDAD Y SALUD Err:509 - - Err:509 - Err:509
01.03.01 ELABORACION E IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD glb 1.00 Err:509 - 0.10 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.02 EQUIPO DE PROTECCIÓN INDIVIDUAL und 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.03 EQUIPO DE PROTECCIÓN COLECTIVA glb 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.04 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05 ACTIVIDADES PARA LA VIGILANCIA, PREVENCIÓN, Y CONTROL DEL COVID-19 EN EL TRABAJO Err:509 - - Err:509 - Err:509
01.03.05.01 ELABORACIÓN DEL PLAN PARA LA VIGILANCIA, PREVENCIÓN Y CONTROL DEL COVID-19 glb 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.02 LIMPIEZA Y DESINFECCIÓN EN OBRA mes 12.00 Err:509 - 0.25 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.03 EVALUACIÓN DE LA CONDICIÓN DE SALUD DEL TRABAJADOR mes 12.00 Err:509 - 0.25 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.04 LAVADO Y DESINFECCIÓN DE MANOS (OBLIGATORIO) mes 12.00 Err:509 - 0.25 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.05 SENSIBILIZACIÓN DE LA PREVENCIÓN DEL CONTAGIO COVID-19 EN OBRA und 12.00 Err:509 - 0.25 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.06 MEDIDAS PREVENTIVAS COLECTIVAS glb 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.07 MEDIDAS DE PROTECCION PERSONAL mes 12.00 Err:509 - 0.50 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.03.05.08 VIGILANCIA DE LA SALUD DEL TRABAJADOR EN EL CONTEXTO DEL COVID-19 mes 12.00 Err:509 - 0.25 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04 OBRAS PROVISIONALES Err:509 - - Err:509 - Err:509
01.04.01 ALMACEN OFICINA Y GUARDIANIA m2 100.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.02 CARTEL DE IDENTIFICACION DE OBRA glb 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.03 CONSTRUCCION DE SS.HH. PROBISIONAL u 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.04 ALQUILER DE SS.HH. PROVICIONALES mes 12.00 Err:509 - 1.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.05 AGUA PARA LA CONSTRUCCION glb 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.04.06 CERCO CON ARPILLERA m 300.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.05 PLAN DE MANEJO AMBIENTAL Err:509 - -
01.05.01 PLAN DE MANEJO AMBIENTAL SRV 1.00 Err:509 - 0.03 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
01.06 PLAN DE CONTIGENCIA Err:509 - - Err:509 - Err:509
MUNICIPALIDAD DISTRITAL DE CAICAY
SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL

5. METRADO DIARIO DEL PRESUPUESTO ORIGINAL


OBRA “MEJORAMIENTO DE LOS SERVICIOS DE SALUD DEL PUESTO DE SALUD DE CAICAY, DISTRITO DE CAICAY - PAUCARTAMBO - CUSCO”
ENTIDAD EJECUTORA MUNICIPALIDAD DISTRITAL DE CAICAY 0.335
EJECUTOR SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL
MODALIDAD ADMINISTRACION DIRECTA F-5

PRESUPUESTO METRADO ANTERIOR MARZO 2022 METRADO MENSUAL METRADO ACUMULADO

ITEM DESCRIPCION METRADO MAYORES M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J S METRADO MAYORES TOTAL


METRADO
UND METRADO MAYOR METRADO TOTAL EJECUTADO
EJECUTADO
EJECUTADO METRADOS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 EJECUTADO METRADOS EJECUTADO

01.07 PLAN DE MONITOREO ARQUEOLOGICO Err:509 - - Err:509 - Err:509


01.07.01 PLAN DE MONITOREO ARQUEOLOGICO glb 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02 MODULOS 01, MODULO 02 Y MODULO 03 Err:509 - - Err:509 - Err:509
02.01 TRABAJOS PRELIMINARES Err:509 - - Err:509 - Err:509
02.01.01 LIMPIEZA DE TERRENO MANUAL m2 1,174.66 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.01.02 LIMPIEZA PERMANENTE DE LA OBRA glb 1.00 Err:509 - 0.10 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.02 TRAZO, NIVELES Y REPLANTEO Err:509 - - Err:509 - Err:509
02.02.01 TRAZO Y REPLAMTEO PRELIMINAR m2 1,174.66 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.02.02 TRAZOS Y REPLANTEO DURANTE LA EJECUCION DE LA OBRA m2 1,089.15 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.03 MOVIMIENTO DE TIERRAS Err:509 - - Err:509 - Err:509
02.03.01 EXCAVACION DE ZANJAS PARA ZAPATAS Y CIMIENTOS m3 324.52 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.03.02 EXCAVACION DE ZANJAS PARA VIGAS Y CIMIENTOS CORRIDOS. m3 249.53 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.03.03 EXCAVACION DE ZANJA PARA CISTERNA m3 34.82 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.03.04 ELIMINACION DE MATERIAL EXCEDENTE Err:509 - - Err:509 - Err:509
02.03.04.01 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (D=30 m) m3 175.01 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.03.04.02 ELIMINACION DE MATERIAL EXEDENTE CON EQUIPO HASTA 15 KM m3 119.62 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.03.05 RELLENO Y COMPACTADO Err:509 - - Err:509 - Err:509
02.03.05.01 RELLENO CON MATERIAL PROPIO m3 131.05 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.04 CONCRETO SIMPLE Err:509 - - Err:509 - Err:509
02.04.01 CIMIENTOS CORRIDOS - CONCRETO C-H. 1:8 +25 % DE P.M. m3 173.41 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.04.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA CIMIENTOS HASTA 0.60 m m2 53.84 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.04.03 SOBRE CIMIENTO DE CONCRETO 1:8, C:H +25% P.M. m3 196.30 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.04.04 SOBRE CIMIENTO - ENCOFRADO Y DESENCOFRADO m2 251.50 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.04.05 FALSA ZAPATA Err:509 - - Err:509 - Err:509
02.04.05.01 CONCRETO CICLOPEO f'c=140 kg/cm2 + 70 % PG., EN SUB ZAPATAS m3 58.13 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.05 CONCRETO ARMADO Err:509 - - Err:509 - Err:509
02.05.01 ZAPATAS Err:509 - - Err:509 - Err:509
02.05.01.01 ZAPATAS AISLADAS - CONCRETO PRE MEZCLADO f'c=210 kg/cm2 m3 65.09 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.05.01.02 ZAPATAS AISLADAS - ACERO fy=4200 KG/cm2. kg 2,630.98 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.05.02 VIGAS DE CIMENTACION Err:509 - - Err:509 - Err:509
02.05.02.01 VIGA DE CIMENTACION CONCRETO f'c=210 KG/CM2 m3 49.03 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.05.02.02 VIGA DE CIMENTACION - ENCOFRADO Y DESENCOFRADO CARAVISTA m2 244.53 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.05.02.03 VIGA DE CIMENTACION - ACERO fy=4200 KG/cm2. kg 8,327.60 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.05.03 COLUMNAS Err:509 - - Err:509 - Err:509
02.05.03.01 COLUMNAS - CONCRETO f'c=210 kg/cm2 m3 40.58 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.05.03.02 COLUMNAS - ENCOFRADO Y DESENCOFRADO CARAVISTA m2 617.76 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.05.03.03 COLUMNAS - ACERO fy=4200 KG/cm2. kg 4,713.43 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.05.04 VIGAS Err:509 - - Err:509 - Err:509
02.05.04.01 VIGAS - CONCRETO PREMEZCLADO f'c=210 kg/cm2 m3 41.29 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.05.04.02 VIGAS - ENCOFRADO Y DESENCOFRADO CARAVISTA m2 433.79 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.05.04.03 VIGAS - ACERO fy=4200 KG/cm2. kg 10,797.36 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

02.05.05 LOSAS ALIGERADAS DE e=0.20 m. Err:509 - - Err:509 - Err:509


02.05.05.01 LOSA ALIGERADA - CONCRETO PREMEZCLADO f'c=210 KG/CM2 m3 49.59 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.05.05.02 LOSA ALIGERADA - ENCOFRADO Y DESENCOFRADO m2 323.06 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.05.05.03 LOSA ALIGERADA - ACERO fy=4200 KG/cm2. kg 8,872.31 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.05.05.04 PLASTOFORMO DE 0.15 X 0.30 X 3.00 PARA ALIGERADO m 1,618.10 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.05.06 CANALETAS DE CONCRETO ARMADO EN TECHOS Err:509 - - Err:509 - Err:509
02.05.06.01 CANALETAS - CONCRETO PREMEZCLADO f'c=210 kg/cm2 m3 20.34 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.05.06.02 CANALETAS - ENCOFRADO Y DESENCOFRADO CARAVISTA m2 323.55 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.05.06.03 CANALETAS - ACERO fy=4200 KG/cm2. kg 2,568.86 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.05.07 COLUMNETAS Err:509 - - Err:509 - Err:509
02.05.07.01 COLUMNETAS - CONCRETO f'c=175 kg/cm2 m3 9.56 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.05.07.02 COLUMNETAS - ENCOFRADO Y DESENCOFRADO CARAVISTA m2 165.62 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.05.07.03 COLUMNETAS - ACERO fy=4200 KG/cm2. kg 971.58 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.05.08 ESCALERAS Err:509 - - Err:509 - Err:509
02.05.08.01 SOLADOS CONCRETO f'c=100 kg/cm2 h=15 cm. m2 0.52 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.05.08.02 CONCRETO f'c=210 kg/cm2 PARA ESCALERAS m3 11.17 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.05.08.03 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS m2 20.21 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.05.08.04 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 252.35 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.05.08.05 BARANDA DE TUBO FIERRO GALVANIZADO PASAMANO 2" - PARANTE 2" X 0.90 m m 10.52 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.05.09 CISTERNA Err:509 - - Err:509 - Err:509
02.05.09.01 CISTERNA - CONCRETO PREMEZCLADO f'c=210 KG/CM2 m3 10.50 Err:509 - 1.48 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.05.09.02 CISTERNA - ENCOFRADO Y DESENCOFRADO m2 55.27 Err:509 - 0.73 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.05.09.03 CISTERNA - ACERO fy=4200 kg/cm2. kg 495.16 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
MUNICIPALIDAD DISTRITAL DE CAICAY
SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL

5. METRADO DIARIO DEL PRESUPUESTO ORIGINAL


OBRA “MEJORAMIENTO DE LOS SERVICIOS DE SALUD DEL PUESTO DE SALUD DE CAICAY, DISTRITO DE CAICAY - PAUCARTAMBO - CUSCO”
ENTIDAD EJECUTORA MUNICIPALIDAD DISTRITAL DE CAICAY 0.335
EJECUTOR SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL
MODALIDAD ADMINISTRACION DIRECTA F-5

PRESUPUESTO METRADO ANTERIOR MARZO 2022 METRADO MENSUAL METRADO ACUMULADO

ITEM DESCRIPCION METRADO MAYORES M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J S METRADO MAYORES TOTAL


METRADO
UND METRADO MAYOR METRADO TOTAL EJECUTADO
EJECUTADO
EJECUTADO METRADOS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 EJECUTADO METRADOS EJECUTADO

02.05.10 TANQUE ALTO Err:509 - - Err:509 - Err:509


02.05.10.01 TANQUE ALTO - CONCRETO f'c=210 KG/CM2 m3 67.80 Err:509 - 0.86 0.73 0.73 0.30 1.42 0.73 0.73 1.04 0.73 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.05.10.02 TANQUE ALTO - ENCOFRADO Y DESENCOFRADO m2 174.35 Err:509 - 9.03 8.51 2.24 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
02.05.10.03 TANQUE ALTO - ACERO fy=4200 kg/cm2. kg 1,996.31 Err:509 - 95.31 4.86 19.44 41.04 145.62 352.08 60.75 59.93 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
03 MURO DE CONTENCION DE CONCRETO ARMADO Err:509 - - Err:509 - Err:509
03.01 TRABAJOS PRELIMINARES Err:509 - - Err:509 - Err:509
03.01.01 TRAZO, NIVELES Y REPLANTEO m2 88.86 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
03.02 MOVIMIENTO DE TIERRAS Err:509 - - Err:509 - Err:509
03.02.01 EXCAVACION MASIVA A MAQUINA EN TERRENO NORMAL CON RETROEXCAVADORA DE 5Y3 m3 145.60 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
03.02.02 ELIMINACION DE DESMONTE CON EQUIPO HASTA 15 KM m3 189.27 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
03.03 CONCRETO SIMPLE Err:509 - - Err:509 - Err:509
03.03.01 SOLADOS CONCRETO f'c=100 kg/cm2 h=0.05 m. PARA ZAPATAS m2 88.86 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
03.04 CONCRETO ARMADO Err:509 - - Err:509 - Err:509
03.04.01 MURO DE CONTENCION - CONCRETO f'c=210 kg/cm2 m3 112.81 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
03.04.02 MURO DE CONTENCION - ENCOFRADO Y DESENCOFRADO CARAVISTA m2 431.76 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
03.04.03 MURO DE CONTENCION - ACERO fy=4200 KG/cm2. kg 5,502.04 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
04 RAMPA DE CONCRETO ARMADO Err:509 - - Err:509 - Err:509
04.01 TRABAJOS PRELIMINARES Err:509 - - Err:509 - Err:509
04.01.01 LIMPIEZA DE TERRENO MANUAL m2 137.35 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
04.02 TRAZO, NIVELES Y REPLANTEO Err:509 - - Err:509 - Err:509
04.02.01 TRAZO Y REPLAMTEO PRELIMINAR m2 137.35 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
04.02.02 TRAZO NIVELADO DURANTE LA EJECUCION m2 137.35 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
04.03 MOVIMIENTO DE TIERRAS Err:509 - - Err:509 - Err:509
04.03.01 EXCAVACIONES Err:509 - - Err:509 - Err:509
04.03.01.01 EXCAVACION DE ZANJAS PARA ZAPATAS m3 36.21 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
04.03.02 RELLENO Y COMPACTADO Err:509 - - Err:509 - Err:509
04.03.02.01 RELLENO Y COMPACTACION DE FUNDACIONES CON MATERIAL PROPIO m3 16.46 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
04.04 OBRAS DE CONCRETO SIMPLE Err:509 - - Err:509 - Err:509
04.05 SOLADOS Err:509 - - Err:509 - Err:509
04.05.01 SOLADOS CONCRETO f'c=100 kg/cm2 h=0.05 m. PARA ZAPATAS m2 5.45 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
04.06 OBRAS DE CONCRETO ARMADO Err:509 - - Err:509 - Err:509
04.06.01 ZAPATAS Err:509 - - Err:509 - Err:509
04.06.01.01 ZAPATAS AISLADAS - CONCRETO PRE MEZCLADO f'c=210 kg/cm2 m3 11.20 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
04.06.01.02 ZAPATAS AISLADAS - ACERO fy=4200 KG/cm2. kg 1,408.13 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
04.06.02 COLUMNAS Err:509 - Err:509 - Err:509
04.06.02.01 COLUMNAS - CONCRETO f'c=210 kg/cm2 m3 5.47 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
04.06.02.02 COLUMNAS - ENCOFRADO Y DESENCOFRADO CARAVISTA m2 54.70 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
04.06.02.03 COLUMNAS - ACERO fy=4200 KG/cm2. kg 2,228.57 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
04.06.03 VIGAS Err:509 - - Err:509 - Err:509
04.06.03.01 VIGAS - CONCRETO f'c=210 kg/cm2 m3 5.72 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
04.06.03.02 VIGAS - ENCOFRADO Y DESENCOFRADO CARAVISTA m2 67.15 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
04.06.03.03 VIGAS - ACERO fy=4200 KG/cm2. kg 1,346.65 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
04.06.04 LOSAS MACIZAS Err:509 - - Err:509 - Err:509
04.06.04.01 LOSA MACIZA - CONCRETO f'c=210 kg/cm2 m3 22.92 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
04.06.04.02 LOSA MACIZA - ENCOFRADO Y DESENCOFRADO m2 197.72 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
04.06.04.03 LOSA MACIZA - ACERO fy=4200 KG/cm2. kg 2,877.94 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
05 PAVIMENTACION DE PATIO DE MANIOBRAS Err:509 - - Err:509 - Err:509
05.01 TRABAJOS PRELIMINARES Err:509 - - Err:509 - Err:509
05.01.01 TRAZO Y REPLAMTEO PRELIMINAR m 93.27 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
05.02 MOVIMIENTO DE TIERRAS Err:509 - - Err:509 - Err:509
05.02.01 CORTE Y EXCAVACION DE MATERIAL SUELTO R=460 m3/día m3 18.65 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
05.02.02 ELIMINACION DE DESMONTE CON EQUIPO HASTA 15 KM m3 23.32 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
05.03 SUB RASANTE Err:509 - - Err:509 - Err:509
05.03.01 PERFILADO Y COMPACTACION DE SUB-RASANTE EN ZONAS-CORTE m3 93.27 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
05.04 BASE Err:509 - - Err:509 - Err:509
05.04.01 EXTRACCION Y APILAMIENTO R=440 m3/día m3 48.60 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
05.04.02 CARGUIO R=400 m3/día m3 48.60 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
05.04.03 TRANSPORTE A LA OBRA R=400 m3/día m3 48.60 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
05.04.04 EXTENDIDO BATIDO Y COMPACTADO DE MAT. BASE m2 93.47 Err:509 - 31.15 62.32 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
MUNICIPALIDAD DISTRITAL DE CAICAY
SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL

5. METRADO DIARIO DEL PRESUPUESTO ORIGINAL


OBRA “MEJORAMIENTO DE LOS SERVICIOS DE SALUD DEL PUESTO DE SALUD DE CAICAY, DISTRITO DE CAICAY - PAUCARTAMBO - CUSCO”
ENTIDAD EJECUTORA MUNICIPALIDAD DISTRITAL DE CAICAY 0.335
EJECUTOR SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL
MODALIDAD ADMINISTRACION DIRECTA F-5

PRESUPUESTO METRADO ANTERIOR MARZO 2022 METRADO MENSUAL METRADO ACUMULADO

ITEM DESCRIPCION METRADO MAYORES M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J S METRADO MAYORES TOTAL


METRADO
UND METRADO MAYOR METRADO TOTAL EJECUTADO
EJECUTADO
EJECUTADO METRADOS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 EJECUTADO METRADOS EJECUTADO

05.05 CARPETA DE RODADURA Err:509 - - Err:509 - Err:509


05.05.01 LOSA MACIZA - CONCRETO PREMEZCLADO f'c=210 kg/cm2 m3 18.65 Err:509 - 18.65 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
05.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS MACIZAS m2 12.82 Err:509 - 12.82 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
05.05.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 1,292.42 Err:509 - 642.60 294.85 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
05.06 SELLADO DE JUNTAS Err:509 - - Err:509 - Err:509
05.06.01 SELLADO DE JUNTAS EN LOSAS DE CARPETA DE RODADURA m 117.29 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
06 FLETE TERRESTRE Err:509 - - Err:509 - Err:509
06.01 FLETE TERRESTRE kg 50,000.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07 COBERTURA Err:509 - - Err:509 - Err:509
07.01 ARMADO DE CORREAS DE MADERA AGUANO DE 2" X 3" X 10' m 1,510.13 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.02 ARMADO DE TIJERALES METALICOS m2 790.11 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.03 COBERTURA CON PLANCHAS TEJA ANDINA TIPO FIBRAFORTE DE 1.42 X 0.72 m. m2 736.50 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.04 CUMBRERA PARA COBERTURA TIPO TEJA ANDINA m 130.36 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.05 VALLE PARA COBERTURA TIPO TEJA ANDINA m 87.08 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08 MUROS Y TABIQUES DE ALBAÑILERIA Err:509 - - Err:509 - Err:509
08.01 MURO DE CABEZA LADRILLO CORRIENTE CON CEMENTO-ARENA m2 754.01 Err:509 - 4.55 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.02 MURO DE SOGA LADRILLO CORRIENTE CON CEMENTO-ARENA m2 338.16 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09 REVOQUES ENLUCIDOS Y MOLDURAS Err:509 - - Err:509 - Err:509
09.01 TARRAJEO PRIMARIO RAYADO CON MEZCLA 1:5, C:A m2 610.49 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.02 TARRAJEO EN INTERIORES ACABADO CON MEZCLA 1:5, CEMENTO-ARENA m2 1,093.32 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.03 TARRAJEO EN EXTERIORES MEZCLA 1:5, C:A. m2 414.58 Err:509 - 5.12 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.04 VESTIDURA DE DERRAMES MEZCLA 1:4, C:A. m 403.74 Err:509 - 6.40 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.05 TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:3, C:A. EN CANALETAS Y/O ALEROS m2 393.77 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.06 TARRAJEO CON IMPERMEABILIZANTES MEZCLA 1:3, C:A. EN CISTERNA Y TANQUE ALTO m2 108.72 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.07 BRUÑAS Err:509 - - Err:509 - Err:509
09.07.01 BRUÑAS EN PARED m 937.92 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
10 CIELORRASOS Err:509 - - Err:509 - Err:509
10.01 TARRAJEO DE SUPERFICIE DE CIELO RASO CON 1:4, CEMENTO-ARENA m2 838.72 Err:509 - 1.09 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11 PISOS Y PAVIMENTOS Err:509 - - Err:509 - Err:509
11.01 FALSO PISOS Err:509 - - Err:509 - Err:509
11.01.01 CORTE, NIVELADO Y APIZONADO INTERIOR DE RASANTE m2 614.44 Err:509 - 56.41 14.09 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.01.02 EMPEDRADO CON PIEDRA MEDIANA 4". m2 401.67 Err:509 - 18.40 9.23 14.01 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.01.03 FALSO PISO DE 4" DE CONCRETO 1:10 m2 401.67 Err:509 - 40.96 125.30 6.90 0.32 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.01.04 FALSO PISO TERMICO DE e=20 CM. DE CONCRETO Y PLASTOFORMO m2 193.46 Err:509 - 43.16 2.89 4.77 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02 CONTRAPISOS Err:509 - - Err:509 - Err:509
11.02.01 CONTRAPISO DE 40 mm m2 753.46 Err:509 - 40.96 168.46 27.32 5.67 32.04 4.77 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.03 PISOS Err:509 - - Err:509 - Err:509
11.03.01 PISO CERAMICO NACIONAL ANTIDESLIZANTE DE 30 X 30 cm. m2 206.60 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.03.02 PISO DE PORCELANATO DE 40 X 40 cm. m2 562.05 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.03.03 PISO DE CONCRETO PULIDO Y BRULADO CADA 1.00m., EN AMBOS SENTIDOS m2 31.93 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.04 SARDINELES Err:509 - - Err:509 - Err:509
11.04.01 EXCAVACION MANUAL DE ZANJAS m3 4.11 Err:509 - 1.51 0.84 0.87 0.29 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.04.02 CONCRETO f'c=175 kg/cm2., PARA SARDINELES m3 11.29 Err:509 - 0.75 1.06 0.83 0.84 0.58 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.04.03 ENCOFRADO Y DESENCOFRADO NORMAL EN SARDINELES m2 150.47 Err:509 - 10.08 3.50 5.60 7.06 5.54 9.50 8.69 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.04.04 SELLADO DE JUNTAS EN SARDINELES m 20.30 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.05 VEREDAS DE CONCRETO Err:509 - - Err:509 - Err:509
11.05.01 CORTE MANUAL EN TERRENO, DE H = 0.20M. m3 46.73 Err:509 - 2.52 0.48 4.05 4.16 2.38 2.45 0.97 0.70 9.67 3.04 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.05.02 AFIRMADO Y COMPACTADO DE SUB RASANTE PARA VEREDAS. m2 207.29 Err:509 - 12.60 8.02 8.76 11.90 12.27 4.85 3.48 24.95 8.81 10.13 15.21 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.05.03 EMPEDRADO CON PIEDRA MEDIANA 4". m2 207.29 Err:509 - 12.60 3.00 11.90 12.27 4.85 3.48 24.95 15.21 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.05.04 CONCRETO f'c=140 kg/cm2., PARA VEREDAS m3 14.51 Err:509 - 2.12 2.55 3.06 2.51 1.73 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.05.05 BRUÑAS EN VEREDAS m 173.00 Err:509 - 12.80 26.14 30.75 18.45 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.05.06 SELLADO DE JUNTAS EN VEREDAS m 86.28 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
20 APARATOS Y ACCESORIOS SANITARIOS Err:509 - - Err:509 - Err:509
20.01 INODORO CON FLUXOMETRO pza 15.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
20.02 LAVATORIOS DE PARED CON PEDESTAL BLANCO pza 23.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
20.03 LAVADERO DE ACERO INOXIDABLE 18" X 20" DE DOS POZAS pza 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
20.04 LAVADERO DE ACERO INOXIDABLE 18" X 35" DE UNA POZA pza 2.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
20.05 LAVADERO DE CONCRETO ENCHAPADO DE MAYOLICA pza 2.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
20.06 URINARIOS DE LOZA DE PICO BLANCO pza 5.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
20.07 DUCHAS CROMADAS DE CABEZA GIRATORIA Y LLAVE MEZCLADORA pza 4.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
20.08 GRIFO PARA LAVATORIO DOS LLAVES pza 15.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
20.09 GRIFO PARA LAVATORIO UNA LLAVE pza 21.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
20.10 GRIFO TIPO GLOBO PARA RIEGO pza 3.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21 ACCESORIOS SANITARIOS Err:509 - - Err:509 - Err:509
21.01 PAPELERA DE LOZA DE COLOR DE 15 X 15 cm pza 15.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.02 JABONERA DE LOSA COLOR BLANCO CON AGARRADERA pza 26.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.03 TOALLERA CON GANCHO BLANCA pza 17.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
MUNICIPALIDAD DISTRITAL DE CAICAY
SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL

5. METRADO DIARIO DEL PRESUPUESTO ORIGINAL


OBRA “MEJORAMIENTO DE LOS SERVICIOS DE SALUD DEL PUESTO DE SALUD DE CAICAY, DISTRITO DE CAICAY - PAUCARTAMBO - CUSCO”
ENTIDAD EJECUTORA MUNICIPALIDAD DISTRITAL DE CAICAY 0.335
EJECUTOR SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL
MODALIDAD ADMINISTRACION DIRECTA F-5

PRESUPUESTO METRADO ANTERIOR MARZO 2022 METRADO MENSUAL METRADO ACUMULADO

ITEM DESCRIPCION METRADO MAYORES M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J S METRADO MAYORES TOTAL


METRADO
UND METRADO MAYOR METRADO TOTAL EJECUTADO
EJECUTADO
EJECUTADO METRADOS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 EJECUTADO METRADOS EJECUTADO

21.04 COLOCACION DE APARATOS SANITARIOS pza 50.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
MUNICIPALIDAD DISTRITAL DE CAICAY
SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL

5. METRADO DIARIO DEL PRESUPUESTO ORIGINAL


OBRA “MEJORAMIENTO DE LOS SERVICIOS DE SALUD DEL PUESTO DE SALUD DE CAICAY, DISTRITO DE CAICAY - PAUCARTAMBO - CUSCO”
ENTIDAD EJECUTORA MUNICIPALIDAD DISTRITAL DE CAICAY 0.335
EJECUTOR SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL
MODALIDAD ADMINISTRACION DIRECTA F-5

PRESUPUESTO METRADO ANTERIOR MARZO 2022 METRADO MENSUAL METRADO ACUMULADO

ITEM DESCRIPCION METRADO MAYORES M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J S METRADO MAYORES TOTAL


METRADO
UND METRADO MAYOR METRADO TOTAL EJECUTADO
EJECUTADO
EJECUTADO METRADOS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 EJECUTADO METRADOS EJECUTADO

22 INSTALACIONES SANITARIAS Err:509 - - Err:509 - Err:509


22.01 SISTEMA DE DESAGUE Err:509 - - Err:509 - Err:509
22.01.01 SALIDA DE DESAGUE EN PVC SAL DE 4",INODOROS pto 15.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.01.02 SALIDA DE DESAGUE EN PVC SAL DE 2", URINARIOS pto 5.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.01.03 SALIDA DE DESAGUE EN PVC SAL DE 2", LAVATORIOS pto 28.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.01.04 SALIDA DE DESAGUE EN PVC SAL DE 2", DUCHAS pto 4.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.01.05 SALIDA DE DESAGUE EN PVC SAL DE 2", SUMIDEROS pto 20.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.01.06 SALIDA DE DESAGUE EN PVC SAL REGISTRO ROSCADO 2" pto 12.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.01.07 SALIDA DE DESAGUE EN PVC SAL REGISTRO ROSCADO 4" pto 6.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.01.08 SALIDAS DE PVC SAL PARA VENTILACION DE 2" pto 31.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.02 SISTEMA DE REDES DE DESAGUE Err:509 - - Err:509 - Err:509
22.02.01 RED COLECTORA DE PVC SAL PARA DESAGUE Ø 6" m 90.15 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.02.02 RED COLECTORA DE PVC SAL PARA DESAGUE Ø 4" m 85.51 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.02.03 RED COLECTORA DE PVC SAL PARA DESAGUE Ø 2" m 291.03 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.02.04 EXCAVACION DE ZANJA PARA TUBERIA MENOR DE 8" h=1.20 m. m3 21.63 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.03 ACCESORIOS VARIOS Err:509 - - Err:509 - Err:509
22.03.01 SUMIDEROS CROMADOS DE BRONCE DE 2" pza 20.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.03.02 REGISTROS ROSCADO DE BRONCE DE 2" pza 12.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.03.03 REGISTROS ROSCADO DE BRONCE DE 4" pza 6.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.03.04 YEE PVC SAL Ø 2" A 2" pza 34.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.03.05 YEE PVC SAL Ø 4" A 2" pza 25.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.03.06 YEE PVC SAL Ø 4" X 4" pza 16.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.03.07 CODO PVC SAL 2"X45° pza 14.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.03.08 CODO PVC SAL 2"X90° pza 77.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.03.09 CODO PVC SAL 4"X 90° pza 6.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.03.10 TEE PVC-SAP 2" X 2" pza 41.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.03.11 TEE PVC-SAP 4" X 4" pza 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.03.12 CODO SANITARIO DE PVC SAL Ø 4" X 2" pza 15.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.03.13 TRAMPA "P" DE PVC SAL PARA DESAGUE DE 2" u 22.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.04 CAJAS DE INSPECCION Err:509 - - Err:509 - Err:509
22.04.01 CAJA DE REGISTRO DE DESAGUE 12" X 24" pza 16.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.05 VENTILACION Err:509 - - Err:509 - Err:509
22.05.01 SOMBRERO VENTILACION PVC DE 2" pza 32.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.06 PRUEBAS HIDRAULICAS Err:509 - - Err:509 - Err:509
22.06.01 PRUEBA HIDRAULICA DE DESAGUE Y DESINFECCION glb 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28 INSTALACIONES ELECTRICAS Err:509 - - Err:509 - Err:509
28.01 SALIDA DE INSTALACIONES ELECTRICAS Err:509 - - Err:509 - Err:509
28.01.01 SALIDA DE CENTROS DE LUZ DE TECHO pto 154.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.01.02 SALIDA DE TOMACORRIENTE DOBLE CON CONEXION A TIERRA EN PLACA METALICA pto 110.00 Err:509 - 4.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.01.03 SALIDA DE TOMACORRIENTE DOBLE CON CONEXION A TIERRA A PRUEBA DE AGUA pto 14.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.01.04 SALIDA PARA INTERRUPTOR UNIPOLAR SIMPLE pto 37.00 Err:509 - 1.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.01.05 SALIDA PARA INTERRUPTOR UNIPOLAR DOBLE pto 7.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.01.06 SALIDA INTERRUPTOR UNIPOLAR CONMUTADOR SIMPLE pto 2.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.01.07 SALIDA DE LUZ EMERGENCIA PORTATIL pto 9.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.01.08 SALIDA PARA THERMA CON PVC. pto 3.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.01.09 SALIDA PARA LUZ DE PATIOS pto 9.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.02 SALIDA PARA COMUNICACIONES Y SEÑALES Err:509 - - Err:509 - Err:509
28.02.01 SALIDA PARA TELEFONO DE INTERCOMUNICADORES pto 20.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.02.02 SALIDA PARA INTERNET pto 20.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.02.03 SALIDA PARA TV CABLE pto 10.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.02.04 SALIDA DE PARLANTES pto 14.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.02.05 SALIDA DE SENSOR DE HUMO pto 18.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.03 CANALES Y TUBERIAS Err:509 - - Err:509 - Err:509
28.03.01 TUBERIA EMPOTRADA PARA ALIMENTADORES PVC SAP DE 35 mm. m 270.39 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.03.02 TUBERIA EMPOTRADA PARA ALIMENTADORES PVC SAP DE 25 mm. m 63.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.03.03 TUBERIA EMPOTRADA PARA P/TIERRA PVC SAP DE 25 mm. m 48.35 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.03.04 TUBERIA EMPOTRADA PARA ALUMBRADO Y TOMACORRIENTES PVC SAP DE 20 mm. m 1,529.17 Err:509 - 69.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.03.05 CURVA PVC SAP PARA INST. ELECTRICAS DE 35 mm. pza 46.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.03.06 CURVA PVC SAP PARA INST. ELECTRICAS DE 25 mm. pza 15.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.03.07 CURVA PVC SAP PARA INST. ELECTRICAS DE 20 mm. pza 730.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.03.08 UNION PVC SAP PARA INST. ELECTRICAS DE 35 mm. pza 13.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.03.09 UNION PVC SAP PARA INST. ELECTRICAS DE 25 mm. pza 15.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.03.10 UNION PVC SAP PARA INST. ELECTRICAS DE 20 mm. pza 270.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.03.11 EXCAVACION Y RELLENO DE ZANJA m 458.07 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.04 CONDUCTORES Y/O CABLES Err:509 - - Err:509 - Err:509
28.04.01 CABLE N2XOH 2.5 mm2, ALUMBRADO m 2,891.70 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.04.02 CABLE N2XOH 4 mm2, TOMACORRIENTES m 1,212.75 Err:509 - 255.00 300.00 90.00 255.00 300.00 12.75 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.04.03 CABLE N2XOH 1 X 6 mm2, ALIMENTADOR DE TABLERO DE BOMBAS m 67.20 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.04.04 CABLE N2XOH 1 X 10 mm2, ALIMENTADOR DE TABLERO m 231.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.04.05 CABLE N2XOH 1 X 16 mm2, ALIMENTADOR DE TABLERO m 134.40 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.04.06 CABLE N2XSY 1 X 35 mm2, ALIMENTADOR PRINCIPAL m 141.75 Err:509 - 141.75 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.04.07 CABLE DE Cu DESNUDOCABLEADO 1 X 25 MM2. m 57.75 Err:509 - 30.75 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
MUNICIPALIDAD DISTRITAL DE CAICAY
SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL

5. METRADO DIARIO DEL PRESUPUESTO ORIGINAL


OBRA “MEJORAMIENTO DE LOS SERVICIOS DE SALUD DEL PUESTO DE SALUD DE CAICAY, DISTRITO DE CAICAY - PAUCARTAMBO - CUSCO”
ENTIDAD EJECUTORA MUNICIPALIDAD DISTRITAL DE CAICAY 0.335
EJECUTOR SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL
MODALIDAD ADMINISTRACION DIRECTA F-5

PRESUPUESTO METRADO ANTERIOR MARZO 2022 METRADO MENSUAL METRADO ACUMULADO

ITEM DESCRIPCION METRADO MAYORES M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J S METRADO MAYORES TOTAL


METRADO
UND METRADO MAYOR METRADO TOTAL EJECUTADO
EJECUTADO
EJECUTADO METRADOS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 EJECUTADO METRADOS EJECUTADO

28.05 CONDUCTORES Y/O CABLES PARA COMUNICACIONES Err:509 - - Err:509 - Err:509


28.05.01 CABLE TELEFONICO FLEXIBLE DE 4 HILOS m 315.00 Err:509 - 77.00 148.00 40.00 50.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.05.02 CABLE UTP CATEGORIA 6 m 273.00 Err:509 - 154.00 119.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.05.03 CONDUCTOR PRESTOFLEX (PARA PARLANTES) m 33.60 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.05.04 CABLE PARA TV COAXIAL RG6 m 115.50 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.05.05 CABLE PARA SENSOR DE HUMO m 57.75 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.06 TABLEROS DE DISTRIBUCION Err:509 - - Err:509 - Err:509
28.06.01 TABLERO GENERAL TG ( TABLERO DE 18 POLOS) pza 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.06.02 TABLERO DE DISTRIBUCION TE - 1N (TABLERO 42 POLOS TIPO BARRA) u 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.06.03 TABLERO DE DISTRIBUCION TE - 2N (TABLERO 18 POLOS TIPO BARRA) u 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.06.04 TABLERO DE DISTRIBUCION TE - 201 (TABLERO 48 POLOS TIPO BARRA) u 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.06.05 TABLERO DE DISTRIBUCION TE - 202 (TABLERO 42 POLOS TIPO BARRA) u 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.06.06 TABLERO DE DISTRIBUCION TE - GB (TABLERO 18 POLOS TIPO BARRA) eqp 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.06.07 TABLERO DE DISTRIBUCION TE - TS (TABLERO 8 POLOS TIPO BARRA) und 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

28.07 CAJAS DE PASO Err:509 - - Err:509 - Err:509


28.07.01 CAJA DE PASO DE 100 X 100 X 100 mm. pza 15.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.07.02 CAJA DE PASO DE 150 X 150 X 100 mm. pza 15.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.07.03 CAJA DE PASO DE 200 X 200 X 100 mm. pza 15.00 Err:509 - 1.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.07.04 CAJA DE PASO DE 300 X 300 X 100 mm. pza 6.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

28.07.05 CAJA DE PASO DE 400 X 400 X 100 mm. pza 8.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.08 SISTEMA DE CONDUCTOS Err:509 - - Err:509 - Err:509
28.08.01 BUZON ELECTRO DUCTO DE CONCRETO ARMADO CON TAPA0.60 X 0.60 X 1.20 m. u 6.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.09 ARTEFACTOS LUMINARIOS Err:509 - - Err:509 - Err:509
28.09.01 LUMINARIA ADOSABLE FLUORECENTE 2 X 36 W REJILLA DE 60 X60 cm. u 83.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.09.02 LUMINARIA 2 X 18 W LED CAUDRADA ADOSABLE u 56.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.09.03 LUMINARIA EN PARED ADOSABLE BRAQUET LED DE 14 W u 5.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.09.04 ARTEFACTO DE ILUMINACION LED 18 W PARA ADOSAR DE 30 X 30 cm. u 30.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.09.05 ALUMINARIA LUZ DE EMERGENCIA LED 25 W u 32.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.10 EQUIPOS ELECTRICOS MECANICOS Y ESPECIALES Err:509 - - Err:509 - Err:509
28.10.01 PUESTA A TIERRA u 9.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.10.02 PARARRAYOS R=100 m. u 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.10.03 PRUEBAS ELECTRICAS (AISLAMIENTO Y CONTINUIDAD) glb 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.10.04 TRANSFORMADOR u 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.10.05 PRUEBAS ELECTRICAS (RESISTENCIA PUESTA A TIERRA) u 9.00 Err:509 - 4.00 5.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.10.06 GRUPO ELECTRGENO PARA EL CENTRO DE SALUD (CON 50 KW) u 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.10.07 TABLERO DE TRANSFERENCIA AUTOMATICA DE 50 KWA u 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.10.08 AMPLIFICADOR CONSOLA PARA COMUNICACION DE RADIO u 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.10.09 PARLANTES u 14.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.10.10 CENTRAL TELEFONICA PARA LOS ANEXOS INTERIOR u 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.10.11 LUZ EXTROGOSCOPICA u 4.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.10.12 EQUIPO SENSOR DE HUMO u 18.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.10.13 THERMA ELECTRICA u 3.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.10.14 SUMINISTRO E INSTALACION DE AUTOCLAVE INCORPORADO CON GENERADOR DE VAPOR DE AGUA glb 1.00 Err:509 - 1.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.10.15 GABINETE PARA EXTINGUIDOR CONTRA INCENDIOS u 4.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
28.11 SUB ESTACION (EXPEDIENTE Y EJECUCION) Err:509 - - Err:509 - Err:509
28.11.01 SUB ESTACION (EXPEDIENTE Y EJECUCION) SRV 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
29 FLETE TERRESTRE Err:509 - - Err:509 - Err:509
29.01 FLETE TERRESTRE kg 5,000.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
30 TRABAJOS PRELIMINARES Err:509 - - Err:509 - Err:509
30.01 TRAZO Y REPLAMTEO PRELIMINAR m2 120.20 Err:509 - 25.81 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
31 MOVIMIENTO DE TIERRAS Err:509 - - Err:509 - Err:509
31.01 EXCAVACION DE ZANJAS PARA CIMIENTOS m3 62.60 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
31.02 RELLENO CON MATERIAL PROPIO m3 6.26 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
31.03 ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO HASTA 15 km m3 73.24 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
32 CONCRETO SIMPLE Err:509 - - Err:509 - Err:509
32.01 CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA m3 38.36 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
32.02 CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS m3 7.67 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
32.03 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS m2 76.73 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
33 CONCRETO ARMADO Err:509 - - Err:509 - Err:509
33.01 COLUMNAS Err:509 - - Err:509 - Err:509
33.01.01 CONCRETO f'c=175 kg/cm2 PARA COLUMNAS m3 5.78 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
33.01.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 92.50 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
33.01.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 514.28 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
33.02 VIGAS DE AMARRE Err:509 - - Err:509 - Err:509
33.02.01 CONCRETO f'c=210 kg/cm2 PARA VIGAS m3 5.72 Err:509 - 0.81 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
33.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 45.74 Err:509 - 5.98 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
33.02.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 392.03 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
34 MUROS Err:509 - - Err:509 - Err:509
34.01 MUROS DE BLOQUES DE CONCRETO Err:509 - - Err:509 - Err:509
34.01.01 MURO DE BLOQUE HUECO DE CONCRETO E=20 cm MEZCLA 1:5 (CEMENTO:ARENA) m2 186.09 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
MUNICIPALIDAD DISTRITAL DE CAICAY
SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL

5. METRADO DIARIO DEL PRESUPUESTO ORIGINAL


OBRA “MEJORAMIENTO DE LOS SERVICIOS DE SALUD DEL PUESTO DE SALUD DE CAICAY, DISTRITO DE CAICAY - PAUCARTAMBO - CUSCO”
ENTIDAD EJECUTORA MUNICIPALIDAD DISTRITAL DE CAICAY 0.335
EJECUTOR SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL
MODALIDAD ADMINISTRACION DIRECTA F-5

PRESUPUESTO METRADO ANTERIOR MARZO 2022 METRADO MENSUAL METRADO ACUMULADO

ITEM DESCRIPCION METRADO MAYORES M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J S METRADO MAYORES TOTAL


METRADO
UND METRADO MAYOR METRADO TOTAL EJECUTADO
EJECUTADO
EJECUTADO METRADOS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 EJECUTADO METRADOS EJECUTADO

35 REVOQUES ENLUCIDOS Y MOLDURAS Err:509 - - Err:509 - Err:509


35.01 TARRAJEO DE VIGAS Y COLUMNAS INCLUYE ARISTAS m2 173.41 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
36 PINTURA Err:509 - - Err:509 - Err:509
36.01 PINTURA EN VIGAS Y COLUMNAS VINILICA 2 MANOS m2 173.41 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
37 CERCO PERIMETRICO TIPO REJA Err:509 - - Err:509 - Err:509
37.01 CONCRETO ARMADO Err:509 - - Err:509 - Err:509
37.01.01 ZAPATAS Err:509 - - Err:509 - Err:509
37.01.01.01 SOLADOS CONCRETO f'c=100 kg/cm2 h=2" PARA ZAPATAS m2 7.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
37.01.01.02 CONCRETO f'c=210 kg/cm2 PARA ZAPATAS m3 2.80 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
37.01.01.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 77.11 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
37.01.02 COLUMNAS Err:509 - - Err:509 - Err:509
37.01.02.01 CONCRETO f'c=210 kg/cm2 PARA COLUMNAS m3 2.00 Err:509 - 0.20 0.24 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
37.01.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 22.14 Err:509 - 1.58 2.85 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
37.01.02.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 264.20 Err:509 - 61.56 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
37.01.03 VIGAS DE AMARRE Err:509 - - Err:509 - Err:509
37.01.03.01 CONCRETO f'c=210 kg/cm2 PARA VIGAS m3 1.85 Err:509 - 0.59 0.41 0.41 0.44 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
37.01.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 18.62 Err:509 - 3.38 4.88 4.88 1.07 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
37.01.03.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 303.76 Err:509 - 26.73 36.72 52.11 15.39 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
37.02 MUROS Y TABIQUES DE ALBAÑILERIA Err:509 - - Err:509 - Err:509
37.02.01 MURO DE CABEZA LADRILLO MECANIZADO CON CEMENTO-ARENA m2 24.44 Err:509 - 4.50 4.58 1.56 5.27 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
37.03 REVOQUES Y ENLUCIDOS Err:509 - - Err:509 - Err:509
37.03.01 TARRAJEO PRIMARIO RAYADO CON MEZACLA 1:5; CEMENTO-ARENA m2 8.23 Err:509 - 8.23 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
37.03.02 TARRAJEO EN EXTERIORES MEZCLA 1:5, C:A. m2 75.90 Err:509 - 21.80 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
37.04 ZOCALOS Err:509 - - Err:509 - Err:509
37.04.01 ENCHAPADO DE PIEDRA LAJA APAREJO IRREGULAR m2 8.23 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
37.05 PINTURA Err:509 - - Err:509 - Err:509
37.05.01 PINTURA EN MUROS, SARDINELES, COLUMNAS Y VIGAS EXTERIORES m2 75.90 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
38 CARPINTERIA METALICA Err:509 - - Err:509 - Err:509
38.01 REJA METALICA DE TUBO 2" X 2mm. PARA CERCO PERIMETRICO m 233.75 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
38.02 COLOCACION DE PUERTA METALICA DOS HOJAS TIPO RM, CON TUBO RECTANGULAR DE 2" X 3", e=2.5 mm.pza 4.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
39 JUEGO DE LETRAS EN BRONCE Err:509 - - Err:509 - Err:509
39.01 JUEGO DE LETRAS EN BRONCE glb 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
40 FLETE TERRESTRE Err:509 - - Err:509 - Err:509
40.01 FLETE TERRESTRE kg 4,000.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
41 EQUIPAMIENTO Y MOBILIARIO Err:509 - - Err:509 - Err:509
41.01 EQUIPO BIOMEDICO glb 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
41.02 EQUIPO COMPLEMENTARIO glb 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
41.03 EQUIPO ELECTROMECÁNICO glb 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
41.04 EQUIPO INFORMÁTICO glb 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
41.05 INSTRUMENTAL glb 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
41.06 MOBILIARIO ADMINISTRATIVO glb 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
41.07 MOBILIARIO CLÍNICO glb 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
41.08 TRANSPORTE (VEHÍCULO) glb 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42 INSTALACION DE COMUNICACIONES Err:509 - - Err:509 - Err:509
42.01 SALIDA PARA COMUNICACIONES Y SEÑALES Err:509 - - Err:509 - Err:509
42.01.01 SALIDA DOBLE PARA RED DE DATOS pto 24.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.01.02 SALIDA SIMPLE DE DATOS PARA ACCESS POINT pto 4.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.01.03 SALIDA SIMPLE DE DATOS PARA CAMARAS IP pto 10.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.01.04 SALIDA PARA PARLANTE EN TECHO CON ATENUADOR EN PARED pto 29.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.01.05 SALIDA PARA DETECTOR DE HUMO DIRECCIONABLE pto 41.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.01.06 SALIDA PARA DETECTOR DE TEMPERATURA DIRECCIONABLES pto 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.01.07 SALIDA DE ESTACION MANUAL DIRECCIONABLE pto 7.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.01.08 SALIDA DE ESTROBO/SIRENA pto 7.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.02 TUBERIA Y/O CANALES Err:509 - - Err:509 - Err:509
42.02.01 TUBERÍA PVC SAP P/INST. ELECT. DE 25 MM m 1,147.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.02.02 CURVA PVC SAP P/INST. ELECT. DE 25MM und 50.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.02.03 TUBERÍA PVC SAP P/INST. ELECT. DE 50 MM m 103.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.02.04 CURVA PVC SAP P/INST. ELECT. DE 50 MM und 10.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.03 CONDUCTORES Y/O CABLES COMUNICACIONES Err:509 - - Err:509 - Err:509
42.03.01 CABLE F/UTP CATEGORIA 6A LSZH m 1,508.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.03.02 CABLE FPL 2X18 AWG DETECCION DE INCENDIO m 444.30 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.03.03 CABLE DE MELLIZO SILICONADO 2X16 AWG POLARIZADO PARA PARLANTES m 264.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.04 LOSAS MACIZAS Err:509 - - Err:509 - Err:509
42.04.01 CAJA DE REGISTRO DE CONCRETO 1200X1200X1000 MM C/TAPA DE CONCRETO pza 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.04.02 CAJA DE PASO 500X500X150 MM FºGº CON TAPA pza 2.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.04.03 CAJA DE PASO 300X300X150 MM FºGº CON TAPA pza 8.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.04.04 CAJA DE PASO 250X250X100 MM FºGº CON TAPA pza 9.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.05 EQUIPOS ELECTRICOS MECANICOS Err:509 - - Err:509 - Err:509
42.05.01 CABLEADO ESTRUCTURADO CATEGORIA 6A Y CONECTIVIDAD NETWORKING Err:509 - - Err:509
42.05.01.01 SWITCH GIGABIT DE 24 PUERTOS ADMINISTRABLE + 02 PUERTOS SFP DE 10GBE EQP 2.00 Err:509 - 2.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.05.01.02 SWITCH GIGABIT DE 24 PUERTOS POE ADMINISTRABLE + 02 PUERTOS SFP DE 10GBE EQP 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509
42.05.01.03 CONTROLADOR UNIFICADOR DE ACCESS POINT EQP 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.05.01.04 PUNTO DE ACCESO ADMINISTRABLE POR CONTROLADOR EQP 4.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.05.01.05 GABINETE DE COMUNICACIÓN DE PISO 42RU INC.ACC.(ORGZ. HORIZ.C/TAPA 2RU, KIT 02 VENTIL, KIT A EQP 1.00 Err:509 - 1.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
MUNICIPALIDAD DISTRITAL DE CAICAY
SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL

5. METRADO DIARIO DEL PRESUPUESTO ORIGINAL


OBRA “MEJORAMIENTO DE LOS SERVICIOS DE SALUD DEL PUESTO DE SALUD DE CAICAY, DISTRITO DE CAICAY - PAUCARTAMBO - CUSCO”
ENTIDAD EJECUTORA MUNICIPALIDAD DISTRITAL DE CAICAY 0.335
EJECUTOR SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL
MODALIDAD ADMINISTRACION DIRECTA F-5

PRESUPUESTO METRADO ANTERIOR MARZO 2022 METRADO MENSUAL METRADO ACUMULADO

ITEM DESCRIPCION METRADO MAYORES M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M J S METRADO MAYORES TOTAL


METRADO
UND METRADO MAYOR METRADO TOTAL EJECUTADO
EJECUTADO
EJECUTADO METRADOS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 EJECUTADO METRADOS EJECUTADO

42.05.01.06 PATCHPANEL CAT6A DE 24 PUERTOS RJ45, INCLUYE 24 JACK RJ45 CAT6A und 3.00 Err:509 - 3.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.05.01.07 PATCHCORD CAT6A DE 07 PIES EN AREA DE TRABAJO und 125.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.05.01.08 PATCHCORD CAT6A DE 03 PIES EN GABINETE und 125.00 Err:509 - 26.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.05.01.09 CERTIFICACION DE LOS PUNTOS DE DATA CAT6A CON INSTRUMENTO CERTIFICADOR GLB 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.05.01.10 ETIQUETAS ADHESIVAS DE IDENTIFICACIÓN Y ORDENAMIENTO PARA EL AREA DE TRABAJO Y GABINE GLB 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.05.01.11 SISTEMA DE ATERRAMIENTO DE GABINETE und 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509
42.05.01.12 UPS FUERZA 03 KVA RACQUEABLE EN GABINETE EQP 1.00 Err:509 - 1.00 Err:509 Err:509 Err:509 Err:509
42.05.01.13 INSTALACIÓN Y PUESTA EN FUNCIONAMIENTO DEL SISTEMA DE CABLEADO ESTRUCTURADO Y NETW EQP 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.05.02 SISTEMA DE TELEFONIA Err:509 - - Err:509 - Err:509
42.05.02.01 CENTRAL TELEFÓNICA IP EQP 1.00 Err:509 - 1.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.05.02.02 TELEFONO BASICO IP EQP 10.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.05.02.03 TELEFONO EJECUTIVO IP EQP 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.05.02.04 TELEFONO OPERADORA IP CON AURICULAR EQP 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.05.02.05 INSTALACION, CONFIGURACION Y PUESTA EN FUNCIONAMIENTO DEL SISTEMA DE TELEFONIA GLB 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.05.03 SISTEMA DE VIDEO VIGILANCIA Err:509 - - Err:509 - Err:509
42.05.03.01 CAMARA TIPO I: IP FIJA TIPO BULLET PARA INTERIORES 4MP VARIFOCAL, WDR, IR60, IP67 EQP 7.00 Err:509 - Err:509 Err:509 Err:509 Err:509
42.05.03.02 CAMARA TIPO II: IP FIJA TIPO DOMO PARA EXTERIORES, CMOS 1/3 ICR, 4.0 MP, WDR, IR30M, IK10&IP67, EQP 3.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.05.03.03 GRABADOR DE VIDEO RACKEABLE NVR 24 CH, 24 POE HASTA 12 MP TASA BITS 320MBPS, HDMI VGA, EQP 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.05.03.04 MONITOR PARA CCTV DE 42 PULGADAS USO 24/7 EQP 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.05.03.05 INSTALACION, CONFIGURACION Y PUESTA EN FUNCIONAMIENTO DEL SISTEMA DE VIDEO VIGILANCIA CGLB 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.05.04 SISTEMA DE SONIDO AMBIENTAL Err:509 - - Err:509 - Err:509
42.05.04.01 GABINETE DE SONIDO DE 15RU INC.ACC.(ORGZ. HORIZ.C/TAPA 2, KIT 02 VENTIL, KIT ATERR PW RACK 1EQP 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.05.04.02 AMPLIFICADOR 1000 WATS RACKEABLE EN GABINETE EQP 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.05.04.03 PARLANTES DE 15 WATT. EN TECHO INCLUYE ATENUADOR EN PARED EQP 29.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.05.04.04 MEZCLADOR DE 16 CANALES ANALOGICO INCLUYE UPS DE 2KW RACKEABLES EN GABINETE EQP 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.05.04.05 EQUIPO DE SONIDO CON REPRODUCTOR DE CD RACKEABLE EN GABINETE EQP 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.05.04.06 MICROFONO ALAMBRICO CON AMPLIFICADOR POTENCIA DE SALIDA 60 WATTS RMS EQP 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509
42.05.04.07 INSTALACION Y PUESTA EN FUNCIONAMIENTO DEL SISTEMA DE SONIDO AMBIENTAL GLB 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.05.05 SISTEMA DE DETECCION DE INCENDIO Err:509 - - Err:509 - Err:509
42.05.05.01 PANEL DE DETECCION DE INCENDIO DIRECCIONABLE INCLUYE BATERIAS EQP 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.05.05.02 DETECTOR DE HUMO FOTOELECTRICO DIRECCIONABLE CON BASE EQP 41.00 Err:509 - Err:509 Err:509 Err:509 Err:509
42.05.05.03 DETECTOR DE TEMPERATURA DIRECCIONABLE CON BASE EQP 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.05.05.04 ESTACION MANUAL DIRECCIONABLE DE DOBLE GOLPE EQP 7.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.05.05.05 SIRENA CON LUZ ESTROBOSCOPICA EQP 7.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.05.05.06 INSTALACION Y PUESTA EN FUNCIONAMIENTO DEL SISTEMA DE DETECCION DE INCENDIO GLB 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
42.05.06 SISTEMA DE INFORMACION HOSPITALARIO Err:509 - - Err:509
42.05.06.01 SERVIDOR RACKEABLE DEL SISTEMA DE INFORMACION HOSPITALARIO EQP 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509
42.05.06.02 INSTALACION, CONFIGURACION, PUESTA EN FUNCIONAMIENTO Y CAPACITACION DEL SISTEMA DE I GLB 1.00 Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
ITEM DESCRIPCION UND PRESUPUESTO ORIGINAL MAYORES METRADOS METRADO EJECUTADO PARTIDAS NUEVAS DEDUCTIVOS
METRADO P.U. COSTO METRADO P.U. COSTO METRADO P.U. COSTO METRADO P.U. COSTO METRADO P.U. COSTO
28 INSTALACIONES ELECTRICAS
28.01 SALIDA DE INSTALACIONES ELECTRICAS
28.01.01 SALIDA DE CENTROS DE LUZ DE TECHO pto 154.00 57.01 8,779.54 154.00 57.01 8,779.54
28.01.02 SALIDA DE TOMACORRIENTE DOBLE CON CONEXION A TIERRA EN PLACA METALICA pto 110.00 50.60 5,566.00 110.00 50.60 5,566.00
28.01.03 SALIDA DE TOMACORRIENTE DOBLE CON CONEXION A TIERRA A PRUEBA DE AGUA pto 14.00 72.76 1,018.64 12.00 72.76 873.12 2.00 72.76 1,018.64
28.01.04 SALIDA PARA INTERRUPTOR UNIPOLAR SIMPLE pto 37.00 41.75 1,544.75 37.00 41.75 1,544.75
28.01.05 SALIDA PARA INTERRUPTOR UNIPOLAR DOBLE pto 7.00 47.51 332.57 3.00 47.51 142.53 10.00 47.51 475.10
28.01.06 SALIDA INTERRUPTOR UNIPOLAR CONMUTADOR SIMPLE pto 2.00 68.53 137.06 6.00 68.53 411.18 8.00 68.53 548.24
28.01.07 SALIDA DE LUZ EMERGENCIA PORTATIL pto 9.00 52.69 474.21 24.00 52.69 1,264.56 33.00 52.69 1,738.77
28.01.08 SALIDA PARA THERMA CON PVC. pto 3.00 95.85 287.55 3.00 95.85 287.55 6.00 95.85 575.10
28.01.09 SALIDA PARA LUZ DE PATIOS pto 9.00 88.05 792.45 9.00 88.05 792.45
28.02 SALIDA PARA COMUNICACIONES Y SEÑALES
28.02.01 SALIDA PARA TELEFONO DE INTERCOMUNICADORES pto 20.00 26.90 538.00 20.00 26.90 538.00
28.02.02 SALIDA PARA INTERNET pto 20.00 51.64 1,032.80 20.00 51.64 1,032.80
28.02.03 SALIDA PARA TV CABLE pto 10.00 36.22 362.20 10.00 36.22 362.20
28.02.04 SALIDA DE PARLANTES pto 14.00 55.99 783.86 14.00 55.99 783.86
28.02.05 SALIDA DE SENSOR DE HUMO pto 18.00 60.17 1,083.06 18.00 60.17 1,083.06
28.03 CANALES Y TUBERIAS
28.03.01 TUBERIA EMPOTRADA PARA ALIMENTADORES PVC SAP DE 35 mm. m 270.38 28.74 7,770.72 8.62 28.74 247.74 279.00 28.74 8,018.46
28.03.02 TUBERIA EMPOTRADA PARA ALIMENTADORES PVC SAP DE 25 mm. m 63.00 40.91 2,577.33 200.00 40.91 8,182.00 93.00 40.91 3,804.63
28.03.03 TUBERIA EMPOTRADA PARA P/TIERRA PVC SAP DE 25 mm. m 48.35 13.41 648.37 48.35 13.41 648.37
28.03.04 TUBERIA EMPOTRADA PARA ALUMBRADO Y TOMACORRIENTES PVC SAP DE 20 mm. m 1,529.17 10.73 16,407.99 50.00 10.73 536.50 1,529.17 10.73 16,407.99
28.03.05 CURVA PVC SAP PARA INST. ELECTRICAS DE 35 mm. pza 46.00 7.31 336.26 2.00 7.31 14.62 48.00 7.31 350.88
28.03.06 CURVA PVC SAP PARA INST. ELECTRICAS DE 25 mm. pza 15.00 2.62 39.30 48.00 2.62 125.76 53.00 2.62 138.86
28.03.07 CURVA PVC SAP PARA INST. ELECTRICAS DE 20 mm. pza 730.00 2.39 1,744.70 40.00 2.39 95.60 763.00 2.39 1,823.57
28.03.08 UNION PVC SAP PARA INST. ELECTRICAS DE 35 mm. pza 13.00 4.56 59.28 6.00 4.56 27.36 19.00 4.56 86.64
28.03.09 UNION PVC SAP PARA INST. ELECTRICAS DE 25 mm. pza 15.00 5.56 83.40 44.00 5.56 244.64 49.00 5.56 272.44
28.03.10 UNION PVC SAP PARA INST. ELECTRICAS DE 20 mm. pza 270.00 4.26 1,150.20 310.00 4.26 1,320.60 565.00 4.26 2,406.90
28.03.11 EXCAVACION Y RELLENO DE ZANJA m 458.07 24.31 11,135.68 50.00 24.31 1,215.50 458.07 24.31 11,135.68
28.04 CONDUCTORES Y/O CABLES
28.04.01 CABLE N2XOH 2.5 mm2, ALUMBRADO m 2,891.70 3.04 8,790.77 2,891.70 3.04 8,790.77
28.04.02 CABLE N2XOH 4 mm2, TOMACORRIENTES m 1,212.75 139.71 169,433.30 1,212.75 139.71 169,433.30
28.04.03 CABLE N2XOH 1 X 6 mm2, ALIMENTADOR DE TABLERO DE BOMBAS m 67.20 139.71 9,388.51 67.20 139.71 9,388.51
28.04.04 CABLE N2XOH 1 X 10 mm2, ALIMENTADOR DE TABLERO m 231.00 139.71 32,273.01 231.00 139.71 32,273.01
28.04.05 CABLE N2XOH 1 X 16 mm2, ALIMENTADOR DE TABLERO m 134.40 10.94 1,470.34 134.40 10.94 1,470.34
28.04.06 CABLE N2XSY 1 X 35 mm2, ALIMENTADOR PRINCIPAL m 141.75 139.71 19,803.89 141.75 139.71 19,803.89
28.04.07 CABLE DE Cu DESNUDOCABLEADO 1 X 25 MM2. m 57.75 7.55 436.01 57.75 7.55 436.01
28.05 CONDUCTORES Y/O CABLES PARA COMUNICACIONES
28.05.01 CABLE TELEFONICO FLEXIBLE DE 4 HILOS m 315.00 2.82 888.30 315.00 2.82 888.30
28.05.02 CABLE UTP CATEGORIA 6 m 273.00 2.45 668.85 273.00 2.45 668.85
28.05.03 CONDUCTOR PRESTOFLEX (PARA PARLANTES) m 33.60 2.58 86.69 33.60 2.58 86.69
28.05.04 CABLE PARA TV COAXIAL RG6 m 115.50 2.53 292.22 115.50 2.53 292.22
28.05.05 CABLE PARA SENSOR DE HUMO m 57.75 2.90 167.48 57.75 2.90 167.48
28.06 TABLEROS DE DISTRIBUCION
28.06.01 TABLERO GENERAL TG ( TABLERO DE 18 POLOS) pza 1.00 1,430.96 1,430.96 1.00 1,430.96 1,430.96
28.06.02 TABLERO DE DISTRIBUCION TE - 1N (TABLERO 42 POLOS TIPO BARRA) u 1.00 1,760.00 1,760.00 1.00 1,760.00 1,760.00
28.06.03 TABLERO DE DISTRIBUCION TE - 2N (TABLERO 18 POLOS TIPO BARRA) u 1.00 1,008.71 1,008.71 1.00 1,008.71 1,008.71
28.06.04 TABLERO DE DISTRIBUCION TE - 201 (TABLERO 48 POLOS TIPO BARRA) u 1.00 2,457.39 2,457.39 1.00 2,457.39 2,457.39
28.06.05 TABLERO DE DISTRIBUCION TE - 202 (TABLERO 42 POLOS TIPO BARRA) u 1.00 2,370.43 2,370.43 1.00 2,370.43 2,370.43
28.06.06 TABLERO DE DISTRIBUCION TE - GB (TABLERO 18 POLOS TIPO BARRA) eqp 1.00 1,065.12 1,065.12 1.00 1,065.12 1,065.12
28.06.07 TABLERO DE DISTRIBUCION TE - TS (TABLERO 8 POLOS TIPO BARRA) und 1.00 351.63 351.63 1.00 351.63 351.63
ITEM DESCRIPCION UND PRESUPUESTO ORIGINAL MAYORES METRADOS METRADO EJECUTADO PARTIDAS NUEVAS DEDUCTIVOS
METRADO P.U. COSTO METRADO P.U. COSTO METRADO P.U. COSTO METRADO P.U. COSTO METRADO P.U. COSTO
28.07 CAJAS DE PASO
28.07.01 CAJA DE PASO DE 100 X 100 X 100 mm. pza 15.00 19.87 298.05 32.00 19.87 635.84 47.00 19.87 933.89
28.07.02 CAJA DE PASO DE 150 X 150 X 100 mm. pza 15.00 19.87 298.05 8.00 19.87 158.96 23.00 19.87 457.01
28.07.03 CAJA DE PASO DE 200 X 200 X 100 mm. pza 15.00 25.11 376.65 15.00 25.11 376.65
28.07.04 CAJA DE PASO DE 300 X 300 X 100 mm. pza 6.00 33.25 199.50 4.00 33.25 133.00 10.00 33.25 332.50
28.07.05 CAJA DE PASO DE 400 X 400 X 100 mm. pza 8.00 47.86 382.88 2.00 47.86 95.72
28.08 SISTEMA DE CONDUCTOS
28.08.01 BUZON ELECTRO DUCTO DE CONCRETO ARMADO CON TAPA0.60 X 0.60 X 1.20 m. u 6.00 306.92 1,841.52 3.00 306.92 920.76
28.09 ARTEFACTOS LUMINARIOS
28.09.01 LUMINARIA ADOSABLE FLUORECENTE 2 X 36 W REJILLA DE 60 X60 cm. u 83.00 148.68 12,340.44 83.00 148.68 12,340.44
28.09.02 LUMINARIA 2 X 18 W LED CAUDRADA ADOSABLE u 56.00 123.73 6,928.88 56.00 123.73 6,928.88
28.09.03 LUMINARIA EN PARED ADOSABLE BRAQUET LED DE 14 W u 5.00 58.90 294.50 5.00 58.90 294.50
28.09.04 ARTEFACTO DE ILUMINACION LED 18 W PARA ADOSAR DE 30 X 30 cm. u 30.00 76.78 2,303.40 30.00 76.78 2,303.40
28.09.05 ALUMINARIA LUZ DE EMERGENCIA LED 25 W u 32.00 61.88 1,980.16 32.00 61.88 1,980.16
28.10 EQUIPOS ELECTRICOS MECANICOS Y ESPECIALES
28.10.01 PUESTA A TIERRA u 9.00 1,480.64 13,325.76 9.00 1,480.64 13,325.76
28.10.02 PARARRAYOS R=100 m. u 1.00 10,840.57 10,840.57 1.00 10,840.57 10,840.57
28.10.03 PRUEBAS ELECTRICAS (AISLAMIENTO Y CONTINUIDAD) glb 1.00 742.00 742.00
28.10.04 TRANSFORMADOR u 1.00 38,204.00 38,204.00 1.00 38,204.00 38,204.00
28.10.05 PRUEBAS ELECTRICAS (RESISTENCIA PUESTA A TIERRA) u 9.00 338.08 3,042.72
28.10.06 GRUPO ELECTRGENO PARA EL CENTRO DE SALUD (CON 50 KW) u 1.00 87,204.00 87,204.00 1.00 87,204.00 87,204.00
28.10.07 TABLERO DE TRANSFERENCIA AUTOMATICA DE 50 KWA u 1.00 3,704.00 3,704.00 1.00 3,704.00 3,704.00
28.10.08 AMPLIFICADOR CONSOLA PARA COMUNICACION DE RADIO u 1.00 884.00 884.00
28.10.09 PARLANTES u 14.00 135.50 1,897.00
28.10.10 CENTRAL TELEFONICA PARA LOS ANEXOS INTERIOR u 1.00 831.36 831.36
28.10.11 LUZ EXTROGOSCOPICA u 4.00 175.50 702.00
28.10.12 EQUIPO SENSOR DE HUMO u 18.00 53.16 956.88
28.10.13 THERMA ELECTRICA u 3.00 192.75 578.25 3.00 192.75 578.25
28.10.14 SUMINISTRO E INSTALACION DE AUTOCLAVE INCORPORADO CON GENERADOR DE VAPOR DE AGUA glb 1.00 13,181.36 13,181.36
28.10.15 GABINETE PARA EXTINGUIDOR CONTRA INCENDIOS u 4.00 679.00 2,716.00
28.11 SUB ESTACION (EXPEDIENTE Y EJECUCION)
28.11.01 SUB ESTACION (EXPEDIENTE Y EJECUCION) SRV 1.00 195,000.00 195,000.00 1.00 195,000.00 195,000.00
42 INSTALACION DE COMUNICACIONES
42.01 SALIDA PARA COMUNICACIONES Y SEÑALES
42.01.01 SALIDA DOBLE PARA RED DE DATOS pto 24.00 117.45 2,818.80 20.00 117.45 2,349.00
42.01.02 SALIDA SIMPLE DE DATOS PARA ACCESS POINT pto 4.00 85.45 341.80
42.01.03 SALIDA SIMPLE DE DATOS PARA CAMARAS IP pto 10.00 85.45 854.50 8.00 85.45 683.60
42.01.04 + pto 29.00 59.98 1,739.42 14.00 59.98 839.72
42.01.05 SALIDA PARA DETECTOR DE HUMO DIRECCIONABLE pto 41.00 14.11 578.51 20.00 14.11 282.20
42.01.06 SALIDA PARA DETECTOR DE TEMPERATURA DIRECCIONABLES pto 1.00 17.11 17.11 1.00 17.11 17.11
42.01.07 SALIDA DE ESTACION MANUAL DIRECCIONABLE pto 7.00 17.11 119.77 4.00 17.11 68.44
42.01.08 SALIDA DE ESTROBO/SIRENA pto 7.00 17.11 119.77 4.00 17.11 68.44
ITEM DESCRIPCION UND PRESUPUESTO ORIGINAL MAYORES METRADOS METRADO EJECUTADO PARTIDAS NUEVAS DEDUCTIVOS
METRADO P.U. COSTO METRADO P.U. COSTO METRADO P.U. COSTO METRADO P.U. COSTO METRADO P.U. COSTO
42.02 TUBERIA Y/O CANALES
42.02.01 TUBERÍA PVC SAP P/INST. ELECT. DE 25 MM m 1,147.00 9.33 10,701.51 870.00 9.33 8,117.10
42.02.02 CURVA PVC SAP P/INST. ELECT. DE 25MM und 50.00 4.26 213.00 30.00 4.26 127.80
42.02.03 TUBERÍA PVC SAP P/INST. ELECT. DE 50 MM m 103.00 16.75 1,725.25 103.00 16.75 1,725.25
42.02.04 CURVA PVC SAP P/INST. ELECT. DE 50 MM und 10.00 8.99 89.90 10.00 8.99 89.90
42.03 CONDUCTORES Y/O CABLES COMUNICACIONES
42.03.01 CABLE F/UTP CATEGORIA 6A LSZH m 1,508.00 5.19 7,826.52 1,400.00 5.19 7,826.52
42.03.02 CABLE FPL 2X18 AWG DETECCION DE INCENDIO m 444.30 4.12 1,830.52 390.00 4.12 1,830.52
42.03.03 CABLE DE MELLIZO SILICONADO 2X16 AWG POLARIZADO PARA PARLANTES m 264.00 3.39 894.96
42.05 EQUIPOS ELECTRICOS MECANICOS
42.05.01 CABLEADO ESTRUCTURADO CATEGORIA 6A Y CONECTIVIDAD NETWORKING
42.05.01.01 SWITCH GIGABIT DE 24 PUERTOS ADMINISTRABLE + 02 PUERTOS SFP DE 10GBE EQP 2.00 5,097.76 10,195.52 2.00 5,097.76 10,195.52
42.05.01.02 SWITCH GIGABIT DE 24 PUERTOS POE ADMINISTRABLE + 02 PUERTOS SFP DE 10GBE EQP 1.00 9,997.76 9,997.76
42.05.01.03 CONTROLADOR UNIFICADOR DE ACCESS POINT EQP 1.00 627.76 627.76
42.05.01.04 PUNTO DE ACCESO ADMINISTRABLE POR CONTROLADOR EQP 4.00 589.44 2,357.76
42.05.01.05 GABINETE DE COMUNICACIÓN DE PISO 42RU INC.ACC.(ORGZ. HORIZ.C/TAPA 2RU, KIT 02 VENTIL, KIT ATER EQP 1.00 3,791.04 3,791.04 1.00 3,791.04 3,791.04
42.05.01.06 PATCHPANEL CAT6A DE 24 PUERTOS RJ45, INCLUYE 24 JACK RJ45 CAT6A und 3.00 1,015.92 3,047.76 3.00 1,015.92 3,047.76
42.05.01.07 PATCHCORD CAT6A DE 07 PIES EN AREA DE TRABAJO und 125.00 41.80 5,225.00 39.00 41.80 5,225.00
42.05.01.08 PATCHCORD CAT6A DE 03 PIES EN GABINETE und 125.00 37.30 4,662.50 39.00 37.30 4,662.50
42.05.01.09 CERTIFICACION DE LOS PUNTOS DE DATA CAT6A CON INSTRUMENTO CERTIFICADOR GLB 1.00 1,345.52 1,345.52 1.00 1,345.52 1,345.52
42.05.01.10 ETIQUETAS ADHESIVAS DE IDENTIFICACIÓN Y ORDENAMIENTO PARA EL AREA DE TRABAJO Y GABINETE GLB 1.00 645.52 645.52 1.00 645.52 645.52
42.05.01.11 SISTEMA DE ATERRAMIENTO DE GABINETE und 1.00 2,214.40 2,214.40 1.00 2,214.40 2,214.40
42.05.01.12 UPS FUERZA 03 KVA RACQUEABLE EN GABINETE EQP 1.00 5,559.20 5,559.20 1.00 5,559.20 5,559.20
42.05.01.13 INSTALACIÓN Y PUESTA EN FUNCIONAMIENTO DEL SISTEMA DE CABLEADO ESTRUCTURADO Y NETWORK EQP 1.00 11,455.20 11,455.20
42.05.02 SISTEMA DE TELEFONIA
42.05.02.01 CENTRAL TELEFÓNICA IP EQP 1.00 3,559.20 3,559.20 1.00 3,559.20 3,559.20
42.05.02.02 TELEFONO BASICO IP EQP 10.00 251.48 2,514.80
42.05.02.03 TELEFONO EJECUTIVO IP EQP 1.00 506.48 506.48
42.05.02.04 TELEFONO OPERADORA IP CON AURICULAR EQP 1.00 1,519.78 1,519.78
42.05.02.05 INSTALACION, CONFIGURACION Y PUESTA EN FUNCIONAMIENTO DEL SISTEMA DE TELEFONIA GLB 1.00 2,459.20 2,459.20
42.05.03 SISTEMA DE VIDEO VIGILANCIA
42.05.03.01 CAMARA TIPO I: IP FIJA TIPO BULLET PARA INTERIORES 4MP VARIFOCAL, WDR, IR60, IP67 EQP 7.00 1,436.51 10,055.57
42.05.03.02 CAMARA TIPO II: IP FIJA TIPO DOMO PARA EXTERIORES, CMOS 1/3 ICR, 4.0 MP, WDR, IR30M, IK10&IP67, PO EQP 3.00 1,478.88 4,436.64 2.00 1,478.88 2,957.76
42.05.03.03 GRABADOR DE VIDEO RACKEABLE NVR 24 CH, 24 POE HASTA 12 MP TASA BITS 320MBPS, HDMI VGA, 01H EQP 1.00 4,645.52 4,645.52
42.05.03.04 MONITOR PARA CCTV DE 42 PULGADAS USO 24/7 EQP 1.00 2,532.76 2,532.76
42.05.03.05 INSTALACION, CONFIGURACION Y PUESTA EN FUNCIONAMIENTO DEL SISTEMA DE VIDEO VIGILANCIA CCTVGLB 1.00 2,791.04 2,791.04
42.05.04 SISTEMA DE SONIDO AMBIENTAL
42.05.04.01 GABINETE DE SONIDO DE 15RU INC.ACC.(ORGZ. HORIZ.C/TAPA 2, KIT 02 VENTIL, KIT ATERR PW RACK 19" EQP 1.00 2,159.20 2,159.20
42.05.04.02 AMPLIFICADOR 1000 WATS RACKEABLE EN GABINETE EQP 1.00 1,654.93 1,654.93
42.05.04.03 PARLANTES DE 15 WATT. EN TECHO INCLUYE ATENUADOR EN PARED EQP 29.00 142.47 4,131.63
42.05.04.04 MEZCLADOR DE 16 CANALES ANALOGICO INCLUYE UPS DE 2KW RACKEABLES EN GABINETE EQP 1.00 5,564.80 5,564.80
42.05.04.05 EQUIPO DE SONIDO CON REPRODUCTOR DE CD RACKEABLE EN GABINETE EQP 1.00 1,820.60 1,820.60
42.05.04.06 MICROFONO ALAMBRICO CON AMPLIFICADOR POTENCIA DE SALIDA 60 WATTS RMS EQP 1.00 4,191.80 4,191.80
42.05.04.07 INSTALACION Y PUESTA EN FUNCIONAMIENTO DEL SISTEMA DE SONIDO AMBIENTAL GLB 1.00 3,598.67 3,598.67
42.05.05 SISTEMA DE DETECCION DE INCENDIO
42.05.05.01 PANEL DE DETECCION DE INCENDIO DIRECCIONABLE INCLUYE BATERIAS EQP 1.00 3,028.56 3,028.56 1.00 3,028.56 3,028.56
42.05.05.02 DETECTOR DE HUMO FOTOELECTRICO DIRECCIONABLE CON BASE EQP 41.00 203.33 8,336.53 20.00 203.33 4,066.60
42.05.05.03 DETECTOR DE TEMPERATURA DIRECCIONABLE CON BASE EQP 1.00 184.33 184.33
42.05.05.04 ESTACION MANUAL DIRECCIONABLE DE DOBLE GOLPE EQP 7.00 327.32 2,291.24
42.05.05.05 SIRENA CON LUZ ESTROBOSCOPICA EQP 7.00 192.32 1,346.24
42.05.05.06 INSTALACION Y PUESTA EN FUNCIONAMIENTO DEL SISTEMA DE DETECCION DE INCENDIO GLB 1.00 4,208.53 4,208.53
42.05.06 SISTEMA DE INFORMACION HOSPITALARIO
42.05.06.01 SERVIDOR RACKEABLE DEL SISTEMA DE INFORMACION HOSPITALARIO EQP 1.00 7,607.76 7,607.76
42.05.06.02 INSTALACION, CONFIGURACION, PUESTA EN FUNCIONAMIENTO Y CAPACITACION DEL SISTEMA DE INFO GLB 1.00 2,298.67 2,298.67
ITEM DESCRIPCION UND PRESUPUESTO ORIGINAL MAYORES METRADOS METRADO EJECUTADO PARTIDAS NUEVAS DEDUCTIVOS
METRADO P.U. COSTO METRADO P.U. COSTO METRADO P.U. COSTO METRADO P.U. COSTO METRADO P.U. COSTO
PARTIDAS NUEVAS
1.01 SALIDA DE INSTALACIONES ELECTRICAS
01.01.01 SALIDA DE CENTROS DE LUZ DE TECHO pto 188.00 26.37 4,957.56 190.00 26.37 5,010.30
01.01.02 SALIDA TOMACORRIENTE pto 139.00 26.37 3,665.43 139.00 26.37 3,665.43
01.01.03 SALIDA DE FUERZA pto 1.00 33.07 33.07 3.00 33.07 99.21
01.01.04 SALIDA DE LUMINARIA EXTERIOR pto 423.07 0.00 5.00 423.07 2,115.35
1.02 CONDUCTORES Y/O CABLES
01.02.01 CABLE LSOH 4 mm2, ALUMBRADO m 3,150.00 3.48 10,962.00 3,358.80 3.48 11,688.62
01.02.02 CABLE LSOH 4 mm2, TOMACORRIENTES m 2,050.00 3.48 7,134.00 2,284.20 3.48 7,949.02
01.02.03 CABLE LSOH 1 X 6 mm2, FUERZA m 800.00 5.57 4,456.00 900.00 5.57 5,013.00
01.02.04 CABLE CU N2XOH 3-1X6 MM2 TB cableado m 80.00 21.87 1,749.60 80.00 21.87 1,749.60
01.02.05 CABLE CU N2XOH 3-1X10 MM2 TB cableado m 50.00 32.37 1,618.50 50.00 32.37 1,618.50
01.02.06 CABLE CU N2XOH 3-1X16 MM2 TB cableado m 50.00 44.37 2,218.50 50.00 44.37 2,218.50
01.02.07 CABLE CU N2XOH 3-1X35 MM2 TB cableado m 50.00 84.37 4,218.50 50.00 84.37 4,218.50
01.02.08 CABLE CU N2XOH 1 -1X6 MM2 TB cableado m 70.00 10.87 760.90 70.00 10.87 760.90
01.02.09 CABLE CU N2XOH 1 -1X10 MM2 TB cableado m 40.00 14.37 574.80 40.00 14.37 574.80
01.02.10 CABLE CU N2XOH 1 -1X16 MM2 TB cableado m 50.00 19.97 998.50 50.00 19.97 998.50
01.02.11 CABLE CU N2XOH 1 -1X35 MM2 TB cableado m 50.00 31.47 1,573.50 50.00 31.47 1,573.50
0.03 CONDUCTORES Y/O CABLES PARA COMUNICACIONES
01.03.01 CABLE UTP CATEGORIA 6A P/TELEFONIA IP m 550.00 4.45 2,447.50 550.00 4.45 2,447.50
01.03.02 CABLE UTP CATEGORIA 6A P/DATA m 850.00 4.45 3,782.50 850.00 4.45 3,782.50
01.03.03 CABLE PARA TV COAXIAL RG6 m 205.00 3.05 625.25 205.00 3.05 625.25
1.04 TABLEROS DE DISTRIBUCION
01.04.01 TABLERO GENERAL TG AUTOSOPORTADO DE 40 POLOS TRIFASICO 220 V, 1.00 10,472.56 10,472.56
01.04.02 TABLERO TRIFASICO TES-01 DE 12 POLOS SISTEMA BARRAS 1.00 1,798.28 1,798.28
01.04.03 TABLERO TRIFASICO TES-02 DE 12 POLOS SISTEMA BARRAS 1.00 1,298.28 1,298.28
01.04.04 TABLERO TRIFASICO TE-06 DE 16 POLOS SISTEMA BARRAS 1.00 1,388.28 1,388.28
01.04.05 TABLERO MONOFASICO TE-07 DE 6 POLOS TIPO RIEL 1.00 703.28 703.28
01.04.06 TABLERO DE DISTRIBUCION TRIFÁSICO (TE1-CB) DE 10 POLOS und 1.00 1,203.28 1,203.28
01.04.07 TABLERO DE DISTRIBUCION TRIFÁSICO (TE2-TC) DE 10 POLOS und 1.00 1,203.28 1,203.28 1.00 1,203.28 1,203.28
01.04.08 TABLERO DE DISTRIBUCION TRIFÁSICO (TE3-1N) DE 18 POLOS 1.00 1,093.28 1,093.28 1.00 1,093.28 1,093.28
01.04.09 TABLERO DE DISTRIBUCION TRIFÁSICO (TE4-2N) DE 38 POLOS 1.00 2,128.28 2,128.28 1.00 2,128.28 2,128.28
01.04.10 TABLERO DE DISTRIBUCION TRIFÁSICO (TE5-2N) DE 28 POLOS 1.00 1,878.28 1,878.28 1.00 1,878.28 1,878.28
1.05 CAJAS DE PASO
01.05.01 CAJA DE PASO DE 100 X 55 X 55 mm. 30.00 8.31 249.30 30.00 8.31 249.30
01.05.02 EXCAVACION PARA PUESTA TIERRA 22.50 40.09 902.03 22.50 40.09 902.03
1.06 ARTEFACTOS LUMINARIOS
01.06.01 LUMINARIA PANEL LED 1. 2X0.3 MTRS 40W PARA ADOSAR 51.00 207.85 10,600.35
01.06.02 LUMINARIA PANEL LED 0.6X0.6 MTRS 40W PARA ADOSAR 21.00 246.85 5,183.85
01.06.03 LUMINARIA PANEL LED PARA ADOSAR 0.60X0.30M 24W 14.00 151.85 2,125.90
01.06.04 LUMINARIA PANEL LED CIRCULAR 18W PARA ADOSAR 30.00 86.85 2,605.50
01.06.05 LUMINARIA DE PARED EXTERIOR E INTERIOR 24W PARA ADOSAR 27.00 363.85 9,823.95
01.06.06 LUMINARIA TIPO HERMETICA 36W PARA ADOSAR 36.00 140.85 5,070.60
01.06.07 LUMINARIA CIRCULAR PARA ADOSAR LED CON DIFUSOR DE ACRÍLICO BLANCO DE 24W 2.00 245.85 491.70
01.06.08 LUMINARIA REFLECTOR LED CON SOPORTE PARA ADOSAR EN PARED DE 30W 4.00 146.85 587.40
01.06.09 EQUIPO CON LAMPARA 1x30 W ULTRAVIOLETA ANTIGERMEN (PARA ADOSAR) 3.00 272.85 818.55
01.06.10 LUMINARIA EXTERIOR TIPO ISLA LED DE 60W 5.00 926.85 4,634.25
1.07 INSTALACION DE TOMACORRIENTES
01.07.01 TOMACORRIENTE DOBLE TIPO SCHUKO MIXTO CON AMERICANO C/CONEXIÓN A TIERRA pto 9.00 121.85 1,096.65
01.07.02 TOMACORRIENTE DOBLE TIPO SCHUKO MIXTO CON AMERICANO C/CONEXIÓN A TIERRA ESTABILIZADO pto 4.00 124.85 499.40
01.07.03 TOMACORRIENTE DOBLE TIPO AMERICANO C/CONEXIÓN A TIERRA pto 110.00 79.85 8,783.50
01.07.04 TOMACORRIENTE DOBLE TIPO AMERICANO C/CONEXIÓN A TIERRA ESTABILIZADO pto 16.00 78.85 1,261.60
01.07.05 TOMA DE FUERZA pto 3.00 206.85 620.55
1.08 EQUIPOS ELECTRICOS MECANICOS Y ESPECIALES
01.08.01 GRUPO ELECTRGENO PARA EL CENTRO DE SALUD (CON 50 KW) u 1.00 65,000.00 65,000.00
01.08.02 TABLERO DE TRANSFERENCIA AUTOMATICA DE 50 KWA u 1.00 20,000.00 20,000.00
01.08.03 TANQUE DE RESERVA PARA COMBUSTIBLE DE 80 GLS u 1.00 30,000.00 30,000.00
01.08.04 MONTAJE DE GRUPO ELECTROGENO TABLERO DE TRANEFERENCIA Y TANQUE DE COMBUSTIBLE DE 100 GLu 1.00 35,000.00 35,000.00
01.08.05 THERMA ELECTRICA de 60 LITROS u 5.00 1,212.75 6,063.75
2.00 SALIDA PARA COMUNICACIONES Y SEÑALES
2.01 SALIDA PARA COMUNICACIONES Y SEÑALES
02.01.01 TUBERÍA PVC SAP P/INST. COMUNICACIONES. DE 20 MM m 388.00 10.27 3,984.76 388.00 10.27 3,984.76
02.01.02 CURVA PVC SAP P/INST. COMUNICACIONES. DE 20 MM m 150.00 12.92 1,938.00 150.00 12.92 1,938.00
02.01.03 UNION PVC SAP P/INST. COMUNICACIONES. DE 20 MM m 76.00 6.32 480.32 76.00 6.32 480.32
2.02 INSTALACION DE COMUNICACIONES
01.02.01 SALIDA PARA TV CABLE PTO 9.00 67.35 606.15
ITEM DESCRIPCION UND PRESUPUESTO ORIGINAL MAYORES METRADOS METRADO EJECUTADO PARTIDAS NUEVAS DEDUCTIVOS
METRADO P.U. COSTO METRADO P.U. COSTO METRADO P.U. COSTO METRADO P.U. COSTO METRADO P.U. COSTO
28.11.01 MONTAJE RP-02
01 TRABAJOS PRELIMINARES
01.01 Replanteo topográfico, ingeniería de detalle y ubicación de estructuras de RP rp 1.00 534.41 534.41 1.00 534.41 534.41
01.02 Cartel de obra und 1.00 587.56 587.56 1.00 587.56 587.56
02 ROTURA DE PISTAS Y VEREDAS
02.02.01 Rotura de veredas m2 1.00 146.86 146.86 2.00 146.86 293.72
03 EXCAVACIÓN DE HOYOS Y ZANJAS 0.00
03.01 Excavación de hoyos para buzones de concreto, en terreno normal. m3 1.00 58.19 58.19
03.02 Excavación de zanjas para tendido de cables subterráneos, en terreno normal. m3 5.00 58.19 290.95
03.03 Excavación de hoyos para postes de concreto, en terreno normal. m3 9.79 58.19 569.68 9.79 58.19 569.68
03.04 Excavación de hoyos para retenidas verticales, en terreno normal. m3 12.00 58.19 698.28 12.00 58.19 698.28
03.05 Excavación de hoyos para puestas a tierra, en terreno normal. m3 11.20 58.19 651.73
04 TENDIDO DE CABLE SUBTERRANEO
04.01 Colocación de buzones und 1.00 112.35 112.35
04.02 Colocación de ductos de PVC und 3.00 9.72 29.16
04.03 Colocación de lecho de arena fina m3 1.20 22.57 27.08
04.04 Tendido de conductor unipolar subterráneo m 100.00 11.43 1,143.00
04.05 Colocación de ladrillos de protección mecánica de cable subterráneo MT und 10.00 0.17 1.70
04.06 Colocación de cinta plástica señalizadora de cable subterráneo MT m 1.00 0.34 0.34
04.07 Relleno y compactación de zanja, con tierra cernida m3 3.80 99.85 379.43
05 IZAJE Y CIMENTACION DE POSTES
05.01 Transporte de postes de concreto, de almacen a punto de izaje und 7.00 135.67 949.69 8.00 135.67 1,085.36
05.02 Izaje de poste de concreto, con pluma de izado und 7.00 48.35 338.45 8.00 48.35 386.80
05.03 Cimentación con concreto ciclopeo de poste de concreto. und 7.00 118.81 831.67 8.00 118.81 950.48
05.04 Resane de pistas y veredas m2 1.00 60.01 60.01 2.00 60.01 120.02
06 MONTAJE DE ARMADOS
06.01 Montaje de armado trifasico de alineamiento ATV-1 jgo 1.00 38.06 38.06 1.00 38.06 38.06
06.02 Montaje de armado trifasico en fin de linea para conductor autoportante (ATPB5-A, ATPB1) jgo 2.00 38.06 76.12 2.00 38.06 76.12
06.03 Montaje de armado trifasico en angulo para conductor autoportante (ATPB6) jgo 3.00 104.85 314.55 3.00 104.85 314.55
06.04 Montaje de armado trifásico de medicion en monoposte (ATTM) jgo 1.00 139.80 139.80 1.00 139.80 139.80
06.05 Montaje de armado trifásico de seccionamiento en línea (SEC+P-3) jgo 1.00 95.11 95.11 1.00 95.11 95.11
06.06 Montaje de armado trifásico de conexión línea aérea - subterránea (EAS-P) jgo 1.00 126.79 126.79 1.00 126.79 126.79
07 MONTAJE DE RETENIDAS 0.00
07.01 Montaje de retenida vertical aislada und 4.00 37.27 149.08 4.00 37.27 149.08
07.02 Relleno y compactación de retenida vertical aislada m3 12.00 77.83 933.96 12.00 77.83 933.96
08 MONTAJE DE CABLE AUTOPORTANTE
08.01 Tendido y puesta en flecha de Cable autoportante de aluminio de 3x50 mm2. m 266.64 11.49 3,063.69
08.02 Instalación de cabeza terminal para cable autoportante de Al 50 mm2. und 15.00 149.48 2,242.20
09 MONTAJE DE PUESTA A TIERRA
09.01 Montaje de sistema de puesta a tierra tipo PAT1 und 7.00 38.51 269.57
09.02 Relleno y compactación de puesta a tierra tipo PAT1 und 7.00 64.02 448.14
10 MONTAJE DE EQUIPOS DE PROTECCIÓN Y MANIOBRA
10.01 MONTAJE DE CELDA DE REMONTE (LLEGADA) eq 1.00 331.62 331.62
10.02 MONTAJE DE CELDA DE PROTECCION CON PORTAFUSIBLE DE 24KV, 630A, 16KA. eq 1.00 331.62 331.62
10.03 MONTAJE DE CELDA DE TRANSFORMACION DE 100KVA 22.9KV/230V. eq 1.00 331.62 331.62
10.04 Montaje de Terminacion contráctil interior "N2XSY" de 50mm2 eq 15.00 149.48 2,242.20
10.05 Montaje de Seccionador unipolar tipo expulsion (Cut-Out) de 27 kV, 100A, 150 kV-BIL. eq 3.00 165.79 497.37
10.06 Montaje de Pararrayos de línea, 21 kV, 10 kA, 150 kV-BIL. eq 3.00 165.79 497.37
11 TRABAJOS COMPLEMENTARIOS DURANTE LA EJECUCION DE OBRA
11.01 Monitoreo, tramite e Inspección de Restos Arqueológicos. rp 1.00 9,250.00 9,250.00 1.00 9,250.00 9,250.00
11.02 Monitoreo y tramite de Impacto Ambiental rp 1.00 4,000.00 4,000.00 1.00 4,000.00 4,000.00
11.03 Corte y reposición de energía eléctrica und 1.00 48.68 48.68
11.04 Equipos de prteccion personal und 9.00 185.00 1,665.00 9.00 185.00 1,665.00
11.05 Seguros complementario de trabajo y riesgo m 9.00 95.00 855.00 9.00 95.00 855.00
11.06 PLAN PARA LA PREVENCION ANTE EL COVID-19 glo 1.00 2,535.00 2,535.00 1.00 2,535.00 2,535.00
11.07 Señalizacion de estructuras MT, según formato SID-ELSE (incluye trámite, fotos y certificación GIS) und 8.00 19.51 156.08
11.08 Señalizacion de puesta a tierra, según formato SID-ELSE (incluye trámite, fotos y certificación GIS) und 8.00 12.65 101.20
ITEM DESCRIPCION UND PRESUPUESTO ORIGINAL MAYORES METRADOS METRADO EJECUTADO PARTIDAS NUEVAS DEDUCTIVOS
METRADO P.U. COSTO METRADO P.U. COSTO METRADO P.U. COSTO METRADO P.U. COSTO METRADO P.U. COSTO
12 TRABAJOS FINALES
12.01 Pruebas y puesta en servicio de redes primarias rp 1.00 581.75 581.75
12.02 Expediente técnico final conforme a obra de redes primarias und 1.00 1,718.84 1,718.84
12.03 TRAMITE DE INSTALACION DE ACOMETIDA PARA CLIENTE MAYOR EN ELSE INCLUYE PORTA MEDIDOR und 1.00 2,500.00 2,500.00
28.11 SUB ESTACION (EXPEDIENTE Y EJECUCION)
28.11.01 SUMINISTRO RP-02
01 BUZONES Y DUCTOS
01.01 Buzon de concreto armado 1000x1000x1200mm und 1.00 450.00 450.00
01.02 Ducto PVC SAP de 100 mm ø, E=5mm, L=5000 mm. und 3.00 65.00 195.00 3.00 65.00 195.00
01.03 Curva PVC SAP de 100 mm ø, E=5mm. und 3.00 58.00 174.00 3.00 58.00 174.00
01.04 Espuma de alto poder expansivo y multiposición. und 3.00 35.00 105.00 3.00 35.00 105.00
02 CONDUCTOR SUBTERRENO Y ACCESORIOS 0.00
02.01 Cable subterraneo de Cu "N2XSY" (aislamiento XLPE) de 1x50mm2, 18/30 kv. m 100.00 80.00 8,000.00
02.02 Terminacion contráctil exterior para conductor subterráneo "N2XSY" de 50mm2 und 3.00 1,125.00 3,375.00
02.03 Terminales estañados para conexión de cable de cobre de 50mm2. und 3.00 2.25 6.75
03 MATERIALES PARA TENDIDO CABLE SUBTERRANEO 0.00
03.01 Arena fina o de mina m3 1.20 46.80 56.16
03.02 Ladrillo de proteccion mecanica 14 x 24 x 10 cm. und 10.00 1.35 13.50
03.03 Cinta de señalizacion de advertencia de presencia de cables electricos MT m 1.00 0.77 0.77
04 POSTES DE CONCRETO 0.00
04.01 Poste de concreto armado centrifugado 13/400/180/375 und 7.00 1,215.00 8,505.00 8.00 1,215.00 9,720.00
4.02 Poste de concreto armado centrifugado 15/400/180/375 und 1.00 1,215.00 1,215.00 1.00 1,215.00 1,215.00
05 CABLES Y CONDUCTORES DE ALUMINIO 0.00
05.01 Cable autoportante de aluminio NA2XSA2Y-S de 3x50 mm2, 18/30 kV m 266.64 56.25 14,998.50
06 ACCESORIOS PARA CONDUCTORES DE ALUMINIO 0.00
06.01 Grapa de anclaje tipo pistola de tres pernos para conductores de sección 50 mm² und 8.00 24.30 194.40 8.00 24.30 194.40
06.02 Cinta plana de armar de aluminio recocido. m 2.00 1.08 2.16 2.00 1.08 2.16
06.03 Cabeza terminal para cable autoportante de Al 50 mm2, 8.7/15 kV und 15.00 315.00 4,725.00
06.04 Alambre de amarre de aluminio de 10 mm2 und 9.00 1.35 12.15
07 AISLADORES Y ACCESORIOS 0.00
07.01 Conectores al-al de dos pernos und 6.00 5.00 30.00
07.02 Terminaciones de cobre estañado para cable de 50 mm con ojal de media caña larga und 26.00 4.50 117.00
08 ARMADOS DE FIERRO GALVANIZADO 0.00
ARMADO TRIFASICO INICIO Y FIN DE LINEA PARA CONDUCTOR AUTOPORTANTE (ATPB5-A): 0.00
08.01 Abrazadera de tres pernos und 3.00 45.00 135.00 3.00 45.00 135.00
08.02 Grillete de anclaje tipo recto D=16mm c/pasador de seguridad und 3.00 6.08 18.24 3.00 6.08 18.24
08.03 Alargadera de fierro galvanizado de 64 x 300 mm, E= 6,4 mm und 3.00 10.13 30.39 3.00 10.13 30.39
ARMADO TRIFASICO EN FIN DE LINEA PARA CONDUCTOR AUTOPORTANTE (ATPB6): 0.00
08.04 CRUCETA DE PERFIL ANGULAR DE FIERRO GALVANIZADO DE 75x75x1500 mm, E=6,4 mm, 1 DADO 100 mm und 3.00 110.00 330.00
08.05 GRILLETE DE ANCLAJE TIPO RECTO D=16mm C/PASADOR DE SEGURIDAD und 2.00 6.08 12.16
08.06 PERNO DOBLE ARMADO 16 mm, L= 508 mm, CR=77kN C/2T/2C/4A/2AP und 6.00 18.23 109.38
Alargadera de fierro galvanizado de 64 x 300 mm, E= 6,4 mm und 3.00 10.13 30.39
08.07 TUERCA OJO, D= 16 mm und 2.00 11.50 23.00
08.08 RIOSTRA DE PERFIL ANGULAR DE 75 x 75 x 1500 mm, e= 6,4 mm und 3.00 85.00 255.00
08.09 Alargadera de fierro galvanizado de 64 x 300 mm, E= 6,4 mm und 2.00 10.13 20.26
ARMADO TRIFÁSICO DE SECCIONAMIENTO EN LÍNEA (SEC+P-3): 0.00
08.10 Abrazadera tipo CAS simple de 64 mm, E=6,4 mm, D=200 mm C/3P/3T/3C/6A/3AP und 1.00 22.50 22.50 1.00 22.50 22.50
08.11 Abrazadera tipo partido para cruceta de 64 mm, E=6,4 mm, D=190 mm C/2P/2T/2C/4A/2AP und 1.00 21.60 21.60 1.00 21.60 21.60
08.12 Cruceta de perfil angular de fierro galvanizado de 64x64x1800 mm., E=6.4mm, 3 dados 100 mm und 1.00 97.20 97.20 1.00 97.20 97.20
08.13 Perno maquinado L= 50 mm, D= 13 mm C/T/C/2A/AP und 1.00 2.03 2.03 1.00 2.03 2.03
08.14 Riostra de perfil angular de F°G° 38x38x710 mm. E= 5 mm. und 1.00 52.65 52.65 1.00 52.65 52.65
08.15 BASE SOPORTE PARA TRANSFORMADOR DE MEDIDA MONOPOSTE und 185.00 0.00 1.00 185.00 185.00
ARMADO TRIFASICO EN ANGULO ATBV-1 0.00 0.00
08.16 Cruceta de perfil angular de fierro galvanizado de 64x64x2500 mm, E=6.4 mm, 1 dado 100 mm izquierda und 3.00 147.60 442.80 3.00 147.60 442.80
08.17 Riostra de perfil angular de 64x64x2075 mm, E= 6,4 mm. und 1.00 143.50 143.50 1.00 143.50 143.50
08.18 Riostra de perfil angular de 64x64x1610 mm, E= 6,4 mm. und 1.00 137.76 137.76 1.00 137.76 137.76
08.19 Riostra de perfil angular de 64x64x2245 mm, E= 6,4 mm. und 1.00 143.50 143.50 1.00 143.50 143.50
08.20 Perno maquinado 16 mm, L= 508 mm, CR=77KN C/2T/2C/4A/2AP und 5.00 14.95 74.75 5.00 14.95 74.75
08.21 ABRAZADERA C/T/C/2A/AP CAS SIMPLE 3X1/4X230MM2. und 1.00 31.98 31.98 1.00 31.98 31.98
08.22 ABRAZADERA C/T/C/2A/AP P/CRUCETA 3X1/4X180MM2. und 1.00 23.90 23.90 1.00 23.90 23.90
08.23 ABRAZADERA C/T/C/2A/AP P/CRUCETA 3X1/4X210MM2. und 1.00 26.61 26.61 1.00 26.61 26.61
08.24 ABRAZADERA C/T/C/2A/AP P/CRUCETA 3X1/4X195MM2. und 1.00 25.71 25.71 1.00 25.71 25.71
08.25 Perno maquinado L= 50 mm, D= 13 mm C/T/C/2A/AP und 3.00 2.62 7.86 3.00 2.62 7.86
ITEM DESCRIPCION UND PRESUPUESTO ORIGINAL MAYORES METRADOS METRADO EJECUTADO PARTIDAS NUEVAS DEDUCTIVOS
METRADO P.U. COSTO METRADO P.U. COSTO METRADO P.U. COSTO METRADO P.U. COSTO METRADO P.U. COSTO
ARMADO TRIFÁSICO DE CONEXIÓN LÍNEA AÉREA - SUBTERRÁNEA (P-EAS) 0.00 0.00
08.26 Abrazadera tipo CAS simple de 64 mm, E=6,4 mm, D=200 mm C/3P/3T/3C/6A/3AP und 1.00 22.50 22.50 1.00 22.50 22.50
08.27 Abrazadera tipo partido para cruceta de 64 mm, E=6,4 mm, D=190 mm C/2P/2T/2C/4A/2AP und 1.00 21.60 21.60 1.00 21.60 21.60
08.28 Cruceta de perfil angular de fierro galvanizado de 64x64x1800 mm., E=6.4mm, 3 dados 100 mm und 1.00 97.20 97.20 1.00 97.20 97.20
08.29 Perno maquinado L= 50 mm, D= 13 mm C/T/C/2A/AP und 1.00 2.03 2.03 1.00 2.03 2.03
08.30 Riostra de perfil angular de F°G° 38x38x710 mm. E= 5 mm. und 1.00 52.65 52.65 1.00 52.65 52.65
08.31 Tubo de F°G° de 101mm ø, E=3mm., 3m long., para bajada/subida cable subterráneo und 2.00 145.80 291.60 2.00 145.80 291.60
08.32 Fleje de acero inoxidable 19mm (Cinta band it) m 6.00 0.97 5.82 6.00 0.97 5.82
08.33 Hebilla para cinta band it 19mm und 6.00 0.41 2.46 6.00 0.41 2.46
08.34 Aislador de porcelana tipo PIN clase ANSI 56-2 und 3.00 49.50 148.50 3.00 49.50 148.50
RETENIDAS Y ANCLAJES (Según R.D. 198-2012-EM/DGE) 0.00 0.00
9.01 Aislador polimerico tipo suspension de longitud 525 mm., 36 kV u 4.00 108.00 432.00 4.00 108.00 432.00
9.02 Cable de acero de grado Siemens Martin D=10.0mm. m 56.00 2.25 126.00 56.00 2.25 126.00
9.03 Grillete de anclaje tipo recto D=16mm c/pasador de seguridad. u 4.00 6.75 27.00 4.00 6.75 27.00
9.04 Varilla de anclaje con ojal L=2400mm. D=19mm. u 4.00 40.50 162.00 4.00 40.50 162.00
9.05 Arandela cuadrada de L=102x102mm. E=6,4mm, diámetro de agujero=19 mm u 4.00 11.25 45.00 4.00 11.25 45.00
9.06 Mordaza preformada de 10.0 mm. u 8.00 2.70 21.60 8.00 2.70 21.60
9.07 Plancha de fierro galvanizado 400mm x 400mm E=6,4mm. u 4.00 31.50 126.00 4.00 31.50 126.00
9.08 Apoyo abrazadera para contrapunta L= 1200m. E=6mm. D=200mm. u 4.00 58.50 234.00 4.00 58.50 234.00
9.09 Abrazadera para soporte de retenida, D=175 mm. E=6,4mm. L=330mm. H=75mm. C/3P/3T/3C/6A/3AP u 4.00 22.50 90.00 4.00 22.50 90.00
9.10 Alambre galvanizado N°14 AWG u 12.00 1.08 12.96 12.00 1.08 12.96
9.11 Templador de fierro galvanizado para retenida de 300x19,0mm de diametro u 4.00 22.50 90.00 4.00 22.50 90.00
09 SISTEMA DE PUESTA A TIERRA 0.00
09.01 Conductor de cobre desnudo temple suave, sección = 25 mm2, para puesta a tierra m 98.00 12.50 1,225.00
09.02 Varilla de cobre con rosca, tuerca y contratuerca en un extremo D=19mm. L=2,40m. und 7.00 198.00 1,386.00
09.03 Plancha antirrobo para varilla de puesta a tierra 200x200mm. E=3mm. und 7.00 31.50 220.50
09.04 Conector tipo AB (Anderson) de bronce de 19 mm und 7.00 4.50 31.50
09.05 Caja con tapa de registro de concreto de 0.40x0.30x0.40 m. E=0.05m. und 7.00 45.00 315.00
09.06 Cemento conductivo x 20 kg bls 21.00 108.00 2,268.00
09.07 Bentonita x 30 kg bls 14.00 45.00 630.00
10 EQUIPOS DE PROTECCIÓN MANIOBRA MEDICION Y TRANSFORMACION 0.00
10.01 TRANSFORMADOR DE MEDIDA 22.9 kV / 0.230 kV , 3 / 5 A. eq 1.00 18,000.00 18,000.00
10.02 CELDA DE REMONTE (LLEGADA) eq 1.00 31,000.00 31,000.00
10.03 CELDA DE PROTECCION CON PORTAFUSIBLE DE 24KV, 630A, 16KA. eq 1.00 32,500.00 32,500.00
10.04 CELDA DE TRANSFORMACION DE 100KVA 22.9KV/230V. eq 1.00 38,500.00 38,500.00
10.05 Terminacion contráctil interior "N2XSY" de 50mm2 eq 15.00 900.00 13,500.00
10.06 Seccionador unipolar tipo expulsion (Cut-Out) de 21 kV, 100A, 150 kV-BIL. eq 3.00 342.00 1,026.00
10.07 Pararrayos de línea, 21 kV, 10 kA, 150 kV-BIL. eq 6.00 315.00 1,890.00
11 EQUIPOS DE MEDICION , MANTENIMIENTO Y MANIOBRA 0.00
11.01 MEDIDOR DE ENERGIA CON MODEM 3G eq 1.00 4,500.00 4,500.00
11.02 PERTIGA TELESCOPICA 1.75MT-12.0MT.SECCIONABLE eq 1.00 3,500.00 3,500.00
11.03 REVELADOR DE TENSION eq 1.00 150.00 150.00
11.04 PUESTA A TIERRA TEMPORAL eq 1.00 950.00 950.00
11.05 GUANTES DIELECTRICOS und 3.00 250.00 750.00
11.06 PINZA AISLANTE und 1.00 180.00 180.00
11.07 BANQUETA AISLANTE PARA TRABAJO EN TENSION und 1.00 750.00 750.00
11.08 ALFOMBRILLA AISLANTE und 1.00 350.00 350.00
11.09 PINZA AMPERIMETRICA und 1.00 250.00 250.00
11.10 JUEGO DE ALICATES y DESTORNILLADORES jg 1.00 220.00 220.00
ITEM DESCRIPCION UND PRESUPUESTO ORIGINAL MAYORES METRADOS METRADO EJECUTADO PARTIDAS NUEVAS DEDUCTIVOS
METRADO P.U. COSTO METRADO P.U. COSTO METRADO P.U. COSTO METRADO P.U. COSTO METRADO P.U. COSTO
28.11.01 MONTAJE RP-02 0.00
01 TRABAJOS PRELIMINARES 0.00
01.01 Replanteo topográfico, ingeniería de detalle y ubicación de estructuras de RP rp 1.00 534.41 534.41 1.00 534.41 534.41
01.02 Cartel de obra und 1.00 587.56 587.56 1.00 587.56 587.56
02 ROTURA DE PISTAS Y VEREDAS 0.00
02.02.01 Rotura de veredas m2 1.00 2.00 146.86 293.72
03 EXCAVACIÓN DE HOYOS Y ZANJAS 0.00
03.01 Excavación de hoyos para buzones de concreto, en terreno normal. m3 1.00 58.19 58.19
03.02 Excavación de zanjas para tendido de cables subterráneos, en terreno normal. m3 5.00 58.19 290.95
03.03 Excavación de hoyos para postes de concreto, en terreno normal. m3 8.51 58.19 495.20 8.51 58.19 495.20
03.04 Excavación de hoyos para retenidas verticales, en terreno normal. m3 12.00 58.19 698.28 12.00 58.19 698.28
03.05 Excavación de hoyos para puestas a tierra, en terreno normal. m3 11.20 58.19 651.73
04 TENDIDO DE CABLE SUBTERRANEO
04.01 Colocación de buzones und 1.00 112.35 112.35
04.02 Colocación de ductos de PVC und 3.00 9.72 29.16
04.03 Colocación de lecho de arena fina m3 1.20 22.57 27.08
04.04 Tendido de conductor unipolar subterráneo m 60.00 11.43 685.80
04.05 Colocación de ladrillos de protección mecánica de cable subterráneo MT und 10.00 0.17 1.70
04.06 Colocación de cinta plástica señalizadora de cable subterráneo MT m 1.00 0.34 0.34
04.07 Relleno y compactación de zanja, con tierra cernida m3 3.80 99.85 379.43
05 IZAJE Y CIMENTACION DE POSTES
05.01 Transporte de postes de concreto, de almacen a punto de izaje und 7.00 135.67 949.69 8.00 135.67 1,085.36
05.02 Izaje de poste de concreto, con pluma de izado und 7.00 48.35 338.45 8.00 48.35 386.80
05.03 Cimentación con concreto ciclopeo de poste de concreto. und 7.00 118.81 831.67 8.00 118.81 950.48
05.04 Resane de pistas y veredas m2 1.00 2.00 60.01 120.02
06 MONTAJE DE ARMADOS 0.00
06.02 Montaje de armado trifasico en fin de linea para conductor autoportante (ATPB5-A, ATPB1) jgo 2.00 38.06 76.12 2.00 38.06 76.12
06.03 Montaje de armado trifasico en angulo para conductor autoportante (ATPB6) jgo 3.00 104.85 314.55 3.00 104.85 314.55
06.04 Montaje de armado trifásico de medicion en monoposte (ATTM) jgo 1.00 139.80 139.80 1.00 139.80 139.80
06.05 Montaje de armado trifásico de seccionamiento en línea (SEC+P-3) jgo 1.00 95.11 95.11
06.06 Montaje de armado trifásico de conexión línea aérea - subterránea (EAS-P) jgo 1.00 126.79 126.79
07 MONTAJE DE RETENIDAS 0.00
07.01 Montaje de retenida vertical aislada und 4.00 37.27 149.08 4.00 37.27 149.08
07.02 Relleno y compactación de retenida vertical aislada m3 12.00 77.83 933.96 12.00 77.83 933.96
08 MONTAJE DE CABLE AUTOPORTANTE 0.00
08.01 Tendido y puesta en flecha de Cable autoportante de aluminio de 3x50 mm2. m 266.64 11.49 3,063.69
08.02 Instalación de cabeza terminal para cable autoportante de Al 50 mm2. und 15.00 149.48 2,242.20
09 MONTAJE DE PUESTA A TIERRA 0.00
09.01 Montaje de sistema de puesta a tierra tipo PAT1 und 7.00 38.51 269.57
09.02 Relleno y compactación de puesta a tierra tipo PAT1 und 7.00 64.02 448.14
10 MONTAJE DE EQUIPOS DE PROTECCIÓN Y MANIOBRA 0.00
10.01 MONTAJE DE CELDA DE REMONTE (LLEGADA) eq 1.00 331.62 331.62
10.02 MONTAJE DE CELDA DE PROTECCION CON PORTAFUSIBLE DE 24KV, 630A, 16KA. eq 1.00 331.62 331.62
10.03 MONTAJE DE CELDA DE TRANSFORMACION DE 100KVA 22.9KV/230V. eq 1.00 331.62 331.62
10.04 Montaje de Terminacion contráctil interior "N2XSY" de 50mm2 eq 15.00 149.48 2,242.20
10.05 Montaje de Seccionador unipolar tipo expulsion (Cut-Out) de 27 kV, 100A, 150 kV-BIL. eq 3.00 165.79 497.37
10.06 Montaje de Pararrayos de línea, 21 kV, 10 kA, 150 kV-BIL. eq 3.00 165.79 497.37
11 TRABAJOS COMPLEMENTARIOS DURANTE LA EJECUCION DE OBRA 0.00
11.01 Monitoreo, tramite e Inspección de Restos Arqueológicos. rp 1.00 9,250.00 9,250.00 1.00 9,250.00 9,250.00
11.02 Monitoreo y tramite de Impacto Ambiental rp 1.00 4,000.00 4,000.00 1.00 4,000.00 4,000.00
11.03 Corte y reposición de energía eléctrica und 1.00 48.68 48.68
11.04 Equipos de prteccion personal und 9.00 185.00 1,665.00 9.00 185.00 1,665.00
11.05 Seguros complementario de trabajo y riesgo m 9.00 95.00 855.00 9.00 95.00 855.00
11.06 PLAN PARA LA PREVENCION ANTE EL COVID-19 glo 1.00 2,535.00 2,535.00 1.00 2,535.00 2,535.00
11.07 Señalizacion de estructuras MT, según formato SID-ELSE (incluye trámite, fotos y certificación GIS) und 7.00 19.51 136.57
11.08 Señalizacion de puesta a tierra, según formato SID-ELSE (incluye trámite, fotos y certificación GIS) und 7.00 12.65 88.55
TOTAL 898,324.22 15,043.94 272,774.99 581,119.43 631,041.29
RESUMEN
PRESUPUESTO TOTAL S/.
TOTAL PRESUPUESTO PROYECTO ORIGINAL 898,324.22
TOTAL PRESUPUESTO MAYORES METRADOS 15,043.94
TOTAL PARTIDAS NUEVAS 581,119.43
TOTAL DEDUCTIVOS 631,041.29
TOTAL EJECUTADO A ABRIL 2022 272,774.99
TOTAL ADICIONAL TOTAL 863,446.30
ADICIONAL REQUERIDO 590,671.31
FORMATO N° 006

VALORIZACIÓN DE DEDUCTIVOS
AÑO 2021
OBRA : “MEJORAMIENTO DE LOS SERVICIOS DE SALUD DEL PUESTO DE SALUD DE CAICAY, DISTRITO DE CAICAY - PAUCARTAMBO - CUSCO” Residente de Obra #REF!
INFORME TECNICO MENSUAL ENERO 2022 Supervisor de Obra #REF!

Precio Valorización Anterior Valorización Actual Valorización Acumulada Saldo por Valorizar
Item DESCRIPCION Uni Metrado Parcial
Unitario Metrado Costo % Metrado Costo % Metrado Costo % Metrado Costo %
02 MODULOS 01, MODULO 02 Y MODULO 03 7,507.98 - - - - 7,507.98
02.05 CONCRETO ARMADO 7,507.98 - 0.00 - 0.00 0.00 7,507.98
02.05.05 LOSAS ALIGERADAS DE e=0.20 m. 7,507.98 0.00 0.00 0.00 7,507.98
02.05.05.04 PLASTOFORMO DE 0.15 X 0.30 X 3.00 PARA ALIGERADO m 1,618.10 4.64 7,507.98 - 0.00 0.00% - 0.00 0.00% - 0.00 0.00% 1,618.10 7,507.98 100.00%
COSTO DIRECTO 22,523.94 0.00 0.00% 0.00 0.00% 0.00 0.00% 22,523.94 100.00%
MUNICIPALIDAD DISTRITAL DE CAICAY
SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL

7.3 VALORIZACIÓN POR MAYORES METRADOS F-7

Err:509

UNIDAD EJECUTORA :MUNICIPALIDAD DISTRITAL DE CAICAY MONTO PROYECTO S/. 4,530,160.57 UBICACIÓN:
RESIDENTE DE OBRA : ING. KILDARE JUSSETY ASCUE ESCALANTE PLAZO DE EJECUCION INICIAL 540 DIAS CALENDARIOS DEPARTAMENTO CUSCO
INSPECTOR DE OBRA : ING. ELIO W. CCANQUE CURASI FECHA DE INICIO 07 DE DICIEMBRE DEL 2020 PROVINCIA PAUCARTAMBO
UBICACIÓN : CAICAY FECHA DE TERMINO REPROG. 30 DE MAYO 2022 DISTRITO CAICAY

PRESUPUESTO ACUMULADO - ANTERIOR AVANCE ACTUAL ACUMULADO - ACTUAL SALDO


ITEM DESCRIPCION UND
METRADO P.U. COSTO METRADO COSTO % METRADO COSTO % METRADO COSTO % METRADO COSTO %

S/. % S/. % S/. % S/. %


COSTO DIRECTO DE PRESUPUESTO DE MAYORES METRADOS S/. 0.00 #N/A 0.00% #N/A 0.00% #N/A 0.00% #N/A 0.00%

7.4 VALORIZACIÓN POR PARTIDAS NUEVAS


PROYECTO: “MEJORAMIENTO Y AMPLIACIÓN DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO RURAL EN LA ASOCIACIÓN DE AGRICULTORES DE SIERRA BELLA PARTE ALTA, DISTRITO DE CAICAY - PROVINCIA DE PAUCARTAMBO - DEPARTAMENTO DE CUSCO”

UNIDAD EJECUTORA : MUNICIPALIDAD DISTRITAL DE CAICAY MONTO PROYECTO S/. 4,530,160.57 UBICACIÓN:
RESIDENTE DE OBRA : ING. ADRIANO ORTIZ DE ZEVALLOS CARDENAS PLAZO DE EJECUCION INICIAL 540 DIAS CALENDARIOS DEPARTAMENTO CUSCO
INSPECTOR DE OBRA : ING. MITDUAR JULIO PEÑA MENDOZA FECHA DE INICIO 07 DE DICIEMBRE DEL 2020 PROVINCIA PAUCARTAMBO
UBICACIÓN : SIERRA BELLA PARTE ALTA FECHA DE TERMINO PROG. 30 DE MAYO 2022 DISTRITO CAICAY

PRESUPUESTO ACUMULADO - ANTERIOR AVANCE ACTUAL ACUMULADO - ACTUAL SALDO


ITEM DESCRIPCION UND
METRADO P.U. COSTO METRADO COSTO % METRADO COSTO % METRADO COSTO % METRADO COSTO %
MUNICIPALIDAD DISTRITAL DE CAICAY
SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL

S/. % S/. % S/. % S/. %


COSTO DIRECTO DE PRESUPUESTO DE MAYORES METRADOS S/. 0.00 0.00 0.00 0.00 0.00

7.5 VALORIZACIÓN DEDUCTIVOS


PROYECTO: “MEJORAMIENTO Y AMPLIACIÓN DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO RURAL EN LA ASOCIACIÓN DE AGRICULTORES DE SIERRA BELLA PARTE ALTA, DISTRITO DE CAICAY - PROVINCIA DE PAUCARTAMBO - DEPARTAMENTO DE CUSCO”

UNIDAD EJECUTORA : MUNICIPALIDAD DISTRITAL DE CAICAY MONTO PROYECTO S/. 4,530,160.57 UBICACIÓN:
RESIDENTE DE OBRA : ING. ADRIANO ORTIZ DE ZEVALLOS CARDENAS PLAZO DE EJECUCION 540 DIAS CALENDARIOS DEPARTAMENTO CUSCO
INSPECTOR DE OBRA : ING. MITDUAR JULIO PEÑA MENDOZA FECHA DE INICIO 07 DE DICIEMBRE DEL 2020 PROVINCIA PAUCARTAMBO
UBICACIÓN : SIERRA BELLA PARTE ALTA FECHA DE TERMINO PROG. 30 DE MAYO 2022 DISTRITO CAICAY

PRESUPUESTO ACUMULADO - ANTERIOR AVANCE ACTUAL ACUMULADO - ACTUAL SALDO


ITEM DESCRIPCION UND
METRADO P.U. COSTO METRADO COSTO % METRADO COSTO % METRADO COSTO % METRADO COSTO %

S/. % S/. % S/. % S/. %


COSTO DIRECTO DE PRESUPUESTO DE MAYORES METRADOS S/. 0.00 0.00 0.00 0.00 0.00
Página 45 de 52
Ejecucion Detallada de Gastos
NO SE TIENE GASTOS A NIVEL DE DEVENGADO
MOVIMIENTO DE ALMACEN MENSUAL
PROYECTO "INSTALACION DEL SISTEMA DE RIEGO PRESURIZADO EN EL SECTOR LIMAMAYO DE LA CC CCACHO - LIMAMAYO, ENE EL DISTRITO DE CHAMACA, PROV.CHUMBIVILCAS, CUSCO"
SUPERVISOR ING° MIGUEL ANGEL GUEVARA REIME

RESIDENTE ING° JAIME TUMI TITO


ALMACENERO MUÑOZ ZOLOAGA, Adriel
MES MAYO_2017

MOVIMIENTO DE ALMACEN MAYO 2017

I L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M
T SALDO
E DESCRIPCION UNID. MED. ANTERIOR MOVIMIENTO INGRESO SALIDA SALDO
M 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

MATERIALES DE CONSTRUCION

INGRESO
1 CODO PVC SAP DE 6" x 90° UND 3 0 0 3
SALIDA
INGRESO
2 CODO PVC SAP DE 1 1/2" x 45° UND 7 0 0 7
SALIDA
INGRESO
3 CODO PVC SAP DE 2" x 45° UND 47 0 0 47
SALIDA
INGRESO
4 CODO PVC SAP DE 2 1/2" x 45° UND 16 0 0 16
SALIDA
INGRESO
5 CODO PVC SAP DE 1" x 45° UND 21 0 0 21
SALIDA
INGRESO
6 CODO PVC SAP DE 3/4" x 45° UND 25 0 0 25
SALIDA
INGRESO
7 CODO PVC SAP DE 2 1/2" x 90° UND 5 0 0 5
SALIDA
INGRESO
8 CODO PVC SAP DE 1/2" x 45° UND 92 0 0 92
SALIDA
INGRESO
9 CANASTILLA PVC SAP 2" a 1 1/2" UND 3 0 0 3
SALIDA
INGRESO
10 CANASTILLA PVC SAP 4" a 2" UND 12 0 0 12
SALIDA
INGRESO
11 CANASTILLA PVC SAP 6" a 4" UND 1 0 0 1
SALIDA
INGRESO
12 CANASTILLA PVC SAP 1" a 1/2" UND 10 0 0 10
SALIDA
INGRESO
13 CANASTILLA PVC SAP 2" a 3/4" UND 40 0 0 40
SALIDA
INGRESO
14 CANASTILLA PVC SAP 2" a 1" UND 22 0 0 22
SALIDA
INGRESO
15 NIPLE DE 3/4" x 1 1/2" UND 8 0 0 8
SALIDA
INGRESO
16 NIPLE DE 4" x 4" UND 5 0 0 5
SALIDA
INGRESO
17 NIPLE PVC SAP 2 1/2" x 2" UND 1 0 0 1
SALIDA
INGRESO
18 NIPLE PVC SAP 1" x 1" UND 12 0 0 12
SALIDA
INGRESO
19 NIPLE 1/2"*+2 UND 6 0 0 6
SALIDA
INGRESO
20 TEE PVC SAP 1" UND 11 0 8 3
SALIDA 8
INGRESO
21 TEE PVC SAP 4" UND 2 0 0 2
SALIDA
INGRESO
22 TEE PVC SAP 1 1/2" UND 4 0 4 0
I L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M
T SALDO
E DESCRIPCION UNID. MED.
ANTERIOR
MOVIMIENTO INGRESO SALIDA SALDO
M 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
22 TEE PVC SAP 1 1/2" UND 4 0 4 0
SALIDA 1 3
INGRESO
23 TEE PVC SAP 3/4" UND 1 0 0 1
SALIDA
INGRESO
24 TEE PVC SAP 1/2" UND 5 0 0 5
SALIDA
INGRESO
25 UNION PR SAP 1/2" UND 4 0 0 4
SALIDA
INGRESO
26 UNION PR SAP 3/4" UND 8 0 0 8
SALIDA
INGRESO
27 UNION PR SAP 1" UND 11 0 0 11
SALIDA
INGRESO
28 UNION UNIVERSAL DE 1/2" UND 8 0 0 8
SALIDA
INGRESO
29 UNION UNIVERSAL DE 3/4" UND 10 0 0 10
SALIDA
INGRESO
30 UNION UNIVERSAL DE 1" UND 14 0 0 14
SALIDA
INGRESO
31 UNION UNIVERSAL DE 1 1/2" UND 10 0 0 10
SALIDA
INGRESO
32 UNION UNIVERSAL DE 2 1/2" UND 1 0 0 1
SALIDA
INGRESO
33 UNION UNIVERSAL DE 4" UND 5 0 0 5
SALIDA
INGRESO
34 UNION MIXTA DE 3/4" UND 45 0 0 45
SALIDA
INGRESO
35 VALVULA COMPUERTA DE BRONCE UND 3 0 0 3
3/4" SALIDA
INGRESO
36 VALVULA COMPUERTA DE BRONCE 1" UND 7 0 0 7
SALIDA
INGRESO
37 VALVULA COMPUERTA DE BRONCE UND 2 0 0 2
1/2" SALIDA
INGRESO
38 CODO PVC SAP DE 4" x 45° UND 40 0 2 38
SALIDA 2
INGRESO
39 CODO PVC SAP DE 1 1/2" x 90° UND 1 0 0 1
SALIDA
INGRESO
40 CONO DE REBOSE 4" a 2" UND 18 0 0 18
SALIDA
INGRESO
41 TAPON HEMBRA UND 105 0 0 105
SALIDA
INGRESO
42 VALVULA DE ACOPLE RAPIDO UND 14 0 0 14
SALIDA
INGRESO
43 NIPLE DE 1 1/2" x 1 1/2" UND 13 0 0 13
SALIDA
INGRESO
44 REDUCCION DE 1 1/2" a 3/4" UND 1 0 0 1
SALIDA
INGRESO
45 REDUCCION DE 1" a 3/4 UND 23 0 8 15
SALIDA 5 3
INGRESO
46 REDUCCION DE 1 1/2" a 1" UND 6 0 6 0
SALIDA 5 1
INGRESO
47 TEE PVC SAL DE 4" x 4" UND 105 0 0 105
SALIDA
INGRESO 10
48 CODO PVC SAL DE 4" x 45° UND 208 10 55 163
SALIDA 10 15 5 15 10
INGRESO
49 REDUCCION DE 3/4" a 1/2" UND 21 0 5 16
SALIDA 5
INGRESO
50 REDUCCION DE 3" A 2" UND 1 0 0 1
I L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M
T SALDO
E DESCRIPCION UNID. MED.
ANTERIOR
MOVIMIENTO INGRESO SALIDA SALDO
M 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
50 REDUCCION DE 3" A 2" UND 1 0 0 1
SALIDA
INGRESO
51 CODO DE 1/2" x 90° UND 3 0 0 3
SALIDA
INGRESO
52 REDUCCION DE 2" a 1 1/2" UND 1 0 1 0
SALIDA 1
INGRESO
53 TAPON DE 1/2" UND 2 0 0 2
SALIDA
INGRESO
54 REDUCCION DE 1" a 1/2" UND 3 0 3 0
SALIDA 3
INGRESO
55 REDUCCION DE 1 1/2" a 1/2" UND 1 0 0 1
SALIDA
INGRESO
56 YESO BLS 25 0 0 25
SALIDA
INGRESO
57 TUBO DE PVC SAL 2" UND 5 0 0 5
SALIDA
INGRESO
58 TUBO DE PVC SAL DE 6" UND 4 0 0 4
SALIDA
INGRESO 220
59 TUBO PVC SAL DE 4" UND 201 220 209 212
SALIDA 30 20 15 15 25 22 18 10 20 18 15 1
INGRESO
60 TUBO PVC SAP 4" UND 1 0 1 0
SALIDA 1
INGRESO
61 TUBO PVC SAP 2 1/2" UND 6 0 6 0
SALIDA 6
INGRESO
62 TUBO PVC SAP 2" UND 35 0 2 33
SALIDA 2
INGRESO 155
63 TUBO PVC SAP 1 1/ 2" UND 43 155 188 10
SALIDA 1 50 45 47 45
INGRESO 380
64 TUBO PVC SAP 1" UND 361 380 512 229
SALIDA 132 180 173 27
INGRESO
65 TUBO PVC SAP 1/2" UND 657 0 515 142
SALIDA 245 160 110
INGRESO
66 TUBO CRIBADO DE 4" UND 2.5 0 0 2.5
SALIDA
INGRESO
67 FIERRO DE 1/4" BAR 88 0 0 88
SALIDA
INGRESO
68 FIERRO DE 3/8" BAR 55 0 0 55
SALIDA
INGRESO
69 ALAMBRE N°16 KG 50 0 2 48
SALIDA 1 1
INGRESO
70 ALAMBRE N°8 KG 50 0 1 49
SALIDA 1
INGRESO 4
71 PINTURA ESMALTE VERDE GL 13 4 0 17
SALIDA
INGRESO 12
72 PINTURA ANTICORROSIVOO ROJO GL 1 12 0 13
SALIDA
INGRESO
73 PEGAMENTO PVC GL 5 0 5 0
SALIDA 1 1 1 1 1
INGRESO
74 IMPERMEABILIZANTE GL 6 0 0 6
SALIDA
INGRESO
75 TRIPLAY PL 3 0 0 3
SALIDA
INGRESO
76 CLAVO MIXTO 2" 3" 4" KG 1 0 0 1
SALIDA
INGRESO
77 TAPA METALICA 60 cm x 60 cm UND 7 0 0 7
SALIDA
INGRESO
78 TAPA METALICA 40 cm x 40 cm UND 17 0 0 17
I L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M
T SALDO
E DESCRIPCION UNID. MED.
ANTERIOR
MOVIMIENTO INGRESO SALIDA SALDO
M 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
78 TAPA METALICA 40 cm x 40 cm UND 17 0 0 17
SALIDA
INGRESO
79 TAPA METALICA 30 cm x 30 cm UND 15 0 0 15
SALIDA
INGRESO
80 CINTA TEFLON UND 11 0 0 11
SALIDA
INGRESO 157
81 TUBO PVC DE 3/4"X 5m C-10 UND 0 157 133 24
SALIDA 85 48
INGRESO 55 110
82 CODO PVC SAL DE 4" x 90 UND 0 165 110 55
SALIDA 10 15 5 15 10 55
INGRESO 55 110
83 YEE DE PVC SAL DE4"X4"X4" UND 0 165 110 55
SALIDA 10 15 5 15 10 55
INGRESO 214
84 CODOS PLAXON DE PVC DE 3/4 UND 0 214 0 214
SALIDA
INGRESO 4
85 VALV. DE COMPT DE PVC 1 1/2" UND 0 4 0 4
SALIDA
INGRESO 3
86 VALV. DE COMPT DE PVC 2" UND 0 3 0 3
SALIDA
INGRESO 18
87 THINNER ACRILICO GAL 0 18 0 18
SALIDA
INGRESO 6
88 BROCHA 4" UND 0 6 0 6
SALIDA
INGRESO 8
89 UPR DE 1 1/2" UND 0 8 0 8
SALIDA
INGRESO 6
90 UPR DE 2" UND 0 6 0 6
SALIDA
INGRESO 4
91 YEE DE PVC SAP DE 1 1/2"x1 1/2" UND 0 4 0 4
SALIDA
INGRESO 10
94 LLANTAS DE CARR. TIPO BOGUI UND 0 10 5 5
SALIDA 3 2
INGRESO 73
95 VALV.DE PASO DE PVC DE 1/2" UND 0 73 0 73
SALIDA
INGRESO 33
96 VALV.DE PASO DE PVC DE 3/4" UND 0 33 0 33
SALIDA
INGRESO 1
97 VALV.DE PASO DE PVC 2" UND 0 1 0 1
SALIDA
INGRESO 100
98 CEMENTO PORTLAN TIPO 42.5 BLS 0 100 0 100
SALIDA

HERRAMIENTAS

INGRESO
1 BALDE DE 5 GL UND 5 0 0 5
SALIDA
INGRESO
2 CAMARA PARA CARRETILA UND 3 0 0 3
SALIDA
INGRESO
3 CINCEL OCTAGOAL DE 3/4 UND 2 0 0 2
SALIDA
INGRESO
4 CINTA DE SEGURIDAD UND 2 0 0 2
SALIDA
INGRESO
5 COMBA DE 6 LBS UND 2 0 1 1
SALIDA 1
INGRESO
6 FOCO DE AHORRADOR UND 1 0 0 1
SALIDA
INGRESO
7 HOJA DE SIERRA N° 18 UND 20 0 10 10
SALIDA 2 7 1
INGRESO
8 HOJA DE SIERRA N° 24 UND 5 0 1 4
SALIDA 1
INGRESO
9 PILA GRANDE RAYO BAK PAR 0 0 0 0
I L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M
T SALDO
E DESCRIPCION UNID. MED.
ANTERIOR
MOVIMIENTO INGRESO SALIDA SALDO
M 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
9 PILA GRANDE RAYO BAK PAR 0 0 0 0
SALIDA
INGRESO
10 PLASTICA DE DOBLE ANCHO MTS 50 0 0 50
SALIDA
INGRESO
11 WINCHA DE 5 MTS UND 3 0 1 2
SALIDA 1
INGRESO
12 PONCHO DE AGUA UND 4 0 0 4
SALIDA
INGRESO
13 GUANTES DE CUERO PAR 20 0 8 12
SALIDA 1 1 1 1 4
INGRESO
14 GUANTES DE JEBE PAR 5 0 0 5
SALIDA

MATERIAL DE ESCRITORIO
40 INGRESO
1 CD RUM INCLUYE SOBRES UND 0 10 30
SALIDA 10
CINTA EMBALAJE TRANSPARENTE DE INGRESO
2 2"
UND 1 0 1 0
SALIDA 1
INGRESO
3 CORRECTOR UND 0 0 0 0
SALIDA
CUADERNOA-4 100HOJAS INGRESO
4 CUADRICULADO
UND 4 0 2 2
SALIDA 2
INGRESO
5 CUADERNO ANILLADO A-4 200 HOJAS UND 0 0 0 0
SALIDA
INGRESO
6 CUADERNO D OBRA AUTOCOPIABLE UND 1 0 1 0
SALIDA 1
INGRESO
7 CUTER GRANDE UND 0 0 0 0
SALIDA
INGRESO
8 FOLDER MANILA A-4 CON FASTENER UND 27 0 7 20
SALIDA 7
INGRESO
9 GRAPAS DE 26/5x500 CJA 0 0 0 0
SALIDA
INGRESO
10 LAPICERO PUNT FINA TINT SECA AZUL UND 12 0 8 4
SALIDA 2 2 4
INGRESO
11 LAPICERO PUNT FINA TINT SECA ROJO UND 8 0 3 5
SALIDA 1 2
INGRESO
12 LAPICERO TINTA LIQ AZUL -ROJO UND 0 0 0 0
SALIDA
INGRESO
13 MARCADOR DE CD PUNTA DELGADA UND 0 0 0 0
SALIDA
INGRESO
14 NOTA DE SALIDA ALMACEN
AUTOCOPIABLE
BLOK 3 0 1 2
SALIDA 1
INGRESO
15 NOTA D ENTRADA DE ALMACEN
AUTOCOPIABLE
BLOK 0 0 0 0
SALIDA
INGRESO
16 PAPEL BONB A-4 80 GR. MLL 4 0 3 1
SALIDA 1 1 1
INGRESO
17 PARTS DIARIOS D MAQUINARIA
AUTOCPTV
BLOK 4 0 0 4
SALIDA
INGRESO
18 PLUMON
VERDE)
GROE. PAPEL (AZUL,ROJO Y UND 6 0 2 4
SALIDA 2
INGRESO
19 POSIT
TCO
CUADRADO DE TODO COLOR c/ UND 0 0 0 0
SALIDA
INGRESO
20 RESALTADOR UND 0 0 0 0
SALIDA
INGRESO
21 TINTA PARA FOLIADOR COLOR NEGRO UND 0 0 0 0
SALIDA
INGRESO
22 TINTA PARA SELLO COLOR AZUL UND 0 0 0 0
SALIDA
INGRESO
23 TINTA CONTINUA PARA IMPRESORA UND 0 0 0 0
SALIDA
INGRESO
24 THONER
SANSUG
MLT- D10 5L IPRESORA UND 1 0 0 1
SALIDA
INGRESO
25 VINIFAN T/A-4 UND 0 0 0 0
SALIDA
I L M M J V S D L M M J V S D L M M J V S D L M M J V S D L M M
T SALDO
E DESCRIPCION UNID. MED.
ANTERIOR
MOVIMIENTO INGRESO SALIDA SALDO
M 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

COMBUSTIBLE

INGRESO 5
95 GASOHOL DE 9° OCTANOS GL 0 5 5 0
SALIDA 2 2 1
INGRESO 5 2 10
96 PETROLEO GL 5 17 7 15
SALIDA 3 2 2
MUNICIPALIDAD DISTRITAL DE CAICAY
SUB GERENCIA DE INFRAESTRUCTURA, DESARROLLO URBANO Y RURAL

MANIFIESTO DE GASTO
PROYECTO “MEJORAMIENTO DE LOS SERVICIOS DE SALUD DEL PUESTO DE SALUD DE CAICAY, DISTRITO DE CAICAY - PAUCARTAMBO - CUSCO”

UNIDAD EJECUTORA : MUNICIPALIDAD DISTRITAL DE CAICAY FECHA DE INICIO 07 DE DICIEMBRE DEL 2020
RESIDENTE DE OBRA : ING. ADRIANO ORTIZ DE ZEVALLOS CARDENAS GASTO TOTAL EN SERVICIOS FECHA DE TERMINO REPROG. 30 DE MAYO 2022
INSPECTOR DE OBRA : ING. MITDUAR JULIO PEÑA MENDOZA

GASTO SERVICIOS
2019
DOCUMENTO DESCRIPCION DE SERVICIO
N° COMPROBANTE DE
ITEM ESPECIFICA DE DEVENGADO GIRADO N° META
TIPO SERVICIOS RAZON SOCIAL/PROVEEDOR PAGO ITEM CONCEPTO UND CANTIDAD P.U SUB TOTAL
GASTO

COSTO DIRECTO
CHAVEZ BAÑARES ANGEL MANTENIMIENTO DE MAQUINARIA - VOLQUETE VOLVO DE 15 M3 MARCA
01 MANTENIMIENTO 10/9/2019 2.6. 2 3. 5 5 X - - 0045 1 MERCEDES BENZ ACTROS PLACA EGG-390 INCLUYE 04 LLANTAS - -
SER 1.00 0.00 0.00
CUSTODIO

TOTAL S/. -

GASTOS GENERALES
ASISTENTE UGARTE FRISANCHO LIZ
01 10/7/2019 2.6. 2 3. 5 5 X - - 0045 1 ASISTENTE ADMINISTRATIVO DE OBRAS - SER 1.00 0.00 0.00
ADMINISTRATIVO CAMILA

TOTAL S/. -

GASTOS DE SUPERVISIÓN
PEÑA MENDOZA MITDUAR
01 INSPECTOR 10/29/2019 2.6. 8 1. 3 1 X - - 0045 1 INSPECTOR DE OBRAS - SER 1.00 0.00 0.00
JULIO

TOTAL S/. -