COSTO MATERIAL CALCULADO

COTIZACION VALOR TIPO COSTO FLETE COSTO FLETE COSTO FINAL


UNIT. IGV PRECIO LIMA X PESO POR CANT.
CAMBIO PRECIO LIMA LIMA - X UNID. - MATERIAL EN PROVEED
UNID EN UNIDAD (KG)- MATERIA PESO (kg)
USD USD DOLARES (A) DOLAR A SOLES (C=AxB) (D) ABANCAY X SOLES CUSCO X UNIDAD OR
L
MATERIALES -ACERO (LIMA) SOLES (B) KG-SOLES (E) (F=DXE) EN SOLES (H=C+F)
N° UND
1 TUBO CUAD. 200X200X4.5mm unid. 249.81 44.966 294.78 3.75 S/. 1,105.43 166.56 0.4 S/. 66.62 S/. 1,172.05 A.A
2 TUBO CUAD. 100X50X2.0mm unid. 34.56 6.2208 40.78 3.75 S/. 152.93 27.00 0.35 S/. 9.45 S/. 162.38 A.A
3 TUBO RECT. 75X50X2.0mm unid. 28.32 5.0976 33.42 3.75 S/. 125.32 23.22 0.35 S/. 8.13 S/. 133.44 A.A

EL COSTO DE MATERIAL ESTA ACTUALIZADO A LA FECHA 18/05/2022


HOJA -CANTIDAD MANO DE OBRA, HERRAMIENTAS Y MAQUINARIA

CANTIDAD HORAS HOMBRE


CANTIDAD CARGO DIAS PARTICIPADOS HORAS DIARIAS TOTAL HH
4 Operario soldador Calificado 35 8 1120
3 Operario armador 35 8 840
3 Operario-instalacion cobertura 6 8 144
0 arenador 0 8 0
2 Pintor 45 8 720
4 Ayudante 50 8 1600

CANTIDAD HORAS MAQUINAS


CANTIDAD MAQUINAS Y HERRAMIENTAS DIAS UTILIZADOS HORAS DIARIAS TOTAL HM
4 Maquina de soldar 15 8 480
2 Tronzadora electrica 5 8 80
3 compresora electrica 5 8 120
1 equipo de arenado 12 8 96
1 amoladora 9" 8 8 64
1 taladro estacionario 2 8 16
3 taladro percutor 5 8 120
1 roladora de perfiles 1 8 8
1 equipo de oxicorte 5 8 40
1 camion grua 3 8 24
COMPRA N° 1-CORAO
MATERIALES - unid. unid. Neto
1 TUBO RECT. 150X50X3.0mm unid. 201 $ 67.20
2 TUBO RECT. 150X50X2.5mm unid. 11 $ 56.48
3 TUBO RECT. 75X50X3.0mm unid. 410 $ 42.60
4 TUBO RECT. 75X50X2.5mm unid. 165 $ 35.78

COMPRA N° 2- COLQUEMARCA
MATERIALES - unid. unid. Neto
1 TUBO RECT 100X50X3.0mm-6.0m und. 83 $ 49.50
2 TUBO RECT 75X50X3.0mm-6.0m und. 147 $ 42.60
3 TUBO CUAD 50X50X3.0mm-6.0m und. 25 $ 31.10
4 TUBO CUAD 50X50X2.5mm-6.0m und. 35 $ 26.64

MATERIALES - unid. cant. Neto


1 TUBO CUAD. 200X200X4.5mm-6.0m unid. 27 $ 232.86

MATERIALES - unid. cant. Neto


1 plancha de 1.50mx3.0m, e=19mm pza 6 $ 838.54
2 plancha de 1.20mx2.4m, e=9.0mm pza 2 $ 254.00
4 plancha de 1.20mx2.4m, e=5.9mm pza 4 $ 164.84
5 plancha galvanizada de 1.2mx2.4m, e=1/40" pza 38 $ 25.00
IGV P. UNITARIO PARCIAL PESO (KG) PESO PARCIAL TUPEMESA
$ 12.10 $ 79.30 $ 15,938.50 53.76 10805.76
$ 10.17 $ 66.65 $ 733.11 45.18 496.98
$ 7.67 $ 50.27 $ 20,609.88 34.08 13972.80
$ 6.44 $ 42.22 $ 6,966.37 28.62 4722.30
TOTAL (USD) $ 44,247.85 TOTAL (Kg) 29997.84

IGV P. UNITARIO PARCIAL PESO (KG) PESO PARCIAL TUPEMESA


$ 8.91 $ 58.41 $ 4,848.03 39.60 3286.80
$ 7.67 $ 50.27 $ 7,389.40 34.08 5009.76
$ 5.60 $ 36.70 $ 917.45 25.92 648.00
$ 4.80 $ 31.44 $ 1,100.23 22.02 770.70
TOTAL (USD) $ 14,255.11 TOTAL (Kg) 9715.26 a

$ 58,502.96 3.73 S/. 218,216.04

IGV P. UNITARIO PARCIAL PESO (KG) PESO PARCIAL TRADI


$ 41.91 $ 274.77 $ 7,418.92 166.56 4497.12 b
TOTAL (USD) $ 7,418.92

IGV P. UNITARIO PARCIAL PESO (KG) PESO PARCIAL A.A


$ 150.94 $ 989.48 $ 5,936.86 671.18 4027.05
$ 45.72 $ 299.72 $ 599.44 203.47 406.94
$ 29.67 $ 194.51 $ 778.04 133.39 533.55
$ 4.50 $ 29.50 $ 1,121.00 18.61 707.18
TOTAL (USD) $ 8,435.35 5674.72 c

19887.10 a+b+c

$ 15,854.27 3.73 S/. 59,136.42


$ 74,357.23 3.73 S/. 277,352.46