MANO DE OBRA
M001 PEON JOR 147.2108 312.16 45,953.32 0.71%
M002 AYUDANTE GENERAL JOR 135.3548 312.16 42,252.35 0.65%
M005 OP. EQ. PESADO JOR 99.3548 861.78 85,621.98 1.33%
M011 CHOFER DE CAMION JOR 640.8901 444.60 284,939.74 4.41%
M018 BANDERERO JOR 58.4847 312.16 18,256.58 0.28%
M055 TOPOGRAFO JOR 36.00 608.92 21,921.12 0.34%
Total MANO DE OBRA 498,945.09
29-ene-2016
EQUIPO Y HERRAMIENTA
%M01 EQUIPO DE SEGURIDAD % 12,771.31 0.20%
%M02 HERRAMIENTA MENOR % 14,420.66 0.22%
CF014 CAMION TORTON DE VOLTEO 16 M3 HRA 97.9827 166.45 16,309.22 0.25%
CFCAMIONGOND CAMION DE VOLTEO DE 30 M3 HRA 5,029.1383 380.15 1,911,826.92 29.59%
CFCASE610 CARGADOR FRONTAL CASE 621 HRA 14.0848 293.99 4,140.79 0.06%
CFESTACIONTO ESTACION TOTAL MCA SOKIA HRA 144.00 15.79 2,273.76 0.04%
CFEXCAVLARGO EXCAVADORA DE LARGO ALCANCE HRA 63.1764 544.41 34,393.86 0.53%
CFEXCCAT235 EXCAVADORA SOBRE ORUGAS CATERPILLAR HRA 413.5211 620.42 256,556.76 3.97%
235
CFLANCHA LANCHA DE FIBRA DE VIDRIO HRA 72.00 8.87 638.64 0.01o/o
CFROH012 RETROEXCAVADORA CATERPILLAR 426. HRA 22.5478 161.99 3,652.52 0.06%
CFROH048 EQUIPO DE TOPOGRAFIA TRANSITO Y NIVEL HRA 108.00 15.07 1,627.56 0.03%
CFROZ034 DRAGA LINK BELT 108 D/1 1/2 Y3 HRA 253.3573 319.07 80,838.71 1.25%
Total EQUIPO Y HERRAMIENTA 2,339,450.71
TOTALES DE INSUMOS
Importe %
Materiales 3,635,685.71 56.06%
Mano de obra 498,945.09 07.72%
Equipo 2,339,450.71 36.21%