Está en la página 1de 1

SELLOS

5 7 9 11 13

Ø
2"

2"
Ø

Ø
2"
Lavandería
Dormitorio Hombres 1 Duchas hombres 6.2 m²

Ø
2"
39.7 m² Ø2" N.P.T. = 0 +773.10

PVC Ø2"
11.4 m²

PVC Ø2" S=1%


Área Social Dormitorio Mujeres

PVC Ø2"
Ø
2"
TI
N.P.T. = 0 +773.10 N.P.T. = 0 +773.10 Ø2"
19.1 m² 31.3 m² S.S.
N.P.T. = 0 +773.10 N.P.T. = 0 +773.10
2.4 m²

Ø
Ø

2"
2"

Ø2"
SV SV SV

Ø3"

PVC Ø3"

CONECTA A DUCHA
PVC Ø1-1/2" S=0.5%
CONECTA A DUCHAS

1%
PVC Ø1-1/2" S=0.5%

S=
3 Ver hoja

3"
PV
N.P.T. = 0 +773.10

Ø
C

C
Ø

PV
A-38

3"
A-44

3"
Ø
PVC Ø3" PVC Ø3" PVC Ø3" PVC Ø3" PVC Ø2"

Ø2"
SV

TUBERÍA PVC Ø2" S=0.5%


CONECTA A S.S.
PVC Ø2"

PVC Ø2" S=0.5%


TUBERÍA PVC Ø2" S=0.5% TUBERÍA PVC Ø2" S=0.5% TUBERÍA PVC Ø2" S=0.5% PVC Ø1-1/2" TUBERÍA PVC Ø2" S=0.5% CONECTA
SV SV A S.S.
S=0.5% TI

2"
Ø2" Ø2"

Ø
CONECTA A
DUCHA

PVC Ø2"
S=1
SV

PVC Ø2"
2"

2"
TUBERÍA PVC Ø3" S=0.5%
Ø

PVC Ø4" S=1%


Ø
S.S.

C
PV

TUBERIA PVC Ø4" S=1%


TI

IA
Dormitorio Hombres 2 Bodega C.Limpieza Ø2" TI
S.S.

R
BE
Hombres Hab. jefe 2 Hab. jefe 3
TU
N.P.T. = 0 +773.10
40.3 m² TI 5.6 m² 4.4 m² 5.1 m²
9.8 m² N.P.T. = 0 +773.10 7.1 m² PVC Ø1-1/2"
CONECTA 7.8 m²
N.P.T. = 0 +773.10 N.P.T. = 0 +773.10 N.P.T. = 0 +773.10
A S.S.

Hab. jefe 1 N.P.T. = 0 +773.10 Ø


2"

PVC Ø2"
SV Ø3"
A 1.80 m
SOBRE
7.1 m²
N.P.T. = 0 +773.10
D EL TECHO

2"
Ø
BAG Ø4"

TI
TI

PVC Ø2"
E

2"
2"

Ø
TUBERÍA PVC Ø3" S=0.5% ASCENDENTE

Ø
SV Ø3"
A 1.80 m
PROYECTO:
SOBRE EL
TECHO BAG Ø6" TUBERIA PVC Ø4" S=1% N.P.T. = 0 +773.10 TI PVC Ø1-1/2" DISEÑO MÁS CONSTRUCCIÓN DEL PROYECTO DE MODERNIZACIÓN

Ø1-1/2"

PVC Ø2"
INTEGRAL DEL PUESTO FRONTERIZO ANGUIATÚ

Ø2"
SV SV PVC Ø1-1/2"
LOTE 1: SEDE ANGUIATU

PVC Ø2"
PVC Ø2" S=1%

PVC Ø1-1/2"
TUBERÍA PVC Ø3" S=0.5%

Área Común Hab. 14 Ø


2"
Hab. 15 Hab. 16 Hab. 17 Hab. 18 Hab. 19

Ø1-1/2"
PVC
22.7 m²
12.0 m² 9.6 m² 9.7 m² 10.5 m² 9.6 m² 12.8 m² PLANO DE DISEÑO ACTUALIZADO A FECHA: OCTUBRE 2021
TUBERIA PVC Ø4" S=1%

PVC Ø1-1/2"
N.P.T. = 0 +773.10 N.P.T. = 0 +773.10 2" N.P.T. = 0 +773.10 N.P.T. = 0 +773.10 N.P.T. = 0 +773.10
N.P.T. = 0 +773.10 N.P.T. = 0 +773.10

PV

PV

Ø
Ø SV

2"
C

C
2"
Ø

Ø
SV

Ø
2"

2"
S=
1%

PVC Ø3" S=1% COLGADA EN LOSA


PVC Ø3" S=1%
P R E S E N T A: E S Q U E M A D E U B I C A C I Ó N:

Ø3"
2"
Ø
PVC Ø2"
TI TI
PVC Ø2"

3"
SV

Ø
PV
C
Ø
2"
N

PVC Ø 2" S=0.5%

PVC Ø3" S=0.5%


Ø
4"

N.P.T. = 0 +773.10 N.P.T. = 0 +773.10


SUPERVISA:

3"
TUBERIA PVC Ø3" S=1%

3"
TUBERIA PVC Ø4" S=1%

Ø
TUBERIA PVC Ø4" S=1%

Ø
N.P.T. = 0 +773.10
Ver hoja SV TUBERÍA PVC Ø3" S=0.5% TUBERÍA PVC Ø3" S=0.5% TUBERÍA PVC Ø3" S=0.5% TUBERÍA PVC Ø3" S=0.5% TUBERÍA PVC Ø3" S=0.5% TUBERÍA PVC Ø3" S=0.5% SV
SV SV PVC Ø2"

A-43 PVC Ø2" CONECTA


TUBERIA PVC Ø3" S=1%

A S.S.
TI Ø2"
TI

PVC Ø3" S=1%


2"
TUBERÍA PVC Ø1-1/2" S=0.5%

Ø2" S=1%
TI Ø2"

Ø3"
PV

PVC Ø1-1/2"
TI C
Ø
2"
PVC Ø2" S=1%
PVC Ø2"

2"
F U E N T E D E F I N A N C I A M I E N T O: P R O P I E T A R I O:

Ø
2"

Ø2"
PVC

PVC Ø3"
TUBERÍA PVC Ø 2" S=0.5%
Ø2"

S=1%
Cocina 2"
SV
2"

2"

2"
Ø Ø
Ø

Hab. 20 Hab. 21 Hab. 22 Hab. 23 Hab. 24 Hab. 25 Hab. 26

Ø
C
PV

C
C

PV
16.1 m²
PV

2"

PVC Ø2" S=1%


Lav.

Ø
N.P.T. = 0 +773.10 TI 10.1 m² 12.8 m² 9.6 m² 9.7 m² 10.5 m² 9.6 m² 12.8 m²
2"
Ø

6.7 m² N.P.T. = 0 +773.10 N.P.T. = 0 +773.10 N.P.T. = 0 +773.10 N.P.T. = 0 +773.10 N.P.T. = 0 +773.10 N.P.T. = 0 +773.10 N.P.T. = 0 +773.10

2"
C

SV SV

Ø
PV

C
Ø2"
N.P.T. = 0 +774.15

PV
2"
Ø
C
TI

PV
2"

N.P.T. = 0 +773.10
Ø
C

Bod. D I S E Ñ O A R Q U I T E C T Ó N I C O: D I S E Ñ O E S T R U C T U R A L:
PV

2"
Ø
C

TI
PV

F ARQ. GUILLERMO ALTAMIRANO

Ø
2"
TI

Tubos 2x2 Cortasoles

PLANTA DE INSTALACIONES DE AGUAS GRISES Y VENTEO D I S E Ñ O E L É C T R I C O: D I S E Ñ O H I D R Á U L I C O:


TERCER NIVEL S I M B O L O G I A
ESC 1:75
TUBERIA DE AGUAS GRISES

YEE

FECHA: REFERENCIA: ÁREA DE TERRENO:


OCTUBRE 2021 8,515.11 m² - 12,185.12 v²
DESCARGA AGUAS GRISES
ESCALA: ÁREA DE CONSTRUCCIÓN:
INDICADAS 8,734.84 m² - 12,499.56 v²
SIFON
C O N T E N I D O:
TUBERIA DE VENTEO
PLANTA DE INSTALACIONES DE
NOTAS DE PLANO TALLER: AGUAS GRISES Y VENTEO
- LA DISTRIBUCION DE RED DE AGUA GRISES Y VENTEO SE ACTUALIZO SEGÚN LOS CAMBIOS TEE PVC PARA VENTEO
REALIZADOS EN CAMPO, LAS SUBIDAS DE VENTEO FUERON ADECUADAS SEGUN PREVISIONES NIVEL 3
VISTOS EN PLANOS TALLER, DISTRIBUCION ESTRUCTUAL DE LOSA, OBSERVACIONES EN
CAMPO E INTERFERENCIAS DE PLANOS DE INTEGRACION. CODO 90 PARA VENTEO
- CAMBIO DE BAJADA LAVADERO DE COCINA POR INTERFERENCIA CON VIGA ESTRUCTURAL
- PENDIENTE CAMBIOS EN RED DE AGUA GRISES Y VENTEO DE EDIFICIO DE MIGRACION
- PENDIENTE INTEGRACION DE DRENAJE DE EQUIPO DE AIRE ACONDICIONADO, FALTA DE TEE
APROBACION DE PLANOS TALLER
CONTRATO: FOM II-CB-2358-A/2019 HOJA No:
DISEÑO MÁS CONSTRUCCIÓN DEL PROYECTO DE MODERNIZACIÓN INTEGRAL
DEL PUESTO FRONTERIZO ANGUIATÚ LOTE 1: SEDE ANGUIATU
IH-19
REV: 003

También podría gustarte