Cubicacion de fundaciones

Radier

Ejes Ancho (m) Largo (m) Area (m2) Altura (m) Volumen ( m3)
A-B1 0.56 2.38 1.333 0.1 0.133
A-B2 0.56 2.38 1.333 0.1 0.133
B-C1 5.61 7.12 39.943 0.1 3.994
B-C2 5.61 7.12 39.943 0.1 3.994
Total hormigon M3 8.255
Cimiento Hormigon

Ejes Ancho (m) Largo (m) Area (m2) Altura (m) Volumen ( m3)
A-A 0.40 5.740 2.296 0.60 1.378
B-B 0.40 7.000 2.800 0.60 1.680
C-C 0.40 11.94 4.776 0.60 2.866
1-1 0.40 7.43 2.972 0.60 1.783
2-2 0.45 6.870 3.092 0.60 1.855
1-1 0.40 7.43 2.972 0.60 1.783
1a 0.40 0.16 0.064 0.60 0.038
1a 0.40 0.16 0.064 0.60 0.038
Subtotal 11.421
Bolon desplasado 20 % 2.284
Total de hormigon M3 9.137

Sobrecimiento Hormigon
Ejes Ancho (m) Largo (m) Area (m2) Altura (m) Volumen ( m3)
A-A 0.154 5.380 0.829 0.30 0.249
B-B 0.154 6.472 0.997 0.30 0.299
C-C 0.154 11.69 1.800 0.30 0.540
1-1 0.154 7.68 1.183 0.30 0.355
2-2 0.154 7.120 1.096 0.30 0.329
1-1 0.154 7.68 1.183 0.30 0.355
1a 0.154 0.41 0.063 0.30 0.019
1a 0.154 0.41 0.063 0.30 0.019
Total hormigon M3 2.164
Viga cadena
Ejes Ancho (m) Largo (m) Area (m2) Altura (m) Volumen ( m3)
A-A 0.154 5.380 0.829 0.42 0.344
B-B 0.154 6.472 0.997 0.42 0.414
C-C 0.154 11.69 1.800 0.42 0.747
1-1 0.154 7.68 1.183 0.42 0.491
2-2 0.154 7.120 1.096 0.42 0.455
1-1 0.154 7.68 1.183 0.42 0.491
1a 0.154 0.41 0.063 0.42 0.026
1a 0.154 0.41 0.063 0.42 0.026
Total hormigon M3 2.994

Viga
Ejes Ancho (m) Largo (m) Area (m2) Altura (m) Volumen ( m3)
viga 15/60 0.150 5.610 0.842 0.60 0.505
viga 15/60 0.150 5.610 0.842 0.60 0.505
Total hormigon M3 1.010

Loza
Ejes Ancho (m) Largo (m) Area (m2) Altura (m) Volumen ( m3)
A-B1 0.56 2.38 1.333 0.12 0.160
A-B2 0.56 2.38 1.333 0.12 0.160
B - C 1,1 5.610 5.87 32.931 0.12 3.952
B - C 1,2 1.090 5.61 6.115 0.12 0.734
B - C 2,1 5.610 5.870 32.931 0.12 3.952
B - C 2,2 1.090 5.61 6.115 0.12 0.734
Total hormigon M3 9.691

RESUMEN
Radier 8.255
Cimiento Hormigon 9.137
Sobrecimiento Hormigon 2.164
Viga cadena 2.994
Viga 1.010
Loza 9.691
TOTAL M3 33.251