Documentos de Académico
Documentos de Profesional
Documentos de Cultura
PRESUPUESTO
3.02 VIGAS
a)Concreto f`c= 175 kg/cm2, fy=4200 kg/cm2 m3 17.50 211.54 3701.95
b) Encofrado m2 38.50 40.86 1573.11
c)Acero kg 770.65 5.23 4030.50 9305.56
4.00 MUROS
4.01 De cabeza ladrillo arcilla de 18 huecos m2 140.00 51.20 7168.00 7168.00
TOTAL COSTO DIRECTO 45952.30
Gastos Generales y Utilidad 20% 9190.46
COSTO TOTAL 55142.76
MO Herr Cement Horm. Ag.G.Pda Gde Maq.Nac Madera Agua Ag. Fino Ac. Corr Ladrillo
0.47 0.37 0.21 0.38 0.05 0.48 0.43 0.02
4062.1 203.35
336.88 16.82
0.349 0.018 0.144 0.012 0.032 0.019 0.069 0.063 0.010 0.060 0.057
1
MO Herr Cement Horm. Ag.G.Pda Gde Maq.Nac Madera Agua Ag. Fino Ac. Corr Lad. Arcil a
0.47 0.37 0.21 0.38 0.05 0.48 0.43 0.02 0.04 0.03 0.17
0.349 0.018 0.144 0.012 0.032 0.019 0.069 0.063 0.010 0.060 0.057
FORMULA
2
3