05 m3
Relleno Compactado suelo cemento 20:1 1.60 m3 28.36
Pared Bloque de 15 cms 14.88 m2 363.87
Losa Concreto e=13.5 cms, Doble Lecho 3/8" @ 15 cms a.s. 4.20 m2 237.92
Losa Concreto e=13.5 cms, Doble Lecho 3/8" @ 15 cms a.s. 2.86 m2 125.96
Viga VC: 25x15, 4-1/2"+ est-3/8" @ 13cms 0.35 m3 222.79
Repello de superficies verticales e=2 cm, m=1:4 1N 15.20 m2 27.03
Afinado de Superficies verticales 1N 15.20 m2 21.60
Repello de superficies Horizontales (losa) e=2 cm, m=1:4 6.00 m2 11.78
Afinado de Superficies Horizontales 6.00 m2 8.53
1047.82
1685.38
89.49 2.68 7.06 92.17
3.77 4.74 23.04 36.86
128.78 22.46 34.62 515.12
116.06 6.75 85.89 360.74
70.06 4.33 70.05 200.34
87.40 5.87 5.87 316.06
47.88 2.41 5.09 77.32
22.36 0.67 2.94 44.63
12.00 0.75 4.09 24.52
8.83 0.26 2.94 17.62
Mano de Obra
Concreteado solera 1 0.00 ml $25.00 $0.00
Pegamento de Bloque 20 cms 1 1 0.00 c/u 0.45 $0.00
Pegamento de Bloque 15 cms 2 1 186.00 c/u 0.35 $65.10
Pegamento de Bloque 10 cms 2 1 0.00 c/u 0.30 $0.00
Lleno de Baston 20 1 0.00 ml $1.50 $0.00
Lleno de Baston 15 1 30.69 ml $1.25 $38.36
Lleno de Baston 10 1 0.00 ml $1.00 $0.00
armaduria 1/4 1 0.25 qq $12.00 $2.98
armaduria 3/8 1 0.00 qq $11.00 $0.00
armaduria 1/2 1 1.06 qq $10.00 $10.63
armaduria 5/8 1 0.00 qq $9.00 $0.00
armaduria 3/4 1 0.00 qq $8.00 $0.00
armaduria 7/8 1 0.00 qq $7.00 $0.00
armaduria 1 1 0.00 qq $6.00 $0.00
Hechura de Andamio de 1.50 1 9.300 ml $1.26 $11.72
hasta altura de 3.00 mts
Total Mano de Obra $128.78 ¢0.69
Herramientas y Equipo
Alquiler Andamios 9.300 ml $2.00 $18.60
Herramienta 0.03 % $128.78 $3.86
$22.46
1N 85.66
2N
ref. horizontal ancho area bloques
Ø sep area 20 area 15 area 10 blo20 blo15 bloq10
6 0.4 0.15 0 14.88 0 0 162.75 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 14.88 0 0 162.75 0
14.88
cuantias 0 10.9375 0
0.00095156
0.00082031
0.00068906
m3 mezcla/bloq
BLOQUITUBOSDIFERENCIA
0.0010 0.00056 0.0004
0.0008 0.0004 0.0004 0.0651
0.0007 0.00036 0.0003
20 15 10 lbs 20 15 10 ml 20 15
0.00 0.13 0.00 0 30.6891026 0 9.3 0.00 23.25
0.00 0.00 0.00 0 0 0 0 0.00 0.00
0.00 0.00 0.00 0 0 0 0 0.00 0.00
0.00 0.00 0.00 0 0 0 0 0.00 0.00
0.00 0.00 0.00 0 0 0 0 0.00 0.00
0.00 0.00 0.00 0 0 0 0 0.00 0.00
solera
10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
LICITACION
2.31559
tabla cuarton regla puntales
1 16.80 14.40 8.80 5.6
2 0.00 0.00 0.00 0
3 0.00 0.00 0.00 0
4 0.00 0.00 0.00 0
5 0.00 0.00 0.00 0
6 0.00 0.00 0.00 0
7 0.00 0.00 0.00 0
8 0.00 0.00 0.00 0
9 0.00 0.00 0.00 0
10 0.00 0.00 0.00 0
11 0.00 0.00 0.00 0
12 0.00 0.00 0.00 0
13 0.00 0.00 0.00 0
14 0.00 0.00 0.00 0
15 0.00 0.00 0.00 0
16 0.00 0.00 0.00 0
17 0.00 0.00 0.00 0
18 0.00 0.00 0.00 0
19 0.00 0.00 0.00 0
20 0.00 0.00 0.00 0
21 0.00 0.00 0.00 0
22 0.00 0.00 0.00 0
23 0.00 0.00 0.00 0
24 0.00 0.00 0.00 0
25 0.00 0.00 0.00 0
26 0.00 0.00 0.00 0
27 0.00 0.00 0.00 0
28 0.00 0.00 0.00 0
29 0.00 0.00 0.00 0
30 0.00 0.00 0.00 0
31 0.00 0.00 0.00 0
32 0.00 0.00 0.00 0
33 0.00 0.00 0.00 0
34 0.00 0.00 0.00 0
35 0.00 0.00 0.00 0
36 0.00 0.00 0.00 0
37 0.00 0.00 0.00 0
38 0.00 0.00 0.00 0
39 0.00 0.00 0.00 0
40 0.00 0.00 0.00 0
41 0.00 0.00 0.00 0
16.80 14.40 8.80 5.60
20.16 17.28 10.56 6.72
2.31559
tabla cuarton regla puntales
1 4.40 5.67 4.20 1.46666667
2 7.04 7.75 5.40 2.34666667
3 0.00 0.00 0.00 0
4 0.00 0.00 0.00 0
5 0.00 0.00 0.00 0
6 0.00 0.00 0.00 0
7 0.00 0.00 0.00 0
8 0.00 0.00 0.00 0
9 0.00 0.00 0.00 0
10 0.00 0.00 0.00 0
11 0.00 0.00 0.00 0
12 0.00 0.00 0.00 0
13 0.00 0.00 0.00 0
14 0.00 0.00 0.00 0
15 0.00 0.00 0.00 0
16 0.00 0.00 0.00 0
17 0.00 0.00 0.00 0
18 0.00 0.00 0.00 0
19 0.00 0.00 0.00 0
20 0.00 0.00 0.00 0
21 0.00 0.00 0.00 0
22 0.00 0.00 0.00 0
23 0.00 0.00 0.00 0
24 0.00 0.00 0.00 0
25 0.00 0.00 0.00 0
26 0.00 0.00 0.00 0
27 0.00 0.00 0.00 0
28 0.00 0.00 0.00 0
29 0.00 0.00 0.00 0
30 0.00 0.00 0.00 0
31 0.00 0.00 0.00 0
32 0.00 0.00 0.00 0
33 0.00 0.00 0.00 0
34 0.00 0.00 0.00 0
35 0.00 0.00 0.00 0
36 0.00 0.00 0.00 0
37 0.00 0.00 0.00 0
38 0.00 0.00 0.00 0
39 0.00 0.00 0.00 0
40 0.00 0.00 0.00 0
41 0.00 0.00 0.00 0
11.44 13.41 9.60 3.81
13.73 16.10 11.52 4.58
Mano de Obra
Concreteado Viga 1 0.35 ml $25.00 $8.72
armaduria 1/4 1 0.00 qq $12.00 $0.00
armaduria 3/8 1 0.73 qq $11.00 $8.04
armaduria 1/2 1 1.02 qq $10.00 $10.19
armaduria 5/8 1 0.00 qq $9.00 $0.00
armaduria 3/4 1 0.00 qq $8.00 $0.00
armaduria 7/8 1 0.00 qq $7.00 $0.00
armaduria 1 1 0.00 qq $6.00 $0.00
Moldeado de Viga de 1 6.05 ml $10.00 $60.45
peralte meyor 25 cms altura
Total Mano de Obra $87.40
Herramientas y Equipo
Herramienta 0.03 % $87.40 $2.62
Vibrador Electrico para concreto 0.35 m3 $4.00 $1.40
Bomba 0.09 hora $20.00 $1.74 1.5
Concretera 0.02 hora $6.50 $0.11
$5.87
calculo volumen
1 0.25 0.15 9.3 0.35
6.355
3.58 ref. de tension ( - neg ) acero acero acero
3.58 n Ø long mts varillas qq
3.01 0 9 19.37 0 0.00 0.0
1.59 12 0 0.00 0.0
0 15 3.5 0 0.00 0.0
0 18 4.5 0 0.00 0.0
20 0 0.00 0.0
25 0 0.00 0.0
ref. de tension ( + pos ) acero acero acero
n Ø long mts varillas qq
9 0 0.00 0.0
12 0 0.00 0.0
0 15 3 0 0.00 0.0
0 18 4 0 0.00 0.0
35.5 20 0 0.00 0.0
0 25 13 0 0.00 0.0
concreto acero en metros Alambre
m3 6 (¼) 9 (⅜) 12 (½) 15 (⅝) 18 (¾) 20 (⅞) 25 (1") lbs tabla
1.00 0 164 123 0 0 0 0 15.05 27.7333333
0.00 2.10 2.92 0 0.00 0.00 0.00
ENCOFRADOS area
cuarton cuarton costanera regla de
puntal durmiente balules patas clavo 2 1/2 clavo 4 encofrado
30.89 16.00 33.14 58.64 40.00 26.67 17.33
LICITACION
PROYECTO CONSTRUCCION DE RESIDENCIA SANDOVAL
MUNICIPIO DE ANTIGUO CUSCATLAN, DEPARTAMENTO DE LA LIBERTAD
PRESENTA ARQ. ADRIANA AVELAR DE SERRANO
13 DE MARZO DE 2017
Materiales
Cuartondepino Varas 2.28 $2.00 $4.56
Arena de río m3 0.24 $10.29 $2.46
Aqua potable llevada en pipa m3 0.08 $4.20 $0.32
Cemento gris portland tipo 1 Bolsa 2.81 $7.00 $19.68
Total de Materiales $27.03
Mano de Obra
Auxiliar por hora hora 4.56 $3.00 $13.68
LA:134 Repellar Superficie M2 15.20 $2.25 $34.20
Verticat.<3 ml
Total de Mano de Obra $47.88 3.15
Herramienta
Herramienta en porcentaje a la % 0.03 $47.88 $1.44
mano de obra
Concretera de 1 bolsa hora $0.29 $3.43 $0.98
Total de Herramienta $2.41
182.59
180.29
LICITACION
PROYECTO CONSTRUCCION DEL COMPLEJO DEPORTIVO DE SAN IGNACIO
MUNICIPIO DE SAN IGNACIO, DEPARTAMENTO DE CHALATENANGO
PRESENTA CONSTRUCTORA AVELAR S.A. DE C.V.
16 DE FEBRERO 2003
Materiales
Aqua potable llevada en pipa m3 0.08 $4.20 $0.32
Cemento gris portland tipo 1 Bolsa 3.04 $7.00 $21.28 V1
Total de Materiales $21.60 V2
V3
V4
Mano de Obra V5
Auxiliar por hora hora 4.56 $1.57 $7.16 V6
LA:134 Pulir Superficie M2 15.20 $1.00 $15.20 V7
Vertical.<3 ml V8
Total de Mano de Obra $22.36 1.471
P1
Herramienta P6
Herramienta en porcentaje a la % 0.03 $22.36 $0.67 P7
mano de obra P8
Total de Herramienta $0.67
Materiales
Cuartondepino Varas 0.90 $2.00 $1.80
Arena de río m3 0.09 $10.29 $0.97
Aqua potable llevada en pipa m3 0.03 $4.20 $0.13
Cemento gris portland tipo 1 Bolsa 1.11 $8.00 $8.88
Total de Materiales $11.78
Mano de Obra
Auxiliar por hora hora 1.80 $3.00 $5.40
LA:134 Repellar Superficie M2 6.00 $1.10 $6.60
Verticat.<3 ml
Total de Mano de Obra $12.00 2
Herramienta
Herramienta en porcentaje a la % 0.03 $12.00 $0.36
mano de obra
Concretera de 1 bolsa hora $0.11 $3.43 $0.39
Total de Herramienta $0.75
Materiales
Aqua potable llevada en pipa m3 0.03 $4.20 $0.13
Cemento gris portland tipo 1 Bolsa 1.20 $7.00 $8.40 V1
Total de Materiales $8.53 V2
V3
V4
Mano de Obra V5
Auxiliar por hora hora 1.80 $1.57 $2.83 V6
LA:134 Pulir Superficie M2 6.00 $1.00 $6.00 V7
Vertical.<3 ml V8
Total de Mano de Obra $8.83 1.471
P1
Herramienta P6
Herramienta en porcentaje a la % 0.03 $8.83 $0.26 P7
mano de obra P8
Total de Herramienta $0.26