Excavacion a Mano menor de 3.00 mts 13.

05 m3
Relleno Compactado suelo cemento 20:1 1.60 m3 28.36
Pared Bloque de 15 cms 14.88 m2 363.87
Losa Concreto e=13.5 cms, Doble Lecho 3/8" @ 15 cms a.s. 4.20 m2 237.92
Losa Concreto e=13.5 cms, Doble Lecho 3/8" @ 15 cms a.s. 2.86 m2 125.96
Viga VC: 25x15, 4-1/2"+ est-3/8" @ 13cms 0.35 m3 222.79
Repello de superficies verticales e=2 cm, m=1:4 1N 15.20 m2 27.03
Afinado de Superficies verticales 1N 15.20 m2 21.60
Repello de superficies Horizontales (losa) e=2 cm, m=1:4 6.00 m2 11.78
Afinado de Superficies Horizontales 6.00 m2 8.53

1047.82
1685.38
89.49 2.68 7.06 92.17
3.77 4.74 23.04 36.86
128.78 22.46 34.62 515.12
116.06 6.75 85.89 360.74
70.06 4.33 70.05 200.34
87.40 5.87 5.87 316.06
47.88 2.41 5.09 77.32
22.36 0.67 2.94 44.63
12.00 0.75 4.09 24.52
8.83 0.26 2.94 17.62

586.63 50.93 1685.38


LICITACION
PROYECTO CONSTRUCCION DE RESIDENCIA SANDOVAL
MUNICIPIO DE ANTIGUO CUSCATLAN, DEPARTAMENTO DE LA LIBERTAD
PRESENTA ARQ. ADRIANA AVELAR DE SERRANO
13 DE MARZO DE 2017

ANALISIS DE PRECIOS UNITARIOS


Descripcion
partida No SERVICIOS SANITARIOS
Unidad m3
ITEM No.: Excavacion a Mano menor de 3.00 mts
vol de obra 13.05
Descripcion Cantidad unidad Precio Total
Mano de Obra ###
Auxiliar por hora 1 78.3 hora $1.14 $89.49
Total Mano de Obra $89.49

Herramientas y Equipo ###


Herramienta en porcentaje a la 0.03 % $89.49 $2.68
mano de obra
Total Herramientas y Equipo $2.68

costo directo $92.17


0.00% Indirectos $0.00
Precio Unitar $7.06
LICITACION
PROYECTO CONSTRUCCION DE RESIDENCIA SANDOVAL
MUNICIPIO DE ANTIGUO CUSCATLAN, DEPARTAMENTO DE LA LIBERTAD
PRESENTA ARQ. ADRIANA AVELAR DE SERRANO
13 DE MARZO DE 2017

ANALISIS DE PRECIOS UNITARIOS


Descripcion
partida No SERVICIOS SANITARIOS
Unidad m3
ITEM No.: Relleno Compactado suelo cemento 20:1
vol de obra 1.60
Descripcion Cantidad unidad Precio Total
Materiales ###
Selecto 1.84 m3 $4.60 $8.46
Cemento 2.4 bolsas $8.05 $19.32
Agua llevada en pipa 0.136 m3 $4.20 $0.57
Total Materiales $28.36

Mano de Obra ###


Auxiliar por hora 2.4 hora $1.57 $3.77
Total Mano de Obra $3.77

Herramientas y Equipo ###


Herramienta en porcentaje a 0.03 % $3.77 $0.11
mano de obra
Vibrocompactadora 0.010384 mes $445.71 $4.63
Total Herramientas y Equipo $4.74

costo directo $36.86


0.00% Indirectos $0.00
Precio Unitar $23.04
password
DVFJHHZZGZMJJGV
PROYECTO CONSTRUCCION DE RESIDENCIA SANDOVAL
MUNICIPIO DE ANTIGUO CUSCATLAN, DEPARTAMENTO DE LA LIBERTAD
PRESENTA ARQ. ADRIANA AVELAR DE SERRANO
13 DE MARZO DE 2017

ANALISIS DE PRECIOS UNITARIOS


Descripcion 40
partida No PAREDES 210
Unidad m2 15
ITEM No.: Pared Bloque de 15 cms
vol de obra 14.88
Descripcion Cantidad unidad Precio Total
Materiales
Grout 0.75 m3 ¢107.28 $80.25 15.58
Mortero 1:4 0.13 m3 ¢103.50 $13.82
Bloque de 20 cms 0.00 unidad $0.55 $0.00 aumento de precio bloque
Solera de 20 cms 0.00 unidad $0.55 $0.00 total
Bloque de 15 cms 162.75 unidad $0.42 $68.36 ¢89.51
Solera de 15 cms 23.25 unidad $0.42 $9.77 ¢15.11
Bloque de 10 cms 0.00 unidad $0.32 $0.00
Solera de 10 cms 0.00 unidad $0.32 $0.00
Hierro Ø 1/4" 0.25 qq $44.00 $10.91
Hierro Ø 3/8" 0.00 qq $44.00 $0.00
Hierro Ø 1/2" 1.06 qq $44.00 $46.77
Hierro Ø 5/8" 0.00 qq $44.00 $0.00
Hierro Ø 3/4" 0.00 qq $44.00 $0.00
Hierro Ø 7/8" 0.00 qq $44.00 $0.00
Hierro Ø 1" 0.00 qq $44.00 $0.00
alambre 3.93 libras $4.00 $15.73
Cuarton de Pino 22.32 varas $4.00 $89.28
Regla Pacha de pino 7.44 varas $2.05 $15.25
Clavo con cabeza 2-1/2" 2.98 libras $0.50 $1.49
Desencofrante-separol cimbrafest 1.79 gln $6.86 $12.25

Total Materiales $363.87

Mano de Obra
Concreteado solera 1 0.00 ml $25.00 $0.00
Pegamento de Bloque 20 cms 1 1 0.00 c/u 0.45 $0.00
Pegamento de Bloque 15 cms 2 1 186.00 c/u 0.35 $65.10
Pegamento de Bloque 10 cms 2 1 0.00 c/u 0.30 $0.00
Lleno de Baston 20 1 0.00 ml $1.50 $0.00
Lleno de Baston 15 1 30.69 ml $1.25 $38.36
Lleno de Baston 10 1 0.00 ml $1.00 $0.00
armaduria 1/4 1 0.25 qq $12.00 $2.98
armaduria 3/8 1 0.00 qq $11.00 $0.00
armaduria 1/2 1 1.06 qq $10.00 $10.63
armaduria 5/8 1 0.00 qq $9.00 $0.00
armaduria 3/4 1 0.00 qq $8.00 $0.00
armaduria 7/8 1 0.00 qq $7.00 $0.00
armaduria 1 1 0.00 qq $6.00 $0.00
Hechura de Andamio de 1.50 1 9.300 ml $1.26 $11.72
hasta altura de 3.00 mts
Total Mano de Obra $128.78 ¢0.69

Herramientas y Equipo
Alquiler Andamios 9.300 ml $2.00 $18.60
Herramienta 0.03 % $128.78 $3.86
$22.46

costo directo $515.12


0.00% Indirectos $0.00
Precio Unitar $34.62
Cantidad largo altura sep ref. vertical ref. horizontal
solera n Ø sep n
1 9.3 1.6 1.6 1 12 0.4 1
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0.4 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0

aumento de precio bloque


diferencia %
$21.16 5.81
$5.35 1.47 34.2366667
7.28
$26.51 5.15
$4,000,000.00

1N 85.66
2N
ref. horizontal ancho area bloques
Ø sep area 20 area 15 area 10 blo20 blo15 bloq10
6 0.4 0.15 0 14.88 0 0 162.75 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 14.88 0 0 162.75 0
14.88
cuantias 0 10.9375 0

0.425 0.2 0.025 0.0021 0.00121875 0.000906


0.425 0.15 0.025 0.0016 0.0008125 0.000781
0.425 0.1 0.025 0.0011 0.00040625 0.000656
m3 grout/ml m3 mezcla/bloq
0.2000 0.0244 0.2000
0.1500 0.0163 0.1500
0.1000 0.0081 0.1000

grout acero en metros

grout 20 grout 15 grout 10 Ø 6 mm Ø 9 mm Ø 12 mm Ø 15 mm Ø 18 mm Ø 20 mm Ø 25 mm


0.00 0.75 0.00 45 0 45 0 0 0 0
0.00 0.00 0.00 0 0 0 0 0 0 0
0.00 0.00 0.00 0 0 0 0 0 0 0
0.00 0.00 0.00 0 0 0 0 0 0 0
0.00 0.00 0.00 0 0 0 0 0 0 0
0.00 0.00 0.00 0 0 0 0 0 0 0
0.00 0.75 0.00 45 0 45 0 0 0 0
0.25 0.00 1.06 0 0.00 0.00 0.00
0 0.0502719674 0 0.0166666667 0 0.0714285714 0 0 0 0

0.00095156
0.00082031
0.00068906
m3 mezcla/bloq
BLOQUITUBOSDIFERENCIA
0.0010 0.00056 0.0004
0.0008 0.0004 0.0004 0.0651
0.0007 0.00036 0.0003

mortero alambre lleno andamio solera solera

20 15 10 lbs 20 15 10 ml 20 15
0.00 0.13 0.00 0 30.6891026 0 9.3 0.00 23.25
0.00 0.00 0.00 0 0 0 0 0.00 0.00
0.00 0.00 0.00 0 0 0 0 0.00 0.00
0.00 0.00 0.00 0 0 0 0 0.00 0.00
0.00 0.00 0.00 0 0 0 0 0.00 0.00
0.00 0.00 0.00 0 0 0 0 0.00 0.00

0.000 0.13 0.000 3.93 0 30.6891026 0 9.3 0.00 23.25


0 0.0089721406 0 0.2642857143 0 2.0624396884 0 0.625 0 1.5625
m3 grout/solera
20 0.005906 0.005906
15 0.003938 0.003938
10 0.001969 0.001969

solera

10
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0
LICITACION

PROYECTO CONSTRUCCION DEL COMPLEJO DEPORTIVO DE SAN IGNACIO 12


MUNICIPIO DE SAN IGNACIO, DEPARTAMENTO DE CHALATENANGO 12
PRESENTA CONSTRUCTORA AVELAR S.A. DE C.V. 12
16 DE FEBRERO 2003 12
12
ANALISIS DE PRECIOS UNITARIOS 12
Descripcion 12
partida No FOSA SEPTICA 12
Unidad m2 12
ITEM No.: Losa Concreto e=13.5 cms, Doble Lecho 3/8" @ 15 cms a.s. 12
vol de obra 4.20 vol 0.42 12
Descripcion unidad Cantidad Precio Total 12
Materiales 12
Concreto Prefabricado m3 0.42 $125.00 $52.50 12
Cemento bolsa 4.12 $0.00 $0.00 12
Arena m3 0.23 $0.00 $0.00 12
Grava m3 0.23 $0.00 $0.00 12
Hierro Ø 3/8" qq 1.30 $50.60 $65.95 12
Hierro Ø 1/2" qq 2.42 $50.60 $122.48 12
Hierro Ø 5/8" qq 0.00 $50.60 $0.00 12
alambre libras 4.20 $1.00 $4.20 12
Tabla de Pino varas 6.72 $3.50 $23.52 12
Regla Pacha de pino varas 3.52 $2.00 $7.04 12
Cuarton de Pino varas 3.46 $4.00 $13.82 12
Clavo con cabeza 4" libras 0.31 $0.50 $0.16 12
Clavo con cabeza 2-1/2" libras 0.31 $0.50 $0.16 12
Clavo acero 2-1/2" unidad 4.42 $0.12 $0.53 12
Desencofrante-separol cimbrafe gln 0.01 $6.86 $0.07 12
Total Materiales $237.92 12
12
Mano de Obra 12
Concreteado m2 4.20 $5.00 $21.00 12
armaduria 3/8 qq 1.30 $11.00 $14.34 12
armaduria 1/2 qq 2.42 $16.00 $38.73 12
armaduria 5/8 qq 0.00 $10.00 $0.00 12
Moldeado de Losa m2 4.20 $10.00 $42.00 12
12
Total Mano de Obra $116.06 ¢27.63 12
12
Herramientas y Equipo 12
Herramienta % 0.03 $116.06 $3.48 12
Vibrador Electrico para concre hora 0.46 $0.57 $0.26
Concretera hora 0.46 $6.50 $3.00
$6.75

costo directo $360.74


0.00% Indirectos $0.00
I.V.A. 0.00
Precio Unitar $85.89

Descripcion unidad Cantidad Precio Total


Mano de Obra
Concreteado m2 65.36 $6.00 $392.18
armaduria 3/8 qq 0.00 $12.00 $0.00
armaduria 1/2 qq 30.47 $14.00 $426.56
armaduria 5/8 qq 0.00 $10.00 $0.00
Moldeado de Losa m2 65.36 $6.60 $431.49

Total Mano de Obra $1,250.23


largo ancho area e vol @ 3/8 1/2 5/8
9 3 1.4 4.2 0.1 0.42 0.1 1.3 2.4 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
4.20 0.42 1.30 2.42 0.00

2.31559
tabla cuarton regla puntales
1 16.80 14.40 8.80 5.6
2 0.00 0.00 0.00 0
3 0.00 0.00 0.00 0
4 0.00 0.00 0.00 0
5 0.00 0.00 0.00 0
6 0.00 0.00 0.00 0
7 0.00 0.00 0.00 0
8 0.00 0.00 0.00 0
9 0.00 0.00 0.00 0
10 0.00 0.00 0.00 0
11 0.00 0.00 0.00 0
12 0.00 0.00 0.00 0
13 0.00 0.00 0.00 0
14 0.00 0.00 0.00 0
15 0.00 0.00 0.00 0
16 0.00 0.00 0.00 0
17 0.00 0.00 0.00 0
18 0.00 0.00 0.00 0
19 0.00 0.00 0.00 0
20 0.00 0.00 0.00 0
21 0.00 0.00 0.00 0
22 0.00 0.00 0.00 0
23 0.00 0.00 0.00 0
24 0.00 0.00 0.00 0
25 0.00 0.00 0.00 0
26 0.00 0.00 0.00 0
27 0.00 0.00 0.00 0
28 0.00 0.00 0.00 0
29 0.00 0.00 0.00 0
30 0.00 0.00 0.00 0
31 0.00 0.00 0.00 0
32 0.00 0.00 0.00 0
33 0.00 0.00 0.00 0
34 0.00 0.00 0.00 0
35 0.00 0.00 0.00 0
36 0.00 0.00 0.00 0
37 0.00 0.00 0.00 0
38 0.00 0.00 0.00 0
39 0.00 0.00 0.00 0
40 0.00 0.00 0.00 0
41 0.00 0.00 0.00 0
16.80 14.40 8.80 5.60
20.16 17.28 10.56 6.72

6.72 3.46 3.52 2.24


1.60 0.82 0.84 0.53
LICITACION

PROYECTO CONSTRUCCION DEL COMPLEJO DEPORTIVO DE SAN IGNACIO 12


MUNICIPIO DE SAN IGNACIO, DEPARTAMENTO DE CHALATENANGO 12
PRESENTA CONSTRUCTORA AVELAR S.A. DE C.V. 12
16 DE FEBRERO 2003 12
12
ANALISIS DE PRECIOS UNITARIOS 12
Descripcion 12
partida No FOSA SEPTICA 12
Unidad m2 12
ITEM No.: Losa Concreto e=13.5 cms, Doble Lecho 3/8" @ 15 cms a.s. 12
vol de obra 2.86 vol 0.29 12
Descripcion unidad Cantidad Precio Total 12
Materiales 12
Concreto Prefabricado m3 0.29 $125.00 $35.75 12
Cemento bolsa 2.80 $0.00 $0.00 12
Arena m3 0.16 $0.00 $0.00 12
Grava m3 0.16 $0.00 $0.00 12
Hierro Ø 3/8" qq 0.00 $50.60 $0.00 12
Hierro Ø 1/2" qq 1.70 $50.60 $85.90 12
Hierro Ø 5/8" qq 0.00 $50.60 $0.00 12
alambre libras 2.86 $1.00 $2.86 12
Tabla de Pino varas 4.58 $3.50 $16.02 12
Regla Pacha de pino varas 3.84 $2.00 $7.68 12
Cuarton de Pino varas 3.22 $4.00 $12.88 12
Clavo con cabeza 4" libras 0.21 $0.50 $0.11 12
Clavo con cabeza 2-1/2" libras 0.21 $0.50 $0.11 12
Clavo acero 2-1/2" unidad 3.01 $0.12 $0.36 12
Desencofrante-separol cimbrafe gln 0.01 $6.86 $0.05 12
Total Materiales $125.96 12
12
Mano de Obra 12
Concreteado m2 2.86 $5.00 $14.30 12
armaduria 3/8 qq 0.00 $11.00 $0.00 12
armaduria 1/2 qq 1.70 $16.00 $27.16 12
armaduria 5/8 qq 0.00 $10.00 $0.00 12
Moldeado de Losa m2 2.86 $10.00 $28.60 12
12
Total Mano de Obra $70.06 ¢24.50 12
12
Herramientas y Equipo 12
Herramienta % 0.03 $70.06 $2.10 12
Vibrador Electrico para concre hora 0.31 $0.57 $0.18
Concretera hora 0.31 $6.50 $2.05
$4.33

costo directo $200.34


0.00% Indirectos $0.00
I.V.A. 0.00
Precio Unitar $70.05

Descripcion unidad Cantidad Precio Total


Mano de Obra
Concreteado m2 65.36 $6.00 $392.18
armaduria 3/8 qq 0.00 $12.00 $0.00
armaduria 1/2 qq 30.47 $14.00 $426.56
armaduria 5/8 qq 0.00 $10.00 $0.00
Moldeado de Losa m2 65.36 $6.60 $431.49

Total Mano de Obra $1,250.23


largo ancho area e vol @ 3/8 1/2 5/8
0 1 1.1 1.1 0.1 0.11 0.1 0.0 0.7 0.0
0 1.6 1.1 1.76 0.1 0.18 0.1 0.0 1.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
9 0 0 0 0.15 0.00 0.1 0.0 0.0 0.0
2.86 0.29 0.00 1.70 0.00

2.31559
tabla cuarton regla puntales
1 4.40 5.67 4.20 1.46666667
2 7.04 7.75 5.40 2.34666667
3 0.00 0.00 0.00 0
4 0.00 0.00 0.00 0
5 0.00 0.00 0.00 0
6 0.00 0.00 0.00 0
7 0.00 0.00 0.00 0
8 0.00 0.00 0.00 0
9 0.00 0.00 0.00 0
10 0.00 0.00 0.00 0
11 0.00 0.00 0.00 0
12 0.00 0.00 0.00 0
13 0.00 0.00 0.00 0
14 0.00 0.00 0.00 0
15 0.00 0.00 0.00 0
16 0.00 0.00 0.00 0
17 0.00 0.00 0.00 0
18 0.00 0.00 0.00 0
19 0.00 0.00 0.00 0
20 0.00 0.00 0.00 0
21 0.00 0.00 0.00 0
22 0.00 0.00 0.00 0
23 0.00 0.00 0.00 0
24 0.00 0.00 0.00 0
25 0.00 0.00 0.00 0
26 0.00 0.00 0.00 0
27 0.00 0.00 0.00 0
28 0.00 0.00 0.00 0
29 0.00 0.00 0.00 0
30 0.00 0.00 0.00 0
31 0.00 0.00 0.00 0
32 0.00 0.00 0.00 0
33 0.00 0.00 0.00 0
34 0.00 0.00 0.00 0
35 0.00 0.00 0.00 0
36 0.00 0.00 0.00 0
37 0.00 0.00 0.00 0
38 0.00 0.00 0.00 0
39 0.00 0.00 0.00 0
40 0.00 0.00 0.00 0
41 0.00 0.00 0.00 0
11.44 13.41 9.60 3.81
13.73 16.10 11.52 4.58

4.58 3.22 3.84 1.53


1.60 1.13 1.34 0.53
LICITACION CALCULO DE CUANTIAS
PROYECTO CONSTRUCCION DE RESIDENCIA SANDOVAL
MUNICIPIO DE ANTIGUO CUSCATLAN, DEPARTAMENTO DE LA LIBERTAD datos
PRESENTA ARQ. ADRIANA AVELAR DE SERRANO
13 DE MARZO DE 2017 VB

ANALISIS DE PRECIOS UNITARIOS


Descripcion grado 60
partida No ENTREPISO f´c 280
Unidad m3
ITEM No.: Viga VC: 25x15, 4-1/2"+ est-3/8" @ 13cms
vol de obra 0.35
Descripcion Cantidad unidad Precio Total
Materiales
Concreto Prefabricado 0.35 m3 ¢118.85 $41.45
Cemento 0.00 bolsa $0.00 $0.00
Arena 0.00 m3 $0.00 $0.00
Grava 0.00 m3 $0.00 $0.00
Hierro Ø 1/4" 0.00 qq $44.00 $0.00
Hierro Ø 3/8" 0.73 qq $44.00 $32.18
Hierro Ø 1/2" 1.02 qq $44.00 $44.82
Hierro Ø 5/8" 0.00 qq $44.00 $0.00
Hierro Ø 3/4" 0.00 qq $44.00 $0.00
Hierro Ø 7/8" 0.00 qq $44.00 $0.00
Hierro Ø 1" 0.00 qq $44.00 $0.00 TECHO
alambre 5.25 libras $1.00 $5.25
Tabla de Pino 9.67 varas $1.50 $14.51
Cuarton de Pino 16.35 varas $1.35 $22.07
Regla Pacha de pino 20.45 varas $0.60 $12.27
Costanera de pino 11.56 varas $0.65 $7.51
Clavo con cabeza 2-1/2" 13.95 libras $0.50 $6.98
Clavo con cabeza 4" 9.30 libras $0.50 $4.65
Desencofrante-separol cimbrafest 4.53 gln $6.86 $31.10
Total Materiales $222.79

Mano de Obra
Concreteado Viga 1 0.35 ml $25.00 $8.72
armaduria 1/4 1 0.00 qq $12.00 $0.00
armaduria 3/8 1 0.73 qq $11.00 $8.04
armaduria 1/2 1 1.02 qq $10.00 $10.19
armaduria 5/8 1 0.00 qq $9.00 $0.00
armaduria 3/4 1 0.00 qq $8.00 $0.00
armaduria 7/8 1 0.00 qq $7.00 $0.00
armaduria 1 1 0.00 qq $6.00 $0.00
Moldeado de Viga de 1 6.05 ml $10.00 $60.45
peralte meyor 25 cms altura
Total Mano de Obra $87.40

Herramientas y Equipo
Herramienta 0.03 % $87.40 $2.62
Vibrador Electrico para concreto 0.35 m3 $4.00 $1.40
Bomba 0.09 hora $20.00 $1.74 1.5
Concretera 0.02 hora $6.50 $0.11
$5.87

costo directo $316.06


0.00% Indirectos $0.00
Precio Unitar $906.26
CALCULO DE CUANTIAS
DIMENSIONES REF. LONGITUDINAL estribos
cant bo d l n Ø n Ø Ø sep
m m m mm mm mm m
1 0.25 0.15 26.67 4 12 0 9 9 0.15

calculo volumen
1 0.25 0.15 9.3 0.35

6.355
3.58 ref. de tension ( - neg ) acero acero acero
3.58 n Ø long mts varillas qq
3.01 0 9 19.37 0 0.00 0.0
1.59 12 0 0.00 0.0
0 15 3.5 0 0.00 0.0
0 18 4.5 0 0.00 0.0
20 0 0.00 0.0
25 0 0.00 0.0
ref. de tension ( + pos ) acero acero acero
n Ø long mts varillas qq
9 0 0.00 0.0
12 0 0.00 0.0
0 15 3 0 0.00 0.0
0 18 4 0 0.00 0.0
35.5 20 0 0.00 0.0
0 25 13 0 0.00 0.0
concreto acero en metros Alambre
m3 6 (¼) 9 (⅜) 12 (½) 15 (⅝) 18 (¾) 20 (⅞) 25 (1") lbs tabla
1.00 0 164 123 0 0 0 0 15.05 27.7333333
0.00 2.10 2.92 0 0.00 0.00 0.00
ENCOFRADOS area
cuarton cuarton costanera regla de
puntal durmiente balules patas clavo 2 1/2 clavo 4 encofrado
30.89 16.00 33.14 58.64 40.00 26.67 17.33
LICITACION
PROYECTO CONSTRUCCION DE RESIDENCIA SANDOVAL
MUNICIPIO DE ANTIGUO CUSCATLAN, DEPARTAMENTO DE LA LIBERTAD
PRESENTA ARQ. ADRIANA AVELAR DE SERRANO
13 DE MARZO DE 2017

Análisis de Precio Unitario


Descripción
Partida No REPELLOS Y AFINADOS
Unidad: m2
ITEM No Repello de superficies verticales e=2 cm, m=1:4 1N
vol. de obra 15.2
Descripción Unidad Cantidad Precio U. Total

Materiales
Cuartondepino Varas 2.28 $2.00 $4.56
Arena de río m3 0.24 $10.29 $2.46
Aqua potable llevada en pipa m3 0.08 $4.20 $0.32
Cemento gris portland tipo 1 Bolsa 2.81 $7.00 $19.68
Total de Materiales $27.03

Mano de Obra
Auxiliar por hora hora 4.56 $3.00 $13.68
LA:134 Repellar Superficie M2 15.20 $2.25 $34.20
Verticat.<3 ml
Total de Mano de Obra $47.88 3.15

Herramienta
Herramienta en porcentaje a la % 0.03 $47.88 $1.44
mano de obra
Concretera de 1 bolsa hora $0.29 $3.43 $0.98
Total de Herramienta $2.41

Costo Direct $77.32


0.00% Indirectos ( $0.00
Unitario $5.09
425.8 2 851.6
46 100
379.8 751.6
194.54 1020.8
38.22 -269.2

182.59
180.29
LICITACION
PROYECTO CONSTRUCCION DEL COMPLEJO DEPORTIVO DE SAN IGNACIO
MUNICIPIO DE SAN IGNACIO, DEPARTAMENTO DE CHALATENANGO
PRESENTA CONSTRUCTORA AVELAR S.A. DE C.V.
16 DE FEBRERO 2003

Análisis de Precio Unitario


Descripción
Partida No REPELLOS Y AFINADOS
Unidad: m2
ITEM No Afinado de Superficies verticales 1N
vol. de obra 15.2
Descripción Unidad Cantidad Precio U. Total

Materiales
Aqua potable llevada en pipa m3 0.08 $4.20 $0.32
Cemento gris portland tipo 1 Bolsa 3.04 $7.00 $21.28 V1
Total de Materiales $21.60 V2
V3
V4
Mano de Obra V5
Auxiliar por hora hora 4.56 $1.57 $7.16 V6
LA:134 Pulir Superficie M2 15.20 $1.00 $15.20 V7
Vertical.<3 ml V8
Total de Mano de Obra $22.36 1.471
P1
Herramienta P6
Herramienta en porcentaje a la % 0.03 $22.36 $0.67 P7
mano de obra P8
Total de Herramienta $0.67

Costo Direct $44.63


0.00% Indirectos ( $0.00
IVA 13% $0.00
Unitario $2.94
117.3546 11 1290.90 1290.90
3.96 6 23.76
0.48 3 1.44
2.4 1 2.4
5.74 3 17.22
5.12 3 15.36
8 1 8
3.77 2 7.54
7.87 2 15.74
91.46 182.92
5.9 1 5.9
70.98 1 70.98
22.25 1 22.25
11.48 1 11.48
110.61 221.22
1088.83
LICITACION
PROYECTO CONSTRUCCION DE RESIDENCIA SANDOVAL
MUNICIPIO DE ANTIGUO CUSCATLAN, DEPARTAMENTO DE LA LIBERTAD
PRESENTA ARQ. ADRIANA AVELAR DE SERRANO
13 DE MARZO DE 2017

Análisis de Precio Unitario


Descripción
Partida No REPELLOS Y AFINADOS
Unidad: m2
ITEM No Repello de superficies Horizontales (losa) e=2 cm, m=1:4
vol. de obra 6
Descripción Unidad Cantidad Precio U. Total

Materiales
Cuartondepino Varas 0.90 $2.00 $1.80
Arena de río m3 0.09 $10.29 $0.97
Aqua potable llevada en pipa m3 0.03 $4.20 $0.13
Cemento gris portland tipo 1 Bolsa 1.11 $8.00 $8.88
Total de Materiales $11.78

Mano de Obra
Auxiliar por hora hora 1.80 $3.00 $5.40
LA:134 Repellar Superficie M2 6.00 $1.10 $6.60
Verticat.<3 ml
Total de Mano de Obra $12.00 2

Herramienta
Herramienta en porcentaje a la % 0.03 $12.00 $0.36
mano de obra
Concretera de 1 bolsa hora $0.11 $3.43 $0.39
Total de Herramienta $0.75

Costo Direct $24.52


0.00% Indirectos ( $0.00
Unitario $4.09
LICITACION
PROYECTO CONSTRUCCION DEL COMPLEJO DEPORTIVO DE SAN IGNACIO
MUNICIPIO DE SAN IGNACIO, DEPARTAMENTO DE CHALATENANGO
PRESENTA CONSTRUCTORA AVELAR S.A. DE C.V.
16 DE FEBRERO 2003

Análisis de Precio Unitario


Descripción
Partida No REPELLOS Y AFINADOS
Unidad: m2
ITEM No Afinado de Superficies Horizontales
vol. de obra 6
Descripción Unidad Cantidad Precio U. Total

Materiales
Aqua potable llevada en pipa m3 0.03 $4.20 $0.13
Cemento gris portland tipo 1 Bolsa 1.20 $7.00 $8.40 V1
Total de Materiales $8.53 V2
V3
V4
Mano de Obra V5
Auxiliar por hora hora 1.80 $1.57 $2.83 V6
LA:134 Pulir Superficie M2 6.00 $1.00 $6.00 V7
Vertical.<3 ml V8
Total de Mano de Obra $8.83 1.471
P1
Herramienta P6
Herramienta en porcentaje a la % 0.03 $8.83 $0.26 P7
mano de obra P8
Total de Herramienta $0.26

Costo Direct $17.62


0.00% Indirectos ( $0.00
IVA 13% $0.00
Unitario $2.94
117.3546 11 1290.90 1290.90
3.96 6 23.76
0.48 3 1.44
2.4 1 2.4
5.74 3 17.22
5.12 3 15.36
8 1 8
3.77 2 7.54
7.87 2 15.74
91.46 182.92
5.9 1 5.9
70.98 1 70.98
22.25 1 22.25
11.48 1 11.48
110.61 221.22
1088.83