Está en la página 1de 1

SECOYA - 002

W.O. # 20
DIAGRAMA PROPUESTO COMPLETACION ORIGINAL: 20-Nov-1987

EMR = 871' W.O. No. 14: 28-Mar-2013


ES = 850' 3-1/2" PUP JOINT EUE 9.3 LB/FT L-80 , RE-RUN W.O. No. 15: 26-Oct-2016
MR = 21' W.O.No. 16: 22-Ener-2017
3-1/2" EUE BOX 3 1/2" TSH BLUE PIN X-OVER
W.O.No. 17: 24-OCT-2017
W.O.No. 18: 21-ABR-2018
W.O.No. 19: 17-ABR-2020
CASING SUPERFICIAL
1991' 10-3/4", J-55, 45.5 L/P, 60 JUNTAS
ZAPATO GUIA SUPERFICIAL
CEMENTADO CON 825 SXS DE CEMENTO TIPO " G "

7" CASING, 282 TUBOS, C-95, 26 L/P + 1 TUBO N-80

3-1/2" PUP JOINT EUE 9.3 LB/FT L-80


3-1/2" EUE CAMISA (ID=2.81" )
3-1/2" EUE, N80, 9.3 LBS/FT, 1 TUBO
3-1/2" NO-GO
3-1/2" EUE, N80, 9.3 LBS/FT, 1 TUBO
3-1/2" EUE DESCARGA DE PRESION
3-1/2" DESGARGA DE PRODUCCION
BOMBA
B
BOMBA
B
BOMBA
B
BOMBA
B
INTAKE

PROTECTOR

MOTOR

SENSOR
CENTRALIZADOR 6".
PATA DE MULA

8785' C.O.T.D. WO 18
8793' 3-1/2" EUE PIN ON-OFF DERECHO
3 -1/2" EUE TUBO CLASE "B"

(ARENA"U Sup" Fracturada WO 8828' 7"x 3-1/2" PACKER HIDRAÚLICO WH6


13)
ARENA"U Inf"
8945' - 8952' ( 7' ) a 5 DPP
8960' - 8966' ( 6' ) a 5 DPP 8 TUBOS DE 3 1/2" EUE CLASE "B"
8976' - 8990' ( 14' ) a 5 DPP
8990' - 9000' ( 10' ) SQZ (WO-03)
9000' - 9006' ( 6' ) SQZ
9082' 7"x 3-1/2" PACKER HIDRAÚLICO WH6
ARENA"T sup"
9103'- 9106' ( 3' ) SQZ (WO-01) 3-1/2" EUE BOX X 2-3/8" EUE PIN X-OVER
9114'- 9115' ( 1' ) SQZ(WO-01)
9115'- 9122' ( 7' ) a 4 DPP 2-3/8" PUP JOINT
9125'- 9132' ( 7' ) SQZ (WO-01) 9100' 2-3/8" NO- GO (ID=1.81")
9132'- 9140' ( 8' ) a 4 DPP 2-3/8" PUP JOINT
9140'- 9142' ( 2' ) SQZ (WO-01) 9113'

9140´ C.O.T.D. WO 16
9144' 7" TAPON CIBP
ARENA"Ti"
9146' - 9160' (14') a 5 DPP
9160' - 9170' (10') SQZ (WO-01)
9173' 7" TAPON CIBP WO 03
9176 '- 9190 ( 14' )
9195'- 9208' ( 13' ) SQZ (WO-03)

9244' COLLAR FLOTADOR


9278' ZAPATO GUIA DE FONDO CEMENTADO
PT(D) = 9300' CON 500 SXS DE CEMENTO TIPO "G"
PT(L) = 9297'

También podría gustarte