UNIVERSIDAD TÉCNICA DE MANABÍ

FACULTAD DE CIENCIAS
MATEMÀTICAS, FÍSICAS Y QUÍMICAS

NOMBRE: CEDEÑO NASARENO ROSARIO ERCILIA

DOCENTE: ING. CESAR PALMA ASIGNATURA: OBRAS HIDRÁULICAS I

PARCIAL: MEDIO CICLO NIVEL: 7 “C”

POBLACION FUTURA POR EL METODO GEOMETRICO, CHONE

AÑOS POBLACION r 2018 2048


1990 63791 0.0059 84258.31488 105364.783
2001 68072 0.0106 82362.6386 111822.649
2010 74906      
PROMEDIO   0.00825 83310.47674 108593.716

Pf=1085394

CALCULO DE CAUDAL

Q∗Pf Q= dotación
q=
86400 Pf= población final

DATOS
Q = 200 l/s
Q∗Pf
q=
86400
200l /s∗1085394
q=
86400
q=314.2179 l/s
q=0.3142 m3 /s
CAUDAL DE RIEGO

Qriego= Areade riego∗dotacion


DATOS

Área= 1000ha
Q = 1 l/s/hab
l l
Qriego=1000 ha∗1 =1000 =1 m3 /s
s s

CAUDAL DE DEMANDA
Qd=Q+Qriego
Qd=1.31421793 m3/ s
VOLUMEN DE DEMANDA.
Volumen de demanda=Qd∗2.59
Volumen de demanda=3.41

Est: CHICO
Lat: 1°2'44" Long: 80°16'52"

AÑO MESES Q (m^3/s) V (hm^3) Vac D (hm^3) D ACU D-V (hm^3) D (hm^3) OBS
(hm^3) (hm^3)
ENERO 0.54 1.4 1.4 3.41 3.41 2.01 2.01 -
FEBRERO 1.64 4.25 5.65 3.41 6.82 -0.84 - -
MARZO 5.73 14.84 20.49 3.41 10.23 -11.43 - -
ABRIL 10.34 26.78 47.27 3.41 13.64 -23.37 - -
MAYO 0.81 2.1 49.37 3.41 17.05 1.31 1.31 -
JUNIO 0.72 1.86 51.23 3.41 20.46 1.55 2.86 -
1964 JULIO 0.51 1.32 52.55 3.41 23.87 2.09 4.95 -
AGOSTO 0.47 1.22 53.77 3.41 27.28 2.19 7.14 -
SEPTIEMBR
E 0.42 1.09 54.86 3.41 30.69 2.32 9.46 -
OCTUBRE 0.37 0.96 55.82 3.41 34.1 2.45 11.91 -
NOVIEMBRE 0.35 0.91 56.73 3.41 37.51 2.5 14.41 -
DICIEMBRE 0.35 0.91 57.64 3.41 40.92 2.5 16.91 -
ENERO 0.67 1.74 59.38 3.41 44.33 1.67 18.58 18.58 = Vu
FEBRERO 3.01 7.8 67.18 3.41 47.74 -4.39 - -
MARZO 11.65 30.17 97.35 3.41 51.15 -26.76 - -
ABRIL 10.55 27.32 124.67 3.41 54.56 -23.91 - -
MAYO 7.45 19.3 143.97 3.41 57.97 -15.89 - -
JUNIO 6.11 15.82 159.79 3.41 61.38 -12.41 - -
1965 JULIO 3.3 8.55 168.34 3.41 64.79 -5.14 - -
AGOSTO 2.15 5.57 173.91 3.41 68.2 -2.16 - -
SEPTIEMBR
E 1.89 4.9 178.81 3.41 71.61 -1.49 - -
OCTUBRE 1.75 4.53 183.34 3.41 75.02 -1.12 - -
NOVIEMBRE 1.65 4.27 187.61 3.41 78.43 -0.86 - -
DICIEMBRE 1.5 3.89 191.5 3.41 81.84 -0.48 - -
ENERO 3.16 8.18 199.68 3.41 85.25 -4.77 - -
FEBRERO 9.92 25.69 225.37 3.41 88.66 -22.28 - -
MARZO 9.33 24.16 249.53 3.41 92.07 -20.75 - -
ABRIL 2.88 7.46 256.99 3.41 95.48 -4.05 - -
MAYO 1.68 4.35 261.34 3.41 98.89 -0.94 - -
JUNIO 2.24 5.8 267.14 3.41 102.3 -2.39 - -
1966 JULIO 0.85 2.2 269.34 3.41 105.71 1.21 1.21 -
AGOSTO 0.71 1.84 271.18 3.41 109.12 1.57 2.78 -
SEPTIEMBR
E 0.63 1.63 272.81 3.41 112.53 1.78 4.56 -
OCTUBRE 0.62 1.61 274.42 3.41 115.94 1.8 6.36 -
NOVIEMBRE 0.55 1.42 275.84 3.41 119.35 1.99 8.35 -
DICIEMBRE 0.52 1.35 277.19 3.41 122.76 2.06 10.41 -
ENERO 7.22 18.7 295.89 3.41 126.17 -15.29 - -
FEBRERO 5.64 14.61 310.5 3.41 129.58 -11.2 - -
MARZO 4.4 11.4 321.9 3.41 132.99 -7.99 - -
ABRIL 1.25 3.24 325.14 3.41 136.4 0.17 0.17 -
1997
MAYO 0.97 2.51 327.65 3.41 139.81 0.9 1.07 -
JUNIO 0.84 2.18 329.83 3.41 143.22 1.23 2.30 -
JULIO 0.78 2.02 331.85 3.41 146.63 1.39 3.69 -
AGOSTO 0.71 1.84 333.69 3.41 150.04 1.57 5.26 -
SEPTIEMBR
E 0.65 1.68 335.37 3.41 153.45 1.73 6.99 -
OCTUBRE 0.58 1.5 336.87 3.41 156.86 1.91 8.90 -
NOVIEMBRE 0.55 1.42 338.29 3.41 160.27 1.99 10.89 -
DICIEMBRE 0.53 1.37 339.66 3.41 163.68 2.04 12.93 -

TRAZADO DE CURVA DE AREA CAPACIDAD


Área
COTA Área Área Intervalo Volúmen Volumen Vol Acum
media
(msnm) (m2) Ha2 Ha2 (m) (m3) (Hm3) (Hm3)
59.52 0 0 0.00 0 0 0 0
60 323837.72 32.38 16.19 0.48 77721.05 0.08 0.08
80 502944.54 50.29 41.34 20 8267822.62 8.27 8.27
100 487730.87 48.77 49.53 20 9906754.07 9.91 18.17
120 447016.53 44.70 46.74 20 9347474.01 9.35 27.52
140 448006.43 44.80 44.75 20 8950229.64 8.95 36.47
160 573975.10 57.40 51.10 20 10219815.30 10.22 46.69
180 674925.34 67.49 62.45 20 12489004.37 12.49 59.18
200 808219.13 80.82 74.16 20 14831444.65 14.83 74.01
220 532222.58 53.22 67.02 20 13404417.03 13.40 87.42
240 346190.85 34.62 43.92 20 8784134.24 8.78 96.20
260 319357.83 31.94 33.28 20 6655486.78 6.66 102.86
280 268714.38 26.87 29.40 20 5880722.12 5.88 108.74
300 213424.88 21.34 24.11 20 4821392.67 4.82 113.56
320 172656.46 17.27 19.30 20 3860813.41 3.86 117.42
340 174857.88 17.49 17.38 20 3475143.34 3.48 120.89
360 91457.83 9.15 13.32 20 2663157.05 2.66 123.56
400

350

300

250
COTAS (msnm)

200

150

100

50

0
0 20 40 60 80 100 120 140
VOLUMEN (Hm3)

Vutil= 18.58 (hm^3)


Vm= (10%*Vu)
Vm= 1.858 (hm^3)
Vut= Vu+Vm
Vut= 20.438 (hm^3)

Volumen util Volumen Muerto Volumen total


(hm^3) (hm^3) (hm^3)
18.58 1.86 20.44
Cota de fondo Cota V. Muerto Cota de Embalse
(msnm) (msnm) (msnm)
60 66.37 110.07

Altura de Volumen Muerto


hm= Cota V. Muerto - Cota de Punto de Cierre
hm= 6.37
Altura de Embalse
he= Cota de Embalse - Cota de Punto de Cierre
he= 50.07
Altura de Volumen Util
hu= he - hm
hm= 43.7
Borde Libre
BL= hd+ ho + h∆

Altura de descarga (hd) 2


Q
Condicion = hd<4m hd=( )3
1.84∗L
Q(catastrofico)= 500
L(ancho de vertedero)= 34.5
hd= 3.958725521

Altura de Oleaje (ho)


Velo. del viento(km/h)= 28.8 ho=(0.005 v−0.068) √ f
f (fetch)= 5.2
ho= 0.173306665

h∆< 0.55 0.50 a 1 m

Borde Libre
BL= hd+ ho + h∆
BL= 4.682032185 = 4.7

Altura de la presa
H= he+ BL
H= 54.77

H
b= 13.95 b¿ 3+ 5
m1= 2.5 L 1=H∗m1
m2= 2
L 2=H∗m2
L1= 136.925
L2= 109.54