PLANILLA DE METRADOS

PROYECTO : AMPLIACION DE LOS SERVICIOS DE EDUCACION INICIAL, PRIMARIA Y


SECUNDARIA EN LA INSTITUCION EDUCATIVA N°33164, FELIPE HUAMAN P. DE
AYALA - VENENILLO

ESPECIALIDAD : ARQUITECTURA

REGION : HUANUCO

PROVINCIA : HUANUCO

DISTRITO : VENENILLO

LUGAR : VENENILLO

FECHA : FEBRERO 2014


HOJA DE JUSTIFICACION DE METRADO
PROYECTO
: AMPLIACION DE LOS SERVICIOS DE EDUCACION INICIAL, PRIMARIA Y SECUNDARIA EN LA INSTITUCION EDUCATIVA N°33164, FELIPE HUAMAN P. DE AYALA - VENENILLO

ESPECIALIDAD : ESTRUCTURAS
FECHA : FEBRERO 2014
LUGAR : LOCALIDAD: VENENILLO - DISTRITO: VENENILLO - PROVINCIA: HUANUCO - REGION: HUANUCO

Nº DE MEDIDAS SUB TOTAL


ITEM DESCRIPCION UND CANTIDAD TOTAL
VECES LARGO ANCHO ALTO UNDS. LONG. AREA VOL. KG.
01 ESTRUCTURAS
01.03 MOVIMIENTO DE TIERRAS
01.03.01 EXCAVACIONES DE ZANJAS p/CC
01.03.01.01 EXCAVACION DE ZANJAS PARA CIMIENTOS HASTA 0.80m m3 21.45
CIMIENTOS CORRIDOS
EJE 1 2.00 4.59 0.40 0.80 2.94
ENTRE 1-2 4.00 4.59 0.40 0.80 5.88

ENTRE 2 Y 3 2.00 4.59 0.40 0.80 2.94


ENTRE 23-AB 2.00 4.59 0.40 0.60 2.20
EJE 3 2.00 4.59 0.40 0.80 2.94

EJE C 2.00 2.18 0.40 0.80 1.39


ENTRE 3 Y 4 2.00 2.18 0.40 0.60 1.04

ENTRE 3-4* 4.00 0.93 0.40 0.40 0.60


EJE 4+ 2.00 2.85 0.20 0.80 0.91

ENTRE 4* 2.00 1.93 0.40 0.40 0.62

01.03.02 EXCAVACION P/7 ZAPATAS

01.03.03 RELLENO MANUAL C/Mat.PROPIO


01.03.03.01 RELLENO Y COMPACTADOCON MATERIAL PROPIO EN ZANJAS CON EQUIPO LIVIANO 35.16
CIMIENTOS CORRIDOS m3

EJE A 2.00 1.00 36.05 0.30 0.35 7.57


EJE C 2.00 1.00 36.05 0.30 0.35 7.57
EJE 6 2.00 1.00 6.00 0.30 0.35 1.26

ENTRE 6 Y 7 2.00 1.00 3.10 0.30 0.35 0.65


ENTRE 8 Y 9 2.00 1.00 6.80 0.30 0.35 1.43
2.00 1.00 2.85 0.33 0.34 0.64
ZAPATAS CORRIDAS
EJE 3 2.00 1.00 8.10 0.58 0.50 4.70
EJE 5 2.00 1.00 8.10 0.58 0.50 4.70
EJE 7 Y 9 2.00 1.00 8.00 0.50 0.40 3.20

EJE 1 Y 13 2.00 1.00 8.00 0.43 0.50 3.44

01.03.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO EN ZAPATAS CON EQUIPO LIVIANO m3 54.92
ZAPATAS AISLADAS
ZAPATA Z-1 1.00 6.00 2.05 1.80 0.50 11.07

descontando columnas C-1 -6.00 0.50 0.20 -0.60


ZAPATA Z-2 1.00 2.00 6.25 1.80 0.50 11.25

descontando columnas C-1 -4.00 0.50 0.20 -0.40


ZAPATAS CORRIDAS
ZAPATA Z-3 1.00 2.00 8.00 1.50 0.50 12.00
descontando columnas C-1 y C-3 -1.00 0.50 0.47 -0.23
ZAPATA Z-4 1.00 2.00 8.00 1.61 0.50 12.88

descontando columnas C-2 -1.00 0.50 0.47 -0.23


ZAPATA Z-5 1.00 2.00 7.90 1.20 0.50 9.48

descontando columnas C-1 y C-3 -1.00 0.50 0.60 -0.30

01.03.02.03 RELLENO Y COMPACTACION CON MATERIAL PROPIO DE E:10CM EN VEREDAS m3 14.24

EJE A-A 1.00 25.53 1.50 0.10 3.83


1.00 12.93 1.50 0.10 1.94
EJE C-C 1.00 25.53 1.50 0.10 3.83
1.00 12.93 1.50 0.10 1.94
EJE 1-1 1.00 8.70 0.80 0.10 0.70
EJE 13-13 1.00 8.70 0.80 0.10 0.70

ESCALERA
EJE 8-8 Y EJE 9-9 1.00 8.32 0.80 0.10 0.67
1.00 4.30 1.50 0.10 0.65
01.03.04 ELIMINACION DE MATERIAL EXCEDENTE considerar(20%esponjamiento)

01.03.02.04 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m3 #REF!

Vol. Eliminado = F. de espongamiento x (Vol. Excavado - Vol. Compactado) 1.20


vol.excabado #REF!

vol. Rellenado y compactado. 104.31

01.03.02.05 NIVELACION Y COMPACTACION DE TERRENO NATURAL EN INTERIORES CON EQUIPO LIVIAN m2 264.40

MODULO
AULA 1 1.00 1.00 8.05 6.60 53.13
AULA 2 1.00 1.00 8.05 6.60 53.13

LABORATORIO 1.00 1.00 12.37 6.60 81.64


SALA DE PROFESORES DIRECCION,SECRETARIA 1.00 1.00 8.23 6.60 54.32

ESCALERA
1.00 16.93 16.93
HOJA DE JUSTIFICACION DE METRADO
PROYECTO
: AMPLIACION DE LOS SERVICIOS DE EDUCACION INICIAL, PRIMARIA Y SECUNDARIA EN LA INSTITUCION EDUCATIVA N°33164, FELIPE HUAMAN P. DE AYALA - VENENILLO

ESPECIALIDAD : ESTRUCTURAS
FECHA : FEBRERO 2014
LUGAR : LOCALIDAD: VENENILLO - DISTRITO: VENENILLO - PROVINCIA: HUANUCO - REGION: HUANUCO

Nº DE MEDIDAS SUB TOTAL


ITEM DESCRIPCION UND CANTIDAD TOTAL
VECES LARGO ANCHO ALTO UNDS. LONG. AREA VOL. KG.
1.00 5.25 5.25
1.04 OBRAS DE CONCRETO SIMPLE
01.04.01 C.S PARA SOLADO PARA ZAPATAS
01.04.01.01 SOLADO EN ZAPATAS CONCRETO 1:12 CEMENTO HORMIGON m3 34.01
ZAPATAS AISLADAS
zapatas tipo 1 1.00 6.00 2.05 1.80 0.30 6.64
zapatas tipo 2 1.00 2.00 6.25 1.80 0.30 6.75

ZAPATAS CORRIDAS
zapatas tipo 3 1.00 2.00 8.00 1.50 0.30 7.20
zapatas tipo 4 1.00 2.00 8.00 1.61 0.30 7.73

zapatas tipo 5 1.00 2.00 7.90 1.20 0.30 5.69

01.04.02 C.S. CIMIENTOS CORRIDOS


01.04.02.01 FALSA CIMENTACION 1:12 + 30 % P.G. f'c >=100Kg/cm2 m3 56.94

EJE A 1.00 36.05 0.80 0.35 10.09


EJE C 1.00 36.05 0.80 0.35 10.09

EJE 6 1.00 6.00 0.80 0.35 1.68


ENTRE 6 Y 7 1.00 3.10 0.80 0.35 0.87

ENTRE 8 Y 9 1.00 6.80 0.80 0.35 1.90


1.00 2.85 1.00 0.35 1.00
ZAPATAS CORRIDAS
EJE 3 1.00 8.10 1.50 0.45 5.47
EJE 5 1.00 8.10 1.50 0.45 5.47

EJE 7 Y 9 2.00 8.00 1.60 0.45 11.52


EJE 1 Y 13 2.00 8.00 1.20 0.45 8.64

CIMENTACION ESCALERA
escalera 1.00 1.00 1.85 0.55 0.20 0.20

01.04.02.02 CIMIENTOS CORRIDOS 1:10 + 30 % P.G. f'c >=100Kg/cm2 m3 54.34


EJE A 1.00 36.05 0.80 0.80 23.07
EJEC 1.00 31.05 0.80 0.80 19.87

EJE 6 1.00 6.00 0.80 0.80 3.84


ENTRE 6 Y 7 1.00 3.10 0.80 0.80 1.98

ENTRE 8 Y 9 1.00 6.80 0.80 0.80 4.35


CIMENTACION ESCALERA
escalera 1.00 1.85 0.55 1.20 1.22

01.04.03 C.S PARA SOBRECIMIENTOS

01.04.04 ENCOFRADO Y DESENCOFRADO DE SC


01.04.03.01 FALSO PISO MEZCLA 1:8 e=4" m2 311.72
ESCALERA 1.00 4.62 3.80 17.56

AULA 1 1.00 8.05 6.60 53.13


AULA 2 1.00 8.05 6.60 53.13

AULA 3 1.00 8.05 6.60 53.13


SALA DE PROFESORES, DIRECCION Y SECRETARIA 1.00 8.05 6.60 53.13
LABORATORIO 1.00 12.37 6.60 81.64

01.05 OBRAS DE CONCRETO ARMADO


01.05.01 C PARA ZAPATAS
01.05.01.01 CONCRETO EN ZAPATAS f'c=210 kg/cm2 m3 69.99

ZAPATAS AISLADAS
zapatas tipo 1 6.00 2.05 1.80 0.80 17.71
zapatas tipo 2 2.00 6.25 1.80 0.80 18.00

ZAPATAS CORRIDAS 0.00


zapatas tipo 3 2.00 8.00 1.50 0.50 12.00

zapatas tipo 4 2.00 8.00 1.60 0.50 12.80


zapatas tipo 5 2.00 7.90 1.20 0.50 9.48

01.05.01.02 ACERO PARA ZAPATAS F'Y=4,200 KG/CM2 GRADO 60 kg 1525.76


HOJA DE JUSTIFICACION DE METRADO
PROYECTO
: AMPLIACION DE LOS SERVICIOS DE EDUCACION INICIAL, PRIMARIA Y SECUNDARIA EN LA INSTITUCION EDUCATIVA N°33164, FELIPE HUAMAN P. DE AYALA - VENENILLO

ESPECIALIDAD : ESTRUCTURAS
FECHA : FEBRERO 2014
LUGAR : LOCALIDAD: VENENILLO - DISTRITO: VENENILLO - PROVINCIA: HUANUCO - REGION: HUANUCO

Nº DE MEDIDAS SUB TOTAL


ITEM DESCRIPCION UND CANTIDAD TOTAL
VECES LARGO ANCHO ALTO UNDS. LONG. AREA VOL. KG.

01.05.02 C PARA COLUMNAS ESTRUCTURALES


01.05.04.01 COLUMNAS APORTICADAS EN EDIFICACIONES
01.05.04.01.01 CONCRETO EN COLUMNAS APORTICADAS f'c=210 kg/cm2 m3 34.43

MODULO 1.00 14.00 0.35 0.20 7.20 7.06

0.35 1.00 14.00 0.65 0.20 7.20 13.10

C-1

0.65

0.35
1.00 8.00 0.35 0.20 7.20 4.03

C-2 1.00 8.00 0.50 0.20 7.20 5.76

0.20
0.50

0.23 1.00 6.00 0.23 0.25 7.20 2.48

C-3
0.25

ESCALERA
0.40
1.00 2.00 0.40 0.23 6.20 1.14

CE-01 0.23

0.30
1.00 2.00 0.30 0.23 6.20 0.86

CE-02 0.23

01.05.03 ENCOFRADO Y DESENCOFRADO NORMAL DE COLUNMAS ESTRUCTURALES

01.05.04.01.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS APORTICADAS m2 Perimetro 248.24

MODULO 1.00 14.00 0.35 7.20 35.28

0.35 1.00 14.00 0.20 7.20 20.16


1.00 14.00 0.65 7.20 65.52

C-1 1.00 14.00 0.20 7.20 20.16

0.65

0.35
1.00 8.00 0.35 7.20 20.16

C-2 1.00 8.00 0.20 7.20 11.52


1.00 8.00 0.50 7.20 28.80
1.00 8.00 0.20 7.20 11.52

0.20
0.50

0.23 1.00 6.00 0.23 7.20 9.94


1.00 6.00 0.25 7.20 10.80

C-3
0.25

ESCALERA 0.40
1.00 2.00 0.40 6.20 4.96
CE-01 0.23 1.00 2.00 0.23 6.20 2.85

0.30
1.00 2.00 0.30 6.20 3.72
CE-02 0.23 1.00 2.00 0.23 6.20 2.85

01.05.04 ACERO DE REFUERZO EN COLUMNAS ESTRUCTURALES

01.05.04.01.03 ACERO EN COLUMNAS APORTICADAS F'Y=4,200 KG/CM2 GRADO 60 kg 6803.55


HOJA DE JUSTIFICACION DE METRADO DE ACERO
PROYECTO AMPLIACION DE LOS SERVICIOS DE EDUCACION INICIAL, PRIMARIA Y SECUNDARIA EN LA INSTITUCION EDUCATIVA N°33164, FELIPE HUAMAN P. DE AYALA -
:
VENENILLO ACERO KG/ML
ESPECIALIDAD : ESTRUCTURAS 1" 4.04
FECHA : FEBRERO 2014 1/2" 1.02
LUGAR : LOCALIDAD: VENENILLO - DISTRITO: VENENILLO - PROVINCIA: HUANUCO - REGION: HUANUCO 1/4" 0.25
3/4" 2.26
3/8" 0.58
5/8" 1.6
Nº DE Nº DE PARCIALES
ITEM DESCRIPCION UND Ø CANTIDAD TOTAL
VECES ELEMENTO LONG. Σ LONG. Kg./Ml KG.
01 ESTRUCTURAS
01.05 OBRAS DE CONCRETO ARMADO
01.05.01 ZAPATAS
01.05.01.02 ACERO PARA ZAPATAS F'Y=4,200 KG/CM2 GRADO 60 kg 1525.76

zapata tipo Z-1 13 @ 0.125 5/8" 1.0 6.0 16.0 1.65 158.40 1.60 253.44

ZAPATA AISLADA 1.65


1.8
2.35 16 @ 0.150 5/8" 1.0 6.0 13.0 2.35 183.30 1.60 293.28

2.05

zapata tipo Z-2 13 @ 0.125 5/8" 1.0 2.0 13.0 6.10 158.60 1.60 253.76

ZAPATA COMBINADA 1.8 1.65


6.1 41 @ 0.150 5/8" 1.0 2.0 41.0 1.65 135.30 1.60 216.48

6.25
ZAPATAS CORRIDAS

11 @ 0.125 5/8" 1.0 2.0 11.0 7.95 174.90 1.60 279.84


zapata tipo Z-3
1.5 1.35
7.95 53 @ 0.15 5/8" 1.0 2.0 53.0 1.35 143.10 1.60 228.96

8.1

12 @ 0.125 5/8" 1.0 2.0 12.0 7.85 188.40 1.60 301.44


zapata tipo Z-4
1.6 1.45
7.85 52 @ 0.15 5/8" 1.0 2.0 52.0 1.45 150.80 1.60 241.28

8.0

8@ 0.125 5/8" 1.0 2.0 8.0 7.95 127.20 1.60 203.52


zapata tipo Z-5
1.2 1.05
7.95 53 @ 0.15 5/8" 1.0 2.0 53.0 1.05 111.30 1.60 178.08

8.1
01.05.02 VIGAS DE CIMENTACION
01.05.02.03 ACERO EN VIGA DE CIMENTACION F'Y=4,200 KG/CM2 GRADO 60 kg 968.07
VC-1
EJE A-A
entre eje 1-1 y eje 7-7 25.7 2 Ø 1/2" 1/2" 1.0 1.0 2.0 39.05 78.10 1.02 79.66
entre eje 10-10 y eje 13-13 12.95 0.2 38.65 0.2

EJE C-C
entre eje 1-1 y eje 7-7 25.7 0.2 2 Ø 1/2" 0.2 1/2" 1.0 1.0 2.0 39.05 78.10 1.02 79.66
entre eje 10-10 y eje 13-13 12.95
38.65
ESTRIBOS
3/8" 9.0 1.0 18.0 1.24 200.88 0.58 116.51
0.35
todo los tramos eje A-A 3.62 1 @ 0.05 0.07
todo los tramos eje C-C 3.62 2 @ 0.15 0.20

3 @ 0.20
r @ 0.35

6 0.75
VC-2
EJE 1-1 Y 13-13 13.2
EJE 3-3 Y 5-5 13.2 4 Ø 1/2" 1/2" 1.0 1.0 4.0 27.00 108.00 1.02 110.16
0.3 26.40 0.3

EJE 1-1 Y 13-13 13.2 0.3 4 Ø 1/2" 0.3 1/2" 1.0 1.0 4.0 27.00 108.00 1.02 110.16
EJE 3-3 Y 5-5 13.2
26.40
ESTRIBOS
3/8" 8.0 1.0 17.0 2.70 367.20 0.58 212.98
0.90
tramo tipico 3.08 1 @ 0.05 0.10

2 @ 0.15 0.35

3 @ 0.20
r @ 0.35

6 0.75

VC-3
EJE 8-8 6.4
EJE 9-9 6.4 5 Ø 1/2" 1/2" 1.0 1.0 5.0 13.40 67.00 1.02 68.34
0.3 12.80 0.3

EJE 8-8 6.4 0.3 5 Ø 1/2" 0.3 1/2" 1.0 1.0 5.0 13.40 67.00 1.02 68.34
EJE 9-9 6.4
12.80
ESTRIBOS
3/8" 4.0 1.0 17.0 3.10 210.80 0.58 122.26
0.85
tramo tipico 3.1 1 @ 0.05 0.10

2 @ 0.15 0.60

3 @ 0.20
r @ 0.35

6 0.75

01.05.03 SOBRECIMIENTO REFORZADO EN TRIBUNAS Y CERCOS


01.05.03.03 ACERO EN SOBRECIMIENTO REFORZADO F'Y=4,200 KG/CM2 GRADO 60 kg 251.86

HORIZONTAL
MODULO
eje A-A Altura
entre eje 1 y 2 2.40 0.60 3 3/8" @ 0.25 3/8" 1.0 1.0 3.0 2.40 7.20 0.58 4.18
entre eje 2 y3 3.50 0.60 3/8" 1.0 1.0 3.0 3.50 10.50 0.58 6.09
entre eje 3 y 4 2.40 0.60 3/8" 1.0 1.0 3.0 2.40 7.20 0.58 4.18
entre eje 4y 5 3.50 0.60 3/8" 1.0 1.0 3.0 3.50 10.50 0.58 6.09
entre eje 5 y 6 3.50 0.60 3/8" 1.0 1.0 3.0 3.50 10.50 0.58 6.09
entre eje 6 y 7 2.40 0.60 3/8" 1.0 1.0 3.0 2.40 7.20 0.58 4.18
ejes 10-11 , 11-12 y 12-13 3.50 0.60 3/8" 3.0 1.0 3.0 3.50 31.50 0.58 18.27
HOJA DE JUSTIFICACION DE METRADO DE ACERO
PROYECTO AMPLIACION DE LOS SERVICIOS DE EDUCACION INICIAL, PRIMARIA Y SECUNDARIA EN LA INSTITUCION EDUCATIVA N°33164, FELIPE HUAMAN P. DE AYALA -
:
VENENILLO ACERO KG/ML
ESPECIALIDAD : ESTRUCTURAS 1" 4.04
FECHA : FEBRERO 2014 1/2" 1.02
LUGAR : LOCALIDAD: VENENILLO - DISTRITO: VENENILLO - PROVINCIA: HUANUCO - REGION: HUANUCO 1/4" 0.25
3/4" 2.26
3/8" 0.58
5/8" 1.6
Nº DE Nº DE PARCIALES
ITEM DESCRIPCION UND Ø CANTIDAD TOTAL
VECES ELEMENTO LONG. Σ LONG. Kg./Ml KG.
eje C-C
ejes tipicos
del eje 1al 7 3.50 0.60 3/8" 6.0 1.0 3.0 3.50 63.00 0.58 36.54
del eje 10 al 13 3.50 0.60 3/8" 3.0 1.0 3.0 3.50 31.50 0.58 18.27

eje 1-1 3.06 0.70 3/8" 2.0 1.0 3.0 3.06 18.36 0.58 10.65
eje 13-13 3.06 0.70 3/8" 2.0 1.0 3.0 3.06 18.36 0.58 10.65

VERTICAL
MODULO
eje A-A
entre eje 1 y 2 2.40 1/2" 1.0 1.0 7.0 0.60 4.20 1.02 4.28
entre eje 2 y3 3.50 1/2" 1.0 1.0 10.0 0.60 6.00 1.02 6.12
entre eje 3 y 4 2.40 0.5 1/2" 1.0 1.0 7.0 0.60 4.20 1.02 4.28
entre eje 4y 5 3.50 1/2" 1.0 1.0 10.0 0.60 6.00 1.02 6.12
entre eje 5 y 6 3.50 0.1 1/2" 1.0 1.0 10.0 0.60 6.00 1.02 6.12
entre eje 6 y 7 2.40
1/2'' @ 0.35 1/2" 1.0 1.0 7.0 0.60 4.20 1.02 4.28
ejes 10-11 , 11-12 y 12-13 3.50 1/2" 3.0 1.0 10.0 0.60 18.00 1.02 18.36

eje C-C 0.5

ejes tipicos
del eje 1al 7 3.50 0.1 1/2" 6.0 1.0 10.0 0.60 36.00 1.02 36.72
del eje 10 al 13 3.50
1/2" @ 0.35 1/2" 3.0 1.0 10.0 0.60 18.00 1.02 18.36

eje 3-3 y 5-5 3.06 1/2" 2.0 1.0 9.0 0.60 10.80 1.02 11.02
eje 8-8 y 9-9 3.06 1/2" 2.0 1.0 9.0 0.60 10.80 1.02 11.02

01.05.04 COLUMNAS
01.05.04.01 COLUMNAS APORTICADAS PARA COBERTURA
01.05.04.01.03 ACERO EN COLUMNAS APORTICADAS F'Y=4,200 KG/CM2 GRADO 60 kg

C-1 6803.55
0.25 TRAMO 1 5/8" 1.0 14.0 4.0 8.80 492.80 1.60 788.48
cantidad LONGITUDINAL 3/4" 1.0 14.0 8.0 8.80 985.60 2.26 2227.46
eje 2-2 2 0.75 traslape
0
eje 3-3 2
eje 4-4 2
eje 5-5 2
6.9
eje 6-6 2
eje 11-11 2
1.6
eje 12-12 2 4 Ø 5/8"

14 0.30 8 Ø 3/4"

ESTRIBOS
base base piso 0.35 3/8" 1.0 14.0 10.0 3.48 487.20 0.58 282.58
piso 1 3 @ 0.15 1 @ 0.05 0.4 0.07 3/8" 1.0 14.0 32.0 3.48 1559.04 0.58 904.24
r @ 0.20 15 @ 0.10

/pisos 0.45 r @ 25.00


0.2
1.55 0.07
0.65

C-2
0.25 TRAMO 1 5/8" 1.0 8.0 6.0 8.80 422.40 1.60 675.84
cantidad LONGITUDINAL 3/4" 1.0 8.0 4.0 8.80 281.60 2.26 636.42
eje 1-1 2 0.75 traslape
0
eje 8-8 2
eje 9-9 2
eje 13-13 2
6.9
8

1.6
6 Ø 5/8"

0.30 4 Ø 3/4"

ESTRIBOS
base base piso 0.35 3/8" 1.0 8.0 10.0 3.18 254.40 0.58 147.55
piso 1 3 @ 0.15 1 @ 0.05 0.4 0.07 3/8" 1.0 8.0 32.0 3.18 814.08 0.58 472.17
r @ 0.20 15 @ 0.10

/pisos 0.45 r @ 25.00 0.2

1.55 0.07
0.5

C-3
eje 1-1 1
eje3-3 1 0.25 TRAMO 1 1/2" 1.0 6.0 4.0 8.65 207.60 1.02 211.75
eje 5-5 1 LONGITUDINAL
eje 7-7 1 0.75 traslape
0
eje 10-10 1
eje 13-13 1
6
6.9

1.5
4 Ø 1/2"

0.25

ESTRIBOS
base base piso 3/8" 1.0 6.0 10.0 1.10 66.00 0.58 38.28
piso 1 3 @ 0.15 1 @ 0.05
0.25
r @ 0.15 5 @ 0.10 0.07 3/8" 1.0 6.0 35.0 1.10 231.00 0.58 133.98
/pisos 0.45 r @ 0.25 0.23

0.55

CE-1, CE2 y CE-3


eje 8-8 2
eje 9-9 2 0.25

entre 8 y9 1 LONGITUDINAL 1/2" 1.0 5.0 4.0 7.55 151.00 1.02 154.02
5 0.75 traslape
0

5.8

1.5
4 Ø 1/2"

0.25

ESTRIBOS
base base piso 3/8" 1.0 5.0 10.0 1.10 55.00 0.58 31.90
piso 1 3 @ 0.15 1 @ 0.05
0.25
r @ 0.15 5 @ 0.10 0.07 3/8" 1.0 5.0 31.0 1.10 170.50 0.58 98.89
/pisos 0.45 r @ 0.25 0.23
HOJA DE JUSTIFICACION DE METRADO DE ACERO
PROYECTO AMPLIACION DE LOS SERVICIOS DE EDUCACION INICIAL, PRIMARIA Y SECUNDARIA EN LA INSTITUCION EDUCATIVA N°33164, FELIPE HUAMAN P. DE AYALA -
:
VENENILLO ACERO KG/ML
ESPECIALIDAD : ESTRUCTURAS 1" 4.04
FECHA : FEBRERO 2014 1/2" 1.02
LUGAR : LOCALIDAD: VENENILLO - DISTRITO: VENENILLO - PROVINCIA: HUANUCO - REGION: HUANUCO 1/4" 0.25
3/4" 2.26
3/8" 0.58
5/8" 1.6
Nº DE Nº DE PARCIALES
ITEM DESCRIPCION UND Ø CANTIDAD TOTAL
VECES ELEMENTO LONG. Σ LONG. Kg./Ml KG.
0.55
01.05.04.02.03 ACERO EN COLUMNAS CONFINADAS F'Y=4,200 KG/CM2 GRADO 60 1066.85

C-A
H= 1.85
eje A-A 18 1piso 0.00 3/8" 1.0 41.0 4.0 2.15 352.60 0.58 204.51
18 2piso LONGITUDINAL 3/8" 1.0 61.0 4.0 1.35 329.40 0.58 191.05
eje 6-6 4 0.00 traslape
0
eje 6 y7 1
41
H= 1.05 piso
1.85 1.05
eje C-C 18 1piso
18 2piso
0.3
eje V-V 25 4 Ø 3/8 "

61 0.00

ESTRIBOS
base base piso 3/8" 1.0 41.0 2.0 0.90 73.80 0.58 42.80
piso 1 3 @ 0.15 1 @ 0.05 3/8" 1.0 41.0 13.0 0.90 479.70 0.58 278.23
0.25
r @ 0.15 3 @ 0.10 0.07

/pisos 0.45 r @ 0.25 0.13

0.35

piso 1 3 @ 0.15 1 @ 0.05 3/8" 1.0 61.0 2.0 0.90 109.80 0.58 63.68
0.25
piso 2 r @ 0.15 3 @ 0.10 0.07 3/8" 1.0 61.0 9.0 0.90 494.10 0.58 286.58
/pisos 0.45 r @ 0.25 0.13

0.35

01.05.05 VIGAS
01.05.05.01 VIGAS APORTICADAS
01.05.05.01.01 ACERO EN VIGAS APORTICADAS F'Y=4,200 KG/CM2 GRADO 60 kg 5037.40

V-1
longitud tipica 6.4
ejes 1-1 , 3-3 , 5-5,7-7,10-10 y 13-13 6 veces 1piso
6 veces 2piso
12
6.4
0.20 0.20

2 Ø 1/2" 1/2" 1.0 12.0 2.0 6.80 163.20 1.02 166.46


0.20 0.20 2 Ø 1/2" 1/2" 1.0 12.0 2.0 6.80 163.20 1.02 166.46
6.4 1/2" 2.0 12.0 1.0 1.20 28.80 1.02 29.38
1/2" 1.0 12.0 1.0 2.55 30.60 1.02 31.21
refuerzo
0.2 1 ESTRIBOS
1 Ø 1/2" 1 @ 0.05

6 @ 0.10 0.35 3/8" 2.0 12.0 24.0 1.30 748.80 0.58 434.30
2.55 1 Ø 1/2" r @ 0.20 0.07

0.65 0.23

V-2
longitud tipica 6.4
ejes 2-2 , 4-4 ,6-6 ,11-11 y 12-12 5 veces

6.4
0.20 0.20

2 Ø 5/8 " 5/8" 1.0 5.0 2.0 6.80 68.00 1.60 108.80
0.20 0.20 3 Ø 5/8 " 5/8" 1.0 5.0 3.0 6.80 102.00 1.60 163.20
6.4 3/4" 1.0 5.0 2.0 2.20 22.00 2.26 49.72
3/4" 1.0 5.0 1.0 4.50 22.50 2.26 50.85
refuerzo ESTRIBOS
0.2 2 1 @ 0.05

2 Ø 3/4 " 6 @ 0.10 0.55 3/8" 1.0 5.0 40.0 1.94 388.00 0.58 225.04
r @ 0.20 0.07

4.5 1 Ø 3/4 " 0.65 0.35

V-3
longitud tipica 3.55
EJE A-A 1 piso 2 piso
del eje 1-1 al eje 7-7 6 veces 6 veces
del eje 10-10 al eje 13-13 3 veces 3 veces
EJE C-C 5/8" 1.0 36.0 2.0 3.95 284.40 1.60 455.04
del eje 1-1 al eje 7-7 6 veces 6 veces 5/8" 1.0 36.0 2.0 3.95 284.40 1.60 455.04
del eje 10-10 al eje 13-13 3 veces 3 veces 1/2" 1.0 36.0 1.0 2.20 79.20 1.02 80.78
18 18

3.55
0.20 0.20

2 Ø 5/8 "

0.20 0.20 2 Ø 5/8 "

3.55
refuerzo
0.2 2 ESTRIBOS 3/8" 1.0 36.0 29.0 1.64 1712.16 0.58 993.05
1 Ø 1/2 " 1 @ 0.05

10 @ 0.10 0.55

r @ 0.20 0.07

1.05 0.20

V-1 (voladizo)

EJE A-A 1 piso


del eje 1-1 al eje 7-7 7 veces 5/8" 1.0 13.0 2.0 1.70 44.20 1.60 70.72
del eje 10-10 al eje 13-13 4 veces 5/8" 1.0 13.0 3.0 2.20 85.80 1.60 137.28
entre eje 8-8 y 9-9 2 veces 3/4" 1.0 13.0 2.0 1.70 44.20 2.26 99.89
13
1.5
0.20

2 Ø 5/8 "

0.20 0.20 3 Ø 5/8 "

1.8
refuerzo
1.5 0.2 ESTRIBOS (promedio) 3/8" 1.0 13.0 14.0 2.04 371.28 0.58 215.34
2 Ø 3/4 " 1 @ 0.05

5 @ 0.10 0.60

r @ 0.20 0.07

0.55 0.35

V-1(techo 2 aguas )
longitud tipica
HOJA DE JUSTIFICACION DE METRADO DE ACERO
PROYECTO AMPLIACION DE LOS SERVICIOS DE EDUCACION INICIAL, PRIMARIA Y SECUNDARIA EN LA INSTITUCION EDUCATIVA N°33164, FELIPE HUAMAN P. DE AYALA -
:
VENENILLO ACERO KG/ML
ESPECIALIDAD : ESTRUCTURAS 1" 4.04
FECHA : FEBRERO 2014 1/2" 1.02
LUGAR : LOCALIDAD: VENENILLO - DISTRITO: VENENILLO - PROVINCIA: HUANUCO - REGION: HUANUCO 1/4" 0.25
3/4" 2.26
3/8" 0.58
5/8" 1.6
Nº DE Nº DE PARCIALES
ITEM DESCRIPCION UND Ø CANTIDAD TOTAL
VECES ELEMENTO LONG. Σ LONG. Kg./Ml KG.
ejes 1-1, 3-3, 5-5, 7-7 , 10-10 y 13-13 6 veces
ejes 8-8 y 9-9 2 veces 1/2" 2.0 8.0 2.0 3.90 124.80 1.02 127.30
1/2" 2.0 8.0 2.0 3.90 124.80 1.02 127.30
1/2" 2.0 8.0 2.0 1.20 38.40 1.02 39.17

3.5
0.20 0.20

2 Ø 1/2 "

0.20 0.20 2 Ø 1/2 "

3.5
refuerzo
1 0.2 ESTRIBOS 3/8" 2.0 8.0 24.0 1.30 499.20 0.58 289.54
2 Ø 1/2 " 1 @ 0.05

5 @ 0.10 0.35

r @ 0.20 0.07

0.55 0.23

V-1(esquinas )
longitud tipica
ejes 1-1, 3-3, 5-5, 7-7 , 10-10 y 13-13 6 veces
ejes 8-8 y 9-9 2 veces 1/2" 2.0 8.0 2.0 2.50 80.00 1.02 81.60
1/2" 2.0 8.0 2.0 2.40 76.80 1.02 78.34
1/2" 2.0 8.0 2.0 1.00 32.00 1.02 32.64
0.20

2.1
0.20

2 Ø 1/2 "

0.20 0.20 2 Ø 1/2 "

2
refuerzo
1 2 Ø 1/2 " ESTRIBOS 3/8" 2.0 8.0 15.0 1.57 376.80 0.58 218.54
1 @ 0.05

5 @ 0.10 0.49 (promedio)

r @ 0.20 0.07

0.55 0.23

V-T (escalera)
longitud tipica
ejes 8-8 y 9-9 2 veces 1/2" 2.0 2.0 2.0 2.75 22.00 1.02 22.44
1/2" 2.0 2.0 2.0 2.75 22.00 1.02 22.44
1/2" 4.0 2.0 2.0 1.20 19.20 1.02 19.58

2.35
0.20 0.20

2 Ø 1/2 "

0.20 0.20 2 Ø 1/2 "

2.35
refuerzo
1 0.2 ESTRIBOS 3/8" 2.0 2.0 18.0 1.10 79.20 0.58 45.94
2 Ø 1/2 " 1 @ 0.05

5 @ 0.10 0.25

r @ 0.20 0.07

0.55 0.23

01.05.05.02 VIGAS CONFINADAS EN MUROS DE EDIFICACIONES


01.05.05.02.03 ACERO EN VIGAS CONFINADAS F'Y=4,200 KG/CM2 GRADO 60 kg 254.59

longitud tipica 3.5


EJE A-A
entre 2 y3, 4 y 5, 6 y 7 3 veces 1piso 1/2" 1.0 10.0 1.0 3.70 37.00 1.02 37.74
3 veces 2 piso 1/2" 1.0 10.0 1.0 3.70 37.00 1.02 37.74
entre 11 y 12 , 12 y 13 2 veces 1piso
2 veces 2 piso
10
EJE C-C
entre 1 y2, 2 y 3, 3 y 4, 4 y 5, 5 y 6 ,6y 7 6 1piso 1/2" 1.0 18.0 1.0 3.70 66.60 1.02 67.93
6 2 piso 1/2" 1.0 18.0 1.0 3.70 66.60 1.02 67.93
entre 10 y 11, 11 y 12 , 12 y 13 3 1piso
3 2 piso
18

3.5
0.10 0.10

2 Ø 1/2 "

0.10 0.10 2 Ø 1/2 "

3.5

longitud tipica 2.45


EJE A-A
entre 1 y2, 3 y 4, 5 y 6 3 veces 1piso
3 veces 2 piso 1/2" 1.0 8.0 1.0 2.65 21.20 1.02 21.62
entre 10 y 11 1 veces 1piso 1/2" 1.0 8.0 1.0 2.65 21.20 1.02 21.62
1 veces 2 piso
8
2.45
0.10 0.10

2 Ø 1/2 "

0.10 0.10 2 Ø 1/2 "

2.45

#NAME? ###
#NAME? ### kg 44.72

LOSA MACIZA (descanso para escalera)


4.15
3/8" 1.0 8.0 1.0 4.45 35.60 0.58 20.65
0.15 0.15 3/8" 1.0 10.0 1.0 4.15 41.50 0.58 24.07

4.15

01.05.06.02 LOSAS ALIGERADAS


01.05.06.02.04 ACERO EN LOSA ALIGERADA FY=4200KG/CM2 kg 1935.60

ACERO LONGITUDINAL
PRIMER PISO
modulo 1
ENTRE EJES A-A Y C-C 1/2" 1.0 21.0 2.0 1.40 58.80 1.02 59.98
HOJA DE JUSTIFICACION DE METRADO DE ACERO
PROYECTO AMPLIACION DE LOS SERVICIOS DE EDUCACION INICIAL, PRIMARIA Y SECUNDARIA EN LA INSTITUCION EDUCATIVA N°33164, FELIPE HUAMAN P. DE AYALA -
:
VENENILLO ACERO KG/ML
ESPECIALIDAD : ESTRUCTURAS 1" 4.04
FECHA : FEBRERO 2014 1/2" 1.02
LUGAR : LOCALIDAD: VENENILLO - DISTRITO: VENENILLO - PROVINCIA: HUANUCO - REGION: HUANUCO 1/4" 0.25
3/4" 2.26
3/8" 0.58
5/8" 1.6
Nº DE Nº DE PARCIALES
ITEM DESCRIPCION UND Ø CANTIDAD TOTAL
VECES ELEMENTO LONG. Σ LONG. Kg./Ml KG.
del eje 1-1 al eje 7-7 17 viguetas 5/8" 1.0 21.0 3.0 2.95 185.85 1.60 297.36
ENTRE EJES V-V y A-A 5/8" 1.0 21.0 2.0 2.85 119.70 1.60 191.52
del eje 1-1 al eje 7-7 4 viguetas 1/2" 1.0 21.0 1.0 25.50 535.50 1.02 546.21
modulo 2
ENTRE EJES A-A Y C-C
del eje 10-10 al eje 13-13 17 viguetas 1/2" 1.0 21.0 2.0 1.40 58.80 1.02 59.98
ENTRE EJES V-V y A-A 5/8" 1.0 21.0 2.0 2.95 123.90 1.60 198.24
del eje 10-10 al eje 13-13 4 viguetas 1/2" 1.0 21.0 1.0 12.90 270.90 1.02 276.32

0.15 1.25 2 Ø 1/2 "

2.85
1 Ø 5/8 "

2.95
1 Ø 5/8 "

0.15 0.15
modulo 1 25.5
modulo 2 12.9 1 Ø 1/2 "

ACERO DE TEMPERATURA
1/4" 9.0 16.0 1.0 8.50 1224.00 0.25 306.00
entre ejes 1-y2 ,2 y 3, 3 y4, 4 y 5, 5y 6, 6 y 7 16 veces
entre ejes 10 y 11, 11 y 12, 12 y 13 16 veces

8.5
#NAME? ###
#NAME? ### kg 331.41

PRIMER TRAMO
ACERO LONGITUDINAL
1/2" 1.0 10.0 1.0 4.82 48.20 1.02 49.16
0.3 1/2" 1.0 10.0 1.0 2.30 23.00 1.02 23.46
1/2" 1.0 10.0 1.0 2.94 29.40 1.02 29.99
1/2" 1.0 10.0 1.0 2.25 22.50 1.02 22.95
3.92 1.1 1/2" 1.0 10.0 1.0 4.75 47.50 1.02 48.45

0.6 1

0.2

1.74
0.1 0.1
1.1 1.85 0.30

ACERO TRANSVERSAL
1.8
0.1 0.1 3/8" 1.0 19.0 1.0 2.00 38.00 0.58 22.04
3/8" 1.0 19.0 1.0 2.00 38.00 0.58 22.04
0.1 0.1
1.8
SEGUNDO TRAMO

ACERO LONGITUDINAL

0.4 1/2" 1.0 10.0 1.0 5.81 58.10 1.02 59.26


1/2" 1.0 10.0 1.0 2.30 23.00 1.02 23.46
1/2" 1.0 10.0 1.0 1.40 14.00 1.02 14.28
3.65 1.9 0.30 1/2" 1.0 10.0 1.0 1.60 16.00 1.02 16.32
0.1 0.1

1.66

0.50

1.1 1.1

0.3

ACERO TRANSVERSAL
1.8 3/8" 1.0 19.0 1.0 2.00 38.00 0.58 22.04
0.1 0.1 3/8" 1.0 19.0 1.0 2.00 38.00 0.58 22.04

0.1 0.1
1.8

01.05.08 GARGOLAS
01.05.08.03 ACERO EN GARGOLAS FY=4200 KG/CM2 kg 1.63

0.2
0.1 1/4" 1.0 5.0 1.0 0.65 3.25 0.25 0.81
1/4" 1.0 5.0 1.0 0.65 3.25 0.25 0.81
0.15 0.2 0.15 0.2

0.3
HOJA DE JUSTIFICACION DE METRADO
PROYECTO AMPLIACION DE LOS SERVICIOS DE EDUCACION INICIAL, PRIMARIA Y SECUNDARIA EN LA INSTITUCION EDUCATIVA N°33164, FELIPE HUAMAN P. DE AYALA -
:
VENENILLO
ESPECIALIDAD : ÀRQUITECTURA
FECHA : FEBRERO 2014
LUGAR : LOCALIDAD: VENENILLO - DISTRITO: VENENILLO - PROVINCIA: HUANUCO - REGION: HUANUCO

Nº DE MEDIDAS SUB TOTAL


ITEM DESCRIPCION UND CANTIDAD TOTAL
VECES LARGO ANCHO ALTO UNDS. LONG. AREA VOL. KG.
02 ARQUITECTURA
02.01 MUROS Y TABIQUES DE ALBAÑILERIA
02.01.01 MURO DE SOGA LADRILLO 18 HUECOS DE ARCILLA - MEZCLA C:A 1:5 m2 198.27
PRIMER PISO
EJE A-A
entre eje 1 y 2, eje 3 y 4 , eje 6-7 1 3.0 1.9 1.85 10.55
entre eje 2 y 3, eje 4 y 5 , eje 5-6 1 3.0 3.0 1.85 16.65
entre eje 9 y10 1 1.0 1.9 1.85 3.52
del eje 11-11 al 13-13 1 2.0 3.0 1.85 11.10
EJE C-C
del eje 1-1 al eje 7-7 1 6.0 3.0 0.93 16.74
del eje 10-10 al 13-13 1 3.0 3.0 0.93 8.37
ENTRE EJE 6-6 AL 7-7
entre eje A-A y C-C 1 1.0 7.2 2.60 18.80

SEGUNDO PISO
EJE A-A
entre eje 1 y 2, eje 3 y 4 , eje 6-7 1 3.0 1.9 2.00 11.40
entre eje 2 y 3, eje 4 y 5 , eje 5-6 1 3.0 3.0 2.00 18.00
entre eje 9 y10 1 1.0 1.9 2.00 3.80
del eje 11-11 al 13-13 1 2.0 3.0 2.00 12.00
EJE C-C
del eje 1-1 al eje 7-7 1 6.0 3.0 1.05 18.90
del eje 10-10 al 13-13 1 3.0 3.0 1.05 9.45

BALCON
EJE C-C
1 12.0 1.8 1.00 21.36
1 6.0 1.8 1.00 10.68
ZONA ESCALERA
1 2.0 1.8 1.00 3.56
1 2.0 1.7 1.00 3.40

02.01.02 MURO DE CABEZA LADRILLO 18 HUECOS DE ARCILLA - MEZCLA C:A 1:5 291.03
PRIMER PISO
EJE 1-1 1 2.0 3.1 2.75 16.83
EJE 3-3 1 2.0 3.1 2.75 16.83
EJE 5-5 1 2.0 3.1 2.75 16.83
EJE 10-10 1 2.0 3.1 2.75 16.83
EJE 13-13 1 2.0 3.1 2.75 16.83
EJE 8-8 1 1.0 2.4 3.26 7.66
EJE 9-9 1 1.0 4.2 3.26 13.79
ENTRE EJE 8-8 AL 9-9
entre eje A-A y C-C 1 1.0 3.0 2.70 8.10
2 1.0 3.4 1.32 9.06

SEGUNDO PISO
EJE 1-1 1 2.0 3.1 2.70 16.52
EJE 3-3 1 2.0 3.1 2.70 16.52
EJE 5-5 1 2.0 3.1 2.70 16.52
EJE 7-7 1 2.0 3.1 2.70 16.52
EJE 10-10 1 2.0 3.1 2.70 16.52
EJE 13-13 1 2.0 3.1 2.70 16.52
EJE 8-8 1 1.0 2.4 1.80 4.23
EJE 9-9 1 1.0 4.2 1.80 7.61

APOYO DE TECHO
EJE 1-1 1 2.0 3.1 1.17 7.16
EJE 3-3 1 2.0 3.1 1.17 7.16
EJE 5-5 1 2.0 3.1 1.17 7.16
EJE 7-7 1 2.0 3.1 1.17 7.16
EJE 10-10 1 2.0 3.1 1.17 7.16
EJE 13-13 1 2.0 3.1 1.17 7.16
EJE 8-8 1 2.0 3.1 1.17 7.16
EJE 9-9 1 2.0 3.1 1.17 7.16

02.02 REVOQUES ENLUCIDOS Y MOLDURAS EN EDIFICACIONES


01.02.01 REVOQUES ENLUCIDOS EN EDIFICACIONES
02.02.01.01 TARRAJEO EN INTERIORES CON CEMENTO-ARENA 1:5 m2 488.82
MUROS DE SOGA
PRIMER PISO
EJE A-A
entre eje 1 y 2, eje 3 y 4 , eje 6-7 1 3.0 2.4 2.05 14.76
entre eje 2 y 3, eje 4 y 5 , eje 5-6 1 3.0 3.6 2.05 21.83
entre eje 9 y10 1 1.0 2.4 2.05 4.92
HOJA DE JUSTIFICACION DE METRADO
PROYECTO AMPLIACION DE LOS SERVICIOS DE EDUCACION INICIAL, PRIMARIA Y SECUNDARIA EN LA INSTITUCION EDUCATIVA N°33164, FELIPE HUAMAN P. DE AYALA -
:
VENENILLO
ESPECIALIDAD : ÀRQUITECTURA
FECHA : FEBRERO 2014
LUGAR : LOCALIDAD: VENENILLO - DISTRITO: VENENILLO - PROVINCIA: HUANUCO - REGION: HUANUCO

Nº DE MEDIDAS SUB TOTAL


ITEM DESCRIPCION UND CANTIDAD TOTAL
VECES LARGO ANCHO ALTO UNDS. LONG. AREA VOL. KG.
del eje 11-11 al 13-13 1 2.0 3.6 2.05 14.56
EJE C-C
del eje 1-1 al eje 7-7 1 6.0 3.6 1.15 24.50
del eje 10-10 al 13-13 1 3.0 3.6 1.15 12.25
ENTRE EJE 6-6 Y 7-7
entre eje A-A y C-C 1 2.0 7.2 2.90 41.93

SEGUNDO PISO
EJE A-A
entre eje 1 y 2, eje 3 y 4 , eje 6-7 1 3.0 2.4 2.00 14.40
entre eje 2 y 3, eje 4 y 5 , eje 5-6 1 3.0 3.6 2.00 21.30
entre eje 9 y10 1 1.0 2.4 2.00 4.80
del eje 11-11 al 13-13 1 2.0 3.6 2.00 14.20
EJE C-C
del eje 1-1 al eje 7-7 1 6.0 3.6 1.15 24.50
del eje 10-10 al 13-13 1 3.0 3.6 1.15 12.25

ZONA ESCALERA
entre eje 8-8 y 9-9 1 2.0 1.8 1.00 3.56
1 2.0 1.7 1.00 3.40
MURO DE CABEZA
PRIMER PISO
EJE 1-1 1 2.0 3.1 2.95 18.05
EJE 3-3 1 4.0 3.1 2.95 36.11
EJE 5-5 1 4.0 3.1 2.95 36.11
EJE 10-10 1 2.0 3.1 2.95 18.05
EJE 13-13 1 2.0 3.1 2.95 18.05
EJE 8-8 1 1.0 2.4 3.26 7.66
EJE 9-9 1 1.0 4.2 3.26 13.79
ENTRE EJE 8-8 AL 9-9
entre eje A-A y C-C 1 1.0 3.0 2.95 8.85
1 1.0 3.4 1.32 4.53

SEGUNDO PISO
EJE 1-1 1 2.0 3.1 2.70 16.52
EJE 3-3 1 2.0 3.1 2.70 16.52
EJE 5-5 1 2.0 3.1 2.70 16.52
EJE 10-10 1 2.0 3.1 2.70 16.52
EJE 13-13 1 2.0 3.1 2.70 16.52
EJE 8-8 1 1.0 2.4 1.80 4.23
EJE 9-9 1 1.0 4.2 1.80 7.61

02.02.01.02 TARRAJEO EN MUROS EXTERIORES CON CEMENTO-ARENA 1:5 m2 395.10


MURO SOGA
PRIMER PISO
EJE A-A
entre eje 1 y 2, eje 3 y 4 , eje 6-7 1 3.0 2.4 2.05 14.76
entre eje 2 y 3, eje 4 y 5 , eje 5-6 1 3.0 3.5 2.05 21.53
entre eje 9 y10 1 1.0 2.4 2.05 4.92
del eje 11-11 al 13-13 1 2.0 3.5 2.05 14.35
EJE C-C
del eje 1-1 al eje 7-7 1 6.0 3.5 1.15 24.15
del eje 10-10 al 13-13 1 3.0 3.5 1.15 12.08

SEGUNDO PISO
EJE A-A
entre eje 1 y 2, eje 3 y 4 , eje 6-7 1 3.0 2.4 2.00 14.40
entre eje 2 y 3, eje 4 y 5 , eje 5-6 1 3.0 3.5 2.00 21.00
entre eje 9 y10 1 1.0 2.4 2.00 4.80
del eje 11-11 al 13-13 1 2.0 3.5 2.00 14.00
EJE C-C
del eje 1-1 al eje 7-7 1 6.0 3.5 1.05 22.05
del eje 10-10 al 13-13 1 3.0 3.5 1.05 11.03

BALCON
EJE C-C
del eje 1-1 al eje 7-7 1 12.0 1.8 1.00 21.36
del eje 10-10 al 13-13 1 6.0 1.8 1.00 10.68
ZONA ESCALERA
entre eje 8-8 y 9-9 1 2.0 1.8 1.00 3.56
1 2.0 1.7 1.00 3.40
MURO CABEZA
PRIMER PISO
EJE 1-1 1 2.0 3.1 2.95 18.05
EJE 13-13 1 2.0 3.1 2.95 18.05
EJE 8-8 1 1.0 2.4 3.26 7.66
HOJA DE JUSTIFICACION DE METRADO
PROYECTO AMPLIACION DE LOS SERVICIOS DE EDUCACION INICIAL, PRIMARIA Y SECUNDARIA EN LA INSTITUCION EDUCATIVA N°33164, FELIPE HUAMAN P. DE AYALA -
:
VENENILLO
ESPECIALIDAD : ÀRQUITECTURA
FECHA : FEBRERO 2014
LUGAR : LOCALIDAD: VENENILLO - DISTRITO: VENENILLO - PROVINCIA: HUANUCO - REGION: HUANUCO

Nº DE MEDIDAS SUB TOTAL


ITEM DESCRIPCION UND CANTIDAD TOTAL
VECES LARGO ANCHO ALTO UNDS. LONG. AREA VOL. KG.
EJE 9-9 1 1.0 4.2 3.26 13.79
ENTRE EJE 8-8 AL 9-9
entre eje A-A y C-C 1 1.0 3.0 2.70 8.10
1 1.0 3.4 1.32 4.53

SEGUNDO PISO
EJE 1-1 1 2.0 3.1 2.70 16.52
EJE 10-10 1 2.0 3.1 2.70 16.52
EJE 13-13 1 2.0 3.1 2.70 16.52
APOYO DE TECHO
EJE 1-1 1 2.0 3.1 1.17 7.16
EJE 3-3 1 2.0 3.1 1.17 7.16
EJE 5-5 1 2.0 3.1 1.17 7.16
EJE 7-7 1 2.0 3.1 1.17 7.16
EJE 10-10 1 2.0 3.1 1.17 7.16
EJE 13-13 1 2.0 3.1 1.17 7.16
EJE 8-8 1 2.0 3.1 1.17 7.16
EJE 9-9 1 2.0 3.1 1.17 7.16

02.02.01.03 TARRAJEO EN COLUMNAS CON CEMENTO-ARENA 1:5 m2 226.45


C-1 PERIMETRO
1 PISO
EJE A-A
del eje 1-1 al eje 7-7 1 5.0 1.7 2.75 23.38
del eje 10-10 al eje 13 -13 1 2.0 1.7 2.75 9.35

EJE C-C
del eje 1-1 al eje 7-7 1 5.0 1.7 2.75 23.38
del eje 10-10 al eje 13 -13 1 2.0 1.7 2.75 9.35

2 PISO
EJE A-A
del eje 1-1 al eje 7-7 1 5.0 1.7 2.70 22.95
del eje 10-10 al eje 13 -13 1 2.0 1.7 2.70 9.18

EJE C-C
del eje 1-1 al eje 7-7 1 5.0 1.7 2.70 22.95
del eje 10-10 al eje 13 -13 1 2.0 1.7 2.70 9.18

C-2
1 PISO
EJE A-A
del eje 1-1 al eje 7-7 1 2.0 1.4 2.75 7.70
del eje 10-10 al eje 13 -13 1 2.0 1.4 2.75 7.70

EJE C-C
del eje 1-1 al eje 7-7 1 2.0 1.4 2.75 7.70
del eje 10-10 al eje 13 -13 1 2.0 1.4 2.75 7.70
2 PISO
EJE A-A
del eje 1-1 al eje 7-7 1 2.0 1.4 2.75 7.70
del eje 10-10 al eje 13 -13 1 2.0 1.4 2.75 7.70

EJE C-C
del eje 1-1 al eje 7-7 1 2.0 1.4 2.75 7.70
del eje 10-10 al eje 13 -13 1 2.0 1.4 2.75 7.70

C-3
1 PISO
EJE 1-1 1 1.0 0.5 2.70 1.35
EJE 3-3 1 1.0 0.5 2.70 1.35
EJE 5-5 1 1.0 0.5 2.70 1.35
EJE 7-7 1 1.0 0.5 2.70 1.35
EJE 8-8 1 1.0 0.5 2.70 1.35
EJE 9-9 1 1.0 0.5 2.70 1.35
EJE 10 -10 1 1.0 0.5 2.70 1.35
EJE 13 -13 1 1.0 0.5 2.70 1.35

2 PISO
EJE 1-1 1 1.0 0.5 2.75 1.38
EJE 3-3 1 1.0 0.5 2.75 1.38
EJE 5-5 1 1.0 0.5 2.75 1.38
EJE 7-7 1 1.0 0.5 2.75 1.38
EJE 8-8 1 1.0 0.5 2.75 1.38
EJE 9-9 1 1.0 0.5 2.75 1.38
HOJA DE JUSTIFICACION DE METRADO
PROYECTO AMPLIACION DE LOS SERVICIOS DE EDUCACION INICIAL, PRIMARIA Y SECUNDARIA EN LA INSTITUCION EDUCATIVA N°33164, FELIPE HUAMAN P. DE AYALA -
:
VENENILLO
ESPECIALIDAD : ÀRQUITECTURA
FECHA : FEBRERO 2014
LUGAR : LOCALIDAD: VENENILLO - DISTRITO: VENENILLO - PROVINCIA: HUANUCO - REGION: HUANUCO

Nº DE MEDIDAS SUB TOTAL


ITEM DESCRIPCION UND CANTIDAD TOTAL
VECES LARGO ANCHO ALTO UNDS. LONG. AREA VOL. KG.
EJE 10 -10 1 1.0 0.5 2.75 1.38
EJE 13 -13 1 1.0 0.5 2.75 1.38

CE-1
EJE A-A
primer piso 1 2.0 0.5 2.74 2.74
segundo piso 1 2.0 0.5 3.00 3.00
CE-2
ENTRE EJE 8-8 Y 9-9
entre A-A y C-C 1 2.0 0.5 2.74 2.74
CE-3
ENTRE EJE 8-8 Y 9-9
entre A-A y C-C 1 1.0 0.3 1.80 0.45
CE-4
1 ENTRE EJE 8-8 Y 9-9
entre A-A y C-C 1 3.0 0.4 2.74 3.29
1 2.0 0.4 1.40 1.12

02.02.01.04 TARRAJEO EN VIGAS CON CEMENTO-ARENA 1:5 m2 268.58


PERIMETRO
V-1
1 PISO
EJE 1-1 1 2.0 0.5 3.06 3.06
EJE 3-3 1 2.0 0.3 3.06 1.84
EJE 5-5 1 2.0 0.3 3.06 1.84
EJE 7-7 1 2.0 0.5 3.06 3.06
EJE 10-10 1 2.0 0.5 3.06 3.06
EJE 13-13 1 2.0 0.5 3.06 3.06
1 PISO
EJE 1-1 1 2.0 0.7 3.06 4.28
EJE 3-3 1 2.0 0.7 3.06 4.28
EJE 5-5 1 2.0 0.7 3.06 4.28
EJE 7-7 1 2.0 0.7 3.06 4.28
EJE 10-10 1 2.0 0.7 3.06 4.28
EJE 13-13 1 2.0 0.7 3.06 4.28

V-1 (TECHO)
EJE 1-1 1 2.0 0.7 3.50 4.90
EJE 3-3 1 2.0 0.7 3.50 4.90
EJE 5-5 1 2.0 0.7 3.50 4.90
EJE 7-7 1 2.0 0.7 3.50 4.90
EJE 10-10 1 2.0 0.7 3.50 4.90
EJE 13-13 1 2.0 0.7 3.50 4.90

V-1 (ESQUINA TECHO)


EJE 1-1 1 2.0 1.2 1.60 3.68
EJE 3-3 1 2.0 1.2 1.60 3.68
EJE 5-5 1 2.0 1.2 1.60 3.68
EJE 7-7 1 2.0 1.2 1.60 3.68
EJE 10-10 1 2.0 1.2 1.60 3.68
EJE 13-13 1 2.0 1.2 1.60 3.68

V-2
1 PISO
EJE 2-2 1 1.0 1.1 6.40 6.72
EJE 4-4 1 1.0 1.1 6.40 6.72
EJE 6-6 1 1.0 1.1 6.40 6.72
EJE 11-11 1 1.0 1.1 6.40 6.72
EJE 12- 12 1 1.0 1.1 6.40 6.72

V-3
1 PISO
EJE A-A
DEL EJE 1-1 AL EJE 7-7 1 6.0 0.9 3.55 19.17
DEL EJE 10-10 AL 13-13 1 3.0 0.9 3.55 9.59
EJE C-C
DEL EJE 1-1 AL EJE 7-7 1 6.0 0.9 3.55 19.17
DEL EJE 10-10 AL 13-13 1 3.0 0.9 3.55 9.59

2 PISO
EJE A-A
DEL EJE 1-1 AL EJE 7-7 1 6.0 1.1 3.55 23.43
DEL EJE 10-10 AL 13-13 1 3.0 1.1 3.55 11.72
EJE C-C
DEL EJE 1-1 AL EJE 7-7 1 6.0 1.1 3.55 23.43
DEL EJE 10-10 AL 13-13 1 3.0 1.1 3.55 11.72
HOJA DE JUSTIFICACION DE METRADO
PROYECTO AMPLIACION DE LOS SERVICIOS DE EDUCACION INICIAL, PRIMARIA Y SECUNDARIA EN LA INSTITUCION EDUCATIVA N°33164, FELIPE HUAMAN P. DE AYALA -
:
VENENILLO
ESPECIALIDAD : ÀRQUITECTURA
FECHA : FEBRERO 2014
LUGAR : LOCALIDAD: VENENILLO - DISTRITO: VENENILLO - PROVINCIA: HUANUCO - REGION: HUANUCO

Nº DE MEDIDAS SUB TOTAL


ITEM DESCRIPCION UND CANTIDAD TOTAL
VECES LARGO ANCHO ALTO UNDS. LONG. AREA VOL. KG.

VIGA DE ESCALERA
1 2.0 1.1 3.20 7.04
1 2.0 1.1 3.20 7.04

02.02.01.05 VESTIDURA DE DERRAMES CON CEMENTO ARENA 1:5 - ANCHO 0.15 M. m 152.44
PRIMER PISO
EJE A-A
entre eje 1 y 2, eje 3 y 4 , eje 6-7 1 3.0 2.4 7.20
entre eje 2 y 3, eje 4 y 5 , eje 5-6 1 3.0 3.6 10.65
entre eje 9 y10 1 1.0 2.4 2.40
del eje 11-11 al 13-13 1 2.0 3.6 7.10
EJE C-C
del eje 1-1 al eje 7-7 1 6.0 3.6 21.30
del eje 10-10 al 13-13 1 3.0 3.6 10.65
SEGÚNDO PISO
EJE A-A
entre eje 1 y 2, eje 3 y 4 , eje 6-7 1 3.0 2.4 7.20
entre eje 2 y 3, eje 4 y 5 , eje 5-6 1 3.0 3.6 10.65
entre eje 9 y10 1 1.0 2.4 2.40
del eje 11-11 al 13-13 1 2.0 3.6 7.10
EJE C-C
del eje 1-1 al eje 7-7 1 6.0 3.6 21.30
del eje 10-10 al 13-13 1 3.0 3.6 10.65
BALCON
EJE V-V
del eje 1-1 al eje 7-7 1 12.0 1.9 22.56
del eje 10-10 al 13-13 1 6.0 1.9 11.28

02.02.01.10 BRUÑAS E=1 CM m 282.20


1 PISO
EJE A-A
entre eje 1 y 2, eje 3 y 4 , eje 6-7 1 3.0 5.3 15.87
entre eje 2 y 3, eje 4 y 5 , eje 5-6 1 3.0 6.4 19.20
entre eje 9 y10 1 1.0 5.3 5.29
del eje 11-11 al 13-13 1 2.0 6.4 12.80

EJE C-C
del eje 1-1 al eje 7-7 1 6.0 4.6 27.48
del eje 10-10 al 13-13 1 3.0 6.4 19.14
2 PISO
EJE A-A
entre eje 1 y 2, eje 3 y 4 , eje 6-7 1 3.0 5.3 15.87
entre eje 2 y 3, eje 4 y 5 , eje 5-6 1 3.0 6.4 19.20
entre eje 9 y10 1 1.0 5.3 5.29
del eje 11-11 al 13-13 1 2.0 6.4 12.80

EJE C-C
del eje 1-1 al eje 7-7 1 6.0 7.9 47.40
del eje 10-10 al 13-13 1 3.0 7.9 23.70

EJE V-V (balcon)


del eje 1-1 al eje 7-7 1 6.0 5.4 32.16
del eje 10-10 al 13-13 1 3.0 5.4 16.08

ESCALERA
eje V-V 1 2.0 5.0 9.92

02.03 CIELORRASOS
02.03.01 CIELORRASOS CON MEZCLA DE CEMENTO-ARENA 1:4 m2 291.73
1 PISO
ENTRE EJE 1-1 Y 3-3
entre eje A-A y C-C 1 1.0 8.2 6.6 54.32
ENTRE EJE 3-3 Y 5-5
entre eje A-A y C-C 1 1.0 8.2 6.6 54.32
ENTRE EJE 5-5 Y 7-7
entre eje A-A y C-C 1 1.0 8.2 6.6 54.32
ENTRE EJE 10-10 Y 12-12
entre eje A-A y C-C 1 1.0 12.3 6.6 80.85
BALCON
ENTRE EJE V-V Y A-A
del eje 1-1 al eje 7-7 1 6.0 3.6 1.5 31.95
del eje 10 -10 al eje 13-13 1 3.0 3.6 1.5 15.98
HOJA DE JUSTIFICACION DE METRADO
PROYECTO AMPLIACION DE LOS SERVICIOS DE EDUCACION INICIAL, PRIMARIA Y SECUNDARIA EN LA INSTITUCION EDUCATIVA N°33164, FELIPE HUAMAN P. DE AYALA -
:
VENENILLO
ESPECIALIDAD : ÀRQUITECTURA
FECHA : FEBRERO 2014
LUGAR : LOCALIDAD: VENENILLO - DISTRITO: VENENILLO - PROVINCIA: HUANUCO - REGION: HUANUCO

Nº DE MEDIDAS SUB TOTAL


ITEM DESCRIPCION UND CANTIDAD TOTAL
VECES LARGO ANCHO ALTO UNDS. LONG. AREA VOL. KG.

02.03.01 CIELORRASOS SUSPENDIDO DE TRIPLAY 301.16


1 PISO
ENTRE EJE 1-1 Y 3-3
entre eje A-A y C-C 1 1.0 8.2 6.6 54.32
ENTRE EJE 3-3 Y 5-5
entre eje A-A y C-C 1 1.0 8.2 6.6 54.32
ENTRE EJE 5-5 Y 7-7
entre eje A-A y C-C 1 1.0 8.2 6.6 54.32
ENTRE EJE 10-10 Y 12-12
entre eje A-A y C-C 1 1.0 12.3 6.6 80.85
BALCON
ENTRE EJE V-V Y A-A
del eje 1-1 al eje 7-7 1 1.0 25.4 1.5 38.13
del eje 10 -10 al eje 13-13 1 1.0 12.8 1.5 19.23

02.04 PISOS Y VEREDAS


02.04.01 PISOS
02.04.01.01 PISO DE CEMENTO PULIDO E=5cm BRUÑADO m2 531.60
1PISO
ENTRE EJE 1-1 Y 3-3
entre eje A-A y C-C (aula) 1 1.0 8.2 6.4 52.48
ENTRE EJE 3-3 Y 5-5
entre eje A-A y C-C (aula) 1 1.0 8.2 6.4 52.16
ENTRE EJE 5-5 Y 7-7
entre eje A-A y C-C (aula) 1 1.0 8.2 6.4 52.48
ENTRE EJE 10-10 Y 12-12
entre eje A-A y C-C (laboratorio) 1 1.0 12.5 6.4 80.00

2 PISO
ENTRE EJE 1-1 Y 3-3
entre eje A-A y C-C (aula) 1 1.0 8.2 6.4 52.48
ENTRE EJE 3-3 Y 5-5
entre eje A-A y C-C (aula) 1 1.0 8.2 6.4 52.16
ENTRE EJE 5-5 Y 7-7
entre eje A-A y C-C (aula) 1 1.0 8.2 6.4 52.48
ENTRE EJE 10-10 Y 12-12
entre eje A-A y C-C (laboratorio) 1 1.0 12.5 6.4 80.00

BALCON
ENTRE EJE V-V Y A-A
del eje 1-1 al eje 7-7 1 1.0 25.4 1.5 38.13
del eje 10 -10 al eje 13-13 1 1.0 12.8 1.5 19.23
02.04.02 VEREDAS
02.04.02.01 VEREDA DE CONCRETO BRUÑADO DE 4'' m2 96.94
EJE A-A 1 1.0 38.2 1.5 57.24
EJE C-C 1 1.0 33.9 0.6 20.33
EJE 1-1 1 1.0 9.3 0.8 7.46
EJE 8-8 1 1.0 2.8 0.8 2.22
EJE 9-9 1 1.0 2.8 0.8 2.22
EJE 13-13 1 1.0 9.3 0.8 7.46

02.04.02.02 ENCOFRADO Y DESCENCOFRADO m2 21.37


EJE A-A 1 1.0 38.2 0.20 7.63
1 2.0 1.5 0.20 0.60
EJE C-C 1 1.0 33.9 0.20 6.78
1 2.0 0.6 0.20 0.24
EJE 1-1 1 1.0 9.3 0.20 1.87
1 2.0 0.8 0.20 0.32
EJE 8-8 1 1.0 2.8 0.20 0.56
1 2.0 0.8 0.20 0.32
EJE 9-9 1 1.0 2.8 0.20 0.56
1 2.0 0.8 0.20 0.32
EJE 13-13 1 1.0 9.3 0.20 1.87
1 2.0 0.8 0.20 0.32

02.04.02.03 JUNTA DE DILATACION m 32.60


EJE A-A 1 10.0 1.5 15.00
EJE C-C 1 10.0 0.8 8.00
EJE 1-1 1 3.0 0.8 2.40
EJE 13- 13 1 3.0 0.8 2.40
EJE 8-8 1 3.0 0.8 2.40
EJE 9-9 1 3.0 0.8 2.40

02.05 ZOCALOS, CONTRAZOCALOS Y REVESTIMIENTOS


02.05.01 ZOCALOS
02.05.02 CONTRAZOCALOS
HOJA DE JUSTIFICACION DE METRADO
PROYECTO AMPLIACION DE LOS SERVICIOS DE EDUCACION INICIAL, PRIMARIA Y SECUNDARIA EN LA INSTITUCION EDUCATIVA N°33164, FELIPE HUAMAN P. DE AYALA -
:
VENENILLO
ESPECIALIDAD : ÀRQUITECTURA
FECHA : FEBRERO 2014
LUGAR : LOCALIDAD: VENENILLO - DISTRITO: VENENILLO - PROVINCIA: HUANUCO - REGION: HUANUCO

Nº DE MEDIDAS SUB TOTAL


ITEM DESCRIPCION UND CANTIDAD TOTAL
VECES LARGO ANCHO ALTO UNDS. LONG. AREA VOL. KG.
02.05.02.01 CONTRAZOCALO DE MADERA TORNILLO DE 4"x1" m 254.96
2 PISO
ENTRE EJE 1-1 Y 3-3
entre eje A-A y C-C (aula) 1 1.0 29.6 29.64
ENTRE EJE 3-3 Y 5-5
entre eje A-A y C-C (aula) 1 1.0 29.6 29.64
ENTRE EJE 5-5 Y 7-7
entre eje A-A y C-C (aula) 1 1.0 29.6 29.64
ENTRE EJE 10-10 Y 12-12
entre eje A-A y C-C (laboratorio) 1 1.0 38.6 38.56

2 PISO
ENTRE EJE 1-1 Y 3-3
entre eje A-A y C-C (aula) 1 1.0 29.6 29.64
ENTRE EJE 3-3 Y 5-5
entre eje A-A y C-C (aula) 1 1.0 29.6 29.64
ENTRE EJE 5-5 Y 7-7
entre eje A-A y C-C (aula) 1 1.0 29.6 29.64
ENTRE EJE 10-10 Y 12-12
entre eje A-A y C-C (laboratorio) 1 1.0 38.6 38.56

02.05.03 REVESTIMIENTOS
02.05.03.01 FORJADO Y REVESTIMIENTO DE GRADAS Y ESCALERAS DE CEMENTO PULIDO m2 31.26
TRAMO SOTANO
paso 1 3.0 1.8 0.2 0.89
contrapaso 1 3.0 1.8 0.3 1.62
PRIMER TRAMO
paso 1 9.0 1.8 0.2 2.67
contrapaso 1 9.0 1.8 0.3 4.86
caras laterales 1 18.0 0.3 0.3 1.35
fondo 1 1.0 2.9 1.8 5.22
SEGUNDO TRAMO
paso 1 9.0 1.8 0.2 2.67
contrapaso 1 9.0 1.8 0.3 4.86
caras laterales 1 18.0 0.3 0.3 1.35
fondo 1 1.0 3.2 1.8 5.76

02.05.03.02 FORJADO Y REVESTIMIENTO DE DE DESCANZO DE ESCALERAS DE CEMENTO PULIDO m2 14.06


ESCALERA DE INGRESO
descanso 1 1.0 3.8 1.9 7.22
1 1.0 3.8 1.8 6.84

02.06 CARPINTERIA DE MADERA


02.06.01 PUERTAS
02.06.01.01 PUERTA DE MADERA TORNILLO APANELADA SEGUN DISEÑO m2 35.85
PUERTA T-1
EJE A-A
del eje 1-1 al eje 7-7 2 4.0 1.1 2.65 23.32
del eje 10-10 al eje 13-13 2 1.0 1.1 2.75 6.05
PUERTA T-2
entre eje 6-6 y 7-7 1 3.0 0.9 2.40 6.48

02.06.01.02 COLOCACION DE PUERTAS u 13.00


1 11.0 11.00
02.07 CARPINTERIA METALICA
02.07.01 VENTANAS
02.07.01.01 VENTANAS METALICAS m2 129.48
VENTANA V-1
EJE C-C (1piso) 1 9.0 3.5 1.6 50.69
EJE C-C (2 piso) 1 6.0 3.5 1.6 33.79
VENTANA V-2
EJE A-A
1 piso 1 5.0 3.5 0.7 12.32
2 piso 1 5.0 3.5 0.7 12.32
EJE C-C
1 piso 1 2.0 3.5 0.7 4.93
VENTANA V-3
EJE A-A
1 piso 1 4.0 2.4 0.7 6.78
2 piso 1 4.0 2.4 0.7 6.78
VENTANA V-4
EJE A-A 1 1.0 3.8 0.5 1.88
02.07.01.02 COLOCACION DE VENTANAS u 36.00
1 36.0 36.00
HOJA DE JUSTIFICACION DE METRADO
PROYECTO AMPLIACION DE LOS SERVICIOS DE EDUCACION INICIAL, PRIMARIA Y SECUNDARIA EN LA INSTITUCION EDUCATIVA N°33164, FELIPE HUAMAN P. DE AYALA -
:
VENENILLO
ESPECIALIDAD : ÀRQUITECTURA
FECHA : FEBRERO 2014
LUGAR : LOCALIDAD: VENENILLO - DISTRITO: VENENILLO - PROVINCIA: HUANUCO - REGION: HUANUCO

Nº DE MEDIDAS SUB TOTAL


ITEM DESCRIPCION UND CANTIDAD TOTAL
VECES LARGO ANCHO ALTO UNDS. LONG. AREA VOL. KG.
02.07.02 CERRAJERIA
02.07.02.01 CERRADURA DE 02 GOLPES TIPO FORTE pza 8.00
PUERTA TIPO 1
PRIMER PISO 1 4.0 4.00
SEGUNDO PISO 1 4.0 4.00
02.07.02.02 CERRADURA DE PERILLA CON SEGURO INTERIOR pza 3.00
DIRECCION, SECRETARIADO , SALON DE PROFESORES 1 3.0 3.00

02.07.02.03 MANIJA DE BRONCE DE 4" PARA PUERTA u 8.00


8 8.00
02.07.03.04 BISAGRA DE FIERRO 4" u 33.00
PUERTA TIPO 1
primer piso 3 4.0 12.00
segundo piso 3 4.0 12.00
PUERTA TIPO 2
primer piso 3 3.0 9.00
02.07.03 PIZARRA
02.07.03.01 PIZARRA ACRÍLICA und 6 6.00

02.07.04 BARANDAS
02.07.04.01 PASAMANOS METALICO DE 2" m 25.84
2 1.0 12.9 25.84

02.08 VIDRIOS, CRISTALES Y SIMILARES


02.08.01 VIDRIO SEMIDOBLE NACIONAL COLOCADO CON SILICONA m2 129.48
VENTANA V-1
EJE C-C (1piso) 1 9.0 3.5 1.6 50.69
EJE C-C (2 piso) 1 6.0 3.5 1.6 33.79
VENTANA V-2
EJE A-A
1 piso 1 5.0 3.5 0.7 12.32
2 piso 1 5.0 3.5 0.7 12.32
EJE C-C
1 piso 1 2.0 3.5 0.7 4.93
VENTANA V-3
EJE A-A
1 piso 1 4.0 2.4 0.7 6.78
2 piso 1 4.0 2.4 0.7 6.78
VENTANA V-4
EJE A-A 1 1.0 3.8 0.5 1.88

02.09 PINTURA
02.09.01 PINTURA EN INTERIORES
02.09.01.01 PINTURA LATEX EN MUROS INTERIORES m2 488.82
MUROS DE SOGA
PRIMER PISO
EJE A-A
entre eje 1 y 2, eje 3 y 4 , eje 6-7 1 3.0 2.4 2.05 14.76
entre eje 2 y 3, eje 4 y 5 , eje 5-6 1 3.0 3.6 2.05 21.83
entre eje 9 y10 1 1.0 2.4 2.05 4.92
del eje 11-11 al 13-13 1 2.0 3.6 2.05 14.56
EJE C-C
del eje 1-1 al eje 7-7 1 6.0 3.6 1.15 24.50
del eje 10-10 al 13-13 1 3.0 3.6 1.15 12.25
ENTRE EJE 6-6 Y 7-7
entre eje A-A y C-C 1 2.0 7.2 2.90 41.93

SEGUNDO PISO
EJE A-A
entre eje 1 y 2, eje 3 y 4 , eje 6-7 1 3.0 2.4 2.00 14.40
entre eje 2 y 3, eje 4 y 5 , eje 5-6 1 3.0 3.6 2.00 21.30
entre eje 9 y10 1 1.0 2.4 2.00 4.80
del eje 11-11 al 13-13 1 2.0 3.6 2.00 14.20
EJE C-C
del eje 1-1 al eje 7-7 1 6.0 3.6 1.15 24.50
del eje 10-10 al 13-13 1 3.0 3.6 1.15 12.25

ZONA ESCALERA
entre eje 8-8 y 9-9 1 2.0 1.8 1.00 3.56
1 2.0 1.7 1.00 3.40
MURO DE CABEZA
PRIMER PISO
EJE 1-1 1 2.0 3.1 2.95 18.05
EJE 3-3 1 4.0 3.1 2.95 36.11
EJE 5-5 1 4.0 3.1 2.95 36.11
EJE 10-10 1 2.0 3.1 2.95 18.05
HOJA DE JUSTIFICACION DE METRADO
PROYECTO AMPLIACION DE LOS SERVICIOS DE EDUCACION INICIAL, PRIMARIA Y SECUNDARIA EN LA INSTITUCION EDUCATIVA N°33164, FELIPE HUAMAN P. DE AYALA -
:
VENENILLO
ESPECIALIDAD : ÀRQUITECTURA
FECHA : FEBRERO 2014
LUGAR : LOCALIDAD: VENENILLO - DISTRITO: VENENILLO - PROVINCIA: HUANUCO - REGION: HUANUCO

Nº DE MEDIDAS SUB TOTAL


ITEM DESCRIPCION UND CANTIDAD TOTAL
VECES LARGO ANCHO ALTO UNDS. LONG. AREA VOL. KG.
EJE 13-13 1 2.0 3.1 2.95 18.05
EJE 8-8 1 1.0 2.4 3.26 7.66
EJE 9-9 1 1.0 4.2 3.26 13.79
ENTRE EJE 8-8 AL 9-9
entre eje A-A y C-C 1 1.0 3.0 2.95 8.85
1 1.0 3.4 1.32 4.53

SEGUNDO PISO
EJE 1-1 1 2.0 3.1 2.70 16.52
EJE 3-3 1 2.0 3.1 2.70 16.52
EJE 5-5 1 2.0 3.1 2.70 16.52
EJE 10-10 1 2.0 3.1 2.70 16.52
EJE 13-13 1 2.0 3.1 2.70 16.52
EJE 8-8 1 1.0 2.4 1.80 4.23
EJE 9-9 1 1.0 4.2 1.80 7.61

02.09.02 PINTURA EN EXTERIORES


02.09.02.01 PINTURA LATEX EN MUROS EXTERIORES COLOR BLANCO ARENA m2 395.10
MURO SOGA
PRIMER PISO
EJE A-A
entre eje 1 y 2, eje 3 y 4 , eje 6-7 1 3.0 2.4 2.05 14.76
entre eje 2 y 3, eje 4 y 5 , eje 5-6 1 3.0 3.5 2.05 21.53
entre eje 9 y10 1 1.0 2.4 2.05 4.92
del eje 11-11 al 13-13 1 2.0 3.5 2.05 14.35
EJE C-C
del eje 1-1 al eje 7-7 1 6.0 3.5 1.15 24.15
del eje 10-10 al 13-13 1 3.0 3.5 1.15 12.08

SEGUNDO PISO
EJE A-A
entre eje 1 y 2, eje 3 y 4 , eje 6-7 1 3.0 2.4 2.00 14.40
entre eje 2 y 3, eje 4 y 5 , eje 5-6 1 3.0 3.5 2.00 21.00
entre eje 9 y10 1 1.0 2.4 2.00 4.80
del eje 11-11 al 13-13 1 2.0 3.5 2.00 14.00
EJE C-C
del eje 1-1 al eje 7-7 1 6.0 3.5 1.05 22.05
del eje 10-10 al 13-13 1 3.0 3.5 1.05 11.03

BALCON
EJE C-C
del eje 1-1 al eje 7-7 1 12.0 1.8 1.00 21.36
del eje 10-10 al 13-13 1 6.0 1.8 1.00 10.68
ZONA ESCALERA
entre eje 8-8 y 9-9 1 2.0 1.8 1.00 3.56
1 2.0 1.7 1.00 3.40
MURO CABEZA
PRIMER PISO
EJE 1-1 1 2.0 3.1 2.95 18.05
EJE 13-13 1 2.0 3.1 2.95 18.05
EJE 8-8 1 1.0 2.4 3.26 7.66
EJE 9-9 1 1.0 4.2 3.26 13.79
ENTRE EJE 8-8 AL 9-9
entre eje A-A y C-C 1 1.0 3.0 2.70 8.10
1 1.0 3.4 1.32 4.53

SEGUNDO PISO
EJE 1-1 1 2.0 3.1 2.70 16.52
EJE 10-10 1 2.0 3.1 2.70 16.52
EJE 13-13 1 2.0 3.1 2.70 16.52

APOYO DE TECHO
EJE 1-1 1 2.0 3.1 1.17 7.16
EJE 3-3 1 2.0 3.1 1.17 7.16
EJE 5-5 1 2.0 3.1 1.17 7.16
EJE 7-7 1 2.0 3.1 1.17 7.16
EJE 10-10 1 2.0 3.1 1.17 7.16
EJE 13-13 1 2.0 3.1 1.17 7.16
EJE 8-8 1 2.0 3.1 1.17 7.16
EJE 9-9 1 2.0 3.1 1.17 7.16

02.09.03 PINTURA EN VIGAS Y COLUMNAS


02.09.03.01 PINTURA LATEX EN VIGA Y COLUMNAS m2 495.02
C-1 PERIMETRO
1 PISO
EJE A-A
HOJA DE JUSTIFICACION DE METRADO
PROYECTO AMPLIACION DE LOS SERVICIOS DE EDUCACION INICIAL, PRIMARIA Y SECUNDARIA EN LA INSTITUCION EDUCATIVA N°33164, FELIPE HUAMAN P. DE AYALA -
:
VENENILLO
ESPECIALIDAD : ÀRQUITECTURA
FECHA : FEBRERO 2014
LUGAR : LOCALIDAD: VENENILLO - DISTRITO: VENENILLO - PROVINCIA: HUANUCO - REGION: HUANUCO

Nº DE MEDIDAS SUB TOTAL


ITEM DESCRIPCION UND CANTIDAD TOTAL
VECES LARGO ANCHO ALTO UNDS. LONG. AREA VOL. KG.
del eje 1-1 al eje 7-7 1 5.0 1.7 2.75 23.38
del eje 10-10 al eje 13 -13 1 2.0 1.7 2.75 9.35

EJE C-C
del eje 1-1 al eje 7-7 1 5.0 1.7 2.75 23.38
del eje 10-10 al eje 13 -13 1 2.0 1.7 2.75 9.35

2 PISO
EJE A-A
del eje 1-1 al eje 7-7 1 5.0 1.7 2.70 22.95
del eje 10-10 al eje 13 -13 1 2.0 1.7 2.70 9.18

EJE C-C
del eje 1-1 al eje 7-7 1 5.0 1.7 2.70 22.95
del eje 10-10 al eje 13 -13 1 2.0 1.7 2.70 9.18

C-2
1 PISO
EJE A-A
del eje 1-1 al eje 7-7 1 2.0 1.4 2.75 7.70
del eje 10-10 al eje 13 -13 1 2.0 1.4 2.75 7.70

EJE C-C
del eje 1-1 al eje 7-7 1 2.0 1.4 2.75 7.70
del eje 10-10 al eje 13 -13 1 2.0 1.4 2.75 7.70
2 PISO
EJE A-A
del eje 1-1 al eje 7-7 1 2.0 1.4 2.75 7.70
del eje 10-10 al eje 13 -13 1 2.0 1.4 2.75 7.70

EJE C-C
del eje 1-1 al eje 7-7 1 2.0 1.4 2.75 7.70
del eje 10-10 al eje 13 -13 1 2.0 1.4 2.75 7.70

C-3
1 PISO
EJE 1-1 1 1.0 0.5 2.70 1.35
EJE 3-3 1 1.0 0.5 2.70 1.35
EJE 5-5 1 1.0 0.5 2.70 1.35
EJE 7-7 1 1.0 0.5 2.70 1.35
EJE 8-8 1 1.0 0.5 2.70 1.35
EJE 9-9 1 1.0 0.5 2.70 1.35
EJE 10 -10 1 1.0 0.5 2.70 1.35
EJE 13 -13 1 1.0 0.5 2.70 1.35

2 PISO
EJE 1-1 1 1.0 0.5 2.75 1.38
EJE 3-3 1 1.0 0.5 2.75 1.38
EJE 5-5 1 1.0 0.5 2.75 1.38
EJE 7-7 1 1.0 0.5 2.75 1.38
EJE 8-8 1 1.0 0.5 2.75 1.38
EJE 9-9 1 1.0 0.5 2.75 1.38
EJE 10 -10 1 1.0 0.5 2.75 1.38
EJE 13 -13 1 1.0 0.5 2.75 1.38

CE-1
EJE A-A
primer piso 1 2.0 0.5 2.74 2.74
segundo piso 1 2.0 0.5 3.00 3.00
CE-2
ENTRE EJE 8-8 Y 9-9
entre A-A y C-C 1 2.0 0.5 2.74 2.74
CE-3
ENTRE EJE 8-8 Y 9-9
entre A-A y C-C 1 1.0 0.3 1.80 0.45
CE-4
ENTRE EJE 8-8 Y 9-9
entre A-A y C-C 1 3.0 0.4 2.74 3.29
1 2.0 0.4 1.40 1.12

PINTURAS EN VIGAS m2
PERIMETRO
V-1
1 PISO
EJE 1-1 1 2.0 0.5 3.06 3.06
EJE 3-3 1 2.0 0.3 3.06 1.84
HOJA DE JUSTIFICACION DE METRADO
PROYECTO AMPLIACION DE LOS SERVICIOS DE EDUCACION INICIAL, PRIMARIA Y SECUNDARIA EN LA INSTITUCION EDUCATIVA N°33164, FELIPE HUAMAN P. DE AYALA -
:
VENENILLO
ESPECIALIDAD : ÀRQUITECTURA
FECHA : FEBRERO 2014
LUGAR : LOCALIDAD: VENENILLO - DISTRITO: VENENILLO - PROVINCIA: HUANUCO - REGION: HUANUCO

Nº DE MEDIDAS SUB TOTAL


ITEM DESCRIPCION UND CANTIDAD TOTAL
VECES LARGO ANCHO ALTO UNDS. LONG. AREA VOL. KG.
EJE 5-5 1 2.0 0.3 3.06 1.84
EJE 7-7 1 2.0 0.5 3.06 3.06
EJE 10-10 1 2.0 0.5 3.06 3.06
EJE 13-13 1 2.0 0.5 3.06 3.06
1 PISO
EJE 1-1 1 2.0 0.7 3.06 4.28
EJE 3-3 1 2.0 0.7 3.06 4.28
EJE 5-5 1 2.0 0.7 3.06 4.28
EJE 7-7 1 2.0 0.7 3.06 4.28
EJE 10-10 1 2.0 0.7 3.06 4.28
EJE 13-13 1 2.0 0.7 3.06 4.28

V-1 (TECHO)
EJE 1-1 1 2.0 0.7 3.50 4.90
EJE 3-3 1 2.0 0.7 3.50 4.90
EJE 5-5 1 2.0 0.7 3.50 4.90
EJE 7-7 1 2.0 0.7 3.50 4.90
EJE 10-10 1 2.0 0.7 3.50 4.90
EJE 13-13 1 2.0 0.7 3.50 4.90

V-1 (ESQUINA TECHO)


EJE 1-1 1 2.0 1.2 1.60 3.68
EJE 3-3 1 2.0 1.2 1.60 3.68
EJE 5-5 1 2.0 1.2 1.60 3.68
EJE 7-7 1 2.0 1.2 1.60 3.68
EJE 10-10 1 2.0 1.2 1.60 3.68
EJE 13-13 1 2.0 1.2 1.60 3.68

V-2
1 PISO
EJE 2-2 1 1.0 1.1 6.40 6.72
EJE 4-4 1 1.0 1.1 6.40 6.72
EJE 6-6 1 1.0 1.1 6.40 6.72
EJE 11-11 1 1.0 1.1 6.40 6.72
EJE 12- 12 1 1.0 1.1 6.40 6.72

V-3
1 PISO
EJE A-A
DEL EJE 1-1 AL EJE 7-7 1 6.0 0.9 3.55 19.17
DEL EJE 10-10 AL 13-13 1 3.0 0.9 3.55 9.59
EJE C-C
DEL EJE 1-1 AL EJE 7-7 1 6.0 0.9 3.55 19.17
DEL EJE 10-10 AL 13-13 1 3.0 0.9 3.55 9.59

2 PISO
EJE A-A
DEL EJE 1-1 AL EJE 7-7 1 6.0 1.1 3.55 23.43
DEL EJE 10-10 AL 13-13 1 3.0 1.1 3.55 11.72
EJE C-C
DEL EJE 1-1 AL EJE 7-7 1 6.0 1.1 3.55 23.43
DEL EJE 10-10 AL 13-13 1 3.0 1.1 3.55 11.72

VIGA DE ESCALERA
1 2.0 1.1 3.20 7.04
1 2.0 1.1 3.20 7.04

02.09.04 PINTURA EN CIELORRASOS


02.09.04.01 PINTURA EN CIELORRASO AL TEMPLE m2 592.89
1 PISO
ENTRE EJE 1-1 Y 3-3
entre eje A-A y C-C 1 1.0 8.2 6.6 54.32
ENTRE EJE 3-3 Y 5-5
entre eje A-A y C-C 1 1.0 8.2 6.6 54.32
ENTRE EJE 5-5 Y 7-7
entre eje A-A y C-C 1 1.0 8.2 6.6 54.32
ENTRE EJE 10-10 Y 12-12
entre eje A-A y C-C 1 1.0 12.3 6.6 80.85
BALCON
ENTRE EJE V-V Y A-A
del eje 1-1 al eje 7-7 1 6.0 3.6 1.5 31.95
del eje 10 -10 al eje 13-13 1 3.0 3.6 1.5 15.98

CIELORRASOS SUSPENDIDO DE TRIPLAY


1 PISO
ENTRE EJE 1-1 Y 3-3
HOJA DE JUSTIFICACION DE METRADO
PROYECTO AMPLIACION DE LOS SERVICIOS DE EDUCACION INICIAL, PRIMARIA Y SECUNDARIA EN LA INSTITUCION EDUCATIVA N°33164, FELIPE HUAMAN P. DE AYALA -
:
VENENILLO
ESPECIALIDAD : ÀRQUITECTURA
FECHA : FEBRERO 2014
LUGAR : LOCALIDAD: VENENILLO - DISTRITO: VENENILLO - PROVINCIA: HUANUCO - REGION: HUANUCO

Nº DE MEDIDAS SUB TOTAL


ITEM DESCRIPCION UND CANTIDAD TOTAL
VECES LARGO ANCHO ALTO UNDS. LONG. AREA VOL. KG.
entre eje A-A y C-C 1 1.0 8.2 6.6 54.32
ENTRE EJE 3-3 Y 5-5
entre eje A-A y C-C 1 1.0 8.2 6.6 54.32
ENTRE EJE 5-5 Y 7-7
entre eje A-A y C-C 1 1.0 8.2 6.6 54.32
ENTRE EJE 10-10 Y 12-12
entre eje A-A y C-C 1 1.0 12.3 6.6 80.85
BALCON
ENTRE EJE V-V Y A-A
del eje 1-1 al eje 7-7 1 1.0 25.4 1.5 38.13
del eje 10 -10 al eje 13-13 1 1.0 12.8 1.5 19.23

02.09.05 PINTURA ESTRUCTURA METALICA


02.09.05.01 PINTURA EN VENTANAS METALICAS CON CON ANTICORROSIVO Y ESMALTE COLOR m2 129.48
VENTANA V-1
EJE C-C (1piso) 1 9.0 3.5 1.6 50.69
EJE C-C (2 piso) 1 6.0 3.5 1.6 33.79
VENTANA V-2
EJE A-A
1 piso 1 5.0 3.5 0.7 12.32
2 piso 1 5.0 3.5 0.7 12.32
EJE C-C
1 piso 1 2.0 3.5 0.7 4.93
VENTANA V-3
EJE A-A
1 piso 1 4.0 2.4 0.7 6.78
2 piso 1 4.0 2.4 0.7 6.78
VENTANA V-4
EJE A-A 1 1.0 3.8 0.5 1.88

02.09.06 PINTURA EN CARPINTERIA DE MADERA


02.09.06.01 PINTURA EN PUERTAS DE MADERA CON LACA Y BARNIZ (2 manos) m2 35.85
PUERTA T-1
EJE A-A
del eje 1-1 al eje 7-7 2 4.0 1.1 2.65 23.32
del eje 10-10 al eje 13-13 2 1.0 1.1 2.75 6.05
PUERTA T-2
entre eje 6-6 y 7-7 1 3.0 0.9 2.40 6.48
HOJA DE JUSTIFICACION DE METRADO
PROYECTO :
CREACION DEL COMPLEJO DEPORTIVO "LUIS MAGUIÑA PAREDES" EN LA JUNTA VECINAL LA MARINA,DISTRITO DE PADRE ABAD,PROVINCIA DE PADRE ABAD - UCAYALI

ESPECIALIDAD : ARQUITECTURA
FECHA : OCTUBRE 2013
LUGAR : CIUDAD DE AGUAYTIA,DISTRITO DE PADRE ABAD,PROVINCIA DE PADRE ABAD UCAYALI

Nº DE MEDIDAS SUB TOTAL


ITEM DESCRIPCION UND CANTIDAD TOTAL
VECES LARGO ANCHO ALTO UNDS. LONG. AREA VOL. KG.
04.00.00 INSTALACIONES ELECTRICAS
04.01.00 TUBERIA EMPOTRADA
04.01.01 TUBERIAS PVC SAP (ELECTRICAS) D=3/4" 580.01
Primer nivel
En centros de Luz ambientes interiores ml 1.0 121.2 121.18
Sube de tablero a techo ml 2.0 1.6 3.20
Bajada a interruptores de cielorraso ml 9.0 1.80 16.20
En tomacorrientes ambientes interiores ml 1.0 137.5 137.50
Sube a tomacorrientes h=0.40 m. ml 41.0 0.40 16.40
Baja del tablero a piso ml 3.0 1.4 4.20
Segundo nivel
En centros de Luz ambientes interiores ml 1.0 116.8 116.83
Sube de tablero a techo ml 2.0 1.6 3.20
Bajada a interruptores de cielorraso ml 6.0 1.80 10.80
En tomacorrientes ambientes interiores ml 1.0 132.7 132.70
Sube a tomacorrientes h=0.40 m. ml 34.0 0.40 13.60
Baja del tablero a piso ml 3.0 1.4 4.20

04.01.02 TUBERIAS PVC SAP (ELECTRICAS) D=1" 184.90


Montantes entre tableros de distribución ml 1.0 3.2 3.20
Sistema de puesta a tierra ml 1.0 7.0 7.00
Red de Computo ml 1.0 53.5 53.50
Red de TD-1A a TG ml 1.0 30.3 30.30
Red de TD-1B a TG ml 1.0 30.3 30.30
Red de TD-2B a TG ml 1.0 30.3 30.30
Red de TD-2B a TG ml 1.0 30.3 30.30

04.02.00 CABLES Y CONDUCTORES


04.02.01 CONDUCTOR DE Cu. TW 2.5MM2 579.01
Primer nivel
En centros de Luz ambientes interiores ml 1.0 260.5 260.53
Sube de tablero a techo ml 4.0 1.6 6.40
Bajada a interruptores de cielorraso ml 18.0 1.80 32.40

Segundo nivel
En centros de Luz ambientes interiores ml 1.0 251.7 251.68
Sube de tablero a techo ml 4.0 1.6 6.40
Bajada a interruptores de cielorraso ml 12.0 1.80 21.60

04.02.02 CONDUCTOR DE Cu. TW 4 MM2 600.40


TOMACORRIENTES
Primer nivel
En tomacorrientes ambientes interiores ml 2.0 137.5 275.00
Sube a tomacorrientes h=0.40 m. ml 82.0 0.40 32.80
Segundo nivel
En tomacorrientes ambientes interiores ml 2.0 132.7 265.40
Sube a tomacorrientes h=0.40 m. ml 68.0 0.40 27.20

04.02.03 CONDUCTOR DE Cu. THW 10 MM2 48.00


Red de TD-1A a TG ml 2.0 4.4 8.80
Red de TD-2A a TG ml 2.0 4.4 8.80
Red de TD-1B a TD-1A ml 2.0 7.6 15.20
Red de TD-2B a TD-2A ml 2.0 7.6 15.20

04.0 3.00 CAJAS DE PASO Y BUSONES DE REGISTRO


04.03.01 CAJA DE PASO, CAJA OCTOGONAL DE FºGº PES. DE 100x40 mm 4.00
Primer nivel PTO 2.0 2.00
Segundo nivel PTO 2.0 2.00

04.03.03 CAJA DE PASO, CAJA CUADRADA DE FºGº DE 150x150 mm 4.00


Primer nivel PTO 2.0 2.00
Segundo nivel PTO 2.0 2.00

04.04.00 SALIDAS DE ILUMINACION


04.04.01 SALIDA DE TECHO - CENTROS DE LUZ 68.00
Primer nivel PTO 35.0 35.00
Segundo nivel PTO 33.0 33.00

04.05.00 SALIDAS DE PARED - INTERRUPTORES Y TOMACORRIENTES


04.05.01 SALIDA PARA INTERRUPTORES SIMPLES 4.00
Primer nivel PTO 2.0 2.00
Segundo nivel PTO 2.0 2.00

04.05.02 SALIDA PARA INTERRUPTOR DOBLE 7.00


Primer nivel PTO 4.0 4.00
Segundo nivel PTO 3.0 3.00

04.05.02 SALIDA PARA INTERRUPTOR TRIPLE 2.00


Primer nivel PTO 1.0 1.00
Segundo nivel PTO 1.0 1.00
HOJA DE JUSTIFICACION DE METRADO
PROYECTO :
CREACION DEL COMPLEJO DEPORTIVO "LUIS MAGUIÑA PAREDES" EN LA JUNTA VECINAL LA MARINA,DISTRITO DE PADRE ABAD,PROVINCIA DE PADRE ABAD - UCAYALI

ESPECIALIDAD : ARQUITECTURA
FECHA : OCTUBRE 2013
LUGAR : CIUDAD DE AGUAYTIA,DISTRITO DE PADRE ABAD,PROVINCIA DE PADRE ABAD UCAYALI

Nº DE MEDIDAS SUB TOTAL


ITEM DESCRIPCION UND CANTIDAD TOTAL
VECES LARGO ANCHO ALTO UNDS. LONG. AREA VOL. KG.
04.05.03 SALIDA PARA INTERRUPTORES COMUTADOS SIMPLES 2.00
Primer nivel PTO 2.0 2.00
Segundo nivel PTO

04.05.04 SALIDA PARA TOMACORRIENTE DOBLE EN PARED 75.00


Primer nivel PTO 41.0 41.00
Segundo nivel PTO 34.0 34.00

04.06.00 TABLEROS Y SUBTABLEROS


04.06.01 TABLERO DE DISTRIBUCIÓN TERMOMAGNETICO TIPO 1 4.00
Primer nivel PZA 2.0 2.00
Segundo nivel PZA 2.0 2.00

04.07.00 INSTALACION DE LUMINARIAS


04.07.01 LUMINARIA FLUORESCENTE RECTO ISPE 2 X 36 W +PANTALLA, REJILLA DIFUSORA, EQUIPO COMPLETO ARMADO PARA ADOSAR 68.00
Primer nivel UND 35.0 35.00
Segundo nivel UND 33.0 33.00

04.08.00 POZO DE TOMA A TIERRA


04.08.01 POZO DE TOMA A TIERRA INCLUIDO INSTALACION GLB 1 1.00 1.00
HOJA DE JUSTIFICACION D
PROYECTO
: AMPLIACION DE LOS SERVICIOS DE EDUCACION INICIAL, PRIMARIA Y SECUNDARIA EN LA

ESPECIALIDAD : ESTRUCTURAS
FECHA : FEBRERO 2014
LUGAR : LOCALIDAD: VENENILLO - DISTRITO: VENENILLO - PROVINCIA: HUANUCO - REGION: H

ITEM DESCRIPCION

01 ESTRUCTURAS
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
01.03 MOVIMIENTO DE TIERRAS
01.03.01 EXCAVACIONES DE ZANJAS p/CC
01.03.01.01 EXCAVACION DE ZANJAS PARA CIMIENTOS HASTA 0.80m
0 ###
#NAME? ###
01.03.03 RELLENO MANUAL C/Mat.PROPIO
01.03.03.01 RELLENO Y COMPACTADOCON MATERIAL PROPIO EN ZANJAS CON EQUIPO LIVIANO
01.03.02.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO EN ZAPATAS CON EQUIPO LIVIANO
01.03.02.03 RELLENO Y COMPACTACION CON MATERIAL PROPIO DE E:10CM EN VEREDAS
01.03.02.04 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA
01.03.02.05 NIVELACION Y COMPACTACION DE TERRENO NATURAL EN INTERIORES CON EQUIPO LIVIANO
1.04 OBRAS DE CONCRETO SIMPLE
01.04.01 C.S PARA SOLADO PARA ZAPATAS
01.04.01.01 SOLADO EN ZAPATAS CONCRETO 1:12 CEMENTO HORMIGON
01.04.02 C.S. CIMIENTOS CORRIDOS
01.04.02.01 FALSA CIMENTACION 1:12 + 30 % P.G. f'c >=100Kg/cm2
01.04.02.02 CIMIENTOS CORRIDOS 1:10 + 30 % P.G. f'c >=100Kg/cm2
01.04.04 ENCOFRADO Y DESENCOFRADO DE SC
01.04.03.01 FALSO PISO MEZCLA 1:8 e=4"
01.05 OBRAS DE CONCRETO ARMADO
01.05.01 C PARA ZAPATAS
01.05.01.01 CONCRETO EN ZAPATAS f'c=210 kg/cm2
01.05.01.02 ACERO PARA ZAPATAS F'Y=4,200 KG/CM2 GRADO 60
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
01.05.02 C PARA COLUMNAS ESTRUCTURALES
01.05.04.01 COLUMNAS APORTICADAS EN EDIFICACIONES
01.05.04.01.01 CONCRETO EN COLUMNAS APORTICADAS f'c=210 kg/cm2
01.05.04.01.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS APORTICADAS
01.05.04.01.03 ACERO EN COLUMNAS APORTICADAS F'Y=4,200 KG/CM2 GRADO 60
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###

02 ARQUITECTURA
02.01 MUROS Y TABIQUES DE ALBAÑILERIA
02.01.01 MURO DE SOGA LADRILLO 18 HUECOS DE ARCILLA - MEZCLA C:A 1:5
02.01.02 MURO DE CABEZA LADRILLO 18 HUECOS DE ARCILLA - MEZCLA C:A 1:5
02.02 REVOQUES ENLUCIDOS Y MOLDURAS EN EDIFICACIONES
01.02.01 REVOQUES ENLUCIDOS EN EDIFICACIONES
02.02.01.01 TARRAJEO EN INTERIORES CON CEMENTO-ARENA 1:5
02.02.01.02 TARRAJEO EN MUROS EXTERIORES CON CEMENTO-ARENA 1:5
02.02.01.03 TARRAJEO EN COLUMNAS CON CEMENTO-ARENA 1:5
02.02.01.04 TARRAJEO EN VIGAS CON CEMENTO-ARENA 1:5
02.02.01.05 VESTIDURA DE DERRAMES CON CEMENTO ARENA 1:5 - ANCHO 0.15 M.
02.02.01.10 BRUÑAS E=1 CM
02.03 CIELORRASOS
02.03.01 CIELORRASOS CON MEZCLA DE CEMENTO-ARENA 1:4
02.03.01 CIELORRASOS SUSPENDIDO DE TRIPLAY
02.04 PISOS Y VEREDAS
02.04.01 PISOS
02.04.01.01 PISO DE CEMENTO PULIDO E=5cm BRUÑADO
02.04.02 VEREDAS
02.04.02.01 VEREDA DE CONCRETO BRUÑADO DE 4''
02.04.02.02 ENCOFRADO Y DESCENCOFRADO
02.04.02.03 JUNTA DE DILATACION
02.05 ZOCALOS, CONTRAZOCALOS Y REVESTIMIENTOS
02.05.01 ZOCALOS
02.05.02 CONTRAZOCALOS
02.05.02.01 CONTRAZOCALO DE MADERA TORNILLO DE 4"x1"
02.05.03 REVESTIMIENTOS
02.05.03.01 FORJADO Y REVESTIMIENTO DE GRADAS Y ESCALERAS DE CEMENTO PULIDO
02.05.03.02 FORJADO Y REVESTIMIENTO DE DE DESCANZO DE ESCALERAS DE CEMENTO PULIDO
02.06 CARPINTERIA DE MADERA
02.06.01 PUERTAS
02.06.01.01 PUERTA DE MADERA TORNILLO APANELADA SEGUN DISEÑO
02.06.01.02 COLOCACION DE PUERTAS
02.07 CARPINTERIA METALICA
02.07.01 VENTANAS
02.07.01.01 VENTANAS METALICAS
02.07.01.02 COLOCACION DE VENTANAS
02.07.02 CERRAJERIA
02.07.02.01 CERRADURA DE 02 GOLPES TIPO FORTE
02.07.02.02 CERRADURA DE PERILLA CON SEGURO INTERIOR
02.07.02.03 MANIJA DE BRONCE DE 4" PARA PUERTA
02.07.03.04 BISAGRA DE FIERRO 4"
02.07.03 PIZARRA
02.07.03.01 PIZARRA ACRÍLICA
02.07.04 BARANDAS
02.07.04.01 PASAMANOS METALICO DE 2"
02.08 VIDRIOS, CRISTALES Y SIMILARES
02.08.01 VIDRIO SEMIDOBLE NACIONAL COLOCADO CON SILICONA
02.09 PINTURA
02.09.01 PINTURA EN INTERIORES
02.09.01.01 PINTURA LATEX EN MUROS INTERIORES
02.09.02 PINTURA EN EXTERIORES
02.09.02.01 PINTURA LATEX EN MUROS EXTERIORES COLOR BLANCO ARENA
02.09.03 PINTURA EN VIGAS Y COLUMNAS
02.09.03.01 PINTURA LATEX EN VIGA Y COLUMNAS
0 PINTURAS EN VIGAS
02.09.04 PINTURA EN CIELORRASOS
02.09.04.01 PINTURA EN CIELORRASO AL TEMPLE
02.09.05 PINTURA ESTRUCTURA METALICA
02.09.05.01 PINTURA EN VENTANAS METALICAS CON CON ANTICORROSIVO Y ESMALTE COLOR
02.09.06 PINTURA EN CARPINTERIA DE MADERA
02.09.06.01 PINTURA EN PUERTAS DE MADERA CON LACA Y BARNIZ (2 manos)

04.00.00 INSTALACIONES ELECTRICAS


04.01.00 TUBERIA EMPOTRADA
04.01.01 TUBERIAS PVC SAP (ELECTRICAS) D=3/4"
04.01.02 TUBERIAS PVC SAP (ELECTRICAS) D=1"
04.02.00 CABLES Y CONDUCTORES
04.02.01 CONDUCTOR DE Cu. TW 2.5MM2
04.02.02 CONDUCTOR DE Cu. TW 4 MM2
0 TOMACORRIENTES
04.02.03 CONDUCTOR DE Cu. THW 10 MM2
04.0 3.00 CAJAS DE PASO Y BUSONES DE REGISTRO
04.03.01 CAJA DE PASO, CAJA OCTOGONAL DE FºGº PES. DE 100x40 mm
04.03.03 CAJA DE PASO, CAJA CUADRADA DE FºGº DE 150x150 mm
04.04.00 SALIDAS DE ILUMINACION
04.04.01 SALIDA DE TECHO - CENTROS DE LUZ
04.05.00 SALIDAS DE PARED - INTERRUPTORES Y TOMACORRIENTES
04.05.01 SALIDA PARA INTERRUPTORES SIMPLES
04.05.02 SALIDA PARA INTERRUPTOR DOBLE
04.05.02 SALIDA PARA INTERRUPTOR TRIPLE
04.05.03 SALIDA PARA INTERRUPTORES COMUTADOS SIMPLES
04.05.04 SALIDA PARA TOMACORRIENTE DOBLE EN PARED
04.06.00 TABLEROS Y SUBTABLEROS
04.06.01 TABLERO DE DISTRIBUCIÓN TERMOMAGNETICO TIPO 1
04.07.00 INSTALACION DE LUMINARIAS
04.07.01 LUMINARIA FLUORESCENTE RECTO ISPE 2 X 36 W +PANTALLA, REJILLA DIFUSORA, EQUIPO COMPLETO ARMAD
04.08.00 POZO DE TOMA A TIERRA
04.08.01 POZO DE TOMA A TIERRA INCLUIDO INSTALACION
TIFICACION DE METRADO
IA Y SECUNDARIA EN LA INSTITUCION EDUCATIVA N°33164, FELIPE HUAMAN P. DE AYALA - VENENILLO

HUANUCO - REGION: HUANUCO

Nº DE MEDIDAS SUB TOTAL


UND CANTIDAD TOTAL
VECES LARGO ANCHO ALTO UNDS. LONG. AREA VOL. KG.

#NAME?
#NAME?

#NAME?
#NAME?
#NAME?

21.45
0.00
#NAME?

35.16
54.92
14.24
#REF!
N EQUIPO LIVIANO 264.40

34.01
0.00
56.94
54.34

311.72

69.99
1525.76

#NAME?
#NAME?
#NAME?

#NAME?
#NAME?
#NAME?
34.43
248.24
6803.55

#NAME?
#NAME?

#NAME?

#NAME?
#NAME?
#NAME?

#NAME?
#NAME?
#NAME?

#NAME?
#NAME?
#NAME?

#NAME?
#NAME?
#NAME?
#NAME?

#NAME?
#NAME?
#NAME?

#NAME?
#NAME?
#NAME?

#NAME?
#NAME?
#NAME?

#NAME?
#NAME?

#NAME?

#NAME?
#NAME?
#NAME?
#NAME?

#NAME?
#NAME?
#NAME?

198.27
291.03

488.82
395.10
226.45
268.58
152.44
282.20

291.73
301.16

531.60

96.94
21.37
32.60

254.96

31.26
14.06

35.85
13.00

129.48
36.00

8.00
3.00
8.00
33.00

6.00
25.84

129.48

488.82

395.10

495.02

592.89

129.48

35.85

580.01
184.90

579.01
600.40

48.00

4.00
4.00

68.00

4.00
7.00
2.00
2.00
75.00

4.00

A, EQUIPO COMPLETO ARMADO PARA ADOSAR 68.00

1.00