CALCULO DEL CAUDAL MEDIO EN EL PUNTO DE CAPTACIÓN AL 75% DE PERSISTENCIA - METODO DE TEMEZ

PROYECTO:
ELABORACION DEL EXPEDIENTE TECNICO: “REHABILITACION DEL SERVICIO DE AGUA PARA RIEGO DEL SECTOR SAN RAFAEL EN EL DISTRITO DE CASMA, PROVINCIA DE CASMA, DEPARTAMENTO DE ANCASH

FECHA Jan-19

Prof.
Responsabl
e ING. JAVIER JOSEF PACHAS NORABUENA, CIP:182613
1
area de la cuenca Ac Km2 1527.566
VARIABLES Unidad INICIO OCT NOV DIC ENE FEB MAR ABR MAY JUN JUL AGO SEP
Precipiacion (P) mm 18.4 23.3 26.6 44.6 57.6 71.4 29.6 3.1 0.0 0.0 0.3 2.2
DATOS
Evapotrans. Potencial. (ETP) mm 51.2 51.7 52.7 54.9 55.9 55.4 55.6 53.7 50.7 49.3 50.1 51.8
Ubral De Escorrentia (Po) mm -1.0 2.9 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Deficit Max. De Humed. Del Suelo (ρ) mm 41.2 80.6 82.7 84.9 85.9 85.4 85.6 83.7 80.7 79.3 80.1 81.8
ECUACIONES DEL MODELO

Excedente (T) mm 6.1 4.3 5.4 14.0 21.7 31.0 6.5 0.0 0.0 0.0 0.0 0.0
Humedad En El Suelo (H) mm 40.00 1.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Evapotranspiracion Real ETR mm 51.2 20.1 21.2 30.6 35.9 40.4 23.1 3.1 0.0 0.0 0.3 2.2
Infiltracion (I) mm 5.1 3.7 4.6 9.5 12.6 15.3 5.3 0.0 0.0 0.0 0.0 0.0
Aportacion Superficial (Asup) mm 1.0 0.5 0.8 4.5 9.1 15.8 1.2 0.0 0.0 0.0 0.0 0.0
Almacenamiento Subterraneo (V) mm 6.60 6.18 5.54 5.28 6.41 7.95 9.88 8.70 6.38 4.73 3.47 2.54 1.88
Aportacion Subterranea (Asub) mm 5.48 4.37 4.83 8.42 11.04 13.32 6.52 2.32 1.65 1.26 0.92 0.66
Aportacion Total AT mm 6.50 4.89 5.66 12.87 20.13 29.09 7.67 2.32 1.65 1.26 0.92 0.66
Tiempo (D) días 31.00 30.00 31.00 31.00 29.00 31.00 30.00 31.00 30.00 31.00 31.00 30.00
Hmax (50 -400) 30.00
PARAMETR

Imax (10 a 200) 30.00


OS

C ( 0-1) 0.10
α (-0,02 ; + 0,02) 0.01
CAUDAL SIMULADO (TEMEZ) Qs m3/s 3.71 2.88 3.23 7.34 12.27 16.59 4.52 1.32 0.97 0.72 0.53 0.39
CAUDAL SIMULADO (TEMEZ) Qs l/s 3,709.80 2,883.54 3,225.45 7,338.74 12,274.55 16,593.15 4,521.94 1,322.15 974.33 718.38 526.89 388.29
NUMERO DE MES N 1 2 3 4 5 6 7 8 9 10 11 12

ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC
19.656086 30.755121 44.443083 11.720873 3.5412362 2.5254519 1.9241101 1.4112327 1.0064407 9.93633833 7.47414693 8.63903787
-6.23 -4.59 -5.41 -12.32 -18.48 -27.85 -7.20 -2.22 -1.55 -1.21 -0.88 -0.62

CAUDAL SIMULADO AL 75% DE PERSISTENCIA (TEMEZ)


18.00
16.00
14.00
12.00
CAUDAL (m3/s)

10.00
8.00
6.00
4.00
2.00
0.00
OCT NOV DIC ENE FEB MAR ABR MAY JUN JUL AGO SEP
CAUDAL (
8.00
6.00
4.00
2.00
0.00
OCT NOV DIC ENE FEB MAR ABR MAY JUN JUL AGO SEP
CALCULO DEL CAUDAL MEDIO EN EL PUNTO DE CAPTACIÓN AL 75% DE PERSISTENCIA - METODO DE TEMEZ

PROYECTO:
ELABORACION DEL EXPEDIENTE TECNICO: “REHABILITACION DEL SERVICIO DE AGUA PARA RIEGO DEL SECTOR SAN RAFAEL EN EL DISTRITO DE CASMA, PROVINCIA DE CASMA, DEPARTAMENTO DE ANCASH

FECHA Jan-19

Prof.
Responsable ING. JAVIER JOSEF PACHAS NORABUENA, CIP:182613
1
area de la cuenca Ac Km2 1527.566
VARIABLES Unidad INICIO OCT NOV DIC ENE FEB MAR ABR MAY JUN JUL AGO SEP
Precipiacion (P) mm 0.4 0.8 0.5 4.1 5.9 10.3 2.4 0.0 0.0 0.0 0.0 0.0
DATOS Evapotrans.
(ETP) mm 51.2 51.7 52.7 54.9 55.9 55.4 55.6 53.7 50.7 49.3 50.1 51.8
Potencial.
Ubral De Escorrentia (Po) mm -1.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Deficit Max. De
(ρ) mm 41.2 81.7 82.7 84.9 85.9 85.4 85.6 83.7 80.7 79.3 80.1 81.8
Humed. Del Suelo
Excedente (T) mm 0.0 0.0 0.0 0.0 0.1 0.6 0.0 0.0 0.0 0.0 0.0 0.0
Humedad En El
ECUACIONES DEL MODELO

(H) mm 40.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Suelo
Evapotranspiracion ETR mm 40.4 0.8 0.5 4.1 5.8 9.7 2.4 0.0 0.0 0.0 0.0 0.0
Real
Infiltracion (I) mm 0.0 0.0 0.0 0.0 0.1 0.6 0.0 0.0 0.0 0.0 0.0 0.0
Aportacion
(Asup) mm 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Superficial
Almacenamiento
(V) mm 6.60 4.85 3.60 2.64 1.94 1.48 1.23 0.91 0.67 0.50 0.36 0.27 0.20
Subterraneo
Aportacion
Subterranea (Asub) mm 1.79 1.26 0.96 0.71 0.56 0.82 0.32 0.24 0.17 0.13 0.10 0.07

Aportacion Total AT mm 1.79 1.26 0.96 0.71 0.56 0.83 0.32 0.24 0.17 0.13 0.10 0.07
Tiempo (D) días 31.00 30.00 31.00 31.00 29.00 31.00 30.00 31.00 30.00 31.00 31.00 30.00
Hmax (50 -400) 30.00
PARAMETR

Imax (10 a 200) 30.00


OS

C ( 0-1) 0.10
α (-0,02 ; + 0,02) 0.01

CAUDAL SIMULADO
Qs m3/s 1.02 0.74 0.55 0.41 0.34 0.47 0.19 0.14 0.10 0.08 0.06 0.04
(TEMEZ)

CAUDAL SIMULADO Qs l/s 1,023.27 741.33 546.59 406.67 343.19 471.56 188.57 139.03 102.46 75.54 55.41 40.83
(TEMEZ)

NUMERO DE MES N 1 2 3 4 5 6 7 8 9 10 11 12

VARIABLE OCT NOV DIC ENE FEB MAR ABR MAY JUN JUL AGO SEP
Qs m3/s 1.02 0.74 0.55 0.41 0.34 0.47 0.19 0.14 0.10 0.08 0.06 0.04
Qs l/s 1,023.27 741.33 546.59 406.67 343.19 471.56 188.57 139.03 102.46 75.54 55.41 40.83
Vol MMC 2.74 1.92 1.46 1.09 0.86 1.26 0.49 0.37 0.27 0.20 0.15 0.11

1.09 0.86 1.26 0.49 0.37 0.27 0.20 0.15 0.11 2.74 1.92 1.46
2.8584772414 2.2561709139 2.7628782418 6.9994718097 12.023341466 16.406951136 4.3847276148 1.2209767849 0.8997702001 0.6634099805 0.4865760309 0.3585755573
-1.84 -1.51 -2.22 -6.59 -11.68 -15.94 -4.20 -1.08 -0.80 -0.59 -0.43 -0.32

CAUDAL SIMULADO AL 75% DE PERSISTENCIA (TEMEZ)


1.20

1.00

0.80
UDAL (m3/s)

0.60
CAUDAL SIMULADO AL 75% DE PERSISTENCIA (TEMEZ)
1.20

1.00

0.80

CAUDAL (m3/s)
0.60

0.40

0.20

0.00
OCT NOV DIC ENE FEB MAR ABR MAY JUN JUL AGO SEP
RIESGO
VIDA ÚTIL DE LAS OBRAS (n años)
ADMISIBLE
R 1 2 3 5 10 20 25
1% 100 199 299 498 995 1990 2488
2% 50 99 149 248 495 990 1238
5% 20 39 59 98 195 390 488
10% 10 19 29 48 95 190 238
20% 5 10 14 23 45 90 113
25% 4 7 11 18 35 70 87
50% 2 3 5 8 15 29 37
75% 1.3 2 2.7 4.1 7.7 15 18
99% 1 1.11 1.27 1.66 2.7 5 5.9
Fuente: MONSALVE, 1999
s)

50 100 200
4975 9950 19900
2475 4950 9900
975 1950 3900
475 950 1899
225 449 897
174 348 695
73 154 289
37 73 144
11 22 44