MUNICIPALIDAD PROVINCIAL DE VILCAS HUAMAN

VALORIZACIÓN DE OBRA N° 06
Correspondiente Mes Diciembre 2017

PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO

EN EL CENTRO POBLADO DE POMACOCHA , DISTRITO DE VISCHONGO, PROVINCIA DE VILC AS HUAMAN - AYACUICHO"

CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Ing° GABRIEL ALFONSO GUZMAN MANRIQUE SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONT ADELANT DIRECTO : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : DICIEMBRE 2017
MONTO ADELANTO MAT : S/. 613,461.40 (CON IGV) S/. 519,882.54 (SIN IGV)
META FISICA: CONSTRUCCION DE EDIFICACION

AVANCES
P. UNITARIO
CODIGO DESCRIPCION UND METRADO P. PARCIAL (S/.) ANTERIOR ACTUAL ACUMULADO SALDO
(S/.)
METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %

1 OBRAS EXTERIORES 187,176.71 187,176.71 100.00 0.00 0.00 187,176.71 100.00 0.00 0.00
2 AULAS Y ESCALERA 594,974.69 594,974.69 100.00 0.00 0.00 594,974.69 100.00 0.00 0.00
3 AUDIDTORIO Y CENTRO COMPUTO 373,086.38 373,086.38 100.00 0.00 0.00 373,086.38 100.00 0.00 0.00
4 AMB ADMINISTRATIVOS 174,076.58 174,076.58 100.00 0.00 0.00 174,076.58 100.00 0.00 0.00
5 COCINA COMEDOR 184,909.43 184,909.43 100.00 0.00 0.00 184,909.43 100.00 0.00 0.00
6 SS.HH. N IÑOS Y NIÑAS 102,692.82 102,692.82 100.00 0.00 0.00 102,692.82 100.00 0.00 0.00
7 SS.HH. ADMINISTRCION 53,554.99 0.00 0.00 0.00 0.00 0.00 0.00 53,554.99 100.00
8 PATIO FORMACION 118,460.67 118,460.67 100.00 0.00 0.00 118,460.67 100.00 0.00 0.00
9 LOSA DEPORTIVA 251,048.94 251,048.94 100.00 0.00 0.00 251,048.94 100.00 0.00 0.00
10 CISTERNA TANQUE ALTO 51,134.12 51,134.12 100.00 0.00 0.00 51,134.12 100.00 0.00 0.00
11 CERCO PERIMENTRICO 150,796.85 150,796.85 100.00 0.00 0.00 150,796.85 100.00 0.00 0.00
12 PUERTA DE INGRESO 7,931.69 7,931.69 100.00 0.00 0.00 7,931.69 100.00 0.00 0.00
13 MOB, MA, CAPACITC Y FLET 113,259.13 35,250.00 31.12 45,301.32 40.00 80,551.32 71.12 32,707.81 28.88

COSTO DIRECTO 2,363,103.00 2,231,477.68 94.43 45,361.99 1.92 2,276,840.20 96.35 86,262.80 3.65
GASTOS GENERALES 5% 0.05 118,154.86 111,573.88 2,268.10 113,841.72 4,313.14

UTILIDAD 5% 0.05 118,154.85 111,573.88 2,268.10 113,841.71 4,313.14

SUB TOTAL 2,599,412.71 2,454,625.44 49,898.19 2,504,523.63 94,889.08


IGV 18% 0.18 467,894.29 441,832.57 8,981.68 450,814.26 17,080.03

PRESUPUESTO BASE 3,067,307.00 2,896,458.01 94.43 58,879.87 1.92 2,955,337.89 96.35 111,969.11 3.65

Valorización N° 06 RESUMEN 1de38


MUNICIPALIDAD PROVINCIAL DE VILCAS HUAMAN

VALORIZACIÓN DE OBRA N° 06
Correspondiente Mes Diciembre 2017

PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO

EN EL CENTRO POBLADO DE POMACOCHA , DISTRITO DE VISCHONGO, PROVINCIA DE VILC AS HUAMAN - AYACUICHO"

CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Ing° GABRIEL ALFONSO GUZMAN MANRIQUE SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONT ADELANT DIRECTO : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : DICIEMBRE 2017
MONT ADELANT MATERIAL : S/. 613,461.40 (CON IGV) S/. 519,882.54 (SIN IGV)
META FISICA: : CONSTRUCCION DE EDIFICACION

AVANCES

P. UNITARIO
CODIGO DESCRIPCION UND METRADO P. PARCIAL (S/.) ANTERIOR ACTUAL ACUMULADO SALDO
(S/.)

METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %

01 OBRAS EXTERIORES
01.01 OBRAS DE EXPLANACION
01.01.01 TRAZO NIVELACION Y REPLANTEO DURANTE EL PROCESO M2 1,226.53 6.95 8,524.38 1,226.53 8,524.38 100.00 0.00 0.00 1,226.53 8,524.38 100.00 0.00 0.00 0.00
01.01.01.01 EXCAVACION MASIVA A MAQUINA DURANTE EL PROCESO m2 613.27 9.20 5,642.08 613.27 5,642.08 100.00 0.00 0.00 613.27 5,642.08 100.00 0.00 0.00 0.00
01.01.01.02 ELIMINACION MATERIAL EXCEDENTE m2 766.58 6.56 5,028.76 766.58 5,028.76 100.00 0.00 0.00 766.58 5,028.76 100.00 0.00 0.00 0.00
01.02 OBRAS DE SANEAMIENTO 0.00 0.00
01.02.01 TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO M2 1,708.14 5.03 8,591.94 1,708.14 8,591.94 100.00 0.00 0.00 0.00 1,708.14 8,591.94 100.00 0.00 0.00 0.00
01.02.02 RED DE DISTRIBUCION TUBERIA DE D=3/4"PVC SAP M 75.15 4.85 364.48 75.15 364.48 100.00 0.00 0.00 0.00 75.15 364.48 100.00 0.00 0.00 0.00
01.02.03 RED DE DISTRIBUCION TUBERIA DE D=1" PVC SAP ML 79.03 10.62 839.30 79.03 839.30 100.00 0.00 0.00 0.00 79.03 839.30 100.00 0.00 0.00 0.00
01.02.04 RED DE DERIVACION PVC SAL PARA DESAGUE DE 6" ML 3,202.97 16.56 53,041.18 3,202.97 53,041.18 100.00 0.00 0.00 0.00 3,202.97 53,041.18 100.00 0.00 0.00 0.00
01.02.05 RED DE DERIVACION PVC SAL PARA DESAGUE DE 8" ML 59.12 8.71 514.94 59.12 514.94 100.00 0.00 0.00 0.00 59.12 514.94 100.00 0.00 0.00 0.00
01.02.06 EXCAVACION DE ZANJAS PARA TUBERIAS DE DESAGUE M3 1,110.29 7.61 8,449.31 1,110.29 8,449.31 100.00 0.00 0.00 0.00 1,110.29 8,449.31 100.00 0.00 0.00 0.00
01.02.07 RELLENO COMP. ZANJA TERR. NORMAL "C" -P/TUB.4"-6" AGU M 3,416.27 20.67 70,614.30 3,416.27 70,614.30 100.00 0.00 0.00 0.00 3,416.27 70,614.30 100.00 0.00 0.00 0.00
01.02.08 RELLENO CON MATERIAL PROPIO SELECCIONADO M3 939.47 7.92 7,440.60 939.47 7,440.60 100.00 0.00 0.00 0.00 939.47 7,440.60 100.00 0.00 0.00 0.00
01.02.09 CAJA DE REGISTRO DE DESAGUE 12" X 24" PZA 6.00 434.38 2,606.28 6.00 2,606.28 100.00 0.00 0.00 0.00 6.00 2,606.28 100.00 0.00 0.00 0.00
01.02.10 TEE PVC SAP 1 " PZA 3.00 8.21 24.63 3.00 24.63 100.00 0.00 0.00 0.00 3.00 24.63 100.00 0.00 0.00 0.00
01.02.11 REDUCCION PVC SAP DE 1" A 3/4" P/AGUA PZA 2.00 10.71 21.42 2.00 21.42 100.00 0.00 0.00 0.00 2.00 21.42 100.00 0.00 0.00 0.00
01.02.12 YEEE DE P. V. C. SAL SP, RAMAL CON REDUCCION DE 8" - 6" UND 2.00 12.50 25.00 2.00 25.00 100.00 0.00 0.00 0.00 2.00 25.00 100.00 0.00 0.00 0.00
01.02.13 YEE PVC SAL DE 6" PZA 11.00 7.17 78.87 11.00 78.87 100.00 0.00 0.00 0.00 11.00 78.87 100.00 0.00 0.00 0.00
01.02.14 CODO PVC SAL DE 6" X 45° PZA 9.00 15.77 141.93 9.00 141.93 100.00 0.00 0.00 0.00 9.00 141.93 100.00 0.00 0.00 0.00
01.02.15 GRIFO PARA RIEGO PZA 9.00 40.40 363.60 9.00 363.60 100.00 0.00 0.00 0.00 9.00 363.60 100.00 0.00 0.00 0.00
01.02.16 VALVULA CHECK DE 1" UND 2.00 55.56 111.12 2.00 111.12 100.00 0.00 0.00 0.00 2.00 111.12 100.00 0.00 0.00 0.00
01.02.17 CAJA PARA MEDIDOR DE AGUA PZA 1.00 161.00 161.00 1.00 161.00 100.00 0.00 0.00 0.00 1.00 161.00 100.00 0.00 0.00 0.00
O1.03 OBRAS ELECTRICAS 0.00 0.00
01.03.01 EXCAVACION M3 36.03 20.60 742.22 36.03 742.22 100.00 0.00 0.00 0.00 36.03 742.22 100.00 0.00 0.00 0.00
01.03.02 RELLENO COMP. ZANJA TERR. NORMAL "C" -P/TUB.4"-6" AGU M 138.59 20.67 2,864.66 138.59 2,864.66 100.00 0.00 0.00 0.00 138.59 2,864.66 100.00 0.00 0.00 0.00
01.03.03 RELLENO CON MATERIAL PROPIO SELECCIONADO M3 38.11 7.92 301.83 38.11 301.83 100.00 0.00 0.00 0.00 38.11 301.83 100.00 0.00 0.00 0.00
01.03.04 TUBERIAS PVC SAP (ELECTRICAS) DE=1 1/2" M 138.59 9.62 1,333.24 138.59 1,333.24 100.00 0.00 0.00 0.00 138.59 1,333.24 100.00 0.00 0.00 0.00

Valorización 06 Obras Exteriores 2de38


MUNICIPALIDAD PROVINCIAL DE VILCAS HUAMAN

VALORIZACIÓN DE OBRA N° 06
Correspondiente Mes Diciembre 2017

PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO

EN EL CENTRO POBLADO DE POMACOCHA , DISTRITO DE VISCHONGO, PROVINCIA DE VILC AS HUAMAN - AYACUICHO"

CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Ing° GABRIEL ALFONSO GUZMAN MANRIQUE SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONT ADELANT DIRECTO : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : DICIEMBRE 2017
MONT ADELANT MATERIAL : S/. 613,461.40 (CON IGV) S/. 519,882.54 (SIN IGV)
META FISICA: : CONSTRUCCION DE EDIFICACION

AVANCES

P. UNITARIO
CODIGO DESCRIPCION UND METRADO P. PARCIAL (S/.) ANTERIOR ACTUAL ACUMULADO SALDO
(S/.)

METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %

01.03.05 CABLE ELECTRICO NYY 2 X 4 MM2 M 138.59 7.98 1,105.95 138.59 1,105.95 100.00 0.00 0.00 0.00 138.59 1,105.95 100.00 0.00 0.00 0.00
01.03.06 POZO A TIERRA UND 1.00 779.45 779.45 1.00 779.45 100.00 0.00 0.00 1.00 779.45 100.00 0.00 0.00 0.00
01.03.07 TABLERO GENERAL UND 1.00 114.00 114.00 1.00 114.00 100.00 0.00 0.00 1.00 114.00 100.00 0.00 0.00 0.00
O1.04 OBRAS DE CIRCULACION (VEREDAS) 0.00 0.00
01.04.01 TRAZO Y REPLANTEO M2 688.86 2.24 1,543.05 688.86 1,543.05 100.00 0.00 0.00 688.86 1,543.05 100.00 0.00 0.00 0.00
01.04.02 EXCAVACION M3 34.44 20.60 709.46 34.44 709.46 100.00 0.00 0.00 34.44 709.46 100.00 0.00 0.00 0.00
01.04.03 ELIMINACION MATERIAL EXCEDENTE M3 43.05 6.56 282.41 43.05 282.41 100.00 0.00 0.00 43.05 282.41 100.00 0.00 0.00 0.00
01.04.04 NIVELACION DE TERRENO M2 688.86 2.00 1,377.72 688.86 1,377.72 100.00 0.00 0.00 688.86 1,377.72 100.00 0.00 0.00 0.00
01.04.05 ENCOFRADO Y DESENCOFRADO M2 32.40 46.95 1,521.18 32.40 1,521.18 100.00 0.00 0.00 32.40 1,521.18 100.00 0.00 0.00 0.00
01.04.06 VEREDA DE CONCRETO F' C=175 KG/CM2 M2 68.89 11.74 808.77 68.89 808.77 100.00 0.00 0.00 68.89 808.77 100.00 0.00 0.00 0.00
01.04.07 JUNTAS ASFALTICAS M 105.39 10.51 1,107.65 105.39 1,107.65 100.00 0.00 0.00 105.39 1,107.65 100.00 0.00 0.00 0.00

COSTO DIRECTO
187,176.71 187,176.71 100.00 0.00 0.00 187,176.71 100.00 0.00 0.00

Valorización 06 Obras Exteriores 3de38


MUNICIPALIDAD PROVINCIAL DE VILCAS HUAMAN

VALORIZACIÓN DE OBRA N° 06
Correspondiente Mes Diciembre 2017

PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO

EN EL CENTRO POBLADO DE POMACOCHA , DISTRITO DE VISCHONGO, PROVINCIA DE VILC AS HUAMAN - AYACUICHO"

CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Ing° GABRIEL ALFONSO GUZMAN MANRIQUE SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONT ADELANT DIRECTO : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : DICIEMBRE 2017
MONT ADELANT MATERIAL : S/. 613,461.40 (CON IGV) S/. 519,882.54 (SIN IGV)
META FISICA: : CONSTRUCCION DE EDIFICACION

AVANCES
P. UNITARIO
CODIGO DESCRIPCION UND METRADO P. PARCIAL (S/.) ANTERIOR ACTUAL ACUMULADO SALDO
(S/.)
METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %

02 CONSTRUCCION DE 06 AULAS
02.01 TRABAJOS PRELIMINARES
02.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M UND 1.00 400.00 400.00 1.00 400.00 100.00 0.00 0.00 1.00 400.00 100.00 0.00 0.00 0.00
02.01.02 LIMPIEZA DE TERRENO MANUAL M2 287.96 0.66 190.05 287.96 190.05 100.00 0.00 0.00 287.96 190.05 100.00 0.00 0.00 0.00
02.01.03 TRAZO Y REPLANTEO M2 287.96 2.24 645.03 287.96 645.03 100.00 0.00 0.00 287.96 645.03 100.00 0.00 0.00 0.00
02.02 MOVIMIENTO DE TIERRAS
02.02.01 REFINE Y NIVELACION EN TERRENO NORMAL M2 287.96 2.55 734.30 287.96 734.30 100.00 0.00 0.00 287.96 734.30 100.00 0.00 0.00 0.00
02.02.02 EXCAVACION PARA ZAPATAS DE 1.00M A 1.90M DE PROFUND M3 182.26 24.36 4,439.85 182.26 4,439.85 100.00 0.00 0.00 182.26 4,439.85 100.00 0.00 0.00 0.00
02.02.03 EXCAVACION PARA CIMIENTOS HASTA 1.00MT TERRENO NO M3 44.64 13.13 586.12 44.64 586.12 100.00 0.00 0.00 44.64 586.12 100.00 0.00 0.00 0.00
02.02.04 RELLENO CON MATERIAL PROPIO M3 69.37 16.65 1,155.01 69.37 1,155.01 100.00 0.00 0.00 69.37 1,155.01 100.00 0.00 0.00 0.00
02.02.05 ELIMINACION MATERIAL EXCEDENTE M3 196.91 6.56 1,291.73 196.91 1,291.73 100.00 0.00 0.00 196.91 1,291.73 100.00 0.00 0.00 0.00
02.03 CONCRETO SIMPLE
02.03.01 SOLADO DE 4" MESCLA 1:12 CEMENTO - HORMIGON M2 87.21 89.39 7,795.70 87.21 7,795.70 100.00 0.00 0.00 87.21 7,795.70 100.00 0.00 0.00 0.00
02.03.02 CIMIENTOS CORRIDOS MESCLA 1:10 + 30%(CEMENTO-HORMI M3 39.39 170.48 6,715.21 39.39 6,715.21 100.00 0.00 0.00 39.39 6,715.21 100.00 0.00 0.00 0.00
02.03.03 ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE 0.30 A 0.60 M2 39.07 24.75 966.98 39.07 966.98 100.00 0.00 0.00 39.07 966.98 100.00 0.00 0.00 0.00
02.03.04 CONCRETO SOBRECIMIENTO DE 1:8 CEM - HOR 25% P. M. AN M3 10.80 225.77 2,438.32 10.80 2,438.32 100.00 0.00 0.00 10.80 2,438.32 100.00 0.00 0.00 0.00
02.04 CONCRETO ARMADO
02.04.01 ZAPATAS
02.04.01.01 CONCRETO EN ZAPATAS F'C=210 KG/CM2 M3 86.33 335.04 28,924.00 86.33 28,924.00 100.00 0.00 0.00 86.33 28,924.00 100.00 0.00 0.00 0.00
02.04.01.02 ACERO GRADO 60 EN ZAPATAS KG 2,190.61 4.68 10,252.05 2,190.61 10,252.05 100.00 0.00 0.00 2,190.61 10,252.05 100.00 0.00 0.00 0.00
02.04.02 COLUMNAS
02.04.02.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 66.07 413.53 27,321.93 66.07 27,321.93 100.00 0.00 0.00 66.07 27,321.93 100.00 0.00 0.00 0.00
02.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 446.49 41.04 18,323.95 446.49 18,323.95 100.00 0.00 0.00 446.49 18,323.95 100.00 0.00 0.00 0.00
02.04.02.03 ACERO GRADO 60 EN COLUMNAS KG 9,894.95 4.44 43,933.58 9,894.95 43,933.58 100.00 0.00 0.00 9,894.95 43,933.58 100.00 0.00 0.00 0.00
02.04.03 VIGAS
02.04.03.01 CONCRETO EN VIGAS F'C=210 KG/CM2 M3 63.03 344.40 21,707.53 63.03 21,707.53 100.00 0.00 0.00 63.03 21,707.53 100.00 0.00 0.00 0.00
02.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 487.12 39.23 19,109.72 487.12 19,109.72 100.00 0.00 0.00 487.12 19,109.72 100.00 0.00 0.00 0.00
02.04.03.03 ACERO GRADO 60 EN VIGAS KG 11,910.79 4.32 51,454.61 11,910.79 51,454.61 100.00 0.00 0.00 11,910.79 51,454.61 100.00 0.00 0.00 0.00
02.04.04 LOSAS ALIGERADAS

Valorización 06 Aulas y Escaler 4de38


02.04.04.01 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 M3 103.05 336.54 34,680.45 103.05 34,680.45 100.00 0.00 0.00 103.05 34,680.45 100.00 0.00 0.00 0.00
02.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS M2 1,046.25 43.46 45,470.03 1,046.25 45,470.03 100.00 0.00 0.00 1,046.25 45,470.03 100.00 0.00 0.00 0.00
02.04.04.03 ACERO GRADO 60 EN LOSAS ALIGERADAS GK 2,186.13 4.36 9,531.53 2,186.13 9,531.53 100.00 0.00 0.00 2,186.13 9,531.53 100.00 0.00 0.00 0.00
02.04.04.04 LADRILLO HUECO DE ARCILLA 25 X 30 X 30 CM. PARA TECHO ALIGE UND 4,588.08 1.83 8,396.19 4,588.08 8,396.19 100.00 0.00 0.00 4,588.08 8,396.19 100.00 0.00 0.00 0.00
02.04.05 ESCALERAS
02.04.05.01 CONCRETO EN ESCALERAS F'C=210 KG/CM2 M3 5.18 390.47 2,022.63 5.18 2,022.63 100.00 0.00 0.00 5.18 2,022.63 100.00 0.00 0.00 0.00
02.04.05.02 ENCOFRADO Y DESENCOFRADO M2 27.18 46.95 1,276.10 27.18 1,276.10 100.00 0.00 0.00 27.18 1,276.10 100.00 0.00 0.00 0.00
02.04.05.03 ACERO GRADO 60 KG 294.83 5.14 1,515.43 294.83 1,515.43 100.00 0.00 0.00 294.83 1,515.43 100.00 0.00 0.00 0.00
02.05 ALBAÑELERIA
02.05.01 MURO DE CABEZA LADRILLO CORRIENTE CON CEMENTO - ARENA M2 285.33 61.67 17,596.30 285.33 17,596.30 100.00 0.00 0.00 285.33 17,596.30 100.00 0.00 0.00 0.00
02.05.02 MURO SOGA LADRILLO CORRIENTE CON CEMENTO - ARENA M2 41.13 54.67 2,248.58 41.13 2,248.58 100.00 0.00 0.00 41.13 2,248.58 100.00 0.00 0.00 0.00
02.06 COBERTURA
02.06.01 COBERTURA DE TEJA ANDINA TIPO ETERNIT M2 288.35 35.13 10,129.74 288.35 10,129.74 100.00 0.00 0.00 288.35 10,129.74 100.00 0.00 0.00 0.00
02.06.02 CUMBRERA CON TEJA ANDINA TIPO ETERNIT ML 27.90 83.06 2,317.37 27.90 2,317.37 100.00 0.00 0.00 27.90 2,317.37 100.00 0.00 0.00 0.00
02.07 REVOQUES, ENLUCIDOS Y MOLDURAS
02.07.01 TARRAJEO EN INTERIORES Y EXTERIORES MESCLA 1:5 E=1.5CM M2 582.12 26.36 15,344.68 582.12 15,344.68 100.00 0.00 0.00 582.12 15,344.68 100.00 0.00 0.00 0.00
02.07.02 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO - ARENA M2 446.49 17.97 8,023.43 446.49 8,023.43 100.00 0.00 0.00 446.49 8,023.43 100.00 0.00 0.00 0.00
02.07.03 TARRAJEO EN SUPERFICIE Y ARISTAS DE VIGAS CON CEMENTO - A M2 487.12 21.15 10,302.59 487.12 10,302.59 100.00 0.00 0.00 487.12 10,302.59 100.00 0.00 0.00 0.00
02.07.04 VESTIDURA DE DERRAMES CON MEZCLA 1:5 (CEMENTO - ARENA) ML 215.00 7.46 1,603.90 215.00 1,603.90 100.00 0.00 0.00 215.00 1,603.90 100.00 0.00 0.00 0.00
02.07.05 TARRAJEO EN CIELORRASO CON C:A - 1:5 E=1.5 CM M2 1,046.25 43.68 45,700.20 1,046.25 45,700.20 100.00 0.00 0.00 1,046.25 45,700.20 100.00 0.00 0.00 0.00
02.07.06 TARRAJEO EN FONDO DE ESCALERA CON CEMENTO - ARENA M2 27.18 16.18 439.77 27.18 439.77 100.00 0.00 0.00 27.18 439.77 100.00 0.00 0.00 0.00
02.07.07 BRUÑAS ML 546.21 1.68 917.63 546.21 917.63 100.00 0.00 0.00 546.21 917.63 100.00 0.00 0.00 0.00
02.08 CIELORRASOS
02.08.01 CIELORRASOS SUSPENDIDO CON BALDOSAS M2 154.55 32.17 4,971.87 154.55 4,971.87 100.00 0.00 0.00 154.55 4,971.87 100.00 0.00 0.00 0.00
02.08.02 FRISOS CON BALDOSAS M2 154.55 26.77 4,137.30 154.55 4,137.30 100.00 0.00 0.00 154.55 4,137.30 100.00 0.00 0.00 0.00
02.08.03 PERFIL METALICO T/"L" 2"X1"X1/16" PARA BALDOSAS M 515.17 5.19 2,673.73 515.17 2,673.73 100.00 0.00 0.00 515.17 2,673.73 100.00 0.00 0.00 0.00
02.08.04 TEE DE SUSPENSIÓN ALAMBRE GALVANISADO N° 14 + 6 VUELTAS PZA 107.00 30.54 3,267.78 107.00 3,267.78 100.00 0.00 0.00 107.00 3,267.78 100.00 0.00 0.00 0.00
02.09 PISOS Y PAVIMENTOS
02.09.01 NIVELACION Y COMPACTACION DE PISO M2 287.96 2.00 575.92 287.96 575.92 100.00 0.00 0.00 287.96 575.92 100.00 0.00 0.00 0.00
02.09.02 FALSO PISO DE 4" DE CONCRETO DE 1:10 M2 152.34 13.66 2,080.96 152.34 2,080.96 100.00 0.00 0.00 152.34 2,080.96 100.00 0.00 0.00 0.00
02.09.03 CONTRAPISO DE 40 MM M2 304.68 24.75 7,540.83 304.68 7,540.83 100.00 0.00 0.00 304.68 7,540.83 100.00 0.00 0.00 0.00
02.09.04 PISO DE CERAMICO ANTIDESLIZANTE 20 X 20 CM. S/PIEDRA VERDE M2 304.68 62.98 19,188.75 304.68 19,188.75 100.00 0.00 0.00 304.68 19,188.75 100.00 0.00 0.00 0.00
02.09.05 REVESTIMIENTO GRADAS C/MORTERO 1:4 X 2CM. PULIDO 1:2 X 1CM M 11.10 27.62 306.58 11.10 306.58 100.00 0.00 0.00 11.10 306.58 100.00 0.00 0.00 0.00
02.09.06 ENCOFRADO Y DESENCOFRADO M2 7.09 46.95 332.88 7.09 332.88 100.00 0.00 0.00 7.09 332.88 100.00 0.00 0.00 0.00
02.09.07 VEREDA DE CONCRETO DE 4" M2 9.44 53.27 502.87 9.44 502.87 100.00 0.00 0.00 9.44 502.87 100.00 0.00 0.00 0.00
02.09.08 JUNTAS ASFALTICAS M 35.10 10.51 368.90 35.10 368.90 100.00 0.00 0.00 35.10 368.90 100.00 0.00 0.00 0.00
02.10 ZOCALOS Y CONTRAZOCALOS
02.10.01 CONTRAZOCALO DE CERAMICO DE H=10CM M 228.80 28.63 6,550.54 228.80 6,550.54 100.00 0.00 0.00 228.80 6,550.54 100.00 0.00 0.00 0.00
02.10.02 CONTRAZOCALO CEMENTO S/COLOREAR H =20 CM M 228.80 6.79 1,553.55 228.80 1,553.55 100.00 0.00 0.00 228.80 1,553.55 100.00 0.00 0.00 0.00
02.11 CARPINTERIA DE MADERA
02.11.01 PUERTAS APANELADAS DE MADERA TORNILLO M2 47.75 236.25 11,280.94 47.75 11,280.94 100.00 0.00 0.00 47.75 11,280.94 100.00 0.00 0.00 0.00
02.12 CARPINTERIA METALICA
02.12.01 VENTANA DE FIERRO C/ PERFIL DE 1" X 1/8" + HOJA BAST. "L"3/4" M2 102.11 153.79 15,703.50 102.11 15,703.50 100.00 0.00 0.00 102.11 15,703.50 100.00 0.00 0.00 0.00
02.12.02 BARANDA DE TUBO FO. GDO. PASAMANO 1 1/2" - PARANTE 1" X 1M. M 28.73 67.88 1,950.19 28.73 1,950.19 100.00 0.00 0.00 28.73 1,950.19 100.00 0.00 0.00 0.00
02.13 CERRAJERIA
02.13.01 BISAGRA CAPUCHINA 3" X 3" PZA 78.00 11.72 914.16 78.00 914.16 100.00 0.00 0.00 78.00 914.16 100.00 0.00 0.00 0.00
02.13.02 CERRADURA DE TRES GOLPES PZA 9.00 103.38 930.42 9.00 930.42 100.00 0.00 0.00 9.00 930.42 100.00 0.00 0.00 0.00
02.13.03 MANIJA DE BRONCE DE 4" PARA PUERTAS UND 9.00 17.63 158.67 9.00 158.67 100.00 0.00 0.00 9.00 158.67 100.00 0.00 0.00 0.00
02.14 VIDRIOS, CRISTALES Y SIMILARES
Valorización 06 Aulas y Escaler 5de38
02.14.01 VIDRIO SEMI DOBLE. PROVISION Y COLOCACION EN VENTANAS FIE P2 1,154.01 7.01 8,089.61 1,154.01 8,089.61 100.00 0.00 0.00 1,154.01 8,089.61 100.00 0.00 0.00 0.00
02.15 PINTURA
02.15.01 PINTURA EN EXTERIORES INTERIORES C/LATEX SUPERMATE M2 1,515.73 8.81 13,353.58 1,515.73 13,353.58 100.00 0.00 0.00 1,515.73 13,353.58 100.00 0.00 0.00 0.00
02.15.02 PINTADO DE CIELO RASO C/LATEX M2 1,046.25 9.30 9,730.13 1,046.25 9,730.13 100.00 0.00 0.00 1,046.25 9,730.13 100.00 0.00 0.00 0.00
02.15.03 PINTURA BARNIZ EN CARPINTERIA DE MADERA M2 47.75 12.68 605.47 47.75 605.47 100.00 0.00 0.00 47.75 605.47 100.00 0.00 0.00 0.00
02.15.04 PINTADO DE VENTANAS METALICAS (2 MANOS ANTIC. + 2 ESMALTE) M2 107.25 4.53 485.84 107.25 485.84 100.00 0.00 0.00 107.25 485.84 100.00 0.00 0.00 0.00
02.16 VARIOS
02.16.01 JUNTA DE COSTRUCCION CON TEKVOPORT M 18.66 2.43 45.34 18.66 45.34 100.00 0.00 0.00 18.66 45.34 100.00 0.00 0.00 0.00
02.16.02 TAPAJUNTA METALICA 4 X 3/16" M 34.72 34.00 1,180.48 34.72 1,180.48 100.00 0.00 0.00 34.72 1,180.48 100.00 0.00 0.00 0.00
02.16.03 PRUEBA DE CALIDAD DEL CONCRETO ( PRUEBA A LA COMPRESION) UND 10.00 45.00 450.00 10.00 450.00 100.00 0.00 0.00 10.00 450.00 100.00 0.00 0.00 0.00
02.16.04 LIMPIEZA GENERAL M2 287.96 1.31 377.23 287.96 377.23 100.00 0.00 0.00 287.96 377.23 100.00 0.00 0.00 0.00
02.17 SISTEMA DE AGUA DE LLLUVIA
02.17.01 CANALETA DE CALAMINAS GALVANIZADAS M 61.00 50.23 3,064.03 61.00 3,064.03 100.00 0.00 0.00 61.00 3,064.03 100.00 0.00 0.00 0.00
02.17.02 TUBERIA PARA AGUAS PLUVIALES PVC SAL 3" M 13.56 13.54 183.60 13.56 183.60 100.00 0.00 0.00 13.56 183.60 100.00 0.00 0.00 0.00
02.17.03 CODO 90° PVC SAP 3" UND 2.00 12.43 24.86 2.00 24.86 100.00 0.00 0.00 2.00 24.86 100.00 0.00 0.00 0.00
02.17.04 ABRAZADERA DE 1" DE PLANCHA METALICA CON TUERCAS Y ARAN U ND 30.00 6.48 194.40 30.00 194.40 100.00 0.00 0.00 30.00 194.40 100.00 0.00 0.00 0.00
02.18 INSTALACIONES ELECTRICAS
02.18.01 SALIDA DE CENTROS DE LUZ PTO 31.00 24.64 763.84 31.00 763.84 100.00 0.00 0.00 31.00 763.84 100.00 0.00 0.00 0.00
02.18.02 SALIDA DE PARED PARA BRAQUETES PTO 8.00 12.46 99.68 8.00 99.68 100.00 0.00 0.00 8.00 99.68 100.00 0.00 0.00 0.00
02.18.03 SALIDA PARA INTERRUPTOR PTO 15.00 24.26 363.90 15.00 363.90 100.00 0.00 0.00 15.00 363.90 100.00 0.00 0.00 0.00
02.18.04 SALIDA PARA TOMACORRIENTES BIPOLARES SIMPLES CON PVC PTO 24.00 96.20 2,308.80 24.00 2,308.80 100.00 0.00 0.00 24.00 2,308.80 100.00 0.00 0.00 0.00
02.18.05 TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA UND 2.00 489.00 978.00 2.00 978.00 100.00 0.00 0.00 2.00 978.00 100.00 0.00 0.00 0.00
02.18.06 FLOURECENTE RECTO 2 40 WATT INCLUENDO EQUIPO Y PANTALLA EQP 31.00 45.06 1,396.86 31.00 1,396.86 100.00 0.00 0.00 31.00 1,396.86 100.00 0.00 0.00 0.00
02.18.07 BRAQUETE CON FOCO "WS" 150R JOSFEL + LAMPARA 100W UND 8.00 48.31 386.48 8.00 386.48 100.00 0.00 0.00 8.00 386.48 100.00 0.00 0.00 0.00

594,974.69 0.00 0.00 594,974.69 100.00 0.00


COSTO DIRECTO 594,974.69 100.00 0.00

Valorización 06 Aulas y Escaler 6de38


MUNICIPALIDAD PROVINCIAL DE VILCAS HUAMAN

VALORIZACIÓN DE OBRA N° 06
Correspondiente Mes Diciembre 2017

PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO

EN EL CENTRO POBLADO DE POMACOCHA , DISTRITO DE VISCHONGO, PROVINCIA DE VILC AS HUAMAN - AYACUICHO"

CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Ing° GABRIEL ALFONSO GUZMAN MANRIQUE SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONT ADELANT DIRECTO : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : DICIEMBRE 2017
MONT ADELANT MATERIAL : S/. 613,461.40 (CON IGV) S/. 519,882.54 (SIN IGV)
META FISICA: : CONSTRUCCION DE EDIFICACION

AVANCES
P. UNITARIO
CODIGO DESCRIPCION UND METRADO P. PARCIAL (S/.) ANTERIOR ACTUAL ACUMULADO SALDO
(S/.)
METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %

03 CONSTRUCCION DE AUDITORIO Y CENTRO DE COMPUTO


03.01 TRABAJOS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL M2 243.15 0.66 160.48 243.15 160.48 100.00 0.00 0.00 243.15 160.48 100.00 0.00 0.00 0.00
03.01.02 TRAZO Y REPLANTEO M2 243.15 2.24 544.66 243.15 544.66 100.00 0.00 0.00 243.15 544.66 100.00 0.00 0.00 0.00
03.02 MOVIMIENTO DE TIERRAS
03.02.01 REFINE Y NIVELACION EN TERRENO NORMAL M2 243.15 2.55 620.03 243.15 620.03 100.00 0.00 0.00 243.15 620.03 100.00 0.00 0.00 0.00
03.02.02 EXCAVACION PARA ZAPATAS DE 1.00M A 1.90M DE PROFUND M3 100.55 24.36 2,449.40 100.55 2,449.40 100.00 0.00 0.00 100.55 2,449.40 100.00 0.00 0.00 0.00
03.02.03 EXCAVACION PARA CIMIENTOS HASTA 1.00MT TERRENO NO M3 19.68 13.13 258.40 19.68 258.40 100.00 0.00 0.00 19.68 258.40 100.00 0.00 0.00 0.00
03.02.04 RELLENO CON MATERIAL PROPIO M3 38.52 16.65 641.36 38.52 641.36 100.00 0.00 0.00 38.52 641.36 100.00 0.00 0.00 0.00
03.02.05 ELIMINACION MATERIAL EXCEDENTE M3 102.13 6.56 669.97 102.13 669.97 100.00 0.00 0.00 102.13 669.97 100.00 0.00 0.00 0.00
03.03 CONCRETO SIMPLE
03.03.01 SOLADO DE 4" MESCLA 1:12 CEMENTO - HORMIGON M2 47.88 89.39 4,279.99 47.88 4,279.99 100.00 0.00 0.00 47.88 4,279.99 100.00 0.00 0.00 0.00
03.03.02 CIMIENTOS CORRIDOS MESCLA 1:10 + 30%(CEMENTO-HORMI M3 6.49 170.48 1,106.42 6.49 1,106.42 100.00 0.00 0.00 6.49 1,106.42 100.00 0.00 0.00 0.00
03.03.03 ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE 0.30 A 0.60 M2 8.72 24.75 215.82 8.72 215.82 100.00 0.00 0.00 8.72 215.82 100.00 0.00 0.00 0.00
03.03.04 CONCRETO SOBRECIMIENTO DE 1:8 CEM - HOR 25% P. M. AN M3 7.63 225.77 1,722.63 7.63 1,722.63 100.00 0.00 0.00 7.63 1,722.63 100.00 0.00 0.00 0.00
3.04 CONCRETO ARMADO
03.04.01 ZAPATAS
03.04.01.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 26.33 335.04 8,821.60 26.33 8,821.60 100.00 0.00 0.00 26.33 8,821.60 100.00 0.00 0.00 0.00
03.04.01.02 ACERO GRADO 60 EN ZAPATAS KG 945.14 4.68 4,423.26 945.14 4,423.26 100.00 0.00 0.00 945.14 4,423.26 100.00 0.00 0.00 0.00
03.04.02 COLUMNAS
03.04.02.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 11.64 413.53 4,813.49 11.64 4,813.49 100.00 0.00 0.00 11.64 4,813.49 100.00 0.00 0.00 0.00
03.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 145.94 41.04 5,989.38 145.94 5,989.38 100.00 0.00 0.00 145.94 5,989.38 100.00 0.00 0.00 0.00
03.04.02.03 ACERO GRADO 60 EN COLUMNAS KG 3,748.89 4.44 16,645.07 3,748.89 16,645.07 100.00 0.00 0.00 3,748.89 16,645.07 100.00 0.00 0.00 0.00
03.04.03 VIGAS
03.04.03.01 CONCRETO EN VIGAS F'C=210 KG/CM2 M3 35.40 344.40 12,191.76 35.40 12,191.76 100.00 0.00 0.00 35.40 12,191.76 100.00 0.00 0.00 0.00
03.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 292.80 39.23 11,486.54 292.80 11,486.54 100.00 0.00 0.00 292.80 11,486.54 100.00 0.00 0.00 0.00
03.04.03.03 ACERO GRADO 60 EN VIGAS KG 4,049.81 4.32 17,495.18 4,049.81 17,495.18 100.00 0.00 0.00 4,049.81 17,495.18 100.00 0.00 0.00 0.00
03.04.04 LOSAS ALIGERADAS
03.04.04.01 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 M3 88.11 336.54 29,652.54 88.11 29,652.54 100.00 0.00 0.00 88.11 29,652.54 100.00 0.00 0.00 0.00

Valorización N° 06 Auditorio y Centro Computo 7de38


03.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGER M2 785.65 43.46 34,144.35 785.65 34,144.35 100.00 0.00 0.00 785.65 34,144.35 100.00 0.00 0.00 0.00
03.04.04.03 ACERO GRADO 60 EN LOSAS ALIGERADAS KG 3,419.61 4.36 14,909.50 3,419.61 14,909.50 100.00 0.00 0.00 3,419.61 14,909.50 100.00 0.00 0.00 0.00
03.04.04.04 LADRILLO HUECO DE ARCILLA 25 X 30 X 30 CM. PARA TECHO AL UND 3,578.07 1.83 6,547.87 3,578.07 6,547.87 100.00 0.00 0.00 3,578.07 6,547.87 100.00 0.00 0.00 0.00
03.05 ALBAÑILERIA
03.05.01 MURO DE CABEZA LADRILLO CORRIENTE CON CEMENTO - A M2 342.52 61.67 21,123.21 342.52 21,123.21 100.00 0.00 0.00 342.52 21,123.21 100.00 0.00 0.00 0.00
03.05.02 MURO DE SOGA LADRILLO CORRIENTE CON CEMENTO - ARE M2 29.75 54.67 1,626.43 29.75 1,626.43 100.00 0.00 0.00 29.75 1,626.43 100.00 0.00 0.00 0.00
03.06 COBERTURA
03.06.01 COBERTURA DE TEJA ANDINA TIPO ETERNIT M2 243.15 35.13 8,541.86 243.15 8,541.86 100.00 0.00 0.00 243.15 8,541.86 100.00 0.00 0.00 0.00
03.06.02 CUMBRERA CON TEJA ANDINA TIPO ETERNIT ML 19.85 83.06 1,648.74 19.85 1,648.74 100.00 0.00 0.00 19.85 1,648.74 100.00 0.00 0.00 0.00
03.07 REVOQUES, ENLUCIDOS Y MOLDURAS
03.07.01 TARRAJEO EN INTERIORES Y EXTERIORES MESCLA 1:5 E=1.5 M2 372.31 26.36 9,814.09 372.31 9,814.09 100.00 0.00 0.00 372.31 9,814.09 100.00 0.00 0.00 0.00
03.07.02 TARRAJEO EN SUPERFICIE DE COLUMNAS CON CEMENTO - M2 145.94 17.97 2,622.54 145.94 2,622.54 100.00 0.00 0.00 145.94 2,622.54 100.00 0.00 0.00 0.00
03.07.03 TARRAJEO EN SUPERFICIE Y ARISTAS DE VIGAS CON CEMEN M2 292.80 21.15 6,192.72 292.80 6,192.72 100.00 0.00 0.00 292.80 6,192.72 100.00 0.00 0.00 0.00
03.07.04 VESTIDURA DE DERRAMES CON MEZCLA 1:5 (CEMENTO - ARE ML 152.21 7.46 1,135.49 152.21 1,135.49 100.00 0.00 0.00 152.21 1,135.49 100.00 0.00 0.00 0.00
03.07.05 TARRAJEO EN CIELORRASO CON C:A - 1:5 E=1.5 CM M2 785.65 43.68 34,317.19 785.65 34,317.19 100.00 0.00 0.00 785.65 34,317.19 100.00 0.00 0.00 0.00
03.07.06 BRUÑAS ML 245.12 1.68 411.80 245.12 411.80 100.00 0.00 0.00 245.12 411.80 100.00 0.00 0.00 0.00
03.08 CIELORRASOS
03.08.01 CIELORRASO SUSPENDIDO CON BALDOSAS M2 153.53 32.17 4,939.06 153.53 4,939.06 100.00 0.00 0.00 153.53 4,939.06 100.00 0.00 0.00 0.00
03.08.02 FRISOS CON BALDOSAS M2 46.06 26.77 1,233.03 46.06 1,233.03 100.00 0.00 0.00 46.06 1,233.03 100.00 0.00 0.00 0.00
03.08.03 PERFIL METALICO T/"L" 2"X1"X1/16" PARA BALDOSAS M 511.77 5.19 2,656.09 511.77 2,656.09 100.00 0.00 0.00 511.77 2,656.09 100.00 0.00 0.00 0.00
03.08.04 TEE DE SUSPENSIÓN ALAMBRE GALVANISADO N° 14 + 6 VU PZA 107.00 30.54 3,267.78 107.00 3,267.78 100.00 0.00 0.00 107.00 3,267.78 100.00 0.00 0.00 0.00
03.09 PISOS Y PAVIMENTOS
03.09.01 NIVELACION Y COMPACTACION DE PISO M2 243.15 2.00 486.30 243.15 486.30 100.00 0.00 0.00 243.15 486.30 100.00 0.00 0.00 0.00
03.09.02 FALSO PISO DE 4" DE CONCRETO DE 1:10 M2 157.07 13.66 2,145.58 157.07 2,145.58 100.00 0.00 0.00 157.07 2,145.58 100.00 0.00 0.00 0.00
03.09.03 CONTRAPISO DE 40 MM M2 314.14 24.75 7,774.97 314.14 7,774.97 100.00 0.00 0.00 314.14 7,774.97 100.00 0.00 0.00 0.00
03.09.04 PISO DE CERAMICO ANTIDESLIZANTE 20 X 20 CM. S/PIEDRA M2 314.40 62.98 19,800.91 314.40 19,800.91 100.00 0.00 0.00 314.40 19,800.91 100.00 0.00 0.00 0.00
03.09.05 ENCOFRADO Y DESENCOFRADO M2 6.42 46.95 301.42 6.42 301.42 100.00 0.00 0.00 6.42 301.42 100.00 0.00 0.00 0.00
03.09.06 VEREDA DE CONCRETO DE 4" M2 8.61 53.27 458.65 8.61 458.65 100.00 0.00 0.00 8.61 458.65 100.00 0.00 0.00 0.00
03.09.07 JUNTAS ASFALTICAS M 33.00 10.51 346.83 33.00 346.83 100.00 0.00 0.00 33.00 346.83 100.00 0.00 0.00 0.00
03.10 ZOCALOS Y CONTRAZOCALOS
03.10.01 CONTRAZOCALOS DE CERAMICA DE H=10CM M 137.56 28.63 3,938.34 137.56 3,938.34 100.00 0.00 0.00 137.56 3,938.34 100.00 0.00 0.00 0.00
03.10.02 CONTRAZOCALOS CEMENTO S/COLOREAR H= 20 CM M 15.79 6.79 107.21 15.79 107.21 100.00 0.00 0.00 15.79 107.21 100.00 0.00 0.00 0.00
03.11 CARPINTERIA DE MADERA
03.11.01 PUERTAS APANELADAS DE MADERA TORNILLO M2 27.88 236.25 6,586.65 27.88 6,586.65 100.00 0.00 0.00 27.88 6,586.65 100.00 0.00 0.00 0.00
03.12 CARPINTERIA METALICA
03.12.01 VENTANA DE FIERRO C/ PERFIL DE 1" X 1/8" + HOJA BAST. "L"3 M2 98.15 153.79 15,094.49 98.15 15,094.49 100.00 0.00 0.00 98.15 15,094.49 100.00 0.00 0.00 0.00
03.12.02 BARANDA DE TUBO FO. GDO. PASAMANO 1 1/2" - PARANTE 1" M 28.73 67.88 1,950.19 28.73 1,950.19 100.00 0.00 0.00 28.73 1,950.19 100.00 0.00 0.00 0.00
03.13 CERRAJERIA
03.13.01 BISAGRA CAPUCHINA 3" X 3" PZA 42.00 11.72 492.24 42.00 492.24 100.00 0.00 0.00 42.00 492.24 100.00 0.00 0.00 0.00
03.13.02 CERRADURA DE TRES GOLPES PZA 17.00 103.38 1,757.46 17.00 1,757.46 100.00 0.00 0.00 17.00 1,757.46 100.00 0.00 0.00 0.00
03.13.03 MANIJA DE BRONCE DE 4" PARA PUERTAS UND 17.00 17.63 299.71 17.00 299.71 100.00 0.00 0.00 17.00 299.71 100.00 0.00 0.00 0.00
03.14 VIDRIOS, CRISTALES Y SIMILARES
03.14.01 VIDRIO SEMI DOBLE. PROVISION Y COLOCACION EN VENTAN P2 988.47 7.01 6,929.17 988.47 6,929.17 100.00 0.00 0.00 988.47 6,929.17 100.00 0.00 0.00 0.00
03.15 PINTURA
03.15.01 PINTURA EN EXTERIORES INTERIORES C/LATEX SUPERMATE M2 811.04 8.81 7,145.26 811.04 7,145.26 100.00 0.00 0.00 811.04 7,145.26 100.00 0.00 0.00 0.00
03.15.02 PINTADO DE CIELO RASO C/LATEX M2 785.65 9.30 7,306.55 785.65 7,306.55 100.00 0.00 0.00 785.65 7,306.55 100.00 0.00 0.00 0.00
03.15.03 PINTURA BARNIZ EN CARPINTERIA DE MADERA M2 27.68 12.68 350.98 27.68 350.98 100.00 0.00 0.00 27.68 350.98 100.00 0.00 0.00 0.00
03.15.04 PINTADO DE VENTANAS METALICAS (2 MANOS ANTIC. + 2 ES M2 107.25 4.53 485.84 107.25 485.84 100.00 0.00 0.00 107.25 485.84 100.00 0.00 0.00 0.00
03.16 VARIOS
Valorización N° 06 Auditorio y Centro Computo 8de38
03.16.01 PRUEBA DE CALIDAD DEL CONCRETO ( PRUEBA A LA COMPR UND 10.00 45.00 450.00 10.00 450.00 100.00 0.00 0.00 10.00 450.00 100.00 0.00 0.00 0.00
03.16.02 LIMPIEZA GENERAL M2 243.15 1.31 318.53 243.15 318.53 100.00 0.00 0.00 243.15 318.53 100.00 0.00 0.00 0.00
03.17 SISTEMA DE AGUA DE LLLUVIA
03.17.01 CANALETA DE CALAMINAS GALVANIZADAS M 61.00 50.23 3,064.03 61.00 3,064.03 100.00 0.00 0.00 61.00 3,064.03 100.00 0.00 0.00 0.00
03.17.02 TUBERIA PARA AGUAS PLUVIALES PVC SAL 3" M 13.56 13.54 183.60 13.56 183.60 100.00 0.00 0.00 13.56 183.60 100.00 0.00 0.00 0.00
03.17.03 CODO DE 90° PVC SAP 3" UND 2.00 12.43 24.86 2.00 24.86 100.00 0.00 0.00 2.00 24.86 100.00 0.00 0.00 0.00
03.17.04 ABRAZADERA DE 1" DE PLANCHA METALICA CON TUERCAS Y UND 30.00 6.48 194.40 30.00 194.40 100.00 0.00 0.00 30.00 194.40 100.00 0.00 0.00 0.00
03.18 INSTALACIONES ELECTRICAS
03.18.01 SALIDA DE CENTROS DE LUZ PTO 24.00 24.64 591.36 24.00 591.36 100.00 0.00 0.00 24.00 591.36 100.00 0.00 0.00 0.00
03.18.02 SALIDA DE PARED PARA BRAQUETES PTO 2.00 12.46 24.92 2.00 24.92 100.00 0.00 0.00 2.00 24.92 100.00 0.00 0.00 0.00
03.18.03 SALIDA PARA INTERRUPTOR PTO 9.00 24.26 218.34 9.00 218.34 100.00 0.00 0.00 9.00 218.34 100.00 0.00 0.00 0.00
03.18.04 SALIDA PARA TOMACORRIENTES BIPOLARES SIMPLES CON P PTO 34.00 96.20 3,270.80 34.00 3,270.80 100.00 0.00 0.00 34.00 3,270.80 100.00 0.00 0.00 0.00
03.18.05 TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA UND 1.00 489.00 489.00 1.00 489.00 100.00 0.00 0.00 1.00 489.00 100.00 0.00 0.00 0.00
03.18.06 FLOURECENTE RECTO 2 40 WATT INCLUENDO EQUIPO Y PAN EQP 24.00 45.06 1,081.44 24.00 1,081.44 100.00 0.00 0.00 24.00 1,081.44 100.00 0.00 0.00 0.00
03.18.07 BRAQUETE CON FOCO "WS" 150R JOSFEL + LAMPARA 100W UND 2.00 48.31 96.62 2.00 96.62 100.00 0.00 0.00 2.00 96.62 100.00 0.00 0.00 0.00

COSTO DIRECTO 373,086.38 373,086.38 100.00 0.00 0.00 373,086.38 100.00 0.00 0.00

Valorización N° 06 Auditorio y Centro Computo 9de38


MUNICIPALIDAD PROVINCIAL DE VILCAS HUAMAN

VALORIZACIÓN DE OBRA N° 06
Correspondiente Mes Diciembre 2017

PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO

EN EL CENTRO POBLADO DE POMACOCHA , DISTRITO DE VISCHONGO, PROVINCIA DE VILC AS HUAMAN - AYACUICHO"

CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Arq° ROLANDO PONCE CORDOVA SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONT ADELANT DIRECTO : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : DICIEMBRE 2017
MONTO ADELANTO MAT : S/. 613,461.40 (CON IGV) S/. 519,882.54 (SIN IGV)
META FISICA: CONSTRUCCION DE EDIFICACION

AVANCES
P. UNITARIO
CODIGO DESCRIPCION UND METRADO
(S/.)
P. PARCIAL (S/.) ANTERIOR ACTUAL ACUMULADO SALDO

METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %

04 CONSTRUCCION DE AMBIENTES ADMINISTRATIVOS


04.01 TRABAJOS PRELIMINARES
04.01.01 LIMPIEZA DE TERRENO MANUAL M2 130.56 0.66 86.17 130.56 86.17 100.00 0.00 0.00 130.56 86.17 100.00 0.00 0.00 0.00
04.01.02 TRAZO Y REPLANTEO M2 130.56 2.24 292.45 130.56 292.45 100.00 0.00 0.00 130.56 292.45 100.00 0.00 0.00 0.00
04.02 MOVIMIENTO DE TIERRAS
04.02.01 REFINE Y NIVELACION EN TERRENO NORMAL M2 130.56 2.55 332.93 130.56 332.93 100.00 0.00 0.00 130.56 332.93 100.00 0.00 0.00 0.00
04.02.02 EXCAVACION PARA ZAPATAS DE 1.00M A 1.90M DE PROFUNDIDAD M3 133.77 24.36 3,258.64 133.77 3,258.64 100.00 0.00 0.00 133.77 3,258.64 100.00 0.00 0.00 0.00
04.02.03 EXCAVACION PARA CIMIENTOS HASTA 1.00MT TERRENO NORMAL M3 18.93 13.13 248.55 18.93 248.55 100.00 0.00 0.00 18.93 248.55 100.00 0.00 0.00 0.00
04.02.04 RELLENO CON MATERIAL PROPIO M3 54.33 16.65 904.59 54.33 904.59 100.00 0.00 0.00 54.33 904.59 100.00 0.00 0.00 0.00
04.02.05 ELIMINACION MATERIAL EXCEDENTE M3 122.93 6.56 806.42 122.93 806.42 100.00 0.00 0.00 122.93 806.42 100.00 0.00 0.00 0.00
04.03 CONCRETO SIMPLE
04.03.01 SOLADO DE 4" MESCLA 1:12 CEMENTO - HORMIGON M2 63.70 89.39 5,694.14 63.70 5,694.14 100.00 0.00 0.00 63.70 5,694.14 100.00 0.00 0.00 0.00
04.03.02 CIMIENTOS CORRIDOS MESCLA 1:10 + 30%(CEMENTO-HORMIGON) M3 14.70 170.48 2,506.06 14.70 2,506.06 100.00 0.00 0.00 14.70 2,506.06 100.00 0.00 0.00 0.00
04.03.03 ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE 0.30 A 0.60 MT M2 15.68 24.75 388.08 15.68 388.08 100.00 0.00 0.00 15.68 388.08 100.00 0.00 0.00 0.00
04.03.04 CONCRETO SOBRECIMIENTO DE 1:8 CEM - HOR 25% P. M. ANCHO=0.25 M3 11.76 225.77 2,655.06 11.76 2,655.06 100.00 0.00 0.00 11.76 2,655.06 100.00 0.00 0.00 0.00
04.04 CONCRETO ARMADO
04.04.01 ZAPATAS
04.04.01.01 CONCRETO EN ZAPATAS F'C=210 KG/CM2 M3 31.85 335.04 10,671.02 31.85 10,671.02 100.00 0.00 0.00 31.85 10,671.02 100.00 0.00 0.00 0.00
04.04.01.02 ACERO GRADO 60 EN ZAPATAS KG 2,842.68 4.68 13,303.74 2,842.68 13,303.74 100.00 0.00 0.00 2,842.68 13,303.74 100.00 0.00 0.00 0.00
04.04.02 COLUMNAS
04.04.02.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 5.22 413.53 2,158.63 5.22 2,158.63 100.00 0.00 0.00 5.22 2,158.63 100.00 0.00 0.00 0.00
04.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 60.90 41.04 2,499.34 60.90 2,499.34 100.00 0.00 0.00 60.90 2,499.34 100.00 0.00 0.00 0.00
04.04.02.03 ACERO GRADO 60 EN COLUMNAS KG 1,028.20 4.44 4,565.21 1,028.20 4,565.21 100.00 0.00 0.00 1,028.20 4,565.21 100.00 0.00 0.00 0.00
04.04.03 VIGAS
04.04.03.01 CONCRETO EN VIGAS F'C=210 KG/CM2 M3 16.73 344.40 5,761.81 16.73 5,761.81 100.00 0.00 0.00 16.73 5,761.81 100.00 0.00 0.00 0.00
04.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 142.96 39.23 5,608.32 142.96 5,608.32 100.00 0.00 0.00 142.96 5,608.32 100.00 0.00 0.00 0.00
04.04.03.03 ACERO GRADO 60 EN VIGAS KG 3,033.65 4.32 13,105.37 3,033.65 13,105.37 100.00 0.00 0.00 3,033.65 13,105.37 100.00 0.00 0.00 0.00
04.04.04 LOSAS ALIGERADAS
04.04.04.01 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 M3 20.82 336.54 7,006.76 20.82 7,006.76 100.00 0.00 0.00 20.82 7,006.76 100.00 0.00 0.00 0.00

Valorización N° 06 Administración 10de38


04.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS M2 229.67 43.46 9,981.46 229.67 9,981.46 100.00 0.00 0.00 229.67 9,981.46 100.00 0.00 0.00 0.00
04.04.04.03 ACERO GRADO 60 EN LOSAS ALIGERADAS KG 602.47 4.36 2,626.77 602.47 2,626.77 100.00 0.00 0.00 602.47 2,626.77 100.00 0.00 0.00 0.00
04.04.04.04 LADRILLO HUECO DE ARCILLA 25 X 30 X 30 CM. PARA TECHO ALIGERADO UND 1,087.56 1.83 1,990.23 1,087.56 1,990.23 100.00 0.00 0.00 1,087.56 1,990.23 100.00 0.00 0.00 0.00
04.05 ALBAÑELERIA
04.05.01 MURO DE CABEZA LADRILLO CORRIENTE CON CEMENTO - ARENA M2 88.79 61.67 5,475.68 88.79 5,475.68 100.00 0.00 0.00 88.79 5,475.68 100.00 0.00 0.00 0.00
04.06 COBERTURA
04.06.01 COBERTURA DE TEJA ANDINA TIPO ETERNIT M2 130.56 35.13 4,586.57 130.56 4,586.57 100.00 0.00 0.00 130.56 4,586.57 100.00 0.00 0.00 0.00
04.06.02 CUMBRERA CON TEJA ANDINA TIPO ETERNIT ML 13.70 83.06 1,137.92 13.70 1,137.92 100.00 0.00 0.00 13.70 1,137.92 100.00 0.00 0.00 0.00
04.07 REVOQUES, ENLUCIDOS Y MOLDURAS
04.07.01 TARRAJEO EN INTERIORES Y EXTERIORES MESCLA 1:5 E=1.5CM M2 88.79 26.36 2,340.50 88.79 2,340.50 100.00 0.00 0.00 88.79 2,340.50 100.00 0.00 0.00 0.00
04.07.02 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO - ARENA M2 60.90 17.97 1,094.37 60.90 1,094.37 100.00 0.00 0.00 60.90 1,094.37 100.00 0.00 0.00 0.00
04.07.03 TARRAJEO EN SUPERFICIE Y ARISTAS DE VIGAS CON CEMENTO - AREN M2 142.96 21.15 3,023.60 142.96 3,023.60 100.00 0.00 0.00 142.96 3,023.60 100.00 0.00 0.00 0.00
04.07.04 VESTIDURA DE DERRAMES CON MEZCLA 1:5 (CEMENTO - ARENA) ML 68.58 7.46 511.61 68.58 511.61 100.00 0.00 0.00 68.58 511.61 100.00 0.00 0.00 0.00
04.07.05 TARRAJEO EN CIELORRASO CON C:A - 1:5 E=1.5 CM M2 229.67 43.68 10,031.99 229.67 10,031.99 100.00 0.00 0.00 229.67 10,031.99 100.00 0.00 0.00 0.00
04.07.06 BRUÑAS ML 215.22 1.68 361.57 215.22 361.57 100.00 0.00 0.00 215.22 361.57 100.00 0.00 0.00 0.00
04.08 CIELORRASOS
04.08.01 CIELORRASO SUSPENDIDO CON BALDOSAS M2 130.56 32.17 4,200.12 130.56 4,200.12 100.00 0.00 0.00 130.56 4,200.12 100.00 0.00 0.00 0.00
04.08.02 FRISOS CON BALDOSAS M2 39.17 26.77 1,048.58 39.17 1,048.58 100.00 0.00 0.00 39.17 1,048.58 100.00 0.00 0.00 0.00
04.08.03 PERFIL METALICO T/"L" 2"X1"X1/16" PARA BALDOSAS M 435.20 5.19 2,258.69 435.20 2,258.69 100.00 0.00 0.00 435.20 2,258.69 100.00 0.00 0.00 0.00
04.08.04 TEE DE SUSPENSIÓN ALAMBRE GALVANISADO N° 14 + 6 VUELTAS DE PZA 91.00 30.54 2,779.14 91.00 2,779.14 100.00 0.00 0.00 91.00 2,779.14 100.00 0.00 0.00 0.00
04.09 PISOS Y PAVIMENTOS
04.09.01 NIVELACION Y COMPACTACION DE PISO M2 130.56 2.00 261.12 130.56 261.12 100.00 0.00 0.00 130.56 261.12 100.00 0.00 0.00 0.00
04.09.02 FALSO PISO DE 4" DE CONCRETO DE 1:10 M2 71.13 13.66 971.64 71.13 971.64 100.00 0.00 0.00 71.13 971.64 100.00 0.00 0.00 0.00
04.09.03 CONTRAPISO DE 40 MM M2 71.30 24.75 1,764.68 71.30 1,764.68 100.00 0.00 0.00 71.30 1,764.68 100.00 0.00 0.00 0.00
04.09.04 PISO DE CERAMICO ANTIDESLIZANTE 20 X 20 CM. S/PIEDRA VERDE PA M2 71.13 62.98 4,479.77 71.13 4,479.77 100.00 0.00 0.00 71.13 4,479.77 100.00 0.00 0.00 0.00
04.09.05 ENCOFRADO Y DESENCOFRADO M2 4.65 46.95 218.32 4.65 218.32 100.00 0.00 0.00 4.65 218.32 100.00 0.00 0.00 0.00
04.09.06 VEREDA DE CONCRETO DE 4" M2 5.94 53.27 316.42 5.94 316.42 100.00 0.00 0.00 5.94 316.42 100.00 0.00 0.00 0.00
04.09.07 JUNTAS ASFALTICAS M 21.00 10.51 220.71 21.00 220.71 100.00 0.00 0.00 21.00 220.71 100.00 0.00 0.00 0.00
04.10 ZOCALOS Y CONTRAZOCALOS
04.10.01 CONTRAZOCALOS DE CERAMICA DE H=10CM M 58.68 28.63 1,680.01 58.68 1,680.01 100.00 0.00 0.00 58.68 1,680.01 100.00 0.00 0.00 0.00
04.10.02 CONRAZOCALO CEMENTO S/COLOREAR H= 20 CM M 7.53 6.79 51.13 7.53 51.13 100.00 0.00 0.00 7.53 51.13 100.00 0.00 0.00 0.00
04.11 CARPINTERIA DE MADERA
04.11.01 PUERTAS APANELADAS DE MADERA TORNILLO M2 8.47 236.25 2,001.04 8.47 2,001.04 100.00 0.00 0.00 8.47 2,001.04 100.00 0.00 0.00 0.00
04.12.01 VENTANA DE FIERRO C/ PERFIL DE 1" X 1/8" + HOJA BAST. "L"3/4" M2 70.36 153.79 10,820.66 70.36 10,820.66 100.00 0.00 0.00 70.36 10,820.66 100.00 0.00 0.00 0.00
04.13 CERRAJERIA
04.13.01 BISAGRA CAPUCHINA 3" X 3" PZA 18.00 11.72 210.96 18.00 210.96 100.00 0.00 0.00 18.00 210.96 100.00 0.00 0.00 0.00
04.13.02 CERRADURA DE TRES GOLPES PZA 8.00 103.38 827.04 8.00 827.04 100.00 0.00 0.00 8.00 827.04 100.00 0.00 0.00 0.00
04.13.03 MANIJA DE BRONCE DE 4" PARA PUERTAS UND 8.00 17.63 141.04 8.00 141.04 100.00 0.00 0.00 8.00 141.04 100.00 0.00 0.00 0.00
04.14 VIDRIOS, CRISTALES Y SIMILARES
04.14.01 VIDRIO SEMI DOBLE. PROVISION Y COLOCACION EN VENTANAS FIERR P2 515.34 7.01 3,612.53 515.34 3,612.53 100.00 0.00 0.00 515.34 3,612.53 100.00 0.00 0.00 0.00
04.15 PINTURA
04.15.01 PINTURA EN EXTERIORES INTERIORES C/LATEX SUPERMATE M2 292.65 8.81 2,578.25 292.65 2,578.25 100.00 0.00 0.00 292.65 2,578.25 100.00 0.00 0.00 0.00
04.15.02 PINTADO CIELORASO C/LATEX M2 229.67 9.30 2,135.93 229.67 2,135.93 100.00 0.00 0.00 229.67 2,135.93 100.00 0.00 0.00 0.00
04.15.03 PINTURA BARNIZ EN CARPINTERIA DE MADERA M2 8.47 12.68 107.40 8.47 107.40 100.00 0.00 0.00 8.47 107.40 100.00 0.00 0.00 0.00
04.15.04 PINTADO DE VENTANAS METALICAS (2 MANOS ANTIC. + 2 ESMALTE) M2 51.34 4.53 232.57 51.34 232.57 100.00 0.00 0.00 51.34 232.57 100.00 0.00 0.00 0.00
04.16 VARIOS
04.16.01 PRUEBA DE CALIDAD DEL CONCRETO ( PRUEBA A LA COMPRESION) UND 10.00 45.00 450.00 10.00 450.00 100.00 0.00 0.00 10.00 450.00 100.00 0.00 0.00 0.00
04.16.02 LIMPIEZA GENERAL M2 130.56 1.31 171.03 130.56 171.03 100.00 0.00 0.00 130.56 171.03 100.00 0.00 0.00 0.00
04.17 SISTEMA DE AGUA DE LLLUVIA
Valorización N° 06 Administración 11de38
04.17.01 CANALETA DE CALAMINAS GALVANIZADAS M 56.00 50.23 2,812.88 56.00 2,812.88 100.00 0.00 0.00 56.00 2,812.88 100.00 0.00 0.00 0.00
04.17.02 TUBERIA PARA AGUAS PLUVIALES PVC SAL 3" M 23.15 13.54 313.45 23.15 313.45 100.00 0.00 0.00 23.15 313.45 100.00 0.00 0.00 0.00
04.17.03 CODO DE 90° PVC SAP 3" UND 12.00 12.43 149.16 12.00 149.16 100.00 0.00 0.00 12.00 149.16 100.00 0.00 0.00 0.00
04.17.04 ABRAZADERA DE 1" DE PLANCHA METALICA CON TUERCAS Y ARANDEL UND 30.00 6.48 194.40 30.00 194.40 100.00 0.00 0.00 30.00 194.40 100.00 0.00 0.00 0.00
04.18 INSTALACIONES ELECTRICAS
04.18.01 SALIDA DE CENTROS DE LUZ PTO 6.00 24.64 147.84 6.00 147.84 100.00 0.00 0.00 6.00 147.84 100.00 0.00 0.00 0.00
04.18.02 SALIDA DE PARED PARA BRAQUETES PTO 3.00 12.46 37.38 3.00 37.38 100.00 0.00 0.00 3.00 37.38 100.00 0.00 0.00 0.00
04.18.03 SALIDA PARA INTERRUPTOR PTO 4.00 24.26 97.04 4.00 97.04 100.00 0.00 0.00 4.00 97.04 100.00 0.00 0.00 0.00
04.18.04 SALIDA PARA TOMACORRIENTES BIPOLARES SIMPLES CON PVC PTO 9.00 96.20 865.80 9.00 865.80 100.00 0.00 0.00 9.00 865.80 100.00 0.00 0.00 0.00
04.18.05 TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA PTO 1.00 489.00 489.00 1.00 489.00 100.00 0.00 0.00 1.00 489.00 100.00 0.00 0.00 0.00
04.18.06 FLOURECENTE RECTO 2 40 WATT INCLUENDO EQUIPO Y PANTALLA EQP 6.00 45.06 270.36 6.00 270.36 100.00 0.00 0.00 6.00 270.36 100.00 0.00 0.00 0.00
04.18.06 BRAQUETE CON FOCO "WS" 150R JOSFEL + LAMPARA 100W UND 3.00 48.31 144.93 3.00 144.93 100.00 0.00 0.00 3.00 144.93 100.00 0.00 0.00 0.00

COSTO DIRECTO 174,076.58 174,076.58 100.00 0.00 0.00 174,076.58 100.00 0.00 0.00

Valorización N° 06 Administración 12de38


MUNICIPALIDAD PROVINCIAL DE VILCAS HUAMAN

VALORIZACIÓN DE OBRA N° 06
Correspondiente Mes Diciembre 2017

PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO

EN EL CENTRO POBLADO DE POMACOCHA , DISTRITO DE VISCHONGO, PROVINCIA DE VILC AS HUAMAN - AYACUICHO"

CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Ing° GABRIEL ALFONSO GUZMAN MANRIQUE SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONT ADELANT DIRECTO : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : DICIEMBRE 2017
MONTO ADELANTO MAT : S/. 613,461.40 (CON IGV) S/. 519,882.54 (SIN IGV)
META FISICA: CONSTRUCCION DE EDIFICACION

AVANCES
P. UNITARIO
CODIGO DESCRIPCION UND METRADO
(S/.)
P. PARCIAL (S/.) ANTERIOR ACTUAL ACUMULADO SALDO

METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %

05 CONTRUCCION DE COCINA Y COMEDOR


05.01 TRABAJOS PRELIMINARES
05.01.01 LIMPIEZA DE TERRENO MANUAL M2 175.18 0.66 115.62 175.18 115.62 100.00 0.00 0.00 175.18 115.62 100.00 0.00 0.00 0.00
05.01.02 TRAZO Y REPLANTEO M2 175.18 2.24 392.40 175.18 392.40 100.00 0.00 0.00 175.18 392.40 100.00 0.00 0.00 0.00
05.02 MOVIMIENTO DE TIERRAS
05.02.01 REFINE Y NIVELACION EN TERRENO NORMAL M2 175.18 2.55 446.71 175.18 446.71 100.00 0.00 0.00 175.18 446.71 100.00 0.00 0.00 0.00
05.02.02 EXCAVACION PARA ZAPATAS DE 1.00M A 1.90M DE PROFUND M3 45.86 24.36 1,117.15 45.86 1,117.15 100.00 0.00 0.00 45.86 1,117.15 100.00 0.00 0.00 0.00
05.02.03 EXCAVACION PARA CIMIENTOS HASTA 1.00MT TERRENO NO M3 19.21 13.13 252.23 19.21 252.23 100.00 0.00 0.00 19.21 252.23 100.00 0.00 0.00 0.00
05.02.04 RELLENO CON MATERIAL PROPIO M3 16.24 16.65 270.40 16.24 270.40 100.00 0.00 0.00 16.24 270.40 100.00 0.00 0.00 0.00
05.02.05 ELIMINACION MATERIAL EXCEDENTE M3 48.84 6.56 320.39 48.84 320.39 100.00 0.00 0.00 48.84 320.39 100.00 0.00 0.00 0.00
05.03 CONCRETO SIMPLE
05.03.01 SOLADO DE 4" MESCLA 1:12 CEMENTO - HORMIGON M2 20.16 89.39 1,802.10 20.16 1,802.10 100.00 0.00 0.00 20.16 1,802.10 100.00 0.00 0.00 0.00
05.03.02 CIMIENTOS CORRIDOS MESCLA 1:10 + 30%(CEMENTO-HORMI M3 6.11 170.48 1,041.63 6.11 1,041.63 100.00 0.00 0.00 6.11 1,041.63 100.00 0.00 0.00 0.00
05.03.03 ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE 0.30 A 0.60 M2 6.52 24.75 161.37 6.52 161.37 100.00 0.00 0.00 6.52 161.37 100.00 0.00 0.00 0.00
05.03.04 CONCRETO SOBRECIMIENTO DE 1:8 CEM - HOR 25% P. M. AN M3 3.26 225.77 736.01 3.26 736.01 100.00 0.00 0.00 3.26 736.01 100.00 0.00 0.00 0.00
05.04 CONCRETO ARMADO
05.04.01 ZAPATAS
05.04.01.01 CONCRETO EN ZAPATAS F'C=210 KG/CM2 M3 12.01 335.04 4,023.83 12.01 4,023.83 100.00 0.00 0.00 12.01 4,023.83 100.00 0.00 0.00 0.00
05.04.01.02 ACERO GRADO 60 EN ZAPATAS KG 302.24 4.68 1,414.48 302.24 1,414.48 100.00 0.00 0.00 302.24 1,414.48 100.00 0.00 0.00 0.00
05.04.02 COLUMNAS
05.04.02.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 14.54 413.53 6,012.73 14.54 6,012.73 100.00 0.00 0.00 14.54 6,012.73 100.00 0.00 0.00 0.00
05.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 138.09 41.04 5,667.21 138.09 5,667.21 100.00 0.00 0.00 138.09 5,667.21 100.00 0.00 0.00 0.00
05.04.02.03 ACERO GRADO 60 EN COLUMNAS KG 1,859.16 4.44 8,254.67 1,859.16 8,254.67 100.00 0.00 0.00 1,859.16 8,254.67 100.00 0.00 0.00 0.00
05.04.03 VIGAS
05.04.03.01 CONCRETO EN VIGAS F'C=210 KG/CM2 M3 12.45 344.40 4,287.78 12.45 4,287.78 100.00 0.00 0.00 12.45 4,287.78 100.00 0.00 0.00 0.00
05.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 122.97 39.23 4,824.11 122.97 4,824.11 100.00 0.00 0.00 122.97 4,824.11 100.00 0.00 0.00 0.00
05.04.03.03 ACERO GRADO 60 EN VIGAS KG 1,423.59 4.32 6,149.91 1,423.59 6,149.91 100.00 0.00 0.00 1,423.59 6,149.91 100.00 0.00 0.00 0.00
05.04.04 LOSAS ALIGERADAS
05.04.04.01 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 M3 37.92 336.54 12,761.60 37.92 12,761.60 100.00 0.00 0.00 37.92 12,761.60 100.00 0.00 0.00 0.00

Valorización N° 06 Cocina y Comedor 13de38


05.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGER M2 316.85 43.46 13,770.30 316.85 13,770.30 100.00 0.00 0.00 316.85 13,770.30 100.00 0.00 0.00 0.00
05.04.04.03 ACERO GRADO 60 EN LOSAS ALIGERADAS KG 1,150.98 4.36 5,018.27 1,150.98 5,018.27 100.00 0.00 0.00 1,150.98 5,018.27 100.00 0.00 0.00 0.00
05.04.04.04 LADRILLO HUECO DE ARCILLA 25 X 30 X 30 CM. PARA TECHO UND 1,459.25 1.83 2,670.43 1,459.25 2,670.43 100.00 0.00 0.00 1,459.25 2,670.43 100.00 0.00 0.00 0.00
05.05 ALBAÑELERIA
05.05.01 MURO DE CABEZA LADRILLO CORRIENTE CON CEMENTO - A M2 152.06 61.67 9,377.54 152.06 9,377.54 100.00 0.00 0.00 152.06 9,377.54 100.00 0.00 0.00 0.00
05.06 COBERTURA
05.06.01 COBERTURA DE TEJA ANDINA TIPO ETERNIT M2 175.18 35.13 6,154.07 175.18 6,154.07 100.00 0.00 0.00 175.18 6,154.07 100.00 0.00 0.00 0.00
05.07 REVOQUES, ENLUCIDOS Y MOLDURAS
05.07.01 TARRAJEO EN INTERIORES Y EXTERIORES MESCLA 1:5 E=1.5 M2 152.06 26.36 4,008.30 152.06 4,008.30 100.00 0.00 0.00 152.06 4,008.30 100.00 0.00 0.00 0.00
05.07.02 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO - A M2 138.09 17.97 2,481.48 138.09 2,481.48 100.00 0.00 0.00 138.09 2,481.48 100.00 0.00 0.00 0.00
05.07.03 TARRAJEO EN SUPERFICIE Y ARISTAS DE VIGAS CON CEMEN M2 122.97 21.15 2,600.82 122.97 2,600.82 100.00 0.00 0.00 122.97 2,600.82 100.00 0.00 0.00 0.00
05.07.04 VESTIDURA DE DERRAMES CON MEZCLA 1:5 (CEMENTO - ARE ML 100.42 7.46 749.13 100.42 749.13 100.00 0.00 0.00 100.42 749.13 100.00 0.00 0.00 0.00
05.07.05 TARRAJEO EN CIELORRASO CON C:A - 1:5 E=1.5 CM M2 316.85 43.68 13,840.01 316.85 13,840.01 100.00 0.00 0.00 316.85 13,840.01 100.00 0.00 0.00 0.00
05.07.06 BRUÑAS ML 195.32 1.68 328.14 195.32 328.14 100.00 0.00 0.00 195.32 328.14 100.00 0.00 0.00 0.00
05.08 CIELORRASOS
05.08.01 CIELORRASOS SUSPENDIDO CON BALDOSAS M2 175.18 32.17 5,635.54 175.18 5,635.54 100.00 0.00 0.00 175.18 5,635.54 100.00 0.00 0.00 0.00
05.08.02 FRISOS CON BALDOSAS M2 52.55 26.77 1,406.76 52.55 1,406.76 100.00 0.00 0.00 52.55 1,406.76 100.00 0.00 0.00 0.00
05.08.03 PERFIL METALICO T/"L" 2"X1"X1/16" PARA BALDOSAS M 583.93 5.19 3,030.60 583.93 3,030.60 100.00 0.00 0.00 583.93 3,030.60 100.00 0.00 0.00 0.00
05.08.04 TEE DE SUSPENSIÓN ALAMBRE GALVANISADO N° 14 + 6 VU PZA 122.00 30.54 3,725.88 122.00 3,725.88 100.00 0.00 0.00 122.00 3,725.88 100.00 0.00 0.00 0.00
05.09 PISOS Y PAVIMENTOS
05.09.01 NIVELACION Y COMPACTACION DE PISO M2 175.18 2.00 350.36 175.18 350.36 100.00 0.00 0.00 175.18 350.36 100.00 0.00 0.00 0.00
05.09.02 FALSO PISO DE 4" DE CONCRETO DE 1:10 M2 109.51 13.66 1,495.91 109.51 1,495.91 100.00 0.00 0.00 109.51 1,495.91 100.00 0.00 0.00 0.00
05.09.03 CONTRAPISO DE 40 MM M2 109.51 24.75 2,710.37 109.51 2,710.37 100.00 0.00 0.00 109.51 2,710.37 100.00 0.00 0.00 0.00
05.09.04 PISO DE CERAMICO ANTIDESLIZANTE 20 X 20 CM. S/PIEDRA M2 109.51 62.98 6,896.94 109.51 6,896.94 100.00 0.00 0.00 109.51 6,896.94 100.00 0.00 0.00 0.00
05.09.05 ENCOFRADO Y DESENCOFRADO M2 5.60 46.95 262.92 5.60 262.92 100.00 0.00 0.00 5.60 262.92 100.00 0.00 0.00 0.00
05.09.06 VEREDA DE CONCRETO DE 4" M2 6.57 53.27 349.98 6.57 349.98 100.00 0.00 0.00 6.57 349.98 100.00 0.00 0.00 0.00
05.09.07 JUNTAS ASFALTICAS M 24.00 10.51 252.24 24.00 252.24 100.00 0.00 0.00 24.00 252.24 100.00 0.00 0.00 0.00
05.10 ZOCALOS Y CONTRAZOCALOS
05.10.01 CONTRAZOCALO DE CERAMICO DE H=10CM M 82.29 28.63 2,355.96 82.29 2,355.96 100.00 0.00 0.00 82.29 2,355.96 100.00 0.00 0.00 0.00
05.10.02 CONTRAZOCALO CEMENTO S/COLOREAR H =20 CM M 9.44 6.79 64.10 9.44 64.10 100.00 0.00 0.00 9.44 64.10 100.00 0.00 0.00 0.00
05.11 CARPINTERIA DE MADERA
05.11.01 PUERTAS APANELADAS DE MADERA TORNILLO M2 18.25 236.25 4,311.56 18.25 4,311.56 100.00 0.00 0.00 18.25 4,311.56 100.00 0.00 0.00 0.00
05.12 CARPINTERIA METALICA
05.12.01 VENTANA DE FIERRO C/ PERFIL DE 1" X 1/8" + HOJA BAST. "L"3 M2 70.36 153.79 10,820.66 70.36 10,820.66 100.00 0.00 0.00 70.36 10,820.66 100.00 0.00 0.00 0.00
05.13 CERRAJERIA
05.13.01 BISAGRA CAPUCHINA 3" X 3" PZA 12.00 11.72 140.64 12.00 140.64 100.00 0.00 0.00 12.00 140.64 100.00 0.00 0.00 0.00
05.13.02 CERRADURA DE TRES GOLPES PZA 9.00 103.38 930.42 9.00 930.42 100.00 0.00 0.00 9.00 930.42 100.00 0.00 0.00 0.00
05.13.03 MANIJA DE BRONCE DE 4" PARA PUERTAS UND 9.00 17.63 158.67 9.00 158.67 100.00 0.00 0.00 9.00 158.67 100.00 0.00 0.00 0.00
05.14 VIDRIOS, CRISTALES Y SIMILARES
05.14.01 VIDRIO SEMI DOBLE. PROVISION Y COLOCACION EN VENTAN P2 515.34 7.01 3,612.53 515.34 3,612.53 100.00 0.00 0.00 515.34 3,612.53 100.00 0.00 0.00 0.00
05.15 PINTURA
05.15.01 PINTURA EN EXTERIORES INTERIORES C/LATEX SUPERMATE M2 413.12 8.81 3,639.59 413.12 3,639.59 100.00 0.00 0.00 413.12 3,639.59 100.00 0.00 0.00 0.00
05.15.02 PINTADO DE CIELO RASO C/LATEX M2 316.85 9.30 2,946.71 316.85 2,946.71 100.00 0.00 0.00 316.85 2,946.71 100.00 0.00 0.00 0.00
05.15.03 PINTURA BARNIZ EN CARPINTERIA DE MADERA M2 18.25 12.68 231.41 18.25 231.41 100.00 0.00 0.00 18.25 231.41 100.00 0.00 0.00 0.00
05.15.04 PINTADO DE VENTANAS METALICAS (2 MANOS ANTIC. + 2 ES M2 70.44 4.53 319.09 70.44 319.09 100.00 0.00 0.00 70.44 319.09 100.00 0.00 0.00 0.00
05.16 VARIOS
05.16.01 PRUEBA DE CALIDAD DEL CONCRETO ( PRUEBA A LA COMPR UND 10.00 45.00 450.00 10.00 450.00 100.00 0.00 0.00 10.00 450.00 100.00 0.00 0.00 0.00
05.16.02 LIMPIEZA GENERAL M2 175.16 1.31 229.46 175.16 229.46 100.00 0.00 0.00 175.16 229.46 100.00 0.00 0.00 0.00
05.17 SISTEMA DE AGUA DE LLLUVIA
Valorización N° 06 Cocina y Comedor 14de38
05.17.01 CANALETA DE CALAMINAS GALVANIZADAS M 56.00 50.23 2,812.88 56.00 2,812.88 100.00 0.00 0.00 56.00 2,812.88 100.00 0.00 0.00 0.00
05.17.02 TUBERIA PARA AGUAS PLUVIALES PVC SAL 3" M 23.15 13.54 313.45 23.15 313.45 100.00 0.00 0.00 23.15 313.45 100.00 0.00 0.00 0.00
05.17.03 CODO 90° PVC SAP 3" UND 12.00 12.43 149.16 12.00 149.16 100.00 0.00 0.00 12.00 149.16 100.00 0.00 0.00 0.00
05.17.04 ABRAZADERA DE 1" DE PLANCHA METALICA CON TUERCAS Y UND 30.00 6.48 194.40 30.00 194.40 100.00 0.00 0.00 30.00 194.40 100.00 0.00 0.00 0.00
05.18 INSTALACIONES ELECTRICAS
05.18.01 SALIDA DE CENTROS DE LUZ PTO 8.00 24.64 197.12 8.00 197.12 100.00 0.00 0.00 8.00 197.12 100.00 0.00 0.00 0.00
05.18.02 SALIDA DE PARED PARA BRAQUETES PTO 5.00 12.46 62.30 5.00 62.30 100.00 0.00 0.00 5.00 62.30 100.00 0.00 0.00 0.00
05.18.03 SALIDA PARA INTERRUPTOR PTO 12.00 24.26 291.12 12.00 291.12 100.00 0.00 0.00 12.00 291.12 100.00 0.00 0.00 0.00
05.18.04 SALIDA PARA TOMACORRIENTES BIPOLARES SIMPLES CON P PTO 9.00 96.20 865.80 9.00 865.80 100.00 0.00 0.00 9.00 865.80 100.00 0.00 0.00 0.00
05.18.05 TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA UND 1.00 489.00 489.00 1.00 489.00 100.00 0.00 0.00 1.00 489.00 100.00 0.00 0.00 0.00
05.18.06 FLOURECENTE RECTO 2 40 WATT INCLUENDO EQUIPO Y PAN EQP 8.00 45.06 360.48 8.00 360.48 100.00 0.00 0.00 8.00 360.48 100.00 0.00 0.00 0.00
05.18.07 BRAQUETE CON FOCO "WS" 150R JOSFEL + LAMPARA 100W UND 5.00 48.31 241.55 5.00 241.55 100.00 0.00 0.00 5.00 241.55 100.00 0.00 0.00 0.00
05.19 INSTALACIONES DE AGUA
05.19.01 SALIDA DE AGUA FRIA CO TUBERIA DE PVC SAP D= 1/2" PTO 46.37 18.44 855.06 46.37 855.06 100.00 0.00 0.00 46.37 855.06 100.00 0.00 0.00 0.00
05.19.02 RED DE DISTRIBUCION TUBERIA DE D=3/4"PVC SAP ML 3.56 8.10 28.84 3.56 28.84 100.00 0.00 0.00 3.56 28.84 100.00 0.00 0.00 0.00
05.19.03 RED DE DISTRIBUCION TUBERIA DE D=1/2"PVC SAP ML 1.53 7.82 11.96 1.53 11.96 100.00 0.00 0.00 1.53 11.96 100.00 0.00 0.00 0.00
05.19.04 VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA DE 1/ PZA 1.00 50.91 50.91 1.00 50.91 100.00 0.00 0.00 1.00 50.91 100.00 0.00 0.00 0.00
05.19.05 TEE PVC SAP 3/4" PZA 1.00 7.71 7.71 1.00 7.71 100.00 0.00 0.00 1.00 7.71 100.00 0.00 0.00 0.00
05.19.06 CODO PVC SAP 1/2" PZA 1.00 7.31 7.31 1.00 7.31 100.00 0.00 0.00 1.00 7.31 100.00 0.00 0.00 0.00
05.19.07 LAVADERO DE COCINA DE ACERO INOXIDABLE PZA 1.00 185.00 185.00 1.00 185.00 100.00 0.00 0.00 1.00 185.00 100.00 0.00 0.00 0.00
05.19.08 MESA DE COCRETO F'C = 175 KG/CM2 CO ENCHAPE DE CERA UND 1.00 281.63 281.63 1.00 281.63 100.00 0.00 0.00 1.00 281.63 100.00 0.00 0.00 0.00
05.20 INSTALACIONES DE DESAGUE
05.20.01 SALIDA DE DESAGUE EN PVC SAL DE 2" PTO 1.00 77.11 77.11 1.00 77.11 100.00 0.00 0.00 1.00 77.11 100.00 0.00 0.00 0.00
05.20.02 RED DE DERIVACION PVC SAL PARA DESAGUE DE 2" M 5.45 8.72 47.52 5.45 47.52 100.00 0.00 0.00 5.45 47.52 100.00 0.00 0.00 0.00

COSTO DIRECTO 184,909.43 184,909.43 100.00 0.00 0.00 184,909.43 100.00 0.00 0.00

Valorización N° 06 Cocina y Comedor 15de38


MUNICIPALIDAD PROVINCIAL DE VILCAS HUAMAN

VALORIZACIÓN DE OBRA N° 06
Correspondiente Mes Diciembre 2017

PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO

EN EL CENTRO POBLADO DE POMACOCHA , DISTRITO DE VISCHONGO, PROVINCIA DE VILC AS HUAMAN - AYACUICHO"

CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Ing° GABRIEL ALFONSO GUZMAN MANRIQUE SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONT ADELANT DIRECTO : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : DICIEMBRE 2017
MONTO ADELANTO MAT : S/. 613,461.40 (CON IGV) S/. 519,882.54 (SIN IGV)
META FISICA: : CONSTRUCCION DE EDIFICACION

AVANCES
P. UNITARIO
CODIGO DESCRIPCION UND METRADO P. PARCIAL (S/.) ANTERIOR ACTUAL ACUMULADO SALDO
(S/.)
METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %

06 CONSTRUCCION SS. HH. NIÑOS Y NIÑAS


06.01 TRABAJOS PRELIMINARES
06.01.01 LIMPIEZA DE TERRENO MANUAL M2 63.70 0.66 42.04 63.70 42.04 100.00 0.00 0.00 63.70 42.04 100.00 0.00 0.00 0.00
06.01.02 TRAZO Y REPLANTEO M2 63.70 2.24 142.69 63.70 142.69 100.00 0.00 0.00 63.70 142.69 100.00 0.00 0.00 0.00
06.02 MOVIMIENTO DE TIERRAS
06.02.01 REFINE Y NIVELACION EN TERRENO NORMAL M2 63.70 2.55 162.44 63.70 162.44 100.00 0.00 0.00 63.70 162.44 100.00 0.00 0.00 0.00
06.02.02 EXCAVACION PARA ZAPATAS DE 1.00M A 1.90M DE PROFUND M3 12.47 24.36 303.77 12.47 303.77 100.00 0.00 0.00 12.47 303.77 100.00 0.00 0.00 0.00
06.02.03 EXCAVACION PARA CIMIENTOS HASTA 1.00MT TERRENO NO M3 12.82 13.13 168.33 12.82 168.33 100.00 0.00 0.00 12.82 168.33 100.00 0.00 0.00 0.00
06.02.04 RELLENO CON MATERIAL PROPIO M3 8.76 16.65 145.85 8.76 145.85 100.00 0.00 0.00 8.76 145.85 100.00 0.00 0.00 0.00
06.02.05 ELIMINACION MATERIAL EXCEDENTE M3 20.66 6.56 135.53 20.66 135.53 100.00 0.00 0.00 20.66 135.53 100.00 0.00 0.00 0.00
06.03 CONCRETO SIMPLE
06.03.01 SOLADO DE 4" MESCLA 1:12 CEMENTO - HORMIGON M2 5.94 89.39 530.98 5.94 530.98 100.00 0.00 0.00 5.94 530.98 100.00 0.00 0.00 0.00
06.03.02 CIMIENTOS CORRIDOS MESCLA 1:10 + 30%(CEMENTO-HORMI M3 11.31 170.48 1,928.13 11.31 1,928.13 100.00 0.00 0.00 11.31 1,928.13 100.00 0.00 0.00 0.00
06.03.03 ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE 0.30 A 0.60 M2 8.54 24.75 211.37 8.54 211.37 100.00 0.00 0.00 8.54 211.37 100.00 0.00 0.00 0.00
06.03.04 CONCRETO SOBRECIMIENTO DE 1:8 CEM - HOR 25% P. M. AN M3 7.48 225.77 1,688.76 7.48 1,688.76 100.00 0.00 0.00 7.48 1,688.76 100.00 0.00 0.00 0.00
06.04 CONCRETO ARMADO
06.04.01 ZAPATAS
06.04.01.01 CONCRETO EN ZAPATAS F'C=210 KG/CM2 M3 4.16 335.04 1,393.77 4.16 1,393.77 100.00 0.00 0.00 4.16 1,393.77 100.00 0.00 0.00 0.00
06.04.01.02 ACERO GRADO 60 EN ZAPATAS KG 102.45 4.68 479.47 102.45 479.47 100.00 0.00 0.00 102.45 479.47 100.00 0.00 0.00 0.00
06.04.02 COLUMNAS
06.04.02.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 3.98 413.53 1,645.85 3.98 1,645.85 100.00 0.00 0.00 3.98 1,645.85 100.00 0.00 0.00 0.00
06.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 47.70 41.04 1,957.61 47.70 1,957.61 100.00 0.00 0.00 47.70 1,957.61 100.00 0.00 0.00 0.00
06.04.02.03 ACERO GRADO 60 EN COLUMNAS KG 1,344.45 4.44 5,969.36 1,344.45 5,969.36 100.00 0.00 0.00 1,344.45 5,969.36 100.00 0.00 0.00 0.00
06.04.03 VIGAS
06.04.03.01 CONCRETO EN VIGAS F'C=210 KG/CM2 M3 4.67 344.40 1,608.35 4.67 1,608.35 100.00 0.00 0.00 4.67 1,608.35 100.00 0.00 0.00 0.00
06.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 50.83 39.23 1,994.06 50.83 1,994.06 100.00 0.00 0.00 50.83 1,994.06 100.00 0.00 0.00 0.00
06.04.03.03 ACERO GRADO 60 EN VIGAS KG 898.10 4.32 3,879.79 898.10 3,879.79 100.00 0.00 0.00 898.10 3,879.79 100.00 0.00 0.00 0.00
06.04.04 LOSAS ALIGERADAS
06.04.04.01 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 M3 13.65 336.54 4,593.77 13.65 4,593.77 100.00 0.00 0.00 13.65 4,593.77 100.00 0.00 0.00 0.00

Valorización N° 06 SS.HH. Alumnado 16de38


06.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGER M2 101.56 43.46 4,413.80 101.56 4,413.80 100.00 0.00 0.00 101.56 4,413.80 100.00 0.00 0.00 0.00
06.04.04.03 ACERO GRADO 60 EN LOSAS ALIGERADAS KG 316.21 4.36 1,378.68 316.21 1,378.68 100.00 0.00 0.00 316.21 1,378.68 100.00 0.00 0.00 0.00
06.04.04.04 LADRILLO HUECO DE ARCILLA 25 X 30 X 30 CM. PARA TECHO UND 530.62 1.83 971.03 530.62 971.03 100.00 0.00 0.00 530.62 971.03 100.00 0.00 0.00 0.00
06.05 ALBAÑELERIA
06.05.01 MURO DE CABEZA LADRILLO CORRIENTE CON CEMENTO - A M2 95.35 61.67 5,880.23 95.35 5,880.23 100.00 0.00 0.00 95.35 5,880.23 100.00 0.00 0.00 0.00
06.06 COBERTURA
06.06.01 COBERTURA DE TEJA ANDINA TIPO ETERNIT M2 63.70 35.13 2,237.78 63.70 2,237.78 100.00 0.00 0.00 63.70 2,237.78 100.00 0.00 0.00 0.00
06.06.01 CUMBRERA CON TEJA ANDINA TIPO ETERNIT ML 4.90 83.06 406.99 4.90 406.99 100.00 0.00 0.00 4.90 406.99 100.00 0.00 0.00 0.00
06.07 REVOQUES, ENLUCIDOS Y MOLDURAS
06.07.01 TARRAJEO EN INTERIORES Y EXTERIORES MESCLA 1:5 E=1.5 M2 95.35 26.36 2,513.43 95.35 2,513.43 100.00 0.00 0.00 95.35 2,513.43 100.00 0.00 0.00 0.00
06.07.02 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO - A M2 47.70 17.97 857.17 47.70 857.17 100.00 0.00 0.00 47.70 857.17 100.00 0.00 0.00 0.00
06.07.03 TARRAJEO EN SUPERFICIE Y ARISTAS DE VIGAS CON CEMEN M2 50.83 21.15 1,075.05 50.83 1,075.05 100.00 0.00 0.00 50.83 1,075.05 100.00 0.00 0.00 0.00
06.07.04 VESTIDURA DE DERRAMES CON MEZCLA 1:5 (CEMENTO - ARE ML 41.48 7.46 309.44 41.48 309.44 100.00 0.00 0.00 41.48 309.44 100.00 0.00 0.00 0.00
06.07.05 TARRAJEO EN CIELORRASO CON C:A - 1:5 E=1.5 CM M2 101.56 43.68 4,436.14 101.56 4,436.14 100.00 0.00 0.00 101.56 4,436.14 100.00 0.00 0.00 0.00
06.07.06 BRUÑAS ML 154.43 1.68 259.44 154.43 259.44 100.00 0.00 0.00 154.43 259.44 100.00 0.00 0.00 0.00
06.08 CIELORRASOS
06.08.01 CIELORRASOS SUSPENDIDO CON BALDOSAS M2 63.70 32.17 2,049.23 63.70 2,049.23 100.00 0.00 0.00 63.70 2,049.23 100.00 0.00 0.00 0.00
06.08.02 FRISOS CON BALDOSAS M2 19.11 26.77 511.57 19.11 511.57 100.00 0.00 0.00 19.11 511.57 100.00 0.00 0.00 0.00
06.08.03 PERFIL METALICO T/"L" 2"X1"X1/16" PARA BALDOSAS M 212.33 5.19 1,101.99 212.33 1,101.99 100.00 0.00 0.00 212.33 1,101.99 100.00 0.00 0.00 0.00
06.08.04 TEE DE SUSPENSIÓN ALAMBRE GALVANISADO N° 14 + 6 VU PZA 45.00 30.54 1,374.30 45.00 1,374.30 100.00 0.00 0.00 45.00 1,374.30 100.00 0.00 0.00 0.00
06.09 PISOS Y PAVIMENTOS
06.09.01 NIVELACION Y COMPACTACION DE PISO M2 63.70 2.00 127.40 63.70 127.40 100.00 0.00 0.00 63.70 127.40 100.00 0.00 0.00 0.00
06.09.02 FALSO PISO DE 4" DE CONCRETO DE 1:10 M2 35.00 13.66 478.10 35.00 478.10 100.00 0.00 0.00 35.00 478.10 100.00 0.00 0.00 0.00
06.09.03 CONTRAPISO DE 40 MM M2 35.00 24.75 866.25 35.00 866.25 100.00 0.00 0.00 35.00 866.25 100.00 0.00 0.00 0.00
06.09.04 PISO DE CERAMICO ANTIDESLIZANTE 20 X 20 CM. S/PIEDRA M2 35.00 62.98 2,204.30 35.00 2,204.30 100.00 0.00 0.00 35.00 2,204.30 100.00 0.00 0.00 0.00
06.09.05 ENCOFRADO Y DESENCOFRADO M2 3.58 46.95 168.08 3.58 168.08 100.00 0.00 0.00 3.58 168.08 100.00 0.00 0.00 0.00
06.09.06 VEREDA DE CONCRETO DE 4" M2 2.87 53.27 152.88 2.87 152.88 100.00 0.00 0.00 2.87 152.88 100.00 0.00 0.00 0.00
06.09.07 JUNTAS ASFALTICAS M 18.00 10.51 189.18 18.00 189.18 100.00 0.00 0.00 18.00 189.18 100.00 0.00 0.00 0.00
06.10 ZOCALOS Y CONTRAZOCALOS
06.10.01 CONTRAZOCALO DE CERAMICO DE H=10CM M 49.35 28.63 1,412.89 49.35 1,412.89 100.00 0.00 0.00 49.35 1,412.89 100.00 0.00 0.00 0.00
06.10.02 CONTRAZOCALO CEMENTO S/COLOREAR H =20 CM M 5.40 6.79 36.67 5.40 36.67 100.00 0.00 0.00 5.40 36.67 100.00 0.00 0.00 0.00
06.11 CARPINTERIA DE MADERA
06.11.01 PUERTAS APANELADAS DE MADERA TORNILLO M22 9.04 236.25 2,135.70 9.04 2,135.70 100.00 0.00 0.00 9.04 2,135.70 100.00 0.00 0.00 0.00
06.12 CARPINTERIA METALICA
06.12.01 VENTANA DE FIERRO C/ PERFIL DE 1" X 1/8" + HOJA BAST. "L"3 M2 35.35 153.79 5,436.48 35.35 5,436.48 100.00 0.00 0.00 35.35 5,436.48 100.00 0.00 0.00 0.00
06.12.02 PUERTA METAL LAC 1/16" C/MARCO 2" X 2" X 1/4" Y REFUERZ M2 11.76 354.69 4,171.15 11.76 4,171.15 100.00 0.00 0.00 11.76 4,171.15 100.00 0.00 0.00 0.00
06.12.03 MANMPOSTERIA METALICA C/MARCO 2" X 2" X 1/4" Y REFUE M2 21.17 177.97 3,767.62 21.17 3,767.62 100.00 0.00 0.00 21.17 3,767.62 100.00 0.00 0.00 0.00
06.13 CERRAJERIA
06.13.01 BISAGRA CAPUCHINA 3" X 3" PZA 12.00 11.72 140.64 12.00 140.64 100.00 0.00 0.00 12.00 140.64 100.00 0.00 0.00 0.00
06.13.02 CERRADURA DE TRES GOLPES PZA 4.00 103.38 413.52 4.00 413.52 100.00 0.00 0.00 4.00 413.52 100.00 0.00 0.00 0.00
06.13.03 MANIJA DE BRONCE DE 4" PARA PUERTAS UND 4.00 17.63 70.52 4.00 70.52 100.00 0.00 0.00 4.00 70.52 100.00 0.00 0.00 0.00
06.14 VIDRIOS, CRISTALES Y SIMILARES
06.14.01 VIDRIO SEMI DOBLE. PROVISION Y COLOCACION EN VENTAN P2 255.24 7.01 1,789.23 255.24 1,789.23 100.00 0.00 0.00 255.24 1,789.23 100.00 0.00 0.00 0.00
06.15 PINTURA
05.15.01 PINTURA EN EXTERIORES INTERIORES C/LATEX SUPERMATE M2 193.89 8.81 1,708.17 193.89 1,708.17 100.00 0.00 0.00 193.89 1,708.17 100.00 0.00 0.00 0.00
05.15.02 PINTADO DE CIELO RASO C/LATEX M2 101.56 9.30 944.51 101.56 944.51 100.00 0.00 0.00 101.56 944.51 100.00 0.00 0.00 0.00
05.15.03 PINTURA BARNIZ EN CARPINTERIA DE MADERA M2 9.04 12.68 114.63 9.04 114.63 100.00 0.00 0.00 9.04 114.63 100.00 0.00 0.00 0.00
05.15.04 PINTADO DE VENTANAS METALICAS (2 MANOS ANTIC. + 2 ES M2 35.35 4.53 160.14 35.35 160.14 100.00 0.00 0.00 35.35 160.14 100.00 0.00 0.00 0.00
06.16 VARIOS
Valorización N° 06 SS.HH. Alumnado 17de38
06.16.01 PRUEBA DE CALIDAD DEL CONCRETO ( PRUEBA A LA COMPR UND 10.00 45.00 450.00 10.00 450.00 100.00 0.00 0.00 10.00 450.00 100.00 0.00 0.00 0.00
06.16.02 LIMPIEZA GENERAL M2 63.70 1.31 83.45 63.70 83.45 100.00 0.00 0.00 63.70 83.45 100.00 0.00 0.00 0.00
06.17 SISTEMA DE AGUA DE LLLUVIA
06.17.01 CANALETA DE CALAMINAS GALVANIZADAS M 35.00 50.23 1,758.05 35.00 1,758.05 100.00 0.00 0.00 35.00 1,758.05 100.00 0.00 0.00 0.00
06.17.02 TUBERIA PARA AGUAS PLUVIALES PVC SAL 3" M 23.15 13.54 313.45 23.15 313.45 100.00 0.00 0.00 23.15 313.45 100.00 0.00 0.00 0.00
06.17.03 CODO 90° PVC SAP 3" UND 12.00 12.43 149.16 12.00 149.16 100.00 0.00 0.00 12.00 149.16 100.00 0.00 0.00 0.00
06.17.04 ABRAZADERA DE 1" DE PLANCHA METALICA CON TUERCAS Y UND 30.00 6.48 194.40 30.00 194.40 100.00 0.00 0.00 30.00 194.40 100.00 0.00 0.00 0.00
06.18 INSTALACIONES ELECTRICAS
06.18.01 SALIDA DE CENTROS DE LUZ PTO 6.00 24.64 147.84 6.00 147.84 100.00 0.00 0.00 6.00 147.84 100.00 0.00 0.00 0.00
06.18.02 SALIDA DE PARED PARA BRAQUETES PTO 4.00 12.46 49.84 4.00 49.84 100.00 0.00 0.00 4.00 49.84 100.00 0.00 0.00 0.00
06.18.03 SALIDA PARA INTERRUPTOR PTO 7.00 24.26 169.82 7.00 169.82 100.00 0.00 0.00 7.00 169.82 100.00 0.00 0.00 0.00
06.18.04 TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA UND 1.00 489.00 489.00 1.00 489.00 100.00 0.00 0.00 1.00 489.00 100.00 0.00 0.00 0.00
06.18.05 FLOURECENTE RECTO 2 40 WATT INCLUENDO EQUIPO Y PAN EQP 6.00 45.06 270.36 6.00 270.36 100.00 0.00 0.00 6.00 270.36 100.00 0.00 0.00 0.00
06.18.06 BRAQUETE CON FOCO "WS" 150R JOSFEL + LAMPARA 100W UND 4.00 48.31 193.24 4.00 193.24 100.00 0.00 0.00 4.00 193.24 100.00 0.00 0.00 0.00
06.19 INSTALACIONES DE AGUA
06.19.01 SALIDA DE AGUA FRIA CO TUBERIA DE PVC SAP D= 1/2" PTO 20.00 18.44 368.80 20.00 368.80 100.00 0.00 0.00 20.00 368.80 100.00 0.00 0.00 0.00
06.19.02 RED DE DISTRIBUCION TUBERIA DE D=3/4"PVC SAP ML 2.53 8.10 20.49 2.53 20.49 100.00 0.00 0.00 2.53 20.49 100.00 0.00 0.00 0.00
06.19.03 RED DE DISTRIBUCION TUBERIA DE D=1/2"PVC SAP ML 27.32 7.82 213.64 27.32 213.64 100.00 0.00 0.00 27.32 213.64 100.00 0.00 0.00 0.00
06.19.04 VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA DE 1/ PZA 4.00 50.91 203.64 4.00 203.64 100.00 0.00 0.00 4.00 203.64 100.00 0.00 0.00 0.00
06.19.05 TEE PVC SAP 3/4" PZA 5.00 7.71 38.55 5.00 38.55 100.00 0.00 0.00 5.00 38.55 100.00 0.00 0.00 0.00
06.19.06 CODO PVC SAP 3/4" PZA 2.00 7.51 15.02 2.00 15.02 100.00 0.00 0.00 2.00 15.02 100.00 0.00 0.00 0.00
06.19.07 REDUCCION PVC SAP DE 3/4" A 1/2" P/AGUA PZA 3.00 10.71 32.13 3.00 32.13 100.00 0.00 0.00 3.00 32.13 100.00 0.00 0.00 0.00
06.19.08 CODO PVC SAP 1/2" PZA 11.00 7.31 80.41 11.00 80.41 100.00 0.00 0.00 11.00 80.41 100.00 0.00 0.00 0.00
06.19.09 TEE PVC SAP 1/2" PZA 2.00 7.31 14.62 2.00 14.62 100.00 0.00 0.00 2.00 14.62 100.00 0.00 0.00 0.00
06.19.10 LAVATORIO DE PARED BLANCO 1 LLAVE PZA 10.00 150.00 1,500.00 10.00 1,500.00 100.00 0.00 0.00 10.00 1,500.00 100.00 0.00 0.00 0.00
06.19.11 INODORO BLANCO TANQUE BAJO UND 9.00 230.50 2,074.50 9.00 2,074.50 100.00 0.00 0.00 9.00 2,074.50 100.00 0.00 0.00 0.00
06.19.12 URINARIOS DE LOZA DE PICO BLANCO PZA 3.00 85.00 255.00 3.00 255.00 100.00 0.00 0.00 3.00 255.00 100.00 0.00 0.00 0.00
06.20 INSTALACIONES DE DESAGUE
06.20.01 EXCAVACION M3 13.82 20.60 284.69 13.82 284.69 100.00 0.00 0.00 13.82 284.69 100.00 0.00 0.00 0.00
06.20.02 RELLENO COMP. ZANJA P/TUB ML 42.54 72.16 3,069.69 42.54 3,069.69 100.00 0.00 0.00 42.54 3,069.69 100.00 0.00 0.00 0.00
06.20.03 RELLENO CON MATERIAL PROPIO SELECCIONADO M3 11.70 7.92 92.66 11.70 92.66 100.00 0.00 0.00 11.70 92.66 100.00 0.00 0.00 0.00
06.20.04 SALIDA DE DESAGUE EN PVC SAL DE 2" PTO 26.00 77.11 2,004.86 26.00 2,004.86 100.00 0.00 0.00 26.00 2,004.86 100.00 0.00 0.00 0.00
06.20.05 SALIDA DE DESAGUE EN PVC SAL DE 4" PTO 9.00 77.11 693.99 9.00 693.99 100.00 0.00 0.00 9.00 693.99 100.00 0.00 0.00 0.00
06.20.06 RED DE DERIVACION PVC SAL PARA DESGUE DE 2" M 71.78 8.72 625.92 71.78 625.92 100.00 0.00 0.00 71.78 625.92 100.00 0.00 0.00 0.00
06.20.07 RED DE DERIVACION PVC SAL PARA DESGUE DE 4" ML 27.46 11.32 310.85 27.46 310.85 100.00 0.00 0.00 27.46 310.85 100.00 0.00 0.00 0.00
06.20.08 SUMIDERO DE BRONCE 2" PROVISION Y COLOCACION PZA 4.00 26.86 107.44 4.00 107.44 100.00 0.00 0.00 4.00 107.44 100.00 0.00 0.00 0.00
06.20.09 REGISTROS DE BRONCE DE 4", PROV. Y COLOCACION PZA 9.00 23.26 209.34 9.00 209.34 100.00 0.00 0.00 9.00 209.34 100.00 0.00 0.00 0.00
06.20.10 YEE DE P. V. C. SAL SP, RAMALCON REDUCCION DE 4" A 2" UND 22.00 12.00 264.00 22.00 264.00 100.00 0.00 0.00 22.00 264.00 100.00 0.00 0.00 0.00
06.20.11 YEE DE PVC SAL DE 2" PZA 2.00 12.67 25.34 2.00 25.34 100.00 0.00 0.00 2.00 25.34 100.00 0.00 0.00 0.00
06.20.12 CODO PVC SAL DE 2" X 45° PZA 8.00 12.95 103.60 8.00 103.60 100.00 0.00 0.00 8.00 103.60 100.00 0.00 0.00 0.00
06.20.13 CODO PVC SAL DE 4" X 45° PZA 8.00 16.07 128.56 8.00 128.56 100.00 0.00 0.00 8.00 128.56 100.00 0.00 0.00 0.00
06.20.14 SOMBRERO PARA VENTILACION DE P. V. C. DE 2" UND 22.00 20.01 440.22 22.00 440.22 100.00 0.00 0.00 22.00 440.22 100.00 0.00 0.00 0.00

COSTO DIRECTO 102,692.82 102,692.82 100.00 0.00 0.00 102,692.82 100.00 0.00 0.00

Valorización N° 06 SS.HH. Alumnado 18de38


MUNICIPALIDAD PROVINCIAL DE VILCAS HUAMAN

VALORIZACIÓN DE OBRA N° 06
Correspondiente Mes Diciembre 2017

PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO

EN EL CENTRO POBLADO DE POMACOCHA , DISTRITO DE VISCHONGO, PROVINCIA DE VILC AS HUAMAN - AYACUICHO"

CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Ing° GABRIEL ALFONSO GUZMAN MANRIQUE SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONT ADELANT DIRECTO : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : DICIEMBRE 2017
MONTO ADELANTO MAT : S/. 613,461.40 (CON IGV) S/. 519,882.54 (SIN IGV)
META FISICA: CONSTRUCCION DE EDIFICACION

AVANCES
P. UNITARIO
CODIGO DESCRIPCION UND METRADO P. PARCIAL (S/.) ANTERIOR ACTUAL ACUMULADO SALDO
(S/.)
METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %

07 CONSTRUCCION DE SS. HH ADMINISTRACION


07.01 TRABAJOS PRELIMINARES
07.01.01 LIMPIEZA DE TERRENO MANUAL M2 28.00 0.66 18.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 28.00 18.48 100.00
07.01.02 TRAZO Y REPLANTEO M2 28.00 2.24 62.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 28.00 62.72 100.00
07.02 MOVIMIENTO DE TIERRAS
07.02.01 REFINE Y NIVELACION EN TERRENO NORMAL M2 28.00 2.55 71.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 28.00 71.40 100.00
07.02.02 EXCAVACION PARA ZAPATAS DE 1.00M A 1.90M DE PROFUND M3 9.26 24.36 225.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.26 225.57 100.00
07.02.03 EXCAVACION PARA CIMIENTOS HASTA 1.00MT TERRENO NO M3 6.38 13.13 83.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.38 83.77 100.00
07.02.04 RELLENO CON MATERIAL PROPIO M3 4.15 16.65 69.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.15 69.10 100.00
07.02.05 ELIMINACION MATERIAL EXCEDENTE M3 14.36 6.56 94.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.36 94.20 100.00
07.03 CONCRETO SIMPLE
07.03.01 SOLADO DE 4" MESCLA 1:12 CEMENTO - HORMIGON M2 4.41 89.39 394.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.41 394.21 100.00
07.03.02 CIMIENTOS CORRIDOS MESCLA 1:10 + 30%(CEMENTO-HORMI M3 5.63 170.48 959.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.63 959.80 100.00
07.03.03 ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE 0.30 A 0.60 M2 2.40 24.75 59.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.40 59.40 100.00
07.03.04 CONCRETO SOBRECIMIENTO DE 1:8 CEM - HOR 25% P. M. AN M3 1.50 225.77 338.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.50 338.66 100.00
07.04 CONCRETO ARMADO
07.04.01 ZAPATAS
07.04.01.01 CONCRETO EN ZAPATAS F'C=210 KG/CM2 M3 3.09 335.04 1,035.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.09 1,035.27 100.00
07.04.01.02 ACERO GRADO 60 EN ZAPATAS KG 70.77 4.68 331.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 70.77 331.20 100.00
07.04.02 COLUMNAS
07.04.02.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 4.68 413.53 1,935.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.68 1,935.32 100.00
07.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 37.44 41.04 1,536.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 37.44 1,536.54 100.00
07.04.02.03 ACERO GRADO 60 EN COLUMNAS KG 793.15 4.44 3,521.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 793.15 3,521.59 100.00
07.04.03 VIGAS
07.04.03.01 CONCRETO EN VIGAS F'C=210 KG/CM2 M3 3.07 344.40 1,057.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.07 1,057.31 100.00
07.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 32.70 39.23 1,282.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 32.70 1,282.82 100.00
07.04.03.03 ACERO GRADO 60 EN VIGAS KG 921.18 4.32 3,979.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 921.18 3,979.50 100.00
07.04.04 LOSAS ALIGERADAS
07.04.04.01 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 M3 4.98 336.54 1,675.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.98 1,675.97 100.00

Valorización N° 06 SS.HH. Administracón 19de38


07.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGER M2 49.14 43.46 2,135.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 49.14 2,135.62 100.00
07.04.04.03 ACERO GRADO 60 EN LOSAS ALIGERADAS KG 145.11 4.36 632.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 145.11 632.68 100.00
07.04.04.04 LADRILLO HUECO DE ARCILLA 25 X 30 X 30 CM. PARA TECHO AL UND 233.24 1.83 426.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 233.24 426.83 100.00
07.05 ALBAÑELERIA
07.05.01 MURO DE CABEZA LADRILLO CORRIENTE CON CEMENTO - A M2 46.42 61.67 2,862.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 46.42 2,862.72 100.00
07.06 COBERTURA
07.06.01 COBERTURA DE TEJA ANDINA TIPO ETERNIT M2 28.00 35.13 983.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 28.00 983.64 100.00
07.07 REVOQUES, ENLUCIDOS Y MOLDURAS
07.07.01 TARRAJEO EN INTERIORES Y EXTERIORES MESCLA 1:5 E=1.5 M2 46.62 26.36 1,228.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 46.62 1,228.90 100.00
07.07.02 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO - A M2 37.44 17.97 672.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 37.44 672.80 100.00
07.07.03 TARRAJEO EN SUPERFICIE Y ARISTAS DE VIGAS CON CEMEN M2 32.70 21.15 691.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 32.70 691.61 100.00
07.07.04 VESTIDURA DE DERRAMES CON MEZCLA 1:5 (CEMENTO - ARE ML 21.96 7.46 163.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21.96 163.82 100.00
07.07.05 TARRAJEO EN CIELORRASO CON C:A - 1:5 E=1.5 CM M2 49.14 43.68 2,146.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 49.14 2,146.44 100.00
07.07.06 BRUÑAS ML 94.43 1.68 158.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 94.43 158.64 100.00
07.08 CIELORRASOS
07.08.01 CIELORRASOS SUSPENDIDO CON BALDOSAS M2 28.00 32.17 900.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 28.00 900.76 100.00
07.08.02 FRISOS CON BALDOSAS M2 8.40 26.77 224.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.40 224.87 100.00
07.08.03 PERFIL METALICO T/"L" 2"X1"X1/16" PARA BALDOSAS M 73.33 5.19 380.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 73.33 380.58 100.00
07.08.04 TEE DE SUSPENSIÓN ALAMBRE GALVANISADO N° 14 + 6 VU PZA 16.00 30.54 488.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 488.64 100.00
07.09 PISOS Y PAVIMENTOS
07.09.01 NIVELACION Y COMPACTACION DE PISO M2 28.00 2.00 56.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 28.00 56.00 100.00
07.09.02 FALSO PISO DE 4" DE CONCRETO DE 1:10 M2 12.25 13.66 167.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.25 167.34 100.00
07.09.03 CONTRAPISO DE 40 MM M2 12.25 24.75 303.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.25 303.19 100.00
07.09.04 PISO DE CERAMICO ANTIDESLIZANTE 20 X 20 CM. S/PIEDRA M2 12.25 62.98 771.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.25 771.51 100.00
07.09.05 ENCOFRADO Y DESENCOFRADO M2 2.20 46.95 103.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.20 103.29 100.00
07.09.06 VEREDA DE CONCRETO DE 4" M2 1.58 53.27 84.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.58 84.17 100.00
07.09.07 JUNTAS ASFALTICAS M 3.00 10.51 31.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 31.53 100.00
07.10 ZOCALOS Y CONTRAZOCALOS
07.10.01 CONTRAZOCALO DE CERAMICO DE H=10CM M 30.90 28.63 884.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30.90 884.67 100.00
07.10.02 CONTRAZOCALO CEMENTO S/COLOREAR H =20 CM M 2.80 6.79 19.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.80 19.01 100.00
07.11 CARPINTERIA DE MADERA
07.11.01 PUERTAS APANELADAS DE MADERA TORNILLO M2 4.57 236.25 1,079.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.57 1,079.66 100.00
07.12 CARPINTERIA METALICA
07.12.01 VENTANA DE FIERRO C/ PERFIL DE 1" X 1/8" + HOJA BAST. "L"3 M2 21.44 153.79 3,297.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21.44 3,297.26 100.00
07.12.02 PUERTA METAL LAC 1/16" C/MARCO 2" X 2" X 1/4" Y REFUERZ M2 5.71 354.69 2,025.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.71 2,025.28 100.00
MANMPOSTERIA METALICA C/MARCO 2" X 2" X 1/4" Y
07.12.03 REFUERZOS M2 6.45 177.97 1,147.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.45 1,147.91 100.00
07.13 CERRAJERIA
07.13.01 BISAGRA CAPUCHINA 3" X 3" PZA 6.00 11.72 70.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 70.32 100.00
07.13.02 CERRADURA DE TRES GOLPES PZA 2.00 103.38 206.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 206.76 100.00
07.13.03 MANIJA DE BRONCE DE 4" PARA PUERTAS UND 2.00 17.63 35.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 35.26 100.00
07.14 VIDRIOS, CRISTALES Y SIMILARES
VIDRIO SEMI DOBLE. PROVISION Y COLOCACION EN
07.14.01 VENTANAS FIERRO P2 145.24 7.01 1,018.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 145.24 1,018.13 100.00
07.15 PINTURA
07.15.01 PINTURA EN EXTERIORES INTERIORES C/LATEX SUPERMATE M2 117.76 8.81 1,037.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 117.76 1,037.47 100.00
07.15.02 PINTADO DE CIELO RASO C/LATEX M2 49.14 9.30 457.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 49.14 457.00 100.00
07.15.03 PINTURA BARNIZ EN CARPINTERIA DE MADERA M2 4.57 12.68 57.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.57 57.95 100.00
07.15.04 PINTADO DE VENTANAS METALICAS (2 MANOS ANTIC. + 2 ES M2 21.44 4.53 97.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21.44 97.12 100.00
07.16 VARIOS
07.16.01 PRUEBA DE CALIDAD DEL CONCRETO ( PRUEBA A LA COMPR UND 10.00 45.00 450.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 450.00 100.00
Valorización N° 06 SS.HH. Administracón 20de38
07.16.02 LIMPIEZA GENERAL M2 28.00 1.31 36.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 28.00 36.68 100.00
07.17 SISTEMA DE AGUA DE LLLUVIA
07.17.01 CANALETA DE CALAMINAS GALVANIZADAS M 21.00 50.23 1,054.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21.00 1,054.83 100.00
07.17.02 TUBERIA PARA AGUAS PLUVIALES PVC SAL 3" M 23.15 13.54 313.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23.15 313.45 100.00
07.17.03 CODO 90° PVC SAP 3" UND 12.00 12.43 149.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 149.16 100.00
07.17.04 ABRAZADERA DE 1" DE PLANCHA METALICA CON TUERCAS Y UND 15.00 6.48 97.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 97.20 100.00
07.18 INSTALACIONES ELECTRICAS
07.18.01 SALIDA DE CENTROS DE LUZ PTO 2.00 24.64 49.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 49.28 100.00
07.18.02 SALIDA DE PARED PARA BRAQUETES PTO 1.00 12.46 12.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 12.46 100.00
07.18.03 SALIDA PARA INTERRUPTOR PTO 3.00 24.26 72.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 72.78 100.00
07.18.04 TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA UND 1.00 489.00 489.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 489.00 100.00
07.18.05 FLOURECENTE RECTO 2 40 WATT INCLUENDO EQUIPO Y PAN EQP 2.00 45.06 90.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 90.12 100.00
07.18.06 BRAQUETE CON FOCO "WS" 150R JOSFEL + LAMPARA 100W UND 1.00 48.31 48.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 48.31 100.00
07.19 INSTALACIONES DE AGUA
07.19.01 SALIDA DE AGUA FRIA CO TUBERIA DE PVC SAP D= 1/2" PTO 8.00 18.44 147.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 147.52 100.00
07.19.02 RED DE DISTRIBUCION TUBERIA DE D=1/2"PVC SAP ML 9.90 7.82 77.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.90 77.42 100.00
07.19.03 VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA DE 1/ PZA 2.00 50.91 101.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 101.82 100.00
07.19.04 TEE PVC SAP 3/4" PZA 1.00 7.71 7.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 7.71 100.00
07.19.05 CODO PVC SAP 3/4" PZA 1.00 7.51 7.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 7.51 100.00
07.19.06 REDUCCION PVC SAP DE 3/4" A 1/2" P/AGUA PZA 2.00 10.71 21.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 21.42 100.00
07.19.07 CODO PVC SAP 1/2" PZA 12.00 7.31 87.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 87.72 100.00
07.19.08 TEE PVC SAP 1/2" PZA 6.00 7.31 43.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 43.86 100.00
07.19.09 LAVATORIO DE PARED BLANCO 1 LLAVE PZA 2.00 150.00 300.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 300.00 100.00
07.19.10 INODORO BLANCO TANQUE BAJO UND 4.00 230.50 922.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 922.00 100.00
07.19.11 URINARIOS DE LOZA DE PICO BLANCO PZA 1.00 85.00 85.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 85.00 100.00
07.20 INSTALACIONES DE DESAGUE
07.20.01 EXCAVACION M3 6.14 20.60 126.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.14 126.48 100.00
07.20.02 RELLENO COMP. ZANJA P/TUB ML 15.81 72.16 1,140.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.81 1,140.85 100.00
07.20.03 RELLENO CON MATERIAL PROPIO SELECCIONADO M3 4.35 7.92 34.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.35 34.45 100.00
07.20.04 SALIDA DE DESAGUE EN PVC SAL DE 2" PTO 10.00 77.11 771.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 771.10 100.00
07.20.05 SALIDA DE DESAGUE EN PVC SAL DE 4" PTO 4.00 77.11 308.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 308.44 100.00
07.20.06 RED DE DERIVACION PVC SAL PARA DESGUE DE 2" M 25.56 8.72 222.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.56 222.88 100.00
07.20.07 RED DE DERIVACION PVC SAL PARA DESGUE DE 4" ML 12.99 11.32 147.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.99 147.05 100.00
07.20.08 SUMIDERO DE BRONCE 2" PROVISION Y COLOCACION PZA 2.00 26.86 53.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 53.72 100.00
07.20.09 REGISTROS DE BRONCE DE 4", PROV. Y COLOCACION PZA 4.00 23.26 93.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 93.04 100.00
07.20.10 YEE DE P. V. C. SAL SP, RAMAL CON REDUCCION DE 4" A 2" UND 6.00 12.00 72.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 72.00 100.00
07.20.11 YEE DE PVC SAL DE 2" PZA 2.00 12.67 25.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 25.34 100.00
07.20.12 CODO PVC SAL DE 4" X 45° PZA 2.00 16.07 32.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 32.14 100.00
07.20.13 SOMBRERO PARA VENTILACION DE P. V. C. DE 2" UND 4.00 20.01 80.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 80.04 100.00

COSTO DIRECTO 53,554.99 0.00 0.00 0.00 0.00 0.00 0.00 53,554.99 100.00

Valorización N° 06 SS.HH. Administracón 21de38


MUNICIPALIDAD PROVINCIAL DE VILCAS HUAMAN

VALORIZACIÓN DE OBRA N° 06
Correspondiente Mes Diciembre 2017

PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO

EN EL CENTRO POBLADO DE POMACOCHA , DISTRITO DE VISCHONGO, PROVINCIA DE VILC AS HUAMAN - AYACUICHO"

CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Ing° GABRIEL ALFONSO GUZMAN MANRIQUE SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONT ADELANT DIRECTO : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : DICIEMBRE 2017
MONTO ADELANTO MAT : S/. 613,461.40 (CON IGV) S/. 519,882.54 (SIN IGV)
META FISICA: CONSTRUCCION DE EDIFICACION

AVANCES
P. UNITARIO
CODIGO DESCRIPCION UND METRADO P. PARCIAL (S/.) ANTERIOR ACTUAL ACUMULADO SALDO
(S/.)
METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %

08 PATIO DE FORMACION CON CUBIETA DE POLICARBONATO


08.01 TRABAJOS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL M2 542.51 0.66 358.06 542.51 358.06 100.00 0.00 0.00 542.51 358.06 100.00 0.00 0.00 0.00
08.01.02 TRAZO Y REPLANTEO M2 542.51 2.24 1,215.22 542.51 1,215.22 100.00 0.00 0.00 542.51 1,215.22 100.00 0.00 0.00 0.00
08.02 MOVIMIENTO DE TIERRAS
08.02.01 REFINE Y NIVELACION EN TERRENO NORMAL M2 542.51 2.55 1,383.40 542.51 1,383.40 100.00 0.00 0.00 542.51 1,383.40 100.00 0.00 0.00 0.00
08.02.02 EXCAVACION PARA ZAPATAS DE 1.00M A 1.40M DE PROFUND M3 16.20 24.36 394.63 16.20 394.63 100.00 0.00 0.00 16.20 394.63 100.00 0.00 0.00 0.00
08.02.03 EXCAVACION M3 9.66 20.60 199.00 9.66 199.00 100.00 0.00 0.00 9.66 199.00 100.00 0.00 0.00 0.00
08.02.04 RELLENO CON MATERIAL SELECIONADO M3 3.78 7.92 29.94 3.78 29.94 100.00 0.00 0.00 3.78 29.94 100.00 0.00 0.00 0.00
08.02.05 ELIMINACION MATERIAL EXCEDENTE M3 30.88 6.56 202.57 30.88 202.57 100.00 0.00 0.00 30.88 202.57 100.00 0.00 0.00 0.00
08.03 CONCRETO SIMPLE
08.03.01 COCRETO CICLOPIO F'C = 140 KG/CM2 + 30% PM M3 4.80 173.72 833.86 4.80 833.86 100.00 0.00 0.00 4.80 833.86 100.00 0.00 0.00 0.00
08.03.02 ENCOFRADO Y DESENCOFREDO DE LOSA M2 12.16 30.85 375.14 12.16 375.14 100.00 0.00 0.00 12.16 375.14 100.00 0.00 0.00 0.00
08.03.03 CONCRETO F'C = 175 KG/CM2. PARA LOSA M3 70.53 319.00 22,499.07 70.53 22,499.07 100.00 0.00 0.00 70.53 22,499.07 100.00 0.00 0.00 0.00
08.03.04 CONCRETO F'C = 140 KG/CM2 M3 2.95 280.05 826.15 2.95 826.15 100.00 0.00 0.00 2.95 826.15 100.00 0.00 0.00 0.00
08.04 CONCRETO ARMADO
08.04.01 ASTAS DE BANDERA
08.04.01.01 CONCRETO F'C=210 KG/CM2 M3 2.68 383.17 1,026.90 2.68 1,026.90 100.00 0.00 0.00 2.68 1,026.90 100.00 0.00 0.00 0.00
08.04.01.02 ENCOFRADO Y DESENCOFRADO M2 6.50 46.95 305.18 6.50 305.18 100.00 0.00 0.00 6.50 305.18 100.00 0.00 0.00 0.00
08.04.01.03 ACERO GRADO 60 KG 18.95 5.14 97.40 18.95 97.40 100.00 0.00 0.00 18.95 97.40 100.00 0.00 0.00 0.00
08.04.02 ZAPATAS
08.04.02.01 CONCRETO EN ZAPATAS F'C=210 KG/CM2 M3 6.00 335.04 2,010.24 6.00 2,010.24 100.00 0.00 0.00 6.00 2,010.24 100.00 0.00 0.00 0.00
08.04.02.02 ACERO GRADO 60 EN ZAPATAS KG 142.99 4.68 669.19 142.99 669.19 100.00 0.00 0.00 142.99 669.19 100.00 0.00 0.00 0.00
08.04.03 COLUMNAS 0.00
08.04.03.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 5.80 413.53 2,398.47 5.80 2,398.47 100.00 0.00 0.00 5.80 2,398.47 100.00 0.00 0.00 0.00
08.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 77.83 41.04 3,194.14 77.83 3,194.14 100.00 0.00 0.00 77.83 3,194.14 100.00 0.00 0.00 0.00
08.04.03.03 ACERO GRADO 60 EN COLUMNAS KG 740.05 4.44 3,285.82 740.05 3,285.82 100.00 0.00 0.00 740.05 3,285.82 100.00 0.00 0.00 0.00
08.04.04 VIGAS
08.04.04.01 CONCRETO EN VIGAS F'C=210 KG/CM2 M3 5.80 344.40 1,997.52 5.80 1,997.52 100.00 0.00 0.00 5.80 1,997.52 100.00 0.00 0.00 0.00

Valorización N° 06 Patio De Formación 22de38


08.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 77.83 39.23 3,053.27 77.83 3,053.27 100.00 0.00 0.00 77.83 3,053.27 100.00 0.00 0.00 0.00
08.04.04.03 ACERO GRADO 60 EN VIGAS KG 568.33 4.32 2,455.19 568.33 2,455.19 100.00 0.00 0.00 568.33 2,455.19 100.00 0.00 0.00 0.00
08.05 REVOQUES, ENLUCIDOS Y MOLDURAS
08.05.01 TARRAJEO EXTERIORES C/MORTERO 1:5 E=1.5CM M2 151.43 25.64 3,882.67 151.43 3,882.67 100.00 0.00 0.00 151.43 3,882.67 100.00 0.00 0.00 0.00
08.05.02 JUNTAS ASFALTICAS M 313.84 10.51 3,298.46 313.84 3,298.46 100.00 0.00 0.00 313.84 3,298.46 100.00 0.00 0.00 0.00
08.06 CARPINTERIA METALICA
08.06.01 TIJERAL METALICO SEGÚN DISEÑO L=14.70M PZA 6.00 1,273.13 7,638.78 6.00 7,638.78 100.00 0.00 0.00 6.00 7,638.78 100.00 0.00 0.00 0.00
08.06.02 CORREAS METALICAS M 202.80 15.86 3,216.41 202.80 3,216.41 100.00 0.00 0.00 202.80 3,216.41 100.00 0.00 0.00 0.00
08.06.03 VIGAS METALICAS LONGITUDINALES SEGÚN DISEÑO (TIPO I) PZA 1.00 1,652.96 1,652.96 1.00 1,652.96 100.00 0.00 0.00 1.00 1,652.96 100.00 0.00 0.00 0.00
08.06.04 VIGAS METALICAS LONGITUDINALES SEGÚN DISEÑO (TIPO II PZA 2.00 3,564.13 7,128.26 2.00 7,128.26 100.00 0.00 0.00 2.00 7,128.26 100.00 0.00 0.00 0.00
08.06.05 REJILLA METALICO SEGÚN DISEÑO M 54.60 134.57 7,347.52 54.60 7,347.52 100.00 0.00 0.00 54.60 7,347.52 100.00 0.00 0.00 0.00
08.06.06 MARCO Y TAPA PLANCHA LAC 1/4" C/MECANISM. DE SEG. S/ UND 109.20 96.94 10,585.85 109.20 10,585.85 100.00 0.00 0.00 109.20 10,585.85 100.00 0.00 0.00 0.00
08.06.07 ASTA DE BANDERA UND 1.00 850.00 850.00 1.00 850.00 100.00 0.00 0.00 1.00 850.00 100.00 0.00 0.00 0.00
08.07 INSTALACION Y MONTAJE
08.07.01 MONTAJE DE ESTRUCTURA METALICA UND 6.00 638.57 3,831.42 6.00 3,831.42 100.00 0.00 0.00 6.00 3,831.42 100.00 0.00 0.00 0.00
08.07.02 PINTURA ANTICORROSIVO EN CARPINTERIA METALICA M2 156.33 6.35 992.70 156.33 992.70 100.00 0.00 0.00 156.33 992.70 100.00 0.00 0.00 0.00
08.08 COBERTURA
08.08.01 COBERTURA CON POLICARBONATO M2 542.51 32.45 17,604.45 542.51 17,604.45 100.00 0.00 0.00 542.51 17,604.45 100.00 0.00 0.00 0.00
08.09 DRENAJE PLUVIAL
08.09.01 RED DE DERIVACION PVC SAL PARA DESAGUE DE 4" ML 12.90 11.32 146.03 12.90 146.03 100.00 0.00 0.00 12.90 146.03 100.00 0.00 0.00 0.00
08.09.02 CODO 90° PVC SAL DE 4" X 90° PZA 30.00 16.07 482.10 30.00 482.10 100.00 0.00 0.00 30.00 482.10 100.00 0.00 0.00 0.00
08.10 PINTURA
08.10.01 PINTURA ANTICORROSIVO EN CARPINTERIA METALICA M2 156.33 6.35 992.70 156.33 992.70 100.00 0.00 0.00 156.33 992.70 100.00 0.00 0.00 0.00

COSTO DIRECTO 118,460.67 118,460.67 100.00 0.00 0.00 118,460.67 100.00 0.00 0.00

Valorización N° 06 Patio De Formación 23de38


MUNICIPALIDAD PROVINCIAL DE VILCAS HUAMAN

VALORIZACIÓN DE OBRA N° 06
Correspondiente Mes Diciembre 2017

PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO

EN EL CENTRO POBLADO DE POMACOCHA , DISTRITO DE VISCHONGO, PROVINCIA DE VILC AS HUAMAN - AYACUICHO"

CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Ing° GABRIEL ALFONSO GUZMAN MANRIQUE SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONT ADELANT DIRECTO : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : DICIEMBRE 2017
MONTO ADELANTO MAT : S/. 613,461.40 (CON IGV) S/. 519,882.54 (SIN IGV)
META FISICA: CONSTRUCCION DE EDIFICACION

AVANCES
P. UNITARIO
CODIGO DESCRIPCION UND METRADO P. PARCIAL (S/.) ANTERIOR ACTUAL ACUMULADO SALDO
(S/.)
METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %

09 LOSA DEPORTIVA CON CUBIERTA DE POLICARBONATO


09.01 TRABAJOS PRELIMINARES
09.01.01 LIMPIEZA DE TERRENO MANUAL M2 991.57 0.66 654.44 991.57 654.44 100.00 0.00 0.00 991.57 654.44 100.00 0.00 0.00 0.00
09.01.02 TRAZO Y REPLANTEO M2 991.57 2.24 2,221.12 991.57 2,221.12 100.00 0.00 0.00 991.57 2,221.12 100.00 0.00 0.00 0.00
09.02 MOVIMIENTO DE TIERRAS
09.02.01 REFINE Y NIVELACION EN TERRENO NORMAL M2 991.57 2.55 2,528.50 991.57 2,528.50 100.00 0.00 0.00 991.57 2,528.50 100.00 0.00 0.00 0.00
09.02.02 EXCAVACION PARA ZAPATAS DE 1.00M A 1.40M DE PROFUND M3 24.30 24.36 591.95 24.30 591.95 100.00 0.00 0.00 24.30 591.95 100.00 0.00 0.00 0.00
09.02.03 EXCAVACION M3 9.36 20.60 192.82 9.36 192.82 100.00 0.00 0.00 9.36 192.82 100.00 0.00 0.00 0.00
09.02.04 EXCAVACION PARA CIMIENTOS HASTA 1.00 M DE PROFUNDI M3 64.37 15.23 980.36 64.37 980.36 100.00 0.00 0.00 64.37 980.36 100.00 0.00 0.00 0.00
09.02.05 RELLENO CON MATERIAL SELECIONADO M3 5.67 7.92 44.91 5.67 44.91 100.00 0.00 0.00 5.67 44.91 100.00 0.00 0.00 0.00
09.02.06 ELIMINACION MATERIAL EXCEDENTE M3 115.45 6.56 757.35 115.45 757.35 100.00 0.00 0.00 115.45 757.35 100.00 0.00 0.00 0.00
09.03 CONCRETO SIMPLE
09.03.01 COCRETO CICLOPIO F'C = 140 KG/CM2 + 30% PM M3 7.20 173.72 1,250.78 7.20 1,250.78 100.00 0.00 0.00 7.20 1,250.78 100.00 0.00 0.00 0.00
09.03.02 ENCOFRADO Y DESENCOFRADO DE LOSA M2 17.10 30.85 527.54 17.10 527.54 100.00 0.00 0.00 17.10 527.54 100.00 0.00 0.00 0.00
09.03.03 ENCOFRADO Y DESENCOFRADO CANALES M2 14.40 39.12 563.33 14.40 563.33 100.00 0.00 0.00 14.40 563.33 100.00 0.00 0.00 0.00
09.03.04 ENCOFRADO Y DESENCOFREDO DE MURO DE CONTENCION M2 188.40 61.64 11,612.98 188.40 11,612.98 100.00 0.00 0.00 188.40 11,612.98 100.00 0.00 0.00 0.00
09.03.05 CONCRETO F'C = 140 KG/CM2 CANAL PLUVIAL M3 4.21 267.83 1,127.56 4.21 1,127.56 100.00 0.00 0.00 4.21 1,127.56 100.00 0.00 0.00 0.00
09.03.06 CONCRETO 1:10 + 30% P. G. PARA CIMIENTOS CORRIDOS M3 64.37 179.54 11,556.99 64.37 11,556.99 100.00 0.00 0.00 64.37 11,556.99 100.00 0.00 0.00 0.00
09.03.07 MURO DE CONTENCION DE PIEDRA GRANDE D 8" M3 113.04 101.29 11,449.82 113.04 11,449.82 100.00 0.00 0.00 113.04 11,449.82 100.00 0.00 0.00 0.00
09.03.08 CONCRETO F'C = 175 KG/CM2. PARA LOSA M3 113.39 319.00 36,171.41 113.39 36,171.41 100.00 0.00 0.00 113.39 36,171.41 100.00 0.00 0.00 0.00
09.04 CONCRETO ARMADO
09.04.01 ZAPATAS
09.04.01.01 CONCRETO EN ZAPATAS F'C=210 KG/CM2 M3 9.00 335.04 3,015.36 9.00 3,015.36 100.00 0.00 0.00 9.00 3,015.36 100.00 0.00 0.00 0.00
09.04.01.02 ACERO GRADO 60 EN ZAPATAS KG 214.49 4.68 1,003.81 214.49 1,003.81 100.00 0.00 0.00 214.49 1,003.81 100.00 0.00 0.00 0.00
09.04.02 COLUMNAS
09.04.02.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 8.69 413.53 3,593.58 8.69 3,593.58 100.00 0.00 0.00 8.69 3,593.58 100.00 0.00 0.00 0.00
09.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 116.75 41.04 4,791.42 116.75 4,791.42 100.00 0.00 0.00 116.75 4,791.42 100.00 0.00 0.00 0.00
09.04.02.03 ACERO GRADO 60 EN COLUMNAS KG 1,105.57 4.44 4,908.73 1,105.57 4,908.73 100.00 0.00 0.00 1,105.57 4,908.73 100.00 0.00 0.00 0.00
09.04.03 VIGAS
09.04.03.01 CONCRETO EN VIGAS F'C=210 KG/CM2 M3 9.02 344.40 3,106.49 9.02 3,106.49 100.00 0.00 0.00 9.02 3,106.49 100.00 0.00 0.00 0.00
09.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 120.32 39.23 4,720.15 120.32 4,720.15 100.00 0.00 0.00 120.32 4,720.15 100.00 0.00 0.00 0.00

Valorización N° 06 Losa Depotiva 24de38


09.04.03.03 ACERO GRADO 60 EN VIGAS KG 909.34 4.32 3,928.35 909.34 3,928.35 100.00 0.00 0.00 909.34 3,928.35 100.00 0.00 0.00 0.00
09.05 REVOQUES, ENLUCIDOS Y MOLDURAS
09.05.01 TARRAJEO EXTERIORES C/MORTERO 1:5 X 1.5CM M2 237.07 25.64 6,078.47 237.07 6,078.47 100.00 0.00 0.00 237.07 6,078.47 100.00 0.00 0.00 0.00
09.05.02 REVESTIMIENTO GRADAS C/MORTERO 1:4 X 2CM. PULIDO 1:2 M 207.24 27.62 5,723.97 207.24 5,723.97 100.00 0.00 0.00 207.24 5,723.97 100.00 0.00 0.00 0.00
09.05.03 JUNTAS ASFALTICAS M 313.84 10.51 3,298.46 313.84 3,298.46 100.00 0.00 0.00 313.84 3,298.46 100.00 0.00 0.00 0.00
09.06 CARPINTERIA METALICA
09.06.01 TIJERAL METALICO SEGÚN DISEÑO L=30.97M PZA 9.00 3,900.12 35,101.08 9.00 35,101.08 100.00 0.00 0.00 9.00 35,101.08 100.00 0.00 0.00 0.00
09.06.02 CORREAS METALICAS M 755.28 15.86 11,978.74 755.28 11,978.74 100.00 0.00 0.00 755.28 11,978.74 100.00 0.00 0.00 0.00
09.06.03 VIGAS METALICAS LONGITUDINALES SEGÚN DISEÑO (TIPO I) PZA 1.00 1,652.96 1,652.96 1.00 1,652.96 100.00 0.00 0.00 1.00 1,652.96 100.00 0.00 0.00 0.00
09.06.04 VIGAS METALICAS LONGITUDINALES SEGÚN DISEÑO (TIPO II PZA 2.00 3,564.13 7,128.26 2.00 7,128.26 100.00 0.00 0.00 2.00 7,128.26 100.00 0.00 0.00 0.00
09.06.05 REJILLA METALICO SEGÚN DISEÑO M 72.00 134.57 9,689.04 72.00 9,689.04 100.00 0.00 0.00 72.00 9,689.04 100.00 0.00 0.00 0.00
09.06.06 MARCO Y TAPA PLANCHA LAC 1/4" C/MECANISM. DE SEG. S/ UND 144.00 96.94 13,959.36 144.00 13,959.36 100.00 0.00 0.00 144.00 13,959.36 100.00 0.00 0.00 0.00
09.07 INSTALACION Y MONTAJE
09.07.01 MONTAJE DE ESTRUCTURA METALICA UND 9.00 638.57 5,747.13 9.00 5,747.13 100.00 0.00 0.00 9.00 5,747.13 100.00 0.00 0.00 0.00
09.07.02 PINTURA ANTICORROSIVO EN CARPINTERIA METALICA M2 215.24 6.35 1,366.77 215.24 1,366.77 100.00 0.00 0.00 215.24 1,366.77 100.00 0.00 0.00 0.00
09.08 COBERTURA
09.08.01 COBERTURA CON POLICARBONATO M2 991.57 32.45 32,176.45 991.57 32,176.45 100.00 0.00 0.00 991.57 32,176.45 100.00 0.00 0.00 0.00
09.09 DRENAJE PLUVIAL
09.09.01 RED DE DERIVACION PVC SAL PARA DESAGUE DE 4" ML 12.90 11.32 146.03 12.90 146.03 100.00 0.00 0.00 12.90 146.03 100.00 0.00 0.00 0.00
09.09.02 CODO 90° PVC SAL DE 4" X 90° PZA 30.00 16.07 482.10 30.00 482.10 100.00 0.00 0.00 30.00 482.10 100.00 0.00 0.00 0.00
09.10 PINTURA
09.10.01 PINTADO DE DELIMITACION DE LOSA M 310.24 1.29 400.21 310.24 400.21 100.00 0.00 0.00 310.24 400.21 100.00 0.00 0.00 0.00
09.10.02 PINTURA EN COLUMNAS C/LATEX LAVABLE M2 129.01 7.52 970.16 129.01 970.16 100.00 0.00 0.00 129.01 970.16 100.00 0.00 0.00 0.00
09.11 EQUIPAMIENTO
09.11.01 ARCOS CON TABLERO PARA BASQUET INCL. INSTALACION UND 2.00 1,500.00 3,000.00 2.00 3,000.00 100.00 0.00 0.00 2.00 3,000.00 100.00 0.00 0.00 0.00
09.11.02 POSTES PARA VOLEY UND 1.00 850.00 850.00 1.00 850.00 100.00 0.00 0.00 1.00 850.00 100.00 0.00 0.00 0.00

COSTO DIRECTO 251,048.94 251,048.94 100.00 0.00 0.00 251,048.94 100.00 0.00 0.00

Valorización N° 06 Losa Depotiva 25de38


MUNICIPALIDAD PROVINCIAL DE VILCAS HUAMAN

VALORIZACIÓN DE OBRA N° 06
Correspondiente Mes Diciembre 2017

PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO

EN EL CENTRO POBLADO DE POMACOCHA , DISTRITO DE VISCHONGO, PROVINCIA DE VILC AS HUAMAN - AYACUICHO"

CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Ing° GABRIEL ALFONSO GUZMAN MANRIQUE SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONT ADELANT DIRECTO : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : DICIEMBRE 2017
MONTO ADELANTO MAT : S/. 613,461.40 (CON IGV) S/. 519,882.54 (SIN IGV)
META FISICA: CONSTRUCCION DE EDIFICACION

AVANCES
P. UNITARIO
CODIGO DESCRIPCION UND METRADO P. PARCIAL (S/.) ANTERIOR ACTUAL ACUMULADO SALDO
(S/.)
METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %

10 CONTRUCCION DE CISTERNA (12M3) Y TANQUE ELEVADO (5.5 M3)


10.01 TRABAJOS PRELIMINARES
10.01.01 LIMPIEZA DE TERRENO MANUAL M2 6.15 0.66 4.06 6.15 4.06 100.00 0.00 0.00 6.15 4.06 100.00 0.00 0.00 0.00
10.01.02 TRAZO Y REPLANTEO M2 6.15 2.24 13.78 6.15 13.78 100.00 0.00 0.00 6.15 13.78 100.00 0.00 0.00 0.00
10.02 MOVIMIENTO DE TIERRAS
10.02.01 REFINE Y NIVELACION EN TERRENO NORMAL M2 6.15 2.55 15.68 6.15 15.68 100.00 0.00 0.00 6.15 15.68 100.00 0.00 0.00 0.00
10.02.02 EXCAVACION M3 29.70 20.60 611.82 29.70 611.82 100.00 0.00 0.00 29.70 611.82 100.00 0.00 0.00 0.00
10.02.03 EXCAVACION PARA ZAPATAS DE 1.00M A 1.90M DE PROFUND M3 9.26 24.36 225.57 9.26 225.57 100.00 0.00 0.00 9.26 225.57 100.00 0.00 0.00 0.00
10.02.04 EXCAVACION PARA CIMIENTOS HASTA 1.00MT TERRENO NO M3 2.38 13.13 31.25 2.38 31.25 100.00 0.00 0.00 2.38 31.25 100.00 0.00 0.00 0.00
10.02.05 RELLENO CON MATERIAL PROPIO M3 3.61 16.65 60.11 3.61 60.11 100.00 0.00 0.00 3.61 60.11 100.00 0.00 0.00 0.00
10.02.06 ELIMINACION MATERIAL EXCEDENTE M3 47.59 6.56 312.19 47.59 312.19 100.00 0.00 0.00 47.59 312.19 100.00 0.00 0.00 0.00
10.03 CONCRETO SIMPLE
10.03.01 SOLADO DE 4" MESCLA 1:12 CEMENTO - HORMIGON M2 4.41 89.39 394.21 4.41 394.21 100.00 0.00 0.00 4.41 394.21 100.00 0.00 0.00 0.00
10.03.02 CIMIENTOS CORRIDOS MESCLA 1:10 + 30%(CEMENTO-HORMI M3 2.40 170.48 409.15 2.40 409.15 100.00 0.00 0.00 2.40 409.15 100.00 0.00 0.00 0.00
10.03.03 ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE 0.30 A 0.60 M2 2.56 24.75 63.36 2.56 63.36 100.00 0.00 0.00 2.56 63.36 100.00 0.00 0.00 0.00
10.03.04 CONCRETO SOBRECIMIENTO DE 1:8 CEM - HOR 25% P. M. AN M3 0.64 225.77 144.49 0.64 144.49 100.00 0.00 0.00 0.64 144.49 100.00 0.00 0.00 0.00
10.04 CONCRETO ARMADO
10.04.01 CISTERNA
10.04.01.01 CONCRETO F'C=210 KG/CM2 M3 10.87 383.17 4,165.06 10.87 4,165.06 100.00 0.00 0.00 10.87 4,165.06 100.00 0.00 0.00 0.00
10.04.01.02 ENCOFRADO Y DESENCOFRADO M2 40.32 46.95 1,893.02 40.32 1,893.02 100.00 0.00 0.00 40.32 1,893.02 100.00 0.00 0.00 0.00
10.04.01.03 ACERO GRADO 60 KG 546.04 5.14 2,806.65 546.04 2,806.65 100.00 0.00 0.00 546.04 2,806.65 100.00 0.00 0.00 0.00
10.04.02 ZAPATAS
10.04.02.01 CONCRETO EN ZAPATAS F'C=210 KG/CM2 M3 3.09 335.04 1,035.27 3.09 1,035.27 100.00 0.00 0.00 3.09 1,035.27 100.00 0.00 0.00 0.00
10.04.02.02 ACERO GRADO 60 EN ZAPATAS KG 47.08 4.68 220.33 47.08 220.33 100.00 0.00 0.00 47.08 220.33 100.00 0.00 0.00 0.00
10.04.03 COLUMNAS
10.04.03.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 8.96 413.53 3,705.23 8.96 3,705.23 100.00 0.00 0.00 8.96 3,705.23 100.00 0.00 0.00 0.00
10.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 89.60 41.04 3,677.18 89.60 3,677.18 100.00 0.00 0.00 89.60 3,677.18 100.00 0.00 0.00 0.00
10.04.03.03 ACERO GRADO 60 EN COLUMNAS KG 1,258.51 4.44 5,587.78 1,258.51 5,587.78 100.00 0.00 0.00 1,258.51 5,587.78 100.00 0.00 0.00 0.00
10.04.04 VIGAS
10.04.04.01 CONCRETO EN VIGAS F'C=210 KG/CM2 M3 2.30 344.40 792.12 2.30 792.12 100.00 0.00 0.00 2.30 792.12 100.00 0.00 0.00 0.00

Valorización N° 06 Cisterna Tanque Alto 26de38


10.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 21.12 39.23 828.54 21.12 828.54 100.00 0.00 0.00 21.12 828.54 100.00 0.00 0.00 0.00
10.04.04.03 ACERO GRADO 60 EN VIGAS KG 346.79 4.32 1,498.13 346.79 1,498.13 100.00 0.00 0.00 346.79 1,498.13 100.00 0.00 0.00 0.00
10.04.05 LOSAS MACIZA
10.04.05.01 CONCRETO EN LOSAS MACIZA F'C=210 KG/CM2 M3 2.30 379.75 873.43 2.30 873.43 100.00 0.00 0.00 2.30 873.43 100.00 0.00 0.00 0.00
10.04.05.02 ENCOFRADO Y DESENCOFRADO EN LOSAS MACIZA M2 1.92 53.13 102.01 1.92 102.01 100.00 0.00 0.00 1.92 102.01 100.00 0.00 0.00 0.00
10.04.05.03 ACERO GRADO 60 EN LOSAS MACIZA KG 67.44 3.82 257.62 67.44 257.62 100.00 0.00 0.00 67.44 257.62 100.00 0.00 0.00 0.00
10.04.06 LOSAS MACIZA
10.04.06.01 CONCRETO F'C=210 KG/CM2 M3 4.32 383.17 1,655.29 4.32 1,655.29 100.00 0.00 0.00 4.32 1,655.29 100.00 0.00 0.00 0.00
10.04.06.02 ENCOFRADO Y DESENCOFRADO M2 29.76 46.95 1,397.23 29.76 1,397.23 100.00 0.00 0.00 29.76 1,397.23 100.00 0.00 0.00 0.00
10.04.06.03 ACERO GRADO 60 KG 194.26 5.14 998.50 194.26 998.50 100.00 0.00 0.00 194.26 998.50 100.00 0.00 0.00 0.00
10.05 ALBAÑELERIA
10..05.01 MURO DE SOGA LADRILLO CORRIENTE CON CEMENTO - ARE M2 78.40 54.67 4,286.13 78.40 4,286.13 100.00 0.00 0.00 78.40 4,286.13 100.00 0.00 0.00 0.00
10.06 REVOQUES, ENLUCIDOS Y MOLDURAS
10.06.01 TARRAJEO EN INTERIORES Y EXTERIORES MESCLA 1:5 E=1.5 M2 78.40 26.36 2,066.62 78.40 2,066.62 100.00 0.00 0.00 78.40 2,066.62 100.00 0.00 0.00 0.00
10.06.02 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO - A M2 89.60 17.97 1,610.11 89.60 1,610.11 100.00 0.00 0.00 89.60 1,610.11 100.00 0.00 0.00 0.00
10.06.03 TARRAJEO EN SUPERFICIE Y ARISTAS DE VIGAS CON CEMEN M2 21.12 21.15 446.69 21.12 446.69 100.00 0.00 0.00 21.12 446.69 100.00 0.00 0.00 0.00
10.06.04 VESTIDURA DE DERRAMES CON MEZCLA 1:5 (CEMENTO - ARE ML 6.01 7.46 44.83 6.01 44.83 100.00 0.00 0.00 6.01 44.83 100.00 0.00 0.00 0.00
10.06.05 TARRAJEO EN CIELORRASO CON C:A - 1:5 E=1.5 CM M2 15.60 43.68 681.41 15.60 681.41 100.00 0.00 0.00 15.60 681.41 100.00 0.00 0.00 0.00
10.06.06 BRUÑAS ML 76.40 1.68 128.35 76.40 128.35 100.00 0.00 0.00 76.40 128.35 100.00 0.00 0.00 0.00
10.07 PISOS Y PAVIMENTOS
10.07.01 NIVELACION Y COMPACTACION DE PISO M2 6.15 2.00 12.30 6.15 12.30 100.00 0.00 0.00 6.15 12.30 100.00 0.00 0.00 0.00
10.07.02 FALSO PISO DE 4" DE CONCRETO DE 1:10 M2 5.45 13.66 74.45 5.45 74.45 100.00 0.00 0.00 5.45 74.45 100.00 0.00 0.00 0.00
10.07.03 PISO DE CEMENTO PULIDO, COLOREADO Y BRUÑADO E = 1.0 M2 5.45 7.26 39.57 5.45 39.57 100.00 0.00 0.00 5.45 39.57 100.00 0.00 0.00 0.00
10.07.04 ENCOFRADO Y DESENCOFRADO M2 0.99 46.95 46.48 0.99 46.48 100.00 0.00 0.00 0.99 46.48 100.00 0.00 0.00 0.00
10.07.05 VEREDA DE CONCRETO DE 4" M2 0.07 53.27 3.73 0.07 3.73 100.00 0.00 0.00 0.07 3.73 100.00 0.00 0.00 0.00
10.07.06 JUNTAS ASFALTICAS M 2.70 10.51 28.38 2.70 28.38 100.00 0.00 0.00 2.70 28.38 100.00 0.00 0.00 0.00
10.08 ZOCALOS Y CONTRAZOCALOS
10.08.01 CONTRAZOCALO CEMENTO S/COLOREAR H =20 CM M 9.92 6.79 67.36 9.92 67.36 100.00 0.00 0.00 9.92 67.36 100.00 0.00 0.00 0.00
10.09 CARPINTERIA METALICA
10.09.01 PUERTA METAL LAC 1/16" C/MARCO 2" X 2" X 1/4" Y REFUERZ M2 1.20 354.69 425.63 1.20 425.63 100.00 0.00 0.00 1.20 425.63 100.00 0.00 0.00 0.00
10.09.02 ESCALERA TUB. F. GVZDO. C/PARANTES DE 2" X PELDAÑOS DE M 14.00 109.77 1,536.78 14.00 1,536.78 100.00 0.00 0.00 14.00 1,536.78 100.00 0.00 0.00 0.00
10.10 CERRAJERIA
10.10.01 CERRADURA DE TRES GOLPES PZA 1.00 103.38 103.38 1.00 103.38 100.00 0.00 0.00 1.00 103.38 100.00 0.00 0.00 0.00
10.10.02 MANIJA DE BRONCE DE 4" PARA PUERTAS UND 1.00 17.63 17.63 1.00 17.63 100.00 0.00 0.00 1.00 17.63 100.00 0.00 0.00 0.00
10.11 PINTURA
10.11.01 PINTURA EN EXTERIORES INTERIORES C/LATEX SUPERMATE M2 189.12 8.81 1,666.15 189.12 1,666.15 100.00 0.00 0.00 189.12 1,666.15 100.00 0.00 0.00 0.00
10.11.02 PINTURA ANTICORROSIVO EN CARPINTERIA METALICA M2 1.33 6.35 8.45 1.33 8.45 100.00 0.00 0.00 1.33 8.45 100.00 0.00 0.00 0.00
10.12 VARIOS
10.12.01 PRUEBA DE CALIDAD DEL CONCRETO ( PRUEBA A LA COMPR UND 5.00 45.00 225.00 5.00 225.00 100.00 0.00 0.00 5.00 225.00 100.00 0.00 0.00 0.00
10.12.02 LIMPIEZA GENERAL M2 6.15 1.31 8.06 6.15 8.06 100.00 0.00 0.00 6.15 8.06 100.00 0.00 0.00 0.00
10.13 INSTALACIONES ELECTRICAS
10.13.01 SALIDA DE CENTROS DE LUZ PTO 1.00 24.64 24.64 1.00 24.64 100.00 0.00 0.00 1.00 24.64 100.00 0.00 0.00 0.00
10.13.02 SALIDA PARA TOMACORRIENTES BIPOLARES PTO 1.00 37.82 37.82 1.00 37.82 100.00 0.00 0.00 1.00 37.82 100.00 0.00 0.00 0.00
10.13.03 SALIDA PARA INTERRUPTOR PTO 1.00 24.26 24.26 1.00 24.26 100.00 0.00 0.00 1.00 24.26 100.00 0.00 0.00 0.00
10.13.04 TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA UND 1.00 489.00 489.00 1.00 489.00 100.00 0.00 0.00 1.00 489.00 100.00 0.00 0.00 0.00
10.13.05 FLOURECENTE RECTO 2 40 WATT INCLUENDO EQUIPO Y PAN EQP 1.00 45.06 45.06 1.00 45.06 100.00 0.00 0.00 1.00 45.06 100.00 0.00 0.00 0.00
10.13.06 CAJA DE PASE UND 1.00 15.26 15.26 1.00 15.26 100.00 0.00 0.00 1.00 15.26 100.00 0.00 0.00 0.00
10.14 INSTALACIONES DE AGUA
10.14.01 TUBO F°G° DE 4" M 6.00 63.68 382.08 6.00 382.08 100.00 0.00 0.00 6.00 382.08 100.00 0.00 0.00 0.00

Valorización N° 06 Cisterna Tanque Alto 27de38


10.14.02 TUBO F°G° DE 2" M 21.30 35.33 752.53 21.30 752.53 100.00 0.00 0.00 21.30 752.53 100.00 0.00 0.00 0.00
10.14.03 TUBO F°G° DE 1 1/2" M 30.23 30.08 909.32 30.23 909.32 100.00 0.00 0.00 30.23 909.32 100.00 0.00 0.00 0.00
10.14.04 TUBERIA PVC SAL 2" M 6.00 11.79 70.74 6.00 70.74 100.00 0.00 0.00 6.00 70.74 100.00 0.00 0.00 0.00
10.14.05 TUBO F°G° DE 3/4" M 6.00 30.08 180.48 6.00 180.48 100.00 0.00 0.00 6.00 180.48 100.00 0.00 0.00 0.00
10.14.06 VALVULA COMPUERTA 2" UND 1.00 116.31 116.31 1.00 116.31 100.00 0.00 0.00 1.00 116.31 100.00 0.00 0.00 0.00
10.14.07 VALVULA COMPUERTA 1 1/2" UND 1.00 55.73 55.73 1.00 55.73 100.00 0.00 0.00 1.00 55.73 100.00 0.00 0.00 0.00
10.14.08 VALVULA COMPUERTA DE BRONCE DE UNION ROSCADA DE 3/ PZA 1.00 73.03 73.03 1.00 73.03 100.00 0.00 0.00 1.00 73.03 100.00 0.00 0.00 0.00
10.14.09 VALVULA CHECK DE 1" UND 3.00 55.56 166.68 3.00 166.68 100.00 0.00 0.00 3.00 166.68 100.00 0.00 0.00 0.00
10.14.10 VALVULA FLOTADORA DE 1" PARA CISTERNA O TANQUE ELE UND 1.00 33.68 33.68 1.00 33.68 100.00 0.00 0.00 1.00 33.68 100.00 0.00 0.00 0.00
10.14.11 ELECTROBOMBA DE 1HP UND 1.00 24.29 24.29 1.00 24.29 100.00 0.00 0.00 1.00 24.29 100.00 0.00 0.00 0.00
10.14.12 TAPA METALICA PARA CAJA DE VALVULA DE 0.90 * 0.75 M UND 2.00 155.00 310.00 2.00 310.00 100.00 0.00 0.00 2.00 310.00 100.00 0.00 0.00 0.00
10.14.13 REBOSE TUBO DE F°G° DE 4" M 1.00 9.73 9.73 1.00 9.73 100.00 0.00 0.00 1.00 9.73 100.00 0.00 0.00 0.00
10.14.14 REBOSE TUBO DE F°G° DE 2" UND 1.00 9.73 9.73 1.00 9.73 100.00 0.00 0.00 1.00 9.73 100.00 0.00 0.00 0.00
10.14.15 ABRAZADERA DE 1" DE PLANCHA METALICA CON TUERCAS Y UND 15.00 6.48 97.20 15.00 97.20 100.00 0.00 0.00 15.00 97.20 100.00 0.00 0.00 0.00

COSTO DIRECTO 51,134.12 51,134.12 100.00 0.00 0.00 51,134.12 100.00 0.00 0.00

Valorización N° 06 Cisterna Tanque Alto 28de38


MUNICIPALIDAD PROVINCIAL DE VILCAS HUAMAN

VALORIZACIÓN DE OBRA N° 06
Correspondiente Mes Diciembre 2017

PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO

EN EL CENTRO POBLADO DE POMACOCHA , DISTRITO DE VISCHONGO, PROVINCIA DE VILC AS HUAMAN - AYACUICHO"

CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Ing° GABRIEL ALFONSO GUZMAN MANRIQUE SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONT ADELANT DIRECTO : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : DICIEMBRE 2017
MONTO ADELANTO MAT : S/. 613,461.40 (CON IGV) S/. 519,882.54 (SIN IGV)
META FISICA: CONSTRUCCION DE EDIFICACION

AVANCES
P. UNITARIO
CODIGO DESCRIPCION UND METRADO P. PARCIAL (S/.) ANTERIOR ACTUAL ACUMULADO SALDO
(S/.)
METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %

11 CERCO PERIMETRICO
11.01 TRABAJOS PRELIMINARES
11.01.01 DEMOLICION DE MUROS DE ADOBE M3 197.40 6.56 1,294.94 197.40 1,294.94 100.00 0.00 0.00 197.40 1,294.94 100.00 0.00 0.00 0.00
11.01.02 ELIMINACION DE DESMONTE, PROV. POR DEMOLICION M3 197.40 22.08 4,358.59 197.40 4,358.59 100.00 0.00 0.00 197.40 4,358.59 100.00 0.00 0.00 0.00
11.01.03 TRAZO Y REPLANTEO M2 173.55 2.24 388.75 173.55 388.75 100.00 0.00 0.00 173.55 388.75 100.00 0.00 0.00 0.00
11.02 MOVIMIENTO DE TIERRAS
11.02.01 EXCAVACION PARA ZAPATAS DE 1.00M A 1.90M DE PROFUND M3 90.16 24.36 2,196.30 90.16 2,196.30 100.00 0.00 0.00 90.16 2,196.30 100.00 0.00 0.00 0.00
11.02.02 EXCAVACION PARA CIMIENTOS HASTA 1.00MT TERRENO NO M3 198.36 13.13 2,604.47 198.36 2,604.47 100.00 0.00 0.00 198.36 2,604.47 100.00 0.00 0.00 0.00
11.02.03 RELLENO CON MATERIAL PROPIO M3 123.08 16.65 2,049.28 123.08 2,049.28 100.00 0.00 0.00 123.08 2,049.28 100.00 0.00 0.00 0.00
11.02.04 ELIMINACION MATERIAL EXCEDENTE M3 165.44 6.56 1,085.29 165.44 1,085.29 100.00 0.00 0.00 165.44 1,085.29 100.00 0.00 0.00 0.00
11.03 CONCRETO SIMPLE
11.03.01 SOLADO DE 4" MESCLA 1:12 CEMENTO - HORMIGON M2 56.35 89.39 5,037.13 56.35 5,037.13 100.00 0.00 0.00 56.35 5,037.13 100.00 0.00 0.00 0.00
11.03.02 CONCRETO F'C = 175 KG/CM2. PARA ZAPATAS M3 78.89 326.74 25,776.52 78.89 25,776.52 100.00 0.00 0.00 78.89 25,776.52 100.00 0.00 0.00 0.00
11.03.03 CIMIENTOS CORRIDOS MESCLA 1:10 + 30%(CEMENTO-HORMI M3 146.16 170.48 24,917.36 146.16 24,917.36 100.00 0.00 0.00 146.16 24,917.36 100.00 0.00 0.00 0.00
11.03.04 ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE 0.30 A 0.60 M2 278.40 24.75 6,890.40 278.40 6,890.40 100.00 0.00 0.00 278.40 6,890.40 100.00 0.00 0.00 0.00
11.03.05 CONCRETO SOBRECIMIENTO DE 1:8 CEM - HOR 25% P. M. AN M3 20.88 225.77 4,714.08 20.88 4,714.08 100.00 0.00 0.00 20.88 4,714.08 100.00 0.00 0.00 0.00
11.04 CONCRETO ARMADO
11.04.01 COLUMNAS
11.04.01.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 12.08 413.53 4,995.44 12.08 4,995.44 100.00 0.00 0.00 12.08 4,995.44 100.00 0.00 0.00 0.00
11.04.01.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 257.06 41.04 10,549.74 257.06 10,549.74 100.00 0.00 0.00 257.06 10,549.74 100.00 0.00 0.00 0.00
11.04.01.03 ACERO GRADO 60 EN COLUMNAS KG 2,512.55 4.44 11,155.72 2,512.55 11,155.72 100.00 0.00 0.00 2,512.55 11,155.72 100.00 0.00 0.00 0.00

Valorización N° 06 Cerco Periméntrico 29de38


11.04.02 VIGAS
11.04.02.01 CONCRETO EN VIGAS F'C=210 KG/CM2 M3 17.40 344.40 5,992.56 17.40 5,992.56 100.00 0.00 0.00 17.40 5,992.56 100.00 0.00 0.00 0.00
11.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 174.00 39.23 6,826.02 174.00 6,826.02 100.00 0.00 0.00 174.00 6,826.02 100.00 0.00 0.00 0.00
11.04.02.03 ACERO GRADO 60 EN VIGAS KG 2,404.33 4.32 10,386.71 2,404.33 10,386.71 100.00 0.00 0.00 2,404.33 10,386.71 100.00 0.00 0.00 0.00
11.05 ALBAÑELERIA
11.05.01 MURO DE LADRILLO CORRIENTE CARAVISTA DE ARCILLA TIPOM2 46.42 122.92 5,705.95 46.42 5,705.95 100.00 0.00 0.00 46.42 5,705.95 100.00 0.00 0.00 0.00
11.06 REVOQUES, ENLUCIDOS Y MOLDURAS
11.06.01 TARRAJEO EN SUPERFICIE DE COLUMNAS CON CEMENTO - M2 257.60 17.97 4,629.07 257.60 4,629.07 100.00 0.00 0.00 257.60 4,629.07 100.00 0.00 0.00 0.00
11.06.02 TARRAJEO EN SUPERFICIE Y ARISTAS DE VIGAS CON CEMEN M2 174.00 21.15 3,680.10 174.00 3,680.10 100.00 0.00 0.00 174.00 3,680.10 100.00 0.00 0.00 0.00
11.06.03 TARRAJEO EN EXTERIORES ACABADO CON CEMENTO - ARENA,M2 278.40 19.98 5,562.43 278.40 5,562.43 100.00 0.00 0.00 278.40 5,562.43 100.00 0.00 0.00 0.00

COSTO DIRECTO 150,796.85 150,796.85 100.00 0.00 0.00 150,796.85 100.00 0.00 0.00

Valorización N° 06 Cerco Periméntrico 30de38


MUNICIPALIDAD PROVINCIAL DE VILCAS HUAMAN

VALORIZACIÓN DE OBRA N° 06
Correspondiente Mes Diciembre 2017

PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO

EN EL CENTRO POBLADO DE POMACOCHA , DISTRITO DE VISCHONGO, PROVINCIA DE VILC AS HUAMAN - AYACUICHO"

CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Ing° GABRIEL ALFONSO GUZMAN MANRIQUE SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONT ADELANT DIRECTO : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : DICIEMBRE 2017
MONTO ADELANTO MAT : S/. 613,461.40 (CON IGV) S/. 519,882.54 (SIN IGV)
META FISICA: CONSTRUCCION DE EDIFICACION

AVANCES
P. UNITARIO
CODIGO DESCRIPCION UND METRADO P. PARCIAL (S/.) ANTERIOR ACTUAL ACUMULADO SALDO
(S/.)
METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %

12 PUERTA DE INGRESO
12.01 TRABAJOS PRELIMINARES
12.01.01 TRAZO Y REPLANTEO M2 2.89 2.24 6.47 2.89 6.47 100.00 0.00 0.00 2.89 6.47 100.00 0.00 0.00 0.00
12.02 MOVIMIENTO DE TIERRAS
12.02.01 EXCAVACION PARA ZAPATAS DE 1.00M A 1.90M DE PROFUND M3 7.91 24.36 192.69 7.91 192.69 100.00 0.00 0.00 7.91 192.69 100.00 0.00 0.00 0.00
12.02.02 RELLENO CON MATERIAL PROPIO M3 3.94 16.65 65.60 3.94 65.60 100.00 0.00 0.00 3.94 65.60 100.00 0.00 0.00 0.00
12.02.03 ELIMINACION MATERIAL EXCEDENTE M3 4.97 6.56 32.60 4.97 32.60 100.00 0.00 0.00 4.97 32.60 100.00 0.00 0.00 0.00
12.03 CONCRETO SIMPLE
12.03.01 SOLADO DE 4" MESCLA 1:12 CEMENTO - HORMIGON M2 5.95 89.39 531.87 5.95 531.87 100.00 0.00 0.00 5.95 531.87 100.00 0.00 0.00 0.00
12.04 CONCRETO ARMADO
12.04.01 ZAPATAS
12.04.01.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 2.98 335.04 998.42 2.98 998.42 100.00 0.00 0.00 2.98 998.42 100.00 0.00 0.00 0.00
12.04.01.02 ACERO GRADO 60 EN ZAPATAS KG 52.71 4.68 246.68 52.71 246.68 100.00 0.00 0.00 52.71 246.68 100.00 0.00 0.00 0.00
12.04.02 COLUMNAS
12.04.02.01 CONCRETO EN COLUMNAS F'C=210 KG/CM2 M3 0.84 413.53 347.37 0.84 347.37 100.00 0.00 0.00 0.84 347.37 100.00 0.00 0.00 0.00
12.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS M2 12.31 41.04 505.20 12.31 505.20 100.00 0.00 0.00 12.31 505.20 100.00 0.00 0.00 0.00
12.04.02.03 ACERO GRADO 60 EN COLUMNAS KG 135.40 4.44 601.18 135.40 601.18 100.00 0.00 0.00 135.40 601.18 100.00 0.00 0.00 0.00
12.04.03 VIGAS
12.04.03.01 CONCRETO EN VIGAS F'C=210 KG/CM2 M3 0.78 344.40 268.63 0.78 268.63 100.00 0.00 0.00 0.78 268.63 100.00 0.00 0.00 0.00
12.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS M2 7.97 39.23 312.66 7.97 312.66 100.00 0.00 0.00 7.97 312.66 100.00 0.00 0.00 0.00
12.04.03.03 ACERO GRADO 60 EN VIGAS KG 91.81 4.32 396.62 91.81 396.62 100.00 0.00 0.00 91.81 396.62 100.00 0.00 0.00 0.00
12.05 REVOQUES, ENLUCIDOS Y MOLDURAS
12.05.01 TARRAJEO EN SUPERFICIE DE COLUMNAS CON CEMENTO - M2 12.31 17.97 221.21 12.31 221.21 100.00 0.00 0.00 12.31 221.21 100.00 0.00 0.00 0.00
12.05.02 TARRAJEO EN SUPERFICIE Y ARISTAS DE VIGAS CON CEMEN M2 7.97 21.15 168.57 7.97 168.57 100.00 0.00 0.00 7.97 168.57 100.00 0.00 0.00 0.00
12.05.03 VESTIDURA DE DERRAMES EN PUERTAS , VENTANAS Y VANO M 14.75 7.68 113.28 14.75 113.28 100.00 0.00 0.00 14.75 113.28 100.00 0.00 0.00 0.00

Valorización N° 06 Puerta De Ingreso 31de38


12.06 CARPINTERIA METALICA
12.06.01 PUERTA DE INGRESO PERSONAL M2 11.00 220.00 2,420.00 11.00 2,420.00 100.00 0.00 0.00 11.00 2,420.00 100.00 0.00 0.00 0.00
12.07 CERRAJERIA
12.07.01 CERRADURA DE TRES GOLPES PZA 2.00 103.38 206.76 2.00 206.76 100.00 0.00 0.00 2.00 206.76 100.00 0.00 0.00 0.00
12.07.02 CANDADO INCLUYENDO ALDABAS UND 2.00 25.00 50.00 2.00 50.00 100.00 0.00 0.00 2.00 50.00 100.00 0.00 0.00 0.00
12.08 PINTURA
12.08.01 PINTURA ANTICORROSIVO EN CARPINTERIA METALICA M2 11.00 6.35 69.85 11.00 69.85 100.00 0.00 0.00 11.00 69.85 100.00 0.00 0.00 0.00
12.09 INSTALACIONES ELECTRICAS
12.09.01 SALIDA DE CENTROS DE LUZ PTO 2.00 24.64 49.28 2.00 49.28 100.00 0.00 0.00 2.00 49.28 100.00 0.00 0.00 0.00
12.09.02 SALIDA DE PARED PARA INTERRUPTOR SIMPLE PTO 1.00 48.53 48.53 1.00 48.53 100.00 0.00 0.00 1.00 48.53 100.00 0.00 0.00 0.00
12.09.03 FLOURECENTE CIRCULAR 32 WATT (INCL EQUIPO COMPLETO UND 2.00 31.48 62.96 2.00 62.96 100.00 0.00 0.00 2.00 62.96 100.00 0.00 0.00 0.00
12.09.04 CAJA DE PASE UND 1.00 15.26 15.26 1.00 15.26 100.00 0.00 0.00 1.00 15.26 100.00 0.00 0.00 0.00

COSTO DIRECTO 7,931.69 7,931.69 100.00 0.00 0.00 7,931.69 100.00 0.00 0.00

Valorización N° 06 Puerta De Ingreso 32de38


MUNICIPALIDAD PROVINCIAL DE VILCAS HUAMAN

VALORIZACIÓN DE OBRA N° 06
Correspondiente Mes Diciembre 2017

PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO

EN EL CENTRO POBLADO DE POMACOCHA , DISTRITO DE VISCHONGO, PROVINCIA DE VILC AS HUAMAN - AYACUICHO"

CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Ing° GABRIEL ALFONSO GUZMAN MANRIQUE SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONT ADELANT DIRECTO : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : DICIEMBRE 2017
MONTO ADELANTO MAT : S/. 613,461.40 (CON IGV) S/. 519,882.54 (SIN IGV)
META FISICA: CONSTRUCCION DE EDIFICACION

AVANCES
P. UNITARIO
CODIGO DESCRIPCION UND METRADO P. PARCIAL (S/.) ANTERIOR ACTUAL ACUMULADO SALDO
(S/.)
METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. % METRADO VALORIZ. %

13 MOBILIARIO
13.01 MOBILIARIO ESCOLAR G LB 1.00 68,009.13 68,009.13 0.00 0.00 0.00 0.52 35,301.32 51.91 0.52 35,301.32 51.91 0.48 32,707.81 48.09
14 MITIGACION AMBIENTAL
14.01 MITIGACION AMBIENTAL GLB 1.00 7,500.00 7,500.00 0.00 0.00 0.00 1.00 7,500.00 100.00 1.00 7,500.00 100.00 0.00 0.00 0.00
15 CAPACITACION TECNICO PEDAGOGICO
15.01 CAPACITACION GLB 1.00 2,500.00 2,500.00 0.00 0.00 0.00 1.00 2,500.00 100.00 1.00 2,500.00 100.00 0.00 0.00 0.00
16 FLETE TERRESTRE
16.01 FLETE TERRESTRE GLB 1.00 35,250.00 35,250.00 1.00 35,250.00 100.00 0.00 0.00 1.00 35,250.00 100.00 0.00 0.00 0.00

COSTO DIRECTO 113,259.13 35,250.00 31.12 45,301.32 40.00 80,551.32 71.12 32,707.81 28.88

Valorización 06 Mob, MA, Capacit y Flet 33de38


MUNICIPALIDAD PROVINCIAL DE VILCAS HUAMAN
VALORIZACION 06 CONSORCIO NUEVA ESPERANZA

AMORTIZACION DEL ADELANTO DIRECTO


Correspondiente Mes Diciembre 2017
OBRA :
"MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO EN EL
CENTRO POBLADO DE POMACOCHA , DISTRITO DE VISCHONGO, PROVINCIA DE VILC AS HUAMAN - AYACUICHO"

CONTRATISTA : CONSORCIO NUEVA ESPERANZA N° DE CONTRATO : CONTRATO N° 044 - 2017 - MPVH / GM


SUPERVISOR : ING. SAMUEL AYALA TINEO FECHA DE CONTRATO: 13 DE JUNIO 2017
RESIDENTE DE OBRA : ING. GABRIEL ALFONSO GUZMAN MANRIQUE PROVINCIA : VILCAS HUAMAN
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) DISTRITO : VISCHONGO
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) CENTRO POBLADO: POMACOCHA
MONTO ADELANTO DIR: S/. 306,730.70 (CON IGV) PLAZO DE EJECUCION : 180 DIAS CALENDARIOS
MONTO ADELANTO MAT : S/. 613,461.40 (CON IGV)
FECHA DE INICIO : 13-Jul-17
META FISICA: CONSTRUCCION DE EDIFICACION FECHA DE TERMINO : 8-Jan-18

AMORTIZACION SIN IGV


VAL.MES Sin ADELANTO OTORGADO
DESCRIPCION AMORTIZACION SALDO POR
Reaj. Sin IGV
CON I.G.V. SIN I.G.V. Amort=VB * 10.00% AMORTIZ.

306,730.70 259,941.27
ADELANTO DIRECTO
10.00% 10.00%
VAL MES PARTIDA
VALORIZACIÓN N° 01 Julio - 2017 Global 763,187.58 76,318.76 183,622.51
VALORIZACIÓN N° 02 Agosto - 2017 Global 604,623.40 60,462.34 123,160.17
VALORIZACIÓN N° 03 Sept - 2017 Global 389,911.91 38,991.19 84,168.98
VALORIZACIÓN N° 04 Oct - 2018 Global 260,201.21 26,020.12 58,148.86
VALORIZACIÓN N° 05 Nov - 2017 Global 436,701.34 58,148.86 0.00
VALORIZACIÓN N° 06 Dic - 2017 Global 49,898.19 0.00 0.00

TOTAL A LA FECHA 2,504,523.63 259,941.27 0.00

AMORTIZACIÓN ACUMULADO ACTUAL 259,941.27


AMORTIZACIÓN ACUMULADA ANTERIOR 259,941.27
AMORTIZACIÓN DEL MES 0.00

RESIDENTE DE OBRA SUPERVISOR DE OBRA


MUNICIPALIDAD PROVINCIAL DE VILCAS HUAMAN
VALORIZACION 06 CONSORCIO NUEVA ESPERANZA

AMORTIZACION DEL ADELANTO MATERIALES


Correspondiente Mes Diciembre 2017
OBRA :
"MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO EN EL CENTRO
POBLADO DE POMACOCHA , DISTRITO DE VISCHONGO, PROVINCIA DE VILC AS HUAMAN - AYACUICHO"

CONTRATISTA : CONSORCIO NUEVA ESPERANZA N° DE CONTRATO : CONTRATO N° 044 - 2017 - MPVH / GM


SUPERVISOR : ING. SAMUEL AYALA TINEO FECHA DE CONTRATO: 13 DE JUNIO 2017
RESIDENTE DE OBRA : Arq° ROLANDO PONCE CORDOVA PROVINCIA : VILCAS HUAMAN
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) DISTRITO : VISCHONGO
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) CENTRO POBLADO: POMACOCHA
MONTO ADELANTO DIR: S/. 306,730.70 (CON IGV) PLAZO DE EJECUCION : 180 DIAS CALENDARIOS
MONTO ADELANTO MAT : S/. 613,461.40 (CON IGV)
FECHA DE INICIO : 13-Jul-17
META FISICA: CONSTRUCCION DE EDIFICACION FECHA DE TERMINO : 8-Jan-18

AMORTIZACION SIN IGV


VAL.MES Sin ADELANTO OTORGADO
DESCRIPCION AMORTIZACION SALDO POR
Reaj. Sin IGV
CON I.G.V. SIN I.G.V. Amort=VB * 20.00% AMORTIZ.

613,461.40 519,882.54
ADELANTO DIRECTO
20.00% 20.00%
VAL MES PARTIDA
VALORIZACIÓN N° 01 julio-17 GLOBAL 0.00 0.00 519,882.54
VALORIZACIÓN N° 02 agosto-17 GLOBAL 604,623.40 120,924.68 398,957.86
VALORIZACIÓN N° 03 septiembre-17 GLOBAL 389,911.91 77,982.38 320,975.48
VALORIZACIÓN N° 04 octubre-17 GLOBAL 260,201.21 52,040.24 268,935.24
VALORIZACIÓN N° 05 noviembre-17 GLOBAL 436,701.34 268,935.24 0.00
VALORIZACIÓN N° 06 diciembre-17 GLOBAL 49,898.19 0.00 0.00

TOTAL A LA FECHA 1,741,336.05 519,882.54 0.00

AMORTIZACIÓN ACUMULADO ACTUAL 519,882.54


AMORTIZACIÓN ACUMULADA ANTERIOR 519,882.54
AMORTIZACIÓN DEL MES 0.00

RESIDENTE DE OBRA SUPERVISOR DE OBRA


RESUMEN DE VALORIZACIÓN DE OBRA Nº 06

(CORRESPONDIENTE MES DICIEMBRE 2017)

CONTRATO : CONTRATO N° 044 - 2017 - MPVH / GM

"MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS
ALTAMIRANO EN EL CENTRO POBLADO DE POMACOCHA , DISTRITO DE VISCHONGO, PROVINCIA DE VILC AS
OBRA : HUAMAN - AYACUICHO"
CONTRATISTA : CONSORCIO NUEVA ESPERANZA
SUPERVISOR : ING. SAMUEL AYALA TINEO
RESIDENTE DE OBRA : ING. GABRIEL ALFONSO GUZMAN MANRIQUE
FECHA VALOR REFERENCIAL :
MONTO CONTRACTUAL : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONTO CONTRACTUAL : S/. 3,067,307.00 (SIN IGV)
ADELANTO DIRECTO 10% : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV)
ADELANTO DE MATERIALES 20% : S/. 613,461.40 (CON IGV) S/. 519,882.54 (SIN IGV)

MONTO CONTRATO VALORIZACIÓN


(S/IGV) % SALDO
DESCRIPCION AVANCE POR
ANTERIOR ACTUAL ACUMULADO ACUMULADO VALORIZAR

A: VALORIZACION CONTRACTUAL

01.- COSTO DIRECTO O.P. 2,599,412.71 2,454,625.44 49,898.19 2,504,523.63 96.35% 94,889.08
SUB TOTAL (A) 2,599,412.71 2,454,625.44 49,898.19 2,504,523.63 94,889.08
AVANCE FISICO DE OBRA PRINCIPAL 94.43% 1.92% 96.35% 3.65%
B: VALORIZACION ADICIONAL

0.00
SUB TOTAL (B) 0.00 0.00 0.00 0.00 0.00
AVANCE FISICO DE ADICIONAL DE OBRA 0.00% 0.00% 0.00%

AVANCE FISICO DE OBRA (TOTAL) 94.43% 1.92% 96.35% 3.65%

C: REAJUSTES

01 .- REAJUSTES OBRA PRINCIPAL 0.00 0.00 0.00

TOTAL (C) 0.00 0.00 0.00

VALORIZACION BRUTA (VB=A+B+C) 2,599,412.71 2,454,625.44 49,898.19 2,504,523.63 94,889.08

D: AMORTIZACIONES

AMORTIZACION DEL ADELANTO DIRECTO 259,941.27 259,941.27 0.00 259,941.27 0.00


AMORTIZACION DEL ADELANTO DE MATERIALES 519,882.54 519,882.54 0.00 519,882.54 0.00
01 .- ESTRUCTURAS 0.00 0.00
02.- ARQUITECTURA 0.00 0.00
03.- INSTALACIONES SANITARIAS 0.00 0.00
04.- INSTALACIONES ELECTRICAS 0.00 0.00
TOTAL (D) 779,823.81 779,823.81 0.00 779,823.81 0.00

VALORIZACION NETA (VN=VB-D) 1,819,588.90 1,674,801.63 49,898.19 1,724,699.82 94,889.08

E: RETENCIONES

FONDO DE GARANTIA (5%*VB) 0.00 0.00 0.00


GASTOS DE LICITACION 0.00 0.00 0.00
MULTA POR ATRASO DE OBRA 0.00 0.00 0.00
TOTAL (E) 0.00 0.00 0.00
F: MONTO A PAGAR AL CONTRATISTA

EN EFECTIVO (VN-D) 1,819,588.90 1,674,801.63 49,898.19 1,724,699.82 94,889.08


EN I.G.V. (18% *VN) 327,526.00 301,464.29 8,981.68 310,445.97 17,080.03
TOTAL (F) 2,147,114.90 1,976,265.92 58,879.87 2,035,145.79 111,969.11

TOTAL COMPROMISO A SOLICITAR 2,147,114.90 1,976,265.92 58,879.87 2,035,145.79 111,969.11


RESUMEN DE VALORIZACION
MONTO TOTAL POR FACTURAR POR EL CONTRATISTA (3)= 58,879.87
DETRACCIONES (4% DEL MONT. TOTAL VALORIZADO)= D1= 2,355.19
NETO A PAGAR AL CONTRATISTA (CHEQUE ) 56,524.68
MUNICIPALIDAD PROVINCIAL DE VILCAS HUAMAN

CALENDARIO DE AVANCE DE OBRA

PROYECTO : "MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. PRIMARIA N° 3874/MX - P JOASE MARIA ARGUEDAS ALTAMIRANO

EN EL CENTRO POBLADO DE POMACOCHA , DISTRITO DE VISCHONGO, PROVINCIA DE VILC AS HUAMAN - AYACUICHO"

CONTRATISTA : CONSORCIO NUEVA ESPERANZA SUPERVISA : CONSORCIO BRYA FECHA DE INICO DE OBRA : 13 JULIO 2017
RESIDENTE DE OBRA : Ingº. GABRIEL ALFONSO GUZMAN MANRIQUE SUPERVISOR DE OBRA : Ingº.SAMUEL AYALA TINEO PLAZO : 180 D.C.
PRESUPUESTO BASE : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV) FECHA TERMINO DE OBRA : 08 ENERO 2018
MONTO DEL CONTRATO : S/. 3,067,307.00 (CON IGV) S/. 2,599,412.71 (SIN IGV)
MONTO ADELANTO DIR : S/. 306,730.70 (CON IGV) S/. 259,941.27 (SIN IGV) FECHA : 13 JUNIO 2017
MONTO ADELANTO MAT : S/. 613,461.40 (CON IGV) S/. 519,882.54 (SIN IGV)

AVANCES

P. ACUMULADO
CODIGO DESCRIPCION UND METRADO UNITARIO P. PARCIAL (S/.)
(S/.) MES 1 MES 2 MES 3 MES 4 MES 5 MES 6
13/07 AL 31/07 01/08 AL 31/08 01/09 AL 30/09 01/10 AL 31/10 01/11 AL 30/11 01/12 AL 31/12 METRADO
|
1 OBRAS EXTERIORES 0.00
2 06 AULAS 0.00
3 AUD Y CC 0.00
4 AMB ADMINISTRATIVOS 0.00
5 COCINA COMEDOR 0.00
6 SS.HH. N IÑOS Y NIÑAS 0.00
7 SS.HH. ADMINISTRCION 0.00
8 PATIO FORMACION 0.00
9 LOSA DEPORTIVA 0.00
10 CISTERNA TANQUE ALTO 0.00
11 CERCO PERIMENTRICO 0.00
12 PUERTA DE INGRESO 0.00
13 MOB, MA, CAPACITC Y FLET 0.00
COSTO DIRECTO 0.46
GASTOS GENERALES 5% 5% -0.30
UTILIDAD 5% 5% -0.30
SUB TOTAL -0.14
IGV 18% 18% -0.02
PRESUPUESTO BASE -0.16

% PARCIAL #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!


% ACUMULAD #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

Valorización N° 01 CAOV 38de38