Está en la página 1de 81

"CREACION DE LOSA DEPORTIVA CON GRASS SINTETICO EN EL ESTADIO MUNICIPAL JESUS NAZARENO DEL DISTRITO DE SAÑO,

Municipalidad Distrital de Saño


JUNIN - HUANCAYO - SAÑO

Item Descripción Und. Metrado Rendimiento Tiempo


01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
01.01 CONSTRUCCIONES PROVICIONALES
01.01.01 ALMACEN DE OBRA Y OFICINA mes 2.00 1.00 2.00
01.01.02 CARTEL DE IDENTIFICACION DE OBRA und 1.00 1.00 1.00
01.01.03 CERCO PERIMETRICO DE PROTECCION MADERA Y LONA DE RAFIA m 78.80 80.00 0.99
01.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 1.00 1.00
01.02 TRABAJOS PRELIMINARES
01.02.01 LIMPIEZA DEL TERRENO MANUAL m2 1,318.24 120.00 10.99
01.03 TRAZO NIVELES Y REPLANTEO
01.03.01 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2 1,318.24 500.00 2.64
01.03.02 TRAZO Y REPLANTEO DURANTE EL PROCESO DE EJECUCION m2 1,318.24 500.00 2.64
02 LOSA DE GRASS SINTETICO
02.01 MOVIMIENTO DE TIERRAS
02.01.01 EXCAVACION EN TERRENO NATURAL A MAQUINA (e=0.25m) m3 305.34 350.00 0.87
02.01.02 NIVELACION INTERIOR Y APISONADO m2 650.44 40.00 16.26
02.01.03 ELIMINACION DE MATERIAL EXCEDENTE A MAQUINA m3 157.00 240.00 0.65
02.02 CONSTRUCCION DEL GRASS SINTETICO
02.02.01 RELLENO Y COMPACTACION DE BASE CON MATERIAL DE m2 70.38 1,200.00 0.06
02.02.02 PRESTAMO
RELLENO DE ARENA FINA m3 35.19 4.00 8.80
02.02.03 SUMINISTRO E INSTALACION DE GRASS SINTETICO m2 703.84 1.00 703.84
02.03 OBRAS DE CONCRETO SIMPLE
02.03.01 DADOS DE CONCRETO
02.03.01.01 CONCRETO SIMPLE PARA DADOS DEL ARCO Y BANCAS f'c=175 m3 1.03 12.00 0.09
02.03.02 kg/cm2
VEREDAS
02.03.02.01 CONCRETO SIMPLE PARA VEREDA f'c=175 kg/cm2 m3 35.42 18.00 1.97
02.03.02.02 ENCOFRADO Y DESENCOFRADO DE VEREDA m2 9.84 35.00 0.28
02.03.03 JUNTAS
02.03.03.01 JUNTAS DE CONSTRUCCION 1" DE 1:3 (arena:asfalto) m 102.60 200.00 0.51
02.04 OTROS
02.04.01 SUMINISTRO E INSTALACION DE ARCOS DE FUTBOL und 2.00 1.00 2.00
03 CERCO PERIMETRICO
03.01 MOVIMIENTO DE TIERRAS
03.01.01 EXCAVACION EN TERRENO NATURAL A MAQUINA m3 32.89 350.00 0.09
03.01.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO A MAQUINA m3 9.76 10.00 0.98
03.01.03 ELIMINACION DE MATERIAL EXCEDENTE A MAQUINA m3 25.45 240.00 0.11
03.02 OBRAS DE CONCRETO SIMPLE
03.02.01 SARDINELES
03.02.01.01 CONCRETO SIMPLE PARA SARDINEL f'c=175 kg/cm2 m3 6.63 18.00 0.37
03.02.01.02 ENCOFRADO Y DESENCOFRADO DE SARDINEL m2 39.80 35.00 1.14
03.02.02 SOLADO
03.02.02.01 CONCRETO PARA SOLADO DE CONCRETO POBRE f´c = 100 kg/cm2 m2 26.80 25.00 1.07
03.02.02.02 DADO DE CONCRETO PARA CERCO PERIMETRICO f'c=210 kg/cm2 m3 2.25 25.00 0.09
03.03 OBRAS DE CONCRETO ARMADO
03.03.01 ZAPATAS
03.03.01.01 CONCRETO PARA ZAPATAS f'c=210 kg/cm2 m3 16.08 12.00 1.34
03.03.01.02 ACERO CORRUGADO GRADO 60 PARA ZAPATAS Fy= 4200 kg/cm2 kg 444.57 250.00 1.78
03.03.02 COLUMNAS
03.03.02.01 CONCRETO PARA COLUMNAS f'c=210 kg/cm2 m3 13.44 12.00 1.12
03.03.02.02 ENCOFRADO Y DESENCOFRADO DE COLUMNA m2 174.72 20.00 8.74
03.03.02.03 ACERO CORRUGADO GRADO 60 PARA COLUMNAS Fy= 4200 kg/cm2 kg 1,546.37 250.00 6.19
03.03.03 VIGAS
03.03.03.01 CONCRETO PARA VIGAS f'c=210 kg/cm2 m3 2.77 12.00 0.23
03.03.03.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 46.97 12.00 3.91
03.03.03.03 ACERO CORRUGADO GRADO 60 PARA VIGAS Fy= 4200 kg/cm2 kg 323.54 250.00 1.29
03.03.04 JUNTAS
03.03.04.01 JUNTAS DE CONSTRUCCION 1" DE 1:3 (arena:asfalto) m 6.40 200.00 0.03
03.04 ARQUITECTURA
03.04.01 TARRAJEO EN COLUMNAS m2 143.00 12.00 11.92
03.04.02 CARPINTERIA METALICA Y HERRERIA
03.04.02.01 SUMINISTRO E INSTALACION DE PUERTA DE FIERRO und 1.00 1.00 1.00
03.04.03 VARIOS
03.04.03.01 SUMINISTRO E INSTALACION DE BANCAS und 4.00 1.00 4.00
03.05 INSTALACIONES SANITARIAS
03.05.01 CANALETA DE FIERRO GALVANIZADO e=0.9mm m 98.00 80.00 1.23
03.05.02 TUBERIA DE BAJADA PVC-SAL Ø4" PARA LLUVIAS m 110.00 80.00 1.38
03.05.03 CONCRETO f'c=175 kg/cm2 PARA FALSA COLUMNA m3 10.89 18.00 0.61
03.05.04 ENCOFRADO Y DESENCOFRADO PARA FALSA COLUMNA m2 23.10 15.00 1.54
03.05.05 ACERO ESTRUCTURAL Fy=4200kg/cm2 PARA FALSA COLUMNA kg 255.20 260.00 0.98
03.06 INSTALACIONES ELECTRICAS
03.06.01 TUBERIA PVC SELL 20mm m 101.87 1.00 101.87
03.06.02 CABLE DE 2X4mm m 203.74 1.00 203.74
03.06.03 INSTALACION DE TABLERO DE DISTRIBUCION und 1.00 2.00 0.50
03.06.04 CAJA DE PASO 200x200x150 und 1.00 1.00 1.00
03.06.05 INSTALACION DE MEDIDOR glb 1.00 4.00 0.25
03.06.06 SUMINISTRO E INSTALACION DE REFLECTOR DE 500W und 4.00 6.00 0.67
03.06.07 INSTALACION DE INTERRUPTOR und 1.00 1.00 1.00
03.07 OTROS
03.07.01 SUMINISTRO E INSTALACION DE TUBO CIRCULAR NEGRO DE 2" m 133.20 1.00 133.20
03.07.02 SUMINISTRO E INSTALACION DE MALLA GALVANIZADA m2 281.14 30.00 9.37
04 ESTRUCTURAS METALICAS
04.01 SUMINISTRO DE TIJERALES m 326.21 8.00 40.78
04.02 INSTALACION DE TIJERALES TM-1 Y TM-2 und 11.00 16.00 0.69
04.03 INSTALACION DE VIGUETAS m 1,190.88 7.00 170.13
04.04 INSTALACION DE APOYOS MOVILES und 24.00 4.00 6.00
04.05 COBERTURA CON TECHO DE CALAMINA
04.05.01 COBERTURA CON CALAMINA GALVANIZADA 1.83x0.86m m2 1,026.00 40.00 25.65
04.05.02 COBERTURA CON CALAMINA TRASLUCIDA 1.83x0.86m m2 410.40 40.00 10.26
COSTO DIRECTO
GASTOS GENERALES (8%)
UTILIDAD (7%)
SUB TOTAL
IGV (18%)
SUPERVISION
PRESUPUESTO TOTAL
RITO DE SAÑO, HUANCAYO-JUNIN"

Cuadrilla Duracion Precio S/. Parcial S/.

1.00 52.00 200.00 400.00


1.00 1.00 410.00 410.00
1.00 1.00 7.50 591.00
1.00 1.00 1,000.00 1,000.00

4.00 3.00 1.04 1,370.97

1.00 3.00 1.21 1,595.07


1.00 3.00 1.18 1,555.52

1.00 1.00 4.21 1,285.48


5.00 4.00 3.89 2,530.21
1.00 1.00 10.45 1,640.65

1.00 1.00 12.32 867.08


2.00 5.00 34.16 1,202.09
1.00 8.00 65.00 45,749.60

1.00 1.00 286.91 295.52

1.00 2.00 317.56 11,247.98


1.00 1.00 28.65 281.92

1.00 1.00 4.01 411.43

1.00 1.00 1,500.00 3,000.00

1.00 1.00 4.21 138.47


1.00 1.00 28.69 280.01
1.00 1.00 10.45 265.95

1.00 1.00 317.56 2,105.42


1.00 2.00 28.65 1,140.27

2.00 1.00 157.57 4,222.88


1.00 1.00 317.78 715.01

1.00 2.00 384.37 6,180.67


1.00 2.00 4.10 1,822.74

1.00 2.00 384.37 5,165.93


2.00 5.00 18.83 3,289.98
2.00 4.00 4.00 6,185.48

1.00 1.00 384.37 1,064.70


1.00 4.00 28.43 1,335.36
1.00 2.00 3.93 1,271.51

1.00 1.00 4.01 25.66


2.00 6.00 21.95 3,138.85

1.00 1.00 301.80 301.80

1.00 4.00 110.00 440.00

1.00 2.00 27.89 2,733.22


1.00 2.00 33.54 3,689.40
1.00 1.00 317.56 3,458.23
1.00 2.00 35.65 823.52
1.00 1.00 4.05 1,033.56

3.00 2.00 2.76 281.16


3.00 2.00 1.77 360.62
1.00 1.00 376.04 376.04
1.00 1.00 40.00 40.00
1.00 1.00 136.97 136.97
1.00 1.00 429.80 1,719.20
1.00 1.00 4.50 4.50

1.00 1.00 32.00 4,262.40


1.00 10.00 25.17 7,076.29

5.00 9.00 94.53 30,836.63


1.00 1.00 85.51 940.61
15.00 12.00 50.13 59,698.81
1.00 6.00 298.42 7,162.08

4.00 7.00 33.24 34,104.24


3.00 4.00 56.38 23,138.35
296,401.04
23,712.08
20,748.07
340,861.20
61,355.02
9,999.84
412,216.06
S10 Página :

Análisis de precios unitarios

Presupuesto 1101002 "CREACION DE LOSA DEPORTIVA CON GRASS SINTETICO EN EL ESTADIO MUNICIPAL JESUS NAZARENO DEL DISTRITO DE SAÑO, HUAN
Subpresupuesto 001 LOSA DE GRASS SINTETICO Fecha presupuesto

Partida 01.01.01 ALMACEN DE OBRA Y OFICINA

Rendimiento mes/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : mes 200.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Materiales
0292040005 ALQUILER ALMACEN Y OFICINA mes 1.0000 200.00

Partida 01.01.02 CARTEL DE IDENTIFICACION DE OBRA

Rendimiento und/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : und 410.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Materiales
0254010003 GIGANTOGRAFIA DE 2.40x3.60 (INC. INSTALACION) und 1.0000 410.00

Partida 01.01.03 CERCO PERIMETRICO DE PROTECCION MADERA Y LONA DE RAFIA

Rendimiento m/DIA 80.0000 EQ. 80.0000 Costo unitario directo por : m 7.50

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010004 OFICIAL hh 0.5000 0.0500 16.51
0101010005 PEON hh 1.0000 0.1000 14.85

Materiales
02041200010001 CLAVOS PARA MADERA CON CABEZA DE 1" kg 0.0660 3.22
0231000003 MADERA p2 0.4100 3.28
0292010005 LONA DE RAFIA m 1.0500 3.39

Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 2.32

Partida 01.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS

Rendimiento glb/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : glb 1,000.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Materiales
0201010024 TRANSPORTE DE EQUIPO Y MAQUINARIA glb 1.0000 1,000.00

Partida 01.02.01 LIMPIEZA DEL TERRENO MANUAL

Rendimiento m2/DIA 120.0000 EQ. 120.0000 Costo unitario directo por : m2 1.04
Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.
Mano de Obra
0101010005 PEON hh 1.0000 0.0667 14.85

Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000 0.99

Partida 01.03.01 TRAZO NIVELES Y REPLANTEO PRELIMINAR

Rendimiento m2/DIA 500.0000 EQ. 500.0000 Costo unitario directo por : m2 1.21

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 0.1000 0.0016 20.10
0101010005 PEON hh 2.0000 0.0320 14.85
0101030000 TOPOGRAFO hh 1.0000 0.0160 20.10

Materiales
02041200010009 CLAVOS PARA MADERA C/C 3" kg 0.0040 3.22
0213030001 YESO kg 0.0200 2.12
0231000003 MADERA p2 0.0050 3.28
0240020016 PINTURA ESMALTE SINTETICO gal 0.0010 30.93

Equipos
0301000011 TEODOLITO hm 1.0000 0.0160 15.00
0301010006 HERRAMIENTAS MANUALES %mo 5.0000 0.83

Partida 01.03.02 TRAZO Y REPLANTEO DURANTE EL PROCESO DE EJECUCION

Rendimiento m2/DIA 500.0000 EQ. 500.0000 Costo unitario directo por : m2 1.18

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010005 PEON hh 2.0000 0.0320 14.85
0101030000 TOPOGRAFO hh 1.0000 0.0160 20.10

Materiales
02041200010009 CLAVOS PARA MADERA C/C 3" kg 0.0040 3.22
0213030001 YESO kg 0.0200 2.12
0231000003 MADERA p2 0.0050 3.28
0240020016 PINTURA ESMALTE SINTETICO gal 0.0010 30.93

Equipos
0301000011 TEODOLITO hm 1.0000 0.0160 15.00
0301010006 HERRAMIENTAS MANUALES %mo 5.0000 0.80

Partida 02.01.01 EXCAVACION EN TERRENO NATURAL A MAQUINA (e=0.25m)

Rendimiento m3/DIA 350.0000 EQ. 350.0000 Costo unitario directo por : m3 4.21

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 0.2000 0.0046 20.10

Equipos
03011800020004 TRACTOR DE ORUGAS D6 hm 1.0000 0.0229 180.00
Partida 02.01.02 NIVELACION INTERIOR Y APISONADO

Rendimiento m2/DIA 40.0000 EQ. 40.0000 Costo unitario directo por : m2 3.89

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 0.2000 0.0400 20.10
0101010005 PEON hh 1.0000 0.2000 14.85

Materiales
0290130022 AGUA m3 0.0500 0.20

Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 3.77

Partida 02.01.03 ELIMINACION DE MATERIAL EXCEDENTE A MAQUINA

Rendimiento m3/DIA 240.0000 EQ. 240.0000 Costo unitario directo por : m3 10.45

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 0.2000 0.0067 20.10

Equipos
03011600010003 CARGADOR SOBRE LLANTAS DE 125-135 HP 3 yd3 hm 1.0000 0.0333 170.00
03012900010008 VOLQUETE DE 15 M3 hm 1.0000 0.0333 140.00

Partida 02.02.01 RELLENO Y COMPACTACION DE BASE CON MATERIAL DE PRESTAMO

Rendimiento m2/DIA 1,200.0000 EQ. 1,200.0000 Costo unitario directo por : m2 12.32

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 1.0000 0.0067 20.10
0101010004 OFICIAL hh 1.0000 0.0067 16.51
0101010005 PEON hh 6.0000 0.0400 14.85

Materiales
0207040003 MATERIAL CLASIFICADO PARA BASE m3 0.1800 50.85
0290130022 AGUA m3 0.0250 0.20

Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 0.83
03011000060003 RODILLO LISO VIBRATORIO AUTOPROPULSADO 125 HP hm 1.0000 0.0067 140.00
03012000010004 MOTONIVELADORA 125 HP hm 1.0000 0.0067 139.40
03012200050001 CAMION CISTERNA (2,500 GLNS.) hm 1.0000 0.0067 65.60

Partida 02.02.02 RELLENO DE ARENA FINA

Rendimiento m3/DIA 4.0000 EQ. 4.0000 Costo unitario directo por : m3 34.16

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010005 PEON hh 1.0000 2.0000 14.85

Materiales
02070200010001 ARENA FINA m3 0.0500 59.32

Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000 29.70

Partida 02.02.03 SUMINISTRO E INSTALACION DE GRASS SINTETICO

Rendimiento m2/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : m2 65.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Materiales
0290220009 SUMINISTRO E INSTALACION DE GRASS SINTETICO m2 1.0000 65.00

Partida 02.03.01.01 CONCRETO SIMPLE PARA DADOS DEL ARCO Y BANCAS f'c=175 kg/cm2

Rendimiento m3/DIA 12.0000 EQ. 12.0000 Costo unitario directo por : m3 286.91

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 1.0000 0.6667 20.10
0101010004 OFICIAL hh 1.0000 0.6667 16.51
0101010005 PEON hh 4.0000 2.6667 14.85

Materiales
0207030001 HORMIGON m3 1.2000 50.85
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 8.0000 19.07
0290130022 AGUA m3 0.2100 0.20

Equipos
0301010006 HERRAMIENTAS MANUALES %mo 2.0000 64.01
03012900030006 MEZCLADORA DE CONCRETO DE 9 - 11P3 - 18 HP hm 1.0000 0.6667 12.00

Partida 02.03.02.01 CONCRETO SIMPLE PARA VEREDA f'c=175 kg/cm2

Rendimiento m3/DIA 18.0000 EQ. 18.0000 Costo unitario directo por : m3 317.56

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 1.0000 0.4444 20.10
0101010004 OFICIAL hh 1.0000 0.4444 16.51
0101010005 PEON hh 8.0000 3.5556 14.85

Materiales
02070100010002 PIEDRA CHANCADA 1/2" m3 0.9000 50.85
02070200010001 ARENA FINA m3 0.5000 59.32
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 8.5000 19.07

Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 69.07
03012900010007 VIBRADOR DE CONCRETO 4 HP 1.50" hm 1.0000 0.4444 20.00

Partida 02.03.02.02 ENCOFRADO Y DESENCOFRADO DE VEREDA

Rendimiento m2/DIA 35.0000 EQ. 35.0000 Costo unitario directo por : m2 28.65

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 1.0000 0.2286 20.10
0101010004 OFICIAL hh 1.0000 0.2286 16.51
0101010005 PEON hh 2.0000 0.4571 14.85

Materiales
0201040003 PETROLEO gal 0.1250 9.68
02040100020002 ALAMBRE NEGRO N° 8 kg 0.2500 3.22
02041200010009 CLAVOS PARA MADERA C/C 3" kg 0.1500 3.22
0231000002 MADERA NACIONAL P/ENCOFRADO-CARP p2 3.2000 3.20

Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000 15.15

Partida 02.03.03.01 JUNTAS DE CONSTRUCCION 1" DE 1:3 (arena:asfalto)

Rendimiento m/DIA 200.0000 EQ. 200.0000 Costo unitario directo por : m 4.01

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010004 OFICIAL hh 1.0000 0.0400 16.51
0101010005 PEON hh 2.0000 0.0800 14.85

Materiales
0201040003 PETROLEO gal 0.0010 9.68
02010500010001 ASFALTO RC-250 gal 0.1330 14.00
02070200010001 ARENA FINA m3 0.0030 59.32
02902400010028 LEÑA kg 0.0250 1.80

Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 1.85

Partida 02.04.01 SUMINISTRO E INSTALACION DE ARCOS DE FUTBOL

Rendimiento und/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : und 1,500.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Materiales
0201010027 INSTALACION DE ARCOS DE FUTBOL und 1.0000 1,500.00

Partida 03.01.01 EXCAVACION EN TERRENO NATURAL A MAQUINA

Rendimiento m3/DIA 350.0000 EQ. 350.0000 Costo unitario directo por : m3 4.21

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 0.2000 0.0046 20.10

Equipos
03011800020004 TRACTOR DE ORUGAS D6 hm 1.0000 0.0229 180.00

Partida 03.01.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO A MAQUINA

Rendimiento m3/DIA 10.0000 EQ. 10.0000 Costo unitario directo por : m3 28.69

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 1.0000 0.8000 20.10
0101010005 PEON hh 0.5000 0.4000 14.85

Materiales
0290130022 AGUA m3 0.0500 0.20

Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 27.96
0301100009 APISONADOR TIPO CANGURO hm 0.5000 0.4000 15.00

Partida 03.01.03 ELIMINACION DE MATERIAL EXCEDENTE A MAQUINA

Rendimiento m3/DIA 240.0000 EQ. 240.0000 Costo unitario directo por : m3 10.45

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 0.2000 0.0067 20.10

Equipos
03011600010003 CARGADOR SOBRE LLANTAS DE 125-135 HP 3 yd3 hm 1.0000 0.0333 170.00
03012900010008 VOLQUETE DE 15 M3 hm 1.0000 0.0333 140.00

Partida 03.02.01.01 CONCRETO SIMPLE PARA SARDINEL f'c=175 kg/cm2

Rendimiento m3/DIA 18.0000 EQ. 18.0000 Costo unitario directo por : m3 317.56

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 1.0000 0.4444 20.10
0101010004 OFICIAL hh 1.0000 0.4444 16.51
0101010005 PEON hh 8.0000 3.5556 14.85

Materiales
02070100010002 PIEDRA CHANCADA 1/2" m3 0.9000 50.85
02070200010001 ARENA FINA m3 0.5000 59.32
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 8.5000 19.07

Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 69.07
03012900010007 VIBRADOR DE CONCRETO 4 HP 1.50" hm 1.0000 0.4444 20.00

Partida 03.02.01.02 ENCOFRADO Y DESENCOFRADO DE SARDINEL

Rendimiento m2/DIA 35.0000 EQ. 35.0000 Costo unitario directo por : m2 28.65

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 1.0000 0.2286 20.10
0101010004 OFICIAL hh 1.0000 0.2286 16.51
0101010005 PEON hh 2.0000 0.4571 14.85

Materiales
0201040003 PETROLEO gal 0.1250 9.68
02040100020002 ALAMBRE NEGRO N° 8 kg 0.2500 3.22
02041200010009 CLAVOS PARA MADERA C/C 3" kg 0.1500 3.22
0231000002 MADERA NACIONAL P/ENCOFRADO-CARP p2 3.2000 3.20
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000 15.15

Partida 03.02.02.01 CONCRETO PARA SOLADO DE CONCRETO POBRE f´c = 100 kg/cm2

Rendimiento m2/DIA 25.0000 EQ. 25.0000 Costo unitario directo por : m2 157.57

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 1.0000 0.3200 20.10
0101010004 OFICIAL hh 1.0000 0.3200 16.51
0101010005 PEON hh 10.0000 3.2000 14.85

Materiales
0207030001 HORMIGON m3 0.3000 50.85
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 4.0000 19.07

Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000 59.23
03012900030006 MEZCLADORA DE CONCRETO DE 9 - 11P3 - 18 HP hm 1.0000 0.3200 12.00

Partida 03.02.02.02 DADO DE CONCRETO PARA CERCO PERIMETRICO f'c=210 kg/cm2

Rendimiento m3/DIA 25.0000 EQ. 25.0000 Costo unitario directo por : m3 317.78

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 1.0000 0.3200 20.10
0101010004 OFICIAL hh 1.0000 0.3200 16.51
0101010005 PEON hh 8.0000 2.5600 14.85

Materiales
0201010026 ACEITE PARA MOTOR SAE-30 gal 0.0030 50.85
02010300010005 GASOLINA 84 OCTANOS gal 0.2200 10.25
02070100010002 PIEDRA CHANCADA 1/2" m3 0.8500 50.85
02070200010002 ARENA GRUESA m3 0.4200 59.32
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 9.7400 19.07
0290130022 AGUA m3 0.1840 0.20

Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 49.73
03012900010007 VIBRADOR DE CONCRETO 4 HP 1.50" hm 1.0000 0.3200 20.00
03012900030006 MEZCLADORA DE CONCRETO DE 9 - 11P3 - 18 HP hm 1.0000 0.3200 12.00

Partida 03.03.01.01 CONCRETO PARA ZAPATAS f'c=210 kg/cm2

Rendimiento m3/DIA 12.0000 EQ. 12.0000 Costo unitario directo por : m3 384.37

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 1.0000 0.6667 20.10
0101010004 OFICIAL hh 1.0000 0.6667 16.51
0101010005 PEON hh 8.0000 5.3333 14.85

Materiales
0201010026 ACEITE PARA MOTOR SAE-30 gal 0.0030 50.85
02010300010005 GASOLINA 84 OCTANOS gal 0.2200 10.25
02070100010002 PIEDRA CHANCADA 1/2" m3 0.8500 50.85
02070200010002 ARENA GRUESA m3 0.4200 59.32
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 9.7400 19.07
0290130022 AGUA m3 0.1840 0.20

Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 103.61
03012900010007 VIBRADOR DE CONCRETO 4 HP 1.50" hm 1.0000 0.6667 20.00
03012900030006 MEZCLADORA DE CONCRETO DE 9 - 11P3 - 18 HP hm 1.0000 0.6667 12.00

Partida 03.03.01.02 ACERO CORRUGADO GRADO 60 PARA ZAPATAS Fy= 4200 kg/cm2

Rendimiento kg/DIA 250.0000 EQ. 250.0000 Costo unitario directo por : kg 4.10

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 1.0000 0.0320 20.10
0101010004 OFICIAL hh 1.0000 0.0320 16.51

Materiales
02040100010002 ALAMBRE NEGRO RECOCIDO N° 16 kg 0.0600 3.22
0207020006 FIERRO CORR. 5/8" G-60 kg 1.0700 2.52

Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 1.17

Partida 03.03.02.01 CONCRETO PARA COLUMNAS f'c=210 kg/cm2

Rendimiento m3/DIA 12.0000 EQ. 12.0000 Costo unitario directo por : m3 384.37

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 1.0000 0.6667 20.10
0101010004 OFICIAL hh 1.0000 0.6667 16.51
0101010005 PEON hh 8.0000 5.3333 14.85

Materiales
0201010026 ACEITE PARA MOTOR SAE-30 gal 0.0030 50.85
02010300010005 GASOLINA 84 OCTANOS gal 0.2200 10.25
02070100010002 PIEDRA CHANCADA 1/2" m3 0.8500 50.85
02070200010002 ARENA GRUESA m3 0.4200 59.32
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 9.7400 19.07
0290130022 AGUA m3 0.1840 0.20

Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 103.61
03012900010007 VIBRADOR DE CONCRETO 4 HP 1.50" hm 1.0000 0.6667 20.00
03012900030006 MEZCLADORA DE CONCRETO DE 9 - 11P3 - 18 HP hm 1.0000 0.6667 12.00

Partida 03.03.02.02 ENCOFRADO Y DESENCOFRADO DE COLUMNA

Rendimiento m2/DIA 20.0000 EQ. 20.0000 Costo unitario directo por : m2 18.83

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 1.0000 0.4000 20.10
0101010005 PEON hh 1.0000 0.4000 14.85

Materiales
02040100020002 ALAMBRE NEGRO N° 8 kg 0.2500 3.22
02041200010012 CLAVOS PARA MADERA C/C 2 1/2" kg 0.1300 3.22
0231000002 MADERA NACIONAL P/ENCOFRADO-CARP p2 1.0000 3.20

Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 13.98

Partida 03.03.02.03 ACERO CORRUGADO GRADO 60 PARA COLUMNAS Fy= 4200 kg/cm2

Rendimiento kg/DIA 250.0000 EQ. 250.0000 Costo unitario directo por : kg 4.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 1.0000 0.0320 20.10
0101010004 OFICIAL hh 1.0000 0.0320 16.51

Materiales
02040100010002 ALAMBRE NEGRO RECOCIDO N° 16 kg 0.0600 3.22
0207020004 FIERRO CORR. 1/2" G-60 kg 1.0700 2.43

Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 1.17

Partida 03.03.03.01 CONCRETO PARA VIGAS f'c=210 kg/cm2

Rendimiento m3/DIA 12.0000 EQ. 12.0000 Costo unitario directo por : m3 384.37

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 1.0000 0.6667 20.10
0101010004 OFICIAL hh 1.0000 0.6667 16.51
0101010005 PEON hh 8.0000 5.3333 14.85

Materiales
0201010026 ACEITE PARA MOTOR SAE-30 gal 0.0030 50.85
02010300010005 GASOLINA 84 OCTANOS gal 0.2200 10.25
02070100010002 PIEDRA CHANCADA 1/2" m3 0.8500 50.85
02070200010002 ARENA GRUESA m3 0.4200 59.32
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 9.7400 19.07
0290130022 AGUA m3 0.1840 0.20

Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 103.61
03012900010007 VIBRADOR DE CONCRETO 4 HP 1.50" hm 1.0000 0.6667 20.00
03012900030006 MEZCLADORA DE CONCRETO DE 9 - 11P3 - 18 HP hm 1.0000 0.6667 12.00

Partida 03.03.03.02 ENCOFRADO Y DESENCOFRADO DE VIGAS

Rendimiento m2/DIA 12.0000 EQ. 12.0000 Costo unitario directo por : m2 28.43

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 1.0000 0.6667 20.10
0101010005 PEON hh 1.0000 0.6667 14.85
Materiales
02040100020002 ALAMBRE NEGRO N° 8 kg 0.2500 3.22
02041200010012 CLAVOS PARA MADERA C/C 2 1/2" kg 0.1300 3.22
0231000002 MADERA NACIONAL P/ENCOFRADO-CARP p2 1.0000 3.20

Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 23.30

Partida 03.03.03.03 ACERO CORRUGADO GRADO 60 PARA VIGAS Fy= 4200 kg/cm2

Rendimiento kg/DIA 250.0000 EQ. 250.0000 Costo unitario directo por : kg 3.93

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 1.0000 0.0320 20.10
0101010004 OFICIAL hh 1.0000 0.0320 16.51

Materiales
02040100010002 ALAMBRE NEGRO RECOCIDO N° 16 kg 0.0600 3.22
0207020005 FIERRO CORR. 3/8" G-60 kg 1.0700 2.36

Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 1.17

Partida 03.03.04.01 JUNTAS DE CONSTRUCCION 1" DE 1:3 (arena:asfalto)

Rendimiento m/DIA 200.0000 EQ. 200.0000 Costo unitario directo por : m 4.01

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010004 OFICIAL hh 1.0000 0.0400 16.51
0101010005 PEON hh 2.0000 0.0800 14.85

Materiales
0201040003 PETROLEO gal 0.0010 9.68
02010500010001 ASFALTO RC-250 gal 0.1330 14.00
02070200010001 ARENA FINA m3 0.0030 59.32
02902400010028 LEÑA kg 0.0250 1.80

Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 1.85

Partida 03.04.01 TARRAJEO EN COLUMNAS

Rendimiento m2/DIA 12.0000 EQ. 12.0000 Costo unitario directo por : m2 21.95

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 1.0000 0.6667 20.10
0101010005 PEON hh 0.4000 0.2667 14.85

Materiales
02070200010001 ARENA FINA m3 0.0180 59.32
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 0.1500 19.07
0272040053 REGLA DE MADERA p2 0.0200 7.00
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 17.36

Partida 03.04.02.01 SUMINISTRO E INSTALACION DE PUERTA DE FIERRO

Rendimiento und/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : und 301.80

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 1.0000 8.0000 20.10
0101010005 PEON hh 0.5000 4.0000 14.85

Materiales
0204020009 ANGULO 3/4"x3/4"x1/8"x6m pza 0.6670 26.00
0204020010 ANGULO 1"x1"x1/8"x6m pza 1.0670 35.00
02150300010005 TEE 3/4"x3/4"x1/8"x6m pza 0.1160 23.00
02150300010006 TEE 1"x1"x1/8"x6m A. pza 0.6830 27.00
0255080017 SOLDADURA CELLOCORD P 1/8" kg 0.1000 14.00

Equipos
0301010006 HERRAMIENTAS MANUALES %mo 2.0000 220.20

Partida 03.04.03.01 SUMINISTRO E INSTALACION DE BANCAS

Rendimiento und/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : und 110.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Materiales
02620800010010 BANCAS PREFABRICADAS INCLUYE COLOCACION und 1.0000 110.00

Partida 03.05.01 CANALETA DE FIERRO GALVANIZADO e=0.9mm

Rendimiento m/DIA 80.0000 EQ. 80.0000 Costo unitario directo por : m 27.89

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 1.0000 0.1000 20.10
0101010004 OFICIAL hh 1.0000 0.1000 16.51

Materiales
0234080002 CANALETA DE FIERRO GALVANIZADO m 1.0000 18.00
0246160002 GANCHO DE FIERRO PARA CANALETA pza 1.0200 6.00

Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 3.66

Partida 03.05.02 TUBERIA DE BAJADA PVC-SAL Ø4" PARA LLUVIAS

Rendimiento m/DIA 80.0000 EQ. 80.0000 Costo unitario directo por : m 33.54

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 1.0000 0.1000 20.10
0101010005 PEON hh 2.0000 0.2000 14.85

Materiales
0212030003 CODO DE 90 PVC SAL DE 4" und 1.0000 5.08
0212040002 REDUCCION DE PLASTICO PVC SAL 6" A 4" und 0.1300 9.84
0222080012 PEGAMENTO PARA PVC gal 0.0040 104.96
0246250002 TUBO PVC SAL 4"X3M pza 1.0300 21.00

Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 4.98

Partida 03.05.03 CONCRETO f'c=175 kg/cm2 PARA FALSA COLUMNA

Rendimiento m3/DIA 18.0000 EQ. 18.0000 Costo unitario directo por : m3 317.56

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 1.0000 0.4444 20.10
0101010004 OFICIAL hh 1.0000 0.4444 16.51
0101010005 PEON hh 8.0000 3.5556 14.85

Materiales
02070100010002 PIEDRA CHANCADA 1/2" m3 0.9000 50.85
02070200010002 ARENA GRUESA m3 0.5000 59.32
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 8.5000 19.07

Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 69.07
03012900010007 VIBRADOR DE CONCRETO 4 HP 1.50" hm 1.0000 0.4444 20.00

Partida 03.05.04 ENCOFRADO Y DESENCOFRADO PARA FALSA COLUMNA

Rendimiento m2/DIA 15.0000 EQ. 15.0000 Costo unitario directo por : m2 35.65

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 1.0000 0.5333 20.10
0101010004 OFICIAL hh 1.0000 0.5333 16.51

Materiales
02040100020002 ALAMBRE NEGRO N° 8 kg 0.3000 3.22
02041200010009 CLAVOS PARA MADERA C/C 3" kg 0.3100 3.22
0231000002 MADERA NACIONAL P/ENCOFRADO-CARP p2 4.2400 3.20

Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 19.52

Partida 03.05.05 ACERO ESTRUCTURAL Fy=4200kg/cm2 PARA FALSA COLUMNA

Rendimiento kg/DIA 260.0000 EQ. 260.0000 Costo unitario directo por : kg 4.05

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 1.0000 0.0308 20.10
0101010004 OFICIAL hh 1.0000 0.0308 16.51

Materiales
02040100020002 ALAMBRE NEGRO N° 8 kg 0.0600 3.22
0207020006 FIERRO CORR. 5/8" G-60 kg 1.0700 2.52
Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 1.13

Partida 03.06.01 TUBERIA PVC SELL 20mm

Rendimiento m/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : m 2.76

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Materiales
0212010002 TUBERIA DE 20mmX3m und 0.4000 6.56
0241020001 CINTA AISLANTE rll 0.0500 2.71

Partida 03.06.02 CABLE DE 2X4mm

Rendimiento m/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : m 1.77

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Materiales
0270010292 CABLE ELECT NYY 2X4 MM2 m 1.0500 1.69

Partida 03.06.03 INSTALACION DE TABLERO DE DISTRIBUCION

Rendimiento und/DIA 2.0000 EQ. 2.0000 Costo unitario directo por : und 376.04

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 1.0000 4.0000 20.10

Materiales
0262040001 INTERRUPTOR TERMOMAGNETICO und 1.0000 55.81
02740100010008 TABLERO DE DISTRIBUCION 14 CIRCUITOS pza 1.0000 239.83

Partida 03.06.04 CAJA DE PASO 200x200x150

Rendimiento und/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : und 40.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Materiales
02681200010007 CAJA DE PASE CUADRADA DE FIERRO GALVANIZADO DE 20und 1.0000 40.00

Partida 03.06.05 INSTALACION DE MEDIDOR

Rendimiento glb/DIA 4.0000 EQ. 4.0000 Costo unitario directo por : glb 136.97

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 1.0000 2.0000 20.10
0101010005 PEON hh 1.0000 2.0000 14.85

Materiales
0246230004 ACCESORIOS DEL MEDIDOR glb 1.0000 25.42
0270120027 MEDIDOR DE ENERGIA ELECTRICA und 1.0000 38.15

Equipos
0301010006 HERRAMIENTAS MANUALES %mo 5.0000 69.90
Partida 03.06.06 SUMINISTRO E INSTALACION DE REFLECTOR DE 500W

Rendimiento und/DIA 6.0000 EQ. 6.0000 Costo unitario directo por : und 429.80

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 1.0000 1.3333 20.10

Materiales
02680100010005 CAJA OCTOGONAL FIERRO GALVANIZADO 100X50 mm und 1.0000 3.00
0270110326 REFLECTOR 500W und 1.0000 400.00

Partida 03.06.07 INSTALACION DE INTERRUPTOR

Rendimiento und/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : und 4.50

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Materiales
0262050005 INTERRUPTOR DOBLE und 1.0000 4.50

Partida 03.07.01 SUMINISTRO E INSTALACION DE TUBO CIRCULAR NEGRO DE 2"

Rendimiento m/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : m 32.00

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Materiales
0272010091 TUBO ACERO GALV. 2" m 1.0000 32.00

Partida 03.07.02 SUMINISTRO E INSTALACION DE MALLA GALVANIZADA

Rendimiento m2/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : m2 25.17

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Materiales
02040200030006 ANGULOS DE ACERO DE 2"X2"X3mm X 6 m var 0.5000 30.00
0204150004 MALLA GALVANIZADA m 1.0000 10.17

Partida 04.01 SUMINISTRO DE TIJERALES

Rendimiento m/DIA 8.0000 EQ. 8.0000 Costo unitario directo por : m 94.53

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 1.0000 1.0000 20.10
0101010004 OFICIAL hh 1.0000 1.0000 16.51
0101010005 PEON hh 1.0000 1.0000 14.85

Materiales
0240070003 PINTURA ANTICORROSIVA gal 0.2600 27.12
02550800140004 SOLDADURA SUPERCITO PUNTO AZUL 1/8" kg 0.5600 14.00
0255080017 SOLDADURA CELLOCORD P 1/8" kg 0.5600 14.00
02901000020017 TIJERAL kg 8.0000 2.35

Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 51.46

Partida 04.02 INSTALACION DE TIJERALES TM-1 Y TM-2

Rendimiento und/DIA 16.0000 EQ. 16.0000 Costo unitario directo por : und 85.51

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010004 OFICIAL hh 2.0000 1.0000 16.51

Equipos
0301210001 GRUA hm 1.0000 0.5000 120.00
0301340008 ANDAMIO METAL TABLAS - ALQUILER est 0.1800 50.00

Partida 04.03 INSTALACION DE VIGUETAS

Rendimiento m/DIA 7.0000 EQ. 7.0000 Costo unitario directo por : m 50.13

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 0.5000 0.5714 20.10
0101010004 OFICIAL hh 0.5000 0.5714 16.51
0101010005 PEON hh 0.5000 0.5714 14.85

Materiales
02160200080006 VIGUETA kg 6.0000 2.35
0240070003 PINTURA ANTICORROSIVA gal 0.0050 27.12
02550800140004 SOLDADURA SUPERCITO PUNTO AZUL 1/8" kg 0.2000 14.00
0255080017 SOLDADURA CELLOCORD P 1/8" kg 0.2000 14.00

Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 29.41

Partida 04.04 INSTALACION DE APOYOS MOVILES

Rendimiento und/DIA 4.0000 EQ. 4.0000 Costo unitario directo por : und 298.42

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010004 OFICIAL hh 2.0000 4.0000 16.51
0101010005 PEON hh 0.2000 0.4000 14.85

Materiales
0201010028 PLANCHA METALICA DE 5/8" pza 1.0000 180.00
0271050139 PERNO DE ANCLAJE P.ENCOF. 5/8"x0.40m. pza 6.0000 7.38

Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 71.98

Partida 04.05.01 COBERTURA CON CALAMINA GALVANIZADA 1.83x0.86m

Rendimiento m2/DIA 40.0000 EQ. 40.0000 Costo unitario directo por : m2 33.24

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 2.0000 0.4000 20.10
0101010004 OFICIAL hh 2.0000 0.4000 16.51

Materiales
0213020005 CALAMINA GALVANIZADA ZIN 1.85 x 3.05m x 0.3mm pza 0.7000 17.80
0240070003 PINTURA ANTICORROSIVA gal 0.2100 27.12

Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 14.64

Partida 04.05.02 COBERTURA CON CALAMINA TRASLUCIDA 1.83x0.86m

Rendimiento m2/DIA 40.0000 EQ. 40.0000 Costo unitario directo por : m2 56.38

Código Descripción Recurso Unidad Cuadrilla Cantidad Precio S/.


Mano de Obra
0101010003 OPERARIO hh 2.0000 0.4000 20.10
0101010004 OFICIAL hh 2.0000 0.4000 16.51

Materiales
0213020006 CALAMINA TRANSLUCIDA 1.85 x 3.05m x 0.3mm pln 0.7000 50.85
0240070003 PINTURA ANTICORROSIVA gal 0.2100 27.12

Equipos
0301010006 HERRAMIENTAS MANUALES %mo 3.0000 14.64
1

SAÑO, HUANCAYO-JUNIN"
11/09/2017

Parcial S/.

200.00
200.00

Parcial S/.

410.00
410.00

78.8

Parcial S/.

0.83 3.94 65.0494 590.734838


1.49 7.88 117.018
2.32 0.00 0
0.00 0
0.21 5.20 16.746576
1.34 32.31 105.97024
3.56 82.74 280.4886
5.11 0.00 0
0.00 0
0.07 182.0674 5.462022
0.07 0.00 0

Parcial S/.

1,000.00
1,000.00
Parcial S/.

0.99
0.99

0.05
0.05

Parcial S/.

0.03
0.48
0.32
0.83

0.01
0.04
0.02
0.03
0.10

0.24
0.04
0.28

Parcial S/.

0.48
0.32
0.80

0.01
0.04
0.02
0.03
0.10

0.24
0.04
0.28

Parcial S/.

0.09
0.09

4.12
4.12
Parcial S/.

0.80
2.97
3.77

0.01
0.01

0.11
0.11

Parcial S/.

0.13
0.13

5.66
4.66
10.32

Parcial S/.

0.13
0.11
0.59
0.83

9.15
0.01
9.16

0.02
0.94
0.93
0.44
2.33

Parcial S/.

29.70
29.70
2.97
2.97

1.49
1.49

Parcial S/.

69.00
69.00

Parcial S/.

13.40
11.01
39.60
64.01

61.02
152.56
0.04
213.62

1.28
8.00
9.28

Parcial S/.

8.93
7.34
52.80
69.07

45.77
29.66
162.10
237.53

2.07
8.89
10.96

Parcial S/.
4.59
3.77
6.79
15.15

1.21
0.81
0.48
10.24
12.74

0.76
0.76

Parcial S/.

0.66
1.19
1.85

0.01
1.86
0.18
0.05
2.10

0.06
0.06

Parcial S/.

1,500.00
1,500.00

Parcial S/.

0.09
0.09

4.12
4.12

Parcial S/.
16.08
5.94
22.02

0.01
0.01

0.84
6.00
6.66

Parcial S/.

0.13
0.13

5.66
4.66
10.32

Parcial S/.

8.93
7.34
52.80
69.07

45.77
29.66
162.10
237.53

2.07
8.89
10.96

Parcial S/.

4.59
3.77
6.79
15.15

1.21
0.81
0.48
10.24
12.74

0.76
0.76

Parcial S/.

6.43
5.28
47.52
59.23

15.26
76.28
91.54

2.96
3.84
6.80

Parcial S/.

6.43
5.28
38.02
49.73

0.15
2.26
43.22
24.91
185.74
0.04
256.32

1.49
6.40
3.84
11.73

Parcial S/.

13.40
11.01
79.20
103.61

0.15
2.26
43.22
24.91
185.74
0.04
256.32

3.11
13.33
8.00
24.44

Parcial S/.

0.64
0.53
1.17

0.19
2.70
2.89

0.04
0.04

Parcial S/.

13.40
11.01
79.20
103.61

0.15
2.26
43.22
24.91
185.74
0.04
256.32

3.11
13.33
8.00
24.44

Parcial S/.

8.04
5.94
13.98

0.81
0.42
3.20
4.43

0.42
0.42

Parcial S/.

0.64
0.53
1.17

0.19
2.60
2.79

0.04
0.04

Parcial S/.

13.40
11.01
79.20
103.61

0.15
2.26
43.22
24.91
185.74
0.04
256.32

3.11
13.33
8.00
24.44

Parcial S/.

13.40
9.90
23.30

0.81
0.42
3.20
4.43

0.70
0.70

Parcial S/.

0.64
0.53
1.17

0.19
2.53
2.72

0.04
0.04

Parcial S/.

0.66
1.19
1.85

0.01
1.86
0.18
0.05
2.10

0.06
0.06

Parcial S/.

13.40
3.96
17.36

1.07
2.86
0.14
4.07
0.52
0.52

Parcial S/.

160.80
59.40
220.20

17.34
37.35
2.67
18.44
1.40
77.20

4.40
4.40

Parcial S/.

110.00
110.00

Parcial S/.

2.01
1.65
3.66

18.00
6.12
24.12

0.11
0.11

Parcial S/.

2.01
2.97
4.98
5.08
1.28
0.42
21.63
28.41

0.15
0.15

Parcial S/.

8.93
7.34
52.80
69.07

45.77
29.66
162.10
237.53

2.07
8.89
10.96

Parcial S/.

10.72
8.80
19.52

0.97
1.00
13.57
15.54

0.59
0.59

Parcial S/.

0.62
0.51
1.13

0.19
2.70
2.89
0.03
0.03

Parcial S/.

2.62
0.14
2.76

Parcial S/.

1.77
1.77

Parcial S/.

80.40
80.40

55.81
239.83
295.64

Parcial S/.

40.00
40.00

Parcial S/.

40.20
29.70
69.90

25.42
38.15
63.57

3.50
3.50

Parcial S/.

26.80
26.80

3.00
400.00
403.00

Parcial S/.

4.50
4.50

Parcial S/.

32.00
32.00

Parcial S/.

15.00
10.17
25.17

Parcial S/.

20.10
16.51
14.85
51.46

7.05
7.84
7.84
18.80
41.53
1.54
1.54

Parcial S/.

16.51
16.51

60.00
9.00
69.00

Parcial S/.

11.49
9.43
8.49
29.41

14.10
0.14
2.80
2.80
19.84

0.88
0.88

Parcial S/.

66.04
5.94
71.98

180.00
44.28
224.28

2.16
2.16

Parcial S/.

8.04
6.60
14.64

12.46
5.70
18.16

0.44
0.44

Parcial S/.

8.04
6.60
14.64

35.60
5.70
41.30

0.44
0.44
Item Descripción Und. Metrado Duración
1
01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
01.01 CONSTRUCCIONES PROVICIONALES

01.01.01 ALMACEN DE OBRA Y OFICINA mes 2.00 52.00


11.54%

01.01.02 CARTEL DE IDENTIFICACION DE OBRA und 1.00 1.00


100.00%

01.01.03 CERCO PERIMETRICO DE PROTECCION MADERA Y LONA DE RAFIA m 78.80 1.00


100.00%

01.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 1.00


100.00%
01.02 TRABAJOS PRELIMINARES

01.02.01 LIMPIEZA DEL TERRENO MANUAL m2 1,318.24 3.00


100.00%
01.03 TRAZO NIVELES Y REPLANTEO

01.03.01 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2 1,318.24 3.00


100.00%

01.03.02 TRAZO Y REPLANTEO DURANTE EL PROCESO DE EJECUCION m2 1,318.24 3.00


66.67%
02 LOSA DE GRASS SINTETICO
02.01 MOVIMIENTO DE TIERRAS

02.01.01 EXCAVACION EN TERRENO NATURAL A MAQUINA (e=0.25m) m3 305.34 1.00


100.00%

02.01.02 NIVELACION INTERIOR Y APISONADO m2 650.44 4.00


25.00%

02.01.03 ELIMINACION DE MATERIAL EXCEDENTE A MAQUINA m3 157.00 1.00

02.02 CONSTRUCCION DEL GRASS SINTETICO

02.02.01 RELLENO Y COMPACTACION DE BASE CON MATERIAL DE PRESTAMO m2 70.38 1.00

02.02.02 RELLENO DE ARENA FINA m3 35.19 5.00

02.02.03 SUMINISTRO E INSTALACION DE GRASS SINTETICO m2 703.84 8.00

02.03 OBRAS DE CONCRETO SIMPLE


02.03.01 DADOS DE CONCRETO

02.03.01.01 CONCRETO SIMPLE PARA DADOS DEL ARCO Y BANCAS f'c=175 kg/cm2 m3 1.03 1.00

02.03.02 VEREDAS

02.03.02.01 CONCRETO SIMPLE PARA VEREDA f'c=175 kg/cm2 m3 35.42 2.00

02.03.02.02 ENCOFRADO Y DESENCOFRADO DE VEREDA m2 9.84 1.00

02.03.03 JUNTAS

02.03.03.01 JUNTAS DE CONSTRUCCION 1" DE 1:3 (arena:asfalto) m 102.60 1.00

02.04 OTROS

02.04.01 SUMINISTRO E INSTALACION DE ARCOS DE FUTBOL und 2.00 1.00


02.04.01 SUMINISTRO E INSTALACION DE ARCOS DE FUTBOL und 2.00 1.00

03 CERCO PERIMETRICO
03.01 MOVIMIENTO DE TIERRAS

03.01.01 EXCAVACION EN TERRENO NATURAL A MAQUINA m3 32.89 1.00


100.00%

03.01.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO A MAQUINA m3 9.76 1.00

03.01.03 ELIMINACION DE MATERIAL EXCEDENTE A MAQUINA m3 25.45 1.00

03.02 OBRAS DE CONCRETO SIMPLE


03.02.01 SARDINELES

03.02.01.01 CONCRETO SIMPLE PARA SARDINEL f'c=175 kg/cm2 m3 6.63 1.00

03.02.01.02 ENCOFRADO Y DESENCOFRADO DE SARDINEL m2 39.80 2.00

03.02.02 SOLADO

03.02.02.01 CONCRETO PARA SOLADO DE CONCRETO POBRE f´c = 100 kg/cm2 m2 26.80 1.00
100.00%

03.02.02.02 DADO DE CONCRETO PARA CERCO PERIMETRICO f'c=210 kg/cm2 m3 2.25 1.00

03.03 OBRAS DE CONCRETO ARMADO


03.03.01 ZAPATAS

03.03.01.01 CONCRETO PARA ZAPATAS f'c=210 kg/cm2 m3 16.08 2.00

03.03.01.02 ACERO CORRUGADO GRADO 60 PARA ZAPATAS Fy= 4200 kg/cm2 kg 444.57 2.00
50.00%
03.03.02 COLUMNAS

03.03.02.01 CONCRETO PARA COLUMNAS f'c=210 kg/cm2 m3 13.44 2.00

03.03.02.02 ENCOFRADO Y DESENCOFRADO DE COLUMNA m2 174.72 5.00

03.03.02.03 ACERO CORRUGADO GRADO 60 PARA COLUMNAS Fy= 4200 kg/cm2 kg 1,546.37 4.00
25.00%
03.03.03 VIGAS

03.03.03.01 CONCRETO PARA VIGAS f'c=210 kg/cm2 m3 2.77 1.00

03.03.03.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 46.97 4.00

03.03.03.03 ACERO CORRUGADO GRADO 60 PARA VIGAS Fy= 4200 kg/cm2 kg 323.54 2.00

03.03.04 JUNTAS

03.03.04.01 JUNTAS DE CONSTRUCCION 1" DE 1:3 (arena:asfalto) m 6.40 1.00

03.04 ARQUITECTURA

03.04.01 TARRAJEO EN COLUMNAS m2 143.00 6.00

03.04.02 CARPINTERIA METALICA Y HERRERIA

03.04.02.01 SUMINISTRO E INSTALACION DE PUERTA DE FIERRO und 1.00 1.00

03.04.03 VARIOS

03.04.03.01 SUMINISTRO E INSTALACION DE BANCAS und 4.00 4.00

03.05 INSTALACIONES SANITARIAS


03.05.01 CANALETA DE FIERRO GALVANIZADO e=0.9mm m 98.00 2.00

03.05.02 TUBERIA DE BAJADA PVC-SAL Ø4" PARA LLUVIAS m 110.00 2.00

03.05.03 CONCRETO f'c=175 kg/cm2 PARA FALSA COLUMNA m3 10.89 1.00

03.05.04 ENCOFRADO Y DESENCOFRADO PARA FALSA COLUMNA m2 23.10 2.00

03.05.05 ACERO ESTRUCTURAL Fy=4200kg/cm2 PARA FALSA COLUMNA kg 255.20 1.00

03.06 INSTALACIONES ELECTRICAS

03.06.01 TUBERIA PVC SELL 20mm m 101.87 2.00

03.06.02 CABLE DE 2X4mm m 203.74 2.00

03.06.03 INSTALACION DE TABLERO DE DISTRIBUCION und 1.00 1.00

03.06.04 CAJA DE PASO 200x200x150 und 1.00 1.00

03.06.05 INSTALACION DE MEDIDOR glb 1.00 1.00

03.06.06 SUMINISTRO E INSTALACION DE REFLECTOR DE 500W und 4.00 1.00

03.06.07 INSTALACION DE INTERRUPTOR und 1.00 1.00

03.07 OTROS

03.07.01 SUMINISTRO E INSTALACION DE TUBO CIRCULAR NEGRO DE 2" m 133.20 1.00

03.07.02 SUMINISTRO E INSTALACION DE MALLA GALVANIZADA m2 281.14 10.00

04 ESTRUCTURAS METALICAS

04.01 SUMINISTRO DE TIJERALES m 326.21 9.00

04.02 INSTALACION DE TIJERALES TM-1 Y TM-2 und 11.00 1.00

04.03 INSTALACION DE VIGUETAS m 1,190.88 12.00

04.04 INSTALACION DE APOYOS MOVILES und 24.00 6.00

04.05 COBERTURA CON TECHO DE CALAMINA

04.05.01 COBERTURA CON CALAMINA GALVANIZADA 1.83x0.86m m2 1,026.00 7.00

04.05.02 COBERTURA CON CALAMINA TRASLUCIDA 1.83x0.86m m2 410.40 4.00


CRONOGRAMA DE EJECUCION

MES 01
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

11.54% 11.54% 11.54% 11.54% 11.54%

100.00%

100.00%

100.00%

100.00%

100.00%

66.67% 33.33%

100.00%

25.00% 75.00%

100.00%

100.00%

20.00% 80.00%

100.00%

100.00%

100.00%
100.00%

100.00%

100.00%

100.00%

100.00%

50.00% 50.00%

100.00%

60.00% 40.00%

25.00% 75.00%

100.00%

50.00% 50.00%

50.00% 50.00%
11.11% 66.67%

8.33%

66.67% 33.33%
MES 02
28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52

11.54% 11.54% 11.54% 11.54% 7.69%

50.00% 50.00%

100.00%

100.00%
100.00%

100.00%

50.00% 50.00%

100.00%

100.00%

16.67% 83.33%

100.00%

25.00% 75.00%
100.00%

100.00%

100.00%

50.00% 50.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

100.00%

10.00% 60.00% 30.00%

66.67% 22.22%

100.00%

8.33% 50.00% 41.67%

33.33%

42.86% 57.14%

100.00%
CRONOGRAMA VALORIZADO

Item Descripción Und. Metrado Precio Unitario


01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
01.01 CONSTRUCCIONES PROVICIONALES

01.01.01 ALMACEN DE OBRA Y OFICINA mes 2.00 200.00

ALQUILER ALMACEN Y OFICINA 1 2.00 400.00

01.01.02 CARTEL DE IDENTIFICACION DE OBRA und 1.00 410.00

GIGANTOGRAFIA DE 2.40x3.60 (INC. INSTALACION) 1 1.00 410.00

01.01.03 CERCO PERIMETRICO DE PROTECCION MADERA Y LONA DE RAFIA m 78.80 7.50

OFICIAL 3.940 16.510 65.049


PEON 7.880 14.850 117.018
CLAVOS PARA MADERA CON CABEZA DE 1" 5.201 3.220 16.747
MADERA 32.308 3.280 105.970
LONA DE RAFIA 82.740 3.390 280.489
HERRAMIENTAS MANUALES 3.000 182.067 5.462

01.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 1,000.00

TRANSPORTE DE EQUIPO Y MAQUINARIA 1 1,000.00 1,000.00


01.02 TRABAJOS PRELIMINARES

01.02.01 LIMPIEZA DEL TERRENO MANUAL m2 1,318.24 1.04

PEON 87.926608 14.85 1,305.71


HERRAMIENTAS MANUALES 5 1,305.71 65.29
01.03 TRAZO NIVELES Y REPLANTEO

01.03.01 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2 1,318.24 1.21

OPERARIO 2.109184 20.10 42.39


PEON 42.18368 14.85 626.43
TOPOGRAFO 21.09184 20.10 423.95
CLAVOS PARA MADERA C/C 3" 5.27296 3.22 16.98
YESO 26.3648 2.12 55.89
MADERA 6.5912 3.28 21.62
PINTURA ESMALTE SINTETICO 1.31824 30.93 40.77
TEODOLITO 21.09184 15.00 316.38
HERRAMIENTAS MANUALES 5 1,092.77 54.64

01.03.02 TRAZO Y REPLANTEO DURANTE EL PROCESO DE EJECUCION m2 1,318.24 1.18

PEON 42.18368 14.85 626.43


TOPOGRAFO 21.09184 20.10 423.95
CLAVOS PARA MADERA C/C 3" 5.27296 3.22 16.98
YESO 26.3648 2.12 55.89
MADERA 6.5912 3.28 21.62
PINTURA ESMALTE SINTETICO 1.31824 30.93 40.77
TEODOLITO 21.09184 15.00 316.38
HERRAMIENTAS MANUALES 5 1,050.37 52.52
02 LOSA DE GRASS SINTETICO
02.01 MOVIMIENTO DE TIERRAS
02.01.01 EXCAVACION EN TERRENO NATURAL A MAQUINA (e=0.25m) m3 305.34 4.21

OPERARIO 1.404564 20.10 28.23


TRACTOR DE ORUGAS D6 6.992286 180.00 1,258.61

02.01.02 NIVELACION INTERIOR Y APISONADO m2 650.44 3.89

OPERARIO 26.0176 20.10 522.95


PEON 130.088 14.85 1,931.81
AGUA 32.522 0.20 6.50
HERRAMIENTAS MANUALES 3 2,454.76 73.64

02.01.03 ELIMINACION DE MATERIAL EXCEDENTE A MAQUINA m3 157.00 10.45

OPERARIO 1.0519 20.10 21.14


CARGADOR SOBRE LLANTAS DE 125-135 HP 3 yd3 5.2281 170.00 888.78
VOLQUETE DE 15 M3 5.2281 140.00 731.93
02.02 CONSTRUCCION DEL GRASS SINTETICO

02.02.01 RELLENO Y COMPACTACION DE BASE CON MATERIAL DE PRESTAMO m2 70.38 12.32

OPERARIO 0.471546 20.10 9.48


OFICIAL 0.471546 16.51 7.79
PEON 2.8152 14.85 41.81
MATERIAL CLASIFICADO PARA BASE 12.6684 50.85 644.19
AGUA 1.7595 0.20 0.35
HERRAMIENTAS MANUALES 3 59.07 1.77
RODILLO LISO VIBRATORIO AUTOPROPULSADO 125 HP 0.471546 140.00 66.02
MOTONIVELADORA 125 HP 0.471546 139.40 65.73
CAMION CISTERNA (2,500 GLNS.) 0.471546 65.60 30.93

02.02.02 RELLENO DE ARENA FINA m3 35.19 34.16

PEON 70.38 14.85 1,045.14


ARENA FINA 1.7595 59.32 104.37
HERRAMIENTAS MANUALES 5 1,045.14 52.26

02.02.03 SUMINISTRO E INSTALACION DE GRASS SINTETICO m2 703.84 65.00

SUMINISTRO E INSTALACION DE GRASS SINTETICO 703.84 65.00 45,749.60


02.03 OBRAS DE CONCRETO SIMPLE
02.03.01 DADOS DE CONCRETO

02.03.01.01 CONCRETO SIMPLE PARA DADOS DEL ARCO Y BANCAS f'c=175 kg/cm2 m3 1.03 286.91

OPERARIO 0.686701 20.10 13.80


OFICIAL 0.686701 16.51 11.34
PEON 2.746701 14.85 40.79
HORMIGON 1.236 50.85 62.85
CEMENTO PORTLAND TIPO I (42.5 kg) 8.24 19.07 157.14
AGUA 0.2163 0.20 0.04
HERRAMIENTAS MANUALES 2 65.93 1.32
MEZCLADORA DE CONCRETO DE 9 - 11P3 - 18 HP 0.686701 12.00 8.24
02.03.02 VEREDAS

02.03.02.01 CONCRETO SIMPLE PARA VEREDA f'c=175 kg/cm2 m3 35.42 317.56

OPERARIO 15.740648 20.10 316.39


OFICIAL 15.740648 16.51 259.88
PEON 125.939352 14.85 1,870.20
PIEDRA CHANCADA 1/2" 31.878 50.85 1,621.00
ARENA FINA 17.71 59.32 1,050.56
CEMENTO PORTLAND TIPO I (42.5 kg) 301.07 19.07 5,741.40
HERRAMIENTAS MANUALES 3 2,446.46 73.39
VIBRADOR DE CONCRETO 4 HP 1.50" 15.740648 20.00 314.81

02.03.02.02 ENCOFRADO Y DESENCOFRADO DE VEREDA m2 9.84 28.65

OPERARIO 2.249424 20.10 45.21


OFICIAL 2.249424 16.51 37.14
PEON 4.497864 14.85 66.79
PETROLEO 1.23 9.68 11.91
ALAMBRE NEGRO N° 8 2.46 3.22 7.92
CLAVOS PARA MADERA C/C 3" 1.476 3.22 4.75
MADERA NACIONAL P/ENCOFRADO-CARP 31.488 3.20 100.76
HERRAMIENTAS MANUALES 5 149.14 7.46
02.03.03 JUNTAS

02.03.03.01 JUNTAS DE CONSTRUCCION 1" DE 1:3 (arena:asfalto) m 102.60 4.01

OFICIAL 4.104 16.51 67.76


PEON 8.208 14.85 121.89
PETROLEO 0.1026 9.68 0.99
ASFALTO RC-250 13.6458 14.00 191.04
ARENA FINA 0.3078 59.32 18.26
LEÑA 2.565 1.80 4.62
HERRAMIENTAS MANUALES 3 189.65 5.69
02.04 OTROS

02.04.01 SUMINISTRO E INSTALACION DE ARCOS DE FUTBOL und 2.00 1,500.00

INSTALACION DE ARCOS DE FUTBOL 2 1,500.00 3,000.00


03 CERCO PERIMETRICO
03.01 MOVIMIENTO DE TIERRAS

03.01.01 EXCAVACION EN TERRENO NATURAL A MAQUINA m3 32.89 4.21

OPERARIO 0.151294 20.10 3.04


TRACTOR DE ORUGAS D6 0.753181 180.00 135.57

03.01.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO A MAQUINA m3 9.76 28.69

OPERARIO 7.808 20.10 156.94


PEON 3.904 14.85 57.97
AGUA 0.488 0.20 0.10
HERRAMIENTAS MANUALES 3 214.92 6.45
APISONADOR TIPO CANGURO 3.904 15.00 58.56

03.01.03 ELIMINACION DE MATERIAL EXCEDENTE A MAQUINA m3 25.45 10.45

OPERARIO 0.170515 20.10 3.43


CARGADOR SOBRE LLANTAS DE 125-135 HP 3 yd3 0.847485 170.00 144.07
VOLQUETE DE 15 M3 0.847485 140.00 118.65
03.02 OBRAS DE CONCRETO SIMPLE
03.02.01 SARDINELES

03.02.01.01 CONCRETO SIMPLE PARA SARDINEL f'c=175 kg/cm2 m3 6.63 317.56

OPERARIO 2.946372 20.10 59.22


OFICIAL 2.946372 16.51 48.64
PEON 23.573628 14.85 350.07
PIEDRA CHANCADA 1/2" 5.967 50.85 303.42
ARENA FINA 3.315 59.32 196.65
CEMENTO PORTLAND TIPO I (42.5 kg) 56.355 19.07 1,074.69
HERRAMIENTAS MANUALES 3 457.94 13.74
VIBRADOR DE CONCRETO 4 HP 1.50" 2.946372 20.00 58.93

03.02.01.02 ENCOFRADO Y DESENCOFRADO DE SARDINEL m2 39.80 28.65

OPERARIO 9.09828 20.10 182.88


OFICIAL 9.09828 16.51 150.21
PEON 18.19258 14.85 270.16
PETROLEO 4.975 9.68 48.16
ALAMBRE NEGRO N° 8 9.95 3.22 32.04
CLAVOS PARA MADERA C/C 3" 5.97 3.22 19.22
MADERA NACIONAL P/ENCOFRADO-CARP 127.36 3.20 407.55
HERRAMIENTAS MANUALES 5 603.25 30.16
03.02.02 SOLADO

03.02.02.01 CONCRETO PARA SOLADO DE CONCRETO POBRE f´c = 100 kg/cm2 m2 26.80 157.57

OPERARIO 8.576 20.10 172.38


OFICIAL 8.576 16.51 141.59
PEON 85.76 14.85 1,273.54
HORMIGON 8.04 50.85 408.83
CEMENTO PORTLAND TIPO I (42.5 kg) 107.2 19.07 2,044.30
HERRAMIENTAS MANUALES 5 1,587.50 79.38
MEZCLADORA DE CONCRETO DE 9 - 11P3 - 18 HP 8.576 12.00 102.91

03.02.02.02 DADO DE CONCRETO PARA CERCO PERIMETRICO f'c=210 kg/cm2 m3 2.25 317.78

OPERARIO 0.72 20.10 14.47


OFICIAL 0.72 16.51 11.89
PEON 5.76 14.85 85.54
ACEITE PARA MOTOR SAE-30 0.00675 50.85 0.34
GASOLINA 84 OCTANOS 0.495 10.25 5.07
PIEDRA CHANCADA 1/2" 1.9125 50.85 97.25
ARENA GRUESA 0.945 59.32 56.06
CEMENTO PORTLAND TIPO I (42.5 kg) 21.915 19.07 417.92
AGUA 0.414 0.20 0.08
HERRAMIENTAS MANUALES 3 111.90 3.36
VIBRADOR DE CONCRETO 4 HP 1.50" 0.72 20.00 14.40
MEZCLADORA DE CONCRETO DE 9 - 11P3 - 18 HP 0.72 12.00 8.64
03.03 OBRAS DE CONCRETO ARMADO
03.03.01 ZAPATAS

03.03.01.01 CONCRETO PARA ZAPATAS f'c=210 kg/cm2 m3 16.08 384.37

OPERARIO 10.720536 20.10 215.48


OFICIAL 10.720536 16.51 177.00
PEON 85.759464 14.85 1,273.53
ACEITE PARA MOTOR SAE-30 0.04824 50.85 2.45
GASOLINA 84 OCTANOS 3.5376 10.25 36.26
PIEDRA CHANCADA 1/2" 13.668 50.85 695.02
ARENA GRUESA 6.7536 59.32 400.62
CEMENTO PORTLAND TIPO I (42.5 kg) 156.6192 19.07 2,986.73
AGUA 2.95872 0.20 0.59
HERRAMIENTAS MANUALES 3 1,666.01 49.98
VIBRADOR DE CONCRETO 4 HP 1.50" 10.720536 20.00 214.41
MEZCLADORA DE CONCRETO DE 9 - 11P3 - 18 HP 10.720536 12.00 128.65

03.03.01.02 ACERO CORRUGADO GRADO 60 PARA ZAPATAS Fy= 4200 kg/cm2 kg 444.57 4.10

OPERARIO 14.22624 20.10 285.95


OFICIAL 14.22624 16.51 234.88
ALAMBRE NEGRO RECOCIDO N° 16 26.6742 3.22 85.89
FIERRO CORR. 5/8" G-60 475.6899 2.52 1,198.74
HERRAMIENTAS MANUALES 3 520.82 15.62
03.03.02 COLUMNAS

03.03.02.01 CONCRETO PARA COLUMNAS f'c=210 kg/cm2 m3 13.44 384.37

OPERARIO 8.960448 20.10 180.11


OFICIAL 8.960448 16.51 147.94
PEON 71.679552 14.85 1,064.44
ACEITE PARA MOTOR SAE-30 0.04032 50.85 2.05
GASOLINA 84 OCTANOS 2.9568 10.25 30.31
PIEDRA CHANCADA 1/2" 11.424 50.85 580.91
ARENA GRUESA 5.6448 59.32 334.85
CEMENTO PORTLAND TIPO I (42.5 kg) 130.9056 19.07 2,496.37
AGUA 2.47296 0.20 0.49
HERRAMIENTAS MANUALES 3 1,392.48 41.77
VIBRADOR DE CONCRETO 4 HP 1.50" 8.960448 20.00 179.21
MEZCLADORA DE CONCRETO DE 9 - 11P3 - 18 HP 8.960448 12.00 107.53

03.03.02.02 ENCOFRADO Y DESENCOFRADO DE COLUMNA m2 174.72 18.83

OPERARIO 69.888 20.10 1,404.75


PEON 69.888 14.85 1,037.84
ALAMBRE NEGRO N° 8 43.68 3.22 140.65
CLAVOS PARA MADERA C/C 2 1/2" 22.7136 3.22 73.14
MADERA NACIONAL P/ENCOFRADO-CARP 174.72 3.20 559.10
HERRAMIENTAS MANUALES 3 2,442.59 73.28

03.03.02.03 ACERO CORRUGADO GRADO 60 PARA COLUMNAS Fy= 4200 kg/cm2 kg 1,546.37 4.00

OPERARIO 49.48384 20.10 994.63


OFICIAL 49.48384 16.51 816.98
ALAMBRE NEGRO RECOCIDO N° 16 92.7822 3.22 298.76
FIERRO CORR. 1/2" G-60 1654.6159 2.43 4,020.72
HERRAMIENTAS MANUALES 3 1,811.60 54.35
03.03.03 VIGAS

03.03.03.01 CONCRETO PARA VIGAS f'c=210 kg/cm2 m3 2.77 384.37

OPERARIO 1.846759 20.10 37.12


OFICIAL 1.846759 16.51 30.49
PEON 14.773241 14.85 219.38
ACEITE PARA MOTOR SAE-30 0.00831 50.85 0.42
GASOLINA 84 OCTANOS 0.6094 10.25 6.25
PIEDRA CHANCADA 1/2" 2.3545 50.85 119.73
ARENA GRUESA 1.1634 59.32 69.01
CEMENTO PORTLAND TIPO I (42.5 kg) 26.9798 19.07 514.50
AGUA 0.50968 0.20 0.10
HERRAMIENTAS MANUALES 3 286.99 8.61
VIBRADOR DE CONCRETO 4 HP 1.50" 1.846759 20.00 36.94
MEZCLADORA DE CONCRETO DE 9 - 11P3 - 18 HP 1.846759 12.00 22.16

03.03.03.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 46.97 28.43

OPERARIO 31.314899 20.10 629.43


PEON 31.314899 14.85 465.03
ALAMBRE NEGRO N° 8 11.7425 3.22 37.81
CLAVOS PARA MADERA C/C 2 1/2" 6.1061 3.22 19.66
MADERA NACIONAL P/ENCOFRADO-CARP 46.97 3.20 150.30
HERRAMIENTAS MANUALES 3 1,094.46 32.83

03.03.03.03 ACERO CORRUGADO GRADO 60 PARA VIGAS Fy= 4200 kg/cm2 kg 323.54 3.93

OPERARIO 10.35328 20.10 208.10


OFICIAL 10.35328 16.51 170.93
ALAMBRE NEGRO RECOCIDO N° 16 19.4124 3.22 62.51
FIERRO CORR. 3/8" G-60 346.1878 2.36 817.00
HERRAMIENTAS MANUALES 3 379.03 11.37
03.03.04 JUNTAS

03.03.04.01 JUNTAS DE CONSTRUCCION 1" DE 1:3 (arena:asfalto) m 6.40 4.01

OFICIAL 0.256 16.51 4.23


PEON 0.512 14.85 7.60
PETROLEO 0.0064 9.68 0.06
ASFALTO RC-250 0.8512 14.00 11.92
ARENA FINA 0.0192 59.32 1.14
LEÑA 0.16 1.80 0.29
HERRAMIENTAS MANUALES 3 11.83 0.35
03.04 ARQUITECTURA

03.04.01 TARRAJEO EN COLUMNAS m2 143.00 21.95

OPERARIO 95.3381 20.10 1,916.30


PEON 38.1381 14.85 566.35
ARENA FINA 2.574 59.32 152.69
CEMENTO PORTLAND TIPO I (42.5 kg) 21.45 19.07 409.05
REGLA DE MADERA 2.86 7.00 20.02
HERRAMIENTAS MANUALES 3 2,482.65 74.48
03.04.02 CARPINTERIA METALICA Y HERRERIA

03.04.02.01 SUMINISTRO E INSTALACION DE PUERTA DE FIERRO und 1.00 301.80

OPERARIO 8 20.10 160.80


PEON 4 14.85 59.40
ANGULO 3/4"x3/4"x1/8"x6m 0.667 26.00 17.34
ANGULO 1"x1"x1/8"x6m 1.067 35.00 37.35
TEE 3/4"x3/4"x1/8"x6m 0.116 23.00 2.67
TEE 1"x1"x1/8"x6m A. 0.683 27.00 18.44
SOLDADURA CELLOCORD P 1/8" 0.1 14.00 1.40
HERRAMIENTAS MANUALES 2 220.20 4.40
03.04.03 VARIOS

03.04.03.01 SUMINISTRO E INSTALACION DE BANCAS und 4.00 110.00

BANCAS PREFABRICADAS INCLUYE COLOCACION 4 110.00 440.00


03.05 INSTALACIONES SANITARIAS

03.05.01 CANALETA DE FIERRO GALVANIZADO e=0.9mm m 98.00 27.89


03.05.01 CANALETA DE FIERRO GALVANIZADO e=0.9mm m 98.00 27.89

OPERARIO 9.8 20.10 196.98


OFICIAL 9.8 16.51 161.80
CANALETA DE FIERRO GALVANIZADO 98 18.00 1,764.00
GANCHO DE FIERRO PARA CANALETA 99.96 6.00 599.76
HERRAMIENTAS MANUALES 3 358.78 10.76

03.05.02 TUBERIA DE BAJADA PVC-SAL Ø4" PARA LLUVIAS m 110.00 33.54

OPERARIO 11 20.10 221.10


PEON 22 14.85 326.70
CODO DE 90 PVC SAL DE 4" 110 5.08 558.80
REDUCCION DE PLASTICO PVC SAL 6" A 4" 14.3 9.84 140.71
PEGAMENTO PARA PVC 0.44 104.96 46.18
TUBO PVC SAL 4"X3M 113.3 21.00 2,379.30
HERRAMIENTAS MANUALES 3 547.80 16.43

03.05.03 CONCRETO f'c=175 kg/cm2 PARA FALSA COLUMNA m3 10.89 317.56

OPERARIO 4.839516 20.10 97.27


OFICIAL 4.839516 16.51 79.90
PEON 38.720484 14.85 575.00
PIEDRA CHANCADA 1/2" 9.801 50.85 498.38
ARENA GRUESA 5.445 59.32 323.00
CEMENTO PORTLAND TIPO I (42.5 kg) 92.565 19.07 1,765.21
HERRAMIENTAS MANUALES 3 752.17 22.57
VIBRADOR DE CONCRETO 4 HP 1.50" 4.839516 20.00 96.79

03.05.04 ENCOFRADO Y DESENCOFRADO PARA FALSA COLUMNA m2 23.10 35.65

OPERARIO 12.31923 20.10 247.62


OFICIAL 12.31923 16.51 203.39
ALAMBRE NEGRO N° 8 6.93 3.22 22.31
CLAVOS PARA MADERA C/C 3" 7.161 3.22 23.06
MADERA NACIONAL P/ENCOFRADO-CARP 97.944 3.20 313.42
HERRAMIENTAS MANUALES 3 451.01 13.53

03.05.05 ACERO ESTRUCTURAL Fy=4200kg/cm2 PARA FALSA COLUMNA kg 255.20 4.05

OPERARIO 7.86016 20.10 157.99


OFICIAL 7.86016 16.51 129.77
ALAMBRE NEGRO N° 8 15.312 3.22 49.30
FIERRO CORR. 5/8" G-60 273.064 2.52 688.12
HERRAMIENTAS MANUALES 3 287.76 8.63
03.06 INSTALACIONES ELECTRICAS

03.06.01 TUBERIA PVC SELL 20mm m 101.87 2.76

TUBERIA DE 20mmX3m 40.748 6.56 267.31


CINTA AISLANTE 5.0935 2.71 13.80

03.06.02 CABLE DE 2X4mm m 203.74 1.77

CABLE ELECT NYY 2X4 MM2 213.927 1.69 361.54

03.06.03 INSTALACION DE TABLERO DE DISTRIBUCION und 1.00 376.04

OPERARIO 4 20.10 80.40


INTERRUPTOR TERMOMAGNETICO 1 55.81 55.81
TABLERO DE DISTRIBUCION 14 CIRCUITOS 1 239.83 239.83
03.06.04 CAJA DE PASO 200x200x150 und 1.00 40.00

CAJA DE PASE CUADRADA DE FIERRO GALVANIZADO DE 200x200x150 mm 1 40.00 40.00

03.06.05 INSTALACION DE MEDIDOR glb 1.00 136.97

OPERARIO 2 20.10 40.20


PEON 2 14.85 29.70
ACCESORIOS DEL MEDIDOR 1 25.42 25.42
MEDIDOR DE ENERGIA ELECTRICA 1 38.15 38.15
HERRAMIENTAS MANUALES 5 69.90 3.50

03.06.06 SUMINISTRO E INSTALACION DE REFLECTOR DE 500W und 4.00 429.80

OPERARIO 5.3332 20.10 107.20


CAJA OCTOGONAL FIERRO GALVANIZADO 100X50 mm 4 3.00 12.00
REFLECTOR 500W 4 400.00 1,600.00

03.06.07 INSTALACION DE INTERRUPTOR und 1.00 4.50

INTERRUPTOR DOBLE 1 4.50 4.50


03.07 OTROS

03.07.01 SUMINISTRO E INSTALACION DE TUBO CIRCULAR NEGRO DE 2" m 133.20 32.00

TUBO ACERO GALV. 2" 133.2 32.00 4,262.40

03.07.02 SUMINISTRO E INSTALACION DE MALLA GALVANIZADA m2 281.14 25.17

ANGULOS DE ACERO DE 2"X2"X3mm X 6 m 140.57 30.00 4,217.10


MALLA GALVANIZADA 281.14 10.17 2,859.19
04 ESTRUCTURAS METALICAS

04.01 SUMINISTRO DE TIJERALES m 326.21 94.53

OPERARIO 326.21 20.10 6,556.82


OFICIAL 326.21 16.51 5,385.73
PEON 326.21 14.85 4,844.22
PINTURA ANTICORROSIVA 84.8146 27.12 2,300.17
SOLDADURA SUPERCITO PUNTO AZUL 1/8" 182.6776 14.00 2,557.49
SOLDADURA CELLOCORD P 1/8" 182.6776 14.00 2,557.49
TIJERAL 2609.68 2.35 6,132.75
HERRAMIENTAS MANUALES 3 16,786.77 503.60

04.02 INSTALACION DE TIJERALES TM-1 Y TM-2 und 11.00 85.51

OFICIAL 11 16.51 181.61


GRUA 5.5 120.00 660.00
ANDAMIO METAL TABLAS - ALQUILER 1.98 50.00 99.00

04.03 INSTALACION DE VIGUETAS m 1,190.88 50.13

OPERARIO 680.468832 20.10 13,677.42


OFICIAL 680.468832 16.51 11,234.54
PEON 680.468832 14.85 10,104.96
VIGUETA 7145.28 2.35 16,791.41
PINTURA ANTICORROSIVA 5.9544 27.12 161.48
SOLDADURA SUPERCITO PUNTO AZUL 1/8" 238.176 14.00 3,334.46
SOLDADURA CELLOCORD P 1/8" 238.176 14.00 3,334.46
HERRAMIENTAS MANUALES 3 35,016.93 1,050.51

04.04 INSTALACION DE APOYOS MOVILES und 24.00 298.42


04.04 INSTALACION DE APOYOS MOVILES und 24.00 298.42

OFICIAL 96 16.51 1,584.96


PEON 9.6 14.85 142.56
PLANCHA METALICA DE 5/8" 24 180.00 4,320.00
PERNO DE ANCLAJE P.ENCOF. 5/8"x0.40m. 144 7.38 1,062.72
HERRAMIENTAS MANUALES 3 1,727.52 51.83
04.05 COBERTURA CON TECHO DE CALAMINA

04.05.01 COBERTURA CON CALAMINA GALVANIZADA 1.83x0.86m m2 1,026.00 33.24

OPERARIO 410.4 20.10 8,249.04


OFICIAL 410.4 16.51 6,775.70
CALAMINA GALVANIZADA ZIN 1.85 x 3.05m x 0.3mm 718.2 17.80 12,783.96
PINTURA ANTICORROSIVA 215.46 27.12 5,843.28
HERRAMIENTAS MANUALES 3 15,024.74 450.74

04.05.02 COBERTURA CON CALAMINA TRASLUCIDA 1.83x0.86m m2 410.40 56.38

OPERARIO 164.16 20.10 3,299.62


OFICIAL 164.16 16.51 2,710.28
CALAMINA TRANSLUCIDA 1.85 x 3.05m x 0.3mm 287.28 50.85 14,608.19
PINTURA ANTICORROSIVA 86.184 27.12 2,337.31
HERRAMIENTAS MANUALES 3 6,009.90 180.30
COSTO DIRECTO
GASTOS GENERALES 8%
UTILIDAD 7%
SUB TOTAL
IGV 18%
SUB TOTAL DE PRESUPUESTO
SUPERVISION
PRESUPUESTO TOTAL
PORCENTAJE DE AVANCE %
PORCENTAJE DE AVANCE ACUMULADO %
ONOGRAMA VALORIZADO

Parcial S/ MES 01 MES 02 Sumatoria

46.15 46.15 46.15 46.15 46.15 46.15 46.15 46.15 30.77 400.00
400.00
11.54% 11.54% 11.54% 11.54% 11.54% 11.54% 11.54% 11.54% 7.69% 100%
400.00 46.15 46.15 46.15 46.15 46.15 46.15 46.15 46.15 30.77
410.00 410.00
410.00
100.00% 100%
410.00 410.00 410.00
591.00 591.00
591.00
100.00% 100%
65.05
117.02
16.75
590.73
105.97
280.49
5.46
1000.00 1,000.00
1,000.00
100.00% 100%
1,000.00 1,000.00

1370.97 1,370.97
1,370.97
100.00% 100%
1,305.71
1,371.00
65.29

1595.07 1,595.07
1,595.07
100.00% 100%
42.39
626.43
423.95
16.98
1,599.05 55.89
21.62
40.77
316.38
54.64
1037.02 518.51 1,555.52
1,555.52
66.67% 33.33% 100%
417.62 208.81
282.63 141.32
11.32 5.66
37.26 18.63
1,554.53
14.41 7.21
27.18 13.59
210.92 105.46
35.01 17.51
1285.48 1,285.48
1,285.48
100.00% 100%
28.23
1,286.84
1,258.61
632.55 1897.66 2,530.21
2,530.21
25.00% 75.00% 100%
130.74 392.22
482.95 1,448.86
2,534.91
1.63 4.88
18.41 55.23
1640.65 1,640.65
1,640.65
100.00% 100%
21.14
1,641.85 888.78
731.93

867.08 867.08
867.08
100.00% 100%
9.48
7.79
41.81
644.19
868.06 0.35
1.77
66.02
65.73
30.93
240.42 961.67 1,202.09
1,202.09
20.00% 80.00% 100%
209.03 836.11
1,201.77 20.87 83.50
10.45 41.81
22874.80 22874.80 45,749.60
45,749.60
50.00% 50.00% 100%
45,749.60 22,874.80 22,874.80

295.52 295.52
295.52
100.00% 100%
13.80
11.34
40.79
62.85
295.52
157.14
0.04
1.32
8.24

11247.98 11,247.98
11,247.98
100.00% 100%
316.39
259.88
1,870.20

11,247.63
1,621.00
11,247.63
1,050.56
5,741.40
73.39
314.81
281.92 281.92
281.92
100.00% 100%
45.21
37.14
66.79
11.91
281.94
7.92
4.75
100.76
7.46

411.43 411.43
411.43
100.00% 100%
67.76
121.89
0.99
410.25 191.04
18.26
4.62
5.69

3000.00 3,000.00
3,000.00
100.00% 100%
3,000.00 3,000.00

138.47 138.47
138.47
100.00% 100%
3.04
138.61
135.57
280.01 280.01
280.01
100.00% 100%
156.94
57.97
280.02 0.10
6.45
58.56
265.95 265.95
265.95
100.00% 100%
3.43
266.15 144.07
118.65

2105.42 2,105.42
2,105.42
100.00% 100%
59.22
48.64

2,105.36
350.07
303.42
2,105.36
196.65
1,074.69
13.74
58.93
570.14 570.14 1,140.27
1,140.27
50.00% 50.00% 100%
91.44 91.44
75.11 75.11
135.08 135.08
24.08 24.08
1,140.38
16.02 16.02
9.61 9.61
203.78 203.78
15.08 15.08

4222.88 4,222.88
4,222.88
100.00% 100%
172.38
141.59
1,273.54
4,222.93 408.83
2,044.30
79.38
102.91
715.01 715.01
715.01
100.00% 100%
14.47
11.89
85.54
0.34
5.07
97.25
715.02
56.06
417.92
0.08
3.36
14.40
8.64

6180.67 6,180.67
6,180.67
100.00% 100%
215.48
177.00
1,273.53
2.45
36.26
695.02
6,180.72
400.62
2,986.73
0.59
6,180.72

49.98
214.41
128.65
911.37 911.37 1,822.74
1,822.74
50.00% 50.00% 100%
142.97 142.97
117.44 117.44
1,821.08 42.95 42.95
599.37 599.37
7.81 7.81

5165.93 5,165.93
5,165.93
100.00% 100%
180.11
147.94
1,064.44
2.05
30.31
580.91
5,165.97
334.85
2,496.37
0.49
41.77
179.21
107.53
1973.99 1315.99 3,289.98
3,289.98
60.00% 40.00% 100%
842.85 561.90
622.70 415.13
84.39 56.26
3,288.75
43.88 29.26
335.46 223.64
43.97 29.31
1546.37 4639.11 6,185.48
6,185.48
25.00% 75.00% 100%
248.66 745.97
204.24 612.73
6,185.43 74.69 224.07
1,005.18 3,015.54
13.59 40.76

1064.70 1,064.70
1,064.70
100.00% 100%
37.12
30.49
219.38
0.42
6.25
119.73
1,064.71
69.01
514.50
0.10
8.61
1,064.71

36.94
22.16
667.68 667.68 1,335.36
1,335.36
50.00% 50.00% 100%
314.71 314.71
232.51 232.51
18.91 18.91
1,335.07
9.83 9.83
75.15 75.15
16.42 16.42
635.76 635.76 1,271.51
1,271.51
50.00% 50.00% 100%
104.05 104.05
85.47 85.47
1,269.92 31.25 31.25
408.50 408.50
5.69 5.69

25.66 25.66
25.66
100.00% 100%
4.23
7.60
0.06
25.59 11.92
1.14
0.29
0.35

523.14 2615.71 3,138.85


3,138.85
16.67% 83.33% 100%
319.38 1,596.91
94.39 471.96
25.45 127.24
3,138.89
68.18 340.88
3.34 16.68
12.41 62.07

301.80 301.80
301.80
100.00% 100%
160.80
59.40
17.34
37.35
301.80
2.67
18.44
1.40
4.40

110.00 330.00 440.00


440.00
25.00% 75.00% 100%
440.00 110.00 330.00

2733.22 2,733.22
2,733.22
2,733.22
100.00% 100%
196.98
161.80
2,733.30 1,764.00
599.76
10.76
3689.40 3,689.40
3,689.40
100.00% 100%
221.10
326.70
558.80
3,689.23 140.71
46.18
2,379.30
16.43
3458.23 3,458.23
3,458.23
100.00% 100%
97.27
79.90
575.00
498.38
3,458.12
323.00
1,765.21
22.57
96.79
411.76 411.76 823.52
823.52
50.00% 50.00% 100%
123.81 123.81
101.70 101.70
11.16 11.16
823.33
11.53 11.53
156.71 156.71
6.77 6.77
1033.56 1,033.56
1,033.56
100.00% 100%
157.99
129.77
1,033.82 49.30
688.12
8.63

281.16 281.16
281.16
100.00% 100%
267.31
281.11
13.80
360.62 360.62
360.62
100.00% 100%
361.54 361.54
376.04 376.04
376.04
100.00% 100%
80.40
376.04 55.81
239.83
40.00 40.00
40.00
100.00% 100%
40.00 40.00

136.97 136.97
136.97
100.00% 100%
40.20
29.70
136.97 25.42
38.15
3.50
1719.20 1,719.20
1,719.20
100.00% 100%
107.20
1,719.20 12.00
1,600.00
4.50 4.50
4.50
100.00% 100%
4.50 4.50

4262.40 4,262.40
4,262.40
100.00% 100%
4,262.40 4,262.40
707.63 4245.78 2122.89 7,076.29
7,076.29
10.00% 60.00% 30.00% 100%
421.71 2,530.26 1,265.13
7,076.29
285.92 1,715.52 857.76

3426.29 20557.75 6852.58 30,836.63


30,836.63
11.11% 66.67% 22.22% 100%
728.54 4,371.21 1,457.07
598.41 3,590.48 1,196.83
538.25 3,229.48 1,076.49
255.57 1,533.45 511.15
30,838.26
284.17 1,704.99 568.33
284.17 1,704.99 568.33
681.42 4,088.50 1,362.83
55.96 335.74 111.91
940.61 940.61
940.61
100.00% 100%
181.61
940.61 660.00
99.00
4974.90 29849.41 24874.51 59,698.81
59,698.81
8.33% 50.00% 41.67% 100%
1,139.79 6,838.71 5,698.93
936.21 5,617.27 4,681.06
842.08 5,052.48 4,210.40
1,399.28 8,395.70 6,996.42
59,689.25
13.46 80.74 67.28
277.87 1,667.23 1,389.36
277.87 1,667.23 1,389.36
87.54 525.25 437.71
4774.72 2387.36 7,162.08
7,162.08
7,162.08
66.67% 33.33% 100%
1,056.64 528.32
95.04 47.52
7,162.07 2,880.00 1,440.00
708.48 354.24
34.55 17.28

14616.10 19488.14 34,104.24


34,104.24
42.86% 57.14% 100%
3,535.30 4,713.74
2,903.87 3,871.83
34,102.72 5,478.84 7,305.12
2,504.26 3,339.01
193.18 257.57
23138.35 23,138.35
23,138.35
100.00% 100%
3,299.62
2,710.28
23,135.69 14,608.19
2,337.31
180.30
296,401.04 14,787.33 19,461.57 8,793.18 22,145.20 28,377.60 37,688.76 46,315.07 84,477.03 34,355.30 296,401.04
23,712.08 1,182.99 1,556.93 703.45 1,771.62 2,270.21 3,015.10 3,705.21 6,758.16 2,748.42 23,712.08
20,748.07 1,035.11 1,362.31 615.52 1,550.16 1,986.43 2,638.21 3,242.06 5,913.39 2,404.87 20,748.07
340,861.20 17,005.42 22,380.81 10,112.16 25,466.98 32,634.23 43,342.07 53,262.33 97,148.59 39,508.60 340,861.20
61,355.02 3,060.98 4,028.55 1,820.19 4,584.06 5,874.16 7,801.57 9,587.22 17,486.75 7,111.55 61,355.02
402,216.21 20,066.40 26,409.35 11,932.35 30,051.03 38,508.40 51,143.64 62,849.56 114,635.33 46,620.15 402,216.21
9,999.84 498.89 656.59 296.66 747.12 957.39 1,271.53 1,562.56 2,850.05 1,159.06 9,999.84
412,216.06 20,565.29 27,065.94 12,229.01 30,798.16 39,465.79 52,415.17 64,412.11 117,485.38 47,779.21 412,216.06
4.99% 6.57% 2.97% 7.47% 9.57% 12.72% 15.63% 28.50% 11.59% 100%
4.99% 11.55% 14.52% 21.99% 31.57% 44.28% 59.91% 88.41% 100.00%
Item Descripción Und. Metrado Duración
1
01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
01.01 CONSTRUCCIONES PROVICIONALES
01.01.01 ALMACEN DE OBRA Y OFICINA mes 2.00 52.00
01.01.02 CARTEL DE IDENTIFICACION DE OBRA und 1.00 1.00
01.01.03 CERCO PERIMETRICO DE PROTECCION MADERA Y LONA DE RAFIA m 78.80 1.00
01.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 1.00
01.02 TRABAJOS PRELIMINARES
01.02.01 LIMPIEZA DEL TERRENO MANUAL m2 1,318.24 3.00
01.03 TRAZO NIVELES Y REPLANTEO
01.03.01 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2 1,318.24 3.00
01.03.02 TRAZO Y REPLANTEO DURANTE EL PROCESO DE EJECUCION m2 1,318.24 3.00
02 LOSA DE GRASS SINTETICO
02.01 MOVIMIENTO DE TIERRAS
02.01.01 EXCAVACION EN TERRENO NATURAL A MAQUINA (e=0.25m) m3 305.34 1.00
02.01.02 NIVELACION INTERIOR Y APISONADO m2 650.44 4.00
02.01.03 ELIMINACION DE MATERIAL EXCEDENTE A MAQUINA m3 157.00 1.00
02.02 CONSTRUCCION DEL GRASS SINTETICO
02.02.01 RELLENO Y COMPACTACION DE BASE CON MATERIAL DE PRESTAMO m2 70.38 1.00
02.02.02 RELLENO DE ARENA FINA m3 35.19 5.00
02.02.03 SUMINISTRO E INSTALACION DE GRASS SINTETICO m2 703.84 8.00
02.03 OBRAS DE CONCRETO SIMPLE
02.03.01 DADOS DE CONCRETO
02.03.01.01 CONCRETO SIMPLE PARA DADOS DEL ARCO Y BANCAS f'c=175 kg/cm2 m3 1.03 1.00
02.03.02 VEREDAS
02.03.02.01 CONCRETO SIMPLE PARA VEREDA f'c=175 kg/cm2 m3 35.42 2.00
02.03.02.02 ENCOFRADO Y DESENCOFRADO DE VEREDA m2 9.84 1.00
02.03.03 JUNTAS
02.03.03.01 JUNTAS DE CONSTRUCCION 1" DE 1:3 (arena:asfalto) m 102.60 1.00
02.04 OTROS
02.04.01 SUMINISTRO E INSTALACION DE ARCOS DE FUTBOL und 2.00 1.00
03 CERCO PERIMETRICO
03.01 MOVIMIENTO DE TIERRAS
03.01.01 EXCAVACION EN TERRENO NATURAL A MAQUINA m3 32.89 1.00
03.01.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO A MAQUINA m3 9.76 1.00
03.01.03 ELIMINACION DE MATERIAL EXCEDENTE A MAQUINA m3 25.45 1.00
03.02 OBRAS DE CONCRETO SIMPLE
03.02.01 SARDINELES
03.02.01.01 CONCRETO SIMPLE PARA SARDINEL f'c=175 kg/cm2 m3 6.63 1.00
03.02.01.02 ENCOFRADO Y DESENCOFRADO DE SARDINEL m2 39.80 2.00
03.02.02 SOLADO
03.02.02.01 CONCRETO PARA SOLADO DE CONCRETO POBRE f´c = 100 kg/cm2 m2 26.80 1.00
03.02.02.02 DADO DE CONCRETO PARA CERCO PERIMETRICO f'c=210 kg/cm2 m3 2.25 1.00
03.03 OBRAS DE CONCRETO ARMADO
03.03.01 ZAPATAS
03.03.01.01 CONCRETO PARA ZAPATAS f'c=210 kg/cm2 m3 16.08 2.00
03.03.01.02 ACERO CORRUGADO GRADO 60 PARA ZAPATAS Fy= 4200 kg/cm2 kg 444.57 2.00
03.03.02 COLUMNAS
03.03.02.01 CONCRETO PARA COLUMNAS f'c=210 kg/cm2 m3 13.44 2.00
03.03.02.02 ENCOFRADO Y DESENCOFRADO DE COLUMNA m2 174.72 5.00
03.03.02.03 ACERO CORRUGADO GRADO 60 PARA COLUMNAS Fy= 4200 kg/cm2 kg 1,546.37 4.00
03.03.03 VIGAS
03.03.03.01 CONCRETO PARA VIGAS f'c=210 kg/cm2 m3 2.77 1.00
03.03.03.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 46.97 4.00
03.03.03.03 ACERO CORRUGADO GRADO 60 PARA VIGAS Fy= 4200 kg/cm2 kg 323.54 2.00
03.03.04 JUNTAS
03.03.04.01 JUNTAS DE CONSTRUCCION 1" DE 1:3 (arena:asfalto) m 6.40 1.00
03.04 ARQUITECTURA
03.04.01 TARRAJEO EN COLUMNAS m2 143.00 6.00
03.04.02 CARPINTERIA METALICA Y HERRERIA
03.04.02.01 SUMINISTRO E INSTALACION DE PUERTA DE FIERRO und 1.00 1.00
03.04.03 VARIOS
03.04.03.01 SUMINISTRO E INSTALACION DE BANCAS und 4.00 4.00
03.05 INSTALACIONES SANITARIAS
03.05.01 CANALETA DE FIERRO GALVANIZADO e=0.9mm m 98.00 2.00
03.05.02 TUBERIA DE BAJADA PVC-SAL Ø4" PARA LLUVIAS m 110.00 2.00
03.05.03 CONCRETO f'c=175 kg/cm2 PARA FALSA COLUMNA m3 10.89 1.00
03.05.04 ENCOFRADO Y DESENCOFRADO PARA FALSA COLUMNA m2 23.10 2.00
03.05.05 ACERO ESTRUCTURAL Fy=4200kg/cm2 PARA FALSA COLUMNA kg 255.20 1.00
03.06 INSTALACIONES ELECTRICAS
03.06.01 TUBERIA PVC SELL 20mm m 101.87 2.00
03.06.02 CABLE DE 2X4mm m 203.74 2.00
03.06.03 INSTALACION DE TABLERO DE DISTRIBUCION und 1.00 1.00
03.06.04 CAJA DE PASO 200x200x150 und 1.00 1.00
03.06.05 INSTALACION DE MEDIDOR glb 1.00 1.00
03.06.06 SUMINISTRO E INSTALACION DE REFLECTOR DE 500W und 4.00 1.00
03.06.07 INSTALACION DE INTERRUPTOR und 1.00 1.00
03.07 OTROS
03.07.01 SUMINISTRO E INSTALACION DE TUBO CIRCULAR NEGRO DE 2" m 133.20 1.00
03.07.02 SUMINISTRO E INSTALACION DE MALLA GALVANIZADA m2 281.14 10.00
04 ESTRUCTURAS METALICAS
04.01 SUMINISTRO DE TIJERALES m 326.21 9.00
04.02 INSTALACION DE TIJERALES TM-1 Y TM-2 und 11.00 1.00
04.03 INSTALACION DE VIGUETAS m 1,190.88 12.00
04.04 INSTALACION DE APOYOS MOVILES und 24.00 6.00
04.05 COBERTURA CON TECHO DE CALAMINA
04.05.01 COBERTURA CON CALAMINA GALVANIZADA 1.83x0.86m m2 1,026.00 7.00
04.05.02 COBERTURA CON CALAMINA TRASLUCIDA 1.83x0.86m m2 410.40 4.00
CRONOGRAMA DE EJECUCION

MES 01
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
MES 02
28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52
"CREACION DE LOSA DEPORTIVA CON GRASS SINTETICO EN EL ESTADIO MUNICIPAL JESUS NAZARENO DEL DIST

Municipalidad Distrital de Saño


JUNIN - HUANCAYO - SAÑO

Item Descripción Und. Parcial S/.


01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
01.01 CONSTRUCCIONES PROVICIONALES
01.01.01 ALMACEN DE OBRA Y OFICINA mes 400.00
01.01.02 CARTEL DE IDENTIFICACION DE OBRA und 410.00
01.01.03 CERCO PERIMETRICO DE PROTECCION MADERA Y LONA DE RAFIA m 591.00
01.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1,000.00
01.02 TRABAJOS PRELIMINARES
01.02.01 LIMPIEZA DEL TERRENO MANUAL m2 1,370.97
01.03 TRAZO NIVELES Y REPLANTEO
01.03.01 TRAZO NIVELES Y REPLANTEO PRELIMINAR m2 1,595.07
01.03.02 TRAZO Y REPLANTEO DURANTE EL PROCESO DE EJECUCION m2 1,555.52
02 LOSA DE GRASS SINTETICO
02.01 MOVIMIENTO DE TIERRAS
02.01.01 EXCAVACION EN TERRENO NATURAL A MAQUINA (e=0.25m) m3 1,285.48
02.01.02 NIVELACION INTERIOR Y APISONADO m2 2,530.21
02.01.03 ELIMINACION DE MATERIAL EXCEDENTE A MAQUINA m3 1,640.65
02.02 CONSTRUCCION DEL GRASS SINTETICO
02.02.01 RELLENO Y COMPACTACION DE BASE CON MATERIAL DE PRESTAMO m2 867.08
02.02.02 RELLENO DE ARENA FINA m3 1,202.09
02.02.03 SUMINISTRO E INSTALACION DE GRASS SINTETICO m2 45,749.60
02.03 OBRAS DE CONCRETO SIMPLE
02.03.01 DADOS DE CONCRETO
02.03.01.01 CONCRETO SIMPLE PARA DADOS DEL ARCO Y BANCAS f'c=175 kg/cm2 m3 295.52
02.03.02 VEREDAS
02.03.02.01 CONCRETO SIMPLE PARA VEREDA f'c=175 kg/cm2 m3 11,247.98
02.03.02.02 ENCOFRADO Y DESENCOFRADO DE VEREDA m2 281.92
02.03.03 JUNTAS
02.03.03.01 JUNTAS DE CONSTRUCCION 1" DE 1:3 (arena:asfalto) m 411.43
02.04 OTROS
02.04.01 SUMINISTRO E INSTALACION DE ARCOS DE FUTBOL und 3,000.00
03 CERCO PERIMETRICO
03.01 MOVIMIENTO DE TIERRAS
03.01.01 EXCAVACION EN TERRENO NATURAL A MAQUINA m3 138.47
03.01.02 RELLENO Y COMPACTADO CON MATERIAL PROPIO A MAQUINA m3 280.01
03.01.03 ELIMINACION DE MATERIAL EXCEDENTE A MAQUINA m3 265.95
03.02 OBRAS DE CONCRETO SIMPLE
03.02.01 SARDINELES
03.02.01.01 CONCRETO SIMPLE PARA SARDINEL f'c=175 kg/cm2 m3 2,105.42
03.02.01.02 ENCOFRADO Y DESENCOFRADO DE SARDINEL m2 1,140.27
03.02.02 SOLADO
03.02.02.01 CONCRETO PARA SOLADO DE CONCRETO POBRE f´c = 100 kg/cm2 m2 4,222.88
03.02.02.02 DADO DE CONCRETO PARA CERCO PERIMETRICO f'c=210 kg/cm2 m3 715.01
03.03 OBRAS DE CONCRETO ARMADO
03.03.01 ZAPATAS
03.03.01.01 CONCRETO PARA ZAPATAS f'c=210 kg/cm2 m3 6,180.67
03.03.01.02 ACERO CORRUGADO GRADO 60 PARA ZAPATAS Fy= 4200 kg/cm2 kg 1,822.74
03.03.02 COLUMNAS
03.03.02.01 CONCRETO PARA COLUMNAS f'c=210 kg/cm2 m3 5,165.93
03.03.02.02 ENCOFRADO Y DESENCOFRADO DE COLUMNA m2 3,289.98
03.03.02.03 ACERO CORRUGADO GRADO 60 PARA COLUMNAS Fy= 4200 kg/cm2 kg 6,185.48
03.03.03 VIGAS
03.03.03.01 CONCRETO PARA VIGAS f'c=210 kg/cm2 m3 1,064.70
03.03.03.02 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 1,335.36
03.03.03.03 ACERO CORRUGADO GRADO 60 PARA VIGAS Fy= 4200 kg/cm2 kg 1,271.51
03.03.04 JUNTAS
03.03.04.01 JUNTAS DE CONSTRUCCION 1" DE 1:3 (arena:asfalto) m 25.66
03.04 ARQUITECTURA
03.04.01 TARRAJEO EN COLUMNAS m2 3,138.85
03.04.02 CARPINTERIA METALICA Y HERRERIA
03.04.02.01 SUMINISTRO E INSTALACION DE PUERTA DE FIERRO und 301.80
03.04.03 VARIOS
03.04.03.01 SUMINISTRO E INSTALACION DE BANCAS und 440.00
03.05 INSTALACIONES SANITARIAS
03.05.01 CANALETA DE FIERRO GALVANIZADO e=0.9mm m 2,733.22
03.05.02 TUBERIA DE BAJADA PVC-SAL Ø4" PARA LLUVIAS m 3,689.40
03.05.03 CONCRETO f'c=175 kg/cm2 PARA FALSA COLUMNA m3 3,458.23
03.05.04 ENCOFRADO Y DESENCOFRADO PARA FALSA COLUMNA m2 823.52
03.05.05 ACERO ESTRUCTURAL Fy=4200kg/cm2 PARA FALSA COLUMNA kg 1,033.56
03.06 INSTALACIONES ELECTRICAS
03.06.01 TUBERIA PVC SELL 20mm m 281.16
03.06.02 CABLE DE 2X4mm m 360.62
03.06.03 INSTALACION DE TABLERO DE DISTRIBUCION und 376.04
03.06.04 CAJA DE PASO 200x200x150 und 40.00
03.06.05 INSTALACION DE MEDIDOR glb 136.97
03.06.06 SUMINISTRO E INSTALACION DE REFLECTOR DE 500W und 1,719.20
03.06.07 INSTALACION DE INTERRUPTOR und 4.50
03.07 OTROS
03.07.01 SUMINISTRO E INSTALACION DE TUBO CIRCULAR NEGRO DE 2" m 4,262.40
03.07.02 SUMINISTRO E INSTALACION DE MALLA GALVANIZADA m2 7,076.29
04 ESTRUCTURAS METALICAS
04.01 SUMINISTRO DE TIJERALES m 30,836.63
04.02 INSTALACION DE TIJERALES TM-1 Y TM-2 und 940.61
04.03 INSTALACION DE VIGUETAS m 59,698.81
04.04 INSTALACION DE APOYOS MOVILES und 7,162.08
04.05 COBERTURA CON TECHO DE CALAMINA
04.05.01 COBERTURA CON CALAMINA GALVANIZADA 1.83x0.86m m2 34,104.24
04.05.02 COBERTURA CON CALAMINA TRASLUCIDA 1.83x0.86m m2 23,138.35
COSTO DIRECTO 296,401.04
GASTOS GENERALES (8%) 23,712.08
UTILIDAD (7%) 20,748.07
SUB TOTAL 340,861.20
IGV (18%) 61,355.02
SUPERVISION 9,999.84
PRESUPUESTO TOTAL 412,216.06
IPAL JESUS NAZARENO DEL DISTRITO DE SAÑO, HUANCAYO-JUNIN"

VALORIZACION - MES 01 VALORIZACION - MES 02 Sumatoria

184.62 215.38 400.00


410.00 410.00
591.00 591.00
1,000.00 1,000.00

1,370.97 1,370.97

1,595.07 1,595.07
1,555.52 1,555.52

1,285.48 1,285.48
2,530.21 2,530.21
1,640.65 1,640.65
0.00
867.08 867.08
1,202.09 1,202.09
45,749.60 45,749.60
0.00
0.00
295.52 295.52
0.00
11,247.98 11,247.98
281.92 281.92
0.00
411.43 411.43
0.00
3,000.00 3,000.00
0.00
0.00
138.47 138.47
280.01 280.01
265.95 265.95
0.00
0.00
2,105.42 2,105.42
1,140.27 1,140.27
0.00
4,222.88 4,222.88
715.01 715.01
0.00
0.00
6,180.67 6,180.67
1,822.74 1,822.74
0.00
5,165.93 5,165.93
3,289.98 3,289.98
6,185.48 6,185.48
0.00
1,064.70 1,064.70
1,335.36 1,335.36
1,271.51 1,271.51
0.00
25.66 25.66
0.00
3,138.85 3,138.85
0.00
301.80 301.80
0.00
440.00 440.00
0.00
2,733.22 2,733.22
3,689.40 3,689.40
3,458.23 3,458.23
823.52 823.52
1,033.56 1,033.56
0.00
281.16 281.16
360.62 360.62
376.04 376.04
40.00 40.00
136.97 136.97
1,719.20 1,719.20
4.50 4.50
0.00
4,262.40 4,262.40
7,076.29 7,076.29
0.00
3,426.29 27,410.34 30,836.63
940.61 940.61
59,698.81 59,698.81
4,774.72 2,387.36 7,162.08
0.00
34,104.24 34,104.24
23,138.35 23,138.35
65,187.28 231,213.76 296,401.04
5,214.98 18,497.10 23,712.08
4,563.11 16,184.96 20,748.07
74,965.37 265,895.83 340,861.20
13,493.77 47,861.25 61,355.02
2,199.26 7,800.59 9,999.84
90,658.40 321,557.66 412,216.06
CRONOGRAMA DE REQUERIMIENTO DE MANO D

Proyecto: "CREACION DE LOSA DEPORTIVA CON GRASS SINTETICO EN EL ESTADIO MUNICIPAL JESUS N

MES 01
Item Descripción Und. Parcial S/
Cantidad Precio unitario Presupuestado
01 MANO DE OBRA
OPERARIO hh 40,556.27 298.79 20.10 6,005.68
OFICIAL hh 30,831.40 226.81 16.51 3,744.70
PEON hh 30,547.99 919.62 14.85 13,656.34
TOPOGRAFO hh 847.89 42.18 20.10 847.89

MONTO TOTAL DE INSUMOS 102,783.56 24,254.62

% DE INSUMOS REQUERIDOS
MENSUAL
% 23.60%

TIEMPO DE EJECUCION 1 MES


RIMIENTO DE MANO DE OBRA

ESTADIO MUNICIPAL JESUS NAZARENO DEL DISTRITO DE SAÑO, HUANCAYO-JUNIN"

MES 02 TOTAL
Cantidad Precio unitario Presupuestado Cantidad Precio unitario Presupuestado

1,718.93 20.10 34,550.59 2,017.73 20.10 40,556.27


1,640.62 16.51 27,086.69 1,867.44 16.51 30,831.40
1,137.48 14.85 16,891.65 2,057.10 14.85 30,547.99
20.10 42.18 20.10 847.89

78,528.93 102,783.56

76.40% 100.00%

1 MES 2 MESES
CRONOGRAMA DE REQUERIMIENTO DE MATER

Proyecto: "CREACION DE LOSA DEPORTIVA CON GRASS SINTETICO EN EL ESTADIO MUNICIPAL JESUS NAZAR

MES 01
Item Descripción Und. Parcial S/
Cantidad Precio unitario
02 MATERIALES
TRANSPORTE DE EQUIPO Y MAQUINARIA glb 1,000.00 1.00 1000.00
ACEITE PARA MOTOR SAE-30 gal 5.27 0.10 50.85
INSTALACION DE ARCOS DE FUTBOL und 3,000.00
PLANCHA METALICA DE 5/8" pza 4,320.00 16.00 180.00
GASOLINA 84 OCTANOS gal 77.89 7.10 10.25
PETROLEO gal 61.12 1.23 9.68
ASFALTO RC-250 gal 202.96
ALAMBRE NEGRO RECOCIDO N° 16 kg 447.16 138.87 3.22
ALAMBRE NEGRO N° 8 kg 290.04 57.88 3.22
ANGULOS DE ACERO DE 2"X2"X3mm X 6 m var 4,217.10
ANGULO 3/4"x3/4"x1/8"x6m pza 17.34
ANGULO 1"x1"x1/8"x6m pza 37.35
CLAVOS PARA MADERA CON CABEZA DE 1" kg 16.75 5.20 3.22
CLAVOS PARA MADERA C/C 3" kg 80.99 12.02 3.22
CLAVOS PARA MADERA C/C 2 1/2" kg 92.80 28.82 3.22
MALLA GALVANIZADA m 2,859.19
PIEDRA CHANCADA 1/2" m3 3,915.70 59.32 50.85
ARENA FINA m3 1,523.66 19.47 59.32
ARENA GRUESA m3 1,183.54 13.56 59.32
FIERRO CORR. 1/2" G-60 kg 4,020.72 1,654.62 2.43
FIERRO CORR. 3/8" G-60 kg 817.00 346.19 2.36
FIERRO CORR. 5/8" G-60 kg 1,886.86 475.69 2.52
HORMIGON m3 471.68 8.04 50.85
MATERIAL CLASIFICADO PARA BASE m3 644.19 12.67 50.85
TUBERIA DE 20mmX3m und 267.31
CODO DE 90 PVC SAL DE 4" und 558.80
REDUCCION DE PLASTICO PVC SAL 6" A 4" und 140.71
CEMENTO PORTLAND TIPO I (42.5 kg) bol 17,607.32 722.77 19.07
CALAMINA GALVANIZADA ZIN 1.85 x 3.05m x 0.3mm pza 12,783.96
CALAMINA TRANSLUCIDA 1.85 x 3.05m x 0.3mm pln 14,608.19
YESO kg 111.79 52.73 2.12
TEE 3/4"x3/4"x1/8"x6m pza 2.67
TEE 1"x1"x1/8"x6m A. pza 18.44
VIGUETA kg 16,791.41
PEGAMENTO PARA PVC gal 46.18
MADERA NACIONAL P/ENCOFRADO-CARP p2 1,531.14 253.18 3.20
MADERA p2 149.21 45.49 3.28
CANALETA DE FIERRO GALVANIZADO m 1,764.00
PINTURA ESMALTE SINTETICO gal 81.55 2.64 30.93
PINTURA ANTICORROSIVA gal 10,642.24 9.42 27.12
CINTA AISLANTE rll 13.80
GANCHO DE FIERRO PARA CANALETA pza 599.76
ACCESORIOS DEL MEDIDOR glb 25.42
TUBO PVC SAL 4"X3M pza 2,379.30
GIGANTOGRAFIA DE 2.40x3.60 (INC. INSTALACION) und 410.00 1.00 410.00
SOLDADURA SUPERCITO PUNTO AZUL 1/8" kg 5,891.95 20.30 14.00
SOLDADURA CELLOCORD P 1/8" kg 5,893.35 20.30 14.00
INTERRUPTOR TERMOMAGNETICO und 55.81
INTERRUPTOR DOBLE und 4.50
BANCAS PREFABRICADAS INCLUYE COLOCACION und 440.00
CAJA OCTOGONAL FIERRO GALVANIZADO 100X50 mm und 12.00
CAJA DE PASE CUADRADA DE FIERRO GALVANIZADO DE
und 40.00
200x200x150 mm
CABLE ELECT NYY 2X4 MM2 m 361.54
REFLECTOR 500W und 1,600.00
MEDIDOR DE ENERGIA ELECTRICA und 38.15
PERNO DE ANCLAJE P.ENCOF. 5/8"x0.40m. pza 1,062.72 96.00 7.38
TUBO ACERO GALV. 2" m 4,262.40
REGLA DE MADERA p2 20.02
TABLERO DE DISTRIBUCION 14 CIRCUITOS pza 239.83
TIJERAL kg 6,132.75 289.96 2.35
AGUA m3 8.27 40.71 0.20
SUMINISTRO E INSTALACION DE GRASS SINTETICO m2 45,749.60
LEÑA kg 4.91
LONA DE RAFIA m 280.49 82.74 3.39
ALQUILER ALMACEN Y OFICINA mes 400.00 0.92 200.00
MONTO TOTAL DE INSUMOS 184,220.79 34,850.06
% DE INSUMOS REQUERIDOS MENSUAL % 18.92%
TIEMPO DE EJECUCION 1 MES
REQUERIMIENTO DE MATERIALES

EL ESTADIO MUNICIPAL JESUS NAZARENO DEL DISTRITO DE SAÑO, HUANCAYO-JUNIN"

MES 01 MES 02 TOTAL


Presupuestado Cantidad Precio unitario Presupuestado Cantidad Precio unitario Presupuestado

1,000.00 1.00 1000.00 1,000.00


4.93 0.01 50.85 0.34 0.10 50.85 5.27
2.00 1500.00 3,000.00 2.00 1500.00 3,000.00
2,880.00 8.00 180.00 1,440.00 24.00 180.00 4,320.00
72.81 0.50 10.25 5.07 7.60 10.25 77.89
11.91 5.08 9.68 49.21 6.31 9.68 61.12
14.50 14.00 202.96 14.50 14.00 202.96
447.16 138.87 3.22 447.16
186.38 32.19 3.22 103.66 90.07 3.22 290.04
140.57 30.00 4,217.10 140.57 30.00 4,217.10
0.67 26.00 17.34 0.67 26.00 17.34
1.07 35.00 37.35 1.07 35.00 37.35
16.75 5.20 3.22 16.75
38.71 13.13 3.22 42.28 25.15 3.22 80.99
92.80 28.82 3.22 92.80
281.14 10.17 2,859.19 281.14 10.17 2,859.19
3,016.65 17.68 50.85 899.05 77.01 50.85 3,915.70
1,154.93 6.22 59.32 368.73 25.69 59.32 1,523.66
804.49 6.39 59.32 379.05 19.95 59.32 1,183.54
4,020.72 1,654.62 2.43 4,020.72
817.00 346.19 2.36 817.00
1,198.74 273.06 2.52 688.12 748.75 2.52 1,886.86
408.83 1.24 50.85 62.85 9.28 50.85 471.68
644.19 12.67 50.85 644.19
40.75 6.56 267.31 40.75 6.56 267.31
110.00 5.08 558.80 110.00 5.08 558.80
14.30 9.84 140.71 14.30 9.84 140.71
13,783.31 200.53 19.07 3,824.01 923.30 19.07 17,607.32
718.20 17.80 12,783.96 718.20 17.80 12,783.96
287.28 50.85 14,608.19 287.28 50.85 14,608.19
111.79 52.73 2.12 111.79
0.12 23.00 2.67 0.12 23.00 2.67
0.68 27.00 18.44 0.68 27.00 18.44
7,145.28 2.35 16,791.41 7,145.28 2.35 16,791.41
0.44 104.96 46.18 0.44 104.96 46.18
810.17 225.30 3.20 720.97 478.48 3.20 1,531.14
149.21 45.49 3.28 149.21
98.00 18.00 1,764.00 98.00 18.00 1,764.00
81.55 2.64 30.93 81.55
255.57 382.99 27.12 10,386.67 392.41 27.12 10,642.24
5.09 2.71 13.80 5.09 2.71 13.80
99.96 6.00 599.76 99.96 6.00 599.76
1.00 25.42 25.42 1.00 25.42 25.42
113.30 21.00 2,379.30 113.30 21.00 2,379.30
410.00 1.00 410.00 410.00
284.17 400.56 14.00 5,607.79 420.85 14.00 5,891.95
284.17 400.66 14.00 5,609.19 420.95 14.00 5,893.35
1.00 55.81 55.81 1.00 55.81 55.81
1.00 4.50 4.50 1.00 4.50 4.50
4.00 110.00 440.00 4.00 110.00 440.00
4.00 3.00 12.00 4.00 3.00 12.00

1.00 40.00 40.00 1.00 40.00 40.00

213.93 1.69 361.54 213.93 1.69 361.54


4.00 400.00 1,600.00 4.00 400.00 1,600.00
1.00 38.15 38.15 1.00 38.15 38.15
708.48 48.00 7.38 354.24 144.00 7.38 1,062.72
133.20 32.00 4,262.40 133.20 32.00 4,262.40
2.86 7.00 20.02 2.86 7.00 20.02
1.00 239.83 239.83 1.00 239.83 239.83
681.42 2,319.72 2.35 5,451.33 2,609.68 2.35 6,132.75
8.14 0.63 0.20 0.13 41.34 0.20 8.27
703.84 65.00 45,749.60 703.84 65.00 45,749.60
2.73 1.80 4.91 2.73 1.80 4.91
280.49 82.74 3.39 280.49
184.62 1.08 200.00 215.38 2.00 200.00 400.00
34,850.06 149,370.73 184,220.79
18.92% 81.08% 100.00%
1 MES 1 MES 2 MESES
CRONOGRAMA DE REQUERIMIENTO DE EQU

Proyecto: "CREACION DE LOSA DEPORTIVA CON GRASS SINTETICO EN EL ESTADIO MUNICIP

MES 01
Item Descripción Und. Parcial S/
Cantidad
3 EQUIPOS Y HERRAMIENTAS
TEODOLITO hm 632.76 42.18
HERRAMIENTAS MANUALES %mo 3,205.97
RODILLO LISO VIBRATORIO AUTOPROPULSADO 125 HP hm 66.02 0.47
APISONADOR TIPO CANGURO hm 58.56 3.90
CARGADOR SOBRE LLANTAS DE 125-135 HP 3 yd3 hm 1,032.85 6.08
TRACTOR DE ORUGAS D6 hm 1,394.18 7.75
MOTONIVELADORA 125 HP hm 65.73 0.47
GRUA hm 660.00
CAMION CISTERNA (2,500 GLNS.) hm 30.93 0.47
VIBRADOR DE CONCRETO 4 HP 1.50" hm 915.49 37.27
VOLQUETE DE 15 M3 hm 850.58 6.08
MEZCLADORA DE CONCRETO DE 9 - 11P3 - 18 HP hm 378.13 30.10
ANDAMIO METAL TABLAS - ALQUILER est 99.00
MONTO TOTAL DE INSUMOS 9,390.19 6,088.80
% DE INSUMOS REQUERIDOS MENSUAL % 64.84%
TIEMPO DE EJECUCION 1 MES
EQUERIMIENTO DE EQUIPOS Y HERRAMIENTAS

TETICO EN EL ESTADIO MUNICIPAL JESUS NAZARENO DEL DISTRITO DE SAÑO, HUANCAYO-JUNIN"

MES 01 MES 02 TOTAL


Precio unitario Presupuestado Cantidad Precio unitario Presupuestado Cantidad Precio unitario Presupuestado

15.00 632.76 42.18 15.00 632.76


850.58 2,355.39 3,205.97
140.00 66.02 0.47 140.00 66.02
15.00 58.56 3.90 15.00 58.56
170.00 1,032.85 6.08 170.00 1,032.85
180.00 1,394.18 7.75 180.00 1,394.18
139.40 65.73 0.47 139.40 65.73
5.50 120.00 660.00 5.50 120.00 660.00
65.60 30.93 0.00 65.60 0.47 65.60 30.93
20.00 745.37 8.51 20.00 170.12 45.77 20.00 915.49
140.00 850.58 6.08 140.00 850.58
12.00 361.24 1.41 12.00 16.88 31.51 12.00 378.13
1.98 50.00 99.00 1.98 50.00 99.00
6,088.80 3,301.39 9,390.19
64.84% 35.16% 100.00%
1 MES 1 MES 2 MESES