1 OBRAS DE ARTE

2 OBRAS PROVISIONALES
3 CAMPAMENTO PROVISIONAL DE OBRA
4 ALCANTARILLAS TIPO ARMCO ALCANTARILLAS DE 4.5 mts de Longitud y 36 Pulgadas de diámetro

METRADO DE ALCANTARILLAS TMC LONGITUD = 4.50 m DIAMETRO = 36 pulg


PROGRESIVA = VARIAS
Nº LARGO ANCHO ALTO DATOS
ITEM PARTIDA UND PARCIAL TOTAL
VECES (m) (m) (m) A = 1.45
4.01 TRAZO Y REPLANTEO m2 10.25 B = 0.20
A D+2Q C = 0.65
CAJA DE INGRESO m2 1
1.45 1.50 2.18 D = 0.90
L D+2Q E = 0.64
ALCANTARILLA m2 1
4.50 1.50 6.75 F = 0.70
E D+C G = 0.50
LOSA DE SALIDA m2 1
0.64 1.55 0.99 H = 0.54
B+Bp Lp/2 I = 0.45
ALETAS DE SALIDA m2 2
0.41 0.405 0.33 J = 0.10
4.02 EXCAVACION NO CLASIFICADA PARA ESTRUCT. m3 13.66 K = 0.15
2J+2D-2I+P+M (L-2B-R-T)/2 D+2Q L = 4.50
ALCANTARILLA m3 1
2.74 1.85 1.50 7.58 M = 0.75
A+B+R D+2Q B+N+O N = 0.55
CAJA DE INGRESO m3 1
1.84 1.50 1.25 3.45 O = 0.50
B+Bp Lp/2 B+G+H P = 0.89
ALETAS DE SALIDA m3 2
0.41 0.41 1.24 0.41 Q = 0.30
B+T D+2Q B+G+H R = 0.19
PARAPETO DE SALIDA m3 1
0.42 1.50 1.24 0.79 S = 2.50 %
E D+C B+G+H T = 0.22
LOSA DE SALIDA m3 1
0.64 1.55 1.24 1.23 Z = 4
2C+D B B Bp = 0.21
UÑA EN LOSA DE SALIDA m3 1
2.20 0.20 0.20 0.09 Lp = 0.81
B+Bp+4b Lp/2 B b = 0.08
CIMIENTO EN ALETAS DE SALIDA m3 2
0.71 0.41 0.20 0.12
4.03 RELLENO CON MATERIAL PROPIO. m3 5.24 ALCANT. PROG.
2J+2D-2I+P+M (L-2B-R-T)/2 D+2Q 09+280
VOLUMEN TOTAL m3 1
2.74 1.85 1.50 7.58
πD2/4 L-2B-R-T
( - ) VOLUMEN TUBO TMC m3 -1
0.64 3.69 -2.35
4.04 ELIMINACION DE MATERIAL EXCEDENTE m3 9.80
COEF.
VOLUMEN DE EXCAVACION m3 1
13.66 1.25 17.07
COEF.
VOLUMEN DE RELLENO m3 -1
5.24 1.39 -7.28 TOTAL=1
4.05 ALCANTARILLA TMC m 4.50
L
ALCANTARILLA TMC Ø = 36" m 1
4.50 4.50
4.07 CONCRETO f'c = 175 kg/cm2 m3 3.47
A B N+O
MUROS LATERALES CAJA DE INGRESO m3 2
1.45 0.20 1.05 0.61
(D+2Q)-2B B N+O
MURO POSTERIOR CAJA DE INGRESO m3 1
1.10 0.20 1.05 0.23
A-B O B
( - ) CUNETAS DE INGRESO m3 -1
1.25 0.50 0.20 -0.13
(D+2Q)-2B O B/2
( - ) INGRESO DE CAUCE m3 -1
1.10 0.50 0.10 -0.06
D+2Q A+B+R B
LOSA CAJA DE INGRESO m3 1
1.50 1.84 0.20 0.55
(B+Bp)/2 Lp (2G+H)/2
ALETAS DE SALIDA m3 2
0.21 0.81 0.77 0.26
B+T D+2Q B
LOSA DE SALIDA m3 1
0.42 1.50 0.20 0.13
B+Bp Lp/2 B
m3 2
0.41 0.41 0.20 0.07
D+C E B
m3 1
1.55 0.64 0.20 0.20
2C+D B B
UÑA EN LOSA DE SALIDA m3 1
2.20 0.20 0.20 0.09
B+Bp+4b Lp/2 B
CIMIENTO EN ALETAS DE SALIDA m3 2
0.71 0.41 0.20 0.12
(M+D+K)B(D+2Q) (M+2D+2K)(R/2)(D+2Q) (πD2/4)(B+R)
PARAPETO EN LA ENTRADA m3 1
0.54 0.40 0.25 0.69
B(P+D)(D+2Q) (P+2D)(T/2)(D+2Q) (πD2/4)(B+T)
PARAPETO EN LA SALIDA m3 1
0.54 0.45 0.27 0.72
4.08 ENCOFRADO Y DESENCOFRADO m2 21.15
2A-4B+D+2Q N+O
MUROS INTERIORES CAJA DE INGRESO m2 1
3.60 1.05 3.78
2A+D+2Q N+O
MUROS EXTERIORES CAJA DE INGRESO m2 1
4.40 1.05 4.62
A-B O/2
( - ) CUNETAS DE INGRESO m2 -4
1.25 0.25 -1.25
D+2Q-2B O/2
( - ) INGRESO DE CAUCE m2 -2
1.10 0.25 -0.55
D+2C 2B
UÑA EN LOSA DE SALIDA m2 1
2.20 0.40 0.88
2Lp+B (2G+H)/2
ALETAS DE SALIDA m2 2
1.82 0.77 2.80
(2B+D+2Q)(M+D+K) (D+2Q)(D+K+(M2+R2)1/2) R(M+2D+2K)-πD2/2
PARAPETO EN LA ENTRADA m2 1
3.42 2.73 -0.74 5.42
(2B+D+2Q)(P+D) (D+2Q)(D+(P2+T2)1/2) T(P+2D)-πD2/2
PARAPETO EN LA SALIDA m2 1
3.40 2.73 -0.67 5.45
4.09 AFIRMADO e= 0.15 mts. m2 9.89
(L+A+E) D+2Q
PARAPETOS DE ENTRADA Y SALIDA m2 2
6.59 1.50 9.89
4.10 EMBOQUILLADO DE PIEDRA e=0.20mts. m2 1.00
EMBOQUILLADO DE ALCANTARILLAS m2 2
1.00 1.00 1.00
4.11 DEMOLICION DE ALCANTARILLA EXISTENTE Und 1.00
DEMOLICION DE ALCANTARILLAS Und 1
1.00
1 OBRAS DE ARTE
2 OBRAS PROVISIONALES
3 CAMPAMENTO PROVISIONAL DE OBRA

4 ALCANTARILLAS TIPO ARMCO ALCANTARILLAS DE 4.00 mts de Longitud y 24 Pulgadas de diámetro

METRADO DE ALCANTARILLAS TMC LONGITUD = 4.00 m DIAMETRO = 24 pulg


PROGRESIVA = VARIAS
Nº LARGO ANCHO ALTO DATOS
ITEM PARTIDA UND PARCIAL TOTAL
VECES (m) (m) (m) A = 1.45
4.01 TRAZO, NIVELACION Y REPLANTEO m2 7.67 B = 0.20
A D+2Q C = 0.65
CAJA DE INGRESO m2 1
1.45 1.20 1.74 D = 0.60
L D+2Q E = 0.64
ALCANTARILLA m2 1
4.00 1.20 4.80 F = 0.70
E D+C G = 0.50
LOSA DE SALIDA m2 1
0.64 1.25 0.80 H = 0.54
B+Bp Lp/2 I = 0.45
ALETAS DE SALIDA m2 2
0.41 0.405 0.33 J = 0.10
4.02 EXCAVACION NO CLASIFICADA PARA ESTRUCT. m3 9.08 K = 0.15
2J+2D-2I+P+M (L-2B-R-T)/2 D+2Q L = 4.00
ALCANTARILLA m3 1
2.14 1.60 1.20 4.10 M = 0.75
A+B+R D+2Q B+N+O N = 0.55
CAJA DE INGRESO m3 1
1.84 1.20 1.25 2.76 O = 0.50
B+Bp Lp/2 B+G+H P = 0.89
ALETAS DE SALIDA m3 2
0.41 0.41 1.24 0.41 Q = 0.30
B+T D+2Q B+G+H R = 0.19
PARAPETO DE SALIDA m3 1
0.42 1.20 1.24 0.63 S = 2.50 %
E D+C B+G+H T = 0.22
LOSA DE SALIDA m3 1
0.64 1.25 1.24 0.99 Z = 4
2C+D B B Bp = 0.21
UÑA EN LOSA DE SALIDA m3 1
1.90 0.20 0.20 0.08 Lp = 0.81
B+Bp+4b Lp/2 B b = 0.08
CIMIENTO EN ALETAS DE SALIDA m3 2
0.71 0.41 0.20 0.12
4.03 RELLENO CON MATERIAL PROPIO. m3 3.19 ALCANT. PROG.
2J+2D-2I+P+M (L-2B-R-T)/2 D+2Q
VOLUMEN TOTAL m3 1
2.14 1.60 1.20 4.10 04+480
πD2/4 L-2B-R-T
( - ) VOLUMEN TUBO TMC m3 -1
0.28 3.19 -0.90
4.04 ELIMINACION DE MATERIAL EXCEDENTE m3 6.90
COEF.
VOLUMEN DE EXCAVACION m3 1
9.08 1.25 11.34
COEF.
VOLUMEN DE RELLENO m3 -1
3.19 1.39 -4.44 TOTAL=1
4.06 ALCANTARILLA TMC m 4.00
L
ALCANTARILLA TMC Ø = 24" m 1
4.00 4.00
4.07 CONCRETO f'c = 175 kg/cm2 m3 2.85
A B N+O
MUROS LATERALES CAJA DE INGRESO m3 2
1.45 0.20 1.05 0.61
(D+2Q)-2B B N+O
MURO POSTERIOR CAJA DE INGRESO m3 1
0.80 0.20 1.05 0.17
A-B O B
( - ) CUNETAS DE INGRESO m3 -1
1.25 0.50 0.20 -0.13
(D+2Q)-2B O B/2
( - ) INGRESO DE CAUCE m3 -1
0.80 0.50 0.10 -0.04
D+2Q A+B+R B
LOSA CAJA DE INGRESO m3 1
1.20 1.84 0.20 0.44
(B+Bp)/2 Lp (2G+H)/2
ALETAS DE SALIDA m3 2
0.21 0.81 0.77 0.26
B+T D+2Q B
LOSA DE SALIDA m3 1
0.42 1.20 0.20 0.10
B+Bp Lp/2 B
m3 2
0.41 0.41 0.20 0.07
D+C E B
m3 1
1.25 0.64 0.20 0.16
2C+D B B
UÑA EN LOSA DE SALIDA m3 1
1.90 0.20 0.20 0.08
B+Bp+4b Lp/2 B
CIMIENTO EN ALETAS DE SALIDA m3 2
0.71 0.41 0.20 0.12
(M+D+K)B(D+2Q) (M+2D+2K)(R/2)(D+2Q) (πD2/4)(B+R)
PARAPETO EN LA ENTRADA m3 1
0.36 0.25 0.11 0.50
B(P+D)(D+2Q) (P+2D)(T/2)(D+2Q) (πD2/4)(B+T)
PARAPETO EN LA SALIDA m3 1
0.36 0.28 0.12 0.52
4.08 ENCOFRADO Y DESENCOFRADO m2 17.87
2A-4B+D+2Q N+O
MUROS INTERIORES CAJA DE INGRESO m2 1
3.30 1.05 3.47
2A+D+2Q N+O
MUROS EXTERIORES CAJA DE INGRESO m2 1
4.10 1.05 4.31
A-B O/2
( - ) CUNETAS DE INGRESO m2 -4
1.25 0.25 -1.25
D+2Q-2B O/2
( - ) INGRESO DE CAUCE m2 -2
0.80 0.25 -0.40
D+2C 2B
UÑA EN LOSA DE SALIDA m2 1
1.90 0.40 0.76
2Lp+B (2G+H)/2
ALETAS DE SALIDA m2 2
1.82 0.77 2.80
(2B+D+2Q)(M+D+K) (D+2Q)(D+K+(M2+R2)1/2) R(M+2D+2K)-πD2/2
PARAPETO EN LA ENTRADA m2 1
2.40 1.83 -0.14 4.08
(2B+D+2Q)(P+D) (D+2Q)(D+(P2+T2)1/2) T(P+2D)-πD2/2
PARAPETO EN LA SALIDA m2 1
2.38 1.82 -0.10 4.10
4.09 AFIRMADO e= 0.15 mts. m2 7.31
(L+A+E) D+2Q
PARAPETOS DE ENTRADA Y SALIDA m2 2
6.09 1.20 7.31
4.10 EMBOQUILLADO DE PIEDRA e=0.20mts. m2 1.00
EMBOQUILLADO DE ALCANTARILLAS m2 2
1.00 1.00 1.00
4.11 DEMOLICION DE ALCANTARILLA EXISTENTE Und 1.00
DEMOLICION DE ALCANTARILLAS Und 1
1.00
1 OBRAS DE ARTE
2 OBRAS PROVISIONALES
3 CAMPAMENTO PROVISIONAL DE OBRA

4 ALCANTARILLAS TIPO ARMCO ALCANTARILLAS DE 4.00 mts de Longitud y 24 Pulgadas de diámetro

METRADO DE ALCANTARILLAS TMC LONGITUD = 4.00 m DIAMETRO = 24 pulg


PROGRESIVA = VARIAS
Nº LARGO ANCHO ALTO DATOS
ITEM PARTIDA UND PARCIAL TOTAL
VECES (m) (m) (m) A = 1.45
4.01 TRAZO Y REPLANTEO m2 7.67 B = 0.20
A D+2Q C = 0.65
CAJA DE INGRESO m2 1
1.45 1.20 1.74 D = 0.60
L D+2Q E = 0.64
ALCANTARILLA m2 1
4.00 1.20 4.80 F = 0.70
E D+C G = 0.50
LOSA DE SALIDA m2 1
0.64 1.25 0.80 H = 0.54
B+Bp Lp/2 I = 0.45
ALETAS DE SALIDA m2 2
0.41 0.405 0.33 J = 0.10
4.02 EXCAVACION NO CLASIFICADA PARA ESTRUCT. m3 9.08 K = 0.15
2J+2D-2I+P+M (L-2B-R-T)/2 D+2Q L = 4.00
ALCANTARILLA m3 1
2.14 1.60 1.20 4.10 M = 0.75
A+B+R D+2Q B+N+O N = 0.55
CAJA DE INGRESO m3 1
1.84 1.20 1.25 2.76 O = 0.50
B+Bp Lp/2 B+G+H P = 0.89
ALETAS DE SALIDA m3 2
0.41 0.41 1.24 0.41 Q = 0.30
B+T D+2Q B+G+H R = 0.19
PARAPETO DE SALIDA m3 1
0.42 1.20 1.24 0.63 S = 2.50 %
E D+C B+G+H T = 0.22
LOSA DE SALIDA m3 1
0.64 1.25 1.24 0.99 Z = 4
2C+D B B Bp = 0.21
UÑA EN LOSA DE SALIDA m3 1
1.90 0.20 0.20 0.08 Lp = 0.81
B+Bp+4b Lp/2 B b = 0.08
CIMIENTO EN ALETAS DE SALIDA m3 2
0.71 0.41 0.20 0.12
4.03 RELLENO CON MATERIAL PROPIO. m3 3.19 ALCANT. PROG.
2J+2D-2I+P+M (L-2B-R-T)/2 D+2Q 00+217
VOLUMEN TOTAL m3 1
2.14 1.60 1.20 4.10
πD2/4 L-2B-R-T 15+291
( - ) VOLUMEN TUBO TMC m3 -1
0.28 3.19 -0.90
4.04 ELIMINACION DE MATERIAL EXCEDENTE m3 6.90
COEF.
VOLUMEN DE EXCAVACION m3 1
9.08 1.25 11.34
COEF.
VOLUMEN DE RELLENO m3 -1
3.19 1.39 -4.44 TOTAL=2
4.06 ALCANTARILLA TMC m 4.00
L
ALCANTARILLA TMC Ø = 24" m 1
4.00 4.00
4.07 CONCRETO f'c = 175 kg/cm2 m3 2.85
A B N+O
MUROS LATERALES CAJA DE INGRESO m3 2
1.45 0.20 1.05 0.61
(D+2Q)-2B B N+O
MURO POSTERIOR CAJA DE INGRESO m3 1
0.80 0.20 1.05 0.17
A-B O B
( - ) CUNETAS DE INGRESO m3 -1
1.25 0.50 0.20 -0.13
(D+2Q)-2B O B/2
( - ) INGRESO DE CAUCE m3 -1
0.80 0.50 0.10 -0.04
D+2Q A+B+R B
LOSA CAJA DE INGRESO m3 1
1.20 1.84 0.20 0.44
(B+Bp)/2 Lp (2G+H)/2
ALETAS DE SALIDA m3 2
0.21 0.81 0.77 0.26
B+T D+2Q B
LOSA DE SALIDA m3 1
0.42 1.20 0.20 0.10
B+Bp Lp/2 B
m3 2
0.41 0.41 0.20 0.07
D+C E B
m3 1
1.25 0.64 0.20 0.16
2C+D B B
UÑA EN LOSA DE SALIDA m3 1
1.90 0.20 0.20 0.08
B+Bp+4b Lp/2 B
CIMIENTO EN ALETAS DE SALIDA m3 2
0.71 0.41 0.20 0.12
(M+D+K)B(D+2Q) (M+2D+2K)(R/2)(D+2Q) (πD2/4)(B+R)
PARAPETO EN LA ENTRADA m3 1
0.36 0.25 0.11 0.50
B(P+D)(D+2Q) (P+2D)(T/2)(D+2Q) (πD2/4)(B+T)
PARAPETO EN LA SALIDA m3 1
0.36 0.28 0.12 0.52
4.08 ENCOFRADO Y DESENCOFRADO m2 17.87
2A-4B+D+2Q N+O
MUROS INTERIORES CAJA DE INGRESO m2 1
3.30 1.05 3.47
2A+D+2Q N+O
MUROS EXTERIORES CAJA DE INGRESO m2 1
4.10 1.05 4.31
A-B O/2
( - ) CUNETAS DE INGRESO m2 -4
1.25 0.25 -1.25
D+2Q-2B O/2
( - ) INGRESO DE CAUCE m2 -2
0.80 0.25 -0.40
D+2C 2B
UÑA EN LOSA DE SALIDA m2 1
1.90 0.40 0.76
2Lp+B (2G+H)/2
ALETAS DE SALIDA m2 2
1.82 0.77 2.80
(2B+D+2Q)(M+D+K) (D+2Q)(D+K+(M2+R2)1/2) R(M+2D+2K)-πD2/2
PARAPETO EN LA ENTRADA m2 1
2.40 1.83 -0.14 4.08
(2B+D+2Q)(P+D) (D+2Q)(D+(P2+T2)1/2) T(P+2D)-πD2/2
PARAPETO EN LA SALIDA m2 1
2.38 1.82 -0.10 4.10
4.09 AFIRMADO e= 0.15 mts. m2 7.31
(L+A+E) D+2Q
PARAPETOS DE ENTRADA Y SALIDA m2 2
6.09 1.20 7.31
4.10 EMBOQUILLADO DE PIEDRA e=0.20mts. m2 1.00
EMBOQUILLADO DE ALCANTARILLAS m2 2
1.00 1.00 1.00
4.11 DEMOLICION DE ALCANTARILLA EXISTENTE Und 1.00
DEMOLICION DE ALCANTARILLAS Und 1
1.00
CUADRO RESUMEN DE METRADO DE ALCANTARILLAS TMC
RESUMEN METRADO DE ALCANTARILLAS
Partida N° 4.01 4.02 4.03 4.04 4.06 4.05 4.07 4.08 4.09 4.10
Encofrado y
Trazo Niv. Excavación Relleno y Eliminación Muro de Alcantarilla Alcantarilla Cº f'c=175 Afirmado Emboquillado
Diámetro desencofrad alcantarillas E=.20
Progresiva Replanteo no clasif. compactado material exc. maposteria TMC 24" TMC 36" kg/cm2 e=0.15 m
o
(pulg) (m2) (m3) (m3) (m3) (m3) (m) (m) (m3) (m2) (m2) (m2)
00+217 24.00 7.67 9.08 3.19 6.90 4.00 2.85 17.87 7.31 1.00
15+291 24.00 7.67 9.08 3.19 6.90 0.00 4.00 0.00 2.85 17.87 7.31 1.00
04+480 24.00 7.67 9.08 3.19 6.90 4.00 2.85 17.87 7.31 1.00
09+280 36.00 10.25 13.66 5.24 9.80 4.50 3.47 21.15 9.89 1.00
33.27 40.89 14.82 30.51 - 12.00 4.50 12.02 74.77 31.81 4.00