Está en la página 1de 8

METRADO DE ACERO DE ZAPATAS

DESCRIPCION DEL ELEMENTOS Cant.varilla


DESCRIPCION DIAMETRO N°ELEMENTOS N° VECES LONGITUD 1/4"

Z-1 5/8" 8 1 1.06

Z-1 5/8" 8 1 1.06

Z-2 5/8" 8 5 1.06

Z-2 5/8" 6 5 0.76

Z-3 5/8" 8 1 4.23

Z-3 5/8" 29 1 1.06

Z-4 5/8" 8 1 1.94

Z-4 5/8" 14 1 1.06

Z-5 5/8" 8 1 1.94

Z-5 5/8" 14 1 0.76

Z-6 5/8" 6 2 0.76

Z-6 5/8" 6 2 0.76

9/27/2021

METRADOS DE ACERO DE SOBRECIMIENTO

DESCRIPCION DEL ELEMENTOS


ESTRIBOS
EJE 1-4
EJE 1-4
EJE2-3
EJE 3-4
EJE C-D
EJE C-D
EJE C-D
EJE 1-3
EJE 1-3
EJE 3-5
EJE 3-5
EJE 1-2
EJE 2-3
EJE 3-4
EJE 4- 5
EJE 1-B
EJE 1-B
EJE 1-B
EJE 1- C
EJE 1- C
EJE 1- C
EJE D-C
EJE D-C
EJE D-C
EJE D-C
EJE D-C
EJE D-C
EJE 3
EJE 3
EJE 3
EJE2-3
EJE 2-3
EJE 2-3
EJE 4-C
EJE 4-C
EJE 4-C
EJE 2-C
EJE 2-C
EJE 2-C
EJE 4-C
EJE 4-C
EJE 4-C
EJE 4-C
EJE 4-C
EJE 4-C
EJE C-3
EJE C-3
EJE 4-C
EJE 4-C
EJE 5-4
EJE 5-4
EJE A-C
EJE A-C

METRADO DE ACERO DE VIGA VC-100


DESCRIPCION DEL ELEMENTOS
DESCRIPCION DIAMETRO N°ELEMENTOS N° VECES LONGITUD 1/4"
VC-100 EJE V2 1/2" 6 1 5.02
VC - 100 EJE C 1/2" 6 1
ESTRIBO EJE V2
ESTRIBO EJE C

METRADO DE ACERO DE TECHO ALIGERADO


DESCRIPCION DEL ELEMENTOS
DESCRIPCION DIAMETRO N°ELEMENTOS N° VECES LONGITUD 1/4"
T-1 1/2" 5 1 5.07
T-1 1/2" 5 1 7.17
T-2 1/2" 7 1 3.87
T-2 1/2" 7 1 5.82
A-1 1
A-1 1
A-3 1
A-3 1
A-4 1
A-4 1

Acero temp. 1/4" 4 1


Tramo A-B 1/4" 4 1 0.222
Tramo A-B
(descontando 1/4" 10 1 0.222
escalera)
Tramo B-C 1/4"

METRADOS DE ACERO DE CISTERNA


DESCRIPCION DEL ELEMENTOS
DESCRIPCION DIAMETRO N°ELEMENTOS N° VECES LONGITUD 1/4"

BAJA
CONTRACION
BAJA
CONTRACION
ACERO DE ZAPATAS
DIAMETRO DE REFERENCIA
3/8" 1/2" 5/8" 3/4" 1" TOTAL (Kg)

1.552 13.16096

1.552 13.16096

1.552 65.8048

1.552 35.3856

1.552 52.51968

1.552 47.70848

1.552 24.08704

1.552 23.03168

1.552 24.08704

1.552 16.51328

1.552 14.15424

1.552 14.15424
SUB TOTAL 343.768 333.09
DESPERDICIO (Incluye alambre de amarre 16) 6% 19.98
TOTAL DE ACERO DE ZAPATAS (Kg) 353.07

RO DE SOBRECIMIENTO

DIAMETRO DE REFERENCIA
SUB TOTAL
DESPERDICIO (Incluye alambre de amarre) 6%
TOTAL DE ACERO DE SOBRECIMIENTO (Kg)

ERO DE VIGA VC-100


DIAMETRO DE REFERENCIA
3/8" 1/2" 5/8" 3/4" 1" TOTAL (Kg)
0.994 29.93928
0.994
SUB TOTAL 29.93928
DESPERDICIO (Incluye alambre de amarre) 6% 1.7963568
TOTAL DE ACERO DE SOBRECIMIENTO (Kg) 31.74

O DE TECHO ALIGERADO
DIAMETRO DE REFERENCIA
3/8" 1/2" 5/8" 3/4" 1" TOTAL (Kg)
0.994 25.20
0.994 35.63
0.994 26.93
0.994 40.50

0.994
0.994
0.994
0.994
0.994

SUB TOTAL
DESPERDICIO (Incluye alambre de amarre) 6%
TOTAL DE ACERO DE SOBRECIMIENTO (Kg)

ACERO DE CISTERNA
DIAMETRO DE REFERENCIA
3/8" 1/2" 5/8" 3/4" 1" TOTAL (Kg)

SUB TOTAL 0
DESPERDICIO (Incluye alambre de amarre) 6% 0
TOTAL DE ACERO DE CISTERNA (Kg) 0
Diametro de Masa Kg/m
Referencia

1/4" 0.250
3/8" 0.560
1/2" 0.994
5/8" 1.552
3/4" 2.235
7/8" 3.042
1 3.973

También podría gustarte