Precios y cantidades de recursos requeridos por tipo
Obra 0306062 "MEJORAMIENTO Y AMPLIACIÓN DE LOS SERVICIOS DE AGUA PARA RIEGO EN EL CANAL
MOLINO A HUAROPAMPA, CASERÍO DE COLCAS DEL DISTRITO DE SANTA CRUZ - PROVINCIA
DE HUAYLAS - DEPARTAMENTO DE ANCASH"..
Subpresupuesto 001 PRESUPUESTO GENERAL.
Fecha 01/10/2019
Lugar 021208 ANCASH - HUAYLAS - SANTA CRUZ
120,353.35 120,378.55
MATERIALES
0202010005 CLAVOS PARA MADERA C/C 3" kg 1.0000 5.00 5.00 5.00
0202010061 CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 38.9234 5.20 202.40 233.54
0202040009 ALAMBRE NEGRO N°16 kg 1,725.0336 5.20 8,970.17 8,965.52
0202100010 PERNOS HEXAGONALES DE 3/4" x 3 1/2" pza 9.0000 10.00 90.00 90.00
0202510028 PERNOS 1/2" X 2" CON T/A pza 6,991.6800 3.50 24,470.88 24,470.88
0202810011 GIGANTOGRAFIA SEGUN DETALLE und 1.0000 380.00 380.00 380.00
0202960045 REJILLA METALICA 0.50x0.80m FIERRO CUAD. und 1.0000 1,250.00 1,250.00 1,250.00
1/2" INC. ACABADO
0202970002 ACERO DE REFUERZO FY=4200 GRADO 60 kg 3,005.4780 2.50 7,513.69 7,528.01
0205000003 PIEDRA CHANCADA DE 1/2" m3 46.2916 62.50 2,893.23 2,893.23
0205000034 GRAVA-CANTO RODADO 4" - 8" m3 3.0475 65.00 198.09 198.09
0205010004 ARENA GRUESA (PUESTO EN OBRA) m3 32.8914 37.80 1,243.29 1,243.17
0210000014 GEOMEMBRANA HDPE e=2mm, POLIETILENO DE m2 23.4600 28.00 656.88 656.88
ALTA DENSIDAD
0221000000 CEMENTO PORTLAND TIPO I (42.5KG) BOL 0.9000 22.50 20.25 20.25
0221000093 CEMENTO PORTLAND TIPO MS BOL 513.4713 23.00 11,809.84 11,809.84
0226800003 TUERCA GALVANIZADA DE 1/2" pza 76.0000 2.50 190.00 190.00
0230020096 YESO X 20 KG BOL 62.2775 9.80 610.32 622.77
0230020097 CABLE DE ACERO 3/8" TIPO BOA 6 x 19 m 1,340.0720 25.50 34,171.84 34,177.66
0230020098 CABLE DE ACERO 1/4" TIPO BOA 6 x 19 m 1,340.0720 18.60 24,925.34 24,925.34
0238000000 HORMIGON m3 0.3600 43.50 15.66 15.66
0238510001 AFIRMADO PARA BASE m3 0.9930 35.00 34.76 34.76
0239050000 AGUA m3 11.2074 13.50 151.30 151.06
0239900111 SUMINISTRO E INSTAL. DE TUBERIA 110MM INC. GLB 1.0000 450.00 450.00 450.00
PRUEBA HIDRA.
0243010003 MADERA TORNILLO p2 1,328.1300 7.50 9,960.98 9,961.15
0243510061 ESTACA DE MADERA p2 194.6170 7.85 1,527.74 1,556.93
0244000016 MADERA TORNILLO CEPILLADA p2 70.0000 7.50 525.00 525.00
0244030024 TRIPLAY DE 8 MM m2 8.6400 5.50 47.52 47.52
0254020042 PINTURA ESMALTE SINTETICO gln 0.4320 24.00 10.37 10.37
0256200030 ARANDELA CUADRADA 4" X 4" X 1/4" pza 76.0000 15.00 1,140.00 1,140.00
0262520053 VARILLA DE ANCLAJE GALV. 1/2" X 2.60M pza 76.0000 27.50 2,090.00 2,090.00
0269000052 TUBERIA HDPE 160MM m 7,135.7500 65.00 463,823.75 463,823.75
0269000056 TAPON TUB. HDPE 160MM und 1.0000 32.50 32.50 32.50
0278030016 VALVULA PURGA PRESION DN110MM und 38.0000 180.00 6,840.00 6,840.00
0287010001 OFICINA, ALMACEN Y CASETA DE GUARDIANIA GLB 4.0000 500.00 2,000.00 2,000.00
637,200.80 637,288.88
EQUIPOS
0337010001 HERRAMIENTAS MANUALES %MO 3,618.42 3,618.42
0337540006 MIRA TOPOGRAFICA hm 102.5682 9.80 1,005.17 968.03
0348040036 TRANSPORTE DE EQUIPO Y HERRAMIENTAS GLB 1.0000 5,500.00 5,500.00 5,500.00
0349030004 COMPACTADOR VIBR. TIPO PLANCHA 7 HP hm 1.5133 25.50 38.59 38.59
0349890001 NIVEL TOPOGRAFICO hm 102.5682 15.00 1,538.52 1,529.89
11,700.70 11,654.93
S/. 769,322.36
La columna parcial es el producto del precio por la cantidad requerida; y en la última columna se muestra el Monto Real que se está utilizando