Documentos de Académico
Documentos de Profesional
Documentos de Cultura
MATERIALES
302-CAL-0102 CALHIDRA, TONELADA TON $2,600.00 * 0.000162 $0.42 1.64%
305-M3A-0101 DUELA DE PINO DE 3a DE PZA $45.00 * 0.015556 $0.70 2.73%
3/4x4x8' ( 0.019x0.10x2.44 m)
304-VAR-0101 HILO CAÑAMO ROLLO DE 100 M PZA $40.00 * 0.001000 $0.04 0.16%
303-ARF-0201 VARILLA R-42 DEL No. 3, (3/8 Ø), KG, KG $22.50 * 0.012444 $0.28 1.09%
0.557 KG/M
PLAN0001 MAQUILA DE PLANO PZA $2,405.26 * 0.001750 $4.21 16.45%
EQUIPO Y HERRAMIENTA
EQEX320C EXCAVADORA HIDRAULICA CAT. 320 C, HOR $1,200.24 * 0.250000 $300.06 85.22%
138 HP
EQMART MARTILLO HIDRAULICO PARA HOR $256.40 * 0.203000 $52.05 14.78%
EXCAVADORA
EQUIPO Y HERRAMIENTA
EQEX320C EXCAVADORA HIDRAULICA CAT. 320 C, HOR $1,200.24 * 0.127500 $153.03 100.00%
138 HP
SUBTOTAL: EQUIPO Y HERRAMIENTA $153.03 100.00%
(CD) Costo directo $153.03 100.00%
(CI) INDIRECTOS 16.0000% $24.48
SUBTOTAL1 $177.51
(CF) FINANCIAMIENTO 0.2521% $0.45
SUBTOTAL2 $177.96
(CU) UTILIDAD 10.0000% $17.80
PRECIO UNITARIO (CD+CI+CF+CU) $195.76
(* CIENTO NOVENTA Y CINCO PESOS 76/100 M.N. *)
MATERIALES
358-AGU-0201 AGUA DE PIPA M3 $120.00 * 0.180000 $21.60 4.06%
MATERIALES
358-AGU-0201 AGUA DE PIPA M3 $120.00 * 0.180000 $21.60 4.06%
MATERIALES
MATUBO13MM TUBO DE POLIDUCTO DE 13 MM DE M $25.00 * 4.000000 $100.00 6.91%
DIAMETRO
MATABRAZADERABRAZADERA DE 1/2" PZA $12.50 * 2.000000 $25.00 1.73%
MATEPETATE TEPETATE PUESTO EN OBRA M3 $180.00 * 0.750000 $135.00 9.33%
MATERIALES
MBASETRONC BASE TRONCOPIRAMIDAL DE PZA $4,695.06 * 1.000000 $4695.06 100.00%
CONCRETO PREMEZCLADO
MATERIALES
MPOSTE7M POSTE DE ACERO CED 40 CONICO PZA $6,929.28 * 1.000000 $6929.28 100.00%
CIRCULAR DE 7.00 M DE ALTURA,
INCLUYE BRAZO DE 1.80 M DE LARGO,
PERCHA DE ASIENTO PARA PLACA
FOTOVOLTAICA ASI COMO BASE PARA
GABINETE DE 0.40 x 0.50 DE ALTURA
MATERIALES
MLAMPARLED15LAMPARA LED PREMIUM DE 150 WATTS PZA $10,035.43 * 1.000000 $10035.43 100.00%
TEMP. BLANCO FRIO 9000 LM 8000 K EQ
1000, INCLUYE CELDA SOLAR, INVERSOR
Y BATERIA DE CARGA
MANO DE OBRA
1CO1A CUADRILLA No. 12 (1 COLOCADOR + 1 JOR $1,412.69 * 3.811346 $5384.25 76.45%
AY.)
SUBTOTAL: MANO DE OBRA $5384.25 76.45%
EQUIPO Y HERRAMIENTA
EQHIAB GRUA HIAB MONTADA EN CAMION DE 12 HOR $694.56 * 2.000000 $1389.12 19.72%
TON
%MO1 HERRAMIENTA MENOR % $5,384.25 * 0.030000 $161.53 2.29%
%MO5 EQUIPO DE SEGURIDAD % $5,384.25 * 0.020000 $107.69 1.53%
MANO DE OBRA
1CO1A CUADRILLA No. 12 (1 COLOCADOR + 1 JOR $1,412.69 * 5.063432 $7153.06 74.55%
AY.)
MANO DE OBRA
1CO1A CUADRILLA No. 12 (1 COLOCADOR + 1 JOR $1,412.69 * 6.037722 $8529.43 64.99%
AY.)