EQUIPO Y HERRAMIENTA
EQRE436C RETROEXCAVADORA CAT. 436 C, 93 HP, HOR $816.72 / 35.000000 $23.33 7.81%
7120 KG, CUCHARON GRAL. 1 M3,
CUCHARON RETRO 0.20 M3, 4.93 M. DE
PROF.
EQCAMION CAMION DE VOLTEO DE 7 M3 HOR $825.61 / 3.000000 $275.20 92.19%
Cliente:
Inicio Obra:
Fin Obra:
MATERIALES
305-M3A-0101 DUELA DE PINO DE 3a DE 3/4x4x8' ( PZA $52.20 * 0.138000 $7.20 1.25%
0.019x0.10x2.44 m)
305-CLA-1504 CLAVOS PARA CONCRETO DE 2 1/2 (143 KG $78.00 * 0.015000 $1.17 0.20%
pzas/kg) CAJA DE 20 KG
358-AGU-0101 AGUA DE TOMA M3 $28.00 * 0.010000 $0.28 0.05%
302-CEM-0102 CEMENTO (GRIS) PORTLAND TIPO II TON $4,250.00 * 0.002000 $8.50 1.48%
PUZOLANICO, TONELADA
303-ARF-2901 MALLA ELECTROSOLDADA 6x6/10-10, M2 M2 $17.40 * 1.100000 $19.14 3.33%
(2.50X40 M)
303-ARF-1101 ALAMBRE RECOCIDO CAL. 16, (1.59 mm Ø), KG $22.90 * 0.030000 $0.69 0.12%
KG, 0.016 KG/M
307-CON-0501 REVENIMIENTO DE 18+-3.5 PARA M3 $229.00 * 0.103000 $23.59 4.10%
CONCRETO BOMBEABLE
307-CON-0401 BOMBEO DE CONCRETO M3 $311.00 * 0.103000 $32.03 5.57%
307-CON-0203 CONCRETO PREMEZCLADO F'c=200 M3 $2,101.00 * 0.154500 $324.60 56.42%
KG/CM2, CLASE 2
Cliente:
Inicio Obra:
Fin Obra:
MATERIALES
303-ARF-0201 VARILLA R-42 DEL No. 3, (3/8 Ø), KG, 0.557 KG $18.80 * 3.427000 $64.43 2.14%
KG/M
303-ARF-0301 VARILLA R-42 DEL No. 4, (1/2 Ø), KG, 0.996 KG $18.80 * 24.976000 $469.55 15.56%
KG/M
303-ARF-1101 ALAMBRE RECOCIDO CAL. 16, (1.59 mm Ø), KG $22.90 * 0.956000 $21.89 0.73%
KG, 0.016 KG/M
305-M3A-0101 DUELA DE PINO DE 3a DE 3/4x4x8' ( PZA $52.20 * 1.375000 $71.78 2.38%
0.019x0.10x2.44 m)
305-M3A-0201 BARROTE DE PINO DE 3a, DE 1 1/2x3 1/2x8' PZA $68.00 * 0.625000 $42.50 1.41%
305-M3A-0301 POLIN DE PINO DE 3a, DE 3 1/2x3 1/2x8' PZA $118.00 * 0.247000 $29.15 0.97%
305-CLA-1301 CLAVOS PARA MADERA DE 2 1/2 (260 KG $28.00 * 0.152000 $4.26 0.14%
pzas/kg) CAJA DE 25 KG
305-CLA-1401 CLAVOS PARA MADERA DE 4 (77 pzas/kg) KG $28.00 * 0.104000 $2.91 0.10%
CAJA DE 25 KG
358-AGU-0101 AGUA DE TOMA M3 $28.00 * 0.037000 $1.04 0.03%
359-CMB-0101 DIESEL LT $21.28 * 0.396000 $8.43 0.28%
Cliente:
Inicio Obra:
Fin Obra:
Cliente:
Inicio Obra:
Fin Obra:
MATERIALES
303-ARF-0301 VARILLA R-42 DEL No. 4, (1/2 Ø), KG, 0.996 KG $18.80 * 9.622000 $180.89 13.22%
KG/M
303-ARF-0201 VARILLA R-42 DEL No. 3, (3/8 Ø), KG, 0.557 KG $18.80 * 5.049000 $94.92 6.94%
KG/M
303-ARF-1101 ALAMBRE RECOCIDO CAL. 16, (1.59 mm Ø), KG $22.90 * 0.548000 $12.55 0.92%
KG, 0.016 KG/M
305-M3A-0503 TRIPLAY DE PINO P/CIMBRA DE 16 MM, PZA $799.00 * 0.117000 $93.48 6.83%
HOJA DE 1.22x2.44 M.
305-M3A-0401 CHAFLAN DE PINO DE 1x1x8' PZA $18.00 * 0.910000 $16.38 1.20%
305-CLA-1201 CLAVOS PARA MADERA DE 1 1/4 (1320 KG $50.00 * 0.037000 $1.85 0.14%
pzas/kg) CAJA DE 25 KG
305-M3A-0101 DUELA DE PINO DE 3a DE 3/4x4x8' ( PZA $52.20 * 0.292000 $15.24 1.11%
0.019x0.10x2.44 m)
305-M3A-0201 BARROTE DE PINO DE 3a, DE 1 1/2x3 1/2x8' PZA $68.00 * 0.458000 $31.14 2.28%
305-M3A-0301 POLIN DE PINO DE 3a, DE 3 1/2x3 1/2x8' PZA $118.00 * 0.219000 $25.84 1.89%
305-CLA-1301 CLAVOS PARA MADERA DE 2 1/2 (260 KG $28.00 * 0.138000 $3.86 0.28%
pzas/kg) CAJA DE 25 KG
305-CLA-1401 CLAVOS PARA MADERA DE 4 (77 pzas/kg) KG $28.00 * 0.156000 $4.37 0.32%
CAJA DE 25 KG
358-AGU-0201 AGUA DE PIPA M3 $100.00 * 0.010000 $1.00 0.07%
359-CMB-0101 DIESEL LT $21.28 * 0.360000 $7.66 0.56%
Cliente:
Inicio Obra:
Fin Obra:
Cliente:
Inicio Obra:
Fin Obra:
MATERIALES
313-VAR-0103 ANCLA DE ACERO A-36 DE 1/2 Ø POR 0.60 PZA $132.20 * 4.000000 $528.80 49.54%
M. DE DESARROLLO C/TCA Y RONDANAS
313-APL-0105 PLACA DE ACERO A-36 DE 1/2 (12.7 MM) TON $25,800.00 * 0.009410 $242.78 22.75%
99.6 KG/M2
337-COM-1202 PRIMARIO ANTICORROSIVO (CUBETA DE LT $157.71 * 0.045000 $7.10 0.67%
19 LTS)
337-SVT-0302 THINNER (LATA 19 LTS) LT $48.00 * 0.022500 $1.08 0.10%
317-SOL-0101 SOLDADURA ELECTRODO 6013 DE 1/8 (3.2 KG $110.00 * 0.050000 $5.50 0.52%
MM) DE DIAMETRO
303-ARF-0201 VARILLA R-42 DEL No. 3, (3/8 Ø), KG, 0.557 KG $18.80 * 1.340000 $25.19 2.36%
KG/M
Cliente:
Inicio Obra:
Fin Obra:
Cliente:
Inicio Obra:
Fin Obra:
Cliente:
Inicio Obra:
Fin Obra:
Cliente:
Inicio Obra:
Fin Obra:
MATERIALES
346-PSD-0104 TUBO PVC SANITARIO DE 100 MM, DE 6.00 PZA $365.73 * 1.000000 $365.73 40.90%
M EXTREMOS LISOS
Cliente:
Inicio Obra:
Fin Obra:
Cliente:
Inicio Obra:
Fin Obra:
Cliente:
Inicio Obra:
Fin Obra:
MATERIALES
337-SLL-1001 SILICON CARTUCHO PZA $133.98 * 0.200000 $26.80 2.70%
314-LAM-0200 LAMINA 100% ACRILICA M2 $680.00 * 1.100000 $748.00 75.46%
Cliente:
Inicio Obra:
Fin Obra:
MATERIALES
LETR01 Suministro letras "DANA" PZA $50,000.00 * 1.000000 $50000.00 76.61%