Está en la página 1de 2

PROGRAMACION DE EJECUCION DE PROYECTO

(A PRECIOS DE MERCADO)
PROYECTO "DISEÑO
: DE MICROCENTRAL HIDROELECTRICA EN LA COMUNIDAD DE "
ENTIDAD : UNIVERSIDAD NACIONAL DE SAN ANTONIO ABAD DEL CUSCO
RESPONSABLE
ING.: WILBERT JULIO LOAIZA CUBA
FECHA : Set-21

SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4


ITEM DESCRIPCION MONTO
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

1.00 SUMINISTRO DE MATERIALES S/. 11,617.76


1.01 SUMINISTRO DE MICROGENERADOR DE ENERGIA HIDROELECTRICA S/. 8,183.76 S/ 584.55 S/ 584.55 S/ 584.55 S/ 584.55 S/ 584.55 S/ 584.55 S/ 584.55 S/ 584.55 S/ 584.55 S/ 584.55 S/ 584.55 S/ 584.55 S/ 584.55 S/ 584.55

1.02 SUMINISTRO DE TUBERIA TIPO PVC DE Ø 2" x 3M. S/. 1,500.00 S/ 214.29 S/ 214.29 S/ 214.29 S/ 214.29 S/ 214.29 S/ 214.29 S/ 214.29

1.03 SUMINISTRO DE SOLDADURA LIQUIDA PARA TUBERIA TIPO PVC. S/. 70.00 S/ 10.00 S/ 10.00 S/ 10.00 S/ 10.00 S/ 10.00 S/ 10.00 S/ 10.00

1.04 SUMINISTRO DE FOCO LED 20 W. S/. 20.00 S/ 2.86 S/ 2.86 S/ 2.86 S/ 2.86 S/ 2.86 S/ 2.86 S/ 2.86

1.05 SUMINISTRO DE MATERIALES PARA PUESTA A TIERRA S/. 614.00 S/ 87.71 S/ 87.71 S/ 87.71 S/ 87.71 S/ 87.71 S/ 87.71 S/ 87.71

1.06 SUMINISTRO DE EQUIPOS DE PROTECCION Y MANIOBRA S/. 250.00 S/ 35.71 S/ 35.71 S/ 35.71 S/ 35.71 S/ 35.71 S/ 35.71 S/ 35.71

1.07 SUMINISTRO DE OTROS INSUMOS. S/. 980.00 S/ 140.00 S/ 140.00 S/ 140.00 S/ 140.00 S/ 140.00 S/ 140.00 S/ 140.00

2.00 MONTAJE DE MICROCENTRAL S/. 3,172.00


2.01 MONTAJE DE MICROGENERADOR HIDROELECTRICO S/. 500.00 S/ 83.33 S/ 83.33 S/ 83.33 S/ 83.33 S/ 83.33 S/ 83.33

2.02 INTALACION DE DUCTOS Y/O TUBERIA S/. 1,260.00 S/ 252.00 S/ 252.00 S/ 252.00 S/ 252.00 S/ 252.00

2.03 INSTALACION DE LUMINARIAS Y LAMPARAS. S/. 2.00 S/. 2.00

2.04 INSTALACION DE EQUIPOS DE PROTECCION Y MANIOBRA S/. 60.00 S/ 60.00

2.05 CONSTRUCCIONDE PRESA DE GRAVEDAD S/. 300.00 S/ 60.00 S/ 60.00 S/ 60.00 S/ 60.00 S/ 60.00

2.06 CONSTRUCCION DE DESARENADOR. S/. 300.00 S/ 60.00 S/ 60.00 S/ 60.00 S/ 60.00 S/ 60.00

2.07 CONSTRUCCION DE CAMARA DE CARGA S/. 350.00 S/ 116.67 S/ 116.67 S/ 116.67

2.08 CONSTRUCCION DE CASA DE MAQUINAS. S/. 400.00 S/ 80.00 S/ 80.00 S/ 80.00 S/ 80.00 S/ 80.00

3.00 TRANSPORTE S/. 1,161.78 S/ 38.73 S/ 38.73 S/ 38.73 S/ 38.73 S/ 38.73 S/ 38.73 S/ 38.73 S/ 38.73 S/ 38.73 S/ 38.73 S/ 38.73 S/ 38.73 S/ 38.73 S/ 38.73 S/ 38.73 S/ 38.73 S/ 38.73 S/ 38.73 S/ 38.73 S/ 38.73 S/ 38.73 S/ 38.73 S/ 38.73 S/ 38.73 S/ 38.73 S/ 38.73 S/ 38.73 S/ 38.73 S/ 38.73 S/ 38.73

4.00 IMPACTO AMBIENTAL S/. 480.00 S/ 68.57 S/ 68.57 S/ 68.57 S/ 68.57 S/ 68.57 S/ 68.57 S/ 68.57

COSTO DIRECTO TOTAL DEL PROYECTO S/. 16,431.54 S/ 1,434.42 S/ 1,434.42 S/ 1,434.42 S/ 1,434.42 S/ 1,434.42 S/ 1,242.42 S/ 1,242.42 S/ 683.28 S/ 683.28 S/ 683.28 S/ 683.28 S/ 683.28 S/ 683.28 S/ 683.28 S/ 98.73 S/ 155.39 S/ 155.39 S/ 155.39 S/ 118.73 S/ 118.73 S/ 118.73 S/ 118.73 S/ 118.73 S/ 122.06 S/ 122.06 S/ 122.06 S/ 122.06 S/ 122.06 S/ 124.06 S/ 98.73

AVANCE FISICO PROGRAMADO ACUMULADO DIARIO (%) 0.00% 8.73% 17.46% 26.19% 34.92% 43.65% 51.21% 58.77% 62.93% 67.09% 71.25% 75.40% 79.56% 83.72% 87.88% 88.48% 89.43% 90.37% 91.32% 92.04% 92.76% 93.48% 94.21% 94.93% 95.67% 96.42% 97.16% 97.90% 98.64% 99.40% 100.00%

AVANCE FISICO ACUMULADO PROGRAMADO SEMANAL (%) 0.00% 58.77% 87.88% 93.48% 100.00%
5.00 GASTOS GENERALES S/. 4,000.00 S/ 133.33 S/ 133.33 S/ 133.33 S/ 133.33 S/ 133.33 S/ 133.33 S/ 133.33 S/ 133.33 S/ 133.33 S/ 133.33 S/ 133.33 S/ 133.33 S/ 133.33 S/ 133.33 S/ 133.33 S/ 133.33 S/ 133.33 S/ 133.33 S/ 133.33 S/ 133.33 S/ 133.33 S/ 133.33 S/ 133.33 S/ 133.33 S/ 133.33 S/ 133.33 S/ 133.33 S/ 133.33 S/ 133.33 S/ 133.33

6.00 ELABORACION DE EXPEDIENTE TECNICO S/. 200.00 S/ 200.00

COSTO TOTAL DEL ROYECTO S/. 20,631.54 S/ 1,767.76 S/ 1,567.76 S/ 1,567.76 S/ 1,567.76 S/ 1,567.76 S/ 1,375.76 S/ 1,375.76 S/ 816.61 S/ 816.61 S/ 816.61 S/ 816.61 S/ 816.61 S/ 816.61 S/ 816.61 S/ 232.06 S/ 288.73 S/ 288.73 S/ 288.73 S/ 252.06 S/ 252.06 S/ 252.06 S/ 252.06 S/ 252.06 S/ 255.39 S/ 255.39 S/ 255.39 S/ 255.39 S/ 255.39 S/ 257.39 S/ 232.06

AVANCE FINANCIERO PROGRAMADO ACUMULADO SEMANAL (%) 0.00% 8.57% 16.17% 23.77% 31.36% 38.96% 45.63% 52.30% 56.26% 60.22% 64.17% 68.13% 72.09% 76.05% 80.01% 81.13% 82.53% 83.93% 85.33% 86.55% 87.77% 88.99% 90.22% 91.44% 92.68% 93.91% 95.15% 96.39% 97.63% 98.88% 100.00%

AVANCE FINANCIERO ACUMULADO PROGRAMADO MENSUAL (%) 0.00% 52.30% 80.01% 88.99% 100.00%
S/ 10,790.29 S/ 5,716.29 S/ 1,854.41 S/ 2,270.53
PROGRAMACION DE EJECUCION DE PROYECTO
(A PRECIOS DE MERCADO)
PROYECTO "DISEÑO
: DE MICROCENTRAL HIDROELECTRICA EN LA COMUNIDAD DE "
ENTIDAD : UNIVERSIDAD NACIONAL DE SAN ANTONIO ABAD DEL CUSCO
RESPONSABLE
ING.: WILBERT JULIO LOAIZA CUBA
FECHA : Set-21

SEMANA 1 SEMANA 2 SEMANA 3 SEMANA 4


ITEM DESCRIPCION MONTO
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

CRONOGRAMA DE EJECUCION DE PROYECTO

100%
98.88% 100.00%
97.63%
96.39%
95.15%
93.91%
92.68%
91.44%
90% 90.22%
88.99%
87.77%
86.55%
85.33%
83.93%
82.53%
80% 80.01% 81.13%
76.05%
72.09%
68.13%
70%
64.17%
60.22%
60% 56.26%
52.30%

50% 45.63%

38.96%
40%

31.36%

30%
23.77%

20% 16.17%

8.57%

10%

0%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30