2.36
###
soles / ton
2.36
###
soles / ton
ESTUDIO DEFINITIVO DE LA CARRETERA CAÑETE - LUNAHUANA
S10 - LA VIGA
CONSTRUCTIVO
CAPECO - LA FAMILIA
CONCEPTO Peso kg/ ml Volumen cm3 / ml Densidad Kg/cm3 S/. S/. X kg
Fierro de 3/8' 0.56 71.26 0.00785902 14.34 2.85
Fierro de 1/2' 0.993 126.68 0.00783884 26.51 2.97
Fierro de 5/8' 1.552 197.93 0.00784105 41.55 2.97
2.93
Aprobado: TSR
COTIZACION DE MATERIALES
FECHA PRESUPUESTO BASE : AGOSTO 2012
TIPO DE CAMBIO S/. : 2.62
COSTOS COTIZACION
DESCRIPCION UND PESO PROCEDENCIA PRECIO S/. S10 CAPECO CONSTRUCTIVO LIMA
(kg / u ) S/. S/. S/.
ACERO CORRUGADO fy=4,200 Kg/cm2 (Gra kg 1.00 LIMA 2.21 2.21 2.93 2.55 2.68
ACERO ESTRUCTURAL GRADO 50 ton ### LIMA 2,363.53 2,363.53
ACERO ESTRUCTURAL GRADO 36 ton ### LIMA 2,363.53 2,363.53
ALAMBRE NEGRO # 16 y # 8 kg 1.00 LIMA 2.91 2.91 4.15 3.09 3.50
PASADOR DE ANCLAJE DE 1 3/8" X 1M. pza 1.00 LIMA 149.00 149.00
ANCHOR NUT PARA BARRAS d=26MM Y und 0.20 LIMA 207.85 207.85
PERNO ANCLAJE 3/8" X 200mm und 0.30 LIMA 15.00 15.00
PERNO ANCLAJE 3/8" X 150mm und 0.25 LIMA 12.00 12.00
PLACA DE BRONCE und 0.50 LIMA 44.50 44.50
ARENA DE SILICE m3 ### PISCO 15.26 15.26
MATERIAL DE RESPALDO PARA SELLLAD m 1.00 LIMA 6.20 6.20
CONECTOR HDPE und 1.00 LIMA 1.83 1.83
ALCANTARILLA T.M.C. DIAMETRO 24" m 36.98 LIMA 212.00 212.00 218.40 212.00
ALCANTARILLA T.M.C. DIAMETRO 36" m 56.14 LIMA 321.00 321.00 333.65 321.00
ALCANTARILLA T.M.C. DIAMETRO 72" m 178.84 LIMA 1,005.00 1,005.00 1,035.15 1,005.00
ALCANTARILLA ABOV T.M.C. LUZ=0.60 m m 35.80 LIMA 190.00 190.00
ALCANTARILLA ABOV T.M.C. LUZ=0.90 m m 52.10 LIMA 260.00 260.00
COMPUERTA METALICA SIMPLE pza 50.00 LIMA 80.00 80.00
ANGULO DE FIERRO 1" x 1" x 3/16" m 1.73 LIMA 5.40 5.40
CLAVOS DIFERENTES MEDIDAS kg 1.00 LIMA 3.09 3.09 4.15 4.66 3.70
PERFIL T 1 1/2 " x 3/16" m 2.67 LIMA 6.98 6.98
PERNOS 3/8" x 8" +T+2A u 0.15 LIMA 1.70 1.70
PERNOS 5/8" x 14" + T+A u 0.75 LIMA 2.50 2.50
CABLE DE ACERO DE 1" m 3.00 LIMA 16.70 16.70
PLANCHA DE ACERO 6.0 x 1220 x 2400 mm pza 135.00 LIMA 377.25 377.25 377.25
PLANCHA DE ACERO 9.5 x 1220 x 2400 mm pza 218.00 LIMA 602.46 602.46 602.46
PLANCHA DE ACERO 12.0 x 1220 x 2400 mmpza 271.00 LIMA 827.79 827.79 827.79
PLANCHA DE ACERO 16.0x 1220 x 2400 mm pza 361.00 LIMA 1,161.78 1,161.78
PLANCHA DE ACERO 20.0x 1220 x 2400 mm pza 520.00 LIMA 1,355.86 1,355.86
PLANCHA DE ACERO LAMINADA AL FRIO kg 1.00 LIMA 2.36 2.36
PLATINA DE FIERRO 1/8" x 2" m 1.17 LIMA 4.10 4.10 4.10
PLATINA DE FIERRO 3/16" x 1" m 0.83 LIMA 3.19 3.19 3.38
PLATINA DE FIERRO 3/16" x 2" m 1.67 LIMA 4.45 6.11 4.45
PLATINA DE FIERRO 3/16" x 3" m 2.83 LIMA 9.35 9.35
SOLDADURA kg 1.00 LIMA 11.86 11.86
SOLDADURA AWS 7018 kg 1.00 LIMA 10.59 10.59 11.44
OXIGENO m3 25.00 LIMA 6.80 6.80
ACETILENO m3 25.00 LIMA 28.31 28.31
SOLDADURA E 7018 kg 1.00 LIMA 10.00 10.59 10.00
BARRA ROSCADA DYWIDAG O SIMILAR d= m 2.00 LIMA 155.87 155.87
TUBO F.N. STD Ø 2 1/2" m 5.78 LIMA 17.67 17.67
TUBO F.N. STD Ø 3" m 7.50 LIMA 23.62 23.62
Proyecto: 100800
Aprobado: TSR
COTIZACION DE MATERIALES
FECHA PRESUPUESTO BASE : AGOSTO 2012
TIPO DE CAMBIO S/. : 2.62
COSTOS COTIZACION
DESCRIPCION UND PESO PROCEDENCIA PRECIO S/. S10 CAPECO CONSTRUCTIVO LIMA
(kg / u ) S/. S/. S/.
Aprobado: TSR
COTIZACION DE MATERIALES
FECHA PRESUPUESTO BASE : AGOSTO 2012
TIPO DE CAMBIO S/. : 2.62
COSTOS COTIZACION
DESCRIPCION UND PESO PROCEDENCIA PRECIO S/. S10 CAPECO CONSTRUCTIVO LIMA
(kg / u ) S/. S/. S/.
CEMENTOS - MADERAS
ADITIVO CURADOR DE CONCRETO gln 3.85 LIMA 9.77 22.43 16.02 14.41 9.77
ADITIVO DESMOLDANTE PARA ENCOFRA gln 3.85 LIMA 52.40 66.65 104.97 52.40 88.84
ADITIVO INCORPORADOR DE AIRE gln 3.85 LIMA 20.27 30.19 20.27
ADITIVO ADHESIVO EPOXICO gln 3.85 LIMA 224.37 224.37
MASILLA PLASTICA BITUMINOSA kg 1.00 LIMA 19.58 19.58
SELLADOR ELASTOMERICO PARA GRIETA kg 3.85 LIMA 157.85 183.65 157.85
IMPRIMANTE PARA JUNTAS (VULKEM 171 gln 4.00 LIMA 158.98 158.98
EXPLOSIVOS Y AFINES
Aprobado: TSR
COTIZACION DE MATERIALES
FECHA PRESUPUESTO BASE : AGOSTO 2012
TIPO DE CAMBIO S/. : 2.62
COSTOS COTIZACION
DESCRIPCION UND PESO PROCEDENCIA PRECIO S/. S10 CAPECO CONSTRUCTIVO LIMA
(kg / u ) S/. S/. S/.
Aprobado: TSR
COTIZACION DE MATERIALES
FECHA PRESUPUESTO BASE : AGOSTO 2012
TIPO DE CAMBIO S/. : 2.62
COSTOS COTIZACION
DESCRIPCION UND PESO PROCEDENCIA PRECIO S/. S10 CAPECO CONSTRUCTIVO LIMA
(kg / u ) S/. S/. S/.
ELEMENTOS VARIOS
Aprobado: TSR
COTIZACION DE MATERIALES
FECHA PRESUPUESTO BASE : AGOSTO 2012
TIPO DE CAMBIO S/. : 2.62
COSTOS COTIZACION
DESCRIPCION UND PESO PROCEDENCIA PRECIO S/. S10 CAPECO CONSTRUCTIVO LIMA
(kg / u ) S/. S/. S/.
FECHA PRESUPUESTO BASE : AGOSTO 2012 Refineria Conchán a Obra (liquid (S/. /kg) : 0.05
Lima a Obra (Liquidos y Explosi (S/. /kg) : 0.05
T.C. 2.62 Lima a Obra (S/. /kg) : 0.05
Pisco - Obra (S/. /kg) : 0.02
ACERO CORRUGADO fy=4,200 Kg/cm2 (Grado 60) kg 1.00 LIMA 2.21 0.05 0.04 2.30
ACERO ESTRUCTURAL GRADO 50 ton 1,000.00 LIMA 2,363.53 50.00 47.27 2,460.80
ACERO ESTRUCTURAL GRADO 36 ton 1,000.00 LIMA 2,363.53 50.00 47.27 2,460.80
PASADOR DE ANCLAJE DE 1 3/8" X 1M. pza 1.00 LIMA 149.00 0.05 2.98 152.03
ANCHOR NUT PARA BARRAS d=26MM Y CONTRATUERCA DW und 0.20 LIMA 207.85 0.01 4.16 212.02
PERNO ANCLAJE 3/8" X 200mm und 0.30 LIMA 15.00 0.02 0.30 15.32
PERNO ANCLAJE 3/8" X 150mm und 0.25 LIMA 12.00 0.01 0.24 12.25
MATERIAL DE RESPALDO PARA SELLLADORES m 1.00 LIMA 6.20 0.05 0.12 6.37
ALCANTARILLA T.M.C. DIAMETRO 24" m 36.98 LIMA 212.00 1.85 4.24 218.09
ALCANTARILLA T.M.C. DIAMETRO 36" m 56.14 LIMA 321.00 2.81 6.42 330.23
ALCANTARILLA T.M.C. DIAMETRO 72" m 178.84 LIMA 1,005.00 8.94 20.10 1,034.04
ALCANTARILLA ABOV T.M.C. LUZ=0.60 m FLECHA=0.40 m, e=1.80 m 35.80 LIMA 190.00 1.79 3.80 195.59
ALCANTARILLA ABOV T.M.C. LUZ=0.90 m FLECHA=0.57 m, e=2.00 m 52.10 LIMA 260.00 2.61 5.20 267.81
COMPUERTA METALICA SIMPLE pza 50.00 LIMA 80.00 2.50 1.60 84.10
ANGULO DE FIERRO 1" x 1" x 3/16" m 1.73 LIMA 5.40 0.09 0.11 5.60
CLAVOS DIFERENTES MEDIDAS kg 1.00 LIMA 3.09 0.05 0.06 0.15 3.35
PERFIL T 1 1/2 " x 3/16" m 2.67 LIMA 6.98 0.13 0.14 7.25
PERNOS 3/8" x 8" +T+2A u 0.15 LIMA 1.70 0.01 0.03 1.74
PERNOS 5/8" x 14" + T+A u 0.75 LIMA 2.50 0.04 0.05 2.59
PLANCHA DE ACERO 6.0 x 1220 x 2400 mm (1/4") pza 135.00 LIMA 377.25 6.75 7.55 391.55
PLANCHA DE ACERO 9.5 x 1220 x 2400 mm (3/8") pza 218.00 LIMA 602.46 10.90 12.05 625.41
PLANCHA DE ACERO 12.0 x 1220 x 2400 mm (1/2") pza 271.00 LIMA 827.79 13.55 16.56 857.90
PLANCHA DE ACERO 16.0x 1220 x 2400 mm (5/8") pza 361.00 LIMA 1,161.78 18.05 23.24 1,203.07
PLANCHA DE ACERO 20.0x 1220 x 2400 mm (3/4") pza 520.00 LIMA 1,355.86 26.00 27.12 1,408.98
PLANCHA DE ACERO LAMINADA AL FRIO kg 1.00 LIMA 2.36 0.05 0.05 2.46
PLATINA DE FIERRO 1/8" x 2" m 1.17 LIMA 4.10 0.06 0.08 4.24
PLATINA DE FIERRO 3/16" x 1" m 0.83 LIMA 3.19 0.04 0.06 3.29
PLATINA DE FIERRO 3/16" x 2" m 1.67 LIMA 4.45 0.08 0.09 4.62
PLATINA DE FIERRO 3/16" x 3" m 2.83 LIMA 9.35 0.14 0.19 9.68
SOLDADURA AWS 7018 kg 1.00 LIMA 10.59 0.05 0.21 0.53 11.38
BARRA ROSCADA DYWIDAG O SIMILAR d=26MM, GRADO 150 C/ACO m 2.00 LIMA 155.87 0.10 3.12 159.09
TUBO F.N. STD Ø 2 1/2" m 5.78 LIMA 17.67 0.29 0.35 18.31
TUBO F.N. STD Ø 3" m 7.50 LIMA 23.62 0.38 0.47 24.47
TUBO F.N. STD Ø 3 1/2" m 9.10 LIMA 29.86 0.46 0.60 30.92
ASFALTO LIQUIDO RC-250 lt 1.00 CONCHAN 2.22 0.05 0.04 0.11 2.42
ASFALTO LIQUIDO MC-30 lt 1.00 CONCHAN 2.40 0.05 0.05 0.12 2.62
EMULSION ASFALTICA CRR-1 C/POLIMERO lt 1.00 LIMA 2.23 0.05 0.04 0.11 2.43
CEMENTO ASFALTICO PEN 60/70 kg 1.00 CONCHAN 2.11 0.05 0.04 0.11 2.31
ADITIVO PARA MEJORAR ADHERENCIA kg 1.00 LIMA 15.75 0.05 0.32 0.79 16.91
PETROLEO DIESEL D-2 gln 3.78 CONCHAN 10.45 0.19 0.21 0.52 11.37
GASOLINA 84 OCT gln 3.78 CONCHAN 9.09 0.19 0.18 0.45 9.91
IMPRIMANTE ASFALTICO MODIFICADO kg 1.00 LIMA 11.35 0.05 0.23 0.57 12.20
CAL HIDRATADA kg 1.00 LIMA 0.85 0.05 0.02 0.04 0.26 1.22
CEMENTOS - MADERAS
FILLER (CAL HIDRATADA) kg 1.00 LIMA 0.85 0.05 0.02 0.04 0.26 1.22
CEMENTO PORTLAND TIPO I (EL SOL) bl 42.50 LIMA 14.54 2.13 0.29 0.73 17.69
CEMENTO PORTLAND TIPO I (ATLAS) bl 42.50 LIMA 13.47 2.13 0.27 0.67 16.54
Proyecto: 100800
CALCULO DE COSTO DE MATERIALES Revisión:
Aprobado: TSR
Proyecto: ESTUDIO DEFINITIVO DE LA REHABILITACION Y MEJORAMIENTO DE LA CARRETERA CAÑETE - Fecha Presupuesto: Agosto 2012
LUNAHUANÁ
Etapa : Estudio Definitivo Especialidad: Costos CSL - 100800 - CP - 004
FECHA PRESUPUESTO BASE : AGOSTO 2012 Refineria Conchán a Obra (liquid (S/. /kg) : 0.05
Lima a Obra (Liquidos y Explosi (S/. /kg) : 0.05
T.C. 2.62 Lima a Obra (S/. /kg) : 0.05
Pisco - Obra (S/. /kg) : 0.02
LIJA PARA CONCRETO hja 0.05 LIMA 1.01 0.01 0.02 1.04
TRIPLAY 19mm PARA ENCOFRADO pza 49.44 LIMA 90.00 2.47 1.80 4.50 98.77
Proyecto: 100800
CALCULO DE COSTO DE MATERIALES Revisión:
Aprobado: TSR
Proyecto: ESTUDIO DEFINITIVO DE LA REHABILITACION Y MEJORAMIENTO DE LA CARRETERA CAÑETE - Fecha Presupuesto: Agosto 2012
LUNAHUANÁ
Etapa : Estudio Definitivo Especialidad: Costos CSL - 100800 - CP - 004
FECHA PRESUPUESTO BASE : AGOSTO 2012 Refineria Conchán a Obra (liquid (S/. /kg) : 0.05
Lima a Obra (Liquidos y Explosi (S/. /kg) : 0.05
T.C. 2.62 Lima a Obra (S/. /kg) : 0.05
Pisco - Obra (S/. /kg) : 0.02
ADITIVO CURADOR DE CONCRETO gln 3.85 LIMA 9.77 0.19 0.20 0.49 10.65
ADITIVO DESMOLDANTE PARA ENCOFRADO gln 3.85 LIMA 52.40 0.19 1.05 2.62 56.26
ADITIVO INCORPORADOR DE AIRE gln 3.85 LIMA 20.27 0.19 0.41 1.01 21.88
ADITIVO ADHESIVO EPOXICO gln 3.85 LIMA 224.37 0.19 4.49 11.22 240.27
MASILLA PLASTICA BITUMINOSA kg 1.00 LIMA 19.58 0.05 0.39 0.98 21.00
SELLADOR ELASTOMERICO PARA GRIETAS Y FISURAS kg 3.85 LIMA 41.70 0.19 0.83 2.09 44.81
IMPRIMANTE PARA JUNTAS (VULKEM 171 O SIMILAR) gln 4.00 LIMA 158.98 0.20 3.18 7.95 170.31
EXPLOSIVOS Y AFINES
BARRENO DE 5' X 1/8" und 4.65 LIMA 327.20 0.23 6.54 333.97
DINAMITA 65% x 7/8" (CAJA 25 kg x 308 und) kg 1.00 LIMA 13.60 0.05 0.27 0.68 4.08 18.68
FULMINANTE # 8 (CAJA 100 u x 0.160 kg) und 0.00 LIMA 0.68 0.01 0.01 0.03 0.20 0.93
GUIA BLANCA m 0.03 LIMA 0.76 0.01 0.02 0.04 0.23 1.06
FIBRA DE VIDRIO 4 mm. Preparada m2 10.00 LIMA 145.00 0.50 2.90 148.40
GUARDAVIAS METALICO (3.81 m x 2.5 mm) m 10.66 LIMA 53.54 0.53 1.07 55.14
TERMINALES TIPO 2 (TERMINAL DE ENTRADA) pza 14.00 LIMA 120.00 0.70 2.40 123.10
TERMINALES TIPO 1 (TERMINAL DE SALIDA) pza 8.00 LIMA 75.00 0.40 1.50 76.90
JUEGO DE PERNOS Y TUERCAS GUARDAVIAS jgo 1.60 LIMA 27.00 0.08 0.54 27.62
LAMINA REFLECTIVA ALTA INTENSIDAD (AMARILLA, BLANCA, ROJ p2 0.20 LIMA 10.78 0.01 0.22 11.01
LAMINA REFLECTIVA GRADO DIAMANTE p2 0.20 LIMA 15.20 0.01 0.30 15.51
PINTURA PARA TRAFICO gln 5.55 LIMA 40.00 0.28 0.80 41.08
PINTURA DE POLIURETANO DE ALTO BRILLO gln 6.00 LIMA 206.00 0.30 4.12 210.42
PINTURA IMPRIMANTE A BASE DE ZINC INORGANICO gln 5.50 LIMA 162.00 0.28 3.24 165.52
PINTURA WASH PRIMER gln 5.50 LIMA 62.00 0.28 1.24 63.52
PINTURA DE RESINA EPOXICA gln 5.34 LIMA 133.50 0.27 2.67 136.44
DISOLVENTE P/PINTURA EPOXICA gln 6.00 LIMA 43.00 0.30 0.86 44.16
DISOLVENTE P/PINTURA DE POLIURETANO gln 5.34 LIMA 61.00 0.27 1.22 62.49
DISOLVENTE P/PINTURA IMPRIMANTE gln 4.75 LIMA 61.00 0.24 1.22 62.46
SOLVENTE P/PINTURA BITUMINOSA gln 4.75 LIMA 20.96 0.24 0.42 21.62
SOLVENTE XILOL o Similar gln 4.75 LIMA 26.00 0.24 0.52 26.76
TACHAS DELINEADORAS BIDIRECCIONALES und 0.25 LIMA 8.00 0.01 0.16 0.40 8.57
TINTA SERIGRAFICA COLOR NEGRO gln 4.00 LIMA 1,086.25 0.20 21.73 1,108.18
TINTA SERIGRAFICA COLOR ROJO gln 4.00 LIMA 1,086.25 0.20 21.73 1,108.18
CODO PVC 1/2" x 90º u 0.14 LIMA 0.94 0.01 0.02 0.97
CODO PVC 1" x 90º u 0.20 LIMA 2.33 0.01 0.05 2.39
CODO PVC 2" x 90º u 0.75 LIMA 7.00 0.04 0.14 7.18
Proyecto: 100800
CALCULO DE COSTO DE MATERIALES Revisión:
Aprobado: TSR
Proyecto: ESTUDIO DEFINITIVO DE LA REHABILITACION Y MEJORAMIENTO DE LA CARRETERA CAÑETE - Fecha Presupuesto: Agosto 2012
LUNAHUANÁ
Etapa : Estudio Definitivo Especialidad: Costos CSL - 100800 - CP - 004
FECHA PRESUPUESTO BASE : AGOSTO 2012 Refineria Conchán a Obra (liquid (S/. /kg) : 0.05
Lima a Obra (Liquidos y Explosi (S/. /kg) : 0.05
T.C. 2.62 Lima a Obra (S/. /kg) : 0.05
Pisco - Obra (S/. /kg) : 0.02
CODO PVC 3" x 90º u 1.75 LIMA 14.02 0.09 0.28 14.39
CODO PVC 4" x 90º u 2.05 LIMA 45.88 0.10 0.92 46.90
Proyecto: 100800
CALCULO DE COSTO DE MATERIALES Revisión:
Aprobado: TSR
Proyecto: ESTUDIO DEFINITIVO DE LA REHABILITACION Y MEJORAMIENTO DE LA CARRETERA CAÑETE - Fecha Presupuesto: Agosto 2012
LUNAHUANÁ
Etapa : Estudio Definitivo Especialidad: Costos CSL - 100800 - CP - 004
FECHA PRESUPUESTO BASE : AGOSTO 2012 Refineria Conchán a Obra (liquid (S/. /kg) : 0.05
Lima a Obra (Liquidos y Explosi (S/. /kg) : 0.05
T.C. 2.62 Lima a Obra (S/. /kg) : 0.05
Pisco - Obra (S/. /kg) : 0.02
ELEMENTOS VARIOS
BLOQUE PREFABRICADO DE CONCRETO F´c=280 KG/CM2 457X203 und 35.00 LIMA 5.50 1.75 0.11 7.36
DISPOSITIVO REFORZADO DW DE APOYO P/ELEMENTOS DE ANCL und 1.00 LIMA 520.74 0.05 10.41 531.20
DISPOSITIVO REFORZADO DW DE APOYO P/ELEMENTOS DE ANCLAund 1.00 LIMA 805.36 0.05 16.11 821.52
APOYO DE NEOPRENO 300x200x50 mm, 3 LAMINAS DE ACERO A-3 pza 3.70 LIMA 353.70 0.19 7.07 360.96
APOYO DE NEOPRENO 340x400x77 mm, 5 LAMINAS DE ACERO A-3 pza 12.88 LIMA 655.00 0.64 13.10 668.74
APOYO DE NEOPRENO 400x100x20 mm, 2 LAMINAS DE ACERO A-3 pza 0.98 LIMA 131.00 0.05 2.62 133.67
APOYO DE NEOPRENO 450x550x37 mm, 3 LAMINAS DE ACERO A-3 pza 11.26 LIMA 759.80 0.56 15.20 775.56
APOYO DE NEOPRENO 450x600x117 mm, 11 LAMINAS DE ACERO A pza 56.50 LIMA 2,384.20 2.83 47.68 2,434.71
NEOPRENO TIPO PANAL 25x80 mm kg 1.00 LIMA 52.40 0.05 1.05 53.50
NEOPRENO TIPO PANAL 30x80 mm kg 1.00 LIMA 52.40 0.05 1.05 53.50
NEOPRENO TIPO PANAL 55x80 mm kg 1.00 LIMA 104.80 0.05 2.10 106.95
SISTEMA DE PROTECCION A LA CORROSION C/TUBO DE POLIETIL m 1.50 LIMA 66.22 0.08 1.32 67.62
SISTEMA ANTIVANDALICO DE F°G° CON UNIONES, SELLOS Y ACC m 2.00 LIMA 72.78 0.10 1.46 74.34
MARCO Y TAPA HIERRO DUCTIL P/BUZON D=0.60 m. C/SIST SEGU pza 12.00 LIMA 690.00 0.60 13.80 704.40
INSUMOS ACTUALIZADOS SEGÚN INDICE
ANCHOR NUT PARA BARRAS Ø=26mm Y CONTRATUERCA DW 30 207.85 356 349.29 203.93 207.85
SISTEMA DE PROTECCION A LA CORROSION C/ TUBO DE
POLIETILENO DE ALTA DENSIDAD PN 10 COLOR NEGRO 30 66.22 356 349.29 64.97 66.22
C/ACCESORIOS y GROUT
SISTEMA ANTIVANDALICO DE F°G° CON UNIONES, SELLOS y
ACCESORIOS
30 72.78 356 349.29 71.41 72.78
4320
0.26838433
38.1