Cuadro Monto Maximo
Cuadro Monto Maximo
SALDO PRESUP. Imo Ima MONTO MONTO MONTO A IGV SUB - TOTAL
IU MATERIAL COEF. % INCID. CONTRATADO Dic. 13. Set. 16 MAXIMO SOLICITADO OTORGAR (18%) S/.
51 Perfil Acero Liviano 0.249 59.84% 313.73 268.5 4,428,851.05 3,914,696.95 3,914,696.95
03 Acero de Construcción Corrugado 0.249 40.16% 469.58 461.45 3,412,872.09 2,194,401.15 2,194,401.15
03 Acero de Construcción Corrugado 0.249 40.16% 469.58 461.45 3,412,872.09 2,194,401.15 2,194,401.15
SALDO PRESUP. Imo Ima MONTO MONTO MONTO A IGV SUB - TOTAL
IU MATERIAL COEF. % INCID. CONTRATADO Dic. 13. Set. 16 MAXIMO SOLICITADO OTORGAR (18%) S/.
51 Perfil de Acero Liviano 0.156 100.00% 312.56 315.83 2,868,324.67 3,218,360.32 3,218,360.32
SALDO PRESUP. Imo Ima MONTO MONTO MONTO A IGV SUB - TOTAL
IU MATERIAL COEF. % INCID. CONTRATADO Dic. 13. Set. 16 MAXIMO SOLICITADO OTORGAR (18%) S/.
12 Artefacto de Alumbrado Interior 0.32 58.13% 298.54 325.24 2,189,526.92 2,815,732.34 2,815,732.34
7 Alambre y Cable Tipo TW y THW 0.189 89.42% 599.33 619.88 1,888,585.45 542,853.31 542,853.31
30 Dólar (General Ponderado) 0.065 100.00% 378.88 404.73 750,197.54 446,750.21 446,750.21
SALDO PRESUP. Imo Ima MONTO MONTO MONTO A IGV SUB - TOTAL
IU MATERIAL COEF. % INCID. CONTRATADO Dic. 13. Set. 16 MAXIMO SOLICITADO OTORGAR (18%) S/.
10 Aparato Sanitario con Grifería 0.139 87.770% 364.53 388.6 684,098.00 684,052.82 684,052.82
77 Válvula de Bronce Nacional 0.139 12.230% 281.89 290.65 92,197.64 91,111.20 91,111.20
SALDO PRESUP. Imo Ima MONTO MONTO MONTO A IGV SUB - TOTAL
IU MATERIAL COEF. % INCID. CONTRATADO Dic. 13. Set. 16 MAXIMO SOLICITADO OTORGAR (18%) S/.
30 Dólar (General Ponderado) 0.519 95.76% 10,504,679.36 378.29 474.82 6,552,973.91 1,229,924.66 1,229,924.66
47 Mano de Obra (Incluye Leyes Sociales) 0.632 17.25% - -
51 Perfil Acero Liviano 0.068 25.000% 312.56 315.83 180,447.85 181,401.96 181,401.96
61 Plancha Galvanizada 0.068 45.588% 259.11 267.93 336,728.15 338,504.65 338,504.65
68 Tubería de Cobre 0.068 29.412% 261.51 245.85 197,514.14 198,412.73 198,412.73
77 Válvula de Bronce Nacional 0.066 25.760% 282.8 314.56 198,653.71 10,697.45 10,697.45
SALDO PRESUP. Imo Ima MONTO MONTO MONTO A IGV SUB - TOTAL
IU MATERIAL COEF. % INCID. CONTRATADO Dic. 13. Set. 16 MAXIMO SOLICITADO OTORGAR (18%) S/.
30 Dólar (General Ponderado) 0.699 100.00% 378.88 404.73 7,476,411.52 7,476,407.19 7,476,407.19
06 Comunicaciones 7,476,407.19
TOTAL A OTORGAR 90,186,636.63 16,233,594.59 106,420,231.22