VALORIZACION AGOSTO - 2020 S/. 1,247,729.43 S/. 211,673.85 S/. 267,916.17 S/. 479,590.02 S/. 768,139.42
TOTAL CONTRACTUAL S/. 1,247,729.43 S/. 211,673.85 S/. 267,916.17 S/. 479,590.02 S/. 768,139.42
REAJUSTES (R.)
TOTAL DE REAJUSTE 0.00 0.00 0.00 0.00 0.00
DEDUCCION DE REAJUSTE (-D) S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
VALORIZACION BRUTA: VB = V + R + D S/. 1,247,729.43 S/. 211,673.85 S/. 267,916.17 S/. 479,590.02 S/. 768,139.42
AMORTIZACIONES (A)
AMORTIZACION DE ADELANTO DIRECTO (AD) S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
AMORTIZACION DE ADELANTO PARA MATERIALES E S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
INSUMOS (AM)
TOTAL DE AMORTIZACIONES A=AD+AM S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
VALORIZACION NETA: VN = VB - A 1,247,729.43 S/. 211,673.85 S/. 267,916.17 S/. 479,590.02 S/. 768,139.42
I.G.V. 224591.30 S/. 38,101.29 S/. 48,224.91 S/. 86,326.20 S/. 138,265.10
MONTO A FACTURAR POR EL CONTRATISTA 1,472,320.73 S/. 249,775.14 S/. 316,141.08 S/. 565,916.22 S/. 906,404.52
RETENCION POR FIEL CUMPLIMIENTO (10%) S/. 147,232.07 S/. 103,062.45 S/. 44,169.62 S/. 147,232.07 S/. 0.00
OBRA : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO CONTRATISTA CONSORCIO UCHUCUAYO
POBLADO DE UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA
LIBERTAD" SUPERVISION : ING. JHORDAN ALBERTO AVALOS ACEVEDO
CONCEPTO S/.
Amortizaciones : (A) -
. Del Adelanto en Efectivo en la Valorización 0.00
. Del Adelanto de Materiales en la Valorización 0.00
OBRA : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE UCHUCHUAYO DEL DISTRITO DE CONTRATISTA CONSORCIO UCHUCUAYO
PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD" INSPECCION : ING. JHORDAN ALBERTO AVALOS ACEVEDO
ENTIDAD : MUNICIPALIDAD DISTRITAL DE PARCOY PLAZO EJECUCIÓN : 150 DIAS CALENDARIOS
VALOR REFERERENCIAL S/. 1´635,911.92 inc IGV FECHA DE INICIO : 03 DE FEBRERO DEL 2020
VALOR CONTRACTUAL S/. 1'472,320.73 inc IGV FECHA DE TÉRMINO : 25 DE NOVIEMBRE DEL 2020
ACUMULADO SALDO
MONTO DEL VALORIZACIÓN
DESCRIPCION
CONTRATO S/IGV ACTUAL
ANTERIOR ACTUAL % MONTO %
VALORIZACIÓN CONTRACTUAL (V1) 1,247,729.43 211,673.85 0.00 211,673.85 16.96% 1,036,055.58 83.04%
TOTAL CONTRACTUAL 1,247,729.43 211,673.85 0.00 211,673.85 16.96% 1,036,055.58 83.04%
REAJUSTES (R)
VALORIZACIÓN N° 01 (SUMA DE LOS REAJUSTES RECONOCIDOS ACTUAL) 0.00 0.00 0.00
AMORTIZACIONES (A)
AMORTIZACION ADELANTO EN EFECTIVO 0.00 0.00 0.00 0.00 0.00% 0.00 0.000%
AMORTIZACION ADELANTO DE MATERIALES 0.00 0.00 0.00 0.00 0.00% 0.00 0.000%
: "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE UCHUCHUAYO DEL
OBRA DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD" CONTRATISTA CONSORCIO UCHUCUAYO
MONTO REAL EJECUTADO MONTO PROGRAMADO % AVANCE REAL EJECUTADO % AVANCE PROGRAMADO SITUACION SITUACION
N° PERIODO DE LA OBRA DE LA OBRA
PARCIAL ACUMULADO PARCIAL ACUMULADO PARCIAL ACUMULADO PARCIAL ACUMULADO
POR MES TOTAL
1.00 FEBRERO 172,979.09 172,979.09 172,979.09 172,979.09 13.86% 13.86% 13.86% 13.86% ADELANTADO ADELANTADO
2.00 MARZO 38,694.76 211,673.85 38,694.76 211,673.85 3.10% 16.96% 3.10% 16.96% ATRASADO ATRASADO
3.00 AGOSTO 267,916.17 479,590.02 139,021.54 350,695.40 21.47% 38.44% 11.14% 28.11% ADELANTADO ADELANTADO
4.00 SETIEMBRE 254,753.40 605,448.80 20.42% 48.52%
5.00 OCTUBRE 502,678.04 1,108,126.84 40.29% 88.81%
6.00 NOVIEMBRE 139,602.59 1,247,729.43 11.19% 100.00%
TOTAL (S/.) 267,916.17 479,590.02 139,021.54 350,695.40 21.47% 38.44% 11.14% 28.11% ADELANTADO ADELANTADO
OBRA : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE UCHUCHUAYO DEL DISTRITO DE CONTRATISTA CONSORCIO UCHUCUAYO
PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD" SUPERVISOR : ING. JHORDAN ALBERTO AVALOS ACEVEDO
ENTIDAD : MUNICIPALIDAD DISTRITAL DE PARCOY PLAZO EJECUCIÓN : 150 DIAS CALENDARIOS
VALOR REFERERENCIAL S/. 1´635,911.92 inc IGV FECHA DE INICIO : 03 DE FEBRERO DEL 2020
VALOR CONTRACTUAL S/. 1'472,320.73 inc IGV FECHA DE TÉRMINO : 25 DE NOVIEMBRE DEL 2020
NOVIEMBRE 172,979.09 211,673.85 172,979.09 211,673.85 211,673.85 #REF! #REF! #REF! #REF!
DICIEMBRE 38,694.76 #REF! 211,673.85 #REF! #REF! #REF! #REF! #REF! #REF!
ENERO 139,021.54 #REF! 350,695.40 #REF! #REF! #REF! #REF! #REF! #REF!
FEBRERO #REF! 0.00 #REF! #REF! 0.00 #REF! #REF! #REF! #REF!
MARZO #REF! 38,694.76 #REF! #REF! 38,694.76 #REF! #REF! #REF! #REF!
ABRIL #REF! #REF!
MAYO 502,678.04 1,108,126.84
JUNIO 139,602.59 1,247,729.43
JULIO 0.00 0.00
NOVIEMBRE #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
DICIEMBRE #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
ENERO #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
FEBRERO #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
MARZO #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
ABRIL #REF! #REF!
MAYO #REF! #REF!
JUNIO #REF! #REF!
JULIO #REF! #REF!
OBRA : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE UCHUCHUAYO CONTRATISTA CONSORCIO UCHUCUAYO
DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD" SUPERVISOR : ING. JHORDAN ALBERTO AVALOS ACEVEDO
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE PARCOY PLAZO EJECUCION : 150 DIAS CALENDARIOS
VALOR CONTRAT. S/. 1´635,911.92 inc IGV FECHA DE INICIO : 03 DE FEBRERO DEL 2020
VALOR REFERENCIAL S/. 1'472,320.73 inc IGV FECHA DE TÉRMINO : 25 DE NOVIEMBRE DEL 2020
COEF. COEF. DEL PORCENTAJE INDICE BASE OCTUBRE NOVIEMBRE DICIEMBRE ENERO Febrero
SIMBOLO IU DESCRIPCIÓN MATERIAL MONOMIO % K K K K K
feb-12 Io Indice Ir Indice Ir Indice Ir Indice Ir Indice Ir
I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.173 0.173 100.000% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
M 47 MANO DE OBRA INCL. LEYES SOCIALES 0.218 0.218 100.000% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
T 72 TUBERIA DE PVC PARA AGUA 0.208 0.208 100.000% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
C 21 CEMENTO PORTLAND TIPO I 0.144 0.144 100.000% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
48 MAQUINARIA Y EQUIPO NACIONAL 0.168 45.240% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
A 02 ACERO DE CONSTRUCCION LISO 0.089 0.089 100.000% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
1.00
COEFICIENTE DE REAJUSTE K (Oct.) #REF! K (Nov.) #REF! K (Dic.) #REF! K (Ener.) #REF! K (Ener.) #REF!
CONSORCIO PARQUE INDUSTRIAL
RUC: 20539777077
OBRA : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE UCHUCHUAYO CONTRATISTA CONSORCIO UCHUCUAYO
DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD" SUPERVISOR : ING. JHORDAN ALBERTO AVALOS ACEVEDO
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE PARCOY PLAZO EJECUCION : 150 DIAS CALENDARIOS
VALOR CONTRAT. S/. 1´635,911.92 inc IGV FECHA DE INICIO : 03 DE FEBRERO DEL 2020
VALOR REFERENCIAL S/. 1'472,320.73 inc IGV FECHA DE TÉRMINO : 25 DE NOVIEMBRE DEL 2020
COEF. COEF. DEL PORCENTAJE INDICE BASE OCTUBRE NOVIEMBRE DICIEMBRE ENERO FEBRERO
SIMBOLO IU DESCRIPCIÓN MATERIAL MONOMIO % K K K K K
feb-12 Io Indice Ir Indice Ir Indice Ir Indice Ir Indice Ir
I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.167 0.167 100.000% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
C 20 CEMENTO ASFALTICO 0.311 0.311 100.000% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
M 49 MAQUINARIA Y EQUIPO IMPORTADO 0.173 0.173 100.000% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
A 05 AGREGADO GRUESO 0.113 0.113 100.000% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
M 47 MANO DE OBRA INCL. LEYES SOCIALES 0.115 0.115 100.000% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
C 21 CEMENTO PORTLAND TIPO I 0.121 0.121 100.000% #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
1.000
COEFICIENTE DE REAJUSTE K (Oct.) #REF! K (Nov.) #REF! K (Dic.) #REF! K (Ene.) #REF! K (Ene.) #REF!
CRONOGRAMA DE AVANCE DE OBRA VALORIZADO
A. OBRA : "CONSTRUCCION DEL COMPLEJO DEPORTIVO Y RECREATIVO EN EL CENTRO POBLADO DE UCHUCUAYO - DISTRITO DE
PARCOY - PATAZ – LA LIBERTAD", CON CODIGO UNICO DE INVERSIONES Nº 2464690
B. PROPIETARIO : MUNICIPALIDAD DISTRITAL DE PARCOY
C. PLAZO DE EJECUCION DEL PROYECTO : CIENTO VEINTE (150) DIAS CALENDARIO
COSTO DIRECTO 1,084,982.11 150,416.60 13.86% 33,647.62 3.10% 120,888.30 11.14% 221,524.70 20.42% 437,111.35 40.29% 121,393.55 11.19%
GASTOS GENERALES (10.00% C.D.) 108,498.21 15,041.66 - 3,364.76 - 12,088.83 - 22,152.47 - 43,711.13 - 12,139.36 -
UTILIDADES (5.00% C.D.) 54,249.11 7,520.83 - 1,682.38 - 6,044.42 - 11,076.24 - 21,855.57 - 6,069.68 -
SUBTOTAL 1,247,729.43 172,979.09 - 38,694.76 - 139,021.54 - 254,753.40 - 502,678.04 - 139,602.59 -
IGV (18.00% S.T.) 224,591.30 31,136.24 - 6,965.06 - 25,023.88 - 45,855.61 - 90,482.05 - 25,128.47 -
MONTO TOTAL CONTRATADO 1,472,320.73 204,115.33 13.86% 45,659.82 3.10% 164,045.42 11.14% 300,609.01 20.42% 593,160.09 40.29% 164,731.06 11.19%
CONSORCIO UCHUCUAYO
: "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE UCHUCHUAYO DEL CONTRATISTA CONSORCIO UCHUCUAYO
OBRA DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
SUPERVISOR : ING. JHORDAN ALBERTO AVALOS ACEVEDO
ENTIDAD : MUNICIPALIDAD DISTRITAL DE PARCOY PLAZO EJECUCIÓN : 150 DIAS CALENDARIOS
VALOR REFERENCIAL : S/. 1´635,911.92 inc IGV FECHA DE INICIO : 03 DE FEBRERO DEL 2020
VALOR CONTRATADO : S/. 1'472,320.73 inc IGV FECHA DE TÉRMINO : 25 DE NOVIEMBRE DEL 2020
AVANCE MENS. PROGRAMADO SIN IGV 172,979.09 38,694.76 139,021.54 254,753.40 502,678.04 139,602.59
AVANCE ACUM. PROGRAMADO SIN IGV 172,979.09 211,673.85 350,695.40 605,448.80 1,108,126.84 1,247,729.43
% MENSUAL 13.86% 3.10% 11.14% 20.42% 40.29% 11.19%
% ACUMULADO 13.86% 16.96% 28.11% 48.52% 88.81% 100.00%
TOTAL
% MENSUAL 13.86% 3.10% 11.14% 20.42% 40.29% 11.19%
OBRA : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE CONTRATISTA CONSORCIO UCHUCUAYO
UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD" SUPERVISOR : ING. JHORDAN ALBERTO AVALOS ACEVEDO
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE PARCOY PLAZO EJECUCIÓN : 150 DIAS CALENDARIOS
VALOR REFERENCIAL S/. 1´635,911.92 incl IGV FECHA DE INICIO : 03 DE FEBRERO DEL 2020
VALOR DEL CONTRATO S/. 1'472,320.73 inc IGV FECHA DE TÉRMINO : 25 DE NOVIEMBRE DEL 2020
SUB TOTAL
VAL-1 VAL-2 VAL-3 VAL-4
DESCRIPCION CONTRAC.
Feb-20 Mar-20 Aug-20 set-20 Oct-20 Nov-20
OBRA : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE UCHUCHUAYO DEL DISTRITO CONTRATISTA CONSORCIO UCHUCUAYO
DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD" SUPERVISION: : ING. JHORDAN ALBERTO AVALOS ACEVEDO
ENTIDAD : MUNICIPALIDAD DISTRITAL DE PARCOY PLAZO EJECUCIÓN : 150 DIAS CALENDARIOS
VALOR REFERERENCIAL S/. 1´635,911.92 inc IGV FECHA DE INICIO : 03 DE FEBRERO DEL 2020
VALOR CONTRACTUAL S/. 1'472,320.73 inc IGV FECHA DE VALORIZACION : 25 DE NOVIEMBRE DEL 2020
OBRA : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE UCHUCHUAYO DEL DISTRITO CONTRATISTA CONSORCIO UCHUCUAYO
DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD" SUPERVISION: : ING. JHORDAN ALBERTO AVALOS ACEVEDO
ENTIDAD : MUNICIPALIDAD DISTRITAL DE PARCOY PLAZO EJECUCIÓN : 150 DIAS CALENDARIOS
VALOR REFERERENCIAL S/. 1´635,911.92 inc IGV FECHA DE INICIO : 03 DE FEBRERO DEL 2020
VALOR CONTRACTUAL S/. 1'472,320.73 inc IGV FECHA DE VALORIZACION : 25 DE NOVIEMBRE DEL 2020
03.03.04.01 VIGAS - CONCRETO F'C=210 KG/CM² m3 33.01 494.8 16,333.35 0.00 0.00 0.00% 6.60 3,266.67 20.00% 6.60 3,266.67 20.00% 26.41 13,066.68 80.00%
03.03.04.02 VIGAS - ENCOFRADO Y DESENCOFRADO NORMAL m2 325.48 40.62 13,221.00 0.00 0.00 0.00% 65.10 2,644.20 20.00% 65.10 2,644.20 20.00% 260.38 10,576.80 80.00%
03.03.04.03 VIGAS - ACERO F'y= 4,200 KG/CM² kg 3851.64 4.67 17,987.16 0.00 0.00 0.00% 1,330.24 6,212.22 34.54% 1,330.24 6,212.22 34.54% 2,521.40 11,774.94 65.46%
03.03.05 LOSA ALIGERADA 0.00
03.03.05.01 LOSA ALIGERADA - CONCRETO F'c= 210 KG/CM² m3 15.39 488.68 7,520.79 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.39 7,520.79 100.00%
03.03.05.02 LOSA ALIGERADA - ENCOFRADO Y DESENCOFRADO NORMAL m2 161.97 36.05 5,839.02 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 161.97 5,839.02 100.00%
03.03.05.03 LOSA ALIGERADA - ACERO F'y= 4,200 KG/CM² kg 986.01 4.67 4,604.67 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 986.01 4,604.67 100.00%
03.03.05.04 LOSA ALIGERADA - LADRILLO HUECO 15X30X30CM und 1344.34 4.08 5,484.91 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,344.34 5,484.91 100.00%
03.03.06 LOSA MACIZA 0.00
03.03.06.01 LOSA MACIZA TRIBUNAS - CONCRETO F'c= 210 KG/CM² m3 290.9 488.68 142,157.01 21.05 10,286.71 7.24% 94.52 46,190.03 32.49% 115.57 56,476.75 39.73% 175.33 85,680.26 60.27%
03.03.06.02 LOSA MACIZA TRIBUNAS - ENCOFRADO Y DESENCOFRADO m2 538.9 36.05 19,427.35 0.00 0.00 0.00% 215.56 7,770.94 40.00% 215.56 7,770.94 40.00% 323.34 11,656.41 60.00%
03.03.06.03 LOSA MACIZA TRIBUNAS - ACERO F'y= 4,200 KG/CM² kg 12485.52 4.67 58,307.38 0.00 0.00 0.00% 4,994.21 23,322.96 40.00% 4,994.21 23,322.96 40.00% 7,491.31 34,984.42 60.00%
03.03.07 ESCALERA 0.00
03.03.07.01 ESCALERA - CONCRETO F'c= 210 KG/CM² m3 2.84 488.68 1,387.85 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.84 1,387.85 100.00%
03.03.07.02 ESCALERA - ENCOFRADO Y DESENCOFRADO NORMAL m2 16.9 36.05 609.25 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 16.90 609.25 100.00%
03.03.07.03 ESCALERA - ACERO F'y= 4,200 KG/CM² kg 193.59 4.67 904.07 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 193.59 904.07 100.00%
04 ARQUITECURA 0.00
04.01 ALBAÑILERÍA 0.00
04.01.01 MURO DE LADRILLO K.K. ARCILLA 18 HUECOS - SOGA 10x14x24 m2 594.01 62.27 36,989.00 0.00 0.00 0.00% 215.80 13,437.87 36.33% 215.80 13,437.87 36.33% 378.21 23,551.14 63.67%
04.02 JUNTAS 0.00
04.02.01 JUNTAS ASFÁLTICAS H=20 CM, E=1" m 515.15 18.19 9,370.58 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 515.15 9,370.58 100.00%
04.03 REVOQUES, ENLUCIDOS Y MOLDURAS 0.00
04.03.01 TARRAJEO EN INTERIORES m2 774.16 20.66 15,994.15 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 774.16 15,994.15 100.00%
04.03.02 TARRAJEO EN EXTERIORES m2 392.33 25.61 10,047.57 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 392.33 10,047.57 100.00%
04.03.03 TARRAJEO DE COLUMNAS m2 348.98 34.04 11,879.28 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 348.98 11,879.28 100.00%
04.03.04 TARRAJEO DE VIGAS m2 169.24 36.73 6,216.19 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 169.24 6,216.19 100.00%
04.03.05 TARRAJEO Y PULIDO DE ESCALERA m2 26.5 29.73 787.85 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 26.50 787.85 100.00%
04.03.06 VESTIDURA DE DERRAMES 1:5 m 107.14 7.64 818.55 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 107.14 818.55 100.00%
04.04 CIELO RASO 0.00
04.04.01 CIELO RASO CON MEZCLA 1:5 m2 161.97 28.88 4,677.69 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 161.97 4,677.69 100.00%
04.05 PISOS Y PAVIMENTOS 0.00
04.05.01 PISO DE CEMENTO PULIDO Y BRUÑADO m2 1193.97 27 32,237.19 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,193.97 32,237.19 100.00%
04.05.02 PISO DE CERÁMICO ANTIDESLIZANTE 40x40cm m2 79.64 73.99 5,892.56 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 79.64 5,892.56 100.00%
04.06 ZÓCALOS Y CONTRAZÓCALOS 0.00
04.06.01 ZÓCALO DE CERÁMICO 20X30cm, H=1.20m m2 79.6 65.3 5,197.88 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 79.60 5,197.88 100.00%
04.06.02 CONTRAZÓCALO CERÁMICO H=10cm m 31.12 17.47 543.67 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 31.12 543.67 100.00%
04.06.03 CONTRAZÓCALO CEMENTO FROTACHADO H=30cm E=2cm m 67.12 12.12 813.49 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 67.12 813.49 100.00%
04.07 CARPINTERÍA DE MADERA 0.00
04.07.01 PUERTA DE MADERA DE 2.35x0.80 INCL INSTALACIÓN und 2 450 900.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 900.00 100.00%
04.07.02 PUERTA DE MADERA DE 2.35x0.90 INCL INSTALACIÓN und 2 630 1,260.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 1,260.00 100.00%
04.07.03 PUERTA DE CONTRAPLACADA DE 1.80X0.75 INCL INSTALACIÓN und 12 162 1,944.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.00 1,944.00 100.00%
04.08 CARPINTERÍA METÁLICA 0.00
04.08.01 PUERTA DE METALICA DE 3.35X4.00 INCL INSTALACIÓN und 3 1170 3,510.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 3,510.00 100.00%
04.08.02 BARANDA METÁLICA DE ACERO DE TUBO GALVANIZADO H=1.10m m 24.75 58.5 1,447.88 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 24.75 1,447.88 100.00%
04.08.03 BARANDA METÁLICA DE ACERO DE TUBO GALVANIZADO H=0.9m m 19.48 54 1,051.92 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 19.48 1,051.92 100.00%
04.08.04 VENTANA METÁLICA 1.60X1.60m, INCL INSTALACIÓN und 2 171 342.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 342.00 100.00%
04.08.05 VENTANA METÁLICA 1.50X0.40m, INCL INSTALACIÓN und 6 72 432.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 432.00 100.00%
04.09 CERRAJERÍA 0.00
04.09.01 CERRADURA FORTE DE 2 GOLPES EN PUERTA pza 8 62.62 500.96 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 500.96 100.00%
04.09.02 CERRADURA PARA PUERTA DE BAÑO CON PERILLA Y MANIJA pza 12 15.35 184.20 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.00 184.20 100.00%
04.09.03 CERROJO 2" ALUMINIZADO PARA PUERTAS DE BAÑO pza 12 5.52 66.24 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.00 66.24 100.00%
04.09.04 BISAGRA ALUMINIZADA CAPUCHINA DE 3" X 3" und 48 5.91 283.68 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 48.00 283.68 100.00%
04.10 VIDRIOS, CRISTALES Y SIMILARES 0.00
CONSORCIO UCHUCUAYO
OBRA : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE UCHUCHUAYO DEL DISTRITO CONTRATISTA CONSORCIO UCHUCUAYO
DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD" SUPERVISION: : ING. JHORDAN ALBERTO AVALOS ACEVEDO
ENTIDAD : MUNICIPALIDAD DISTRITAL DE PARCOY PLAZO EJECUCIÓN : 150 DIAS CALENDARIOS
VALOR REFERERENCIAL S/. 1´635,911.92 inc IGV FECHA DE INICIO : 03 DE FEBRERO DEL 2020
VALOR CONTRACTUAL S/. 1'472,320.73 inc IGV FECHA DE VALORIZACION : 25 DE NOVIEMBRE DEL 2020
04.10.01 VIDRIOS AUTOREFLEJANTES 8mm p2 173.17 13.37 2,315.28 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 173.17 2,315.28 100.00%
04.11 PINTURA 0.00
04.11.01 PINTURA LÁTEX EN INTERIORES m2 774.16 9.59 7,424.19 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 774.16 7,424.19 100.00%
04.11.02 PINTURA LÁTEX EN EXTERIORES m2 392.33 11.2 4,394.10 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 392.33 4,394.10 100.00%
04.11.03 PINTURA LÁTEX EN CIELO RASO, VIGAS Y COLUMNAS m2 1261.66 10.55 13,310.51 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1,261.66 13,310.51 100.00%
04.11.04 PINTURA ESMALTE EN CONTRAZÓCALOS H=30cm m 67.12 7.74 519.51 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 67.12 519.51 100.00%
04.11.05 PINTURA DE TRAFICO PARA PLATAFORMA DE LOSA DEPORTIVA E=5.00CM m 221 12.87 2,844.27 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 221.00 2,844.27 100.00%
04.12 COBERTURA 0.00
04.12.01 ARCOS METALICOS DE TUBO DE 50X10MM - TUBO DE 30X30MM DE 39.35 M DE ARCO pza 18 3695 66,510.00 0.00 0.00 0.00% 7.50 27,712.50 41.67% 7.50 27,712.50 41.67% 10.50 38,797.50 58.33%
04.12.02 ARCOS METALICOS DE TUBO DE 50X10MM - TUBO DE 30X30MM DE 32.13 M DE ARCO pza 4 2929.1 11,716.40 0.00 0.00 0.00% 1.60 4,686.56 40.00% 1.60 4,686.56 40.00% 2.40 7,029.84 60.00%
17,248.59 0.00
04.12.03 MEDIO ARCOS METALICOS DE TUBO DE 50X10MM - TUBO DE 30X30MM DE 15.85 M DE ARCO pza 9 1916.51 0.00 0.00% 4.00 7,666.04 44.44% 4.00 7,666.04 44.44% 5.00 9,582.55 55.56%
04.12.04 PLATINAS DE 1" DE 0.5X0.6M pza 108 82.4 8,899.20 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 108.00 8,899.20 100.00%
04.12.05 PLATINAS DE 1" DE 0.3X0.5M pza 8 70.7 565.60 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 565.60 100.00%
04.12.06 ANCLAJE C/ PLATINAS DE 1" INCL.PERNOS 0.30X0.45M pza 9 188.56 1,697.04 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.00 1,697.04 100.00%
04.12.07 ANCLAJE C/ PLATINAS DE 1" INCL.PERNOS 0.30X0.45M DOBLE pza 36 188.56 6,788.16 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 36.00 6,788.16 100.00%
04.12.08 ANCLAJE C/ PLATINAS DE 1" INCL.PERNOS 0.30X0.30M pza 4 152.56 610.24 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 610.24 100.00%
04.12.09 VIGA METALICA ARMADA DE TENCION m 756.63 48.69 36,840.31 0.00 0.00 0.00% 453.97 22,103.80 60.00% 453.97 22,103.80 60.00% 302.66 14,736.52 40.00%
04.12.10 VIGA DE TUBO RECTAGULAR DE DE 4X8 CM m 731.82 22.63 16,561.09 0.00 0.00 0.00% 439.09 9,936.61 60.00% 439.09 9,936.61 60.00% 292.73 6,624.48 40.00%
04.12.11 TEMPLADORES DE FIERO LISO DE 1/2" m 2398 11.14 26,713.72 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2,398.00 26,713.72 100.00%
04.12.12 COBERTURA DE TECHO m2 2063.72 23.45 48,394.23 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2,063.72 48,394.23 100.00%
04.12.13 CANALETA METALICO DE E=0.10M PARA DESAGUE PLUVIAL m 132.6 41.81 5,544.01 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 132.60 5,544.01 100.00%
04.12.14 TUBERIA DE 4" INCL. ABRASADERAS METALICAS m 38.6 35.43 1,367.60 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 38.60 1,367.60 100.00%
05 INSTLACIONES ELECTRICAS 0.00
05.01 CABLES Y/O CONDUCTORES 0.00
05.01.01 CABLE ELÉCTRICO THW-90(AWG/MCM) #1 0 m 15 12.76 191.40 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.00 191.40 100.00%
05.01.02 CABLE ELÉCTRICO THW-90(AWG/MCM) #10 m 100.28 11.02 1,105.09 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 100.28 1,105.09 100.00%
05.01.03 CABLE ELÉCTRICO THW-90(AWG/MCM) #12 m 182.54 8.13 1,484.05 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 182.54 1,484.05 100.00%
05.02 TABLEROS Y CUCHILLAS 0.00
TABLERO GENERAL DE DISTRIBUCIÓN DE 04 CIRCUITOS, INCL INTERRUPTORES 215.69 0.00
05.02.01 TERMOMAGNÉTICOS und 1 215.69 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 215.69 100.00%
05.02.02 INTERRUPTOR TERMOMAGNÉTICO MONOFÁSICA 2 X 40A und 4 73.68 294.72 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 294.72 100.00%
05.02.03 INTERRUPTOR TERMOMAGNÉTICO DIFERENCIAL MONOFÁSICA 2 X 40A und 1 186.18 186.18 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 186.18 100.00%
431.38 0.00
05.02.04 SUB-TABLERO DE DISTRIBUCIÓN DE 04 CIRCUITOS, INCL INTERRUPTORES TERMOMAGNÉTICOS und 2 215.69 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 431.38 100.00%
05.02.05 INTERRUPTOR TERMOMAGNÉTICO MONOFÁSICA 2 X 16A und 2 56.23 112.46 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 112.46 100.00%
05.02.06 INTERRUPTOR TERMOMAGNÉTICO MONOFÁSICA 2 X 20A und 2 62.01 124.02 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 124.02 100.00%
05.02.07 INTERRUPTOR TERMOMAGNÉTICO DIFERENCIAL MONOFÁSICA 2 X 30A und 2 169.81 339.62 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 339.62 100.00%
05.03 SALIDA DE ALUMBRADO Y TOMACORRIENTES 0.00
05.03.01 SALIDA DE TECHO C/CABLE THW-90(AWG/MCM) #12 + D PVC SEL 15MM pto 23 31.06 714.38 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 23.00 714.38 100.00%
05.03.02 SALIDA PARA INTERRUPTOR SIMPLE DE ALUMBRADO INTERIOR/EXTERIOR pto 10 28.08 280.80 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.00 280.80 100.00%
05.03.03 SALIDA PARA INTERRUPTOR DOBLE DE ALUMBRADO INTERIOR/EXTERIOR pto 2 29.44 58.88 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 58.88 100.00%
05.03.04 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE C/PUESTA A TIERRA pto 18 38.84 699.12 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 18.00 699.12 100.00%
05.04 SUMINISTRO E INSTALACIÓN DE LUMINARIAS 0.00
05.04.01 ARTEFACTO EMPOTRADO CON DOS LAMPARAS FLUORESCENTES DE 20 W. und 11 118.96 1,308.56 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.00 1,308.56 100.00%
05.04.02 ARTEFACTO EN COBERTURA METALICA PANTALLA REFLECTOR LED DE 50W und 12 123.5 1,482.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.00 1,482.00 100.00%
05.05 TUBERÍAS PVC 0.00
05.05.01 TUBERÍA DE PVC SAP DE 35 MM m 15 4.4 66.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.00 66.00 100.00%
05.05.02 TUBERÍA DE PVC SAP DE 20 MM m 107.57 2.83 304.42 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 107.57 304.42 100.00%
05.05.03 TUBERÍA DE PVC SAP DE 15 MM m 109.52 2.53 277.09 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 109.52 277.09 100.00%
05.06 VARIOS 0.00
05.06.01 CAJA DE PASE 150x150x100 und 30 19.07 572.10 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 30.00 572.10 100.00%
CONSORCIO UCHUCUAYO
OBRA : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE UCHUCHUAYO DEL DISTRITO CONTRATISTA CONSORCIO UCHUCUAYO
DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD" SUPERVISION: : ING. JHORDAN ALBERTO AVALOS ACEVEDO
ENTIDAD : MUNICIPALIDAD DISTRITAL DE PARCOY PLAZO EJECUCIÓN : 150 DIAS CALENDARIOS
VALOR REFERERENCIAL S/. 1´635,911.92 inc IGV FECHA DE INICIO : 03 DE FEBRERO DEL 2020
VALOR CONTRACTUAL S/. 1'472,320.73 inc IGV FECHA DE VALORIZACION : 25 DE NOVIEMBRE DEL 2020
05.06.02 CAJA DE PASE OCTOGONAL 150x150x100 und 23 20.87 480.01 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 23.00 480.01 100.00%
05.06.03 POZO A TIERRA und 1 1350 1,350.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 1,350.00 100.00%
06 INSTALACIONES SANITARIAS 0.00
06.01 SISTEMA DE DESAGÜE 0.00
06.01.01 TRABAJOS PRELIMINARES 0.00
06.01.01.01 TRAZO Y REPLANTEO PRELIMINAR m 93 1.63 151.59 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 93.00 151.59 100.00%
06.01.02 MOVIMIENTO DE TIERRAS 0.00
06.01.02.01 EXCAVACIÓN MANUAL DE ZANJAS m3 37.2 26.02 967.94 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 37.20 967.94 100.00%
06.01.02.02 NIVELACIÓN, REFINE Y APISONADO MANUAL m 93 1.76 163.68 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 93.00 163.68 100.00%
06.01.02.03 CAMA DE APOYO CON ARENA GRUESA E=0.10m m3 3.72 9.62 35.79 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.72 35.79 100.00%
06.01.02.04 RELLENO Y APISONADO MANUAL CON MATERIAL PROPIO m3 29.76 19.25 572.88 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 29.76 572.88 100.00%
06.01.03 SALIDAS DE DESAGÜE 0.00
06.01.03.01 SALIDA PVC - SAP PARA DESAGÜE DE Ø 4'' pto 14 61.25 857.50 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.00 857.50 100.00%
06.01.03.02 SALIDA PVC - SAP PARA DESAGÜE DE Ø 2'' pto 15 59.56 893.40 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.00 893.40 100.00%
06.01.04 RED DE DISTRIBUCIÓN 0.00
06.01.04.01 TUBERÍA DE PVC SAP 4" m 61 29.04 1,771.44 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 61.00 1,771.44 100.00%
06.01.04.02 TUBERÍA DE PVC SAP 2" m 32.86 24.35 800.14 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 32.86 800.14 100.00%
06.01.05 CÁMARAS DE INSPECCIÓN 0.00
06.01.05.01 CAJA DE REGISTRO DESAGÜE 12"X24"-C°S° FC=175 Kg/cm² und 4 150.26 601.04 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 601.04 100.00%
06.01.06 ADITAMIENTOS VARIOS 0.00
06.01.06.01 ACCESORIOS DE INSTALACIÓN DE DESAGÜE GLB 1 1795.97 1,795.97 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 1,795.97 100.00%
06.01.06.02 REGISTRO DE BRONCE 4" und 2 29.59 59.18 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2.00 59.18 100.00%
06.02 SISTEMA DE AGUA FRÍA 0.00
06.02.01 SALIDAS DE AGUA FRÍA 0.00
06.02.01.01 SALIDA DE AGUA FRÍA CON TUBERÍA DE PVC-SAP 1/2" pto 27 39.3 1,061.10 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 27.00 1,061.10 100.00%
06.02.02 RED DE DISTRIBUCIÓN 0.00
06.02.02.01 RED DE DISTRIBUCIÓN TUBERÍA DE 1/2" PVC-SAP m 98.1 3.88 380.63 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 98.10 380.63 100.00%
06.02.02.02 RED DE DISTRIBUCIÓN TUBERÍA DE 1" PVC-SAP m 15 5.58 83.70 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 15.00 83.70 100.00%
06.02.03 SUMINISTRO DE VÁLVULAS 0.00
06.02.03.01 VÁLVULA COMPUERTA DE BRONCE DE 1/2" und 5 72.6 363.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 363.00 100.00%
06.02.04 ADITAMIENTOS VARIOS 0.00
06.02.04.01 ACCESORIOS DE INSTALACIÓN DE AGUA GLB 1 451.77 451.77 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 451.77 100.00%
06.03 APARATOS Y ACCESORIOS SANITARIOS 0.00
06.03.01 INODORO BLANCO D/LOSA 1ERA NAC. INC. ACCESORIOS und 12 186.5 2,238.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.00 2,238.00 100.00%
06.03.02 LAVATORIO DE LOSA 1 LLAVE, INC. ACCESORIOS und 12 186.5 2,238.00 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.00 2,238.00 100.00%
06.03.03 URINARIO DE LOSA INC. ACCESORIOS und 3 134.8 404.40 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.00 404.40 100.00%
06.04 VARIOS 0.00
06.04.01 PRUEBA HIDRÁULICA GLB 1 367.58 367.58 0.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 367.58 100.00%
0
COSTO DIRECTO S/. 1,084,982.11 184,064.22 16.96% 232,970.58 21.47% 417,034.81 38.44% 667,947.34 61.56%
GASTOS GENERALES (10 %) S/. 10.00% S/. 108,498.21 18,406.42 16.96% 23,297.06 21.47% 41,703.48 38.44% 66,794.73 61.56%
UTILIDAD ( 5 %) S/. 5.00% S/. 54,249.11 9,203.21 16.96% 11,648.53 21.47% 20,851.74 38.44% 33,397.37 61.56%
SUBTOTAL S/. S/. 1,247,729.43 211,673.85 16.96% 267,916.17 21.47% 479,590.03 38.44% 768,139.44 61.56%
I.G.V. (18%) S/. 224,591.30 38,101.29 16.96% 48,224.91 21.47% 86,326.21 38.44% 138,265.10 61.56%
PRESUPUESTO CONTRATADO 1,472,320.73 249,775.14 16.96% 316,141.08 21.47% 565,916.24 38.44% 906,404.54 61.56%
VALORIZACION CONTRACTUAL (INC. IGV) 1,472,320.73 249,775.14 316,141.08 565,916.24 906,404.54
VALORIZACION CONTRACTUAL (SIN. IGV) 1,247,729.43 211,673.85 267,916.17 479,590.03 768,139.44
Porcentaje de avance 100.00% 16.96% 21.47% 38.44% 61.56%
CONSORCIO UCHUCUAYO
OBRA : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE UCHUCHUAYO DEL
DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
CONTRATISTA CONSORCIO UCHUCUAYO
ENTIDAD : MUNICIPALIDAD DISTRITAL DE PARCOY SUPERVISOR : ING. JHORDAN ALBERTO AVALOS ACEVEDO
VALOR REFERERENCIAL S/. 1´635,911.92 incl. IGV PLAZO DE EJECUCION : 150 DIAS CALENDARIOS
VALOR CONTRACTUAL S/. 1'472,320.73 incl. IGV
MONTO PARCIAL
1400000.00
1,247,729.43
1200000.00 1,108,126.84
1000000.00
800000.00
SITUACIÓN DE LA
605,448.80
OBRA MONTO
ACUMULADO. 600000.00
479,590.02
TERMINADA 350,695.40
400000.00
211,673.85 211,673.85
172,979.09 172,979.09
200000.00
0.00 0.00
0.00 MESES
Inicio feb-20 mar-20 Row 47
ago-20 Row 48
sep-20 oct-20 nov-20
1 2 3 4 5
OBRA : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE
UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
CONTRATISTA CONSORCIO UCHUCUAYO
ENTIDAD : MUNICIPALIDAD DISTRITAL DE PARCOY SUPERVISOR : ING. JHORDAN ALBERTO AVALOS ACEVEDO
VALOR REFERERENCIAL S/. 1´635,911.92 inc IGV PLAZO EJECUCIÓN : 150 DIAS CALENDARIOS
VALOR CONTRACTUAL S/. 1'472,320.73 inc IGV
PORCENTAJE
100.0% 100.0%
90.0% 88.8%
SITUACIÓN ACTUAL DE LA OBRA
80.0%
70.0%
60.0%
50.0%
48.5%
40.0%
38.44%
LEYENDA
LEYENDA 30.0%
28.1%
CURVA
CURVA PROG.
PROG. 20.0%
16.96%
17.0%
CURVA 13.86%
13.9%
CURVA REAL
REAL 10.0%
0.0% 0.00%
0.0%
Inicio 2/02/2020 Feb-20 Mar-20 Aug-20 Sep-20 Oct-20 Nov-20
MESES
0 1 2 6
Proyecto : "CONSTRUCCION DEL COMPLEJO DEPORTIVO Y RECREATIVO EN EL CENTRO POBLADO DE HUCHUCUAYO-DISTRITO DE PARCOY - PATAZ - LA LIBERTAD"
DIMENSIONES METRADO
Veces
Elem.
Simil.
Nº de
Und
ITEM DESCRIPCIÓN Total
Largo Ancho Alto Lon. Área Vol. Kg. Und.
GLB 1 1 1.00
01.04 TRABAJOS PRELIMINARES
01.04.01 TRANSPORTE DE EQUIPOS Y HERRAMIENTAS GLB 1.00
GLB 1 1 1.00
01.04.02 TRAZO Y REPLANTEO PRELIMINAR m2 2186.60
COLISEO m2 1 58.00 37.70 1 2186.60
01.04.03 LIMPIEZA DE TERRENO MANUAL m2 2186.60
COLISEO m2 1 58.00 37.70 1 2186.60
m3 1 990.00 1 990.00
m3 1 45.00 1 45.00
02 FELTE TERRESTRE
02.01 FELTE TERRESTRE GLB 1.00
TRANSPORTE DE MATERIALES Y EQUIPOS GLB 1 1 1.00
03 ESTRUCTURAS
03.01 MOVIMIENTO DE TIERRAS
03.01.01 EXCAVACIÓN MANUAL PARA LA CIMENTACIÓN m3 35.44
ZAPATAZ - Z1 m3 1 1.50 1.50 2.10 39 184.28
ZAPATAZ - Z2 m3 1 2.60 1.50 2.10 2 16.38
SANJAS EJE A-A H-H m3 1 23.92 0.30 1.50 2 21.53
SANJAS EJE 11-11 m3 1 31.50 0.30 1.50 1 14.18
SANJAS EJE B-B G-G m3 1 30.03 0.50 1.50 1 22.52
SANJAS EJE 12-12 m3 1 34.63 0.50 1.50 0 0.00
SANJAS EJE 1-1 m3 1 16.69 0.30 1.50 1 7.51
1 8.45 0.30 1.50 -1 -3.80
SANJAS EJE 2-2 m3 1 14.49 0.30 1.50 1 6.52
1 8.45 0.30 1.50 -1 -3.80
SANJAS EJE A'-B-C-D-E-F-G' m3 1 4.57 0.30 1.50 8 16.45
m3 1 4.57 0.30 1.50 -1 -2.06
metrado mes anterior: m3 -244.26
Estribo : EJE I''-H'' 26 Und de Ø3/8'' en 1 Elem. Simil. kg 1 1.70 26 44.20 0.56 24.75
Estribo : EJE A''- B'' 26 Und de Ø3/8'' en 1 Elem. Simil. kg 1 1.70 26 44.20 0.56 24.75
Estribo : EJE A''-11 32 Und de Ø3/8'' en 1 Elem. Simil. kg 1 1.70 32 54.40 0.56 30.46
EJE 2-2
VC 3 Ø1/2'' |_____| kg 1 35.00 0.50 2.00 3 112.50 0.99 111.38
VC 2 Ø5/8'' |_____| kg 1 35.00 0.70 2.40 2 76.20 1.55 118.11
Estribo :A-A' - G-H' 29 Und de Ø3/8'' en 2 Elem. Simil. kg 2 1.70 29 98.60 0.56 55.22
Estribo: A'-B - F-G' 18 Und de Ø3/8'' en 2 Elem. Simil. kg 2 1.70 18 61.20 0.56 34.27
Estribo :B-B' - G-G' 19 Und de Ø3/8'' en 2 Elem. Simil. kg 2 1.70 19 64.60 0.56 36.18
Estribo :B'-C-D-E-F' 34 Und de Ø3/8'' en 5 Elem. Simil. kg 5 1.70 34 289.00 0.56 161.84
EJE 1-1
VC 3 Ø1/2'' |_____| kg 1 28.50 0.50 1.50 3 91.50 0.99 90.59
VC 2 Ø5/8'' |_____| kg 1 28.50 0.70 1.80 2 62.00 1.55 96.10
Estribo :A'-B'-C F-F'-G' 32 Und de Ø3/8'' en 4 Elem. Simil. kg 4 1.70 32 217.60 0.56 121.86
Estribo : C-D-E-F-F' 34 Und de Ø3/8'' en 3 Elem. Simil. kg 3 1.70 34 173.40 0.56 97.10
EJE A'-B-C-D-E-F-G'-G
VC 3 Ø1/2'' |_____| kg 8 4.57 0.50 0.00 3 121.68 0.99 120.46
VC 2 Ø5/8'' |_____| kg 8 4.57 0.70 0.00 2 84.32 1.55 130.70
Estribo :A-B'-C-E-F-F'-G' 36 Und de Ø3/8'' en 8 Elem. Simil. kg 8 1.70 36 489.60 0.56 274.18
EJE 2-2
VC 3 Ø1/2'' |_____| kg -1 8.45 0.00 0.00 3 -25.35 0.99 -25.10
VC 2 Ø5/8'' |_____| kg -1 8.45 0.00 0.00 2 -16.90 1.55 -26.20
Estribo :C-D-E 34 Und de Ø3/8'' en 5 Elem. Simil. kg -2 1.70 34 -115.60 0.56 -64.74
EJE 1-1
VC 3 Ø1/2'' |_____| kg -1 8.45 0.00 0.00 3 -25.35 0.99 -25.10
VC 2 Ø5/8'' |_____| kg -1 8.45 0.00 0.00 2 -16.90 1.55 -26.20
Estribo : C-D-E- 34 Und de Ø3/8'' en 2 Elem. Simil. kg -2 1.70 34 -115.60 0.56 -64.74
EJE -D
VC 3 Ø1/2'' |_____| kg -1 4.57 0.50 0.00 3 -15.21 0.99 -15.06
VC 2 Ø5/8'' |_____| kg -1 4.57 0.70 0.00 2 -10.54 1.55 -16.34
Estribo :D 36 Und de Ø3/8'' en 1 Elem. Simil. kg -1 1.70 36 -61.20 0.56 -34.27
03.03.03 COLUMNAS
03.03.03.01 COLUMNAS - CONCRETO F'C=210 KG/CM² m3 6.39
C1 EJE 11-11 m3 11 0.45 0.30 4.30 1 6.39
Estribo : TRAMO 02 18 Und de Ø3/8'' en 27 Elem. Simil. kg 27 1.70 18 826.20 0.56 462.67
Estribo : TRAMO 03 24 Und de Ø3/8'' en 27 Elem. Simil. kg 27 1.70 24 1101.60 0.56 616.90
C2 EJE B-2 C-2 D-2 E-2 F-2 F'-2 gancho empal kg/m
C2 8 Ø1/2'' |_____| kg 6 5.20 0.70 0.00 8 283.20 0.99 280.37
Estribo : TRAMO 01 30 Und de Ø3/8'' en 6 Elem. Simil. kg 6 1.70 30 306.00 0.56 171.36
C2 EJE A-1 B-1 C-1 D-1 E-1 F-1 F'-1 G'-1 gancho empal kg/m
C2 8 Ø1/2'' |_____| kg 10 5.20 0.70 0.00 8 472.00 0.99 467.28
Estribo :TRAMO 01 30 Und de Ø3/8'' en 10 Elem. Simil. kg 10 1.70 0.70 0.00 30 720.00 0.56 403.20
Estribo :TRAMO 02 28 Und de Ø3/8'' en 10 Elem. Simil. kg 10 1.70 28 476.00 0.56 266.56
03.03.04 VIGAS
03.03.04.01 VIGAS - CONCRETO F'C=210 KG/CM² m3 4.15
V1 -(0.30X0.45) EJE A-A entre 2 y 5 m3 1 15.38 0.30 0.45 2 4.15
V1 -(0.30X0.45)
EJE A-A H-H gancho empal kg/m
V1 6 Ø5/8'' |_____| kg 2 15.19 0.30 1.20 6 200.28 1.55 310.43
Estribo :V1 30 Und de Ø3/8'' en 14 Elem. Simil. kg 2 1.70 30 102.00 0.56 57.12
04 ARQUITECURA
04.01 ALBAÑILERÍA
04.01.01 MURO DE LADRILLO K.K. ARCILLA 18 HUECOS - SOGA m2 124.39
10x14x24
EJE 1-1 ENTRE EJE A'-B' m2 1 3.50 2.48 1 8.68
EJE 1-1 ENTRE EJE B'-C m2 1 3.51 2.48 1 8.70
EJE 1-1 ENTRE EJE E-F m2 1 4.07 2.48 1 10.09
EJE 1-1 ENTRE EJE F-F' m2 1 3.49 2.48 1 8.66
EJE 1-1 ENTRE EJE F´-G' m2 1 3.49 2.48 1 8.66
OBRA : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE UCHUCHUAYO DEL
DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
ENTIDAD : MUNICIPALIDAD DISTRITAL DE PARCOY
VALOR REFERERENCIAL S/. 1´635,911.92
VALOR CONTRACTUAL S/. 1'472,320.73
VALORIZACION N° 3
Ítem Descripción Und.
Metrado S/. %
04.12.03 MEDIO ARCOS METALICOS DE TUBO DE 50X10MM - TUBO DE 30X30MM DE 15.85 M DE ARCO pza 4.00 7,666.04 44.44%
04.12.09 VIGA METALICA ARMADA DE TENCION m 453.97 22,103.80 60.00%
04.12.10 VIGA DE TUBO RECTAGULAR DE DE 4X8 CM m 439.09 9,936.61 60.00%
PLANILLA DE SUSTENTO DE METRADOS - VAL. 03 DICIEMBRE 2019
Proyecto : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE
UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
02 OBRAS PRELIMINARES
Partida: 02.01 LIMPIEZA DEL TERRENO MANUAL Unidad: m2
Veces de se Metrado
Descripción Cantidad Largo (m) Ancho (m) Alto (m)
repiten Parcial
PROGRESIVA
00 - 20 - 1.00 Area Cad 42.37 -
20 - 40 - 1.00 Area Cad 37.68 -
40 - 60 - 1.00 Area Cad 65.61 -
60 - 80 - 1.00 Area Cad 51.21 -
80 - 100 - 1.00 Area Cad 38.58 -
100 - 120 - 1.00 Area Cad 59.20 -
120 - 140 - 1.00 Area Cad 57.81 -
140 - 160 - 1.00 Area Cad 56.37 -
160 - 180 - 1.00 Area Cad 57.85 -
180 - 200 - 1.00 Area Cad 60.72 -
200 - 220 - 1.00 Area Cad 42.22 -
220 - 240 - 1.00 Area Cad 58.45 -
240 - 260 - 1.00 Area Cad 57.43 -
260 - 280 - 1.00 Area Cad 64.50 -
280 - 300 - 1.00 Area Cad 61.54 -
300 - 320 - 1.00 Area Cad 60.35 -
320 - 340 - 1.00 Area Cad 60.78 -
340 - 360 - 1.00 Area Cad 56.10 -
360 - 380 - 1.00 Area Cad 59.00 -
380 - 390 - 1.00 Area Cad 30.60 -
MUROS DE CONTENCIÓN
MURO CORTE A-A - 1.00 11.00 1.20 -
PLANILLA DE SUSTENTO DE METRADOS - VAL. 03 DICIEMBRE 2019
Proyecto : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE
UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
PROGRESIVA
00 - 20 1.00 1.00 Area Cad 42.37 42.37
20 - 40 1.00 1.00 Area Cad 37.68 37.68
40 - 60 1.00 1.00 Area Cad 65.61 65.61
60 - 80 1.00 1.00 Area Cad 51.21 51.21
80 - 100 1.00 1.00 Area Cad 38.58 38.58
100 - 120 1.00 1.00 Area Cad 59.20 59.20
120 - 140 1.00 1.00 Area Cad 57.81 57.81
140 - 160 1.00 1.00 Area Cad 56.37 56.37
160 - 180 1.00 1.00 Area Cad 57.85 57.85
180 - 200 1.00 1.00 Area Cad 60.72 60.72
200 - 220 1.00 1.00 Area Cad 42.22 42.22
220 - 240 1.00 1.00 Area Cad 58.45 58.45
240 - 260 1.00 1.00 Area Cad 57.43 57.43
260 - 280 1.00 1.00 Area Cad 64.50 64.50
280 - 300 1.00 1.00 Area Cad 61.54 61.54
300 - 320 1.00 1.00 Area Cad 60.35 60.35
320 - 340 1.00 1.00 Area Cad 60.78 60.78
340 - 360 1.00 1.00 Area Cad 56.10 56.10
360 - 380 1.00 1.00 Area Cad 59.00 59.00
380 - 390 1.00 1.00 Area Cad 30.60 30.60
MUROS DE CONTENCIÓN
MURO CORTE A-A 1.00 1.00 6.20 0.90 5.58
MURO CORTE B-B 1.00 1.00 9.50 1.70 16.15
MURO CORTE C-C 1.00 1.00 12.64 1.70 21.49
MURO CORTE D-D - 1.00 10.00 0.90 -
MURO CORTE E-E - 1.00 7.50 1.90 -
MURO CORTE F-F 1.00 1.00 8.20 1.90 15.58
MURO CORTE G-G 1.00 1.00 14.50 0.90 13.05
MURO CORTE H-H 1.00 1.00 25.00 0.90 22.50
MURO CORTE I-I 1.00 1.00 14.00 1.35 18.90
MURO CORTE J -J 1.00 1.00 11.00 0.90 9.90
METRADO CONTRACTUAL 1,201.52
PROGRESIVA
00 - 20 1.00 1.00 Area Cad 53.85 53.85
20 - 40 1.00 1.00 Area Cad 40.32 40.32
40 - 60 1.00 1.00 Area Cad 41.67 41.67
60 - 80 1.00 1.00 Area Cad 42.78 42.78
80 - 100 1.00 1.00 Area Cad 47.04 47.04
100 - 120 1.00 1.00 Area Cad 54.37 54.37
120 - 140 1.00 1.00 Area Cad 71.08 71.08
140 - 160 1.00 1.00 Area Cad 53.13 53.13
PLANILLA DE SUSTENTO DE METRADOS - VAL. 03 DICIEMBRE 2019
Proyecto : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE
UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
Metrado
215.67
Total (m2)
PROGRESIVA
00 - 20 - 1.00 Area Cad 42.37 -
20 - 40 - 1.00 Area Cad 37.68 -
40 - 60 - 1.00 Area Cad 65.61 -
60 - 80 - 1.00 Area Cad 51.21 -
80 - 100 - 1.00 Area Cad 38.58 -
100 - 120 - 1.00 Area Cad 59.20 -
120 - 140 - 1.00 Area Cad 57.81 -
140 - 160 - 1.00 Area Cad 56.37 -
160 - 180 - 1.00 Area Cad 57.85 -
180 - 200 - 1.00 Area Cad 60.72 -
200 - 220 - 1.00 Area Cad 42.22 -
220 - 240 - 1.00 Area Cad 58.45 -
240 - 260 - 1.00 Area Cad 57.43 -
260 - 280 - 1.00 Area Cad 64.50 -
280 - 300 - 1.00 Area Cad 61.54 -
300 - 320 - 1.00 Area Cad 60.35 -
PLANILLA DE SUSTENTO DE METRADOS - VAL. 03 DICIEMBRE 2019
Proyecto : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE
UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
PROGRESIVA
00 - 20 1.00 1.00 Area Cad 42.37 42.37
20 - 40 1.00 1.00 Area Cad 37.68 37.68
40 - 60 1.00 1.00 Area Cad 65.61 65.61
60 - 80 1.00 1.00 Area Cad 51.21 51.21
80 - 100 1.00 1.00 Area Cad 38.58 38.58
100 - 120 1.00 1.00 Area Cad 59.20 59.20
120 - 140 1.00 1.00 Area Cad 57.81 57.81
140 - 160 1.00 1.00 Area Cad 56.37 56.37
160 - 180 1.00 1.00 Area Cad 57.85 57.85
180 - 200 1.00 1.00 Area Cad 60.72 60.72
200 - 220 1.00 1.00 Area Cad 42.22 42.22
220 - 240 1.00 1.00 Area Cad 58.45 58.45
240 - 260 1.00 1.00 Area Cad 57.43 57.43
260 - 280 1.00 1.00 Area Cad 64.50 64.50
280 - 300 1.00 1.00 Area Cad 61.54 61.54
300 - 320 1.00 1.00 Area Cad 60.35 60.35
320 - 340 1.00 1.00 Area Cad 60.78 60.78
340 - 360 1.00 1.00 Area Cad 56.10 56.10
360 - 380 1.00 1.00 Area Cad 59.00 59.00
380 - 390 1.00 1.00 Area Cad 30.60 30.60
MUROS DE CONTENCIÓN
MURO CORTE A-A 1.00 1.00 6.20 0.90 5.58
MURO CORTE B-B 1.00 1.00 9.50 1.70 16.15
MURO CORTE C-C 1.00 1.00 12.64 1.70 21.49
MURO CORTE D-D - 1.00 10.00 0.90 -
MURO CORTE E-E - 1.00 7.50 1.90 -
MURO CORTE F-F 1.00 1.00 8.20 1.90 15.58
MURO CORTE G-G 1.00 1.00 14.50 0.90 13.05
MURO CORTE H-H 1.00 1.00 25.00 0.90 22.50
MURO CORTE I-I 1.00 1.00 14.00 1.35 18.90
MURO CORTE J -J 1.00 1.00 11.00 0.90 9.90
METRADO CONTRACTUAL 1,201.52
PROGRESIVA
00 - 20 1.00 1.00 Area Cad 53.85 53.85
20 - 40 1.00 1.00 Area Cad 40.32 40.32
PLANILLA DE SUSTENTO DE METRADOS - VAL. 03 DICIEMBRE 2019
Proyecto : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE
UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
MUROS DE CONTENCIÓN
MURO CORTE A-A 1.00 1.00 6.20 0.90 5.58
MURO CORTE B-B 1.00 1.00 9.50 1.70 16.15
MURO CORTE C-C 1.00 1.00 12.64 1.70 21.49
MURO CORTE D-D - 1.00 10.00 0.90 -
MURO CORTE E-E - 1.00 7.50 1.90 -
MURO CORTE F-F 1.00 1.00 8.20 1.90 15.58
MURO CORTE G-G 1.00 1.00 14.50 0.90 13.05
MURO CORTE H-H 1.00 1.00 25.00 0.90 22.50
MURO CORTE I-I 1.00 1.00 14.00 1.35 18.90
MURO CORTE J -J 1.00 1.00 11.00 0.90 9.90
METRADO EJECUTADO 1,317.14
MAYORES METRADOS (METRADO EJECUTADO - METRADO
115.62
CONTRACTUAL)
VALORIZACION MES DE OCTUBRE 2019 985.85
Metrado
215.67
Total (m2)
03 MOVIMIENTO DE TIERRAS
Partida: 03.01 CORTE DE TERRENO NATURAL Unidad: m3
Veces de se Alto (m) Metrado
Descripción Cantidad Largo (m) Ancho (m)
repiten promedio Parcial
PROGRESIVA
00 - 20 - 1.00 Area Cad 42.37 0.25 -
20 - 40 - 1.00 Area Cad 37.68 0.25 -
40 - 60 - 1.00 Area Cad 65.61 0.25 -
60 - 80 - 1.00 Area Cad 51.21 0.25 -
80 - 100 - 1.00 Area Cad 38.58 0.25 -
100 - 120 - 1.00 Area Cad 59.20 0.25 -
120 - 140 - 1.00 Area Cad 57.81 0.25 -
140 - 160 - 1.00 Area Cad 56.37 0.25 -
160 - 180 - 1.00 Area Cad 57.85 0.25 -
PLANILLA DE SUSTENTO DE METRADOS - VAL. 03 DICIEMBRE 2019
Proyecto : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE
UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
PROGRESIVA
00 - 20 1.00 1.00 Area Cad 42.37 0.25 10.59
20 - 40 1.00 1.00 Area Cad 37.68 0.25 9.42
40 - 60 1.00 1.00 Area Cad 65.61 0.25 16.40
60 - 80 1.00 1.00 Area Cad 51.21 0.25 12.80
80 - 100 1.00 1.00 Area Cad 38.58 0.25 9.65
100 - 120 1.00 1.00 Area Cad 59.20 0.25 14.80
120 - 140 1.00 1.00 Area Cad 57.81 0.25 14.45
140 - 160 1.00 1.00 Area Cad 56.37 0.25 14.09
160 - 180 1.00 1.00 Area Cad 57.85 0.25 14.46
180 - 200 1.00 1.00 Area Cad 60.72 0.25 15.18
200 - 220 1.00 1.00 Area Cad 42.22 0.25 10.56
220 - 240 1.00 1.00 Area Cad 58.45 0.25 14.61
240 - 260 1.00 1.00 Area Cad 57.43 0.25 14.36
260 - 280 1.00 1.00 Area Cad 64.50 0.25 16.13
280 - 300 1.00 1.00 Area Cad 61.54 0.25 15.39
300 - 320 1.00 1.00 Area Cad 60.35 0.25 15.09
320 - 340 1.00 1.00 Area Cad 60.78 0.25 15.20
340 - 360 1.00 1.00 Area Cad 56.10 0.25 14.03
360 - 380 1.00 1.00 Area Cad 59.00 0.25 14.75
380 - 390 1.00 1.00 Area Cad 30.60 0.25 7.65
MUROS DE CONTENCIÓN
MURO CORTE A-A 1.00 1.00 6.20 0.90 1.80 10.04
MURO CORTE B-B 1.00 1.00 9.50 1.70 3.35 54.10
MURO CORTE C-C 1.00 1.00 12.64 1.70 3.15 67.69
MURO CORTE D-D - 1.00 10.00 0.90 1.80 -
MURO CORTE E-E - 1.00 7.50 1.90 2.30 -
PLANILLA DE SUSTENTO DE METRADOS - VAL. 03 DICIEMBRE 2019
Proyecto : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE
UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
PROGRESIVA
00 - 20 1.00 1.00 Area Cad 53.85 0.25 13.46
20 - 40 1.00 1.00 Area Cad 40.32 0.25 10.08
40 - 60 1.00 1.00 Area Cad 41.67 0.25 10.42
60 - 80 1.00 1.00 Area Cad 42.78 0.25 10.70
80 - 100 1.00 1.00 Area Cad 47.04 0.25 11.76
100 - 120 1.00 1.00 Area Cad 54.37 0.25 13.59
120 - 140 1.00 1.00 Area Cad 71.08 0.25 17.77
140 - 160 1.00 1.00 Area Cad 53.13 0.25 13.28
160 - 180 1.00 1.00 Area Cad 58.97 0.25 14.74
180 - 200 1.00 1.00 Area Cad 64.80 0.25 16.20
200 - 220 1.00 1.00 Area Cad 61.40 0.25 15.35
220 - 240 1.00 1.00 Area Cad 54.10 0.25 13.53
240 - 260 1.00 1.00 Area Cad 67.50 0.25 16.88
260 - 280 1.00 1.00 Area Cad 62.30 0.25 15.58
280 - 300 1.00 1.00 Area Cad 85.40 0.25 21.35
300 - 320 1.00 1.00 Area Cad 64.96 0.25 16.24
320 - 340 1.00 1.00 Area Cad 65.17 0.25 16.29
340 - 360 1.00 1.00 Area Cad 61.60 0.25 15.40
360 - 380 1.00 1.00 Area Cad 76.20 0.25 19.05
380 - 398.73 1.00 1.00 Area Cad 67.35 0.25 16.84
MUROS DE CONTENCIÓN
MURO CORTE A-A 1.00 1.00 6.20 0.90 1.80 10.04
MURO CORTE B-B 1.00 1.00 9.50 1.70 3.35 54.10
MURO CORTE C-C 1.00 1.00 12.64 1.70 3.15 67.69
MURO CORTE D-D - 1.00 10.00 0.90 1.80 -
MURO CORTE E-E - 1.00 7.50 1.90 2.30 -
MURO CORTE F-F 1.00 1.00 8.20 1.90 2.30 35.83
MURO CORTE G-G 1.00 1.00 14.50 0.90 1.80 23.49
MURO CORTE H-H 1.00 1.00 25.00 0.90 1.80 40.50
MURO CORTE I-I 1.00 1.00 14.00 1.35 2.65 50.09
MURO CORTE J -J 1.00 1.00 11.00 0.90 1.80 17.82
Metrado
53.92
Total (m3)
Proyecto : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE
UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
Veces de se Metrado
Descripción Cantidad Largo (m) Ancho (m) Alto (m)
repiten Parcial
PROGRESIVA
00 - 20 - 1.00 Area Cad 42.37 0.10 -
20 - 40 - 1.00 Area Cad 37.68 - -
40 - 60 - 1.00 Area Cad 65.61 0.10 -
60 - 80 - 1.00 Area Cad 51.21 - -
80 - 100 - 1.00 Area Cad 38.58 0.10 -
100 - 120 - 1.00 Area Cad 59.20 - -
120 - 140 - 1.00 Area Cad 57.81 0.10 -
140 - 160 - 1.00 Area Cad 56.37 - -
160 - 180 - 1.00 Area Cad 57.85 0.10 -
180 - 200 - 1.00 Area Cad 60.72 - -
200 - 220 - 1.00 Area Cad 42.22 0.10 -
220 - 240 - 1.00 Area Cad 58.45 - -
240 - 260 - 1.00 Area Cad 57.43 0.10 -
260 - 280 - 1.00 Area Cad 64.50 - -
280 - 300 - 1.00 Area Cad 61.54 0.10 -
300 - 320 - 1.00 Area Cad 60.35 - -
320 - 340 - 1.00 Area Cad 60.78 0.10 -
340 - 360 - 1.00 Area Cad 56.10 - -
360 - 380 - 1.00 Area Cad 59.00 0.10 -
380 - 390 - 1.00 Area Cad 30.60 - -
MUROS DE CONTENCIÓN
MURO CORTE A-A - 1.00 11.00 0.50 1.50 -
MURO CORTE B-B - 1.00 14.00 1.10 3.00 -
MURO CORTE C-C - 1.00 25.00 1.10 2.80 -
MURO CORTE D-D - 1.00 14.50 0.50 1.50 -
MURO CORTE E-E - 1.00 8.20 0.95 2.00 -
MURO CORTE F-F - 1.00 7.50 0.95 2.00 -
MURO CORTE G-G - 1.00 10.00 0.50 1.50 -
MURO CORTE H-H - 1.00 11.60 0.50 1.50 -
MURO CORTE I-I - 1.00 12.00 0.75 2.30 -
MURO CORTE J -J - 1.00 6.20 0.50 1.50 -
PROGRESIVA
00 - 20 1.00 - Area Cad 42.37 0.10 -
20 - 40 1.00 - Area Cad 37.68 - -
40 - 60 1.00 - Area Cad 65.61 0.10 -
60 - 80 1.00 - Area Cad 51.21 - -
80 - 100 1.00 - Area Cad 38.58 0.10 -
100 - 120 1.00 - Area Cad 59.20 - -
120 - 140 1.00 - Area Cad 57.81 0.10 -
140 - 160 1.00 - Area Cad 56.37 - -
160 - 180 1.00 - Area Cad 57.85 0.10 -
180 - 200 1.00 - Area Cad 60.72 - -
200 - 220 1.00 - Area Cad 42.22 0.10 -
220 - 240 1.00 - Area Cad 58.45 - -
240 - 260 1.00 - Area Cad 57.43 0.10 -
260 - 280 1.00 - Area Cad 64.50 - -
PLANILLA DE SUSTENTO DE METRADOS - VAL. 03 DICIEMBRE 2019
Proyecto : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE
UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
Metrado
-
Total (m3)
PROGRESIVA
00 - 20 - 1.00 Area Cad 42.37 -
20 - 40 - 1.00 Area Cad 37.68 -
40 - 60 - 1.00 Area Cad 65.61 -
60 - 80 - 1.00 Area Cad 51.21 -
80 - 100 - 1.00 Area Cad 38.58 -
100 - 120 - 1.00 Area Cad 59.20 -
120 - 140 - 1.00 Area Cad 57.81 -
140 - 160 - 1.00 Area Cad 56.37 -
160 - 180 - 1.00 Area Cad 57.85 -
180 - 200 - 1.00 Area Cad 60.72 -
200 - 220 - 1.00 Area Cad 42.22 -
220 - 240 - 1.00 Area Cad 58.45 -
240 - 260 - 1.00 Area Cad 57.43 -
260 - 280 - 1.00 Area Cad 64.50 -
280 - 300 - 1.00 Area Cad 61.54 -
300 - 320 - 1.00 Area Cad 60.35 -
320 - 340 - 1.00 Area Cad 60.78 -
340 - 360 - 1.00 Area Cad 56.10 -
360 - 380 - 1.00 Area Cad 59.00 -
380 - 390 - 1.00 Area Cad 30.60 -
PROGRESIVA
00 - 20 1.00 1.00 Area Cad 42.37 42.37
20 - 40 1.00 1.00 Area Cad 37.68 37.68
40 - 60 1.00 1.00 Area Cad 65.61 65.61
PLANILLA DE SUSTENTO DE METRADOS - VAL. 03 DICIEMBRE 2019
Proyecto : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE
UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
PROGRESIVA
00 - 20 1.00 1.00 Area Cad 53.85 53.85
20 - 40 1.00 1.00 Area Cad 40.32 40.32
40 - 60 1.00 1.00 Area Cad 41.67 41.67
60 - 80 1.00 1.00 Area Cad 42.78 42.78
80 - 100 1.00 1.00 Area Cad 47.04 47.04
100 - 120 1.00 1.00 Area Cad 54.37 54.37
120 - 140 1.00 1.00 Area Cad 71.08 71.08
140 - 160 1.00 1.00 Area Cad 53.13 53.13
160 - 180 1.00 1.00 Area Cad 58.97 58.97
180 - 200 1.00 1.00 Area Cad 64.80 64.80
200 - 220 1.00 1.00 Area Cad 61.40 61.40
220 - 240 1.00 1.00 Area Cad 54.10 54.10
240 - 260 1.00 1.00 Area Cad 67.50 67.50
260 - 280 1.00 1.00 Area Cad 62.30 62.30
280 - 300 1.00 1.00 Area Cad 85.40 85.40
300 - 320 1.00 1.00 Area Cad 64.96 64.96
320 - 340 1.00 1.00 Area Cad 65.17 65.17
340 - 360 1.00 1.00 Area Cad 61.60 61.60
360 - 380 1.00 1.00 Area Cad 76.20 76.20
380 - 398.73 1.00 1.00 Area Cad 67.35 67.35
Metrado
323.48
Total (m2)
PLANILLA DE SUSTENTO DE METRADOS - VAL. 03 DICIEMBRE 2019
Proyecto : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE
UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
Veces de se Metrado
Descripción Cantidad Largo (m) Ancho (m) Alto (m)
repiten Parcial
PROGRESIVA
00 - 20 - 1.00 Area Cad 42.37 0.20 -
20 - 40 - 1.00 Area Cad 37.68 0.20 -
40 - 60 - 1.00 Area Cad 65.61 0.20 -
60 - 80 - 1.00 Area Cad 51.21 0.20 -
80 - 100 - 1.00 Area Cad 38.58 0.20 -
100 - 120 - 1.00 Area Cad 59.20 0.20 -
120 - 140 - 1.00 Area Cad 57.81 0.20 -
140 - 160 - 1.00 Area Cad 56.37 0.20 -
160 - 180 - 1.00 Area Cad 57.85 0.20 -
180 - 200 - 1.00 Area Cad 60.72 0.20 -
200 - 220 - 1.00 Area Cad 42.22 0.20 -
220 - 240 - 1.00 Area Cad 58.45 0.20 -
240 - 260 - 1.00 Area Cad 57.43 0.20 -
260 - 280 - 1.00 Area Cad 64.50 0.20 -
280 - 300 - 1.00 Area Cad 61.54 0.20 -
300 - 320 - 1.00 Area Cad 60.35 0.20 -
320 - 340 - 1.00 Area Cad 60.78 0.20 -
340 - 360 - 1.00 Area Cad 56.10 0.20 -
360 - 380 - 1.00 Area Cad 59.00 0.20 -
380 - 390 - 1.00 Area Cad 30.60 0.20 -
PROGRESIVA
00 - 20 1.00 1.00 Area Cad 42.37 0.20 8.47
20 - 40 1.00 1.00 Area Cad 37.68 0.20 7.54
40 - 60 1.00 1.00 Area Cad 65.61 0.20 13.12
60 - 80 1.00 1.00 Area Cad 51.21 0.20 10.24
80 - 100 1.00 1.00 Area Cad 38.58 0.20 7.72
100 - 120 1.00 1.00 Area Cad 59.20 0.20 11.84
120 - 140 1.00 1.00 Area Cad 57.81 0.20 11.56
140 - 160 1.00 1.00 Area Cad 56.37 0.20 11.27
160 - 180 1.00 1.00 Area Cad 57.85 0.20 11.57
180 - 200 1.00 1.00 Area Cad 60.72 0.20 12.14
200 - 220 1.00 1.00 Area Cad 42.22 0.20 8.44
220 - 240 1.00 1.00 Area Cad 58.45 0.20 11.69
240 - 260 1.00 1.00 Area Cad 57.43 0.20 11.49
260 - 280 1.00 1.00 Area Cad 64.50 0.20 12.90
280 - 300 1.00 1.00 Area Cad 61.54 0.20 12.31
300 - 320 1.00 1.00 Area Cad 60.35 0.20 12.07
320 - 340 1.00 1.00 Area Cad 60.78 0.20 12.16
340 - 360 1.00 1.00 Area Cad 56.10 0.20 11.22
360 - 380 1.00 1.00 Area Cad 59.00 0.20 11.80
380 - 390 1.00 1.00 Area Cad 30.60 0.20 6.12
Proyecto : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE
UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
PROGRESIVA
00 - 20 1.00 1.00 Area Cad 53.85 0.20 10.77
20 - 40 1.00 1.00 Area Cad 40.32 0.20 8.06
40 - 60 1.00 1.00 Area Cad 41.67 0.20 8.33
60 - 80 1.00 1.00 Area Cad 42.78 0.20 8.56
80 - 100 1.00 1.00 Area Cad 47.04 0.20 9.41
100 - 120 1.00 1.00 Area Cad 54.37 0.20 10.87
120 - 140 1.00 1.00 Area Cad 71.08 0.20 14.22
140 - 160 1.00 1.00 Area Cad 53.13 0.20 10.63
160 - 180 1.00 1.00 Area Cad 58.97 0.20 11.79
180 - 200 1.00 1.00 Area Cad 64.80 0.20 12.96
200 - 220 1.00 1.00 Area Cad 61.40 0.20 12.28
220 - 240 1.00 1.00 Area Cad 54.10 0.20 10.82
240 - 260 1.00 1.00 Area Cad 67.50 0.20 13.50
260 - 280 1.00 1.00 Area Cad 62.30 0.20 12.46
280 - 300 1.00 1.00 Area Cad 85.40 0.20 17.08
300 - 320 1.00 1.00 Area Cad 64.96 0.20 12.99
320 - 340 1.00 1.00 Area Cad 65.17 0.20 13.03
340 - 360 1.00 1.00 Area Cad 61.60 0.20 12.32
360 - 380 1.00 1.00 Area Cad 76.20 0.20 15.24
380 - 398.73 1.00 1.00 Area Cad 67.35 0.20 13.47
METRADO EJECUTADO 238.80
MAYORES METRADOS (METRADO EJECUTADO - METRADO
23.13
CONTRACTUAL)
VALORIZACION MES DE OCTUBRE 2019 93.33
Metrado
122.34
Total (m3)
Veces de se Metrado
Descripción Cantidad Largo (m) Ancho (m) Alto (m)
repiten Parcial
Corte terreno - Relleno con material propio 53.92 53.92
Metrado
53.92
Total (m3)
04 MUROS DE CONTENCION
CONCRETO F´c=140 Kg/cm2 + 30% PG PARA MUROS
Partida: 04.01 Unidad: m3
DE CONTENCIÓN
Veces de se Metrado
Descripción Cantidad Largo (m) Ancho (m) Alto (m)
repiten Parcial
MURO CORTE B-B
MURO CORTE C-C
Muro contencion h = 1.50m - 1.00 11.00 Area Cad 1.05 -
MURO CORTE D-D
Muro contencion h = 3.00m - 1.00 14.00 Area Cad 2.37 -
MURO CORTE E-E
Muro contencion h = 2.80m - 1.00 25.00 Area Cad 2.26 -
MURO CORTE F-F
PLANILLA DE SUSTENTO DE METRADOS - VAL. 03 DICIEMBRE 2019
Proyecto : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE
UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
MUROS DE CONTENCIÓN
MURO CORTE A-A
Muro contencion h = 1.50m - 1.00 6.20 Area Cad 0.53 -
MURO CORTE B-B
Muro contencion h = 3.00m - 1.00 9.50 Area Cad 1.19 -
MURO CORTE C-C
Muro contencion h = 2.80m - 1.00 12.64 Area Cad 1.14 -
MURO CORTE D-D
Muro contencion h = 1.50m - - 10.00 Area Cad 0.53 -
MURO CORTE E-E
Muro contencion h = 2.00m - - 7.50 Area Cad 1.75 -
MURO CORTE F-F
Muro contencion h = 2.00m - 1.00 8.20 Area Cad 0.88 -
MURO CORTE G-G
Muro contencion h = 1.50m - 1.00 14.50 Area Cad 0.65 -
MURO CORTE H-H
Muro contencion h = 1.50m - 1.00 25.00 Area Cad 0.53 -
MURO CORTE I-I
Muro contencion h = 2.30m - 1.00 14.00 Area Cad 0.92 -
MURO CORTE J -J
Muro contencion h = 1.50m - 1.00 11.00 Area Cad 0.53 -
Metrado
-
Total (m3)
Proyecto : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE
UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
MUROS DE CONTENCIÓN
MURO CORTE A-A
Muro contencion h = 1.50m - 2.00 6.20 1.50 -
en zapata - 2.00 6.20 0.25 -
Laterales - 3.00 Area Cad 0.53 -
MURO CORTE B-B
Muro contencion h = 3.00m - 2.00 9.50 3.00 -
en zapata - 2.00 9.50 0.30 -
Laterales - 3.00 Area Cad 1.19 -
MURO CORTE C-C
Muro contencion h = 2.80m - 2.00 12.64 2.80 -
en zapata - 2.00 12.64 0.30 -
Laterales - 3.00 Area Cad 1.14 -
MURO CORTE D-D
Muro contencion h = 1.50m - - 10.00 1.50 -
en zapata - - 10.00 0.25 -
PLANILLA DE SUSTENTO DE METRADOS - VAL. 03 DICIEMBRE 2019
Proyecto : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE
UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
Metrado
-
Total (m2)
05 ALCANTARILLAS
Veces de se Metrado
Descripción Cantidad Largo (m) Ancho (m) Alto (m)
repiten Parcial
1.00 1.00 3.10 Area cad 0.25 0.78
Metrado
-
Total (m3)
ENCOFRADO Y DESENCOFRADO DE
Partida: 05.02 Unidad: m2
ALCANTARILLAS
Veces de se Metrado
Descripción Cantidad Largo (m) Ancho (m) Alto (m)
repiten Parcial
1.00 4.00 3.10 long total 0.40 4.96
Metrado
-
Total (m2)
Proyecto : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE
UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
Veces de se Metrado
Descripción Cantidad Largo (m) Ancho (m) Alto (m)
repiten Parcial
1.00 Cad 3.10 3.10
Metrado
-
Total (m)
06 CUNETAS
Partida: 06.01 CONCRETO CUNETAS F´c=175 Kg/cm2 Unidad: m3
Veces de se Metrado
Descripción Cantidad Largo (m) Ancho (m) Alto (m)
repiten Parcial
1.00 1.00 406.50 Area Cad 0.26 105.69
Metrado
-
Total (m3)
07 PAVIMENTO RIGIDO
CONCRETO PAVIMENTO RIGIDO f'c=210 kg/cm2,
Partida: 7.01 Unidad: m2
E=15cm
Veces de se Metrado
Descripción Cantidad Largo (m) Ancho (m) Alto (m)
repiten Parcial
PROGRESIVA
00 - 20 1.00 1.00 Area Cad 42.37 42.37
20 - 40 1.00 1.00 Area Cad 37.68 37.68
40 - 60 1.00 1.00 Area Cad 65.61 65.61
60 - 80 1.00 1.00 Area Cad 51.21 51.21
80 - 100 1.00 1.00 Area Cad 38.58 38.58
100 - 120 1.00 1.00 Area Cad 59.20 59.20
120 - 140 1.00 1.00 Area Cad 57.81 57.81
140 - 160 1.00 1.00 Area Cad 56.37 56.37
160 - 180 1.00 1.00 Area Cad 57.85 57.85
180 - 200 1.00 1.00 Area Cad 60.72 60.72
200 - 220 1.00 1.00 Area Cad 42.22 42.22
220 - 240 1.00 1.00 Area Cad 58.45 58.45
PLANILLA DE SUSTENTO DE METRADOS - VAL. 03 DICIEMBRE 2019
Proyecto : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE
UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
PROGRESIVA
00 - 20 1.00 1.00 Area Cad 53.85 53.85
20 - 40 1.00 1.00 Area Cad 40.32 40.32
40 - 60 1.00 1.00 Area Cad 41.67 41.67
60 - 80 1.00 1.00 Area Cad 42.78 42.78
80 - 100 1.00 1.00 Area Cad 47.04 47.04
100 - 120 1.00 1.00 Area Cad 54.37 54.37
120 - 140 1.00 1.00 Area Cad 71.08 71.08
140 - 160 1.00 1.00 Area Cad 53.13 53.13
160 - 180 1.00 1.00 Area Cad 58.97 58.97
180 - 200 1.00 1.00 Area Cad 64.80 64.80
200 - 220 1.00 1.00 Area Cad 61.40 61.40
220 - 240 1.00 1.00 Area Cad 54.10 54.10
240 - 260 1.00 1.00 Area Cad 67.50 67.50
260 - 280 1.00 1.00 Area Cad 62.30 62.30
280 - 300 1.00 1.00 Area Cad 85.40 85.40
300 - 320 1.00 1.00 Area Cad 64.96 64.96
320 - 340 1.00 1.00 Area Cad 65.17 65.17
340 - 360 1.00 1.00 Area Cad 61.60 61.60
360 - 380 1.00 1.00 Area Cad 76.20 76.20
380 - 398.73 1.00 1.00 Area Cad 67.35 67.35
Prog. 0+090.00 (uña de concreto)
2.65
0.60
0.80 1.00 1.00 5.39 5.39
7.70
0.25
1.10 1.00 1.00 4.19 4.19
6.2
PLANILLA DE SUSTENTO DE METRADOS - VAL. 03 DICIEMBRE 2019
Proyecto : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE
UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
0.35
0.70 1.00 2.00 1.31 2.63
2.50
0.25
1.25 1.00 1.00 4.35 4.35
5.80
0.40
0.95 1.00 1.00 4.96 4.96
7.35
0.40
1.00 1.00 1.00 7.56 7.56
10.8
0.30
1.85 1.00 1.00 11.83 11.83
11.00
8.15
Proyecto : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE
UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
Metrado
932.67
Total (m2)
Proyecto : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE
UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
Proyecto : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE
UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
1.70
0.70
1.00 1.00 3.18 3.18
2.65
Proyecto : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE
UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
0.60
0.80
1.00 1.00 5.39 5.39
7.70
0.25
1.10 1.00 1.00 4.19 4.19
6.2
0.35
0.70 1.00 2.00 1.31 2.63
2.50
0.25
1.25 1.00 1.00 4.35 4.35
5.80
0.40
0.95 1.00 1.00 4.96 4.96
7.35
0.40
1.00 1.00 1.00 7.56 7.56
10.8
0.30
1.85 1.00 1.00 11.83 11.83
11.00
8.15
Metrado
185.38
Total (m2)
Proyecto : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE
UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
Veces de se Metrado
Descripción Cantidad Largo (m) Ancho (m) Alto (m)
repiten Parcial
0.60 71.30 3.00 128.34
Proyecto : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE
UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
Proyecto : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE
UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
Metrado
128.34
Total (m)
Proyecto : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE
UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
02 OBRAS PRELIMINARES
Partida: 02.01 LIMPIEZA DEL TERRENO MANUAL Unidad: m2
Veces de se Metrado
Descripción Cantidad Largo (m) Ancho (m) Alto (m)
repiten Parcial
PROGRESIVA
00 - 20 1.00 0.80 Area Cad 42.37 33.90
20 - 40 1.00 0.80 Area Cad 37.68 30.14
40 - 60 1.00 0.80 Area Cad 65.61 52.49
60 - 80 1.00 0.80 Area Cad 51.21 40.97
80 - 100 1.00 0.80 Area Cad 38.58 30.86
100 - 120 1.00 0.80 Area Cad 59.20 47.36
120 - 140 1.00 0.80 Area Cad 57.81 46.25
140 - 160 1.00 0.80 Area Cad 56.37 45.10
160 - 180 1.00 0.80 Area Cad 57.85 46.28
180 - 200 1.00 0.80 Area Cad 60.72 48.58
200 - 220 1.00 0.80 Area Cad 42.22 33.78
220 - 240 1.00 0.80 Area Cad 58.45 46.76
240 - 260 1.00 0.80 Area Cad 57.43 45.94
260 - 280 1.00 0.80 Area Cad 64.50 51.60
280 - 300 1.00 0.80 Area Cad 61.54 49.23
300 - 320 1.00 0.80 Area Cad 60.35 48.28
320 - 340 1.00 0.80 Area Cad 60.78 48.62
340 - 360 1.00 0.80 Area Cad 56.10 44.88
360 - 380 1.00 0.80 Area Cad 59.00 47.20
380 - 390 1.00 0.80 Area Cad 30.60 24.48
MUROS DE CONTENCIÓN
MURO CORTE A-A 1.00 1.00 6.20 0.90 5.58
MURO CORTE B-B 1.00 1.00 9.50 1.70 16.15
PLANILLA DE SUSTENTO DE METRADOS - VAL. 01 OCTUBRE 2019
Proyecto : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE
UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
Metrado
985.85
Total (m2)
PROGRESIVA
00 - 20 1.00 0.80 Area Cad 42.37 33.90
20 - 40 1.00 0.80 Area Cad 37.68 30.14
40 - 60 1.00 0.80 Area Cad 65.61 52.49
60 - 80 1.00 0.80 Area Cad 51.21 40.97
80 - 100 1.00 0.80 Area Cad 38.58 30.86
100 - 120 1.00 0.80 Area Cad 59.20 47.36
120 - 140 1.00 0.80 Area Cad 57.81 46.25
140 - 160 1.00 0.80 Area Cad 56.37 45.10
160 - 180 1.00 0.80 Area Cad 57.85 46.28
180 - 200 1.00 0.80 Area Cad 60.72 48.58
200 - 220 1.00 0.80 Area Cad 42.22 33.78
220 - 240 1.00 0.80 Area Cad 58.45 46.76
240 - 260 1.00 0.80 Area Cad 57.43 45.94
260 - 280 1.00 0.80 Area Cad 64.50 51.60
280 - 300 1.00 0.80 Area Cad 61.54 49.23
300 - 320 1.00 0.80 Area Cad 60.35 48.28
320 - 340 1.00 0.80 Area Cad 60.78 48.62
340 - 360 1.00 0.80 Area Cad 56.10 44.88
360 - 380 1.00 0.80 Area Cad 59.00 47.20
380 - 390 1.00 0.80 Area Cad 30.60 24.48
MUROS DE CONTENCIÓN
MURO CORTE A-A 1.00 1.00 6.20 0.90 5.58
MURO CORTE B-B 1.00 1.00 9.50 1.70 16.15
MURO CORTE C-C 1.00 1.00 12.64 1.70 21.49
MURO CORTE D-D - 1.00 10.00 0.90 -
MURO CORTE E-E - 1.00 7.50 1.90 -
MURO CORTE F-F 1.00 1.00 8.20 1.90 15.58
MURO CORTE G-G 1.00 1.00 14.50 0.90 13.05
MURO CORTE H-H 1.00 1.00 25.00 0.90 22.50
MURO CORTE I-I 1.00 1.00 14.00 1.35 18.90
MURO CORTE J -J 1.00 1.00 11.00 0.90 9.90
Metrado
985.85
Total (m2)
PLANILLA DE SUSTENTO DE METRADOS - VAL. 01 OCTUBRE 2019
Proyecto : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE
UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
03 MOVIMIENTO DE TIERRAS
Partida: 03.01 CORTE DE TERRENO NATURAL Unidad: m3
Veces de se Alto (m) Metrado
Descripción Cantidad Largo (m) Ancho (m)
repiten promedio Parcial
PROGRESIVA
00 - 20 1.00 0.80 Area Cad 42.37 0.25 8.47
20 - 40 1.00 0.80 Area Cad 37.68 0.25 7.54
40 - 60 1.00 0.80 Area Cad 65.61 0.25 13.12
60 - 80 1.00 0.80 Area Cad 51.21 0.25 10.24
80 - 100 1.00 0.80 Area Cad 38.58 0.25 7.72
100 - 120 1.00 0.80 Area Cad 59.20 0.25 11.84
120 - 140 1.00 0.80 Area Cad 57.81 0.25 11.56
140 - 160 1.00 0.80 Area Cad 56.37 0.25 11.27
160 - 180 1.00 0.80 Area Cad 57.85 0.25 11.57
180 - 200 1.00 0.80 Area Cad 60.72 0.25 12.14
200 - 220 1.00 0.80 Area Cad 42.22 0.25 8.44
220 - 240 1.00 0.80 Area Cad 58.45 0.25 11.69
240 - 260 1.00 0.80 Area Cad 57.43 0.25 11.49
260 - 280 1.00 0.80 Area Cad 64.50 0.25 12.90
280 - 300 1.00 0.80 Area Cad 61.54 0.25 12.31
300 - 320 1.00 0.80 Area Cad 60.35 0.25 12.07
320 - 340 1.00 0.80 Area Cad 60.78 0.25 12.16
340 - 360 1.00 0.80 Area Cad 56.10 0.25 11.22
360 - 380 1.00 0.80 Area Cad 59.00 0.25 11.80
380 - 390 1.00 0.80 Area Cad 30.60 0.25 6.12
MUROS DE CONTENCIÓN
MURO CORTE A-A 1.00 1.00 6.20 0.90 1.80 10.04
MURO CORTE B-B 1.00 1.00 9.50 1.70 3.35 54.10
MURO CORTE C-C 1.00 1.00 12.64 1.70 3.15 67.69
MURO CORTE D-D - 1.00 10.00 0.90 1.80 -
MURO CORTE E-E - 1.00 7.50 1.90 2.30 -
MURO CORTE F-F 1.00 1.00 8.20 1.90 2.30 35.83
MURO CORTE G-G 1.00 1.00 14.50 0.90 1.80 23.49
MURO CORTE H-H 1.00 1.00 25.00 0.90 1.80 40.50
MURO CORTE I-I 1.00 1.00 14.00 1.35 2.65 50.09
MURO CORTE J -J 1.00 1.00 11.00 0.90 1.80 17.82
Metrado
515.24
Total (m3)
PROGRESIVA
00 - 20 1.00 1.00 Area Cad 42.37 0.10 4.24
20 - 40 1.00 1.00 Area Cad 37.68 - -
40 - 60 1.00 1.00 Area Cad 65.61 0.10 6.56
60 - 80 1.00 1.00 Area Cad 51.21 - -
PLANILLA DE SUSTENTO DE METRADOS - VAL. 01 OCTUBRE 2019
Proyecto : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE
UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
Metrado
206.86
Total (m3)
PROGRESIVA
00 - 20 1.00 0.70 Area Cad 42.37 29.66
20 - 40 1.00 0.70 Area Cad 37.68 26.38
40 - 60 1.00 0.70 Area Cad 65.61 45.93
60 - 80 1.00 0.70 Area Cad 51.21 35.85
80 - 100 1.00 0.70 Area Cad 38.58 27.01
100 - 120 1.00 0.70 Area Cad 59.20 41.44
120 - 140 1.00 0.70 Area Cad 57.81 40.47
140 - 160 1.00 0.70 Area Cad 56.37 39.46
160 - 180 1.00 0.70 Area Cad 57.85 40.50
180 - 200 1.00 0.70 Area Cad 60.72 42.50
200 - 220 1.00 0.70 Area Cad 42.22 29.55
220 - 240 1.00 0.70 Area Cad 58.45 40.92
240 - 260 1.00 0.70 Area Cad 57.43 40.20
260 - 280 1.00 0.70 Area Cad 64.50 45.15
280 - 300 1.00 0.70 Area Cad 61.54 43.08
PLANILLA DE SUSTENTO DE METRADOS - VAL. 01 OCTUBRE 2019
Proyecto : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE
UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
Metrado
754.89
Total (m2)
Veces de se Metrado
Descripción Cantidad Largo (m) Ancho (m) Alto (m)
repiten Parcial
PROGRESIVA
00 - 20 1.00 1.00 Area Cad 42.37 0.20 8.47
20 - 40 1.00 1.00 Area Cad 37.68 0.20 7.54
40 - 60 1.00 1.00 Area Cad 65.61 0.20 13.12
60 - 80 1.00 1.00 Area Cad 51.21 0.20 10.24
80 - 100 1.00 1.00 Area Cad 38.58 0.20 7.72
100 - 120 1.00 1.00 Area Cad 59.20 0.20 11.84
120 - 140 1.00 1.00 Area Cad 57.81 0.20 11.56
140 - 160 1.00 1.00 Area Cad 56.37 0.20 11.27
160 - 180 1.00 1.00 Area Cad 57.85 0.20 11.57
180 - 200 1.00 1.00 Area Cad 60.72 0.20 -
200 - 220 1.00 1.00 Area Cad 42.22 0.20 -
220 - 240 1.00 1.00 Area Cad 58.45 0.20 -
240 - 260 1.00 1.00 Area Cad 57.43 0.20 -
260 - 280 1.00 1.00 Area Cad 64.50 0.20 -
280 - 300 1.00 1.00 Area Cad 61.54 0.20 -
300 - 320 1.00 1.00 Area Cad 60.35 0.20 -
320 - 340 1.00 1.00 Area Cad 60.78 0.20 -
340 - 360 1.00 1.00 Area Cad 56.10 0.20 -
360 - 380 1.00 1.00 Area Cad 59.00 0.20 -
380 - 390 1.00 1.00 Area Cad 30.60 0.20 -
Metrado
93.33
Total (m3)
Proyecto : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE
UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
04 MUROS DE CONTENCION
CONCRETO F´c=140 Kg/cm2 + 30% PG PARA MUROS
Partida: 04.01 Unidad: m3
DE CONTENCIÓN
Veces de se Metrado
Descripción Cantidad Largo (m) Ancho (m) Alto (m)
repiten Parcial
MUROS DE CONTENCIÓN
MURO CORTE A-A
Muro contencion h = 1.50m 1.00 1.00 6.20 Area Cad 0.53 3.29
MURO CORTE B-B
Muro contencion h = 3.00m 1.00 1.00 9.50 Area Cad 1.19 11.31
MURO CORTE C-C
Muro contencion h = 2.80m 1.00 1.00 12.64 Area Cad 1.14 14.41
MURO CORTE D-D
Muro contencion h = 1.50m 1.00 - 10.00 Area Cad 0.53 -
MURO CORTE E-E
Muro contencion h = 2.00m 1.00 - 7.50 Area Cad 1.75 -
MURO CORTE F-F
Muro contencion h = 2.00m 1.00 1.00 8.20 Area Cad 0.88 7.22
MURO CORTE G-G
Muro contencion h = 1.50m 1.00 1.00 14.50 Area Cad 0.65 9.43
MURO CORTE H-H
Muro contencion h = 1.50m 1.00 1.00 25.00 Area Cad 0.53 13.25
MURO CORTE I-I
Muro contencion h = 2.30m 1.00 1.00 14.00 Area Cad 0.92 12.92
MURO CORTE J -J
Muro contencion h = 1.50m 1.00 1.00 11.00 Area Cad 0.53 5.83
Metrado
77.66
Total (m3)
MUROS DE CONTENCIÓN
MURO CORTE A-A
Muro contencion h = 1.50m 1.00 2.00 6.20 1.50 18.60
en zapata 1.00 2.00 6.20 0.25 3.10
Laterales 1.00 3.00 Area Cad 0.53 1.59
MURO CORTE B-B
Muro contencion h = 3.00m 1.00 2.00 9.50 3.00 57.00
en zapata 1.00 2.00 9.50 0.30 5.70
Laterales 1.00 3.00 Area Cad 1.19 3.57
MURO CORTE C-C
Muro contencion h = 2.80m 1.00 2.00 12.64 2.80 70.78
en zapata 1.00 2.00 12.64 0.30 7.58
Laterales 1.00 3.00 Area Cad 1.14 3.42
MURO CORTE D-D
Muro contencion h = 1.50m 1.00 - 10.00 1.50 -
PLANILLA DE SUSTENTO DE METRADOS - VAL. 01 OCTUBRE 2019
Proyecto : "CREACION DEL SERVICIO DEPORTIVO Y RECREATIVO COMPLEJO DEPORTIVO UCHUCHUAYO DEL CENTRO POBLADO DE
UCHUCHUAYO DEL DISTRITO DE PARCOY - PROVINCIA DE PATAZ - DEPARTAMENTO LA LIBERTAD"
Metrado
471.50
Total (m2)
07 PAVIMENTO RIGIDO
NIVELACION DE BUZONES AL NIVEL DE RASANTE EN
Partida: Unidad: und
7.04 PAVIMENTOS
Veces de se Metrado
Descripción Cantidad Largo (m) Ancho (m) Alto (m)
repiten Parcial
1.00 10.00 10.00
Metrado
10.00
Total (und)
SUSTENTO DE METRADOS - ACERO
“CONSTRUCCIÓN DE PAVIMENTO, CUNETAS Y MURO DE CONTENCIÓN; EN EL(LA) CAMINO VECINAL ANEXO LA SOLEDAD DISTRITO DE PARCOY, PROVINCIA PATAZ, DEPARTAMENTO LA LIBERTAD”, CON C.U.I.
Proyecto :
2437929
Propietario : MUNICIPALIDAD DISTRITAL DE PARCOY
Fecha : Oct-19
Especialidad: ESTRUCTURAS
Modulo : MURO DE CONTENCION
Long x D
N° de pza. 1/4 3/8 1/2 5/8 3/4 1
Canti-dad Long. Por
N° Descripción Diseño del fierro f por elemen- 0.25 0.58 1.02 1.58 2.2 4.02 Total Unid.
ELEM pza
tos 5% 6% 7% 8% 9% 10%
0.23 0.56 0.994 1.552 2.235 3.973
Long x D
N° de pza. 1/4 3/8 1/2 5/8 3/4 1
Canti-dad Long. Por
N° Descripción Diseño del fierro f por elemen- 0.25 0.58 1.02 1.58 2.2 4.02 Total Unid.
ELEM pza
tos 5% 6% 7% 8% 9% 10%
0.23 0.56 0.994 1.552 2.235 3.973
Long x D
N° de pza. 1/4 3/8 1/2 5/8 3/4 1
Canti-dad Long. Por
N° Descripción Diseño del fierro f por elemen- 0.25 0.58 1.02 1.58 2.2 4.02 Total Unid.
ELEM pza
tos 5% 6% 7% 8% 9% 10%
0.23 0.56 0.994 1.552 2.235 3.973
Long x D
N° de pza. 1/4 3/8 1/2 5/8 3/4 1
Canti-dad Long. Por
N° Descripción Diseño del fierro f por elemen- 0.25 0.58 1.02 1.58 2.2 4.02 Total Unid.
ELEM pza
tos 5% 6% 7% 8% 9% 10%
0.23 0.56 0.994 1.552 2.235 3.973
Long x D
N° de pza. 1/4 3/8 1/2 5/8 3/4 1
Canti-dad Long. Por
N° Descripción Diseño del fierro f por elemen- 0.25 0.58 1.02 1.58 2.2 4.02 Total Unid.
ELEM pza
tos 5% 6% 7% 8% 9% 10%
0.23 0.56 0.994 1.552 2.235 3.973
PANTALLA
CARA INTERIOR Longitudinal 3/8 6 1.00 13.90 83.40
Transversal 3/8 36 1.00 2.96 106.56
Acero refuerzo 3/8 36 1.00 1.98 71.28
CARA EXTERIOR Longitudinal 3/8 12 1.00 13.90 166.80
Transversal 3/8 72 1.00 2.76 198.72
ZAPATA
PUNTA Longitudinal 1/2 3 1.00 13.90 41.70
Transversal 1/2 72 1.00 0.83 59.76
TALON Longitudinal 1/2 5 1.00 13.90 69.50
Transversal 1/2 72 1.00 1.42 102.24
MURO CORTE J -J
Muro contencion h = 1.50m
PANTALLA
CARA INTERIOR Longitudinal 3/8 4 1.00 10.90 43.60
Transversal 3/8 23 1.00 2.18 50.14
Acero refuerzo 3/8 23 1.00 1.48 34.04
CARA EXTERIOR Longitudinal 3/8 7 1.00 10.90 76.30
Transversal 3/8 46 1.00 1.98 91.08
ZAPATA
PUNTA Longitudinal 1/2 2 1.00 10.90 21.80
Transversal 1/2 46 1.00 0.65 29.90
TALON Longitudinal 3/8 4 1.00 10.90 43.60
Transversal 1/2 46 1.00 0.95 43.70
TOTAL 4,009.77 KG