CRONOGRAMA DE DESEMBOLSOS MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07 MES 08 MES 09 MES 10 MES 11 MES 12 MES

06 MES 07 MES 08 MES 09 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16 MES 17 MES 18 MES 19 MES 20 MES 21 MES 22 MES 23 MES 24 MES 25 MES 26 MES 27 MES 28 MES 29 MES 30 MES 31 MES 32 MES 33
OBRAS VIALES
OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS 333333.33 350000.00 316666.67
TOPOGRAFIA Y GEOREFERENCIACION 4831.57 35431.50 35431.50 4831.57
MANTENIENTO DE TRANSITO Y SEGURIDAD VIAL 1987756.00
ACCESOS A CANTERAS, DME'S, PLANTAS, FUENTES DE AGUA 61664.73 143884.38
MOVIMIENTO DE TIERRAS
DESBROCE Y LIMPIEZA EN ZONAS NO BOSCOSAS 9509.22 38036.88
EXCAVACION EN ROCA FIJA 151520.51 238103.66 238103.66 227280.77 238103.66 248926.55 227280.77 216457.87 248926.55 227280.77 238103.66 238103.66 227280.77 248926.55 32468.68
EXCAVACIÓN EN ROCA SUELTA 320060.02 502951.46 502951.46 480090.03 502951.46 525812.89 480090.03 457228.60 525812.89 480090.03 502951.46 502951.46 480090.03 525812.89 68584.29
EXCAVACION EN MATERIAL SUELTO 162367.84 255149.46 255149.46 243551.76 255149.46 266747.16 243551.76 231954.06 266747.16 243551.76 255149.46 255149.46 243551.76 266747.16 34793.11
PERFILADO Y COMPACTADO EN ZONAS DE CORTE 18749.02 29462.75 29462.75 28123.53 29462.75 30801.96 28123.53 26784.32 30801.96 28123.53 29462.75 29462.75 28123.53 30801.96 4017.65
TERRAPLENES 60668.07 133469.75 133469.75 127402.94 133469.75 139536.55 127402.94 54601.26
MATERIAL DE CANTERA PARA RELLENOS 173404.30 381489.45 381489.45 364149.02 381489.45 398829.88
MEJORAMIENTO DE SUELOS 26802.39 58965.27 58965.27 56285.03 58965.27 61645.51
PAVIMENTOS
CAPAS ANTICONTAMINANTES, SUBBASES Y BASES
SUB-BASE GRANULAR 53779.92 59755.46 68718.78 62743.23 65731.01 65731.01 62743.23 68718.78 29877.73
BASE GRANULAR 142020.09 624888.39 624888.39 624888.39 624888.39 596484.38 624888.39 653292.41 596484.38 568080.36 653292.41 596484.38 624888.39 624888.39 596484.38 653292.41 511272.32
PAVIMENTOS FLEXIBLES
IMPRIMACION ASFALTICA 303459.81 667611.57 697957.55 637265.59 606919.61 121383.92
RIEGO DE LIGA 279.50 161.81
PAVIMENTO DE CONCRETO ASFALTICO EN CALIENTEE 474257.99 524179.88 549140.83 549140.83 524179.88 574101.77 549140.83
CEMENTO ASFALTICO DE PENETRACION 120/150 1131307.31 1250392.29 1309934.78 1309934.78 1250392.29 1369477.27 1309934.78 1250392.29 1309934.78 1309934.78 1309934.78 1190849.80 1369477.27 1190849.80 1369477.27 1309934.78 1250392.29 1369477.27 1250392.29 1309934.78 1071764.82
EMULSION ASFALTICA DE ROTURA RAPIDA CRS-1 42.65 47.14 49.38 49.38 35.91
ASFALTO DILUIDO TIPO MC-30 25980.42 28715.20 30082.59 30082.59 28715.20 31449.98 30082.59 28715.20 30082.59 30082.59 30082.59 27347.81 31449.98 27347.81 31449.98 30082.59 28715.20 31449.98 28715.20 30082.59 24613.03
FILLER MINERAL 100426.32 110997.51 116283.11 116283.11 110997.51 121568.70 116283.11 110997.51 116283.11 116283.11 116283.11 105711.92 121568.70 105711.92 121568.70 116283.11 110997.51 121568.70 110997.51 116283.11 95140.73
ADITIVO MEJORADOR DE ADHERENCIA 27819.78 30748.18 32212.38 32212.38 30748.18 33676.58 32212.38 30748.18 32212.38 32212.38 32212.38 29283.98 33676.58 29283.98 33676.58 32212.38 30748.18 33676.58 30748.18 32212.38 26355.58
OBRAS DE ARTE Y DRENAJE
EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS 56425.09 32667.16
RELLENO COMPACTADO CON MATERIAL DE PRESTAMO 34306.19 75473.62 78904.24 72043.00 68612.38 78904.24 72043.00 75473.62 75473.62 72043.00 78904.24 75473.62
MATERIAL DE RELLENO FILTRANTE PARA MUROS 12704.63 25409.25
RELLENO CON MATERIAL IMPERMEABLE 7005.44 14010.89
CAMA DE ARENA 1375.21 4518.56
CONCRETO CLASE D (f'c=210 Kg/cm2 ) 51483.79 169161.04
CONCRETO CLASE E (f'c=175 Kg/cm2) 71395.69 234585.83 203987.68
CONCRETO CLASE H (f'c=100 Kg/cm2) 3332.71 3808.81
ENCOFRADO Y DESENCOFRADO 5365.56 61703.92 56338.36 53655.58 61703.92 56338.36 59021.14 59021.14 56338.36 61703.92 59021.14 56338.36 59021.14 59021.14 59021.14 34876.13
ACERO DE REFUERZO fy=4,200 kg/cm2 9331.48 30660.57 26661.37 30660.57 29327.50 27994.43 30660.57 27994.43 29327.50 29327.50 21329.09
TUBERIA METALICA CORRUGADA Ø = 1.50 m 23885.16 9554.07
SUBDRENES 31367.83 69009.23 72146.02 65872.45 62735.67 72146.02 65872.45 69009.23 69009.23 65872.45 72146.02 69009.23
CUNETA TRIANGULAR TIPO I 17549.17 38608.18 40363.10 36853.26 35098.34 40363.10 36853.26 38608.18 38608.18 36853.26 40363.10 38608.18 36853.26 38608.18 12284.42
CUNETA CUADRANGULAR TIPO I 62814.89 138192.76 144474.25 131911.27 125629.78 144474.25 131911.27 138192.76 138192.76 131911.27 144474.25 138192.76 131911.27 138192.76 43970.42
CUNETA RECTANGULAR TIPO I 62814.89 138192.76 144474.25 131911.27 125629.78 144474.25 131911.27 138192.76 138192.76 131911.27 144474.25 138192.76 131911.27 138192.76 43970.42
GEOTEXTIL NO TEJIDO CLASE 2 1224.13 14077.44 12853.31 8568.88
JUNTA PARA MUROS 16593.39
TUBERIA DE PVC D=4" PERFORADA 18737.33 9368.67
TUBERIA DE PVC D=4" SIN PERFORAR 8314.81
TUBERIA DE PVC D=2" 19628.81
OBRAS COMPLEMENTARIAS
EMBOQUILLADO DE PIEDRA 45243.17 50005.61 52386.83 54768.05 35718.29
DEMOLICION DE ESTRUCTURAS DE CONCRETO 88365.87 51159.19
REMOCION DE ALCANTARILLAS METALICAS 1580.28
TRANSPORTE
TRANSPORTE DE MATERIALES GRANULARES PARA DISTANCIAS ENTRE 120 Y 1,0 36826.21 40702.65 42640.87 44579.09 40702.65 38764.43 44579.09 40702.65 42640.87 15505.77
TRANSPORTE DE MATERIALES GRANULARES PARA DISTANCIAS MAYORES DE 1, 4576450.05 5058181.63 5299047.42 5539913.21 5058181.63 4817315.84 5539913.21 5058181.63 5299047.42 5299047.42 5058181.63 5539913.21 5299047.42 4817315.84
TRANSPORTE DE MATERIALES EXCEDENTES ENTRE 120M Y 1000M 40872.61 45174.99 47326.18 49477.37 45174.99 43023.80 49477.37 45174.99 47326.18 47326.18 45174.99 49477.37 47326.18 45174.99 47326.18 47326.18 10755.95
TRANSPORTE DE MATERIALES EXCEDENTES PARA DISTANCIAS MAYORES A 10 13570.17 14998.60 15712.82 16427.04 14998.60 14284.38 16427.04 14998.60 15712.82 15712.82 14998.60 16427.04 15712.82 14998.60 15712.82 15712.82 3571.10
TRANSPORTE DE MEZCLA ASFALTICA HASTA 1000M 40762.35 45053.12 47198.51 49343.89 32180.80
TRANSPORTE DE MEZCLAS ASFALTICAS PARA DISTANCIAS MAYORES DE 1000M 37285.42 41210.20 43172.59 45134.98 41210.20 39247.81 45134.98 41210.20 43172.59 43172.59 41210.20 45134.98 43172.59 41210.20 43172.59 43172.59 9811.95
TRANSPORTE DE CONCRETO HIDRAULICO ENTRE 120M Y 1000M 39443.53 43595.48 20759.75
TRANSPORTE DE CONCRETO HIDRAULICO PARA DISTANCIA MAYOR DE 1000M 32155.15 35539.91 37232.28 38924.66 35539.91 33847.53 38924.66 35539.91 37232.28 13539.01
SEÑALIZACION Y SEGURIDAD VIAL
POSTES DE SOPORTE DE SEÑALES DE CONCRETO 3632.76 8476.44 8880.08 7265.52
ESTRUCTURA DE SOPORTE DE SEÑALES TIPO E-1 2799.41 7698.37
ESTRUCTURA DE SOPORTE DE SEÑALES TIPO E-2 761.65 2094.55
SEÑALES PREVENTIVAS 0.80m x 0.80m 3384.02 9306.06
SEÑALES REGLAMENTARIAS RECTANGULARES 0.80m x 0.80m 1039.45 2858.48
SEÑAL REGLAMENTARIA OCTOGONAL 0.60m x0.60m 1013.28 2786.52
SEÑALES INFORMATIVAS 672.63 1849.73
POSTE DELINEADOR 193.09 531.01
TACHAS RETROREFLECTIVAS 3935.05 5902.58
MARCAS EN EL PAVIMENTO 19213.75
BARRERAS DE SEGURIDAD VIAL TIPO P3 348.21
GUARDAVIA METALICA 91657.10 131757.08 120299.94 126028.51 103114.24
POSTE DE KILOMETRAJE 1947.60
GIBAS O RESALTO TIPO I 25188.80
PROTECCIÓN AMBIENTAL
SUB PROGRAMA DE SEÑALIZACION AMBIENTAL
SEÑALES INFORMATIVAS AMBIENTALES (PERMANENTES) 19004.76
ESTRUCTURA DE SOPORTE DE SEÑALES TIPO E-1 12597.34 18896.00
PROGRAMA DE SEGUIMIENTO, CONTROL Y MONITOREO AMBIENTAL
MONITOREO DE CALIDAD DE AIRE 75.36 79.13 82.90 82.90 82.90 82.90 79.13 82.90 86.67 79.13 75.36 86.67 79.13 82.90 82.90 79.13 86.67 82.90 79.13 82.90 82.90 82.90 75.36 86.67 75.36 86.67 82.90 79.13 86.67 79.13 82.90 67.83
MONITOREO DE CALIDAD DE AGUA 46.38 48.70 51.01 51.01 51.01 51.01 48.70 51.01 53.33 48.70 46.38 53.33 48.70 51.01 51.01 48.70 53.33 51.01 48.70 51.01 51.01 51.01 46.38 53.33 46.38 53.33 51.01 48.70 53.33 48.70 51.01 41.74
MONITOREO DE CALIDAD DE SUELO 78.26 82.17 86.09 86.09 86.09 86.09 82.17 86.09 90.00 82.17 78.26 90.00 82.17 86.09 86.09 82.17 90.00 86.09 82.17 86.09 86.09 86.09 78.26 90.00 78.26 90.00 86.09 82.17 90.00 82.17 86.09 70.43
MONITOREO DE RUIDO AMBIENTAL 17.39 18.26 19.13 19.13 19.13 19.13 18.26 19.13 20.00 18.26 17.39 20.00 18.26 19.13 19.13 18.26 20.00 19.13 18.26 19.13 19.13 19.13 17.39 20.00 17.39 20.00 19.13 18.26 20.00 18.26 19.13 15.65
MONITOREO METEREOLOGICO 46.38 48.70 51.01 51.01 51.01 51.01 48.70 51.01 53.33 48.70 46.38 53.33 48.70 51.01 51.01 48.70 53.33 51.01 48.70 51.01 51.01 51.01 46.38 53.33 46.38 53.33 51.01 48.70 53.33 48.70 51.01 41.74
MONITOREO DE FLORA Y FAUNA 81.16 85.22 89.28 89.28 89.28 89.28 85.22 89.28 93.33 85.22 81.16 93.33 85.22 89.28 89.28 85.22 93.33 89.28 85.22 89.28 89.28 89.28 81.16 93.33 81.16 93.33 89.28 85.22 93.33 85.22 89.28 73.04
MONITOREO HIDROBIOLOGICO 46.38 48.70 51.01 51.01 51.01 51.01 48.70 51.01 53.33 48.70 46.38 53.33 48.70 51.01 51.01 48.70 53.33 51.01 48.70 51.01 51.01 51.01 46.38 53.33 46.38 53.33 51.01 48.70 53.33 48.70 51.01 41.74
PROGRAMA DE CIERRE DE OBRA
ACONDICIONAMIENTO DE MATERIAL EXCEDENTE EN DME 98892.89 109302.67 114507.56 114507.56 109302.67 119712.44 114507.56 109302.67 114507.56 114507.56 114507.56 104097.78 119712.44 104097.78 119712.44 114507.56 109302.67 119712.44 109302.67 114507.56 93688.00
RESTAURACION DE AREAS DE CANTERAS 53280.00 79920.00
RESTAURACION DE AREAS DE CAMPAMENTOS 28800.00
READECUACION AMBIENTAL DE LA PLANTA DE CONCRETO 7200.00
READECUACION AMBIENTAL DE POLVORIN 1440.00
READECUACION AMBIENTAL DE LA PLANTA DE ASFALTO 14400.00
READECUACION AMBIENTAL DE LA PLANTA DE CHANCADO 14400.00
RESTAURACION DE PATIO DE MAQUINAS 7200.00
PAGO POR EXTRACCIÓN DE MATERIALES DE CANTERA DE RIO 16200.00 37800.00 41400.00 39600.00 37800.00 39600.00 39600.00 39600.00 36000.00 41400.00 36000.00 41400.00 39600.00 37800.00 41400.00 37800.00 39600.00 32400.00
COMPENSACION POR USO TEMPORAL DE TERRENO DE AREAS AUXILIARES 240000.00
CRONOGRAMA DE DESEMBOLSOS MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07 MES 08 MES 09 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16 MES 17 MES 18 MES 19 MES 20 MES 21 MES 22 MES 23 MES 24 MES 25 MES 26 MES 27 MES 28 MES 29 MES 30 MES 31 MES 32 MES 33
PUENTE
PUENTE JARJANTO
TRABAJOS PRELIMINARES
TRAZO GEOMETRICO Y REPLANTEO 870.39
DEMOLICION DE LA SUB ESTRUCTURAS 3453.50 9497.11
DEMOLICION DE LA SUPER ESTRUCTURAS 1592.49 4379.33
SUB ESTRUCTURA
EXCAVACION PARA ESTRUCTURAS EN MATERIAL SUELTO 10804.03
RELLENO COMPACTADO CON MATERIAL DE PRESTAMO 11783.84 61865.14 64811.10 8837.88
CONCRETO CLASE D (f'c=210 Kg/cm2 ) 141211.37
CONCRETO CLASE H (f'c=100 Kg/cm2) 3358.37
ENCOFRADO Y DESENCOFRADO 3175.47 16671.22 17465.08 18258.95
ACERO DE REFUERZO fy=4,200 kg/cm2 4409.09 23147.73 24250.00 25352.28 23147.73 22045.46 25352.28 23147.73 24250.00 24250.00 23147.73 25352.28 7715.91
ELIMINACION DE MATERIAL EXCEDENTE 42994.63 21497.32
LOSA DE CONCRETO
CONCRETO CLASE C (f'c=280 Kg/cm2) 24543.77 3775.97
ENCOFRADO Y DESENCOFRADO EN LOSA 9932.63
ACERO DE REFUERZO fy=4,200 kg/cm2 26782.88 11478.38
CARPETA ASFALTICA EN FRIO 2079.00
RIEGO DE LIGA 66.22 132.44
LOSA DE APROXIMACION
CONCRETO CLASE C (f'c=280 Kg/cm2) 9936.75
ENCOFRADO Y DESENCOFRADO CARAVISTA 995.15 248.79
ACERO DE REFUERZO fy=4,200 kg/cm2 13425.00
CONCRETO CLASE H (f'c=100 Kg/cm2) 801.02
JUNTAS DE DILATACION EN LOSAS DE APROXIMACION 1880.40 12222.60
VARIOS
TUBERIA DE DRENAJE D=4", L= 0.80m 197.28 98.64
BARRERAS PROTECCION TIPO NEW JERSEY 5911.08 2955.54
BARANDAS METALICAS ASTM 36 FY= 2530 kg/cm2 5760.00 2880.00
BRUÑA ROMPE AGUA EN LOSA 126.84 63.42
PRUEBA DE CARGA 22163.07
TRANSPORTE
TRANSPORTE DE MATERIALES GRANULARES PARA DISTANCIAS ENTRE 120 Y 1,0 14278.43
TRANSPORTE DE MATERIALES GRANULARES PARA DISTANCIAS MAYORES DE 1, 37260.59 41182.76 43143.84 45104.92 41182.76 39221.67 45104.92 41182.76 43143.84 43143.84 41182.76 45104.92 43143.84 39221.67
TRANSPORTE DE MATERIALES EXCEDENTES ENTRE 120M Y 1000M 5992.80
TRANSPORTE DE MATERIALES EXCEDENTES PARA DISTANCIAS MAYORES A 10 2445.05
TRANSPORTE DE CONCRETO HIDRAULICO ENTRE 120M Y 1000M 12820.20
TRANSPORTE DE CONCRETO HIDRAULICO PARA DISTANCIA MAYOR DE 1000M 30118.96 17437.29
PUENTE CHALLA
TRABAJOS PRELIMINARES
TRAZO GEOMETRICO Y REPLANTEO 1869.80
DEMOLICION DE LA SUB ESTRUCTURAS 6315.21 33154.87 34733.68 36312.48 31576.07
DEMOLICION DE LA SUPER ESTRUCTURAS 3749.62 10311.46
SUB ESTRUCTURA
EXCAVACION PARA ESTRUCTURAS EN MATERIAL SUELTO 25001.25 14474.41
RELLENO COMPACTADO CON MATERIAL DE PRESTAMO 35562.55 78237.60 81793.86 74681.35 71125.09 81793.86 74681.35 78237.60 28450.04
CONCRETO CLASE D (f'c=210 Kg/cm2 ) 286858.64 191239.09
CONCRETO CLASE H (f'c=100 Kg/cm2) 7320.10
ENCOFRADO Y DESENCOFRADO 8937.05 19661.52 20555.22 18767.81 17874.11 20555.22 18767.81 19661.52 19661.52 18767.81 4468.53
ACERO DE REFUERZO fy=4,200 kg/cm2 26123.51 82102.47 78370.54 82102.47 85834.40 78370.54 74638.61 85834.40 78370.54 82102.47 82102.47 78370.54 18659.65
ELIMINACION DE MATERIAL EXCEDENTE 32989.62 49484.43 54197.23 51840.83 47128.03
SUPERESTRUCTURA
CONCRETO CLASE C (f'c=280 Kg/cm2) 3318.87
ACERO DE REFUERZO fy=4,200 kg/cm2 16978.01 8489.00
ENCOFRADO Y DESENCOFRADO CARAVISTA 17278.89 8639.44
IZAJE Y COLOCACION DE VIGAS POSTENSADAS 5667.22 5950.58 6233.94 6233.94 6233.94 6233.94 5950.58 6233.94 6517.30 1416.80
LOSA DE CONCRETO
CONCRETO CLASE C (f'c=280 Kg/cm2) 22365.64
ENCOFRADO Y DESENCOFRADO EN LOSA 14972.45 7486.23
ACERO DE REFUERZO fy=4,200 kg/cm2 20145.37 10072.69
CARPETA ASFALTICA EN FRIO 4842.00
RIEGO DE LIGA 462.83
LOSA DE APROXIMACION
CONCRETO CLASE C (f'c=280 Kg/cm2) 13573.60
ENCOFRADO Y DESENCOFRADO CARAVISTA 1271.08
ACERO DE REFUERZO fy=4,200 kg/cm2 18335.87
CONCRETO CLASE H (f'c=100 Kg/cm2) 1102.70
JUNTAS DE DILATACION EN LOSAS DE APROXIMACION 19264.70
VARIOS
JUNTAS DE DILATACION METALICA PARA PUENTE 19242.13
DISPOSITIVO DE APOYO NEOPRENO (60x35x9) 37316.72
TUBERIA DE DRENAJE D=4", L= 0.80m 493.20
BARRERAS PROTECCION TIPO NEW JERSEY 15762.88
BARANDAS METALICAS ASTM 36 FY= 2530 kg/cm2 6602.67 6932.80 1320.53
BRUÑA ROMPE AGUA EN LOSA 317.10
PRUEBA DE CARGA 22163.07
TRANSPORTE
TRANSPORTE DE MATERIALES GRANULARES PARA DISTANCIAS ENTRE 120 Y 1,0 2191.89 2301.48 2411.08 2411.08 2411.08 2411.08 2301.48 2411.08 2520.67 2301.48 2191.89 2520.67 2301.48 2411.08 2411.08 2301.48 2520.67 2411.08 2301.48 2411.08 2411.08 2411.08 2191.89 328.78
TRANSPORTE DE MATERIALES GRANULARES PARA DISTANCIAS MAYORES DE 1, 85119.70 89375.68 93631.67 93631.67 93631.67 93631.67 89375.68 93631.67 97887.65 89375.68 85119.70 97887.65 89375.68 93631.67 93631.67 89375.68 97887.65 93631.67 89375.68 93631.67 93631.67 93631.67 85119.70 12767.95
TRANSPORTE DE MATERIALES EXCEDENTES ENTRE 120M Y 1000M 1730.42 1816.95 1903.47 1903.47 1903.47 1903.47 1816.95 1903.47 1989.99 1816.95 1730.42 1989.99 1816.95 1903.47 1903.47 1816.95 432.61
TRANSPORTE DE MATERIALES EXCEDENTES PARA DISTANCIAS MAYORES A 10 728.17 764.58 800.98 800.98 800.98 800.98 764.58 800.98 837.39 764.58 728.17 837.39 764.58 800.98 800.98 764.58 837.39 800.98 764.58 691.76
TRANSPORTE DE CONCRETO HIDRAULICO ENTRE 120M Y 1000M 2179.85 2288.84 2397.83 2397.83 2397.83 2397.83 2288.84 2397.83 2506.83 2288.84 2179.85 2506.83 2288.84 2397.83 2397.83 2288.84 544.96
TRANSPORTE DE CONCRETO HIDRAULICO PARA DISTANCIA MAYOR DE 1000M 6419.85 6740.84 7061.83 7061.83 7061.83 7061.83 6740.84 7061.83 7382.83 6740.84 6419.85 7382.83 6740.84 7061.83 7061.83 6740.84 7382.83 7061.83 6740.84 6098.86
COSTO DIRECTO 693571.52 643290.08 1133752.34 1870684.53 2400906.43 9599241.58 8602367.11 9491885.98 9903399.24 8744378.28 8011861.87 10423149.19 9763243.60 10228159.93 10176733.62 9699592.89 10830722.32 9204740.02 7056395.68 2262132.80 2010472.78 1823381.33 1779081.16 2219947.37 1793603.59 1757764.20 1672378.35 1688018.26 1883785.37 1725137.54 1877099.33 1977746.82 48453.81 S/. 162,997,078.92
GASTOS GENERALES 28760.02 26675.02 47012.80 77570.84 99557.31 398047.46 356710.51 393595.79 410659.83 362599.22 332224.29 432212.07 404848.06 424126.53 421994.06 402208.68 449112.72 381688.84 292604.40 93802.85 83367.38 75609.34 73772.36 92053.56 74374.56 72888.42 69347.77 69996.30 78114.09 71535.51 77836.84 82010.34 2009.21 S/. 6,758,926.99
UTILIDAD 55485.72 51463.21 90700.19 149654.76 192072.51 767939.33 688189.37 759350.88 792271.94 699550.26 640948.95 833851.93 781059.49 818252.79 814138.69 775967.43 866457.79 736379.20 564511.65 180970.62 160837.82 145870.51 142326.49 177595.79 143488.29 140621.14 133790.27 135041.46 150702.83 138011.00 150167.95 158219.75 3876.30 S/. 13,039,766.31
SUB TOTAL 777817.26 721428.31 1271465.33 2097910.13 2692536.26 10765228.36 9647266.99 10644832.65 11106331.01 9806527.77 8985035.11 11689213.19 10949151.14 11470539.26 11412866.37 10877769.00 12146292.83 10322808.06 7913511.74 2536906.27 2254677.98 2044861.17 1995180.02 2489596.72 2011466.44 1971273.76 1875516.38 1893056.02 2112602.29 1934684.05 2105104.11 2217976.91 54339.33 S/. 182,795,772.22
I.G.V. 140007.11 129857.10 228863.76 377623.82 484656.53 1937741.11 1736508.06 1916069.88 1765175.00 1617306.32 2104058.37 1970847.21 2064697.07 2054315.95 1957998.42 2186332.71 1858105.45 1424432.11 456643.13 405842.04 368075.01 359132.40 448127.41 362063.96 354829.28 337592.95 340750.08 380268.41 348243.13 378918.74 399235.84 9781.08 S/. 32,903,239.00
PRESUPUESTADO OBRA 917824.37 851285.40 1500329.09 2475533.95 3177192.78 12702969.47 11383775.05 12560902.53 11106331.01 11571702.76 10602341.43 13793271.57 12919998.35 13535236.33 13467182.32 12835767.42 14332625.53 12180913.51 9337943.85 2993549.40 2660520.01 2412936.19 2354312.42 2937724.13 2373530.39 2326103.03 2213109.33 2233806.10 2492870.70 2282927.18 2484022.86 2617212.75 64120.41 S/. 215,699,011.22
GASTOS DE SUPERVISION 9491.99 8803.86 15516.17 25601.58 32858.02 131372.10 117729.20 129902.86 114859.92 119672.72 109647.74 142647.83 133616.58 139979.27 139275.47 132745.47 148225.74 125973.08 96571.54 30958.81 27514.68 24954.20 24347.93 30381.48 24546.68 24056.19 22887.63 23101.67 25780.87 23609.67 25689.37 27066.80 663.12 S/. 2,230,725.00
EXPEDIENTE TECNICO 4882.16 4528.22 7980.67 13168.05 16900.37 67570.63 60553.47 66814.94 59077.67 61553.11 56396.81 73370.25 68725.07 71997.69 71635.69 68277.02 76239.22 64793.67 49671.12 15923.52 14152.05 12835.08 12523.24 15626.57 12625.47 12373.19 11772.14 11882.24 13260.27 12143.53 13213.21 13921.68 341.07 S/. 1,147,363.08
COSTO TOTAL 932198.53 864617.49 1523825.92 2514303.59 3226951.18 12901912.20 11562057.71 12757620.33 11280268.59 11752928.59 10768385.97 14009289.65 13122339.99 13747213.28 13678093.48 13036789.92 14557090.50 12371680.26 9484186.51 3040431.74 2702186.74 2450725.47 2391183.59 2983732.18 2410702.54 2362532.41 2247769.10 2268790.01 2531911.84 2318680.38 2522925.44 2658201.23 65124.60 S/. 219,077,099.30
CRONOGRAMA DE DESEMBOLSOS MES 01 MES 02 MES 03 MES 04 MES 05 MES 06 MES 07 MES 08 MES 09 MES 10 MES 11 MES 12 MES 13 MES 14 MES 15 MES 16 MES 17 MES 18 MES 19 MES 20 MES 21 MES 22 MES 23 MES 24 MES 25 MES 26 MES 27 MES 28 MES 29 MES 30 MES 31 MES 32 MES 33
PAVIMENTO 121,957,240.95 1340000.00 4000000.00 4000000.00 4000000.00 4000000.00 3736330.03 3736330.03 3736330.03 3736330.03 3736330.03 3736330.03 3736330.03 3736330.03 3736330.03 3736330.03 3736330.03 3736330.03 3736330.03 3736330.03 3736330.03 3736330.03 3736330.03 3736330.03 3736330.03 3736330.03 3736330.03 3736330.03 3736330.03 3736330.03 3736330.03 3736330.03 3736330.03 3736330.03 S/. 121,957,240.95
PUENTE 6,170,541.05 342807.84 342807.84 342807.84 342807.84 342807.84 342807.84 342807.84 342807.84 342807.84 342807.84 342807.84 342807.84 342807.84 342807.84 342807.84 342807.84 342807.84 342807.84 S/. 6,170,541.05
OBRAS DE ARTE Y DRENAJE 7,866,064.36 253744.01 253744.01 253744.01 253744.01 253744.01 253744.01 253744.01 253744.01 253744.01 253744.01 253744.01 253744.01 253744.01 253744.01 253744.01 253744.01 253744.01 253744.01 253744.01 253744.01 253744.01 253744.01 253744.01 253744.01 253744.01 253744.01 253744.01 253744.01 253744.01 253744.01 253744.01 S/. 7,866,064.36
SEÑALIZACIÓN Y SEGURIDAD VIAL 693,214.81 86651.85 86651.85 86651.85 86651.85 86651.85 86651.85 86651.85 86651.85 S/. 693,214.81
PROTECCIÓN AMBIENTAL 3,575,493.83 27500.00 27500.00 113564.32 113564.32 113564.32 113564.32 113564.32 113564.32 113564.32 113564.32 113564.32 113564.32 113564.32 113564.32 113564.32 113564.32 113564.32 113564.32 113564.32 113564.32 113564.32 113564.32 113564.32 113564.32 113564.32 113564.32 113564.32 113564.32 113564.32 113564.32 113564.32 113564.32 113564.32 S/. 3,575,493.83
COSTO DIRECTO 140,262,555 1367500.00 4027500.00 4710116.16 4710116.16 4710116.16 4446446.20 4446446.20 4446446.20 4446446.20 4446446.20 4446446.20 4446446.20 4446446.20 4446446.20 4446446.20 4446446.20 4446446.20 4446446.20 4446446.20 4446446.20 4103638.36 4103638.36 4103638.36 4103638.36 4103638.36 4190290.21 4190290.21 4190290.21 4190290.21 4190290.21 4190290.21 4190290.21 4190290.21 S/. 140,262,555.00
GASTOS GENERALES 65896.65 194075.88 226969.57 226969.57 226969.57 214263.92 214263.92 214263.92 214263.92 214263.92 214263.92 214263.92 214263.92 214263.92 214263.92 214263.92 214263.92 214263.92 214263.92 214263.92 197744.81 197744.81 197744.81 197744.81 197744.81 201920.36 201920.36 201920.36 201920.36 201920.36 201920.36 201920.36 201920.36 S/. 6,758,926.99
UTILIDAD 127132.15 374423.94 437884.61 437884.61 437884.61 413372.05 413372.05 413372.05 413372.05 413372.05 413372.05 413372.05 413372.05 413372.05 413372.05 413372.05 413372.05 413372.05 413372.05 413372.05 381502.29 381502.29 381502.29 381502.29 381502.29 389558.03 389558.03 389558.03 389558.03 389558.03 389558.03 389558.03 389558.03 S/. 13,039,766.31
SUB TOTAL 1560528.80 4595999.82 5374970.34 5374970.34 5374970.34 5074082.17 5074082.17 5074082.17 5074082.17 5074082.17 5074082.17 5074082.17 5074082.17 5074082.17 5074082.17 5074082.17 5074082.17 5074082.17 5074082.17 5074082.17 4682885.46 4682885.46 4682885.46 4682885.46 4682885.46 4781768.61 4781768.61 4781768.61 4781768.61 4781768.61 4781768.61 4781768.61 4781768.61 S/. 160,061,248.30
I.G.V. 280895.18 827279.97 967494.66 967494.66 967494.66 913334.79 913334.79 913334.79 913334.79 913334.79 913334.79 913334.79 913334.79 913334.79 913334.79 913334.79 913334.79 913334.79 913334.79 842919.38 842919.38 842919.38 842919.38 842919.38 860718.35 860718.35 860718.35 860718.35 860718.35 860718.35 860718.35 860718.35 S/. 32,903,239.00
PRESUPUESTADO OBRA 1841423.99 5423279.79 6342465.00 6342465.00 6342465.00 5987416.96 5987416.96 5987416.96 5074082.17 5987416.96 5987416.96 5987416.96 5987416.96 5987416.96 5987416.96 5987416.96 5987416.96 5987416.96 5987416.96 5987416.96 5525804.84 5525804.84 5525804.84 5525804.84 5525804.84 5642486.96 5642486.96 5642486.96 5642486.96 5642486.96 5642486.96 5642486.96 5642486.96 S/. 192,964,487.30
GASTOS DE SUPERVISION 21287.39 62694.67 73320.72 73320.72 73320.72 69216.26 69216.26 69216.26 58657.85 69216.26 69216.26 69216.26 69216.26 69216.26 69216.26 69216.26 69216.26 69216.26 69216.26 69216.26 63879.89 63879.89 63879.89 63879.89 63879.89 65228.77 65228.77 65228.77 65228.77 65228.77 65228.77 65228.77 65228.77 S/. 2,230,725.00
EXPEDIENTE TECNICO 10949.07 32246.72 37712.17 37712.17 37712.17 35601.06 35601.06 35601.06 30170.39 35601.06 35601.06 35601.06 35601.06 35601.06 35601.06 35601.06 35601.06 35601.06 35601.06 35601.06 32856.33 32856.33 32856.33 32856.33 32856.33 33550.12 33550.12 33550.12 33550.12 33550.12 33550.12 33550.12 33550.12 S/. 1,147,363.08
COSTO TOTAL 1873660.45 5518221.18 6453497.90 6453497.90 6453497.90 6092234.28 6092234.28 6092234.28 5162910.41 6092234.28 6092234.28 6092234.28 6092234.28 6092234.28 6092234.28 6092234.28 6092234.28 6092234.28 6092234.28 6092234.28 5622541.06 5622541.06 5622541.06 5622541.06 5622541.06 5741265.85 5741265.85 5741265.85 5741265.85 5741265.85 5741265.85 5741265.85 5741265.85 S/. 196,342,575.38
11752928.6