PRESUPUESTO DE OBRA

ÍTEM NOMBRE DE PARTIDA UND CANTIDAD P.U. PARCIAL


01.00.00 MOVIMIENTO DE TIERRAS
01.01.00 EXCAVACIÓN DE ZANJAS M3 1,500.00 40.00 60,000.00
01.02.00 RELLENO CON MATERIAL PROPIO M3 500.00 30.00 15,000.00
01.03.00 ELIMINACIÓN DE MATERIAL M3 1,000.00 10.00 10,000.00
02.00.00 CONCRETO SIMPLE
02.01.00 DADO DE CONCRETO M3 1,000.00 250.00 250,000.00
COSTO DIRECTO 335,000.00
GASTOS GENERALES 10% 33,500.00
FIJOS (4%)
VARIABLES (6%)
UTILIDAD 10% 33,500.00
SUBTOTAL DE OBRA 402,000.00
I.G.V. 18% 72,360.00
COSTO TOTAL DE OBRA 474,360.00
DATOS:

LA OBRA DURA 5 MESES


LA PARTIDA EXCAVACIÓN SE EJECUTARÁ DEL PRIMER AL CUARTO MES
LA PARTIDA RELLENO SE EJECUTARÁ EL SEGUNDO AL QUINTO MES
LA PARTIDA ELIMINACIÓN SE EJECUTARÁ TERCER Y QUINTO MES
LA PARTIDA DADO DE CONCRETO DEL SEGUNDO AL QUINTO MES
* CONSIDERAR QUE LOS TRABAJOS SE EJECUTARÁN DE MANERA PROPORCIONAL.

CALENDARIO DE AVANCE DE OBRA VALORIZADO

ÍTEM NOMBRE DE PARTIDA UND CANTIDAD P.U. PARCIAL


01.00.00 MOVIMIENTO DE TIERRAS
01.01.00 EXCAVACIÓN DE ZANJAS M3 1,500.00 40.00 60,000.00
01.02.00 RELLENO CON MATERIAL PROPIO M3 500.00 30.00 15,000.00
01.03.00 ELIMINACIÓN DE MATERIAL M3 1,000.00 10.00 10,000.00
02.00.00 CONCRETO SIMPLE
02.01.00 DADO DE CONCRETO M3 1,000.00 250.00 250,000.00
COSTO DIRECTO 335,000.00
GASTOS GENERALES 10% 33,500.00
FIJOS (4%)
VARIABLES (6%)
UTILIDAD 10% 33,500.00
SUBTOTAL DE OBRA 402,000.00
I.G.V. 18% 72,360.00
COSTO TOTAL DE OBRA 474,360.00
MES 1 MES 2 MES 3 MES 4 MES 5

15,000.00 15,000.00 15,000.00 15,000.00


3,750.00 3,750.00 3,750.00 3,750.00
5,000.00 5,000.00

62,500.00 62,500.00 62,500.00 62,500.00


15,000.00 81,250.00 86,250.00 81,250.00 71,250.00
1,500.00 8,125.00 8,625.00 8,125.00 7,125.00

1,500.00 8,125.00 8,625.00 8,125.00 7,125.00


18,000.00 97,500.00 103,500.00 97,500.00 85,500.00
3,240.00 17,550.00 18,630.00 17,550.00 15,390.00
21,240.00 115,050.00 122,130.00 115,050.00 100,890.00
FÓRMULA POLINÓMICA

CALCULE EL FACTOR "K" DE REAJUSTE PARA TODOS LOS MESES, CONSIDERANDO LA SIGUIENTE FÓRMULA POLIN

𝐾=0.35 𝑥 𝑀𝑂𝑟/𝑀𝑂𝑜+0. 33 𝑥 𝐶𝑟/𝐶𝑜+ 0.12 𝑥 𝐵𝑟/𝐵𝑜+ 0.09

FECHA DE PRESUPUESTO: SETIEMBRE DE 2019.


FECHA DE REAJUSTE: ENERO DE 2020.

MONOMIO ELEMENTO REPRESENTATIVO INDICE COEF. DE


UNIFICADO INCIDENCIA
MO MANO DE OBRA INC. LEYES SOCIALES 47 0.250
C CEMENTO PORTLAND TIPO I 21 0.380
B BLOQUE Y LADRILLO 17 0.170
A ACERO DE CONSTRUCCIÓN CORRUGADO 03 0.100
M MADERA NACIONAL PARA ENCOFRADO Y CARPINTERÍA 43 0.100

Sep-19
Cod. 1 2 3 4 5 6 Cod. 1 2
01 973.52 973.52 973.52 973.52 973.52 973.52 01 974.96 974
03 538.41 538.41 538.41 538.41 538.41 538.41 03 533.60 533
05 449.57 215.03 434.86 599.17 (*) 628.95 05 450.99 215
07 663.93 663.93 663.93 663.93 663.93 663.93 07 689.76 689
09 282.08 282.08 282.08 282.08 282.08 282.08 09 279.56 279
11 256.09 256.09 256.09 256.09 256.09 256.09 11 252.86 252
13 1792.19 1792.19 1792.19 1792.19 1792.19 1792.19 13 1792.19 1792
17 621.80 679.94 709.42 839.66 759.93 884.71 17 631.82 675
19 742.49 742.49 742.49 742.49 742.49 742.49 19 756.65 756
21 471.42 423.68 449.56 438.28 449.56 414.76 21 471.42 423
23 439.25 439.25 439.25 439.25 439.25 439.25 23 439.25 439
27 476.61 476.61 476.61 476.61 476.61 476.61 27 472.36 472
31 384.55 384.55 384.55 384.55 384.55 384.55 31 383.24 383
33 865.45 865.45 865.45 865.45 865.45 865.45 33 864.79 864
37 312.40 312.40 312.40 312.40 312.40 312.40 37 312.36 312
39 458.59 458.59 458.59 458.59 458.59 458.59 39 460.84 460
41 435.86 435.86 435.86 435.86 435.86 435.86 41 436.82 436
43 755.26 704.10 932.30 656.58 1153.53 912.18 43 756.35 707
27 476.61 476.61 476.61 476.61 476.61 476.61 27 472.36 472
31 384.55 384.55 384.55 384.55 384.55 384.55 31 383.24 383
33 865.45 865.45 865.45 865.45 865.45 865.45 33 864.79 864
37 312.40 312.40 312.40 312.40 312.40 312.40 37 312.36 312
39 458.59 458.59 458.59 458.59 458.59 458.59 39 460.84 460
41 435.86 435.86 435.86 435.86 435.86 435.86 41 436.82 436
43 755.26 704.10 932.30 656.58 1153.53 912.18 43 756.35 707
45 330.77 330.77 330.77 330.77 330.77 330.77 45 330.99 330
47 619.76 619.76 619.76 619.76 619.76 619.76 47 619.99 619
49 315.57 315.57 315.57 315.57 315.57 315.57 49 313.19 313
UIENTE FÓRMULA POLINÓMICA:

𝐵𝑟/𝐵𝑜+ 0.095 𝑥 𝐴𝑟/𝐴𝑜+ 0.105 𝑥 𝑀𝑟/𝑀𝑜

Io Jan-20
%
Sep-19 lr K
100.00% 619.76 619.99 0.25
100.00% 438.28 254.97 0.221
100.00% 839.66 842.05 0.381
100.00% 538.41 533.60 0.099
100.00% 656.58 677.12 0.103
1.054

Jan-20
Cod. 1 2 3 4 5 6
01 974.96 974.96 974.96 974.96 974.96 974.96
03 533.60 533.60 533.60 533.60 533.60 533.60
05 450.99 215.09 436.23 605.60 (*) 627.62
07 689.76 689.76 689.76 689.76 689.76 689.76
09 279.56 279.56 279.56 279.56 279.56 279.56
11 252.86 252.86 252.86 252.86 252.86 252.86
13 1792.19 1792.19 1792.19 1792.19 1792.19 1792.19
17 631.82 675.04 708.45 842.05 747.74 888.19
19 756.65 756.65 756.65 756.65 756.65 756.65
21 471.42 423.68 449.56 452.97 449.56 419.52
23 439.25 439.25 439.25 439.25 439.25 439.25
27 472.36 472.36 472.36 472.36 472.36 472.36
31 383.24 383.24 383.24 383.24 383.24 383.24
33 864.79 864.79 864.79 864.79 864.79 864.79
37 312.36 312.36 312.36 312.36 312.36 312.36
39 460.84 460.84 460.84 460.84 460.84 460.84
41 436.82 436.82 436.82 436.82 436.82 436.82
43 756.35 707.77 927.69 677.12 1136.10 938.17
27 472.36 472.36 472.36 472.36 472.36 472.36
31 383.24 383.24 383.24 383.24 383.24 383.24
33 864.79 864.79 864.79 864.79 864.79 864.79
37 312.36 312.36 312.36 312.36 312.36 312.36
39 460.84 460.84 460.84 460.84 460.84 460.84
41 436.82 436.82 436.82 436.82 436.82 436.82
43 756.35 707.77 927.69 677.12 1136.10 938.17
45 330.99 330.99 330.99 330.99 330.99 330.99
47 619.99 619.99 619.99 619.99 619.99 619.99
49 313.19 313.19 313.19 313.19 313.19 313.19
VALORIZACIÓN DE OBRA PRINCIPAL

ÍTEM NOMBRE DE PARTIDA UND CANTIDAD P.U.


01.00.00 MOVIMIENTO DE TIERRAS
01.01.00 EXCAVACIÓN DE ZANJAS M3 1,500.00 40.00
01.02.00 RELLENO CON MATERIAL PROPIO M3 500.00 30.00
01.03.00 ELIMINACIÓN DE MATERIAL M3 1,000.00 10.00
02.00.00 CONCRETO SIMPLE
02.01.00 DADO DE CONCRETO M3 1,000.00 250.00
COSTO DIRECTO
GASTOS GENERALES 10%
FIJOS (4%)
VARIABLES (6%)
UTILIDAD 10%
SUBTOTAL DE OBRA
I.G.V. 18%
COSTO TOTAL DE OBRA
ANTERIOR ACUMULADO ACTUAL ACTUAL ACUMULADO SALDO

PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO PARCIAL METRADO

60,000.00 - 350.00 14,000.00 350.00 14,000.00 1,150.00


15,000.00 - 30.00 900.00 30.00 900.00 470.00
10,000.00 - - - - 1,000.00

250,000.00 - - - - 1,000.00
335,000.00 - 14,900.00 14,900.00
33,500.00 - 1,490.00 1,490.00

33,500.00 - 1,490.00 1,490.00


402,000.00 - 17,880.00 17,880.00
72,360.00 - 3,218.40 3,218.40
474,360.00 - 21,098.40 21,098.40
SALDO

PARCIAL

46,000.00
14,100.00
10,000.00

250,000.00
320,100.00
32,010.00

32,010.00
384,120.00
69,141.60
453,261.60