PRODUCTO FINAL 1 2 3 4

A 33 33 33 40
B 17 17 17 13

PRODUCTO FINAL man obra (horas/und)


A 0.95
B 1.85

CEN DE TRABAJO % UTILIZACION 1 2 3


100 60.30% 37.87 37.87 37.87
200 30.40% 19.09 19.09 19.09
300 9.30% 5.84 5.84 5.84

TOTALES 62.80 62.80 62.80

37.87 37.87 37.87


19.0912 19.0912 19.0912
5.8404 5.8404 5.8404

62.80 62.80 62.80


5 6 7 8 9
40 40 30 30 30
13 13 25 25 25

PERIODOS
4 5 6 7 8
37.42 37.42 37.42 45.07 45.07
18.86 18.86 18.86 22.72 22.72
5.77 5.77 5.77 6.95 6.95

62.05 62.05 62.05 74.75 74.75

37.42 37.42 37.42 45.07 45.07


18.8632 18.8632 18.8632 22.724 22.724
5.77065 5.77065 5.77065 6.95175 6.95175

62.05 62.05 62.05 74.75 74.75


10 11 12 13 TOTAL
37 37 37 37 457
27 27 27 27 273

9 10 11 12 13 HORAS TOTALES % UTILIZACION = TIEMPO QU


45.07 51.32 51.32 51.32 51.32 566.34
22.72 25.87 25.87 25.87 25.87 285.52 TIEMPO H/ MOBRA =
6.95 7.91 7.91 7.91 7.91 87.35
HORAS TOTALES = HORAS TO
74.75 85.10 85.10 85.10 85.10 939.20
HORAS TOTALES= HORAS TO

45.07 51.32 51.32 51.32 51.32 566.34


22.724 25.8704 25.8704 25.8704 25.8704 285.52
6.95175 7.9143 7.9143 7.9143 7.9143 87.35

74.75 85.10 85.10 85.10 85.10 939.20


% UTILIZACION = TIEMPO QUE LOS PRODUCTOS A Y B PERMANECESN EN L CENTRO DE TRABAJO

TIEMPO H/ MOBRA = TIEMPO REQUERIDO PARA PRODUCIR A Y B EN DETERMINADO PERIODO EN EL CENTRO DE TRABAJO

HORAS TOTALES = HORAS TOTALES DE MANO DE OBRA DIRECTA REQUERIDOS EN EL CENTRO DE TRABAJO PARA PRODUCIR A Y B

HORAS TOTALES= HORAS TOTALES DE MANO DE OBRA DIRECT REQUERIDAS PARA PROCESAR A Y B EN EL PERIODO 1 EN LOS TRES CENT
PRODUCIR A Y B

DO 1 EN LOS TRES CENTRO DE TRABAJO


PROD FINAL TAMAÑO LOTE OPERACIÓN CEN TRAB
A A 40 1 de 1 100
B B 20 1 de 1 100

COMPONENTES
C C 40 1 de 2 200
2 de 2 300
D D 60 1 de 1 200
E E 100 1 de 1 200
F F 100 1 de1 200

CENT DE TRABAJO 1 2 3
100 23.75 23.75 23.75
200 32.47 32.47 32.47
300 6.6 6.6 6.6

TOTAL 62.82 62.82 62.82

PRODUCTO FINAL 1 2 3
A 33 33 33
B 17 17 17
HORAS ESTAND PREP HORAS EST PREP/UND TIEM CORR HORAS EST/UND
1 0.025 0.025
1 0.05 1.25

1 0.025 0.575
1 0.025 0.175
2 0.033 0.067
2 0.02 0.08
2 0.02 0.0425

4 5 6
18.9 18.9 18.9
35.17 35.17 35.17
8 8 8

62.07 62.07 62.07

4 5 6
40 40 40
13 13 13
HORAS TOTA/UND CEN DE TRABAJ A B
0.05 100 0.05 1.3
1.30 200 0.70 0.55
300 0.2 0
TOTALES 0.95 1.85
0.6
0.2
0.10 A
0.10 C D
0.0625

7 8 9 10 11 12
34 34 34 36.95 36.95 36.95
34.77 34.77 34.77 40.77 40.77 40.77
6 6 6 7.4 7.4 7.4

74.77 74.77 74.77 85.12 85.12 85.12

7 8 9 10 11 12
30 30 30 37 37 37
25 25 25 27 27 27
TIEMPO DE MANO REQUERIDO PARA PROCESAR UNA UNIDAD DE CADA PRODUCTO EN CADA CENTRO D E TRAB

B
D E(2)
F(4)

13
36.95
40.77
7.4

85.12

13 TOTAL
37 457
27 273
CTO EN CADA CENTRO D E TRABAJO
C10 H23 P33
centro de trabajo tiempo total/ud tiempo total/ud tiempo total/ud total
A 2.522 0.95 2.25 5.722
B 6.39 3.528 6.18 16.098
C 1.2644 1.1452 0.4486 2.8582
D 1.1518 0.7178 1.8017 3.6713
E 1.36 0.0832 1.91 3.3532
F 2.034 1.574 2.494 6.102
tiempo total/ ud 14.7222 7.9982 15.0843 37.8047

CENTRO DE TRAB 1 2 3
A 1229 1166.9 1035.09
B 3406.74 3281.4 2867.28
C 607.47 576.126 522.0668
D 759.477 752.277 631.3066
E 717.876 689.74 594.776
F 1265.68 1245.34 1060.562
TOTAL
producto final 1 2 3 4
C10 250 200 220 245
H23 180 200 155 201
P33 190 210 148 225

4 5 HORAS TOTALES USO DEL CENTRO HORAS DISPO


1315.09 1458.44 6204.52 15%
3665.178 4090.5 17311.098 43%
640.8982 735.352 3081.913 8%
831.8513 922.844 3897.7559 10%
779.6732 846.4 3628.4652 9%
1375.854 1541.24 6488.676 16%
40612.4281 100%
5 TOTAL
270 1185
250 986
240 1013
CENTRO DE TRAB A H TIEMPO TOT
100 11.05 5.51 16.56
200 2.14 1.8 3.94
300 2.71 4.47 7.18
400 0.87 1.01 1.88
total 16.77 12.79 29.56

produc final 1 2 3 4 5
A 120 115 118 125 120
H 110 114 108 116 120

CENTRO DE TRAB 1 2 3 4 5 HORAS TOTALES


100 1932.1 1898.89 1898.98 2020.41 1987.2 9737.58
200 454.8 451.3 446.92 476.3 472.8 2302.12
300 816.9 821.23 802.54 857.27 861.6 4159.54
400 215.5 215.19 211.74 225.91 225.6 1093.94
TOTAL 3419.3 3386.61 3360.18 3579.89 3547.2 17293.18

TOTAL
USO DEL CENTROHORAS DISPO
56% 4000 -5737.58
13% 4000 1697.88
24% 4000 -159.54
6% 4000 2906.06
100% 16000
TAMAÑO LOTE OPERACIÓN CEN TRAB HORAS ESTAND PREP
productos finales
1 de 2 A 1.6
W 70 2 de 2 B 0.4
A 60 1 de 1 E 0
Componentes
1 de 2 C 0.7
X 50 2 de 2 A 0.6
J 70 1 de 1 D 1
O 60 1 de 1 E 0.32
1 de 2 B 0
H 45 2 de 2 B 0.24
Y 40 1 de 1 C 0.18
Z 38 1 de 1 A 0
M 50 1 de 1 D 0
1 de 2 E 1.1
P 70 2 de 2 B 0.4

LISTA CAPACIDAD PRODUTO FINAL


W A
centro de trabajo tiempo total/ud tiempo total/ud TOTAL
A 14.647 7.012 21.659
B 4.711 8.7278095238095 13.439
C 4.733 3.319 8.051
D 10.614 7.4142857142857 18.029
E 8.226 9.4471428571429 17.674
tiempo total/ud 42.931 35.919738095238 78.851
HORAS EST PREP/UND TIEM CORR HORAS EST/UND HORAS TOTA/UND PLAN MAESTRO
ctos finales
0.023 3.3 3.323 Producto final
0.006 4 4.006 W
0.000 2.8 2.800 A
mponentes
0.014 1.4 1.414
0.012 1.6 1.612
0.014 2.6 2.614
0.005 3 3.005
0.000 2.8 2.800
0.005 0.5 0.505
0.005 1.9 1.905
0.000 2.7 2.700
0.000 1.6 1.600
0.016 2.2 2.216
0.006 0.7 0.706

CENTRO DE TRABAJO 1 2 3 4

A 12886.217 12434.354 11522.794 10707.8743


B 7251.777 7365.318 6230.703 6162.73714
C 4669.005 4565.120 4133.715 3901.995
D 10458.143 10224.000 9260.143 8739.57143
E 9881.776 9848.343 8620.214 8327.7819
TOTAL 45146.918 44437.135 39767.569 37839.9598

12886.2171428571
7251.77714285714
4669.005
10458.1428571429
9881.77619047619
PLAN MAESTRO DE PRODUCCION (MPS) EN UNIDADES DE PRODUCTO
Periodo
Producto final 1 2 3 4 5 TOTAL
W 650 600 600 530 470 2850
A 480 520 390 420 300 2110

PERIODO
5 Horas totales uso del centro horas disponible sobra/falta

8987.62285714 56538.86285714 28.53


4832.71428571 31843.24952381 16.07
3219.825 20489.66 10.34 horas disponible
7213 45894.85714286 23.16 8h*25dias/mes=200h/mes
6700.54190476 43378.65714286 21.89
30953.7040476 198145.2866667 100.00
oras disponible
h*25dias/mes=200h/mes*50trabajadores =10000horas mano de obra /mes