CADECO 71.18% 14.94% 5.00% 15.00% 10.00% 3.

09%

TRANSFERENC
HERRAMIENT
MAQUINARIA
MATERIALES

IMPUESTO A
BENEFICIOS

GENERALES
SOCIALES
MANO DE

A+B+C+D
GASTOS
UNIDAD
CODIG

A+B+C

UTILIDAD
OBRA

IVA

LA
AS
O DESCRIPCION DEL ITEM

IA
ITEM

1 MODULOS DE OBRAS PRELIMINARES


OP-001 INSTALACION DE FAENAS m2 90.41 80.50 57.30 20.59 13.50 7.92 40.53 31.07 10.56
OP-002 LETRERO DE OBRAS(LONA PVC) m2 157.80 101.00 71.89 25.83 - 9.94 54.97 42.14 14.32
REPLANTEO Y TRAZADO CON EQUIPO
OP-003 m2 2.04 1.03 0.73 0.26 1.50 0.10 0.85 0.65 0.22
TOPOGRÁFICO (ÁREA)
OP-004 REPLANTEO Y TRAZADO LINEAL ml 0.95 2.30 1.64 0.59 1.50 0.23 1.08 0.83 0.28
OP-005 REPLANTEO Y TRAZADO DE CANALES ml 0.75 4.33 3.08 1.11 1.50 0.43 1.68 1.29 0.44
MONTAJE DE CIERRE PERIMETRAL DE
OP-006 m2 17.24 7.00 4.98 1.79 1.80 0.69 5.03 3.85 1.31
PROTECCION CON YUTE
MONTAJE DE CIERRE PERIMETRAL DE
OP-007 m2 47.80 8.75 6.23 2.24 - 0.86 9.88 7.58 2.58
PROTECCION
CINTA CON CALAMINA
DE SEÑALIZACION N 28 A=40
AMARILLA
OP-008 ml 4.00 0.70 0.50 0.18 - 0.07 0.82 0.63 0.21
MM E=50U
2 MÓDULO DEMOLICIONES
DE-001 DEMOLICIÓN DE HORMIGÓN SIMPLE m3 - 168.00 119.58 42.96 - 16.53 52.06 39.91 13.57
DE-002 DEMOLICIÓN DE HORMIGÓN ARMADO m3 - 196.00 139.51 50.13 - 19.28 60.74 46.57 15.83
DE-003 DEMOLICIÓN DE HORMIGÓN CICLOPEO m3 - 39.05 27.80 9.99 150.00 3.84 34.60 26.53 9.02
DE-004 DEMOLICIÓN DE MURO MAMPOSTERIA m3 - 98.00 69.76 25.06 - 9.64 30.37 23.28 7.91
DE-005 DEMOLICIÓN DE MURO DE ADOBE m3 - 56.00 39.86 14.32 - 5.51 17.35 13.30 4.52
DE-006 DEMOLICIÓN DE MURO DE LADRILLO m2 - 25.20 17.94 6.44 - 2.48 7.81 5.99 2.03
DE-007 ROTURA DE ACERAS m2 - 10.35 7.37 2.65 6.00 1.02 4.11 3.15 1.07
DE-008 ROTURA DE ASFALTO m2 - 12.40 8.83 3.17 15.00 1.22 6.09 4.67 1.59
3 MODULO MOVIMIENTO DE TIERRA
MT-001 EXCAVACION CON RETROEXCAVADORA m3 - 2.59 1.84 0.66 15.40 0.25 3.11 2.39 0.81
EXCAVACION MANUAL (0-2 M)SUELO
MT-002 m3 - 28.00 19.93 7.16 - 2.75 8.68 6.65 2.26
BLANDO
EXCAVACION MANUAL (0-2 M)SUELO
MT-003 m3 - 35.00 24.91 8.95 - 3.44 10.85 8.32 2.83
SEMI DURO MANUAL (2-4 M)SUELO
EXCAVACION
MT-004 m3 37.50 70.00 49.83 17.90 - 6.89 27.32 20.94 7.12
SEMI DURO
MT-005 RELLENO Y COMPACTADO MANUAL m3 - 28.00 19.93 7.16 - 2.75 8.68 6.65 2.26
RELLENO Y COMPACTADO CON
MT-006 m3 - 21.00 14.95 5.37 12.22 2.07 8.34 6.39 2.17
COMPACTADORA SALTARINA
MT-007 EXCAVACION CON AGOTAMIENTO m3 - 73.50 52.32 18.80 11.25 7.23 24.46 18.76 6.38
EXCAVACION MANUAL DE ZANJAS(0-2
MT-008 m3 - 56.00 39.86 14.32 - 5.51 17.35 13.30 4.52
M)SUELO SEMI DURO
MT-009 RETIRO DE ESCOMBROS CON VOLQUETA m3 - 5.90 4.20 1.51 40.00 0.58 7.83 6.00 2.04
MT-010 RELLENO CON TIERRA CERNIDA m3 - 35.00 24.91 8.95 - 3.44 10.85 8.32 2.83
RELLENO Y COMPACTADO CON TIERRA
MT-011 m3 72.45 35.00 24.91 8.95 10.47 3.44 23.28 17.85 6.07
(MAT. DE PRESTAMO)
MT-012 ENTIBADO Y APUNTALADO m2 61.00 35.00 24.91 8.95 - 3.44 20.00 15.33 5.21
4 MODULO DE OBRA GRUESA
OG-001 ACERO DE REFUERZO KG 7.19 3.50 2.49 0.90 - 0.34 2.16 1.66 0.56
OG-002 HORMIGON POBRE m3 376.26 227.00 161.58 58.05 6.00 22.33 127.68 97.89 33.27
OG-003 HORMIGON SIMPLE ZAPATAS H-21 m3 735.56 631.00 449.15 161.37 33.60 62.08 310.91 238.37 81.02
HORMIGON SIMPLE LOSA DE
OG-004 m3 610.11 415.00 295.40 106.13 33.60 40.83 225.16 172.62 58.67
CIMENTACION
HORMIGON H-21 PARA VIGA DE
SIMPLE
OG-005 m3 846.06 678.00 482.60 173.39 15.95 66.70 339.41 260.21 88.45
FUNDACIONSIMPLE
HORMIGON H-21 PARA
OG-006 m3 898.76 421.00 299.67 107.67 1.48 41.42 265.50 203.55 69.19
SOBRECIMIENTOS H-21 CICLOPEO H-21
CIMIENTO DE HORMIGON
OG-007 m3 274.20 185.00 131.68 47.31 12.00 18.20 100.26 76.87 26.13
60% PIEDRA DESPL.
CIMIENTO DE HORMIGON CICLOPEO H-180
OG-008 m3 338.35 185.00 131.68 47.31 12.00 18.20 109.88 84.24 28.63
60% PIEDRA DESPL.
SOBRECIMIENTO DE HORMIGON
OG-009 m3 453.61 310.00 220.66 79.28 - 30.50 164.11 125.82 42.76
CICLOPEO
IMPERMEABILIZACION DE
OG-010 m2 22.81 18.50 13.17 4.73 - 1.82 9.15 7.02 2.39
SOBRECIMIENTOS
IMPERMEABILIZACION CON CARTON
OG-011 m2 129.50 37.00 26.34 9.46 - 3.64 30.89 23.68 8.05
ASFALTICO
IMPERMEABILIZACION CON MENBRANA
OG-012 m2 91.74 103.60 73.74 26.49 - 10.19 45.87 35.16 11.95
DE ALUMINIO 3,5 MM CON LAMINA
IMPERMEABILIZACION
OG-013 m2 69.81 12.25 8.72 3.13 - 1.21 14.27 10.94 3.72
ASFALTICA
IMPERMEABILIZACION MURO DE
OG-014 m2 59.59 27.30 19.43 6.98 - 2.69 17.40 13.34 4.53
CONTENCION
MURO CON POLIETILENO
DE LADRILLO DE 6H (24*18*12)
OG-015 m2 50.28 56.00 39.86 14.32 - 5.51 24.90 19.09 6.49
E=12CM
MURO DE LADRILLO DE 6H (24*18*12)
OG-016 m2 53.09 77.70 55.31 19.87 - 7.64 32.04 24.57 8.35
E=15CM
MURO DE LADRILLO DE 6H (24*18*12)
OG-017 m2 67.57 56.00 39.86 14.32 - 5.51 27.49 21.08 7.16
E=18CM
MURO DE LADRILLO DE 3H (24*18*12)
OG-018 m2 29.72 48.30 34.38 12.35 - 4.75 19.43 14.89 5.06
E=8CM
MURO DE LADRILLO GAMBOTE VISTO
OG-019 m2 83.87 74.20 52.82 18.98 - 7.30 35.57 27.27 9.27
E=12CM
MURO DE LADRILLO GAMBOTE VISTO
OG-020 m2 166.41 100.80 71.75 25.78 - 9.92 56.20 43.09 14.64
E=24CM
OG-021 MURO DE ADOBE DE 25CM m2 16.03 52.50 37.37 13.43 - 5.16 18.67 14.32 4.87
OG-022 MURO DE ADOBE DE 40CM m2 50.83 52.50 37.37 13.43 - 5.16 23.89 18.32 6.23
OG-023 MURO DE BLOQUE DE HORMIGON m2 99.81 45.50 32.39 11.64 - 4.48 29.07 22.29 7.58
OG-024 MURO BLOQUE DE VIDRIO BLANCO m2 635.04 96.60 68.76 24.70 - 9.50 125.19 95.98 32.62
OG-025 MURO BLOQUE DE VIDRIO COLOR m2 710.04 96.60 68.76 24.70 - 9.50 136.44 104.60 35.56
MURO DE CONTENCION DE HORMIGON
OG-026 m3 517.61 269.50 191.83 68.92 - 26.51 161.16 123.55 42.00
CICLOPEO
HORMIGON CICLOPEO 50& PIEDRA
OG-027 m3 274.70 222.00 158.02 56.77 12.00 21.84 111.80 85.71 29.13
DESPLAZADORA (1;2;4)
OG-028 MURO DE CONTENCION CON GAVIONES m3 344.71 111.00 79.01 28.39 - 10.92 86.10 66.01 22.44
OG-029 MAMPOSTERIA DE PIEDRA BRUTA m3 364.00 270.50 192.54 69.18 - 26.61 138.42 106.13 36.07
OG-030 MAMPOSTERIA DE PIEDRA CORTADA m3 424.84 300.50 213.90 76.85 - 29.56 156.85 120.25 40.87
OG-031 ESCOLLERADO m3 31.25 73.50 52.32 18.80 - 7.23 27.46 21.06 7.16
OG-032 COLCHONETA DE 4X2X0.30 M m3 420.77 164.50 117.09 42.07 - 16.18 114.09 87.47 29.73
COLUMNA DE MAMPOSTERÍA DE PIEDRA
OG-033 m3 470.64 666.00 474.06 170.32 - 65.52 276.98 212.35 72.18
CORTADA
OG-034 COLUMNA DE LADRILLO 25 X 25 CM ml 49.62 31.45 22.39 8.04 - 3.09 17.19 13.18 4.48
COLUMNA DE LADRILLO GAMBOTE DE
OG-035 ml 111.01 51.80 36.87 13.25 - 5.10 32.70 25.07 8.52
40X40 CM
OG-036 EMPEDRADO m2 18.00 25.90 18.44 6.62 - 2.55 10.73 8.22 2.80
OG-037 BARANDA DE HORMIGÓN ARMADO ml 216.33 234.10 166.63 59.87 8.40 23.03 106.25 81.46 27.69
OG-038 BOTAGUAS DE HORMIGÓN ARMADO ml 74.42 34.70 24.70 8.87 - 3.41 21.92 16.80 5.71
OG-039 BOTAGUAS DE LADRILLO GAMBOTE ml 22.43 38.50 27.40 9.85 - 3.79 15.30 11.73 3.99
CANAL DE HORMIGÓN ARMADO 25X25 e=5
OG-040 ml 49.25 139.00 98.94 35.55 - 13.67 50.46 38.69 13.15
CM
OG-041 DINTEL DE HORMIGÓN ARMADO ml 105.13 154.00 109.62 39.38 - 15.15 63.49 48.68 16.55
OG-042 DINTEL DE LADRILLO ARMADO ml 25.51 28.70 20.43 7.34 - 2.82 12.72 9.75 3.31
OG-043 DINTEL DE MADERA ml 43.05 18.55 13.20 4.74 - 1.82 12.21 9.36 3.18
OG-044 ELEVACIÓN DE CAMARAS DOSIF: 1:3:4 m3 381.73 185.00 131.68 47.31 - 18.20 114.59 87.85 29.86
OG-045 GRADAS DE CEMENTO m2 147.95 105.00 74.74 26.85 - 10.33 54.73 41.96 14.26
OG-046 JUNTA DE DILATACIÓN ml 9.60 3.50 2.49 0.90 - 0.34 2.52 1.94 0.66
OG-047 HORMIGÓN SIMPLE COLUMNA H-21 m3 ### 720.00 512.50 184.13 17.10 70.83 404.97 310.48 105.53
OG-048 HORMIGÓN SIMPLE PARA VIGA H-21 m3 983.87 797.00 567.30 203.83 33.60 78.41 399.60 306.36 104.13
OG-049 HORMIGÓN SIMPLE PARA ENCADENADO m3 ### 583.00 414.98 149.10 15.10 57.35 336.68 258.12 87.74
OG-050 HORMIGÓN SIMPLE PARA ESCALERA m3 ### 790.00 562.32 202.04 15.10 77.72 415.12 318.26 108.18
OG-051 HORMIGÓN SIMPLE LOSA ALIVIANADA m2 163.80 52.00 37.01 13.30 1.48 5.12 40.91 31.36 10.66
OG-052 HORMIGÓN SIMPLE PARA LOSA LLENA m3 ### 569.00 405.01 145.52 15.10 55.98 333.43 255.63 86.89
HORMIGÓN SIMPLE COLUMNA EN
OG-053 m3 ### ### 718.92 258.30 27.15 99.36 496.35 380.53 129.34
ALTURA H-21
HORMIGÓN SIMPLE PARA VIGA EN
OG-054 m3 983.87 899.00 639.91 229.91 43.65 88.44 432.72 331.75 112.76
ALTURA H-21
HORMIGÓN SIMPLE LOSA LLENA EN
OG-055 m3 ### 795.00 565.88 203.32 25.15 78.21 407.22 312.20 106.12
ALTURA H-21
HORMIGÓN SIMPLE MURO DE
OG-056 m3 974.94 755.00 537.41 193.09 15.10 74.27 382.47 293.23 99.67
CONTENCIÓN
LOSA TAPA DE HORMIGON ARMADO
OG-057 m3 ### 814.00 579.41 208.17 33.60 80.08 515.27 395.04 134.27
PARA TANQUE DE AGUA
OG-058 MESÓN DE Hº Aº M2 171.25 111.00 79.01 28.39 - 10.92 60.09 46.07 15.66
OG-059 CORDÓN PARA ACERA DE HORMIGÓN ml 607.26 259.00 184.36 66.24 6.00 25.48 172.25 132.06 44.89
OG-060 LAVANDERÍA DE Hº Aº pza 295.00 231.00 164.43 59.08 - 22.73 115.83 88.81 30.19
PISO DE CEMENTO ENLUCIDO Y
OG-061 m2 59.05 52.50 37.37 13.43 - 5.16 25.13 19.26 6.55
EMPEDRADO
OG-062 CONTRAPISO DE CEMENTO SOBRE LOSA m2 20.31 52.50 37.37 13.43 - 5.16 19.32 14.81 5.03
CUBIERTA DE CALAMINA GALVANIZADA
OG-063 m2 89.96 85.10 60.57 21.76 - 8.37 39.87 30.56 10.39
Nº28
CUBIERTA DE CALAMINA GALVANIZADA
OG-064 m2 76.75 92.10 65.56 23.55 - 9.06 40.05 30.71 10.44
Nº 33
CUBIERTA DE POLICARBONATO E=6 MM
OG-065 m2 229.50 61.95 44.10 15.84 - 6.09 53.62 41.11 13.97
COSTANERA 100X50X15X3 MM
CUBIERTA DE CALAMINA PLASTICA 300
OG-066 m2 124.01 106.50 75.81 27.24 - 10.48 51.60 39.56 13.45
GR
CUBIERTA DE TEJA CERAMICA TIPO
OG-067 m2 148.60 114.80 81.71 29.36 - 11.29 57.87 44.36 15.08
COLONIAL
CUBIERTA DE TEJA CERAMICA TIPO
OG-068 m2 159.62 119.00 84.70 30.43 - 11.71 60.82 46.63 15.85
ESPAÑOLA
OG-069 CUMBRERA DE CALAMINA PLANA Nº 28 ml 50.03 30.80 21.92 7.88 - 3.03 17.05 13.07 4.44
OG-070 CUMBRERA DE CERAMICA ml 24.44 15.40 10.96 3.94 - 1.52 8.44 6.47 2.20
HORMIGON SIMPLE LOSA ALIVIANADA
OG-071 EN UNA DIRECCION (PLATAFORMA) H21 m3 137.62 66.80 47.55 17.08 1.48 6.57 41.57 31.87 10.83
E=20 CM
HORMIGON SIMPLE LOSA ALIVIANADA
OG-072 EN UNA DIRECCION (PLATAFORMA) H21 m3 155.26 69.35 49.36 17.74 1.48 6.82 45.00 34.50 11.73
E=25 CM
OG-073 CONTRAPISO DE CEMENT S/LOSA m2 20.91 55.50 39.50 14.19 0.03 5.46 20.34 15.59 5.30
OG-074 EMBOQULLADO DE CEMENTO BLANCO m2 8.75 17.50 12.46 4.48 - 1.72 6.74 5.16 1.76
MAMPOSTERIA DE PIEDRA CORTADA TIPO
OG-075 m3 418.96 206.00 146.63 52.68 2.19 20.27 127.01 97.37 33.10
A MORT 1:4
REVESTIMIENTO DE GAVIONES CON Hº
OG-076 m3 36.43 30.80 21.92 7.88 2.19 3.03 15.34 11.76 4.00
E=7 CM DOSIF 1:2:3
REVESTIMIENTO DE GAVIONES CON Hº
OG-077 m3 21.08 26.60 18.93 6.80 2.19 2.62 11.73 9.00 3.06
E=4 CM DOSIF 1:2:3
5 MODULA DE OBRA FINA
BAJANTE PLUVIAL CUADRADA 4´´ DE
OF-001 ml 33.10 37.00 26.34 9.46 - 3.64 16.43 12.60 4.28
CALAMINA PLANA N°28 SEC.(10*15 CM)
OF-002 BAJANTE SANITARIA DE PVC 4´´ ml 51.36 22.20 15.80 5.68 - 2.18 14.58 11.18 3.80
OF-003 ALERO m2 93.51 77.00 54.81 19.69 - 7.58 37.89 29.05 9.87
OF-004 CANALETA DE CALAMINA N°28 0.50 MT ml 33.77 55.50 39.50 14.19 - 5.46 22.26 17.07 5.80
OF-005 REVOQUE DE CIELO RASO m2 87.63 81.00 57.66 20.72 - 7.97 38.25 29.32 9.97
OF-006 REVOQUE CIELO RASO SOBRE LOSA m2 10.06 74.00 52.67 18.92 - 7.28 24.44 18.74 6.37
OF-007 REVOQUE INTERIOR DE YESO m2 5.39 59.20 42.14 15.14 - 5.82 19.15 14.68 4.99
OF-008 REVOQUE EXTERIOR m2 21.56 62.90 44.77 16.09 - 6.19 22.73 17.42 5.92
REVOQUE DE CEMENTO SOBRE MURO DE
OF-009 m2 12.12 74.00 52.67 18.92 - 7.28 24.75 18.97 6.45
PIEDRA
REVOQUE CASTIGADO DE CEMENTO
OF-010 m2 15.24 74.00 52.67 18.92 - 7.28 25.22 19.33 6.57
S/LADRILLO
OF-011 REVOQUE CASTIGADO SOBRE CEMENTO SO m2 23.52 100.40 71.46 25.68 - 9.88 34.64 26.56 9.03
OF-012 REVOQUE CAL CEMENTO EXTERIOR SOBRE m2 30.13 81.40 57.94 20.82 - 8.01 29.74 22.80 7.75
OF-013 ENLUCIDO FINO DE CEMENTO m2 34.48 99.50 70.82 25.45 - 9.79 36.01 27.60 9.38
OF-014 ENLUCIDO DE MORTERO IMPERMEABILIZA m2 5.71 20.35 14.49 5.20 - 2.00 7.16 5.49 1.87
OF-015 PROVISION Y COLOCADO DE VIDRIO CATE m2 85.76 18.50 13.17 4.73 - 1.82 18.60 14.26 4.85
OF-016 ENLADRILLADO m2 51.91 35.00 24.91 8.95 - 3.44 18.63 14.28 4.86
OF-017 PISO DE CARPETA DE HORMIGON SIMPLE E=m2 43.65 51.10 36.37 13.07 - 5.03 22.38 17.16 5.83
OF-018 PISO DE CEMENTO SOBRE EMPEDRADO m2 31.33 39.20 27.90 10.03 - 3.86 16.85 12.92 4.39
OF-019 PISO DE CERAMICA CON COLOR (40*40CM) m2 86.08 75.25 53.56 19.24 - 7.40 36.23 27.78 9.44
OF-020 PISO DE CERAMICA TIPO GRANITO SOBRE m2 66.44 52.50 37.37 13.43 - 5.16 26.24 20.11 6.84
OF-021 PISO DE PIEDRA TARIJA m2 82.25 52.50 37.37 13.43 - 5.16 28.61 21.93 7.45
OF-022 PISO DE PORCELANA PULIDO 6MM m2 252.32 77.00 54.81 19.69 - 7.58 61.71 47.31 16.08
OF-023 PISO DE VINIL m2 46.41 42.00 29.90 10.74 - 4.13 19.98 15.32 5.21
OF-024 PISO MACHIMBRE CON ENVIGADO m2 314.36 116.15 82.68 29.70 - 11.43 83.15 63.75 21.67
OF-025 PISO DE PARQUET TAJIBO m2 79.65 66.60 47.41 17.03 - 6.55 32.59 24.98 8.49
OF-026 PISO CON ALFOMFRA m2 113.44 11.10 7.90 2.84 - 1.09 20.46 15.68 5.33
OF-027 PISO CON ALFOMBRA AMERICANA m2 219.18 11.10 7.90 2.84 - 1.09 36.32 27.84 9.46
OF-028 PISO CON ALFOMBRA DE ALTO TRAFICO m2 140.41 11.10 7.90 2.84 - 1.09 24.50 18.78 6.38
OF-029 PISO DE ALFOMBRA TAPIZON m2 49.33 14.80 10.53 3.78 - 1.46 11.99 9.19 3.12
OF-030 PISO ENTABLONADO MADERA QUINA QUIN m2 243.00 61.40 43.70 15.70 - 6.04 55.48 42.53 14.46
OF-031 PISO LAMINADO FLOTANTE COMERCIAL (A m2 129.60 15.70 11.18 4.02 - 1.54 24.31 18.63 6.33
OF-032 REVESTIMIENTO DE CERAMICA CON COLORm2 88.64 85.10 60.57 21.76 - 8.37 39.67 30.41 10.34
OF-033 REVESTIMIENTO DE PIEDRA PIZARRA COR m2 126.00 74.00 52.67 18.92 - 7.28 41.83 32.07 10.90
OF-034 PINTURA LATEX EXTERIOR (DOS MANOS) m2 8.60 16.20 11.53 4.14 - 1.59 6.31 4.84 1.64
OF-035 PINTURA LATEX INTERIOR (DOS MANOS) m2 5.58 13.65 9.72 3.49 - 1.34 5.07 3.88 1.32
OF-036 PINTURA OLEO MATE SINTETICA m2 23.66 22.20 15.80 5.68 - 2.18 10.43 8.00 2.72
OF-037 PINTURA AL ACEITE SOBRE CARPINTERIA m2 26.58 37.00 26.34 9.46 - 3.64 15.45 11.85 4.03
OF-038 PINTURA AL OLEO BRILLO SINTETICA m2 21.90 22.20 15.80 5.68 - 2.18 10.16 7.79 2.65
OF-039 PINTURA ANTOCORROSIVA PARA CUBIERT m2 11.02 14.80 10.53 3.78 - 1.46 6.24 4.78 1.63
OF-040 REMOCIÓN DE DERRUMBES ml 0.90 11.10 7.90 2.84 - 1.09 3.57 2.74 0.93
OF-041 BARNIZ SOBRE MAMPOSTERIA m2 16.54 22.20 15.80 5.68 - 2.18 9.36 7.18 2.44
OF-042 PISO PARQUETON m2 132.02 43.25 30.79 11.06 - 4.25 33.21 25.46 8.65
OF-043 PIRULEADO EXTERIOR m2 3.18 14.00 9.97 3.58 - 1.38 4.82 3.69 1.25
OF-044 PROVISION Y COLOCACION DE VENTANA D m2 461.54 37.00 26.34 9.46 - 3.64 80.70 61.87 21.03
OF-045 PROVISION Y COLOCACION DE VIDRIO E= m2 54.29 18.50 13.17 4.73 - 1.82 13.88 10.64 3.62
OF-046 PROVISION Y COLOCACION E=4MM m2 73.13 18.50 13.17 4.73 - 1.82 16.70 12.81 4.35
OF-047 PROVISION Y COLOCACION E=6MM m2 119.41 18.50 13.17 4.73 - 1.82 23.64 18.13 6.16
OF-048 PROVISION Y COLOCACION DE VIDRIO CA m2 57.87 18.50 13.17 4.73 - 1.82 14.41 11.05 3.76
OF-049 RASGOS Y BUÑAS CON ESTUCO SOBRE MURml 1.39 28.00 19.93 7.16 - 2.75 8.89 6.81 2.32
OF-050 DESVIO TIPO B CON CALAMINA (5 USOS) ml 10.97 37.00 26.34 9.46 - 3.64 13.11 10.05 3.42
6 MODULO INSTALACIONES SANITARIAS
IS -001 CAMARA DE HORMIGON CICLOPEO 40X40 C pza 218.89 350.00 249.13 89.51 - 34.43 141.29 108.33 36.82
IS -002 CAMARA DE HORMIGON CICLOPEO 60X60 C pza 850.47 455.00 323.87 116.36 - 44.76 268.57 205.90 69.99
IS -003 CAMARA DE INSPECCION DE LADRILLO GA pza 237.97 530.25 377.43 135.61 - 52.16 200.01 153.34 52.12
IS -004 CAMARA DE REGISTRO pza 235.32 350.00 249.13 89.51 - 34.43 143.76 110.22 37.46
PROVISION Y COLOCADO DE CAJAN
IS -005 pza 52.75 74.00 52.67 18.92 - 7.28 30.84 23.65 8.04
INTERCEPTORA DE 6x30 CM
PROVISION Y COLOCACION DE
IS -006 pza 203.23 35.00 24.91 8.95 - 3.44 41.33 31.69 10.77
ACCESORIOS PARA BAÑO
IS -007 POZO ABSORBENTE D=12 pza 612.98 504.00 358.75 128.89 - 49.58 248.13 190.23 64.66
PROV. Y COLOC. BASE DE DUCHA DE
IS -008 pza 174.85 68.70 48.90 17.57 - 6.76 47.52 36.43 12.38
FIBRA DE VIDRIO 80x80 CM
PROV. Y COLOC. DE DISPENSADOR DE
IS -009 pza 102.03 6.90 4.91 1.76 - 0.68 17.44 13.37 4.55
JABON LIQUIDO
IS -010 PROV. Y COLOC. DE INODORO TURCO. pza 101.50 227.00 161.58 58.05 - 22.33 85.57 65.60 22.30
IS -011 PROV. Y COLOC. INODORO TANQUE BAJO. pza 598.19 227.00 161.58 58.05 - 22.33 160.07 122.72 41.71
PROV. Y COLOC. DE FRIFO PARA
IS -012 pza 113.43 37.00 26.34 9.46 - 3.64 28.48 21.83 7.42
LAVAPLATOS
PROV. Y COLOC. INODORO TURCO
IS -013 pza 172.01 74.00 52.67 18.92 - 7.28 48.73 37.36 12.70
TANQUE
PROV. ALTO DE LAVANDERIA DE
Y COLOC.
IS -014 pza 384.82 177.00 125.99 45.27 - 17.41 112.57 86.31 29.34
HORMIGON ARMADO
IS -015 PROV. Y COLOC. DE LAVAMANOS pza ### 148.00 105.35 37.85 - 14.56 217.03 166.39 56.56
IS -016 PROV. Y COLOC. LAVAPPLATOS 1 FOSA pza 777.86 148.00 105.35 37.85 - 14.56 162.54 124.62 42.36
PROV. Y COLOC. DE MEZCLADORA PARA
IS -017 pza 568.74 92.50 65.84 23.66 - 9.10 113.98 87.38 29.70
DUCHA
LLAVE DE PASO CORTINA D=4´´(PROV. Y
IS-018 PZA 987.50 4.60 3.27 1.18 - 0.45 149.55 114.66 38.97
COLOC.)
LLAVE DE PASO CORTINA D=3´´(PROV. Y
IS-019 PZA 494.16 4.60 3.27 1.18 - 0.45 75.55 57.92 19.69
COLOC.)
LLAVE DE PASO CORTINA D=2 1/2´´(PROV.
IS-020 PZA 395.72 25.90 18.44 6.62 - 2.55 67.38 51.66 17.56
Y COLOC.)
LLAVE DE PASO CORTINA D=2´´(PROV. Y
IS-021 PZA 293.06 25.90 18.44 6.62 - 2.55 51.99 39.86 13.55
COLOC.)
LLAVE DE PASO CORTINA D=1 1/2´´(PROV.
IS-022 PZA 82.52 25.90 18.44 6.62 - 2.55 20.40 15.64 5.32
Y COLOC.)
LLAVE DE PASO CORTINA D=1´´(PROV. Y
IS-023 PZA 68.11 22.20 15.80 5.68 - 2.18 17.10 13.11 4.46
COLOC.)
LLAVE DE PASO CORTINA D=3/4´´(PROV. Y
IS-024 PZA 80.98 18.50 13.17 4.73 - 1.82 17.88 13.71 4.66
COLOC.)
LLAVE DE PASO CORTINA D=1/2´´(PROV. Y
IS-025 PZA 48.10 18.50 13.17 4.73 - 1.82 12.95 9.93 3.37
COLOC.)
IS-026 MEDIDOR DE AGUA (PROV. Y COLOC.) PZA ### 13.80 9.82 3.53 - 1.36 385.67 295.68 100.50
IS-027 REJILLA DE PISO DE BRONCE PZA 37.00 35.00 24.91 8.95 - 3.44 16.40 12.57 4.27
PROV. Y COLOC. TANQUE DE AGUA DE
IS-028 PZA 650.00 148.00 105.35 37.85 - 14.56 143.36 109.91 37.36
CAPACIDAD
PROV. Y COLOC. 500 LTS
TANQUE DE AGUA DE
IS-029 PZA ### 148.00 105.35 37.85 - 14.56 210.86 161.66 54.95
CAPACIDAD 1000 LTS
IS-030 PROV. COLOC. TINA CON GRIFERIA PZA ### 185.00 131.68 47.31 - 18.20 239.35 183.50 62.37
PROVISION E INSTALACION DE DUCHA
IS-031 PZA 354.87 15.70 11.18 4.02 - 1.54 58.10 44.54 15.14
METALICA
Provisión y Tendido de Tuberia de concreto
IS-032 ml 88.79 77.00 54.81 19.69 - 7.58 37.18 28.50 9.69
D=10"
Provisión y Tendido de Tuberia de concreto
IS-033 ml 134.37 105.00 74.74 26.85 - 10.33 52.69 40.40 13.73
D=12''
Provisión e instalacion de Tuberia de concreto
IS-034 ml 222.91 122.50 87.20 31.33 - 12.05 71.40 54.74 18.61
D=16''
IS-035 Provisión y Tendido de Tuberia de FG 1/2'' ml 29.59 12.21 8.69 3.12 - 1.20 8.22 6.30 2.14
IS-036 Provisión y Tendido de Tuberia de FG 3/4'' ml 36.66 12.21 8.69 3.12 - 1.20 9.28 7.12 2.42
IS-037 Provisión y Tendido de Tuberia de FG 1'' ml 48.96 14.80 10.53 3.78 - 1.46 11.93 9.15 3.11
IS-038 Provisión y Tendido de Tuberia de FG 1 1/2'' ml 73.72 14.80 10.53 3.78 - 1.46 15.64 11.99 4.08
IS-039 Provisión y Tendido de Tuberia de FG 2'' ml 99.08 18.50 13.17 4.73 - 1.82 20.59 15.79 5.37
Provisión y Tendido de Tuberia de Polipropileno
IS-040 ml 30.75 11.10 7.90 2.84 - 1.09 8.05 6.17 2.10
de 1/2'' y Tendido de Tuberia de Polipropileno
Provisión
IS-041 ml 43.54 11.10 7.90 2.84 - 1.09 9.97 7.64 2.60
de 3/4'' y Tendido de Tuberia de Polipropileno
Provisión
IS-042 ml 79.70 12.98 9.24 3.32 - 1.28 15.98 12.25 4.16
de 1''
IS-043 Provisión y Tendido de Tubería de PVC 1/2'' C-9 ml 9.00 11.10 7.90 2.84 - 1.09 4.79 3.67 1.25
IS-044 Provisión y Tendido de Tubería de PVC 2'' C-9 ml 15.67 20.35 14.49 5.20 - 2.00 8.66 6.64 2.26
IS-045 Provisión y Tendido de Tubería de PVC 4'' C-9 ml 56.16 3.70 2.63 0.95 - 0.36 9.57 7.34 2.49
IS-046 Provisión y Tendido de Tubería de PVC 3/4'' E-40 ml 7.51 16.20 11.53 4.14 - 1.59 6.15 4.71 1.60
IS-047 PROVISION Y TENDIDO DE TUBERIA DE PVC ml 17.32 14.80 10.53 3.78 - 1.46 7.18 5.51 1.87
IS-048 PROVISION Y TENDIDO DE TUBERIA DE PVC ml 27.99 20.35 14.49 5.20 - 2.00 10.50 8.05 2.74
IS-049 PROVISION Y TENDIDO DE TUBERIA DE PVC ml 72.60 3.72 2.65 0.95 - 0.37 12.04 9.23 3.14
IS-050 PROVISION Y TENDIDO DE TUBO PVC DESA ml 12.57 10.20 7.26 2.61 - 1.00 5.05 3.87 1.32
IS-051 PROVISION Y TENDIDO DE TUBO PVC DESA ml 19.65 18.50 13.17 4.73 - 1.82 8.68 6.65 2.26
IS-052 PROVISION Y TENDIDO DE TUBO PVC DESA ml 29.90 20.35 14.49 5.20 - 2.00 10.79 8.27 2.81
IS-053 PROVISION Y TENDIDO DE TUBO PVC DESA ml 69.14 25.90 18.44 6.62 - 2.55 18.40 14.10 4.79
7 MODULO INSTALACIONES ELECTRICAS
IE-001 INSTALACION ELECTRICA DE PUNTOS DE ml 112.03 107.50 76.52 27.49 - 10.58 50.12 38.42 13.06
IE-002 INSTALACION ELECTRICA DE PUNTOS DE ml 125.46 94.60 67.34 24.19 - 9.31 48.13 36.90 12.54
IE-003 PROVISION E INSTALACION DE CABLE MON ml 17.51 1.08 0.77 0.28 - 0.11 2.96 2.27 0.77
IE-004 PROVISION E INSTALACION DE CABLE MO ml 11.23 1.06 0.75 0.27 - 0.10 2.01 1.54 0.52
IE-005 PROVISION E INSTALACION DE CABLE MO ml 7.69 1.08 0.77 0.28 - 0.11 1.49 1.14 0.39
IE-006 PROVISION E INSTALACION DE CABLE MO ml 4.77 1.06 0.75 0.27 - 0.10 1.04 0.80 0.27
IE-007 PROVISION E INSTALACION DE CABLE 7 H ml 3.56 1.08 0.77 0.28 - 0.11 0.87 0.67 0.23
PROVISIÓN E INSTALACIÓN DE
IE-008 DISYUNTOR TERMOMAGNÉTICO BIPOLAR PZA 79.50 43.50 30.96 11.12 - 4.28 25.41 19.48 6.62
15 AMP
PROVISIÓN E INSTALACIÓN DE
IE-009 PZA 87.10 43.50 30.96 11.12 - 4.28 26.55 20.35 6.92
DISYUNTOR MAGNETICO BIPOLAR 20 AMP
PROVISIÓN E INSTALACIÓN DE
IE-010 PZA 95.40 43.50 30.96 11.12 - 4.28 27.79 21.31 7.24
DISYUNTOR MAGNETICO BIPOLAR 30 AMP
PROVISIÓN E INSTALACIÓN DE
IE-011 PZA 110.50 43.50 30.96 11.12 - 4.28 30.06 23.04 7.83
DISYUNTOR MAGNETICO BIPOLAR 40 AMP
PROVISIÓN E INSTALACIÓN DE FOCO
IE-012 PZA 17.29 10.00 7.12 2.56 - 0.98 5.69 4.36 1.48
AHORRADOR DE 20W CON SOQUET
PROVISIÓN E INSTALACIÓN DE
IE-013 PZA 130.81 24.40 17.37 6.24 - 2.40 27.18 20.84 7.08
LUMINARIAS FLUORESCENTES 2*20W
PROVISIÓN E INSTALACIÓN DE
IE-014 PZA 123.92 86.00 61.21 21.99 - 8.46 45.24 34.68 11.79
INTERRUPTORES ELÉCTRICOS DOBLES
PROVISIÓN E INSTALACIÓN DE PLACA DE
IE-015 PZA 18.60 29.00 20.64 7.42 - 2.85 11.78 9.03 3.07
INTERRUPTOR SIMPLE
PROVISIÓN E INSTALACIÓN DE PLACA DE
IE-016 PZA 39.00 5.80 4.13 1.48 - 0.57 7.65 5.86 1.99
INTERRUPTOR TRIPLE
IE-017 PUNTO TV PTO 111.46 95.33 67.86 24.38 - 9.38 46.26 35.47 12.06
IE-018 PUNTO TELÉFONO PTO 72.05 101.71 72.40 26.01 - 10.01 42.33 32.45 11.03
8 MODULO VIAS URBANAS
VU-001 ACERA DE CEMENTO Y EMPEDRADO m2 58.87 110.60 78.73 28.29 - 10.88 43.10 33.05 11.23
VU-002 APLICACIÓN DE TERMOPLASTICO E=2MM m2 149.70 28.20 20.07 7.21 27.00 2.77 35.24 27.02 9.18
BACHEO CON PROVISIÓN DE CEMENTO
VU-003 m2 83.98 8.21 5.84 2.10 13.65 0.81 17.19 13.18 4.48
ASFÁTICO ESPESOR=5CM
CORDÓN DE HORMIGÓN SIMPLE PARA
VU-004 m2 17.46 14.00 9.97 3.58 14.80 1.38 9.18 7.04 2.39
JARDINERA (15*25*50 CM)
CORDÓN PARA ACERA DE HORMIGÓN
VU-005 m2 56.99 35.00 24.91 8.95 - 3.44 19.39 14.87 5.05
SIMPLE (20*40
PROVISIÓN DECM)
CAPA BASE PARA BACHES
VU-006 PROFUNDOS E=30 CM (CONFORMACIÓN Y m2 44.40 8.97 6.38 2.29 1.72 0.88 9.70 7.43 2.53
PROVISIÓN
NIVELACIÓN)DE CAPA BASE PARA BACHES
VU-007 PROFUNDOS E=30 CM (CONFORMACIÓN Y m2 48.84 5.77 4.11 1.48 2.66 0.57 9.51 7.29 2.48
PROVISIÓN
NIVELACIÓN Y SUELO
COLOCACIÓN DE
CEMENTO)
VU-008 SEÑALIZACIÓN DIRECCIONAL NO pza 33.06 24.95 17.76 6.38 25.00 2.45 16.44 12.60 4.28
REFLECTIVA
PROVISIÓN Y DE 60*20 CM DE OJOS DE
COLOCACIÓN
VU-009 pza 13.30 4.90 3.49 1.25 15.00 0.48 5.76 4.42 1.50
GATO
PROVISIÓN Y COLOCACIÓN DE
VU-010 SEÑALIZACIÓN HORIZONTAL m2 38.54 3.25 2.31 0.83 3.00 0.32 7.24 5.55 1.89
REFLECTIVA
PROVISIÓN Y COLOCACIÓN DE
VU-011 SEÑALIZACIÓN VERTICAL DE 2 COLORES pza 633.15 35.00 24.91 8.95 1.78 3.44 106.09 81.33 27.64
60*60* Y 75*50
PROVISIÓN GRADO DIAMANTE
Y COLOCACIÓN DE
SEÑALIZACIÓN
VU-012 PROVISIÓN VERTICAL NO
Y COLOCACIÓN DE pza 340.45 35.00 24.91 8.95 1.78 3.44 62.18 47.67 16.20
REFLECTIVA 60*60
SEÑALIZACIÓN Y 75*50 LÁMINA
VERTICAL
VU-013 PROVISIÓN Y COLOCACIÓN DE pza 703.23 15.00 10.68 3.84 - 1.48 110.13 84.44 28.70
AUTOADHESIVA NO REFLECTIVA 80*80 Y
VU-014 SEÑALIZACIÓN VERTICAL GRADO pza 865.49 85.49 60.85 21.86 3.55 8.41 156.85 120.25 40.87
80*40
9DIAMANTE 90*60 CMY3CARRETERAS
MODULO CAMINOS COLORES
CC-001 EXCAVACIÓN NO CLASIFICADA m3 - 1.81 1.29 0.46 18.09 0.18 3.27 2.51 0.85
CC-002 EXCAVACIÓN EN ROCA m3 30.70 5.30 3.77 1.36 55.31 0.52 14.54 11.15 3.79
CONFORMACIÓN DE TERRAPLEN (SIN
CC-003 m3 - 4.41 3.14 1.13 29.27 0.43 5.76 4.41 1.50
MATERIAL)
CC-004 REMOCIÓN DE DERRUMBES m3 - 1.73 1.23 0.44 17.08 0.17 3.10 2.38 0.81
CC-005 SOBRECARREO Y TERRAPLENES m3 - 0.25 0.18 0.06 2.63 0.02 0.47 0.36 0.12
CC-006 MEJORAMIENTO DE SUBRASANTE m3 - 2.98 2.12 0.76 29.88 0.29 5.41 4.14 1.41
PROVISIÓN Y COLOCACIÓN DE CAPA SUB-
CC-007 m3 82.00 2.68 1.91 0.69 22.09 0.26 16.44 12.61 4.29
BASE
PROVISIÓN Y COLOCACIÓN DE CAPA
CC-008 m2 35.10 8.22 5.85 2.10 47.41 0.81 14.92 11.44 3.89
BASE E=20CM
CC-009 IMPRIMACIÓN BITUMINOSA m2 9.81 0.17 0.12 0.04 0.64 0.02 1.62 1.24 0.42
CC-010 TRATAMIENTO SUPERFICIAL DOBLE m2 28.04 1.08 0.77 0.28 7.74 0.11 5.70 4.37 1.49
BERMAS TRATAMIENTO SUPERFICIAL
CC-011 m2 10.83 0.90 0.64 0.23 3.85 0.09 2.48 1.90 0.65
SIMPLE
CARPETA ASFÁLTICA CONVENCIONAL
CC-012 m3 ### 15.09 10.74 3.86 117.94 1.48 286.81 219.89 74.74
(SIN TRANSPORTE)
CC-013 HORMIGON PARA PAVIMENTO RÍGIDO m3 574.81 378.00 269.06 96.67 33.40 37.19 208.37 159.75 54.30
DEFENSA METÁLICA FLEXIBLE TIPO FLEX
CC-014 pza 556.80 35.00 24.91 8.95 - 3.44 94.37 72.35 24.59
´BEAM
CC-015 SEÑAL REGLAMENTARIA pza 816.59 35.00 24.91 8.95 - 3.44 133.33 102.22 34.75
CC-016 SEÑAL PREVENTIVA pza 816.59 35.00 24.91 8.95 - 3.44 133.33 102.22 34.75
SEÑALIZACIÓN HORIZONTAL PINTADO DE
CC-017 m2 3.15 0.59 0.42 0.15 0.96 0.06 0.80 0.61 0.21
CALZADA ANCHO=10CM
LOSA DE HORMIGON DE 20CM PARA
CC -019 m2 146.11 24.32 17.31 6.22 1.68 2.39 29.70 22.77 7.74
PAVIMENTO RIGIDO (SIN
LOSA DE HORMIGON PASAJUNTAS)
DE 20CM PARA
CC - 020 PAVIMENTO RIGIDO (CON PASAJUNTAS, m2 183.77 27.83 19.81 7.12 12.34 2.74 38.04 29.16 9.91
CC - 021 TRANSVERSALES Y LONGITUDINALES)
RELLENO CON MATERIAL GRANULAR m3 62.23 52.50 37.37 13.43 - 5.16 25.60 19.63 6.67
10 MODULO AREA DEPORTIVA
AD- 001 MALLA OLIMPICA C/TUBOFG2" C/2,5M m2 141.28 33.30 23.70 8.52 - 3.28 31.51 24.16 8.21
AD -002 PELDAÑOS DE H°C° EN GRADERIAS m3 455.71 329.00 234.18 84.14 - 32.37 170.31 130.57 44.38
LOSA DE HORMIGON SIMPLE PARA
AD- 003 m2 83.09 35.00 24.91 8.95 - 3.44 23.31 17.87 6.07
CANCHA CON MALLA DE ACERO H=10CM
PINTADO DE LINEAS CANCHA DE
AD -004 pza 240.27 296.00 210.69 75.70 - 29.12 127.77 97.95 33.29
BALONCESTO
11 MODULO AREAS VERDES
AV-001 PROVISION Y COLOCADO DE TEPE m2 33.30 11.50 8.19 2.94 - 1.13 8.56 6.56 2.23
PROVISION Y COLOCADO DE CESPED
AV-002 m2 238.10 34.50 24.56 8.82 - 3.39 46.41 35.58 12.09
SINTETICO
AV-003 REMOCION DE TEPE m2 - 17.50 12.46 4.48 - 1.72 5.42 4.16 1.41
AV-004 AREA VERDE CIB RAY-GRASS m2 37.85 34.50 24.56 8.82 - 3.39 16.37 12.55 4.27
12 MODULO
PROV OBRAS
Y COLOC HIDRAULICAS
DE SILLARES A
OH-001 (30X4X60)H=40CM
SILLARES TIPO A EXTRACCION YCON
MORTERO 1:3 m2 533.70 135.80 96.66 34.73 - 13.36 122.14 93.64 31.83
ADITIVO ACELERANTE
SUSTITUCION DE FRAGUADO
H=0,30M CON ADITIVO
OH-002 m2 429.90 157.50 112.11 40.28 - 15.49 113.29 86.86 29.52
ACELERANTE DE FRAGUADO EXCENTO
PROV Y COLOC DE SILLARES TIPO
DE CLORUROS
B(30x30x40) MORTERO DOSIF 1:3 H=0,30M
OH-003 m2 421.88 135.80 96.66 34.73 - 13.36 105.36 80.78 27.46
CON ADITIVO ACELERANTE DE
FRAGUADO EXCENTO DE CLORUROS
EMBOQUILLADO DENTRO DE GALERIAS
OH-004 m2 124.39 42.00 29.90 10.74 - 4.13 31.67 24.28 8.25
CON ADITIVO ADHESIVO
6.96

PRECIO
PRECIO
UNITARIO
UNITARIO
($U$)

352.39 50.63
477.89 68.66
7.39 1.06
9.39 1.35
14.60 2.10
43.69 6.28
85.91 12.34
7.10 1.02

452.62 65.03
528.05 75.87
300.82 43.22
264.03 37.93
150.87 21.68
67.89 9.75
35.71 5.13
52.97 7.61

27.06 3.89
75.44 10.84
94.29 13.55
237.49 34.12
75.44 10.84
72.51 10.42
212.69 30.56
150.87 21.68
68.06 9.78
94.29 13.55
202.43 29.08
173.84 24.98

18.81 2.70
1,110.07 159.49
2,703.06 388.37
1,957.52 281.25
2,950.77 423.96
2,308.23 331.64
871.65 125.24
955.30 137.26
1,426.73 204.99
79.59 11.44
268.56 38.59
398.75 57.29
124.04 17.82
151.26 21.73
216.44 31.10
278.57 40.02
238.99 34.34
168.88 24.27
309.28 44.44
488.58 70.20
162.35 23.33
207.73 29.85
252.74 36.31
1,088.40 156.38
1,186.21 170.43
1,401.08 201.30
971.98 139.65
748.58 107.55
1,203.45 172.91
1,363.62 195.92
238.77 34.31
991.91 142.52
2,408.06 345.98
149.44 21.47
284.32 40.85
93.25 13.40
923.77 132.73
190.54 27.38
132.98 19.11
438.71 63.03
552.00 79.31
110.59 15.89
106.12 15.25
996.23 143.14
475.82 68.37
21.95 3.15
3,520.82 505.87
3,474.10 499.15
2,927.08 420.56
3,609.00 518.53
355.64 51.10
2,898.83 416.50
4,315.23 620.00
3,762.01 540.52
3,540.36 508.67
3,325.18 477.76
4,479.71 643.64
522.37 75.05
1,497.53 215.16
1,007.05 144.69
218.45 31.39
167.93 24.13
346.59 49.80
348.22 50.03
466.19 66.98
448.65 64.46
503.08 72.28
528.76 75.97
148.22 21.30
73.36 10.54
361.37 51.92

391.24 56.21
176.83 25.41
58.56 8.41
1,104.21 158.65
133.34 19.16
102.01 14.66

142.85 20.52
126.79 18.22
329.39 47.33
193.56 27.81
332.50 47.77
212.49 30.53
166.52 23.93
197.58 28.39
215.17 30.92
219.24 31.50
301.16 43.27
258.60 37.15
313.03 44.98
62.27 8.95
161.68 23.23
161.99 23.27
194.59 27.96
146.47 21.04
314.99 45.26
228.09 32.77
248.70 35.73
536.50 77.08
173.68 24.95
722.88 103.86
283.30 40.70
177.84 25.55
315.74 45.36
213.01 30.61
104.20 14.97
482.31 69.30
211.31 30.36
344.87 49.55
363.68 52.25
54.86 7.88
44.05 6.33
90.66 13.03
134.35 19.30
88.37 12.70
54.24 7.79
31.08 4.47
81.38 11.69
288.69 41.48
41.86 6.02
701.57 100.80
120.64 17.33
145.21 20.86
205.56 29.53
125.31 18.00
77.25 11.10
113.99 16.38

1,228.40 176.49
2,334.92 335.48
1,738.90 249.84
1,249.83 179.57
268.16 38.53
359.32 51.63
2,157.23 309.95
413.11 59.35
151.65 21.79
743.94 106.89
1,391.66 199.95
247.61 35.58
423.68 60.87
978.70 140.62
1,886.84 271.10
1,413.13 203.04
990.90 142.37
1,300.18 186.81
656.82 94.37
585.83 84.17
451.95 64.94
177.39 25.49
148.63 21.36
155.45 22.33
112.57 16.17
3,353.01 481.75
142.55 20.48
1,246.39 179.08
1,833.23 263.40
2,080.93 298.98
505.08 72.57
323.24 46.44
458.12 65.82
620.73 89.18
71.48 10.27
80.70 11.60
103.72 14.90
136.01 19.54
179.05 25.73
70.01 10.06
86.68 12.45
138.91 19.96
41.64 5.98
75.26 10.81
83.21 11.95
53.44 7.68
62.46 8.97
91.33 13.12
104.70 15.04
43.87 6.30
75.47 10.84
93.82 13.48
159.94 22.98

435.72 62.60
418.48 60.13
25.74 3.70
17.50 2.51
12.94 1.86
9.08 1.30
7.55 1.09
220.87 31.73

230.78 33.16

241.61 34.71

261.30 37.54

49.49 7.11

236.32 33.95

393.30 56.51

102.39 14.71

66.49 9.55
402.19 57.79
367.98 52.87

374.74 53.84
306.41 44.02
149.44 21.47

79.79 11.46
168.61 24.23
84.31 12.11
82.71 11.88
142.93 20.54
50.11 7.20
62.93 9.04

922.30 132.51

540.59 77.67
957.49 137.57
1,363.63 195.92

28.47 4.09
126.44 18.17
50.05 7.19
26.93 3.87
4.10 0.59
46.99 6.75
142.96 20.54
129.75 18.64
14.09 2.02
49.57 7.12
21.57 3.10
2,493.54 358.27
1,811.55 260.28
820.41 117.88
1,159.20 166.55
1,159.20 166.55
6.95 1.00

258.25 37.11

330.72 47.52
222.60 31.98

273.96 39.36
1,480.66 212.74
202.65 29.12
1,110.80 159.60

74.41 10.69
403.45 57.97
47.15 6.77
142.31 20.45

1,061.86 152.57
984.96 141.52

916.03 131.61

275.37 39.56