Está en la página 1de 2

COLECTORES DE CLOACAS

COTA TERRENO: COTA CARPETA ASFALTICA TUBERIA PVC JUNTA AUTOMATICA - NORMA DIN 8061 : Øe 200 mm (Ext.) - Øi 192 mm (Int.)

TRAMO L Emp. GASTOS (lps) Øe Øi S Vc C TERRENO RASANTE BANQUEOS Vr Hr hr ANCHO TIPO B.V. CLASE
(m.) (Un) Qa Qp Qi Qt mm mm º/oo (m/s) (lps) ARRIBA ABAJO ARRIBA ABAJO ARRIBA ABAJO (m/s) (m) (m) ZANJA APOYO ARRIB. TUB.
A.1 - A2 108.00 8 - 10.00 0.036 10.036 200 192.00 0.0030 0.603 17.45 199.90 199.00 196.93 196.60 2.97 2.40 0.627 0.106 0.09 0.60 C Ia
A2 - B2 110.00 10 10.036 14.000 0.039 24.075 200 192.00 0.0080 0.984 28.50 199.00 198.00 196.51 195.63 2.49 2.37 1.103 0.136 0.11 0.60 C Ia
A.2 - B1 100.00 9 - 11.000 0.035 11.035 200 192.00 0.0030 0.603 17.45 199.82 198.70 197.01 196.71 2.81 1.99 0.633 0.109 0.08 0.60 C Ia
B1 - B2 120.00 10 11.035 12.000 0.041 23.076 200 192.00 0.0080 0.984 28.50 198.70 198.00 196.62 195.66 2.08 2.34 1.093 0.132 0.14 0.60 C Ia
B2 - C2 80.00 8 47.151 11.000 0.029 58.180 315 299.40 0.0040 0.936 65.90 198.00 197.60 195.52 195.20 2.48 2.40 1.048 0.219 1.00 C Ia
518.00 45 58.000 0.151 58.151

Long. Emp = 5.80 m Vr/Vc H/D


Qa: GASTO TRAMO (S) AGUAS ARRIBA S: PENDIENTE (POR MIL) 1.04 0.55
Qp: GASTO PROPIO DEL TRAMO C: GASTO A SECCION PLENA 1.12 0.71
Qi: GASTO DE INFILTRACION EN EL TRAMO Vc: VELOCIDAD A SECCION PLENA 1.05 0.57
Qt: GASTO TOTAL DEL TRAMO hr: ESCALON EN B.V. 1.11 0.69
Hr: Tirante de agua 1.12 0.73
A.2
1 10 m
12 m 11 lps
A.1 Vr/Vc H/D
10 lps 12 lps 120.00 0.87 0.38
1.05 0.57
2 14 lps 0.92 0.42
EXISTENTE 1.04 0.55
A B C 1.12 0.73
110.00 80.00

TRAMO L Emp. GASTOS (lps) Øe Øi S Vc C TERRENO RASANTE BANQUEOS Vr Hr hr ANCHO TIPO B.V. CLASE
(m.) (Un) Qa Qp Qi Qt mm mm º/oo (m/s) (lps) ARRIBA ABAJO ARRIBA ABAJO ARRIBA ABAJO (m/s) (m) (m) ZANJA APOYO ARRIB. TUB.
A.1 - A2 108.00 8 - 10.00 0.036 10.036 200 192.00 0.0120 1.206 34.91 199.90 199.00 198.69 197.39 1.21 1.61 1.049 0.073 0.11 0.60 C II
A2 - B2 110.00 10 10.036 14.000 0.039 24.075 200 192.00 0.0150 1.348 39.03 199.00 198.00 197.28 195.63 1.72 2.37 1.415 0.109 0.11 0.60 C Ia
A.2 - B1 100.00 9 - 11.000 0.035 11.035 200 192.00 0.0100 1.101 31.87 199.82 198.70 198.53 197.53 1.29 1.17 1.013 0.081 0.10 0.60 C II
B1 - B2 120.00 10 11.035 12.000 0.041 23.076 200 192.00 0.0150 1.348 39.03 198.70 198.00 197.43 195.63 1.27 2.37 1.402 0.106 0.11 0.60 C II
B2 - C2 80.00 8 47.151 11.000 0.029 58.180 315 299.40 0.0040 0.936 65.90 198.00 197.60 195.52 195.20 2.48 2.40 1.048 0.219 1.00 C Ia
518.00 45 58.000 0.151 58.151
COMPUTOS METRICOS COLECTORES Y EMPOTRAMIENTOS

Ø 200 mm EXC. MAQ. EXC. MAN EXC. MAN. B.V. CONC. B.V. CIL CONOS A CARGA MAR. TAPA DEM. PAV. EXC. EMP. EXC. EMP. Ø 160 mm CARGA RELLENO CARGA
(m) (m³) (m³) (m³) (m³) (m) (Pza) COL. (m³) (Pza) (m³) MAN. (m²) MAQ. (m²) (m) EMP.(m³) (m³) TOT.(m³)
108.00 170.79 6.48 3.79 0.938 - 1.00 5.19 1.00 4.61 39.58 46.40 1.81 218.25 6.99
110.00 157.08 6.60 3.17 0.938 - 1.00 5.25 1.00 5.76 45.79 58.00 2.26 210.90 7.50
100.00 141.19 6.00 3.59 0.938 0.31 1.00 5.45 1.00 5.18 40.87 52.20 2.03 189.35 7.48
120.00 155.23 7.20 2.65 0.938 0.31 1.00 6.08 1.00 5.76 42.57 58.00 2.26 205.07 8.34
80.00 191.20 8.00 1.67 4.61 46.40 1.81
518.00 815.50 34.28 14.87 3.75 0.61 4.00 21.97 4.00 - 25.92 168.80 261.00 10.16 823.57 30.32