Está en la página 1de 9

OPERADOR A OPERADOR C OPERADOR D

PARTES
1 2 1 2 1 2
1 2.102 2.101 2.102 2.102 2.101 2.100
2 2.106 2.107 2.106 2.105 2.107 2.108
3 2.109 2.109 2.109 2.110 2.108 2.109
4 2.110 2.106 2.110 2.106 2.106 2.106
5 2.107 2.105 2.109 2.107 2.108 2.110
6 2.103 2.103 2.105 2.104 2.106 2.103
7 2.107 2.111 2.109 2.106 2.108 2.107
8 2.106 2.105 2.106 2.108 2.106 2.107
9 2.104 2.107 2.107 2.104 2.105 2.107
10 2.107 2.108 2.103 2.106 2.106 2.104

P 6 7 8 9 10
d2 2.67 2.83 2.96 3.08 3.18
ANOVA
PROMEDIO PARTES
2.101 MAX= 2.109
2.107 MIN= 2.101
2.109
2.107 R= 0.008
2.108
2.104 varianza de la parte= R/d2 0.0024109
2.108
2.106
2.106
2.106
OPERADOR A OPERADOR C OPERADOR D
PARTES
1 2 1 2 1
1 2.102 2.101 2.102 2.102 2.101
2 2.106 2.107 2.106 2.105 2.107
3 2.109 2.109 2.109 2.110 2.108
4 2.110 2.106 2.110 2.106 2.106
5 2.107 2.105 2.109 2.107 2.108
6 2.103 2.103 2.105 2.104 2.106
7 2.107 2.111 2.109 2.106 2.108
8 2.106 2.105 2.106 2.108 2.106
9 2.104 2.107 2.107 2.104 2.105
10 2.107 2.108 2.103 2.106 2.106
Totales operad 42.123 42.124 42.122
TOTALES AL CUADR 1,774.347 1,774.431 1,774.263

SCT 266.152-(123.369)^2/60 0.00036765


SCT= 0.00037
CMT 6.23135593E-06

SC OPER 9.99999088E-08
SC PART 0.00026215
SC OPERPART 4.09000002E-05
SC ERROR 6.44999999E-05
SC ERROR

ANOVA
FV SC GL CM F0 FCRIT
OPERADOR 9.99999088E-08 2 4.9999954E-08 0.02325579 3.3158295
PARTE 0.00026215 9 2.9127778E-05 13.5478036 2.21069698
OPERADPARTE 4.09000002E-05 18 2.2722222E-06 0.02325579 1.96011591
ERROR 6.44999999E-05 30 2.15E-06
TOTAL 0.00037 59 6.2711864E-06
FV SC GL CM FD FCRIT

OPERADOR 9.9999E-08 2 5E-08 0.023 3.316


PARTE 0.00026215 9 2.91278E-05 13.265 2.211
ERROR 0.00011 48 2.19583E-06
TOTAL 0.00037 59 6.1275E-06

varianza inst CME 2.19X10 A LA MENOS 6

varianza oper FORMULAS EN PAG 69 〖𝐶𝑀〗 _𝑂𝑃𝐸𝑅− 〖𝐶𝑀𝐸〗 _ /(𝑇∗𝑃)

varianza parte

varianza total
OPERADOR D
2 Totales partes
2.100 12.608 158.962
2.108 12.639 159.744
2.109 12.654 160.124
2.106 12.644 159.871
2.110 12.646 159.921
2.103 12.624 159.365
2.107 12.648 159.972
2.107 12.638 159.719
2.107 12.634 159.618
2.104 12.634 159.618
42.122 126.369 1,596.914 Eyj^2
1,774.263

y^2 del total partes= 15,969.124161


n= 60

desaparece y se le
suma al error el q
desaparece y te toca
hacer nuevas
huevadas FUENTE VARIANZA

REPETIBILIDAD 2.19*10^-6
REPRODUCIBILIDAD 1.07*10^-7
SUMA DE LOS DE
RYR ARRIBA
DE LAS VARIANAAS
PARTE SACADAS
TOTAL ES ES ESE CM TOTAL

𝐸〗 _ /(𝑇∗𝑃)
4.418404 4.414201 4.418404 4.418404 4.414201
4.435236 4.439449 4.435236 4.431025 4.439449
4.447881 4.447881 4.447881 4.452100 4.443664
4.452100 4.435236 4.452100 4.435236 4.435236
4.439449 4.431025 4.447881 4.439449 4.443664
4.422609 4.422609 4.431025 4.426816 4.435236
4.439449 4.456321 4.447881 4.435236 4.443664
4.435236 4.431025 4.435236 4.443664 4.435236
4.426816 4.439449 4.439449 4.426816 4.431025
4.439449 4.443664 4.422609 4.435236 4.435236
EYijk^2=

OPERPARTES
OPERARIOA OP2 OP3 OP1^2
4.203 4.204 4.201 17.665209
4.213 4.211 4.215 17.749369
4.218 4.219 4.217 17.791524
4.216 4.216 4.212 17.774656
4.212 4.216 4.218 17.740944
4.206 4.209 4.209 17.690436
4.218 4.215 4.215 17.791524
4.211 4.214 4.213 17.732521
4.211 4.211 4.212 17.732521
4.215 4.209 4.210 17.766225

% DE
VARIACION
CON
RESPECTO A
% LA INDICE DE
DESVESTAN 5.15*DESV.E CONTRIBUCION DESVIACION TOLERANCI
DAR ST DE LA VARIANZA ESTANDAR A %
RAICES DE
LA LO DE VARIANZA/VARI DESVIAC/DE
IZQUIERDA ARRIBA ANZA TOTAL SVTOTAL PAG 70
COLOCAS EN %
4.410000
4.443664
4.447881
4.435236
4.452100
4.422609
4.439449
4.439449
4.439449
4.426816
266.152

OP2^2 OP3^2
17.673616 17.648401
17.732521 17.766225
17.799961 17.783089
17.774656 17.740944
17.774656 17.791524
17.715681 17.715681
17.766225 17.766225
17.757796 17.749369
17.732521 17.740944
17.715681 17.724100
532.3047

También podría gustarte