Documentos de Académico
Documentos de Profesional
Documentos de Cultura
0.270% 12,852.00
0.162% 7,711.20
0.027% 1,285.20
0.081% 3,855.60
0.016% 771.12
0.027% 1,285.20
0.016% 771.12
0.328% 15,628.89
0.095% 4,507.86
1.022% 48,668.19
0.00096 4,569.60
0.00240 11,424.00
0.00004 182.78
0.00005 228.48
0.00038 1,827.84
0.00144 6,854.40
0.00
0.00014 685.44
0.00032 1,521.68
0.00117 5,558.92
0.00690 32,853.14
0.00020 952.00
0.00020 952.00
0.00032 1,523.20
0.00072 3,427.20
0.00072 3,427.20
0.00115 5,483.52
0.00024 1,142.40
0.00024 1,142.40
0.00012 571.20
0.00010 456.96
0.00024 1,164.24
0.00048 2,284.80
0.00014 685.44
0.00344 16,358.16
0.00016 761.60
0.00032 1,523.20
0.00048 2,284.80
0.00002 114.24
0.00060 2,856.00
0.00010 495.04
0.00014 666.40
0.00084 4,017.44
2.28% 113,206.68
(%) Costos Indirectos = (%) Costo Indirecto de Oficna Central + (%) Costo Indirecto de Campo
$ 5,859,086.80
$ 585,908.68
$ 585,908.68
175,772.60
$
410,136.08
7.00%
1 2 3
CONCEPTO
JULIO AGOSTO SEPTIEMBRE
EGRESOS
Materiales 928,200.00 618,800.00 618,800.00
Mano de Obra 71,400.00 107,100.00 178,500.00
Maquinaria o Equipo 95,200.00 142,800.00 238,000.00
Herramientas y mandos medios
Costo Directo 1,094,800.00 868,700.00 1,035,300.00
Costo Indirecto 255,954.28 203,094.16 242,043.72
Costo Directo + Costo Indirecto 1,350,754.28 1,071,794.16 1,277,343.72
EGRESOS ACUMULADOS 1,350,754.28 2,422,548.44 3,699,892.16
INGRESOS
Planilla de Obra 1,489,781.50
Amortización del Anticipo 446,934.45
Planilla con Anticipo Amortizado 1,042,847.05
Anticipos (10% +20%) 1,958,639.25
INGRESO ACUMULADO 1,958,639.25 1,958,639.25 3,001,486.30
0.0305
2.196
30 DIAS 7 DIAS
PERIODO DE TRABAJO ELABORACION DE PLANILLA
30
7
15
20
72
15 DIAS 20 DIAS
REVISION Y AUTORIZACION, ENTREGA DE FACTURA PLAZO PARA PAGO
costo cemento agencia = 56 Bs.-
costo del flete de camion de 35 tn = 4176 0.11931429 50
5.96571429 700
5.96571429 35000
5
700 0.00714
0.71%
0.71 56
0.400 5.97
0.4
100 Bs/dia 0.43
8 12.5 Bs/Hrs 62.8
24 300 Bs
0.42857143
60
FBS
395 83