Presupuesto
Presupuesto 0103001 CREACION DE PLAZOLETA DE TINGO PALCA
Subpresupuesto 001 PLAZOLETA CENTRAL
Cliente MUNICIPALIDAD DISTRITAL DE YANACANCHA Costo al 16/10/2013
01.02.06 RELLENO COMPACTADO CON MATERIAL PROPIO EN ZANJAS m3 60.00 18.12 1,087.20
01.03.03 CONCRETO PARA PISO FC= 140 KG/CM2, CEMENTO TIPO I m3 38.14 311.49 11,880.23
01.06.01 ENLUCIDO DE BANCAS CON MARMOLINA Y GRANITO und 82.48 24.63 2,031.48
02.02.01.01 CIMIENTO CORRIDO MEZCLA 1:10 CEMENTO HORMIGON +30% P.M _x000D_ m3 13.22 125.17 1,654.75
02.03.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 39.86 7.36 293.37
02.04.01 MURO DE LADRILLO PANDERETA (0.10x0.12x0.24) AMARRE SOGA MORTERO 1:5 JUNTA m2 22.15 22.06 488.63
1.5 cm.
02.05.02 TARRAJEO EN ENTERIORES ACABADO CON CEMENTO- ARENA MEZCLA 1:5, e=1.5 cm m2 21.05 18.35 386.27
02.05.04 TARRAJEO EN CIELO RRAZO CON MEZCLA CEMENTO ARENA 1:5, E= 1.5 CM m2 5.00 25.66 128.30
02.08.01 PUERTAS, TABIQUES CONTRAPLACADA METALICAS DEL SSHH E=.10m m2 2.00 300.00 600.00
03.01.03 SALIDA PARA CENTROS DE LUZ CON INTERRUPTOR DE CONMUTACION pto 4.00 32.56 130.24
03.01.04 SALIDA DE PARED (BRAQUETES) CON PVC pto 4.00 34.67 138.68
03.01.06 SALIDA PARA TOMACORRIENTES BIPOLARES SIMPLES CON PVC pto 6.00 57.37 344.22
03.01.07 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP 3/4" m 170.00 3.90 663.00
04.01.02 EXCAVACION DE ZANJA PARA TUBERIA DESAGUE DE 4" Y 6" m3 50.18 14.36 720.58
04.01.04 SUMINISTRO Y COLOCADO DE TUBERIA PVC SAL 2'' m 15.89 14.67 233.11
04.01.05 SUMINISTRO Y COLOCACION DE CAJA DE REGISTRO DE CONCRETO jgo 2.00 50.19 100.38
04.02.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 15.00 44.52 667.80
04.02.02 SUMIDERO DE BRONCE 2" PROVISION Y COLOCACION und 3.00 21.81 65.43
04.02.03 VALVULAS DE COMPUERTA DE BRONCE DE 3/4" und 2.00 47.21 94.42
05.02.01 SOLADO DE CONCRETO Fc=100 kg/cm2 e=4" - ZAPATA m2 23.63 42.88 1,013.25
05.03.01 CONCRETO PARA PISO FC= 140 KG/CM2, CEMENTO TIPO I m3 4.87 311.49 1,516.96
05.03.03.01 CONCRETO PARA ZAPATA Y MUROS Fc= 175 kg/cm2 m3 16.54 341.00 5,640.14
05.03.03.02 ENCOFRADO Y DESENCOFRADO DE MURO CON PANELES und 53.64 26.68 1,431.12
05.04.01 SUMINISTRO Y MONTAJE DE COLUMNA DE TUBO 6", E=1" kg 300.00 26.74 8,022.00
05.04.02 ANCLAJE EN LOSA PARA COLUMNA DE 6" und 6.00 72.40 434.40
05.04.03 ANCLAJE PARA TIJERALES COLOCADO EN COLUMNAS DE 6" und 6.00 83.80 502.80
05.04.04 BARANDA METALICA DE TUBO 2" m 218.95 17.97 3,934.53
05.05.04 SUMINISTRO Y COLOCADO DE CALAMINA POLIPROPILENO COLOR ROJO m2 50.47 45.61 2,301.94
05.06.02.03 EXCAVACION DE POZO PARA PUESTA A TIERRA (2700x1000mm) m3 5.40 34.61 186.89
05.06.04.01 SUMINISTRO E IZADO DE POSTE DE F°G° DE 5M/150KG und 18.00 415.15 7,472.70
05.06.04.02 SUMINISTRO E IZADO DE POSTE DE F°G° DE 10m/250kg und 1.00 713.04 713.04
05.06.05.01 ALUMBRADO PUBLICO, SALIDA PARA LUMINARIA 70W und 36.00 358.18 12,894.48
05.06.05.02 ALUMBRADO PUBLICO, SALIDA PARA LUMINARIA 150W und 1.00 388.70 388.70
05.06.05.03 SUMIN INSTALACION DE FLUORECENTE LARGO DE 2x36W + EQUIPO und 6.00 89.20 535.20
05.06.05.05 SUMIN E INSTALACION ARMADO ESPECIAL P/FAROLA DOS BRAZOS und 18.00 540.00 9,720.00
05.06.07.01 PRUEBA HIDRAULICA A ZANJA ABIERTA TUBERIA PVC 6" m 30.00 9.08 272.40
05.06.07.02 PRUEBA HIDRAULICA DEL SISTEMA DE AGUA POTABLE m 36.00 9.42 339.12
SUBTOTAL 360,517.33
IGV(18%) 64,893.12
======================
COSTO DIRECTO S/. 300,431.11 S/. 132,473.92 S/. 102,250.90 S/. 65,706.29
********************** ========================= ========================= =========================
GASTOS GENERALES (10%) S/. 30,043.11 S/. 13,247.39 S/. 10,225.09 S/. 6,570.63
UTILIDAD (10%) S/. 30,043.11 S/. 13,247.39 S/. 10,225.09 S/. 6,570.63
********************** ========================= ========================= =========================
SUBTOTAL S/. 360,517.33 S/. 158,968.70 S/. 122,701.08 S/. 78,847.55
IGV(18%) S/. 64,893.12 S/. 28,614.37 S/. 22,086.19 S/. 14,192.56
********************** ========================= ========================= =========================
TOTAL DE PRESUPUESTO S/. 425,410.45 S/. 187,583.07 S/. 144,787.28 S/. 93,040.11
VI. DEDUCCIONES
Deducciones del reajuste por adelanto directo (10%) 0.00
Del presente mes 0.00 14,833.89
Del mes anterior 0.00
Del penultimo mes 0.00
VII. SUB TOTAL DEL LIQUIDO A PAGAR 630,676.47 148,338.88 80,490.13 228,829.01
MONTO A FACTURAR: DOSCIENTOS CINCUENTA Y DOS MIL OCHOCIENTOS SESENTA Y SEIS CON 73/100 SOLES
“Mejoramiento de Vías con Pistas, Veredas, Graderías en las Calles, Jirones y Pasajes del AA.HH. Uliachin - Sector 4, Distrito de Chaupimarca, Provincia de Pasco – Primera Etapa: Mejoramiento de Vías con Pistas y Veredas y Graderías en las Calles Prlg. 2 de Mayo, Jr. 2
OBRA
de Mayo, Jr. Grau y el Pasaje Ricardo Palma del AA.HH. Uliachin”
SISTEMA DE
CONTRATACION:
A PRECIOS UNITARIOS Presupuesto Base : S/. 744,198.23 Avance Anterior Acum.: 23.52% Mes 01 Valor Nº 01 ago-20 10 Días Calendarios
CONTRATISTA: CONSORIO ULIACHIN Monto de Contrato : S/. 744,198.23 Fr = 1.00000 Avance Actual : 12.76% Mes 02 Valor Nº 02 sep-20 30 Días Calendarios
RESIDENTE: ING. ERIC MIGUEL CHAVEZ RIOS Adelanto Directo: No presenta Avance Actual Acum. : 36.28% Mes 03 Valor Nº 03 oct-20 31 Días Calendarios
SUPERVISOR: ING. ROMMEL MONTES GOMEZ Adelanto para Materiales No presenta Saldo por Ejecutar : 63.72% Mes 04 Valor Nº 04 nov-20 30 Días Calendarios
AVANCES
SALDO
Precio ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado COSTO PARCIAL
Unitario
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
CALLES, PASAJES, JIRONES CUENTAN CON CALZADA ADECUADAS PARA LA
01
TRANSITABILIDAD VEHICULAR
01.01 PAVIMENTO RIGIDO
01.01.01 OBRAS PROVICIONALES -
01.01.01.01 ALQUILER DE CAMPAMENTO PROVISIONAL (OFICINA Y ALMACEN) mes 3.60 200.00 720.00 0.60 120.00 16.67% 0.00 - 0.00% 0.60 120.00 16.67% 3.00 600.00 83.33%
01.01.01.02 MOVILIZACION Y DESMOVILIZACION DE EQUIPO TRANSPORTADO glb 1.00 4,850.80 4,850.80 0.50 2,425.40 50.00% 0.00 - 0.00% 0.50 2,425.40 50.00% 0.50 2,425.40 50.00%
01.01.01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPO AUTOPORPULSADO glb 1.00 3,006.72 3,006.72 0.50 1,503.36 50.00% 0.00 - 0.00% 0.50 1,503.36 50.00% 0.50 1,503.36 50.00%
01.01.01.04 CARTEL DE OBRA DE 2.40x3.60mt und 1.00 890.50 890.50 1.00 890.50 100.00% 0.00 - 0.00% 1.00 890.50 100.00% - - 0.00%
01.01.01.05 DISEÑO DE MEZCLAS(f´c=175kg/cm2, f´c=210kg/cm2) und 2.00 380.54 761.08 2.00 761.08 100.00% 0.00 - 0.00% 2.00 761.08 100.00% - - 0.00%
01.01.01.06 ROTURA DE PROBETAS (f´c=175kg/cm2, f´c=210kgcm2) und 30.00 45.20 1,356.00 0.00 - 0.00% 12.00 542.40 40.00% 12.00 542.40 40.00% 18.00 813.60 60.00%
01.01.02 TRABAJOS PRELIMINARES -
01.01.02.01 LIMPIEZA DEL TERRENO MANUAL m2 1,271.55 2.51 3,191.59 1,155.95 2,901.43 90.91% 0.00 - 0.00% 1,155.95 2,901.43 90.91% 115.60 290.16 9.09%
01.01.02.02 TRAZO, NIVELACION Y REPLANTEO PRELIMINAR m2 1,271.55 1.98 2,517.67 1,155.95 2,288.78 90.91% 0.00 - 0.00% 1,155.95 2,288.78 90.91% 115.60 228.89 9.09%
01.01.02.03 TRAZO Y CONTROL DE NIVELES DURANTE LA CONSTRUCCION m2 1,271.55 1.98 2,517.67 317.89 629.42 25.00% 0.00 - 0.00% 317.89 629.42 25.00% 953.66 1,888.25 75.00%
01.01.02.04 CERCO DE SEGURIDAD Y PROTECCION - CINTAS PLASTICAS m 677.58 4.23 2,866.16 135.52 573.23 20.00% 0.00 - 0.00% 135.52 573.23 20.00% 542.06 2,292.93 80.00%
01.01.02.05 NIVELACION DE BUZONES EN GENERAL f´c=210kg/cm2 und 6.00 320.76 1,924.56 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 6.00 1,924.56 100.00%
01.01.03 MOVIMINETO DE TIERRAS
01.01.03.01 CONFORMACION DE BASES
01.01.03.01.01 EXCAVACION EN TERRENO COMPACTO PARA EXPLANACIONES m3 534.01 4.19 2,237.50 534.01 2,237.50 100.00% 0.00 - 0.00% 534.01 2,237.50 100.00% - 0.00 0.00%
01.01.03.01.02 EXCAVACION EN TERRENO ROCOSO PARA EXPLANACIONES m3 308.21 123.43 38,042.36 308.21 38,042.36 100.00% 0.00 - 0.00% 308.21 38,042.36 100.00% - 0.00 0.00%
01.01.03.01.03 TRANSPORTE DE MATERIAL DE PRESTAMO m3 145.87 14.51 2,116.57 145.87 2,116.57 100.00% 0.00 - 0.00% 145.87 2,116.57 100.00% - 0.00 0.00%
01.01.03.01.04 RELLENO CON MATERIAL DE PRESTAMO m3 145.87 17.85 2,603.78 145.87 2,603.78 100.00% 0.00 - 0.00% 145.87 2,603.78 100.00% - (0.00) 0.00%
01.01.03.01.05 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA d=4.3KM m3 1,010.66 17.40 17,585.48 1,010.66 17,585.48 100.00% 0.00 - 0.00% 1,010.66 17,585.48 100.00% - 0.00 0.00%
01.01.03.01.06 PERFILADO Y COMPACTADO DE SUB-RASANTE m2 1,355.16 2.42 3,279.49 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 1,355.16 3,279.49 100.00%
01.01.03.01.07 TRANSPORTE DE AFIRMADO DE CANTERA A OBRA-SUBBASE m3 254.09 16.68 4,238.22 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 254.09 4,238.22 100.00%
01.01.03.01.08 RELLENO Y PREPARACION PARA SUBBASE E=0.15m m2 1,355.16 18.80 25,477.01 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 1,355.16 25,477.01 100.00%
01.01.03.01.09 PRUEBA DE COMPACTACION SUELOS (PROCTOR MODIFICADO DENSIDAD DE CAMPO) und 13.00 32.95 428.35 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 13.00 428.35 100.00%
SISTEMA DE
CONTRATACION:
A PRECIOS UNITARIOS Presupuesto Base : S/. 744,198.23 Avance Anterior Acum.: 23.52% Mes 01 Valor Nº 01 ago-20 10 Días Calendarios
CONTRATISTA: CONSORIO ULIACHIN Monto de Contrato : S/. 744,198.23 Fr = 1.00000 Avance Actual : 12.76% Mes 02 Valor Nº 02 sep-20 30 Días Calendarios
RESIDENTE: ING. ERIC MIGUEL CHAVEZ RIOS Adelanto Directo: No presenta Avance Actual Acum. : 36.28% Mes 03 Valor Nº 03 oct-20 31 Días Calendarios
SUPERVISOR: ING. ROMMEL MONTES GOMEZ Adelanto para Materiales No presenta Saldo por Ejecutar : 63.72% Mes 04 Valor Nº 04 nov-20 30 Días Calendarios
AVANCES
SALDO
Precio ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado COSTO PARCIAL
Unitario
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
01.01.05 CURADO Y LIMPIEZA DE LOSA
01.01.05.01 TENDIDO DE ARROCERA Y CURADO Y CURADO DE LOSA m2 1,271.55 1.28 1,627.58 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 1,271.55 1,627.58 100.00%
01.01.05.02 LIMPIEZA DE LOSA m2 1,271.55 1.03 1,309.70 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 1,271.55 1,309.70 100.00%
01.01.06 SELLADO DE JUNTAS
01.01.06.01 JUNTA DE CONSTRUCCION DE TEKNOPOR E=1" m 1,277.76 14.46 18,476.41 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 1,277.76 18,476.41 100.00%
01.01.06.02 JUNTAS m 1,277.76 2.24 2,862.18 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 1,277.76 2,862.18 100.00%
01.02 SISTEMA DE DRENAJE (CUNETAS - CANAL CON REJILLAS)
01.02.01 TRABAJOS PRELIMINARES
01.02.01.01 LIMPIEZA DEL TERRENO MANUAL m2 214.19 1.85 396.25 0.00 - 0.00% 150.64 278.68 70.33% 150.64 278.68 70.33% 63.55 117.57 29.67%
01.02.01.02 TRAZO, NIVELACION Y REPLANTEO PRELIMINAR m2 214.19 1.98 424.10 0.00 - 0.00% 150.64 298.27 70.33% 150.64 298.27 70.33% 63.55 125.83 29.67%
01.02.01.03 TRAZO Y CONTROL DE NIVELES DURANTE LA CONSTRUCCION m2 214.19 1.98 424.10 0.00 - 0.00% 150.64 298.27 70.33% 150.64 298.27 70.33% 63.55 125.83 29.67%
01.02.02 OBRAS DE CONCRETO SIMPLE
01.02.02.01 CUNETAS DE CONCRETO F´C=175KG/CM2 m3 31.85 308.36 9,821.27 0.00 - 0.00% 26.11 8,051.28 81.98% 26.11 8,051.28 81.98% 5.74 1,769.99 18.02%
01.02.02.02 ENCOFRADO Y DESENCOFRADO DE CUNETAS m2 106.63 24.35 2,596.44 0.00 - 0.00% 99.07 2,412.35 92.91% 99.07 2,412.35 92.91% 7.56 184.09 7.09%
01.02.03 SELLADO DE JUNTAS
01.02.03.01 JUNTAS DE DILATACION m 7.18 2.24 16.08 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 7.18 16.08 100.00%
01.02.04 OBRAS DE CONCRETO ARMADO
01.02.04.01 CANAL CON REJILLAS CONCRETO F´C=175KG/CM2 m3 1.56 315.17 491.67 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 1.56 491.67 100.00%
01.02.04.02 ENCOFRADO Y DESENCOFRADO DE SCANAL CON REJILLAS m2 5.20 37.45 194.74 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 5.20 194.74 100.00%
01.02.04.03 ACERO fy=4,200kgcm2 GRADO 60 EN CANAL CON REJILLAS kg 105.56 4.15 438.07 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 105.56 438.07 100.00%
01.02.05 REVOQUES, ENLUCIDOS Y MOLDADURAS
01.02.05.01 ACABADO INTEGRAL DE CUNETAS m2 324.06 16.03 5,194.68 0.00 - 0.00% 215.92 3,461.20 66.63% 215.92 3,461.20 66.63% 108.14 1,733.48 33.37%
01.02.05.02 TARRAJEO DE CANAL CON REJILLAS m2 7.80 30.58 238.52 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 7.80 238.52 100.00%
01.02.06 REJAS DE PROTECCION
01.02.06.01 REJILLA METALICA EN CANAL m 24.00 52.23 1,253.52 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 24.00 1,253.52 100.00%
01.04 SUMIDERO
01.04.01 OBRAS DE CONCRETO
01.04.01.01 SUMIDERO DE CONCRETO F´C=175KG/CM2 m3 0.68 308.36 209.68 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 0.68 209.68 100.00%
01.04.01.02 SOLADO m2 0.09 29.24 2.63 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 0.09 2.63 100.00%
01.04.01.03 ENCOFRADO Y DESENCOFRADO DE SUMIDERO DRENAJE PLUVIAL m2 3.12 30.15 94.07 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 3.12 94.07 100.00%
01.04.01.04 ACERO fy=4,200kgcm2 GRADO 60 kg 5.55 4.28 23.75 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 5.55 23.75 100.00%
01.04.02 REVOQUES, ENLUCIDOS Y MOLDADURAS
01.04.02.01 TARRAJEO EN SUMIDERO m2 3.28 28.16 92.36 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 3.28 92.36 100.00%
SISTEMA DE
CONTRATACION:
A PRECIOS UNITARIOS Presupuesto Base : S/. 744,198.23 Avance Anterior Acum.: 23.52% Mes 01 Valor Nº 01 ago-20 10 Días Calendarios
CONTRATISTA: CONSORIO ULIACHIN Monto de Contrato : S/. 744,198.23 Fr = 1.00000 Avance Actual : 12.76% Mes 02 Valor Nº 02 sep-20 30 Días Calendarios
RESIDENTE: ING. ERIC MIGUEL CHAVEZ RIOS Adelanto Directo: No presenta Avance Actual Acum. : 36.28% Mes 03 Valor Nº 03 oct-20 31 Días Calendarios
SUPERVISOR: ING. ROMMEL MONTES GOMEZ Adelanto para Materiales No presenta Saldo por Ejecutar : 63.72% Mes 04 Valor Nº 04 nov-20 30 Días Calendarios
AVANCES
SALDO
Precio ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado COSTO PARCIAL
Unitario
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
01.04.03 TUBERIA PVC
01.04.03.01 TUBERIA DE PVC-SAP DE 6" m 11.57 45.23 523.31 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 11.57 523.31 100.00%
01.05 SISTEMA DE DESAGUE
01.05.01 TRABAJOS PRELIMINARES
01.05.01.01 TRAZO, NIVELACION Y REPLANTEO PRELIMINAR m2 20.37 1.96 39.93 20.37 39.93 100.01% 0.00 - 0.00% 20.37 39.93 100.00% 0.00 (0.00) -0.01%
01.05.01.02 TRAZO Y CONTROL DE NIVELES DURANTE LA CONSTRUCCION m2 20.37 2.03 41.35 5.09 10.34 25.01% 0.00 - 0.00% 5.09 10.34 25.01% 15.28 31.01 74.99%
01.05.02 MOVIMIENTO DE TIERRAS
01.05.02.01 EXCAVACION DE ZANJA TERRENO ROCOSO SIN EXPLOSIVOS TUBO DE 6" MENOR =1m m3 20.37 62.10 1,264.98 20.37 1,264.98 100.00% 0.00 - 0.00% 20.37 1,264.98 100.00% - (0.00) 0.00%
01.05.02.02 CAMA DE APOYO E=0.10M m 20.37 15.52 316.14 20.37 316.14 100.00% 0.00 - 0.00% 20.37 316.14 100.00% - 0.00 0.00%
01.05.02.03 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO m3 20.37 17.85 363.60 20.37 363.60 100.00% 0.00 - 0.00% 20.37 363.60 100.00% - 0.00 0.00%
01.05.02.04 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (50M) m3 20.37 43.11 878.15 20.37 878.15 100.00% 0.00 - 0.00% 20.37 878.15 100.00% - 0.00 0.00%
01.05.05 TUBERIA DE DESAGUE
01.05.05.01 SUMINISTRO DE TUBERIA D=6"PARA DESAGUE m 30.56 31.40 959.58 30.56 959.58 100.00% 0.00 - 0.00% 30.56 959.58 100.00% - 0.00 0.00%
01.05.05.02 INSTALACION DE TUBERIA D=6" PÁRA DESAGUE m 30.56 2.43 74.26 30.56 74.26 100.00% 0.00 - 0.00% 30.56 74.26 100.00% - 0.00 0.00%
01.05.06 INSTALACIONES DOMICILIARIAS
01.05.06.01 INSTALACION DOMICILIARIA DE DESASGUE und 2.00 250.68 501.36 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 2.00 501.36 100.00%
SISTEMA DE
CONTRATACION:
A PRECIOS UNITARIOS Presupuesto Base : S/. 744,198.23 Avance Anterior Acum.: 23.52% Mes 01 Valor Nº 01 ago-20 10 Días Calendarios
CONTRATISTA: CONSORIO ULIACHIN Monto de Contrato : S/. 744,198.23 Fr = 1.00000 Avance Actual : 12.76% Mes 02 Valor Nº 02 sep-20 30 Días Calendarios
RESIDENTE: ING. ERIC MIGUEL CHAVEZ RIOS Adelanto Directo: No presenta Avance Actual Acum. : 36.28% Mes 03 Valor Nº 03 oct-20 31 Días Calendarios
SUPERVISOR: ING. ROMMEL MONTES GOMEZ Adelanto para Materiales No presenta Saldo por Ejecutar : 63.72% Mes 04 Valor Nº 04 nov-20 30 Días Calendarios
AVANCES
SALDO
Precio ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado COSTO PARCIAL
Unitario
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
02.01.04.02 LIMPIEZA DE LOSA m2 1,026.60 0.96 985.54 0.00 - 0.00% 438.88 421.32 42.75% 438.88 421.32 42.75% 587.72 564.22 57.25%
02.01.05 SELLADO DE JUNTAS
02.01.05.01 JUNTAS DE DILATACION m 754.52 2.29 1,727.85 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 754.52 1,727.85 100.00%
02.01.06 OBRAS DE ARTE
02.01.06.01 BRUÑAS E=1 cm m 1,258.92 4.13 5,199.34 0.00 - 0.00% 1,009.71 4,170.10 80.20% 1,009.71 4,170.10 80.20% 249.21 1,029.24 19.80%
02.01.07 PINTURA EN GENERAL
02.01.07.01 PINTURA EN VEREDAS m2 58.39 18.14 1,059.19 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 58.39 1,059.19 100.00%
02.02 GRADERIAS DE CONCRETO
02.02.01 TRABAJOS PRELIMINARES
02.02.01.01 LIMPIEZA DEL TERRENO MANUAL m2 140.87 2.51 353.58 140.87 353.58 100.00% 0.00 - 0.00% 140.87 353.58 100.00% - 0.00 0.00%
02.02.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 140.87 1.98 278.92 140.87 278.92 100.00% 0.00 - 0.00% 140.87 278.92 100.00% - 0.00 0.00%
02.02.01.03 TRAZO Y CONTROL DE NIVELES DURANTE LA CONSTRUCCION m2 140.87 1.98 278.92 35.22 69.73 25.00% 0.00 - 0.00% 35.22 69.73 25.00% 105.65 209.19 75.00%
02.02.02 OBRAS DE CONCRETO
02.02.02.01 CONCRETO F´C=175KG/CM2 PARA GRADERIA m3 135.23 317.21 42,896.31 57.00 18,080.97 42.15% 0.00 - 0.00% 57.00 18,080.97 42.15% 78.23 24,815.34 57.85%
02.02.02.02 ENCOFRADO Y DESENCOFRADO PARA GRADAS(APOYADAS SOBRE EL TERRENO) m2 151.59 45.13 6,841.26 41.00 1,850.33 27.05% 0.00 - 0.00% 41.00 1,850.33 27.05% 110.59 4,990.93 72.95%
02.02.02.03 ACABADO DE GRADERIAS CON CEMENTO m2 136.36 32.14 4,382.61 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 136.36 4,382.6 100.00%
02.02.02.04 RELLENO DE JUNTAS DE DILATACION m 9.60 2.16 20.74 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 9.60 20.74 100.00%
02.03 SARDINELES
02.03.01 TRABAJOS PRELIMINARES
02.03.01.01 LIMPIEZA DEL TERRENO MANUAL m2 33.43 2.51 83.91 27.95 70.15 83.60% 5.48 13.75 16.39% 33.43 83.90 99.99% - 0.01 0.01%
02.03.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 33.43 1.98 66.19 27.95 55.34 83.61% 5.48 10.85 16.39% 33.43 66.19 100.00% - 0.00 0.00%
02.03.01.03 TRAZO Y CONTROL DE NIVELES DURANTE LA CONSTRUCCION m2 33.43 1.98 66.19 27.95 55.34 83.61% 5.48 10.85 16.39% 33.43 66.19 100.00% - 0.00 0.00%
02.03.02 MOVIMIENTO DE TIERRAS
02.03.02.01 COMPACTACION DE SUELOS PARA SARDINELES m2 138.61 3.10 429.69 - - 0.00% 0.00 - 0.00% - - 0.00% 138.61 429.69 100.00%
02.03.03 OBRAS DE CONCRETO ARMADO
02.03.03.01 SARDINEL DE CONCRETO F´C=175KG/CM2 m3 33.31 319.16 10,631.22 22.03 7,031.09 66.14% 11.28 3,600.12 33.86% 33.31 10,631.21 100.00% - 0.01 0.00%
02.03.03.02 ENCOFRADO Y DESENCOFRADO EN SARDINELES m2 285.06 36.20 10,319.17 223.36 8,085.63 78.36% 61.70 2,233.54 21.64% 285.06 10,319.17 100.00% - 0.00 0.00%
02.03.03.03 ACERO fy=4,200 kg/cm2 GRADO 60 EN SARDINELES kg 1,770.08 4.15 7,345.83 755.89 3,136.94 42.70% 1,014.19 4,208.89 57.30% 1,770.08 7,345.83 100.00% - 0.00 0.00%
02.03.04 REVOQUES, ENLUCIDOS Y MOLDADURAS
02.03.04.01 TARRAJEO EN SARDINELES m2 191.54 31.85 6,100.55 83.85 2,670.62 43.78% 107.69 3,429.93 56.22% 191.54 6,100.55 100.00% - (0.00) 0.00%
02.03.05 PINTURA EN GENERAL
02.03.05.01 PINTADO DE SARDINELES m2 191.54 11.96 2,290.82 - - 0.00% 0.00 - 0.00% - - 0.00% 191.54 2,290.82 100.00%
SISTEMA DE
CONTRATACION:
A PRECIOS UNITARIOS Presupuesto Base : S/. 744,198.23 Avance Anterior Acum.: 23.52% Mes 01 Valor Nº 01 ago-20 10 Días Calendarios
CONTRATISTA: CONSORIO ULIACHIN Monto de Contrato : S/. 744,198.23 Fr = 1.00000 Avance Actual : 12.76% Mes 02 Valor Nº 02 sep-20 30 Días Calendarios
RESIDENTE: ING. ERIC MIGUEL CHAVEZ RIOS Adelanto Directo: No presenta Avance Actual Acum. : 36.28% Mes 03 Valor Nº 03 oct-20 31 Días Calendarios
SUPERVISOR: ING. ROMMEL MONTES GOMEZ Adelanto para Materiales No presenta Saldo por Ejecutar : 63.72% Mes 04 Valor Nº 04 nov-20 30 Días Calendarios
AVANCES
SALDO
Precio ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado COSTO PARCIAL
Unitario
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
2.04 RAMPA PARA PERSONAS MINUSVALIDAS
02.04.01 OBRAS DE CONCREYTO SIMPLE
02.04.01.01 RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO m3 0.59 17.85 10.53 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 0.59 10.53 100.00%
02.04.01.02 SOLADO e=4" m2 5.85 30.17 176.49 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 5.85 176.49 100.00%
02.04.01.03 CONCRETO EN RAMPAS F´C=175KG/CM2 m3 0.59 317.21 187.15 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 0.59 187.15 100.00%
02.04.01.03 ENCOFRADO Y DESENCOFRADO DE RAMPAS m2 0.50 39.92 19.96 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 0.50 19.96 100.00%
SISTEMA DE
CONTRATACION:
A PRECIOS UNITARIOS Presupuesto Base : S/. 744,198.23 Avance Anterior Acum.: 23.52% Mes 01 Valor Nº 01 ago-20 10 Días Calendarios
CONTRATISTA: CONSORIO ULIACHIN Monto de Contrato : S/. 744,198.23 Fr = 1.00000 Avance Actual : 12.76% Mes 02 Valor Nº 02 sep-20 30 Días Calendarios
RESIDENTE: ING. ERIC MIGUEL CHAVEZ RIOS Adelanto Directo: No presenta Avance Actual Acum. : 36.28% Mes 03 Valor Nº 03 oct-20 31 Días Calendarios
SUPERVISOR: ING. ROMMEL MONTES GOMEZ Adelanto para Materiales No presenta Saldo por Ejecutar : 63.72% Mes 04 Valor Nº 04 nov-20 30 Días Calendarios
AVANCES
SALDO
Precio ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado COSTO PARCIAL
Unitario
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
3.04 VARIOS
03.04.01 LIMPIEZA FINAL DE OBRA m2 2,271.55 1.10 2,498.71 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 2,271.55 2,498.71 100.00%
03.04.02 PLACA RECORDATORIA INCLUIDO PEDESTAL glb 1.00 500.00 500.00 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 1.00 500.00 100.00%
03.04.03 TUBERIA PVC-SAP DE 6" m 4.00 45.21 180.84 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 4.00 180.84 100.00%
03.04.04 TACHOS DE BASURA und 2.00 180.45 360.90 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 2.00 360.90 100.00%
03.04.05 BANCAS und 2.00 210.45 420.90 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 2.00 420.90 100.00%
3.05 IMPACTO AMBIENTAL
03.05.01 PROGRAMAS DE EDUCACION TECNICA Y EDUCACION AMBIENTAL
03.05.01.01 CHARLAS AL PERSONAL DE OBRA und 6.00 135.68 814.08 1.00 135.68 16.67% 1.00 135.68 16.67% 2.00 271.36 33.33% 4.00 542.72 66.67%
03.05.01.02 BOLETINES INFORMATIVOS und 250.00 1.38 345.00 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 250.00 345.00 100.00%
03.05.01.03 CHARLAS A LA POBLACION BENEFICIADA und 5.00 160.74 803.70 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 5.00 803.70 100.00%
03.05.02 PROGRAMAS DE PREVENCION
03.05.02.01 MANEJO DE CAMPAMENTO
03.05.02.01.01 HABILITACION DE CONTENEDORES DE RESIDUOS ORGANICOS E INORGANICOS und 2.00 188.42 376.84 1.00 188.42 50.00% 1.00 188.42 50.00% 2.00 376.84 100.00% - - 0.00%
03.05.02.01.02 HABILITACION E INSTALACION DE LETRINAS und 1.00 1,500.00 1,500.00 0.00 - 0.00% 1.00 1,500.00 100.00% 1.00 1,500.00 100.00% - - 0.00%
03.05.02.02 SEÑALIZACION AMBIENTAL Y DE SEGURIDAD
03.05.02.02.01 LETREROS DE SEÑALIZACION AMBIENTAL und 3.00 118.41 355.23 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 3.00 355.23 100.00%
03.05.02.02.02 LETREROS DE SEÑALIZACION PREVENTIVA und 4.00 209.87 839.48 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 4.00 839.48 100.00%
03.05.02.02.03 LETREROS DE SEÑALIZACION DE OBLIGACION DE USO DE EQUIPOS DE PROTECCION und 2.00 209.94 419.88 2.00 419.88 100.00% 0.00 - 0.00% 2.00 419.88 100.00% - - 0.00%
03.05.03 PROGRAMAS DE MITIGACION AMBIENTAL
03.05.03.01 CIERRE DE CAMPAMENTO glb 1.00 500.00 500.00 0.00 - 0.00% 0.00 - 0.00% - - 0.00% 1.00 500.00 100.00%
AVANCE PROGAMADO
406438.87 33,356.21 V.S
381328.28AVANCE REAL
2,887,038.13
45.00%
40.00%
35.00%
30.00%
25.00%
AVANCE PROGRAMADO
20.00%
10.00%
5.00%
0.00%
Aug-20 Sep-20 Oct-20 Nov-20 Dec-20
PROGRAMADO EJECUTADO
VALORIZACION mes Monto S/. % Avance Monto S/. (S/IGV) % Avance
Parcial Acumulado Parcial Acumulado Parcial Acumulado Parcial Acumulado
1 del 22 al 30 de Agosto 2020 Agosto 36,299.84 36,299.84 4.88% 4.88% 145,155.05 145,155.05 19.50% 19.50%
2 del 01 al 30 de Setiembre 2020 Setiembre 156,146.51 192,446.35 20.98% 25.86% 94,978.35 240,133.40 12.76% 32.27%
3 del 01 al 30 de Octubre 2020 Octubre 136,883.08 329,329.43 18.39% 44.25% - -
4 del 01 al 30 de Noviembre 2020 Noviembre 371,134.02 700,463.45 49.87% 94.12% - -
5 del 01 al 21 de Diciembre 2020 Diciembre 43,734.79 744,198.23 5.88% 100.00% - -
100.00%
AVANCE PROGRAMADO VS EJECUTADO 100.00%
94.12%
90.00% 90.00%
80.00% 80.00%
70.00% 70.00%
60.00% 60.00%
% DE AVANCE
40.00% 40.00%
32.27%
30.00% 25.86% 30.00%
19.50%
20.00% 20.00%
10.00% 10.00%
4.88%
0.00%
0.00% 0.00% 0.00%
Inicio de obra Agosto Setiembre Octubre Noviembre Diciembre
VALORIZACION
OB
“MEJORAMIENTO DE VÍAS CON PISTAS, VEREDAS, GRADERÍAS EN LAS CALLES, JIRONES Y PASAJES DEL AA.HH. ULIACHIN – SECTOR 4, DISTRITO DE CHAUPIMARCA, PROVINCIA DE PASCO – PASCO; PRIMERA ETAPA;
MEJORAMIENTO DE VÍAS CON PISTAS, VEREDAS Y GRADERÍAS EN LAS CALLES PRLG. 2 DE MAYO, JR. 2 DE MAYO, JR. GRAU Y PSJE. RICARDO PALMA DEL AA. DEL AA.HH. ULIACHIN SECTOR 4
RESIDENTE: ING. ERIC MIGUEL CHAVEZ RIOS Mes 03 Valor Nº 03 oct-20 31 Días Calendarios
SUPERVISOR: ING. ROMMEL MONTES GOMEZ Mes 04 Valor Nº 04 nov-20 30 Días Calendarios
21 de AgostoMes 1 mes 2
01 de Septiembre Mes 3
01 de Octubre Mes 4
01 de Noviembre 01 de DiciembreMes 5 al
P. Unit. Parcial
Item Descripción Und Metrado al al al al 21
S/. S/.
Parcial 31 de Agosto% Parcial de Septiembre
30 % Parcial de Cctubre%
31 Parcial de Noviembre
30 % Parcialde Diciembre %
01 CALLES, PASAJES, JIRONES CUENTAN CON CALZADA ADECUADAS PARA LA TRANSITABILIDAD VEHICULAR
01.01.01.01 ALQUILER DE CAMPAMENTO PROVISIONAL (OFICINA Y ALMACEN) mes 3.60 200.00 720.00 720.00 100% 0% 0% 0% 0%
01.01.01.02 MOVILIZACION Y DESMOVILIZACION DE EQUIPO TRANSPORTADO glb 1.00 4,850.80 4,850.80 4,850.80 100% 0% 0% 0% 0%
01.01.01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPO AUTOPORPULSADO glb 1.00 3,006.72 3,006.72 3,006.72 100% 0% 0% 0% 0%
01.01.01.04 CARTEL DE OBRA DE 2.40x3.60mt und 1.00 890.50 890.50 890.50 100% 0% 0% 0% 0%
01.01.01.05 DISEÑO DE MEZCLAS(f´c=175kg/cm2, f´c=210kg/cm2) und 2.00 380.54 761.08 0% 0% 761.08 100% 0% 0%
01.01.01.06 ROTURA DE PROBETAS (f´c=175kg/cm2, f´c=210kgcm2) und 30.00 45.20 1,356.00 0% 0% 0% 1,356.00 100% 0%
01.01.02.01 LIMPIEZA DEL TERRENO MANUAL m2 1,271.55 2.51 3,191.59 3,191.59 100% 0% 0% 0% 0%
01.01.02.02 TRAZO, NIVELACION Y REPLANTEO PRELIMINAR m2 1,271.55 1.98 2,517.67 2,517.67 100% 0% 0% 0% 0%
01.01.02.03 TRAZO Y CONTROL DE NIVELES DURANTE LA CONSTRUCCION m2 1,271.55 1.98 2,517.67 2,517.67 100% 0% 0% 0% 0%
01.01.02.04 CERCO DE SEGURIDAD Y PROTECCION - CINTAS PLASTICAS m 677.58 4.23 2,866.16 2,866.16 100% 0% 0% 0% 0%
01.01.02.05 NIVELACION DE BUZONES EN GENERAL f´c=210kg/cm2 und 6.00 320.76 1,924.56 0% 1,924.56 100% 0% 0% 0%
01.01.03.01.01 EXCAVACION EN TERRENO COMPACTO PARA EXPLANACIONES m3 534.01 4.19 2,237.50 0% 2,237.50 100% 0% 0% 0%
01.01.03.01.02 EXCAVACION EN TERRENO ROCOSO PARA EXPLANACIONES m3 308.21 123.43 38,042.36 0% 38,042.36 100% 0% 0% 0%
01.01.03.01.04 RELLENO CON MATERIAL DE PRESTAMO m3 145.87 17.85 2,603.78 0% 2,603.78 100% 0% 0% 0%
01.01.03.01.05 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA d=4.3KM m3 1,010.66 17.40 17,585.48 0% 0% 17,585.48 100% 0% 0%
01.01.03.01.07 TRANSPORTE DE AFIRMADO DE CANTERA A OBRA-SUBBASE m3 254.09 16.68 4,238.22 0% 2,825.48 67% 1,412.74 33% 0% 0%
01.01.03.01.08 RELLENO Y PREPARACION PARA SUBBASE E=0.15m m2 1,355.16 18.80 25,477.01 0% 0% 25,477.01 100% 0% 0%
01.01.03.01.09 PRUEBA DE COMPACTACION SUELOS (PROCTOR MODIFICADO DENSIDAD DE CAMPO) und 13.00 32.95 428.35 0% 0% 428.35 100% 0% 0%
01.01.04.01 PAVIMENTO DE CONCRETO DE 8" f´C=210KG/CM2 m3 254.31 324.35 82,485.45 0% 0% 16,497.09 20% 65,988.36 80% 0%
01.01.04.03 ACERO EN JUNTAS DE EXPANSION d=15.88mm kg 2,121.60 4.18 8,868.29 0% 0% 3,941.46 44% 4,926.83 56% 0%
01.01.04.04 IMPREGNACION DE GRASA EN FIERRO LISO und 1,711.00 1.03 1,762.33 0% 0% 640.85 36% 1,121.48 64% 0%
01.01.04.05 TUBO PVC SAL 3/4" PARA PAVIMENTO m 1,711.00 11.56 19,779.16 0% 0% 15,823.33 80% 3,955.83 20% 0%
01.01.05.01 TENDIDO DE ARROCERA Y CURADO Y CURADO DE LOSA m2 1,271.55 1.28 1,627.58 0% 0% 187.80 12% 1,439.78 88% 0%
01.01.06.01 JUNTA DE CONSTRUCCION DE TEKNOPOR E=1" m 1,277.76 14.46 18,476.41 0% 0% 3,519.32 19% 14,957.09 81% 0%
01.02.01.01 LIMPIEZA DEL TERRENO MANUAL m2 214.19 1.85 396.25 0% 0% 0% 198.12 50% 198.13 50%
01.02.01.02 TRAZO, NIVELACION Y REPLANTEO PRELIMINAR m2 214.19 1.98 424.10 0% 0% 0% 0% 424.10 100%
01.02.01.03 TRAZO Y CONTROL DE NIVELES DURANTE LA CONSTRUCCION m2 214.19 1.98 424.10 0% 0% 0% 0% 424.10 100%
01.02.04.01 CANAL CON REJILLAS CONCRETO F´C=175KG/CM2 m3 1.56 315.17 491.67 0% 0% 0% 0% 491.67 100%
01.02.04.02 ENCOFRADO Y DESENCOFRADO DE SCANAL CON REJILLAS m2 5.20 37.45 194.74 0% 0% 0% 0% 194.74 100%
01.02.04.03 ACERO fy=4,200kgcm2 GRADO 60 EN CANAL CON REJILLAS kg 105.56 4.15 438.07 0% 0% 0% 0% 438.07 100%
01.02.05.02 TARRAJEO DE CANAL CON REJILLAS m2 7.80 30.58 238.52 0% 0% 0% 0% 238.52 100%
01.04 SUMIDERO
01.04.01.03 ENCOFRADO Y DESENCOFRADO DE SUMIDERO DRENAJE PLUVIAL m2 3.12 30.15 94.07 0% 0% 0% 0% 94.07 100%
01.05.01.01 TRAZO, NIVELACION Y REPLANTEO PRELIMINAR m2 20.37 1.96 39.93 39.93 100% 0% 0% 0% 0%
01.05.01.02 TRAZO Y CONTROL DE NIVELES DURANTE LA CONSTRUCCION m2 20.37 2.03 41.35 41.35 100% 0% 0% 0% 0%
01.05.02.01 EXCAVACION DE ZANJA TERRENO ROCOSO SIN EXPLOSIVOS TUBO DE 6" MENOR =1m m3 20.37 62.10 1,264.98 1,264.98 100% 0% 0% 0% 0%
01.05.02.03 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO m3 20.37 17.85 363.60 0% 363.60 100% 0% 0% 0%
01.05.02.04 ELIMINACION DE MATERIAL EXCEDENTE EN CARRETILLA (50M) m3 20.37 43.11 878.15 439.08 50% 439.07 50% 0% 0% 0%
01.05.05.01 SUMINISTRO DE TUBERIA D=6"PARA DESAGUE m 30.56 31.40 959.58 479.79 50% 479.79 50% 0% 0% 0%
01.05.05.02 INSTALACION DE TUBERIA D=6" PÁRA DESAGUE m 30.56 2.43 74.26 74.26 100% 0% 0% 0% 0%
01.05.06.01 INSTALACION DOMICILIARIA DE DESASGUE und 2.00 250.68 501.36 0% 501.36 100% 0% 0% 0%
02.01.01.01 LIMPIEZA DEL TERRENO MANUAL m2 1,026.60 2.51 2,576.77 0% 0% 0% 2,576.77 100% 0%
02.01.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 1,026.60 1.98 2,032.67 0% 0% 0% 2,032.67 100% 0%
02.01.01.03 TRAZO Y CONTROL DE NIVELES DURANTE LA CONSTRUCCION m2 1,026.60 1.98 2,032.67 0% 0% 0% 2,032.67 100% 0%
02.01.02.02 BASE GRANULAR DE VEREDA =4" m2 1,026.60 5.86 6,015.88 0% 0% 0% 6,015.88 100% 0%
02.01.02.03 COMPACTACION DE SUELO PARA VEREDAS m2 1,026.60 2.96 3,038.74 0% 0% 0% 3,038.74 100% 0%
02.01.02.04 MEJORAMIENTO DE CAJAS DE REGISTRO DE AGUA Y DESAGUE A NIVEL und 40.00 139.95 5,598.00 0% 0% 0% 5,598.00 100% 0%
02.01.02.05 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA d=4.5 KM m3 38.50 4.24 163.24 0% 0% 0% 163.24 100% 0%
02.01.03.01 VEREDA DE CONCRETO E=6" F´C=175KG/CM2 m3 153.99 317.21 48,847.17 0% 0% 0% 48,847.17 100% 0%
02.01.04.01 TENDIDO DE ARROCERA Y CURADO DE LOSA m2 1,026.60 1.17 1,201.12 0% 0% 0% 1,059.81 88% 141.31 12%
02.01.04.02 LIMPIEZA DE LOSA m2 1,026.60 0.96 985.54 0% 0% 0% 463.78 47% 521.76 53%
02.01.06.01 BRUÑAS E=1 cm m 1,258.92 4.13 5,199.34 0% 0% 0% 4,679.41 90% 519.93 10%
02.02.01.01 LIMPIEZA DEL TERRENO MANUAL m2 140.87 2.51 353.58 0% 353.58 100% 0% 0% 0%
02.02.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 140.87 1.98 278.92 0% 278.92 100% 0% 0% 0%
02.02.01.03 TRAZO Y CONTROL DE NIVELES DURANTE LA CONSTRUCCION m2 140.87 1.98 278.92 0% 278.92 100% 0% 0% 0%
02.02.02.01 CONCRETO F´C=175KG/CM2 PARA GRADERIA m3 135.23 317.21 42,896.31 0% 42,896.31 100% 0% 0% 0%
02.02.02.02 ENCOFRADO Y DESENCOFRADO PARA GRADAS(APOYADAS SOBRE EL TERRENO) m2 151.59 45.13 6,841.26 0% 6,841.26 100% 0% 0% 0%
02.02.02.03 ACABADO DE GRADERIAS CON CEMENTO m2 136.36 32.14 4,382.61 0% 4,382.61 100% 0% 0% 0%
02.03 SARDINELES
02.03.01.01 LIMPIEZA DEL TERRENO MANUAL m2 33.43 2.51 83.91 0% 0% 0% 83.91 100% 0%
02.03.01.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 33.43 1.98 66.19 0% 0% 0% 66.19 100% 0%
02.03.01.03 TRAZO Y CONTROL DE NIVELES DURANTE LA CONSTRUCCION m2 33.43 1.98 66.19 0% 0% 0% 66.19 100% 0%
02.03.02.01 COMPACTACION DE SUELOS PARA SARDINELES m2 138.61 3.10 429.69 0% 0% 0% 429.69 100% 0%
02.03.03.03 ACERO fy=4,200 kg/cm2 GRADO 60 EN SARDINELES kg 1,770.08 4.15 7,345.83 0% 0% 0% 7,345.83 100% 0%
02.04.01.01 RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO m3 0.59 17.85 10.53 0% 0% 0% 0% 10.53 100%
03.01.01.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 138.61 1.98 274.45 0% 0% 0% 274.45 100% 0%
03.01.01.02 TRAZO Y CONTROL DE NIVELES DURANTE LA CONSTRUCCION m2 138.61 1.98 274.45 0% 0% 0% 274.45 100% 0%
03.01.02.01 MEJORAMIENTO DE SUELO PARA JARDINERIA m2 145.72 19.94 2,905.66 0% 0% 0% 2,905.66 100% 0%
03.01.02.04 PLANTACION DE ESPECIES ORNAMENTALES und 25.00 72.25 1,806.25 0% 0% 0% 1,806.25 100% 0%
03.01.03.01 CERCO METALICO PARA JARDINERIA m 88.43 119.34 10,553.24 0% 0% 0% 10,553.24 100% 0%
03.01.03.02 PINTURA ESMALTE EN CERCO METALICO PARA JARDINERIA m 88.43 7.11 628.74 0% 0% 0% 628.74 100% 0%
03.02.01.03 ACERO fy=4,200 kg/cm2 GRADO 60 kg 44.92 4.23 190.01 0% 0% 0% 190.01 100% 0%
3.03 SEÑALIZACION
03.03.01.01 MARCAS EN EL PAVIMENTO PARA CRUCE PEATONAL m2 159.76 13.17 2,104.04 0% 0% 0% 2,104.04 100% 0%
03.03.02.01 SEÑAL IMFORMATIVA- POSTE CON CARTEL DE DENOMINACION DE VIA und 3.00 636.24 1,908.72 0% 0% 0% 1,908.72 100% 0%
03.03.02.02 SEÑAL IMFORMATIVA- CARTEL CON DENOMINACION DE VIA EN MURO und 4.00 280.14 1,120.56 0% 0% 0% 1,120.56 100% 0%
3.04 VARIOS
03.04.02 PLACA RECORDATORIA INCLUIDO PEDESTAL glb 1.00 500.00 500.00 0% 0% 0% 0% 500.00 100%
03.05.01.01 CHARLAS AL PERSONAL DE OBRA und 6.00 135.68 814.08 122.11 15% 407.04 50% 284.93 35% 0% 0%
03.05.01.03 CHARLAS A LA POBLACION BENEFICIADA und 5.00 160.74 803.70 0% 0% 803.70 100% 0% 0%
03.05.02.01.01 HABILITACION DE CONTENEDORES DE RESIDUOS ORGANICOS E INORGANICOS und 2.00 188.42 376.84 376.84 100% 0% 0% 0% 0%
03.05.02.01.02 HABILITACION E INSTALACION DE LETRINAS und 1.00 1,500.00 1,500.00 1,500.00 100% 0% 0% 0% 0%
03.05.02.02.01 LETREROS DE SEÑALIZACION AMBIENTAL und 3.00 118.41 355.23 0% 0% 0% 355.23 100% 0%
03.05.02.02.02 LETREROS DE SEÑALIZACION PREVENTIVA und 4.00 209.87 839.48 0% 0% 0% 839.48 100% 0%
03.05.02.02.03 LETREROS DE SEÑALIZACION DE OBLIGACION DE USO DE EQUIPOS DE PROTECCION und 2.00 209.94 419.88 419.88 100% 0% 0% 0% 0%
CONTRATO PRINCIPAL
N° VAL. VALORIZ. REINTEGRO VALORIZ. AMORTIZACION DE ADELANTOS
I.G.V. MONTO TOTAL
NETA BRUTA DIRECTO MATERIALES FACTURADO
1 123,012.75 0.00 123,012.75 0.00 0.00 22,142.30 145,155.05
###
2 80,490.13 0.00 80,490.13 0.00 0.00 14,488.22 94,978.35
###
Obra: CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
Entidad MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR
Contratista CONSORCIO N & F Plazo de Ejecucion 110 Dìas Calend.
Residente de Obra Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 Fecha de Incio de Obra 21/08/2020
Término de Obra 08/12/2020
Utilidad 10% S/. 100,359.32 S/. 179.65 S/. 20,020.33 S/. 27,556.58 S/. 29,077.18 S/. 23,525.58
Gastos Generales 10% S/. 100,359.32 S/. 179.65 S/. 20,020.33 S/. 27,556.58 S/. 29,077.18 S/. 23,525.58
SUB TOTAL S/. 1,204,311.86 S/. 2,155.80 S/. 240,243.91 S/. 330,678.91 S/. 348,926.22 S/. 282,307.02
Impuesto IGV 18% S/. 216,776.14 S/. 388.04 S/. 43,243.90 S/. 59,522.20 S/. 62,806.73 S/. 50,815.27
TOTAL S/. 1,421,088.00 S/. 2,543.84 S/. 283,487.81 S/. 390,201.11 S/. 411,732.95 S/. 333,122.29
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
1 OBRAS PROVISIONALES - - - - - - - - - - -
1.01 CAMPAMENTO PROVISIONAL DE OBRA u 1.00 4,027.48 4,027.48 - 0.00% - 0.00% - - 0.00% 1.00 4,027.48 100.00%
1.02 CARTEL DE IDENTIFICACION DE OBRA. u 1.00 639.12 639.12 - 0.00% - 0.00% - - 0.00% 1.00 639.12 100.00%
1.03 ADECUACION DE TERRENO PARA PATIO DE MAQUINAS u 2.00 379.80 759.60 - 0.00% - 0.00% - - 0.00% 2.00 759.60 100.00%
2 OBRAS PRELIMINARES - - - - - - - - - - -
2.01 MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPOS glb 1.00 18,035.00 18,035.00 - 0.00% - 0.00% - - 0.00% 1.00 18,035.00 100.00%
2.02 FLETE TERRESTRE glb 1.00 3,500.00 3,500.00 - 0.00% - 0.00% 1.00 3,500.00 100.00%
2.03 TOPOGRAFÍA Y GEOREFERENCIACIÓN km 5.59 414.09 2,314.76 - 0.00% 3.35 1,388.86 60.00% 3.35 1,388.86 60.00% 2.24 925.91 40.00%
2.04 REUBICACION DE CERCO DE ALAMBRE CON PUAS m 2,000.00 9.94 19,880.00 - 0.00% - 0.00% - - 0.00% 2,000.00 19,880.00 100.00%
3 MOVIMIENTO DE TIERRA - - - - - - - -
3.01 EXPLANACIONES - - - - - - - - - - -
3.01.01 CORTE DE MATERIAL COMPACTO CON MAQUINARIA m3 13,813.00 5.27 72,794.51 - 0.00% - 0.00% - - 0.00% 13,813.00 72,794.51 100.00%
3.01.02 CORTE DE TIERRA AGRICOLA m3 12,294.79 3.57 43,892.40 - 0.00% - 0.00% - - 0.00% 12,294.79 43,892.40 100.00%
3.01.03 PERFILADO Y COMPACTADO EN ZONA DE CORTE m2 30,736.97 1.93 59,322.35 - 0.00% - 0.00% - - 0.00% 30,736.97 59,322.35 100.00%
3.02 TERRAPLENES - - - - - - - - - - -
3.02.01 TRANSPORTE DE MATERIAL GRANULAR PARA D<= 30KM m3 9,071.89 6.13 55,610.69 - 0.00% - 0.00% - - 0.00% 9,071.89 55,610.69 100.00%
3.02.02 CONFORMACION DE TERRAPLENES CON MATERIAL DE PRESTAMO m3 9,071.89 20.90 189,602.50 - 0.00% - 0.00% - - 0.00% 9,071.89 189,602.50 100.00%
4 AFIRMADO - - - - - - - - - - -
4.01 TRANSPORTE DE AFIRMADO EN CAMION VOLQUETE DE 15M3 m3 11,987.42 6.13 73,482.88 - 0.00% - 0.00% - - 0.00% 11,987.42 73,482.88 100.00%
4.02 AFIRMADO Y/O MATERIAL GRANULAR E=0.37M m3 11,987.42 26.86 321,982.10 - 0.00% - 0.00% - - 0.00% 11,987.42 321,982.10 100.00%
5 OBRAS DE DRENAJE - - - - - - - - - - -
5.01 DRENAJE SUB SUPÉRFICIAL - - - - - - - - - - -
5.01.01 TRANSPORTE DE PIEDRA m3 717.75 6.13 4,399.81 - 0.00% - 0.00% - - 0.00% 717.75 4,399.81 100.00%
5.01.02 INSTALACION DE DRENAJE Y COLOCACION DE PIEDRAS m2 2,392.50 17.51 41,892.68 - 0.00% - 0.00% 2,392.50 41,892.68 100.00%
5.02 CUNETAS - - - - - - - - - - -
5.02.01 CONFORMACION DE CUNETAS DE TIERRA m 11,177.08 2.33 26,042.60 - 0.00% - 0.00% - - 0.00% 11,177.08 26,042.60 100.00%
5.03 ALCANTARILLAS DE 24"(5UND) - - - - - - - - - - -
5.03.01 TRABAJOS PRELIMINARES - - - - - - - - - - -
5.03.01.01 TRAZO Y REPLANTEO m2 63.00 2.83 178.29 - 0.00% - 0.00% - - 0.00% 63.00 178.29 100.00%
5.03.02 MOVIMIENTO DE TIERRA - - - - - - - - - - -
5.03.02.01 EXCAVACIÓN MANUAL m3 88.20 37.24 3,284.57 - 0.00% - 0.00% - - 0.00% 88.20 3,284.57 100.00%
5.03.02.02 REFINE NIVELACION Y COMPACTACION m2 140.00 5.34 747.60 - 0.00% - 0.00% - - 0.00% 140.00 747.60 100.00%
5.03.02.03 RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO m3 28.05 31.50 883.58 - 0.00% - 0.00% - - 0.00% 28.05 883.58 100.00%
5.03.02.04 ELIMINACION DE MATERIAL m3 114.66 11.64 1,334.64 - 0.00% - 0.00% - - 0.00% 114.66 1,334.64 100.00%
5.03.03 CONCRETO SIMPLE - - - - - - - - - - -
5.03.03.01 CONCRETO CIMENTACIÓN 1:8+25% DE PM D=4" m3 8.55 279.96 2,393.66 - 0.00% - 0.00% 8.55 2,393.66 100.00%
5.03.03.02 ENCOFRADO Y DESENCOFRADO m2 73.06 42.75 3,123.32 - 0.00% - 0.00% - - 0.00% 73.06 3,123.32 100.00%
5.03.03.03 CONCRETO CLASE F (F'C = 140 KG/CM2) m3 7.00 320.67 2,244.69 - 0.00% - 0.00% - - 0.00% 7.00 2,244.69 100.00%
5.03.04 COLOCACION DE ALCANTARILLA - - - - - - - - - - -
5.03.04.01 COLOCACION DE ALCANTARILLA TMC D=24" m 27.50 337.65 9,285.38 - 0.00% - 0.00% - - 0.00% 27.50 9,285.38 100.00%
5.04 ALCANTARILLA DOBLE DE 36"(1UND) - - - - - - - - - - -
5.04.01 TRABAJOS PRELIMINARES - - - - - - - - - - -
5.04.01.01 TRAZO Y REPLANTEO m2 23.05 2.83 65.23 - 0.00% - 0.00% - - 0.00% 23.05 65.23 100.00%
5.04.02 MOVIMIENTO DE TIERRA - - - - - - - - - - -
5.04.02.01 EXCAVACIÓN MANUAL m3 39.19 37.24 1,459.44 - 0.00% - 0.00% - - 0.00% 39.19 1,459.44 100.00%
5.04.02.02 REFINE NIVELACION Y COMPACTACION m2 41.75 5.34 222.95 - 0.00% - 0.00% - - 0.00% 41.75 222.95 100.00%
5.04.02.03 RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO m3 13.20 31.50 415.80 - 0.00% - 0.00% - - 0.00% 13.20 415.80 100.00%
5.04.02.04 ELIMINACION DE MATERIAL m3 50.94 11.64 592.94 - 0.00% - 0.00% - - 0.00% 50.94 592.94 100.00%
5.04.03 CONCRETO SIMPLE - - - - - - - - - - -
5.04.03.01 CONCRETO CIMENTACIÓN 1:8+25% DE PM D=4" m3 2.48 279.96 694.30 - 0.00% - 0.00% - - 0.00% 2.48 694.30 100.00%
5.04.03.02 ENCOFRADO Y DESENCOFRADO m2 29.05 42.75 1,241.89 - 0.00% - 0.00% - - 0.00% 29.05 1,241.89 100.00%
VALORIZACION DE OBRA Nº 01
Obra CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
ENTIDAD MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR
SISTEMA Sistema a suma alzada Presupuesto Base : S/. 1,421,088.00 Avance Anterior : 0.00%
Contratista CONSORCIO N & F Monto de Contrato : S/. 1,421,088.00 Fr = 1.00000 Avance Actual : 0.14% Plazo de Ejecución : 120 Días Calend
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 Adelantos : S/. 213,163.20 Avance Acumulado : 0.14% Inicio del Plazo de Ejecución : 27-dic-14
Valorizado @ 31-ene-15 Saldo por Ejecutar : 99.86% Fin del Plazo de Ejecución : 25-abr-15
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
5.04.03.03 CONCRETO CLASE F (F'C = 140 KG/CM2) m3 2.44 320.67 782.43 - 0.00% - 0.00% - - 0.00% 2.44 782.43 100.00%
5.04.04 COLOCACION DE ALCANTARILLA - - - - - - - - - - -
5.04.04.01 COLOCACION DE ALCANTARILLA TMC D=36" m 11.00 426.75 4,694.25 - 0.00% - 0.00% - - 0.00% 11.00 4,694.25 100.00%
6 PROTECCIÓN AMBIENTAL - - - - - - - - - - -
6.01 RESTAURACION DE AREA AFECTADA POR CAMPAMENTO glb 1.00 1,500.00 1,500.00 - 0.00% - 0.00% - - 0.00% 1.00 1,500.00 100.00%
6.02 ALQUILER DE BAÑOS PORTATILES u 2.00 1,000.00 2,000.00 - 0.00% - 0.00% - - 0.00% 2.00 2,000.00 100.00%
6.03 ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE glb 1.00 2,500.00 2,500.00 - 0.00% - 0.00% - - 0.00% 1.00 2,500.00 100.00%
7 SEÑALIZACION Y SEGURIDAD VIAL - - - - - - - - - - -
7.01 SEÑAL INFORMATIVA u 3.00 350.96 1,052.88 - 0.00% - 0.00% - - 0.00% 3.00 1,052.88 100.00%
7.02 SEÑAL PREVENTIVA u 3.00 350.96 1,052.88 - 0.00% - 0.00% - - 0.00% 3.00 1,052.88 100.00%
7.03 HITOS KILOMETRICOS u 6.00 132.62 795.72 - 0.00% - 0.00% - - 0.00% 6.00 795.72 100.00%
8 VARIOS - - - - - - - - - - -
8.01 NIVELACION DE CORTE DE MATERIAL ORGANICO m3 12,294.79 1.86 22,868.31 - 0.00% - 0.00% - - 0.00% 12,294.79 22,868.31 100.00%
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
CALENDARIO VALORIZADO DE AVANCE DE OBRA
Presupuesto CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
Subpresupuesto Plazo de Ejecucion 120 Días Calendarios
Cliente MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR Inicio de Obra 27-Dec-14
Lugar CARHUAC - NINACACA - PASCO -PASCO Fin de Obra 26-Mar-15
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
CALENDARIO VALORIZADO DE AVANCE DE OBRA
Presupuesto CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
Subpresupuesto Plazo de Ejecucion 120 Días Calendarios
Cliente MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR Inicio de Obra 27-Dec-14
Lugar CARHUAC - NINACACA - PASCO -PASCO Fin de Obra 26-Mar-15
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
CALENDARIO VALORIZADO DE AVANCE DE OBRA
Presupuesto CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
Subpresupuesto Plazo de Ejecucion 120 Días Calendarios
Cliente MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR Inicio de Obra 27-Dec-14
Lugar CARHUAC - NINACACA - PASCO -PASCO Fin de Obra 26-Mar-15
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
S/. -
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
01 INSTALACION DE BIODIGESTORES
01.01 INSTALACION DE BIODIGESTOR DE 7000 Lts - - - - - - - - - - -
01.02 INSTALACION DE BIODIGESTOR CON FILTRO DE AROS PET DE 7000 LTS EN TRAMO 12 u 1.00 16,350.06 16,350.06 - - 0.00% 0.35 5,722.52 35.00% 0.35 5,722.52 35.00% 0.65 10,627.54 65.00%
01.03 FILTRO BIOLOGICO PARA BIODIGESTOR u 1.00 2,486.05 2,486.05 - - 0.00% 1.00 2,486.05 100.00% 1.00 2,486.05 100.00% - - 0.00%
01.04 INSTALACION DE BIODIGESTOR DE 1300 Lts - - - - - - - - - - - -
01.04.01 INSTALACION DE BIODIGESTOR CON FILTRO DE AROS PET DE 3000 LTS EN TRAMO 15 u 1.00 10,139.06 10,139.06 - - 0.00% 0.35 3,548.67 35.00% 0.35 3,548.67 35.00% 0.65 6,590.39 65.00%
01.04.02 FILTRO BIOLOGICO PARA BIODIGESTOR u 1.00 2,486.05 2,486.05 - - 0.00% 1.00 2,486.05 100.00% 1.00 2,486.05 100.00% - - 0.00%
-
02 INSTALACION DE LETRINAS - 3.35 - - - - 3.35 - - (3.35) - -
02.01 INSTALACION DE LETRINAS u 2.00 2,000.00 4,000.00 - - 0.00% 2.00 4,000.00 100.00% 2.00 4,000.00 100.00% - - 0.00%
-
03 RED DE ALCANTARILLADO EN PLANTA DE TRATAMIENTO - - - - - - - - - - - -
03.01 TRABAJOS PRELIMINARES - - - - - - - - - - - -
03.01.01 TRAZO, NIVELACION Y REPLANTEO m 130.00 3.19 414.70 - - 0.00% - 0.00% - - 0.00% 130.00 414.70 100.00%
03.02 MOVIMIENTO DE TIERRAS - - - - - - - - - - - -
03.02.01 EXCAV. ZANJA TERRENO c/BOLONERIAS GRANDES REDONDEADOS 8" A MAS 2M m3 93.60 204.24 19,116.86 - - 0.00% - 0.00% - - 0.00% 93.60 19,116.86 100.00%
03.02.02 REFINE, NIVELACION DE ZANJA Y CONFORMACION DE FONDOS m2 78.00 3.32 258.96 - - 0.00% - 0.00% - - 0.00% 78.00 258.96 100.00%
03.02.03 PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO m 130.00 3.80 494.00 - - 0.00% - 0.00% - - 0.00% 130.00 494.00 100.00%
03.02.04 RELLENO COMP. C/APISON T/CANGURO H<1.70 M c/MAT PROPIO ZAR. C=20cm m 62.40 5.02 313.25 - - 0.00% - 0.00% - - 0.00% 62.40 313.25 100.00%
03.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 39.00 16.72 652.08 - - 0.00% - 0.00% - - 0.00% 39.00 652.08 100.00%
03.03 SUMINISTRO E INSTALACION DE TUBERIAS - - - - - - - - - - - -
03.03.01 TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 200MM m 130.00 10.81 1,405.30 - - 0.00% - 0.00% - - 0.00% 130.00 1,405.30 100.00%
03.04 BUZONES - - - - - - - - - - - -
03.04.01 BUZON CONCRETO T-2 H=1.50 a 3m c/DISPOSITIVO DE CAIDA DENTRO DE BUZON u 5.00 1,986.81 9,934.05 - - 0.00% - 0.00% - - 0.00% 5.00 9,934.05 100.00%
-
04 CERCO PERIMETRICO - - - - - - - - - - - -
04.01 TRABAJOS PRELIMINARES - - - - - - - - - - - -
04.01.01 LIMPIEZA DE TERRENO MANUAL m2 150.00 0.35 52.50 - - 0.00% - 0.00% - - 0.00% 150.00 52.50 100.00%
04.01.02 TRAZO Y REPLANTEO m2 150.00 3.19 478.50 - - 0.00% - 0.00% - - 0.00% 150.00 478.50 100.00%
04.02 MOVIMIENTO DE TIERRAS - - - - - - - - - - - -
04.02.01 EXCAVACION MANUAL m3 27.00 34.94 943.38 - - 0.00% - 0.00% - - 0.00% 27.00 943.38 100.00%
04.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 33.75 16.72 564.30 - - 0.00% - 0.00% - - 0.00% 33.75 564.30 100.00%
04.03 CERCO PERIMETRICO CON ALAMBRE DE PUAS - - - - - - - - - - - -
04.03.01 CERCO PERIMETRICO DE ALAMBRE CON PUAS m 150.00 17.36 2,604.00 - - 0.00% - 0.00% - - 0.00% 150.00 2,604.00 100.00%
04.03.02 PUERTA DE INGRESO - - - - - - - - - - - -
04.03.02.01 INSTALACION DE PUERTA DE INGRESO u 1.00 706.95 706.95 - - 0.00% - 0.00% - - 0.00% 1.00 706.95 100.00%
-
05 CONSTRUC PLANTA TRATAMIENTO AGUAS RESIDUALES (PTAR-03) - - - - - - - - - - - -
05.01 CAMARA DE REJAS (01 UND) - - - - - - - - - - - -
05.01.01 TRABAJOS PRELIMINARES - - - - - - - - - - - -
05.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 4.40 0.35 1.54 - - 0.00% - 0.00% - - 0.00% 4.40 1.54 100.00%
05.01.01.02 TRAZO Y REPLANTEO m2 4.40 3.19 14.04 - - 0.00% - 0.00% - - 0.00% 4.40 14.04 100.00%
05.01.02 MOVIMIENTO DE TIERRAS - - - - - - - - - - - -
05.01.02.01 EXCAVACION EN TERRENO SEMIRROCOSO m3 3.52 74.68 262.87 - - 0.00% - 0.00% - - 0.00% 3.52 262.87 100.00%
05.01.02.02 REFINE NIVELACION INTERIOR APISONADO MANUAL m2 4.40 2.86 12.58 - - 0.00% - 0.00% - - 0.00% 4.40 12.58 100.00%
05.01.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 4.40 16.72 73.57 - - 0.00% - 0.00% - - 0.00% 4.40 73.57 100.00%
05.01.03 OBRAS DE CONCRETO SIMPLE - - - - - - - - - - - -
05.01.03.01 SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2 3.83 194.08 743.33 - - 0.00% - 0.00% - - 0.00% 3.83 743.33 100.00%
05.01.04 OBRAS DE CONCRETO ARMADO - - - - - - - - - - - -
05.01.04.01 CONCRETO F'C=210 KG/CM2 m3 2.60 434.07 1,128.58 - - 0.00% - 0.00% - - 0.00% 2.60 1,128.58 100.00%
05.01.04.02 ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS m2 16.97 38.99 661.66 - - 0.00% - 0.00% - - 0.00% 16.97 661.66 100.00%
05.01.04.03 ACERO FY=4200 KG/CM2 kg 99.35 4.55 452.04 - - 0.00% - 0.00% - - 0.00% 99.35 452.04 100.00%
VALORIZACION DE OBRA Nº 02
Obra CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
ENTIDAD MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR
SISTEMA Sistema a suma alzada Presupuesto Base : S/. 1,421,088.00 Avance Anterior : 0.00%
Contratista CONSORCIO N & F Monto de Contrato : S/. 1,421,088.00 Fr = 1.00000 Avance Actual : 32.92% Plazo de Ejecución : 120 Días Calend
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 Adelantos : Ninguno a la fecha Avance Acumulado : 32.92% Inicio del Plazo de Ejecución : 27-dic-14
Valorizado @ 30-nov-14 Saldo por Ejecutar : Err:509 Fin del Plazo de Ejecución : 25-abr-15
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
05.01.05 REVOQUES Y ENLUCIDOS - - - - - - - - - - - -
05.01.05.01 TARRAJEO CON IMPERMEABILIZANTES m2 14.21 30.31 430.71 - - 0.00% - 0.00% - - 0.00% 14.21 430.71 100.00%
05.01.05.02 TARRAJEO EN EXTERIORES CON CEMENTO - ARENA m2 7.70 37.25 286.83 - - 0.00% - 0.00% - - 0.00% 7.70 286.83 100.00%
05.01.06 ACCESORIOS - - - - - - - - - - - -
05.01.06.01 REJILLA METALICA u 1.00 37.82 37.82 - - 0.00% - 0.00% - - 0.00% 1.00 37.82 100.00%
05.01.06.02 COMPUERTA DE PLANCHA METALICA DE 1/8" COMO MINIMO u 1.00 305.04 305.04 - - 0.00% - 0.00% - - 0.00% 1.00 305.04 100.00%
06 DESARENADOR Y MEDIDOR PARSHALL (01 UND) - - - - - - - - - - - -
06.01 TRABAJOS PRELIMINARES - - - - - - - - - - - -
06.01.01 LIMPIEZA DE TERRENO MANUAL m2 17.19 0.35 6.02 - - 0.00% - 0.00% - - 0.00% 17.19 6.02 100.00%
06.01.02 TRAZO Y REPLANTEO m2 17.19 3.19 54.84 - - 0.00% - 0.00% - - 0.00% 17.19 54.84 100.00%
06.02 MOVIMIENTO DE TIERRAS - - - - - - - - - - - -
06.02.01 EXCAVACION EN TERRENO SEMIRROCOSO m3 25.79 74.68 1,926.00 - - 0.00% - 0.00% - - 0.00% 25.79 1,926.00 100.00%
06.02.02 REFINE NIVELACION INTERIOR APISONADO MANUAL m2 17.19 2.86 49.16 - - 0.00% - 0.00% - - 0.00% 17.19 49.16 100.00%
06.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 32.23 16.72 538.89 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
06.03 OBRAS DE CONCRETO SIMPLE - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
06.03.01 SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2 17.19 194.08 3,336.24 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
06.04 OBRAS DE CONCRETO ARMADO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
06.04.01 CONCRETO F'C=210 KG/CM2 m3 8.71 434.07 3,780.75 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
06.04.02 ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS m2 53.42 38.99 2,082.85 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
06.04.03 ACERO FY=4200 KG/CM2 kg 224.95 4.55 1,023.52 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
06.05 REVOQUES Y ENLUCIDOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
06.05.01 TARRAJEO CON IMPERMEABILIZANTES m2 28.14 30.31 852.92 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
06.06 ACCESORIOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
06.06.01 REJILLA METALICA DE 15MM u 1.00 576.76 576.76 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
06.06.02 COMPUERTA DE PLANCHA METALICA DE 1/8" COMO MINIMO u 4.00 305.04 1,220.16 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07 TANQUE IMHOFF (01 UND) - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
07.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
07.01.01 LIMPIEZA DE TERRENO MANUAL m2 33.00 0.35 11.55 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.01.02 TRAZO Y REPLANTEO m2 33.00 3.19 105.27 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.02 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
07.02.01 EXCAVACION EN TERRENO SEMIRROCOSO m3 260.93 74.68 19,486.25 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.02.02 REFINE NIVELACION INTERIOR APISONADO MANUAL m2 106.50 2.86 304.59 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 76.64 5.02 384.73 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.02.04 ELIMINACION DE MATERIAL EXCEDENTE m3 230.36 16.72 3,851.62 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.03 OBRAS DE CONCRETO SIMPLE - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
07.03.01 SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2 60.32 194.08 11,706.91 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.04 OBRAS DE CONCRETO ARMADO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
07.04.01 CONCRETO F'C=210 KG/CM2 m3 79.44 434.07 34,482.52 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.04.02 ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS m2 414.00 38.99 16,141.86 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.04.03 ACERO FY=4200 KG/CM2 kg 13,859.26 4.55 63,059.63 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.05 REVOQUES Y ENLUCIDOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
07.05.01 TARRAJEO CON IMPERMEABILIZANTES m2 280.39 30.31 8,498.62 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.05.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 52.85 28.29 1,495.13 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.06 CARPINTERIA METALICA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
07.06.01 BARANDA DE TUBO FO. GDO. PASAMANO 1 1/2"-PARANTE 1" X 1M.ALT m 28.40 99.81 2,834.60 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.06.02 ESCALERA TUB F.GVZDO. C/PARANTES DE 2" X PELDAÑOS DE 3/4" m 4.09 236.53 967.41 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.07 INSTALACIONES SANITARIAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
07.07.01 TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 200MM m 8.50 10.81 91.89 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.07.02 TEE UPVC UF S-25 DE 8" u 1.00 109.92 109.92 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.07.03 CODO SP PVC UF S-25 DE 8" u 1.00 244.08 244.08 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VALORIZACION DE OBRA Nº 02
Obra CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
ENTIDAD MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR
SISTEMA Sistema a suma alzada Presupuesto Base : S/. 1,421,088.00 Avance Anterior : 0.00%
Contratista CONSORCIO N & F Monto de Contrato : S/. 1,421,088.00 Fr = 1.00000 Avance Actual : 32.92% Plazo de Ejecución : 120 Días Calend
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 Adelantos : Ninguno a la fecha Avance Acumulado : 32.92% Inicio del Plazo de Ejecución : 27-dic-14
Valorizado @ 30-nov-14 Saldo por Ejecutar : Err:509 Fin del Plazo de Ejecución : 25-abr-15
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
07.07.04 VALVULA DE COMPUERTA DE FIERRO FUNDIDO MAZZA DE 8" u 1.00 1,220.98 1,220.98 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.07.05 PANTALLA DEFLECTORA u 2.00 250.00 500.00 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08 LECHO DE SECADO (01 UND) - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
08.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
08.01.01 LIMPIEZA DE TERRENO MANUAL m2 35.15 0.35 12.30 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.01.02 TRAZO Y REPLANTEO m2 35.15 3.19 112.13 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.02 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
08.02.01 EXCAVACION EN TERRENO SEMIRROCOSO m3 50.96 74.68 3,805.69 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.02.02 REFINE NIVELACION INTERIOR APISONADO MANUAL m2 35.15 2.86 100.53 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 63.70 16.72 1,065.06 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.03 OBRAS DE CONCRETO SIMPLE - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
08.03.01 SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2 35.15 194.08 6,821.91 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.04 OBRAS DE CONCRETO ARMADO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
08.04.01 CONCRETO F'C=210 KG/CM2 m3 25.44 434.07 11,042.74 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 143.98 38.99 5,613.78 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.04.03 ACERO FY=4200 KG/CM2 kg 620.00 4.55 2,821.00 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.05 REVOQUES Y ENLUCIDOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
08.05.01 TARRAJEO CON IMPERMEABILIZANTES m2 93.14 30.31 2,823.07 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.05.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 69.54 30.31 2,107.76 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.06 ESTRUCTURA DE MADERA Y COBERTURA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
08.06.01 TIJERAL DE MADERA TIPO 01 L=3.00M u 5.00 677.82 3,389.10 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.06.02 VIGA DE MADERA 3" X 4" m 9.90 21.12 209.09 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.06.03 CORREAS Y TIRANTES DE MADERA p2 106.76 7.18 766.54 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.06.04 COBERTURA DE CALAMINA 11 CANALES E=3MM m2 46.98 45.91 2,156.85 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.07 INSTALACIONES SANITARIAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
08.07.01 TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 100MM m 14.58 16.27 237.22 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.07.02 TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 50MM m 76.60 68.42 5,240.97 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.07.03 CODO PVC SAP 6"X90° u 3.00 55.43 166.29 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.07.04 CODO PVC SAP 4"X90° u 2.00 34.42 68.84 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.07.05 TEE PVC-SAP 4"* 2" u 23.00 30.84 709.32 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.07.06 TEE PVC-SAP 150mmx150mm u 3.00 54.85 164.55 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.07.07 TEE PVC-SAP 200mmx150mm u 1.00 42.35 42.35 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.07.08 TAPON PVC-SAP 2" u 23.00 23.01 529.23 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.08 FILTROS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
08.08.01 FILTRO DE GRAVA m3 12.48 180.66 2,254.64 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.08.02 FILTRO DE ARENA m3 9.36 259.66 2,430.42 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.08.03 FILTRO DE LADRILLO m2 31.20 110.56 3,449.47 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09 FILTRO BIOLOGICO (01 UND) - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
09.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
09.01.01 LIMPIEZA DE TERRENO MANUAL m2 12.75 0.35 4.46 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.01.02 TRAZO Y REPLANTEO m2 12.75 3.19 40.67 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.02 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
09.02.01 EXCAVACION EN TERRENO SEMIRROCOSO m3 18.63 74.68 1,391.29 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.02.02 REFINE NIVELACION INTERIOR APISONADO MANUAL m2 6.90 2.86 19.73 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 21.42 16.72 358.14 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.03 OBRAS DE CONCRETO SIMPLE - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
09.03.01 SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2 10.75 194.08 2,086.36 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.04 OBRAS DE CONCRETO ARMADO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
09.04.01 CONCRETO F'C=210 KG/CM2 m3 15.11 434.07 6,558.80 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VALORIZACION DE OBRA Nº 02
Obra CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
ENTIDAD MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR
SISTEMA Sistema a suma alzada Presupuesto Base : S/. 1,421,088.00 Avance Anterior : 0.00%
Contratista CONSORCIO N & F Monto de Contrato : S/. 1,421,088.00 Fr = 1.00000 Avance Actual : 32.92% Plazo de Ejecución : 120 Días Calend
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 Adelantos : Ninguno a la fecha Avance Acumulado : 32.92% Inicio del Plazo de Ejecución : 27-dic-14
Valorizado @ 30-nov-14 Saldo por Ejecutar : Err:509 Fin del Plazo de Ejecución : 25-abr-15
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
09.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 79.05 38.99 3,082.16 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.04.03 ACERO FY=4200 KG/CM2 kg 830.36 4.55 3,778.14 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.05 REVOQUES Y ENLUCIDOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
09.05.01 TARRAJEO CON IMPERMEABILIZANTES m2 85.95 30.31 2,605.14 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.06 FILTROS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
09.06.01 FILTRO DE GRAVA m3 12.42 180.66 2,243.80 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.06.02 FILTRO DE LADRILLO m2 13.80 110.56 1,525.73 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.07 SISTEMA DE DESINFECCION (HIPOCLORADOR POR GOTEO) - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
09.07.01 HIPOCLORADOR DIFUSION inc Gancho u 1.00 32.40 32.40 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.07.02 TAPA METALICA 0.40X0.45X1/8" u 1.00 108.77 108.77 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.07.03 ACCESORIOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
09.07.03.01 CANALETA DE DISTRIBUCION DE PVC m 50.00 67.95 3,397.50 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
10 FILTRO BIOLOGICO PARA BIODIGESTORES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
Err:509
11 RECONSTRUCCION DE CAPTACIONE EXISTENTE - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
11.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
11.01.01 DEMOLICION DE CAPTACION EXISTENTE glb 1.00 1,138.18 1,138.18 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.01.02 ELIMINACION DE DESMONTE PROVENIENTE DE LA DEMOLICION DE CAPTACION glb 1.00 324.33 324.33 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.01.03 LIMPIEZA DE TERRENO MANUAL m2 19.90 0.35 6.97 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.01.04 TRAZO Y REPLANTEO SIN EQUIPO m2 19.90 2.84 56.52 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
11.02.01 REFINE NIVELACION INTERIOR APISONADO MANUAL m2 8.29 2.09 17.33 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.02 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 1.73 5.02 8.68 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.03 ELIMINACION MATERIAL EXCEDENTE A MANO D<200M m3 4.46 16.72 74.57 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.04 FILTROS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
11.02.04.01 FILTRO DE GRAVA m3 4.41 180.66 796.71 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.05 OBRAS DE CONCRETO ARMADO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
11.02.05.01 CONCRETO EN MUROS REFORZADOS F'C= 210 KG/CM2 EN TABIQUE Y PLACAS m3 4.44 506.72 2,249.84 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.05.02 ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS m2 45.92 49.97 2,294.62 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.05.03 ACERO FY=4200 KG/CM2 kg 158.46 4.55 720.99 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.06 REVOQUES Y ENLUCIDOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
11.02.06.01 TARRAJEO CON IMPERMEABILIZANTES m2 54.61 34.32 1,874.22 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.06.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 26.70 28.29 755.34 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.07 VARIOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
11.02.07.01 TUBERIA DE REBOSE Y DESAGUE DE 2" SAL PVC u 1.00 1,226.35 1,226.35 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.07.02 TUBERIA DE REBOSE Y DESAGUE DE 3" SAL PVC u 1.00 798.52 798.52 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.07.03 TUBERIA DE SALIDA DE CAPTACION PVC SAP C-10 DE 1 1/2" u 1.00 274.72 274.72 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.07.04 TUBERIA DE SALIDA DE CAPTACION PVC SAP C-10 DE 2" u 1.00 466.10 466.10 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.08 PINTURA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
11.02.08.01 PINTURA LATEX EN MUROS 2 MANOS m2 28.60 7.11 203.35 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.09 CARPINTERIA METALICA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
11.02.09.01 TAPA METALICA 0.73X0.73X1/8" u 2.00 166.77 333.54 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.09.02 PINTURA EN CARPINTERIA METALICA m2 4.00 31.13 124.52 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
12 REHABILITACION DE RESERVORIO EXISTENTE (44 M3) - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
12.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
12.01.01 LIMPIEZA DE TERRENO MANUAL m2 21.62 0.35 7.57 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.01.02 TRAZO Y REPLANTEO SIN EQUIPO m2 21.62 2.84 61.40 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.02 REVOQUES Y ENLUCIDOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
12.03 TARRAJEO EN INTERIOR DE RESERVORIO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
12.03.01 PICADO DE TARRAJEO INTERIOR DE RESERVORIO m2 63.71 8.16 519.87 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.03.02 TARRAJEO CON IMPERMEABILIZANTES m2 63.71 34.32 2,186.53 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.04 TARRAJEO EN EXTERIOR DE RESERVORIO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
12.04.01 PICADO DE TARRAJEO EXTERIOR DE RESERVORIO m2 64.64 4.33 279.89 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.04.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 64.64 28.29 1,828.67 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.05 PINTURA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
VALORIZACION DE OBRA Nº 02
Obra CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
ENTIDAD MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR
SISTEMA Sistema a suma alzada Presupuesto Base : S/. 1,421,088.00 Avance Anterior : 0.00%
Contratista CONSORCIO N & F Monto de Contrato : S/. 1,421,088.00 Fr = 1.00000 Avance Actual : 32.92% Plazo de Ejecución : 120 Días Calend
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 Adelantos : Ninguno a la fecha Avance Acumulado : 32.92% Inicio del Plazo de Ejecución : 27-dic-14
Valorizado @ 30-nov-14 Saldo por Ejecutar : Err:509 Fin del Plazo de Ejecución : 25-abr-15
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
12.05.01 PINTURA LATEX EN MUROS 2 MANOS m2 64.64 7.11 459.59 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.05.02 PINTURA EN ESTRUCTURAS METALICAS glb 1.00 68.91 68.91 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.06 CARPINTERIA METALICA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
12.06.01 ESCALERA GATO, TUB F.GVZDO. C/PARANTES DE 1 1/2" SEGUN DISEÑO m 2.00 208.50 417.00 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.06.02 TAPA METALICA 0.60X0.60X1/8" u 2.00 88.77 177.54 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.07 INSTALACIONES SANITARIAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
12.07.01 TUBERIA DE REBOSE Y DESAGUE DE 2 1/2" SAL PVC u 1.00 212.37 212.37 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.07.02 TUBERIA DE SALIDA DE PVC SAP C-10 DE 1 1/2" u 2.00 182.42 364.84 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.07.03 ACCESORIOS DE RESERVORIO glb 1.00 1,442.69 1,442.69 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
13 MEJORAMIENTO DE LA LINEA DE CONDUCCION - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
13.01 MEJORAMIENTO DE LA LINEA DE CONDUCCION m 653.00 2.16 1,410.48 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
14 LINEA DE ADUCCION - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
14.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
14.01.01 LIMPIEZA DE LINEA DE ADUCCION m 170.00 0.35 59.50 Err:509 Err:509 Err:509 170.00 59.50 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
14.01.02 TRAZO, NIVELACION Y REPLANTEO m 170.00 3.10 527.00 Err:509 Err:509 Err:509 170.00 527.00 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
14.02 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
14.02.01 EXCAV. ZANJAS EN T.S.R P/TUB. 2"-4", HASTA 1.50M, A=0.60M m 170.00 11.88 2,019.60 Err:509 Err:509 Err:509 170.00 2,019.60 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
14.02.02 REFINE, NIVELACION DE ZANJA Y CONFORMACION DE FONDOS m 170.00 3.01 511.70 Err:509 Err:509 Err:509 170.00 511.70 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
14.02.03 PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO m 170.00 3.80 646.00 Err:509 Err:509 Err:509 170.00 646.00 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
14.02.04 RELLENO COMP c/PLANCHA VIBRAT H<3.00m c/MAT PROPIO ZARAND. C=20cm m 170.00 5.02 853.40 Err:509 Err:509 Err:509 170.00 853.40 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
14.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 29.75 16.72 497.42 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
14.03 TUBERIAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
14.03.01 TUBERIA PVC SAP ISO 4422 DN 75MM C-10 m 170.00 15.37 2,612.90 Err:509 Err:509 Err:509 170.00 2,612.90 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
14.03.02 SUMINISTRO E INSTALACION DE ACCESORIOS PVC RED ADUCCION glb 1.00 501.64 501.64 Err:509 Err:509 Err:509 1.00 501.64 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
14.03.03 PRUEBA HIDRAULICA+DESINFECCION TUB.6"-8" A ZANJA TAPADA m 170.00 2.70 459.00 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
15 RED DE DISTRIBUCION - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
15.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
15.01.01 LIMPIEZA DE RED DE DISTRIBUCION m 3,845.00 0.35 1,345.75 Err:509 Err:509 Err:509 3,670.94 1,284.83 95.47% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.01.02 TRAZO, NIVELACION Y REPLANTEO m 3,845.00 3.10 11,919.50 Err:509 Err:509 Err:509 3,670.94 11,379.91 95.47% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.02 DEMOLICION DE PAVIMENTO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
15.02.01 CORTE DE PAVIMENTO RIGIDO C/EQUIPO m 537.82 14.10 7,583.26 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.02.02 DEMOLICION DE PAVIMENTO DE CONCRETO DE 8" m2 121.01 31.13 3,767.04 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.02.03 REPOSICION DE PAVIMENTO DE CONCRETO F'C=210 KG/CM2, LOSA E=8" m2 121.01 93.08 11,263.61 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.03 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
15.03.01 EXCAV. ZANJAS EN TERRENO SEMI ROCOSO PARA AGUA m 547.00 12.51 6,842.97 Err:509 Err:509 Err:509 547.00 6,842.97 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.03.02 EXCAVACION TERRENO COMPACTO c/BOLONERIA p/TUBO DE AGUA HASTA 1.5 m 3,298.12 12.51 41,259.48 Err:509 Err:509 Err:509 3,298.12 41,259.48 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.03.03 REFINE, NIVELACION DE ZANJA Y CONFORMACION DE FONDOS m 3,845.00 3.01 11,573.45 Err:509 Err:509 Err:509 3,670.94 11,049.53 95.47% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.03.04 PREPARACION DE CAMA DE APOYO CON MATERIAL DE PRESTAMO m 3,845.00 3.80 14,611.00 Err:509 Err:509 Err:509 3,670.94 13,949.57 95.47% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.03.05 RELLENO COMP c/APISON T/CANGURO H<1.00m c/MAT/PROPIO ZARAN c=20cm m 3,845.00 5.02 19,301.90 Err:509 Err:509 Err:509 3,670.94 18,428.12 95.47% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.03.06 ELIMINACION DE MATERIAL EXCEDENTE m3 672.88 16.72 11,250.55 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.04 SUMINISTRO DE TUBERIAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
15.04.01 TUBERIA PVC CLASE A-10 AGUA POTABLE DE 2" + 3% DESPERDICIO m 175.00 9.77 1,709.75 Err:509 Err:509 Err:509 175.00 1,709.75 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.04.02 TUBERIA PVC CLASE A-10 AGUA POTABLE DE 1 1/2" + 3% DESPERDICIO m 140.99 8.70 1,226.61 Err:509 Err:509 Err:509 140.99 1,226.61 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.04.03 TUBERIA PVC CLASE A-10 AGUA POTABLE DE 1 1/4" + 3% DESPERDICIO m 692.64 7.08 4,903.89 Err:509 Err:509 Err:509 692.64 4,903.89 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.04.04 TUBERIA PVC CLASE A-10 AGUA POTABLE DE 1" + 3% DESPERDICIO m 578.71 4.69 2,714.15 Err:509 Err:509 Err:509 578.71 2,714.15 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.04.05 TUBERIA PVC CLASE A-10 AGUA POTABLE DE 3/4" + 3% DESPERDICIO m 2,258.31 4.08 9,213.90 Err:509 Err:509 Err:509 2,258.31 9,213.90 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.04.06 INSTALACION DE TUBERIAS DE PVC - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
15.04.07 INSTALACION DE TUBERIAS < 3" PVC SP C-10 m 3,845.00 3.01 11,573.45 Err:509 Err:509 Err:509 3,670.94 11,049.53 95.47% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.04.08 SUMINISTRO E INSTALACION DE ACCESORIOS PVC RED DE DISTRIBUCION glb 1.00 1,601.20 1,601.20 Err:509 Err:509 Err:509 1.00 1,601.20 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.04.09 PRUEBA HIDRAULICA+DESINFECCION TUB.6"-8" A ZANJA TAPADA m 3,845.00 2.70 10,381.50 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
16 CAJA DE VALVULA DE CONTROL - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
16.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
VALORIZACION DE OBRA Nº 02
Obra CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
ENTIDAD MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR
SISTEMA Sistema a suma alzada Presupuesto Base : S/. 1,421,088.00 Avance Anterior : 0.00%
Contratista CONSORCIO N & F Monto de Contrato : S/. 1,421,088.00 Fr = 1.00000 Avance Actual : 32.92% Plazo de Ejecución : 120 Días Calend
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 Adelantos : Ninguno a la fecha Avance Acumulado : 32.92% Inicio del Plazo de Ejecución : 27-dic-14
Valorizado @ 30-nov-14 Saldo por Ejecutar : Err:509 Fin del Plazo de Ejecución : 25-abr-15
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
16.01.01 LIMPIEZA DE TERRENO MANUAL m2 7.00 0.35 2.45 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
16.01.02 TRAZO Y REPLANTEO m2 7.00 3.19 22.33 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
16.02 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
16.02.01 EXCAVACION MANUAL m3 8.40 32.91 276.44 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
16.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 10.50 16.72 175.56 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
16.03 OBRAS DE CONCRETO SIMPLE - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
16.03.01 CONCRETO F'c= 175 KG/CM2 m3 5.76 391.20 2,253.31 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
16.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 57.60 38.99 2,245.82 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
16.04 REVOQUES Y ENLUCIDOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
16.04.01 TARRAJEO CON IMPERMEABILIZANTES m2 42.48 34.32 1,457.91 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
16.05 CARPINTERIA METALICA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
16.05.01 TAPA METALICA 0.40X0.45X1/8" u 20.00 108.77 2,175.40 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
16.06 PINTURA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
16.06.01 PINTURA LATEX EN MUROS 2 MANOS m2 42.48 7.11 302.03 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
16.07 SUMINISTRO E INSTALACION DE VALVULAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
16.07.01 SUMINISTRO DE VALVULAS u 20.00 152.20 3,044.00 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
17 VALVULA DE PURGA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
17.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
17.01.01 LIMPIEZA DE TERRENO MANUAL m2 0.98 0.35 0.34 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
17.01.02 TRAZO Y REPLANTEO m2 0.98 3.19 3.13 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
17.02 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
17.02.01 EXCAVACION MANUAL m3 1.18 34.94 41.23 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
17.02.02 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 0.10 5.02 0.50 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
17.02.03 ELIMINACION MATERIAL EXCEDENTE A MANO D<200M m3 2.70 16.72 45.14 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
17.03 OBRAS DE CONCRETO SIMPLE - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
17.03.01 SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2 1.28 194.08 248.42 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
17.03.02 CONCRETO F'c= 175 KG/CM2 m3 4.70 391.20 1,838.64 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
17.03.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 6.72 38.99 262.01 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
17.04 SUMINISTRO E INSTALACION DE TUBERIAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
17.04.01 TUBERIA PVC SAP ISO 4422 DN 12.7 MM C-10 m 3.00 17.98 53.94 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
17.04.02 VALVULA DE PURGA 19.10mm (3/4") u 2.00 76.77 153.54 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
17.04.03 ABRAZADERA PVC D=19.1 MM C/SALIDA A 12.70 MM INC. ACCESORIOS u 4.00 154.82 619.28 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
18 CONSTRUCCION DE CONEXIONES DOMICILIARIAS DE AGUA POTABLE - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
18.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
18.01.01 TRAZO, NIVELACION Y REPLANTEO DURANTE LA EJECUCION DE LA OBRA m 603.00 3.26 1,965.78 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
18.02 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
18.02.01 EXCAVACION DE ZANJA HASTA 0.80 M, TERRENO COMPACTO CON BOLONERIA m 603.00 12.51 7,543.53 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
18.02.02 REFINE, NIVELACION DE ZANJA Y CONFORMACION DE FONDOS m 603.00 3.01 1,815.03 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
18.02.03 PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO m 536.00 3.80 2,036.80 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
18.02.04 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 633.15 5.02 3,178.41 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
18.03 SUMINISTRO E INSTALACION DE TUBERIAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
18.03.01 TUBERIA PVC SAP ISO 4422 DN 19.1MM C-10 m 603.00 13.28 8,007.84 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
18.03.02 PRUEBA HIDRAULICA+DESINFECCION TUB.6"-8" A ZANJA TAPADA m 603.00 2.70 1,628.10 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
18.04 SUMINISTRO E INSTALACION DE ACCESORIOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
18.04.01 SUMINISTRO E INSTALACION DE ACCESORIOS RED SECUNDARIA 01 glb 1.00 1,391.90 1,391.90 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
18.05 CONEXIONES DOMICILIARIAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
18.05.01 CONEXION DOMICILIARIA DE AGUA POTABLE L=4.50 M. u 134.00 135.08 18,100.72 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
19 RED DE ALCANTARILLADO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
19.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
19.01.01 TRAZO, NIVELACION Y REPLANTEO DURANTE LA EJECUCION DE LA OBRA m 4,981.52 4.60 22,914.99 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.02 CORTE, DEMOLICION Y REPOSICION DE PAVIMENTO RIGIDO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
19.02.01 CORTE DE PAVIMENTO RIGIDO C/EQUIPO m 537.82 14.10 7,583.26 Err:509 Err:509 Err:509 537.82 7,583.26 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.02.02 DEMOLICION DE PAVIMENTO DE CONCRETO DE 8" m2 215.13 31.13 6,697.00 Err:509 Err:509 Err:509 215.13 6,697.00 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VALORIZACION DE OBRA Nº 02
Obra CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
ENTIDAD MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR
SISTEMA Sistema a suma alzada Presupuesto Base : S/. 1,421,088.00 Avance Anterior : 0.00%
Contratista CONSORCIO N & F Monto de Contrato : S/. 1,421,088.00 Fr = 1.00000 Avance Actual : 32.92% Plazo de Ejecución : 120 Días Calend
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 Adelantos : Ninguno a la fecha Avance Acumulado : 32.92% Inicio del Plazo de Ejecución : 27-dic-14
Valorizado @ 30-nov-14 Saldo por Ejecutar : Err:509 Fin del Plazo de Ejecución : 25-abr-15
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
19.02.03 REPOSICION DE PAVIMENTO DE CONCRETO F'C=210 KG/CM2, LOSA E=8" m2 215.13 93.08 20,024.30 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.03 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
19.03.01 EXCAVACION EN TERRENO COMPACTO CON BOLONERIA PARA TUB. 6-8" HAST 1.7 m 3,772.60 12.51 47,195.23 Err:509 Err:509 Err:509 3,002.12 37,556.52 79.58% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.03.02 EXCAV. ZANJA (PULSO) P/TUB. T-SEMIROCOSO DN 160 - 200 DE HASTA 1.70 PROF. m 1,208.93 13.35 16,139.22 Err:509 Err:509 Err:509 1,027.59 13,718.33 85.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.03.03 REFINE, NIVELACION DE ZANJA Y CONFORMACION DE FONDOS m2 3,985.22 0.35 1,394.83 Err:509 Err:509 Err:509 3,769.22 1,319.23 94.58% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.03.04 PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO m 4,981.53 3.80 18,929.81 Err:509 Err:509 Err:509 4,711.53 17,903.82 94.58% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.03.05 RELLENO COMP c/APISON T/CANGURO H<1.70m c/MAT/PROPIO ZARAN C=20CM m 4,981.53 5.02 25,007.28 Err:509 Err:509 Err:509 4,711.53 23,651.89 94.58% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.03.06 ELIMINACION DE MATERIAL EXCEDENTE m3 1,494.46 16.72 24,987.37 Err:509 Err:509 Err:509 1,120.85 18,740.53 75.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.04 SUMINISTRO DE TUBERIAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
19.04.01 TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 200MM m 799.78 10.17 8,133.76 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.04.02 TUBERIA PVC ALCANT U.F. ISO 4435,S-25 160MM m 4,181.75 7.44 31,112.22 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.05 INSTALACION DE TUBERIAS DE ALCANTARILLADO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
19.05.01 INSTALACION DE TUBERIA PVC DESAGUE m 4,981.53 3.67 18,282.22 Err:509 Err:509 Err:509 4,682.64 17,185.28 94.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
20 CRUCE ESPECIAL EN PUENTE Y RIACHUELO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
20.01 CRUCE BAJO RIACHUELO glb 1.00 1,500.00 1,500.00 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
20.02 CRUCE BAJO PUENTE PROVISIONAL glb 1.00 2,000.00 2,000.00 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
21 BUZONES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
21.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
21.01.01 LIMPIEZA DE TERRENO MANUAL m2 219.24 0.35 76.73 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.01.02 TRAZO Y REPLANTEO m2 219.24 3.19 699.38 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.02 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
21.02.01 EXCAVACION MANUAL DE BUZON HASTA 1.49 m. EN ROCA SUELTA m3 218.23 81.51 17,787.93 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.02.02 EXCAVACION MANUAL DE BUZON DE 1.50 A 1.99 m. EN ROCA SUELTA m3 49.74 94.06 4,678.54 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.02.03 EXCAVACION MANUAL DE BUZON DE 2.00 A 2.49 m. EN ROCA SUELTA m3 22.80 111.16 2,534.45 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.02.04 EXCAVACION MANUAL DE BUZON DE 2.50 A 2.99 m. EN ROCA SUELTA m3 11.17 231.96 2,590.99 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.02.05 EXCAVACION MANUAL DE BUZON DE 3.50 A 3.99 m. EN ROCA SUELTA m3 7.92 274.46 2,173.72 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.02.06 ELIMINACION DE MATERIAL EXCEDENTE m3 433.83 16.72 7,253.64 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.03 CONSTRUCCION DE BUZONES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
21.03.01 CONSTRUCCION DE BUZONES EN ROCA SUELTA HASTA 1.49 m u 86.00 1,243.69 106,957.34 Err:509 Err:509 Err:509 35.00 43,529.15 40.70% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.03.02 CONSTRUCCION DE BUZONES EN ROCA SUELTA DE 1.50 HASTA 1.99 m u 13.00 1,439.13 18,708.69 Err:509 Err:509 Err:509 5.00 7,195.65 38.46% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.03.03 CONST. BUZON e/ROCA SUELTA DE 1.5-1.99m c/DIPOSIT. CAIDA INT. DE BUZON u 1.00 2,182.25 2,182.25 Err:509 Err:509 Err:509 1.00 2,182.25 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.03.04 CONSTRUCCION DE BUZONES EN ROCA SUELTA DE 2.00 HASTA 2.49 m u 5.00 1,644.85 8,224.25 Err:509 Err:509 Err:509 2.00 3,289.70 40.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.03.05 CONSTRUCCION DE BUZONES EN ROCA SUELTA DE 2.50 HASTA 2.99 m u 2.00 1,842.97 3,685.94 Err:509 Err:509 Err:509 1.00 1,842.97 50.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.03.06 CONSTRUC. BUZON EN ROCA SUELTA DE 2.5-2.99 m CON ESCALERA TIPO GATO u 1.00 2,411.45 2,411.45 Err:509 Err:509 Err:509 1.00 2,411.45 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
22 CONSTRUCCION CONEXIONES DOMICILIARIAS - ALCANTARILLADO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
22.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
22.01.01 LIMPIEZA DE TERRENO MANUAL m2 469.00 0.35 164.15 Err:509 Err:509 Err:509 469.00 164.15 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.01.02 TRAZO, NIVELACION Y REPLANTEO m 670.00 3.10 2,077.00 Err:509 Err:509 Err:509 670.00 2,077.00 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.02 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
22.02.01 EXCAV. ZANJA (PULSO) P/CONEX. TUBO DN 160 TERR. COMPACTO c/BOLONERIA m 683.00 11.15 7,615.45 Err:509 Err:509 Err:509 375.65 4,188.50 55.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.02.02 REFINE NIVELACION INTERIOR APISONADO MANUAL m2 402.00 3.01 1,210.02 Err:509 Err:509 Err:509 221.10 665.51 55.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.02.03 PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO m 670.00 3.80 2,546.00 Err:509 Err:509 Err:509 368.50 1,400.30 55.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.02.04 RELLENO COMPAC c/PLANC. VIBRAT. H<3.00m c/MAT-PROPIO ZARAND C=20cm m3 683.40 5.02 3,430.67 Err:509 Err:509 Err:509 375.87 1,886.87 55.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 854.25 16.72 14,283.06 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.03 CONEXIONES DOMICILIARIAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
22.03.01 CONEXIONES DOMICILIARIAS 4"X6" u 134.00 360.32 48,282.88 Err:509 Err:509 Err:509 73.70 26,555.58 55.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
23 CRUCE AEREO DE ACUEDUCTOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
23.01 PASE DE ACUEDUCTOS COLGANTES DE 50 MTS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
23.01.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
23.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 100.00 0.35 35.00 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.01.02 TRAZO Y REPLANTEO m2 100.00 5.76 576.00 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.02 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
VALORIZACION DE OBRA Nº 02
Obra CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
ENTIDAD MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR
SISTEMA Sistema a suma alzada Presupuesto Base : S/. 1,421,088.00 Avance Anterior : 0.00%
Contratista CONSORCIO N & F Monto de Contrato : S/. 1,421,088.00 Fr = 1.00000 Avance Actual : 32.92% Plazo de Ejecución : 120 Días Calend
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 Adelantos : Ninguno a la fecha Avance Acumulado : 32.92% Inicio del Plazo de Ejecución : 27-dic-14
Valorizado @ 30-nov-14 Saldo por Ejecutar : Err:509 Fin del Plazo de Ejecución : 25-abr-15
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
23.01.02.01 EXCAVACION MANUAL m3 71.60 32.91 2,356.36 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.02.02 RELLENO CON MATERIAL PROPIO m3 17.60 5.02 88.35 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.02.03 ELIMINACION DE MATERIAL EXCEDENTE A MANO D<200M m3 64.48 16.72 1,078.11 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.03 OBRAS DE CONCRETO SIMPLE - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
23.01.03.01 SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2 1.50 70.89 106.34 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.03.02 CONCRETO CICLOPEO f'c=140 kg/cm2 + 30 % PM. EN CAMARA DE ANCLAJE m3 20.76 262.73 5,454.27 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.03.03 ENCOFRADO Y DESENCOFRADO EN CAMARA DE ANCLAJE m2 88.24 38.99 3,440.48 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.03.04 DADOS DE CONCRETO m3 0.66 408.04 269.31 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04 OBRAS DE CONCRETO ARMADO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
23.01.04.01 ZAPATAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
23.01.04.01.01 CONCRETO f 'c=175 kg/cm2, PARA ZAPATAS m3 20.00 337.24 6,744.80 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.01.02 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 487.60 4.45 2,169.82 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.02 COLUMNAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
23.01.04.03 CONCRETO f 'c=210 kg/cm2 PARA COLUMNAS TORRE m3 2.18 468.39 1,021.09 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.04 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS TORRE m2 28.98 38.99 1,129.93 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.05 ACERO fy=4200 kg/cm2 GRADO 60 kg 483.66 4.55 2,200.65 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.06 ESTRUCTURA DE ACERO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
23.01.04.06.01 SUMINISTRO Y COLOCACION CABLE PRINCIPAL DE ACERO GALV. Ø 3/4" m 139.32 79.29 11,046.68 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.06.02 SUMIN Y COLOC GUARDACABOS p/CABLE 3/4" e/ANCLAJE MACIZO Ø 3" u 4.00 67.36 269.44 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.06.03 SUMINISTRO Y COLOC. GRAPAS TIPO CROSBY p/FIJACION DE CABLE Ø 3/4" u 40.00 40.48 1,619.20 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.06.04 SUMINISTRO Y COLOCACION DE PENDOLAS DE FIERRO LISO DIAM=1/4" m 86.20 33.73 2,907.53 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.06.05 DOBLADO Y SOLDADO DE EXTREMOS DE PENDOLAS S/DETALLE u 48.00 17.29 829.92 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.06.06 SUMIN Y COLOC. ABRAZADERA PLANCHA 1/4"x4"x4" en PENDOLA SUP. Ø3/4" u 48.00 44.17 2,120.16 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.06.07 SUMIN Y COLOC. ABRAZAD FF8"x1/2" P/INF. PENDOLA 1/4"+PERNO 3/4" c/a u 48.00 50.48 2,423.04 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.06.08 CARRITO DE DILATACION C/RODILLO MACIZO DE 2" u 4.00 412.73 1,650.92 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.06.09 MACIZO DE FIERRO LISO DE 3.0" PARA ANCLAJE Y SUJECION DE CABLE m 9.20 158.07 1,454.24 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.06.10 SUMINISTRO Y COLOCACION DE TUBO HDPE DIAM=8" m 107.80 55.99 6,035.72 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.07 PINTURA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
23.01.04.07.01 PINTURA ESMALTE 2 MANOS mil 270.00 7.11 1,919.70 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
24 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
24.01 OBRAS PROVISIONALES PARA TODA LA OBRA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
24.01.01 CARTEL DE IDENTIFICACION DE OBRA DE 3.60 x 2.40 M. u 1.00 1,222.76 1,222.76 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
24.01.02 CAMPAMENTO PROVISIONAL DE LA OBRA glb 1.00 5,171.53 5,171.53 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
25 TRABAJOS PRELIMINARES PARA TODA LA OBRA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
25.01 CINTA PLASTICA SEÑALIZADORA p/LIMITE DE SEGURIDAD DE OBRA m 2,270.10 0.93 2,111.19 Err:509 Err:509 Err:509 1,350.00 1,255.50 59.47% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
25.02 PUENTE DE MADERA p/PASE PEATONAL SOBRE ZANJA (PROV. DURANTE LA OBRA) u 15.00 229.62 3,444.30 Err:509 Err:509 Err:509 15.00 3,444.30 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
25.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUINARIA glb 1.00 5,000.00 5,000.00 Err:509 Err:509 Err:509 0.25 1,250.00 25.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
25.04 PRUEBA A ZANJA TAPADA PARA TUBERIA DESAGUE DE 6" A 8" m 3,772.00 1.88 7,091.36 Err:509 Err:509 Err:509 943.00 1,772.84 25.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
25.05 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MOD. - DENSIDAD DE CAMPO) u 10.00 105.53 1,055.30 Err:509 Err:509 Err:509 5.00 527.65 50.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
25.06 FLETE TERRESTRE glb 1.00 65,701.00 65,701.00 Err:509 Err:509 Err:509 0.15 9,855.15 15.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
26 MITIGACION DE IMPACTOS AMBIENTALES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
26.01 PROGRAMA DE PREVENCIÓN Y MITIGACIÓN - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
26.01.01 ALQUILER DE BAÑOS PORTATILES PARA CAMPAMENTO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
26.01.01.01 BAÑO PORTATIL TIPO DYSAL mes 6.00 600.00 3,600.00 Err:509 Err:509 Err:509 2.00 1,200.00 33.33% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
27 CONTINGENCIA DE OBRA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
27.01 ALQUILER DE CAMION CISTERNA PARA DOTACION DE AGUA A LA POBLACION glb 1.00 8,000.00 8,000.00 Err:509 Err:509 Err:509 0.29 2,320.00 29.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
01 INSTALACION DE BIODIGESTORES
01.01 INSTALACION DE BIODIGESTOR DE 7000 Lts - - - - - - - - - - -
01.02 INSTALACION DE BIODIGESTOR CON FILTRO DE AROS PET DE 7000 LTS EN TRAMO 12 u 1.00 16,350.06 16,350.06 0.35 5,722.52 35.00% - - 0.00% 0.35 5,722.52 35.00% 0.65 10,627.54 65.00%
01.03 FILTRO BIOLOGICO PARA BIODIGESTOR u 1.00 2,486.05 2,486.05 1.00 2,486.05 100.00% - - 0.00% 1.00 2,486.05 100.00% - - 0.00%
01.04 INSTALACION DE BIODIGESTOR DE 1300 Lts - - - - - - - - - - - -
01.04.01 INSTALACION DE BIODIGESTOR CON FILTRO DE AROS PET DE 3000 LTS EN TRAMO 15 u 1.00 10,139.06 10,139.06 0.35 3,548.67 35.00% - - 0.00% 0.35 3,548.67 35.00% 0.65 6,590.39 65.00%
01.04.02 FILTRO BIOLOGICO PARA BIODIGESTOR u 1.00 2,486.05 2,486.05 1.00 2,486.05 100.00% - - 0.00% 1.00 2,486.05 100.00% - - 0.00%
-
02 INSTALACION DE LETRINAS - 3.35 - - - - 3.35 - - (3.35) - -
02.01 INSTALACION DE LETRINAS u 2.00 2,000.00 4,000.00 2.00 4,000.00 100.00% - - 0.00% 2.00 4,000.00 100.00% - - 0.00%
-
03 RED DE ALCANTARILLADO EN PLANTA DE TRATAMIENTO - - - - - - - - - - - -
03.01 TRABAJOS PRELIMINARES - - - - - - - - - - - -
03.01.01 TRAZO, NIVELACION Y REPLANTEO m 130.00 3.19 414.70 - - 0.00% - 0.00% - - 0.00% 130.00 414.70 100.00%
03.02 MOVIMIENTO DE TIERRAS - - - - - - - - - - - -
03.02.01 EXCAV. ZANJA TERRENO c/BOLONERIAS GRANDES REDONDEADOS 8" A MAS 2M m3 93.60 204.24 19,116.86 - - 0.00% - 0.00% - - 0.00% 93.60 19,116.86 100.00%
03.02.02 REFINE, NIVELACION DE ZANJA Y CONFORMACION DE FONDOS m2 78.00 3.32 258.96 - - 0.00% - 0.00% - - 0.00% 78.00 258.96 100.00%
03.02.03 PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO m 130.00 3.80 494.00 - - 0.00% - 0.00% - - 0.00% 130.00 494.00 100.00%
03.02.04 RELLENO COMP. C/APISON T/CANGURO H<1.70 M c/MAT PROPIO ZAR. C=20cm m 62.40 5.02 313.25 - - 0.00% - 0.00% - - 0.00% 62.40 313.25 100.00%
03.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 39.00 16.72 652.08 - - 0.00% - 0.00% - - 0.00% 39.00 652.08 100.00%
03.03 SUMINISTRO E INSTALACION DE TUBERIAS - - - - - - - - - - - -
03.03.01 TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 200MM m 130.00 10.81 1,405.30 - - 0.00% - 0.00% - - 0.00% 130.00 1,405.30 100.00%
03.04 BUZONES - - - - - - - - - - - -
03.04.01 BUZON CONCRETO T-2 H=1.50 a 3m c/DISPOSITIVO DE CAIDA DENTRO DE BUZON u 5.00 1,986.81 9,934.05 - - 0.00% - 0.00% - - 0.00% 5.00 9,934.05 100.00%
-
04 CERCO PERIMETRICO - - - - - - - - - - - -
04.01 TRABAJOS PRELIMINARES - - - - - - - - - - - -
04.01.01 LIMPIEZA DE TERRENO MANUAL m2 150.00 0.35 52.50 - - 0.00% - 0.00% - - 0.00% 150.00 52.50 100.00%
04.01.02 TRAZO Y REPLANTEO m2 150.00 3.19 478.50 - - 0.00% - 0.00% - - 0.00% 150.00 478.50 100.00%
04.02 MOVIMIENTO DE TIERRAS - - - - - - - - - - - -
04.02.01 EXCAVACION MANUAL m3 27.00 34.94 943.38 - - 0.00% - 0.00% - - 0.00% 27.00 943.38 100.00%
04.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 33.75 16.72 564.30 - - 0.00% - 0.00% - - 0.00% 33.75 564.30 100.00%
04.03 CERCO PERIMETRICO CON ALAMBRE DE PUAS - - - - - - - - - - - -
04.03.01 CERCO PERIMETRICO DE ALAMBRE CON PUAS m 150.00 17.36 2,604.00 - - 0.00% - 0.00% - - 0.00% 150.00 2,604.00 100.00%
04.03.02 PUERTA DE INGRESO - - - - - - - - - - - -
04.03.02.01 INSTALACION DE PUERTA DE INGRESO u 1.00 706.95 706.95 - - 0.00% - 0.00% - - 0.00% 1.00 706.95 100.00%
-
05 CONSTRUC PLANTA TRATAMIENTO AGUAS RESIDUALES (PTAR-03) 126.60 - - - - - - - - - 126.60 - -
05.01 CAMARA DE REJAS (01 UND) - - - - - - - - - - - -
05.01.01 TRABAJOS PRELIMINARES - - - - - - - - - - - -
05.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 4.40 0.35 1.54 - - 0.00% 4.40 1.54 100.00% 4.40 1.54 100.00% - - 0.00%
05.01.01.02 TRAZO Y REPLANTEO m2 4.40 3.19 14.04 - - 0.00% 4.40 14.04 100.00% 4.40 14.04 100.00% - - 0.00%
05.01.02 MOVIMIENTO DE TIERRAS - - - - - - - - - - - -
05.01.02.01 EXCAVACION EN TERRENO SEMIRROCOSO m3 3.52 74.68 262.87 - - 0.00% - 0.00% - - 0.00% 3.52 262.87 100.00%
05.01.02.02 REFINE NIVELACION INTERIOR APISONADO MANUAL m2 4.40 2.86 12.58 - - 0.00% - 0.00% - - 0.00% 4.40 12.58 100.00%
05.01.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 4.40 16.72 73.57 - - 0.00% - 0.00% - - 0.00% 4.40 73.57 100.00%
05.01.03 OBRAS DE CONCRETO SIMPLE - - - - - - - - - - - -
05.01.03.01 SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2 3.83 194.08 743.33 - - 0.00% - 0.00% - - 0.00% 3.83 743.33 100.00%
05.01.04 OBRAS DE CONCRETO ARMADO - - - - - - - - - - - -
05.01.04.01 CONCRETO F'C=210 KG/CM2 m3 2.60 434.07 1,128.58 - - 0.00% - 0.00% - - 0.00% 2.60 1,128.58 100.00%
05.01.04.02 ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS m2 16.97 38.99 661.66 - - 0.00% - 0.00% - - 0.00% 16.97 661.66 100.00%
05.01.04.03 ACERO FY=4200 KG/CM2 kg 99.35 4.55 452.04 - - 0.00% - 0.00% - - 0.00% 99.35 452.04 100.00%
VALORIZACION DE OBRA Nº 03
Obra CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
ENTIDAD MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR Plazo de Ejecución : 120 Días Calend
SISTEMA Sistema a suma alzada Presupuesto Base : S/. 1,421,088.00 Avance Anterior : Err:509 Inicio del Plazo de Ejecución : 27-dic-14
Contratista CONSORCIO N & F Monto de Contrato : S/. 1,421,088.00 Fr = 1.00000 Avance Actual : 3.03% Fin del Plazo de Ejecución : 25-abr-15
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 Adelantos : Ninguno a la fecha Avance Acumulado : Err:509 Total dias ejecutados : 5 Días Calend
Valorizado @ 31-dic-14 Saldo por Ejecutar : Err:509 Faltan para terminar la Obra : 115 Días Calend
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
05.01.05 REVOQUES Y ENLUCIDOS - - - - - - - - - - - -
05.01.05.01 TARRAJEO CON IMPERMEABILIZANTES m2 14.21 30.31 430.71 - - 0.00% - 0.00% - - 0.00% 14.21 430.71 100.00%
05.01.05.02 TARRAJEO EN EXTERIORES CON CEMENTO - ARENA m2 7.70 37.25 286.83 - - 0.00% - 0.00% - - 0.00% 7.70 286.83 100.00%
05.01.06 ACCESORIOS - - - - - - - - - - - -
05.01.06.01 REJILLA METALICA u 1.00 37.82 37.82 - - 0.00% - 0.00% - - 0.00% 1.00 37.82 100.00%
05.01.06.02 COMPUERTA DE PLANCHA METALICA DE 1/8" COMO MINIMO u 1.00 305.04 305.04 - - 0.00% - 0.00% - - 0.00% 1.00 305.04 100.00%
06 DESARENADOR Y MEDIDOR PARSHALL (01 UND) - - - - - - - - - - - -
06.01 TRABAJOS PRELIMINARES - - - - - - - - - - - -
06.01.01 LIMPIEZA DE TERRENO MANUAL m2 17.19 0.35 6.02 - - 0.00% 17.19 6.02 100.00% 17.19 6.02 100.00% - - 0.00%
06.01.02 TRAZO Y REPLANTEO m2 17.19 3.19 54.84 - - 0.00% 17.19 54.84 100.00% 17.19 54.84 100.00% - - 0.00%
06.02 MOVIMIENTO DE TIERRAS - - - - - - - - - - - -
06.02.01 EXCAVACION EN TERRENO SEMIRROCOSO m3 25.79 74.68 1,926.00 - - 0.00% - 0.00% - - 0.00% 25.79 1,926.00 100.00%
06.02.02 REFINE NIVELACION INTERIOR APISONADO MANUAL m2 17.19 2.86 49.16 - - 0.00% - 0.00% - - 0.00% 17.19 49.16 100.00%
06.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 32.23 16.72 538.89 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
06.03 OBRAS DE CONCRETO SIMPLE - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
06.03.01 SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2 17.19 194.08 3,336.24 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
06.04 OBRAS DE CONCRETO ARMADO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
06.04.01 CONCRETO F'C=210 KG/CM2 m3 8.71 434.07 3,780.75 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
06.04.02 ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS m2 53.42 38.99 2,082.85 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
06.04.03 ACERO FY=4200 KG/CM2 kg 224.95 4.55 1,023.52 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
06.05 REVOQUES Y ENLUCIDOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
06.05.01 TARRAJEO CON IMPERMEABILIZANTES m2 28.14 30.31 852.92 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
06.06 ACCESORIOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
06.06.01 REJILLA METALICA DE 15MM u 1.00 576.76 576.76 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
06.06.02 COMPUERTA DE PLANCHA METALICA DE 1/8" COMO MINIMO u 4.00 305.04 1,220.16 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07 TANQUE IMHOFF (01 UND) - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
07.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
07.01.01 LIMPIEZA DE TERRENO MANUAL m2 33.00 0.35 11.55 Err:509 Err:509 Err:509 33.00 11.55 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.01.02 TRAZO Y REPLANTEO m2 33.00 3.19 105.27 Err:509 Err:509 Err:509 33.00 105.27 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.02 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
07.02.01 EXCAVACION EN TERRENO SEMIRROCOSO m3 260.93 74.68 19,486.25 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.02.02 REFINE NIVELACION INTERIOR APISONADO MANUAL m2 106.50 2.86 304.59 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 76.64 5.02 384.73 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.02.04 ELIMINACION DE MATERIAL EXCEDENTE m3 230.36 16.72 3,851.62 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.03 OBRAS DE CONCRETO SIMPLE - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
07.03.01 SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2 60.32 194.08 11,706.91 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.04 OBRAS DE CONCRETO ARMADO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
07.04.01 CONCRETO F'C=210 KG/CM2 m3 79.44 434.07 34,482.52 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.04.02 ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS m2 414.00 38.99 16,141.86 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.04.03 ACERO FY=4200 KG/CM2 kg 13,859.26 4.55 63,059.63 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.05 REVOQUES Y ENLUCIDOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
07.05.01 TARRAJEO CON IMPERMEABILIZANTES m2 280.39 30.31 8,498.62 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.05.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 52.85 28.29 1,495.13 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.06 CARPINTERIA METALICA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
07.06.01 BARANDA DE TUBO FO. GDO. PASAMANO 1 1/2"-PARANTE 1" X 1M.ALT m 28.40 99.81 2,834.60 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.06.02 ESCALERA TUB F.GVZDO. C/PARANTES DE 2" X PELDAÑOS DE 3/4" m 4.09 236.53 967.41 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.07 INSTALACIONES SANITARIAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
07.07.01 TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 200MM m 8.50 10.81 91.89 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.07.02 TEE UPVC UF S-25 DE 8" u 1.00 109.92 109.92 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.07.03 CODO SP PVC UF S-25 DE 8" u 1.00 244.08 244.08 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VALORIZACION DE OBRA Nº 03
Obra CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
ENTIDAD MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR Plazo de Ejecución : 120 Días Calend
SISTEMA Sistema a suma alzada Presupuesto Base : S/. 1,421,088.00 Avance Anterior : Err:509 Inicio del Plazo de Ejecución : 27-dic-14
Contratista CONSORCIO N & F Monto de Contrato : S/. 1,421,088.00 Fr = 1.00000 Avance Actual : 3.03% Fin del Plazo de Ejecución : 25-abr-15
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 Adelantos : Ninguno a la fecha Avance Acumulado : Err:509 Total dias ejecutados : 5 Días Calend
Valorizado @ 31-dic-14 Saldo por Ejecutar : Err:509 Faltan para terminar la Obra : 115 Días Calend
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
07.07.04 VALVULA DE COMPUERTA DE FIERRO FUNDIDO MAZZA DE 8" u 1.00 1,220.98 1,220.98 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.07.05 PANTALLA DEFLECTORA u 2.00 250.00 500.00 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08 LECHO DE SECADO (01 UND) - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
08.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
08.01.01 LIMPIEZA DE TERRENO MANUAL m2 35.15 0.35 12.30 Err:509 Err:509 Err:509 35.15 12.30 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.01.02 TRAZO Y REPLANTEO m2 35.15 3.19 112.13 Err:509 Err:509 Err:509 35.15 112.13 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.02 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
08.02.01 EXCAVACION EN TERRENO SEMIRROCOSO m3 50.96 74.68 3,805.69 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.02.02 REFINE NIVELACION INTERIOR APISONADO MANUAL m2 35.15 2.86 100.53 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 63.70 16.72 1,065.06 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.03 OBRAS DE CONCRETO SIMPLE - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
08.03.01 SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2 35.15 194.08 6,821.91 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.04 OBRAS DE CONCRETO ARMADO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
08.04.01 CONCRETO F'C=210 KG/CM2 m3 25.44 434.07 11,042.74 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 143.98 38.99 5,613.78 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.04.03 ACERO FY=4200 KG/CM2 kg 620.00 4.55 2,821.00 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.05 REVOQUES Y ENLUCIDOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
08.05.01 TARRAJEO CON IMPERMEABILIZANTES m2 93.14 30.31 2,823.07 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.05.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 69.54 30.31 2,107.76 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.06 ESTRUCTURA DE MADERA Y COBERTURA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
08.06.01 TIJERAL DE MADERA TIPO 01 L=3.00M u 5.00 677.82 3,389.10 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.06.02 VIGA DE MADERA 3" X 4" m 9.90 21.12 209.09 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.06.03 CORREAS Y TIRANTES DE MADERA p2 106.76 7.18 766.54 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.06.04 COBERTURA DE CALAMINA 11 CANALES E=3MM m2 46.98 45.91 2,156.85 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.07 INSTALACIONES SANITARIAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
08.07.01 TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 100MM m 14.58 16.27 237.22 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.07.02 TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 50MM m 76.60 68.42 5,240.97 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.07.03 CODO PVC SAP 6"X90° u 3.00 55.43 166.29 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.07.04 CODO PVC SAP 4"X90° u 2.00 34.42 68.84 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.07.05 TEE PVC-SAP 4"* 2" u 23.00 30.84 709.32 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.07.06 TEE PVC-SAP 150mmx150mm u 3.00 54.85 164.55 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.07.07 TEE PVC-SAP 200mmx150mm u 1.00 42.35 42.35 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.07.08 TAPON PVC-SAP 2" u 23.00 23.01 529.23 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.08 FILTROS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
08.08.01 FILTRO DE GRAVA m3 12.48 180.66 2,254.64 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.08.02 FILTRO DE ARENA m3 9.36 259.66 2,430.42 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.08.03 FILTRO DE LADRILLO m2 31.20 110.56 3,449.47 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09 FILTRO BIOLOGICO (01 UND) - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
09.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
09.01.01 LIMPIEZA DE TERRENO MANUAL m2 12.75 0.35 4.46 Err:509 Err:509 Err:509 12.75 4.46 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.01.02 TRAZO Y REPLANTEO m2 12.75 3.19 40.67 Err:509 Err:509 Err:509 12.75 40.67 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.02 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
09.02.01 EXCAVACION EN TERRENO SEMIRROCOSO m3 18.63 74.68 1,391.29 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.02.02 REFINE NIVELACION INTERIOR APISONADO MANUAL m2 6.90 2.86 19.73 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 21.42 16.72 358.14 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.03 OBRAS DE CONCRETO SIMPLE - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
09.03.01 SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2 10.75 194.08 2,086.36 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VALORIZACION DE OBRA Nº 03
Obra CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
ENTIDAD MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR Plazo de Ejecución : 120 Días Calend
SISTEMA Sistema a suma alzada Presupuesto Base : S/. 1,421,088.00 Avance Anterior : Err:509 Inicio del Plazo de Ejecución : 27-dic-14
Contratista CONSORCIO N & F Monto de Contrato : S/. 1,421,088.00 Fr = 1.00000 Avance Actual : 3.03% Fin del Plazo de Ejecución : 25-abr-15
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 Adelantos : Ninguno a la fecha Avance Acumulado : Err:509 Total dias ejecutados : 5 Días Calend
Valorizado @ 31-dic-14 Saldo por Ejecutar : Err:509 Faltan para terminar la Obra : 115 Días Calend
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
09.04 OBRAS DE CONCRETO ARMADO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
09.04.01 CONCRETO F'C=210 KG/CM2 m3 15.11 434.07 6,558.80 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 79.05 38.99 3,082.16 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.04.03 ACERO FY=4200 KG/CM2 kg 830.36 4.55 3,778.14 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.05 REVOQUES Y ENLUCIDOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
09.05.01 TARRAJEO CON IMPERMEABILIZANTES m2 85.95 30.31 2,605.14 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.06 FILTROS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
09.06.01 FILTRO DE GRAVA m3 12.42 180.66 2,243.80 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.06.02 FILTRO DE LADRILLO m2 13.80 110.56 1,525.73 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.07 SISTEMA DE DESINFECCION (HIPOCLORADOR POR GOTEO) - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
09.07.01 HIPOCLORADOR DIFUSION inc Gancho u 1.00 32.40 32.40 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.07.02 TAPA METALICA 0.40X0.45X1/8" u 1.00 108.77 108.77 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.07.03 ACCESORIOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
09.07.03.01 CANALETA DE DISTRIBUCION DE PVC m 50.00 67.95 3,397.50 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
10 FILTRO BIOLOGICO PARA BIODIGESTORES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
-
11 RECONSTRUCCION DE CAPTACIONE EXISTENTE - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
11.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
11.01.01 DEMOLICION DE CAPTACION EXISTENTE glb 1.00 1,138.18 1,138.18 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.01.02 ELIMINACION DE DESMONTE PROVENIENTE DE LA DEMOLICION DE CAPTACION glb 1.00 324.33 324.33 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.01.03 LIMPIEZA DE TERRENO MANUAL m2 19.90 0.35 6.97 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.01.04 TRAZO Y REPLANTEO SIN EQUIPO m2 19.90 2.84 56.52 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
11.02.01 REFINE NIVELACION INTERIOR APISONADO MANUAL m2 8.29 2.09 17.33 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.02 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 1.73 5.02 8.68 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.03 ELIMINACION MATERIAL EXCEDENTE A MANO D<200M m3 4.46 16.72 74.57 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.04 FILTROS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
11.02.04.01 FILTRO DE GRAVA m3 4.41 180.66 796.71 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.05 OBRAS DE CONCRETO ARMADO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
11.02.05.01 CONCRETO EN MUROS REFORZADOS F'C= 210 KG/CM2 EN TABIQUE Y PLACAS m3 4.44 506.72 2,249.84 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.05.02 ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS m2 45.92 49.97 2,294.62 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.05.03 ACERO FY=4200 KG/CM2 kg 158.46 4.55 720.99 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.06 REVOQUES Y ENLUCIDOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
11.02.06.01 TARRAJEO CON IMPERMEABILIZANTES m2 54.61 34.32 1,874.22 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.06.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 26.70 28.29 755.34 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.07 VARIOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
11.02.07.01 TUBERIA DE REBOSE Y DESAGUE DE 2" SAL PVC u 1.00 1,226.35 1,226.35 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.07.02 TUBERIA DE REBOSE Y DESAGUE DE 3" SAL PVC u 1.00 798.52 798.52 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.07.03 TUBERIA DE SALIDA DE CAPTACION PVC SAP C-10 DE 1 1/2" u 1.00 274.72 274.72 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.07.04 TUBERIA DE SALIDA DE CAPTACION PVC SAP C-10 DE 2" u 1.00 466.10 466.10 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.08 PINTURA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
11.02.08.01 PINTURA LATEX EN MUROS 2 MANOS m2 28.60 7.11 203.35 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.09 CARPINTERIA METALICA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
11.02.09.01 TAPA METALICA 0.73X0.73X1/8" u 2.00 166.77 333.54 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.09.02 PINTURA EN CARPINTERIA METALICA m2 4.00 31.13 124.52 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
-
12 REHABILITACION DE RESERVORIO EXISTENTE (44 M3) - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
12.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
12.01.01 LIMPIEZA DE TERRENO MANUAL m2 21.62 0.35 7.57 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.01.02 TRAZO Y REPLANTEO SIN EQUIPO m2 21.62 2.84 61.40 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.02 REVOQUES Y ENLUCIDOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
12.03 TARRAJEO EN INTERIOR DE RESERVORIO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
12.03.01 PICADO DE TARRAJEO INTERIOR DE RESERVORIO m2 63.71 8.16 519.87 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VALORIZACION DE OBRA Nº 03
Obra CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
ENTIDAD MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR Plazo de Ejecución : 120 Días Calend
SISTEMA Sistema a suma alzada Presupuesto Base : S/. 1,421,088.00 Avance Anterior : Err:509 Inicio del Plazo de Ejecución : 27-dic-14
Contratista CONSORCIO N & F Monto de Contrato : S/. 1,421,088.00 Fr = 1.00000 Avance Actual : 3.03% Fin del Plazo de Ejecución : 25-abr-15
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 Adelantos : Ninguno a la fecha Avance Acumulado : Err:509 Total dias ejecutados : 5 Días Calend
Valorizado @ 31-dic-14 Saldo por Ejecutar : Err:509 Faltan para terminar la Obra : 115 Días Calend
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
12.03.02 TARRAJEO CON IMPERMEABILIZANTES m2 63.71 34.32 2,186.53 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.04 TARRAJEO EN EXTERIOR DE RESERVORIO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
12.04.01 PICADO DE TARRAJEO EXTERIOR DE RESERVORIO m2 64.64 4.33 279.89 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.04.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 64.64 28.29 1,828.67 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.05 PINTURA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
12.05.01 PINTURA LATEX EN MUROS 2 MANOS m2 64.64 7.11 459.59 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.05.02 PINTURA EN ESTRUCTURAS METALICAS glb 1.00 68.91 68.91 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.06 CARPINTERIA METALICA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
12.06.01 ESCALERA GATO, TUB F.GVZDO. C/PARANTES DE 1 1/2" SEGUN DISEÑO m 2.00 208.50 417.00 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.06.02 TAPA METALICA 0.60X0.60X1/8" u 2.00 88.77 177.54 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.07 INSTALACIONES SANITARIAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
12.07.01 TUBERIA DE REBOSE Y DESAGUE DE 2 1/2" SAL PVC u 1.00 212.37 212.37 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.07.02 TUBERIA DE SALIDA DE PVC SAP C-10 DE 1 1/2" u 2.00 182.42 364.84 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.07.03 ACCESORIOS DE RESERVORIO glb 1.00 1,442.69 1,442.69 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
-
13 MEJORAMIENTO DE LA LINEA DE CONDUCCION - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
13.01 MEJORAMIENTO DE LA LINEA DE CONDUCCION m 653.00 2.16 1,410.48 Err:509 Err:509 Err:509 653.00 1,410.48 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
-
14 LINEA DE ADUCCION - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
14.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
14.01.01 LIMPIEZA DE LINEA DE ADUCCION m 170.00 0.35 59.50 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
14.01.02 TRAZO, NIVELACION Y REPLANTEO m 170.00 3.10 527.00 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
14.02 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - - Err:509 Err:509 - Err:509 Err:509 -
14.02.01 EXCAV. ZANJAS EN T.S.R P/TUB. 2"-4", HASTA 1.50M, A=0.60M m 170.00 11.88 2,019.60 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
14.02.02 REFINE, NIVELACION DE ZANJA Y CONFORMACION DE FONDOS m 170.00 3.01 511.70 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
14.02.03 PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO m 170.00 3.80 646.00 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
14.02.04 RELLENO COMP c/PLANCHA VIBRAT H<3.00m c/MAT PROPIO ZARAND. C=20cm m 170.00 5.02 853.40 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
14.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 29.75 16.72 497.42 Err:509 Err:509 Err:509 29.75 497.42 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
14.03 TUBERIAS - Err:509 Err:509 - - - - Err:509 Err:509 - Err:509 Err:509 -
14.03.01 TUBERIA PVC SAP ISO 4422 DN 75MM C-10 m 170.00 15.37 2,612.90 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
14.03.02 SUMINISTRO E INSTALACION DE ACCESORIOS PVC RED ADUCCION glb 1.00 501.64 501.64 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
14.03.03 PRUEBA HIDRAULICA+DESINFECCION TUB.6"-8" A ZANJA TAPADA m 170.00 2.70 459.00 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- -
15 RED DE DISTRIBUCION - Err:509 Err:509 - - - - Err:509 Err:509 - Err:509 Err:509 -
15.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - - Err:509 Err:509 - Err:509 Err:509 -
15.01.01 LIMPIEZA DE RED DE DISTRIBUCION m 3,845.00 0.35 1,345.75 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.01.02 TRAZO, NIVELACION Y REPLANTEO m 3,845.00 3.10 11,919.50 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.02 DEMOLICION DE PAVIMENTO - Err:509 Err:509 - - - - Err:509 Err:509 - Err:509 Err:509 -
15.02.01 CORTE DE PAVIMENTO RIGIDO C/EQUIPO m 537.82 14.10 7,583.26 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.02.02 DEMOLICION DE PAVIMENTO DE CONCRETO DE 8" m2 121.01 31.13 3,767.04 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.02.03 REPOSICION DE PAVIMENTO DE CONCRETO F'C=210 KG/CM2, LOSA E=8" m2 121.01 93.08 11,263.61 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.03 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - - Err:509 Err:509 - Err:509 Err:509 -
15.03.01 EXCAV. ZANJAS EN TERRENO SEMI ROCOSO PARA AGUA m 547.00 12.51 6,842.97 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.03.02 EXCAVACION TERRENO COMPACTO c/BOLONERIA p/TUBO DE AGUA HASTA 1.5 m 3,298.12 12.51 41,259.48 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.03.03 REFINE, NIVELACION DE ZANJA Y CONFORMACION DE FONDOS m 3,845.00 3.01 11,573.45 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.03.04 PREPARACION DE CAMA DE APOYO CON MATERIAL DE PRESTAMO m 3,845.00 3.80 14,611.00 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.03.05 RELLENO COMP c/APISON T/CANGURO H<1.00m c/MAT/PROPIO ZARAN c=20cm m 3,845.00 5.02 19,301.90 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.03.06 ELIMINACION DE MATERIAL EXCEDENTE m3 672.88 16.72 11,250.55 Err:509 Err:509 Err:509 269.15 4,500.22 40.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.04 SUMINISTRO DE TUBERIAS - Err:509 Err:509 - - - - Err:509 Err:509 - Err:509 Err:509 -
15.04.01 TUBERIA PVC CLASE A-10 AGUA POTABLE DE 2" + 3% DESPERDICIO m 175.00 9.77 1,709.75 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.04.02 TUBERIA PVC CLASE A-10 AGUA POTABLE DE 1 1/2" + 3% DESPERDICIO m 140.99 8.70 1,226.61 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.04.03 TUBERIA PVC CLASE A-10 AGUA POTABLE DE 1 1/4" + 3% DESPERDICIO m 692.64 7.08 4,903.89 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VALORIZACION DE OBRA Nº 03
Obra CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
ENTIDAD MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR Plazo de Ejecución : 120 Días Calend
SISTEMA Sistema a suma alzada Presupuesto Base : S/. 1,421,088.00 Avance Anterior : Err:509 Inicio del Plazo de Ejecución : 27-dic-14
Contratista CONSORCIO N & F Monto de Contrato : S/. 1,421,088.00 Fr = 1.00000 Avance Actual : 3.03% Fin del Plazo de Ejecución : 25-abr-15
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 Adelantos : Ninguno a la fecha Avance Acumulado : Err:509 Total dias ejecutados : 5 Días Calend
Valorizado @ 31-dic-14 Saldo por Ejecutar : Err:509 Faltan para terminar la Obra : 115 Días Calend
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
15.04.04 TUBERIA PVC CLASE A-10 AGUA POTABLE DE 1" + 3% DESPERDICIO m 578.71 4.69 2,714.15 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.04.05 TUBERIA PVC CLASE A-10 AGUA POTABLE DE 3/4" + 3% DESPERDICIO m 2,258.31 4.08 9,213.90 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.04.06 INSTALACION DE TUBERIAS DE PVC - Err:509 Err:509 - - - - Err:509 Err:509 - Err:509 Err:509 -
15.04.07 INSTALACION DE TUBERIAS < 3" PVC SP C-10 m 3,845.00 3.01 11,573.45 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.04.08 SUMINISTRO E INSTALACION DE ACCESORIOS PVC RED DE DISTRIBUCION glb 1.00 1,601.20 1,601.20 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.04.09 PRUEBA HIDRAULICA+DESINFECCION TUB.6"-8" A ZANJA TAPADA m 3,845.00 2.70 10,381.50 Err:509 Err:509 Err:509 1,150.00 3,105.00 29.91% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
-
16 CAJA DE VALVULA DE CONTROL - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
16.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
16.01.01 LIMPIEZA DE TERRENO MANUAL m2 7.00 0.35 2.45 Err:509 Err:509 Err:509 7.00 2.45 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
16.01.02 TRAZO Y REPLANTEO m2 7.00 3.19 22.33 Err:509 Err:509 Err:509 7.00 22.33 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
16.02 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
16.02.01 EXCAVACION MANUAL m3 8.40 32.91 276.44 Err:509 Err:509 Err:509 2.20 72.40 26.19% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
16.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 10.50 16.72 175.56 Err:509 Err:509 Err:509 2.80 46.82 26.67% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
16.03 OBRAS DE CONCRETO SIMPLE - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
16.03.01 CONCRETO F'c= 175 KG/CM2 m3 5.76 391.20 2,253.31 Err:509 Err:509 Err:509 0.80 312.96 13.89% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
16.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 57.60 38.99 2,245.82 Err:509 Err:509 Err:509 8.03 313.09 13.94% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
16.04 REVOQUES Y ENLUCIDOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
16.04.01 TARRAJEO CON IMPERMEABILIZANTES m2 42.48 34.32 1,457.91 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
16.05 CARPINTERIA METALICA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
16.05.01 TAPA METALICA 0.40X0.45X1/8" u 20.00 108.77 2,175.40 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
16.06 PINTURA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
16.06.01 PINTURA LATEX EN MUROS 2 MANOS m2 42.48 7.11 302.03 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
16.07 SUMINISTRO E INSTALACION DE VALVULAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
16.07.01 SUMINISTRO DE VALVULAS u 20.00 152.20 3,044.00 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
-
17 VALVULA DE PURGA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
17.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
17.01.01 LIMPIEZA DE TERRENO MANUAL m2 0.98 0.35 0.34 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
17.01.02 TRAZO Y REPLANTEO m2 0.98 3.19 3.13 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
17.02 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
17.02.01 EXCAVACION MANUAL m3 1.18 34.94 41.23 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
17.02.02 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 0.10 5.02 0.50 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
17.02.03 ELIMINACION MATERIAL EXCEDENTE A MANO D<200M m3 2.70 16.72 45.14 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
17.03 OBRAS DE CONCRETO SIMPLE - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
17.03.01 SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2 1.28 194.08 248.42 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
17.03.02 CONCRETO F'c= 175 KG/CM2 m3 4.70 391.20 1,838.64 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
17.03.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 6.72 38.99 262.01 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
17.04 SUMINISTRO E INSTALACION DE TUBERIAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
17.04.01 TUBERIA PVC SAP ISO 4422 DN 12.7 MM C-10 m 3.00 17.98 53.94 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
17.04.02 VALVULA DE PURGA 19.10mm (3/4") u 2.00 76.77 153.54 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
17.04.03 ABRAZADERA PVC D=19.1 MM C/SALIDA A 12.70 MM INC. ACCESORIOS u 4.00 154.82 619.28 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
-
18 CONSTRUCCION DE CONEXIONES DOMICILIARIAS DE AGUA POTABLE - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
18.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
18.01.01 TRAZO, NIVELACION Y REPLANTEO DURANTE LA EJECUCION DE LA OBRA m 603.00 3.26 1,965.78 Err:509 Err:509 Err:509 301.00 981.26 49.92% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
18.02 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
18.02.01 EXCAVACION DE ZANJA HASTA 0.80 M, TERRENO COMPACTO CON BOLONERIA m 603.00 12.51 7,543.53 Err:509 Err:509 Err:509 301.00 3,765.51 49.92% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
18.02.02 REFINE, NIVELACION DE ZANJA Y CONFORMACION DE FONDOS m 603.00 3.01 1,815.03 Err:509 Err:509 Err:509 301.00 906.01 49.92% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
18.02.03 PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO m 536.00 3.80 2,036.80 Err:509 Err:509 Err:509 285.00 1,083.00 53.17% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
18.02.04 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 633.15 5.02 3,178.41 Err:509 Err:509 Err:509 315.00 1,581.30 49.75% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VALORIZACION DE OBRA Nº 03
Obra CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
ENTIDAD MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR Plazo de Ejecución : 120 Días Calend
SISTEMA Sistema a suma alzada Presupuesto Base : S/. 1,421,088.00 Avance Anterior : Err:509 Inicio del Plazo de Ejecución : 27-dic-14
Contratista CONSORCIO N & F Monto de Contrato : S/. 1,421,088.00 Fr = 1.00000 Avance Actual : 3.03% Fin del Plazo de Ejecución : 25-abr-15
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 Adelantos : Ninguno a la fecha Avance Acumulado : Err:509 Total dias ejecutados : 5 Días Calend
Valorizado @ 31-dic-14 Saldo por Ejecutar : Err:509 Faltan para terminar la Obra : 115 Días Calend
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
18.03 SUMINISTRO E INSTALACION DE TUBERIAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
18.03.01 TUBERIA PVC SAP ISO 4422 DN 19.1MM C-10 m 603.00 13.28 8,007.84 Err:509 Err:509 Err:509 301.00 3,997.28 49.92% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
18.03.02 PRUEBA HIDRAULICA+DESINFECCION TUB.6"-8" A ZANJA TAPADA m 603.00 2.70 1,628.10 Err:509 Err:509 Err:509 301.00 812.70 49.92% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
18.04 SUMINISTRO E INSTALACION DE ACCESORIOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
18.04.01 SUMINISTRO E INSTALACION DE ACCESORIOS RED SECUNDARIA 01 glb 1.00 1,391.90 1,391.90 Err:509 Err:509 Err:509 0.50 695.95 50.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
18.05 CONEXIONES DOMICILIARIAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
18.05.01 CONEXION DOMICILIARIA DE AGUA POTABLE L=4.50 M. u 134.00 135.08 18,100.72 Err:509 Err:509 Err:509 54.00 7,294.32 40.30% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
-
19 RED DE ALCANTARILLADO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
19.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
19.01.01 TRAZO, NIVELACION Y REPLANTEO DURANTE LA EJECUCION DE LA OBRA m 4,981.52 4.60 22,914.99 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.02 CORTE, DEMOLICION Y REPOSICION DE PAVIMENTO RIGIDO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
19.02.01 CORTE DE PAVIMENTO RIGIDO C/EQUIPO m 537.82 14.10 7,583.26 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.02.02 DEMOLICION DE PAVIMENTO DE CONCRETO DE 8" m2 215.13 31.13 6,697.00 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.02.03 REPOSICION DE PAVIMENTO DE CONCRETO F'C=210 KG/CM2, LOSA E=8" m2 215.13 93.08 20,024.30 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.03 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - - Err:509 Err:509 - Err:509 Err:509 -
19.03.01 EXCAVACION EN TERRENO COMPACTO CON BOLONERIA PARA TUB. 6-8" HAST 1.7 m 3,772.60 12.51 47,195.23 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.03.02 EXCAV. ZANJA (PULSO) P/TUB. T-SEMIROCOSO DN 160 - 200 DE HASTA 1.70 PROF. m 1,208.93 13.35 16,139.22 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.03.03 REFINE, NIVELACION DE ZANJA Y CONFORMACION DE FONDOS m2 3,985.22 0.35 1,394.83 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.03.04 PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO m 4,981.53 3.80 18,929.81 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.03.05 RELLENO COMP c/APISON T/CANGURO H<1.70m c/MAT/PROPIO ZARAN C=20CM m 4,981.53 5.02 25,007.28 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.03.06 ELIMINACION DE MATERIAL EXCEDENTE m3 1,494.46 16.72 24,987.37 Err:509 Err:509 Err:509 75.50 1,262.36 5.05% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.04 SUMINISTRO DE TUBERIAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
19.04.01 TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 200MM m 799.78 10.17 8,133.76 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.04.02 TUBERIA PVC ALCANT U.F. ISO 4435,S-25 160MM m 4,181.75 7.44 31,112.22 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.05 INSTALACION DE TUBERIAS DE ALCANTARILLADO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
19.05.01 INSTALACION DE TUBERIA PVC DESAGUE m 4,981.53 3.67 18,282.22 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
-
20 CRUCE ESPECIAL EN PUENTE Y RIACHUELO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
20.01 CRUCE BAJO RIACHUELO glb 1.00 1,500.00 1,500.00 Err:509 Err:509 Err:509 1.00 1,500.00 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
20.02 CRUCE BAJO PUENTE PROVISIONAL glb 1.00 2,000.00 2,000.00 Err:509 Err:509 Err:509 1.00 2,000.00 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
-
21 BUZONES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
21.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
21.01.01 LIMPIEZA DE TERRENO MANUAL m2 219.24 0.35 76.73 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.01.02 TRAZO Y REPLANTEO m2 219.24 3.19 699.38 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.02 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
21.02.01 EXCAVACION MANUAL DE BUZON HASTA 1.49 m. EN ROCA SUELTA m3 218.23 81.51 17,787.93 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.02.02 EXCAVACION MANUAL DE BUZON DE 1.50 A 1.99 m. EN ROCA SUELTA m3 49.74 94.06 4,678.54 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.02.03 EXCAVACION MANUAL DE BUZON DE 2.00 A 2.49 m. EN ROCA SUELTA m3 22.80 111.16 2,534.45 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.02.04 EXCAVACION MANUAL DE BUZON DE 2.50 A 2.99 m. EN ROCA SUELTA m3 11.17 231.96 2,590.99 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.02.05 EXCAVACION MANUAL DE BUZON DE 3.50 A 3.99 m. EN ROCA SUELTA m3 7.92 274.46 2,173.72 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.02.06 ELIMINACION DE MATERIAL EXCEDENTE m3 433.83 16.72 7,253.64 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.03 CONSTRUCCION DE BUZONES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
21.03.01 CONSTRUCCION DE BUZONES EN ROCA SUELTA HASTA 1.49 m u 86.00 1,243.69 106,957.34 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.03.02 CONSTRUCCION DE BUZONES EN ROCA SUELTA DE 1.50 HASTA 1.99 m u 13.00 1,439.13 18,708.69 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.03.03 CONST. BUZON e/ROCA SUELTA DE 1.5-1.99m c/DIPOSIT. CAIDA INT. DE BUZON u 1.00 2,182.25 2,182.25 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.03.04 CONSTRUCCION DE BUZONES EN ROCA SUELTA DE 2.00 HASTA 2.49 m u 5.00 1,644.85 8,224.25 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.03.05 CONSTRUCCION DE BUZONES EN ROCA SUELTA DE 2.50 HASTA 2.99 m u 2.00 1,842.97 3,685.94 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.03.06 CONSTRUC. BUZON EN ROCA SUELTA DE 2.5-2.99 m CON ESCALERA TIPO GATO u 1.00 2,411.45 2,411.45 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
-
VALORIZACION DE OBRA Nº 03
Obra CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
ENTIDAD MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR Plazo de Ejecución : 120 Días Calend
SISTEMA Sistema a suma alzada Presupuesto Base : S/. 1,421,088.00 Avance Anterior : Err:509 Inicio del Plazo de Ejecución : 27-dic-14
Contratista CONSORCIO N & F Monto de Contrato : S/. 1,421,088.00 Fr = 1.00000 Avance Actual : 3.03% Fin del Plazo de Ejecución : 25-abr-15
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 Adelantos : Ninguno a la fecha Avance Acumulado : Err:509 Total dias ejecutados : 5 Días Calend
Valorizado @ 31-dic-14 Saldo por Ejecutar : Err:509 Faltan para terminar la Obra : 115 Días Calend
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
22 CONSTRUCCION CONEXIONES DOMICILIARIAS - ALCANTARILLADO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
22.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
22.01.01 LIMPIEZA DE TERRENO MANUAL m2 469.00 0.35 164.15 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.01.02 TRAZO, NIVELACION Y REPLANTEO m 670.00 3.10 2,077.00 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.02 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
22.02.01 EXCAV. ZANJA (PULSO) P/CONEX. TUBO DN 160 TERR. COMPACTO c/BOLONERIA m 683.00 11.15 7,615.45 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.02.02 REFINE NIVELACION INTERIOR APISONADO MANUAL m2 402.00 3.01 1,210.02 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.02.03 PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO m 670.00 3.80 2,546.00 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.02.04 RELLENO COMPAC c/PLANC. VIBRAT. H<3.00m c/MAT-PROPIO ZARAND C=20cm m3 683.40 5.02 3,430.67 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 854.25 16.72 14,283.06 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.03 CONEXIONES DOMICILIARIAS - Err:509 Err:509 - - - - Err:509 Err:509 - Err:509 Err:509 -
22.03.01 CONEXIONES DOMICILIARIAS 4"X6" u 134.00 360.32 48,282.88 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- -
23 CRUCE AEREO DE ACUEDUCTOS - Err:509 Err:509 - - - - Err:509 Err:509 - Err:509 Err:509 -
23.01 PASE DE ACUEDUCTOS COLGANTES DE 50 MTS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
23.01.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
23.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 100.00 0.35 35.00 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.01.02 TRAZO Y REPLANTEO m2 100.00 5.76 576.00 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.02 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
23.01.02.01 EXCAVACION MANUAL m3 71.60 32.91 2,356.36 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.02.02 RELLENO CON MATERIAL PROPIO m3 17.60 5.02 88.35 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.02.03 ELIMINACION DE MATERIAL EXCEDENTE A MANO D<200M m3 64.48 16.72 1,078.11 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.03 OBRAS DE CONCRETO SIMPLE - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
23.01.03.01 SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2 1.50 70.89 106.34 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.03.02 CONCRETO CICLOPEO f'c=140 kg/cm2 + 30 % PM. EN CAMARA DE ANCLAJE m3 20.76 262.73 5,454.27 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.03.03 ENCOFRADO Y DESENCOFRADO EN CAMARA DE ANCLAJE m2 88.24 38.99 3,440.48 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.03.04 DADOS DE CONCRETO m3 0.66 408.04 269.31 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04 OBRAS DE CONCRETO ARMADO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
23.01.04.01 ZAPATAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
23.01.04.01.01 CONCRETO f 'c=175 kg/cm2, PARA ZAPATAS m3 20.00 337.24 6,744.80 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.01.02 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 487.60 4.45 2,169.82 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.02 COLUMNAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
23.01.04.03 CONCRETO f 'c=210 kg/cm2 PARA COLUMNAS TORRE m3 2.18 468.39 1,021.09 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.04 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS TORRE m2 28.98 38.99 1,129.93 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.05 ACERO fy=4200 kg/cm2 GRADO 60 kg 483.66 4.55 2,200.65 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.06 ESTRUCTURA DE ACERO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
23.01.04.06.01 SUMINISTRO Y COLOCACION CABLE PRINCIPAL DE ACERO GALV. Ø 3/4" m 139.32 79.29 11,046.68 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.06.02 SUMIN Y COLOC GUARDACABOS p/CABLE 3/4" e/ANCLAJE MACIZO Ø 3" u 4.00 67.36 269.44 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.06.03 SUMINISTRO Y COLOC. GRAPAS TIPO CROSBY p/FIJACION DE CABLE Ø 3/4" u 40.00 40.48 1,619.20 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.06.04 SUMINISTRO Y COLOCACION DE PENDOLAS DE FIERRO LISO DIAM=1/4" m 86.20 33.73 2,907.53 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.06.05 DOBLADO Y SOLDADO DE EXTREMOS DE PENDOLAS S/DETALLE u 48.00 17.29 829.92 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.06.06 SUMIN Y COLOC. ABRAZADERA PLANCHA 1/4"x4"x4" en PENDOLA SUP. Ø3/4" u 48.00 44.17 2,120.16 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.06.07 SUMIN Y COLOC. ABRAZAD FF8"x1/2" P/INF. PENDOLA 1/4"+PERNO 3/4" c/a u 48.00 50.48 2,423.04 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.06.08 CARRITO DE DILATACION C/RODILLO MACIZO DE 2" u 4.00 412.73 1,650.92 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.06.09 MACIZO DE FIERRO LISO DE 3.0" PARA ANCLAJE Y SUJECION DE CABLE m 9.20 158.07 1,454.24 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.06.10 SUMINISTRO Y COLOCACION DE TUBO HDPE DIAM=8" m 107.80 55.99 6,035.72 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.07 PINTURA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
23.01.04.07.01 PINTURA ESMALTE 2 MANOS mil 270.00 7.11 1,919.70 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
-
VALORIZACION DE OBRA Nº 03
Obra CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
ENTIDAD MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR Plazo de Ejecución : 120 Días Calend
SISTEMA Sistema a suma alzada Presupuesto Base : S/. 1,421,088.00 Avance Anterior : Err:509 Inicio del Plazo de Ejecución : 27-dic-14
Contratista CONSORCIO N & F Monto de Contrato : S/. 1,421,088.00 Fr = 1.00000 Avance Actual : 3.03% Fin del Plazo de Ejecución : 25-abr-15
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 Adelantos : Ninguno a la fecha Avance Acumulado : Err:509 Total dias ejecutados : 5 Días Calend
Valorizado @ 31-dic-14 Saldo por Ejecutar : Err:509 Faltan para terminar la Obra : 115 Días Calend
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
24 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
24.01 OBRAS PROVISIONALES PARA TODA LA OBRA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
24.01.01 CARTEL DE IDENTIFICACION DE OBRA DE 3.60 x 2.40 M. u 1.00 1,222.76 1,222.76 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
24.01.02 CAMPAMENTO PROVISIONAL DE LA OBRA glb 1.00 5,171.53 5,171.53 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
-
25 TRABAJOS PRELIMINARES PARA TODA LA OBRA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
25.01 CINTA PLASTICA SEÑALIZADORA p/LIMITE DE SEGURIDAD DE OBRA m 2,270.10 0.93 2,111.19 Err:509 Err:509 Err:509 105.00 97.65 4.63% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
25.02 PUENTE DE MADERA p/PASE PEATONAL SOBRE ZANJA (PROV. DURANTE LA OBRA) u 15.00 229.62 3,444.30 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
25.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUINARIA glb 1.00 5,000.00 5,000.00 Err:509 Err:509 Err:509 0.05 250.00 5.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
25.04 PRUEBA A ZANJA TAPADA PARA TUBERIA DESAGUE DE 6" A 8" m 3,772.00 1.88 7,091.36 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
25.05 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MOD. - DENSIDAD DE CAMPO) u 10.00 105.53 1,055.30 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
25.06 FLETE TERRESTRE glb 1.00 65,701.00 65,701.00 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- -
26 MITIGACION DE IMPACTOS AMBIENTALES - Err:509 Err:509 - - - - Err:509 Err:509 - Err:509 Err:509 -
26.01 PROGRAMA DE PREVENCIÓN Y MITIGACIÓN - Err:509 Err:509 - - - - Err:509 Err:509 - Err:509 Err:509 -
26.01.01 ALQUILER DE BAÑOS PORTATILES PARA CAMPAMENTO - Err:509 Err:509 - - - - Err:509 Err:509 - Err:509 Err:509 -
26.01.01.01 BAÑO PORTATIL TIPO DYSAL mes 6.00 600.00 3,600.00 Err:509 Err:509 Err:509 - - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- -
27 CONTINGENCIA DE OBRA - Err:509 Err:509 - - - - Err:509 Err:509 - Err:509 Err:509 -
27.01 ALQUILER DE CAMION CISTERNA PARA DOTACION DE AGUA A LA POBLACION glb 1.00 8,000.00 8,000.00 Err:509 Err:509 Err:509 0.29 2,320.00 29.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
01 INSTALACION DE BIODIGESTORES
01.01 INSTALACION DE BIODIGESTOR DE 7000 Lts - - - - - - - - - - -
01.02 INSTALACION DE BIODIGESTOR CON FILTRO DE AROS PET DE 7000 LTS EN TRAMO 12 u 1.00 16,350.06 16,350.06 0.35 5,722.52 35.00% - 0.00% 0.35 5,722.52 35.00% 0.65 10,627.54 65.00%
01.03 FILTRO BIOLOGICO PARA BIODIGESTOR u 1.00 2,486.05 2,486.05 1.00 2,486.05 100.00% - 0.00% 1.00 2,486.05 100.00% - - 0.00%
01.04 INSTALACION DE BIODIGESTOR DE 1300 Lts - - - - - - - - - - - -
01.04.01 INSTALACION DE BIODIGESTOR CON FILTRO DE AROS PET DE 3000 LTS EN TRAMO 15 u 1.00 10,139.06 10,139.06 0.35 3,548.67 35.00% - 0.00% 0.35 3,548.67 35.00% 0.65 6,590.39 65.00%
01.04.02 FILTRO BIOLOGICO PARA BIODIGESTOR u 1.00 2,486.05 2,486.05 1.00 2,486.05 100.00% - 0.00% 1.00 2,486.05 100.00% - - 0.00%
-
02 INSTALACION DE LETRINAS - 3.35 - - - - 3.35 - - (3.35) - -
02.01 INSTALACION DE LETRINAS u 2.00 2,000.00 4,000.00 2.00 4,000.00 100.00% - 0.00% 2.00 4,000.00 100.00% - - 0.00%
-
03 RED DE ALCANTARILLADO EN PLANTA DE TRATAMIENTO - - - - - - - - - - - -
03.01 TRABAJOS PRELIMINARES - - - - - - - - - - - -
03.01.01 TRAZO, NIVELACION Y REPLANTEO m 130.00 3.19 414.70 - - 0.00% 130.00 414.70 100.00% 130.00 414.70 100.00% - - 0.00%
03.02 MOVIMIENTO DE TIERRAS - - - - - - - - - - - -
03.02.01 EXCAV. ZANJA TERRENO c/BOLONERIAS GRANDES REDONDEADOS 8" A MAS 2M m3 93.60 204.24 19,116.86 - - 0.00% - 0.00% - - 0.00% 93.60 19,116.86 100.00%
03.02.02 REFINE, NIVELACION DE ZANJA Y CONFORMACION DE FONDOS m2 78.00 3.32 258.96 - - 0.00% - 0.00% - - 0.00% 78.00 258.96 100.00%
03.02.03 PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO m 130.00 3.80 494.00 - - 0.00% - 0.00% - - 0.00% 130.00 494.00 100.00%
03.02.04 RELLENO COMP. C/APISON T/CANGURO H<1.70 M c/MAT PROPIO ZAR. C=20cm m 62.40 5.02 313.25 - - 0.00% - 0.00% - - 0.00% 62.40 313.25 100.00%
03.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 39.00 16.72 652.08 - - 0.00% - 0.00% - - 0.00% 39.00 652.08 100.00%
03.03 SUMINISTRO E INSTALACION DE TUBERIAS - - - - - - - - - - - -
03.03.01 TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 200MM m 130.00 10.81 1,405.30 - - 0.00% - 0.00% - - 0.00% 130.00 1,405.30 100.00%
03.04 BUZONES - - - - - - - - - - - -
03.04.01 BUZON CONCRETO T-2 H=1.50 a 3m c/DISPOSITIVO DE CAIDA DENTRO DE BUZON u 5.00 1,986.81 9,934.05 - - 0.00% - 0.00% - - 0.00% 5.00 9,934.05 100.00%
-
04 CERCO PERIMETRICO - - - - - - - - - - - -
04.01 TRABAJOS PRELIMINARES - - - - - - - - - - - -
04.01.01 LIMPIEZA DE TERRENO MANUAL m2 150.00 0.35 52.50 - - 0.00% - 0.00% - - 0.00% 150.00 52.50 100.00%
04.01.02 TRAZO Y REPLANTEO m2 150.00 3.19 478.50 - - 0.00% - 0.00% - - 0.00% 150.00 478.50 100.00%
04.02 MOVIMIENTO DE TIERRAS - - - - - - - - - - - -
04.02.01 EXCAVACION MANUAL m3 27.00 34.94 943.38 - - 0.00% - 0.00% - - 0.00% 27.00 943.38 100.00%
04.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 33.75 16.72 564.30 - - 0.00% - 0.00% - - 0.00% 33.75 564.30 100.00%
04.03 CERCO PERIMETRICO CON ALAMBRE DE PUAS - - - - - - - - - - - -
04.03.01 CERCO PERIMETRICO DE ALAMBRE CON PUAS m 150.00 17.36 2,604.00 - - 0.00% - 0.00% - - 0.00% 150.00 2,604.00 100.00%
04.03.02 PUERTA DE INGRESO - - - - - - - - - - - -
04.03.02.01 INSTALACION DE PUERTA DE INGRESO u 1.00 706.95 706.95 - - 0.00% - 0.00% - - 0.00% 1.00 706.95 100.00%
-
05 CONSTRUC PLANTA TRATAMIENTO AGUAS RESIDUALES (PTAR-03) - - - - - - - - - - - -
05.01 CAMARA DE REJAS (01 UND) - - - - - - - - - - - -
05.01.01 TRABAJOS PRELIMINARES - - - - - - - - - - - -
05.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 4.40 0.35 1.54 4.40 1.54 100.00% - 0.00% 4.40 1.54 100.00% - - 0.00%
05.01.01.02 TRAZO Y REPLANTEO m2 4.40 3.19 14.04 4.40 14.04 100.00% - 0.00% 4.40 14.04 100.00% - - 0.00%
05.01.02 MOVIMIENTO DE TIERRAS - - - - - - - - - - - -
05.01.02.01 EXCAVACION EN TERRENO SEMIRROCOSO m3 3.52 74.68 262.87 - - 0.00% - 0.00% - - 0.00% 3.52 262.87 100.00%
05.01.02.02 REFINE NIVELACION INTERIOR APISONADO MANUAL m2 4.40 2.86 12.58 - - 0.00% - 0.00% - - 0.00% 4.40 12.58 100.00%
05.01.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 4.40 16.72 73.57 - - 0.00% - 0.00% - - 0.00% 4.40 73.57 100.00%
05.01.03 OBRAS DE CONCRETO SIMPLE - - - - - - - - - - - -
05.01.03.01 SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2 3.83 194.08 743.33 - - 0.00% - 0.00% - - 0.00% 3.83 743.33 100.00%
05.01.04 OBRAS DE CONCRETO ARMADO - - - - - - - - - - - -
05.01.04.01 CONCRETO F'C=210 KG/CM2 m3 2.60 434.07 1,128.58 - - 0.00% - 0.00% - - 0.00% 2.60 1,128.58 100.00%
05.01.04.02 ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS m2 16.97 38.99 661.66 - - 0.00% - 0.00% - - 0.00% 16.97 661.66 100.00%
05.01.04.03 ACERO FY=4200 KG/CM2 kg 99.35 4.55 452.04 - - 0.00% 99.35 452.04 100.00% 99.35 452.04 100.00% - - 0.00%
VALORIZACION DE OBRA Nº 04
Obra CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
ENTIDAD MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR Plazo de Ejecución : 120 Días Calend
SISTEMA Sistema a suma alzada Presupuesto Base : S/. 1,421,088.00 Avance Anterior : Err:509 Inicio del Plazo de Ejecución : 27-dic-14
Contratista CONSORCIO N & F Monto de Contrato : S/. 1,421,088.00 Fr = 1.00000 Avance Actual : Err:509 Fin del Plazo de Ejecución : 25-abr-15
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 Adelantos : Ninguno a la fecha Avance Acumulado : Err:509 Total dias ejecutados : 36 Días Calend
Valorizado @ 31-ene-15 Saldo por Ejecutar : Err:509 Faltan para terminar la Obra : 84 Días Calend
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
05.01.05 REVOQUES Y ENLUCIDOS - - - - - - - - - - - -
05.01.05.01 TARRAJEO CON IMPERMEABILIZANTES m2 14.21 30.31 430.71 - - 0.00% - 0.00% - - 0.00% 14.21 430.71 100.00%
05.01.05.02 TARRAJEO EN EXTERIORES CON CEMENTO - ARENA m2 7.70 37.25 286.83 - - 0.00% - 0.00% - - 0.00% 7.70 286.83 100.00%
05.01.06 ACCESORIOS - - - - - - - - - - - -
05.01.06.01 REJILLA METALICA u 1.00 37.82 37.82 - - 0.00% - 0.00% - - 0.00% 1.00 37.82 100.00%
05.01.06.02 COMPUERTA DE PLANCHA METALICA DE 1/8" COMO MINIMO u 1.00 305.04 305.04 - - 0.00% - 0.00% - - 0.00% 1.00 305.04 100.00%
06 DESARENADOR Y MEDIDOR PARSHALL (01 UND) - - - - - - - - - - - -
06.01 TRABAJOS PRELIMINARES - - - - - - - - - - - -
06.01.01 LIMPIEZA DE TERRENO MANUAL m2 17.19 0.35 6.02 17.19 6.02 100.00% - 0.00% 17.19 6.02 100.00% - - 0.00%
06.01.02 TRAZO Y REPLANTEO m2 17.19 3.19 54.84 17.19 54.84 100.00% - 0.00% 17.19 54.84 100.00% - - 0.00%
06.02 MOVIMIENTO DE TIERRAS - - - - - - - - - - - -
06.02.01 EXCAVACION EN TERRENO SEMIRROCOSO m3 25.79 74.68 1,926.00 - - 0.00% - 0.00% - - 0.00% 25.79 1,926.00 100.00%
06.02.02 REFINE NIVELACION INTERIOR APISONADO MANUAL m2 17.19 2.86 49.16 - - 0.00% - 0.00% - - 0.00% 17.19 49.16 100.00%
06.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 32.23 16.72 538.89 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
06.03 OBRAS DE CONCRETO SIMPLE - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
06.03.01 SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2 17.19 194.08 3,336.24 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
06.04 OBRAS DE CONCRETO ARMADO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
06.04.01 CONCRETO F'C=210 KG/CM2 m3 8.71 434.07 3,780.75 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
06.04.02 ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS m2 53.42 38.99 2,082.85 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
06.04.03 ACERO FY=4200 KG/CM2 kg 224.95 4.55 1,023.52 Err:509 Err:509 Err:509 224.95 1,023.52 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
06.05 REVOQUES Y ENLUCIDOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
06.05.01 TARRAJEO CON IMPERMEABILIZANTES m2 28.14 30.31 852.92 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
06.06 ACCESORIOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
06.06.01 REJILLA METALICA DE 15MM u 1.00 576.76 576.76 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
06.06.02 COMPUERTA DE PLANCHA METALICA DE 1/8" COMO MINIMO u 4.00 305.04 1,220.16 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07 TANQUE IMHOFF (01 UND) - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
07.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
07.01.01 LIMPIEZA DE TERRENO MANUAL m2 33.00 0.35 11.55 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.01.02 TRAZO Y REPLANTEO m2 33.00 3.19 105.27 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.02 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
07.02.01 EXCAVACION EN TERRENO SEMIRROCOSO m3 260.93 74.68 19,486.25 - 0.00% 260.93 19,486.25 100.00% 260.93 19,486.25 100.00% - - 0.00%
07.02.02 REFINE NIVELACION INTERIOR APISONADO MANUAL m2 106.50 2.86 304.59 - 0.00% 106.50 304.59 100.00% 106.50 304.59 100.00% - - 0.00%
07.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 76.64 5.02 384.73 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.02.04 ELIMINACION DE MATERIAL EXCEDENTE m3 230.36 16.72 3,851.62 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.03 OBRAS DE CONCRETO SIMPLE - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
07.03.01 SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2 60.32 194.08 11,706.91 - 0.00% 60.32 11,706.91 100.00% 60.32 11,706.91 100.00% - - 0.00%
07.04 OBRAS DE CONCRETO ARMADO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
07.04.01 CONCRETO F'C=210 KG/CM2 m3 79.44 434.07 34,482.52 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.04.02 ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS m2 414.00 38.99 16,141.86 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.04.03 ACERO FY=4200 KG/CM2 kg 13,859.26 4.55 63,059.63 Err:509 Err:509 Err:509 9,701.48 44,141.74 70.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.05 REVOQUES Y ENLUCIDOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
07.05.01 TARRAJEO CON IMPERMEABILIZANTES m2 280.39 30.31 8,498.62 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.05.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 52.85 28.29 1,495.13 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.06 CARPINTERIA METALICA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
07.06.01 BARANDA DE TUBO FO. GDO. PASAMANO 1 1/2"-PARANTE 1" X 1M.ALT m 28.40 99.81 2,834.60 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.06.02 ESCALERA TUB F.GVZDO. C/PARANTES DE 2" X PELDAÑOS DE 3/4" m 4.09 236.53 967.41 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.07 INSTALACIONES SANITARIAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
07.07.01 TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 200MM m 8.50 10.81 91.89 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.07.02 TEE UPVC UF S-25 DE 8" u 1.00 109.92 109.92 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.07.03 CODO SP PVC UF S-25 DE 8" u 1.00 244.08 244.08 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VALORIZACION DE OBRA Nº 04
Obra CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
ENTIDAD MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR Plazo de Ejecución : 120 Días Calend
SISTEMA Sistema a suma alzada Presupuesto Base : S/. 1,421,088.00 Avance Anterior : Err:509 Inicio del Plazo de Ejecución : 27-dic-14
Contratista CONSORCIO N & F Monto de Contrato : S/. 1,421,088.00 Fr = 1.00000 Avance Actual : Err:509 Fin del Plazo de Ejecución : 25-abr-15
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 Adelantos : Ninguno a la fecha Avance Acumulado : Err:509 Total dias ejecutados : 36 Días Calend
Valorizado @ 31-ene-15 Saldo por Ejecutar : Err:509 Faltan para terminar la Obra : 84 Días Calend
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
07.07.04 VALVULA DE COMPUERTA DE FIERRO FUNDIDO MAZZA DE 8" u 1.00 1,220.98 1,220.98 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
07.07.05 PANTALLA DEFLECTORA u 2.00 250.00 500.00 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08 LECHO DE SECADO (01 UND) - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
08.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
08.01.01 LIMPIEZA DE TERRENO MANUAL m2 35.15 0.35 12.30 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.01.02 TRAZO Y REPLANTEO m2 35.15 3.19 112.13 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.02 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
08.02.01 EXCAVACION EN TERRENO SEMIRROCOSO m3 50.96 74.68 3,805.69 Err:509 Err:509 Err:509 50.96 3,805.69 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.02.02 REFINE NIVELACION INTERIOR APISONADO MANUAL m2 35.15 2.86 100.53 Err:509 Err:509 Err:509 35.15 100.53 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 63.70 16.72 1,065.06 Err:509 Err:509 Err:509 63.70 1,065.06 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.03 OBRAS DE CONCRETO SIMPLE - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
08.03.01 SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2 35.15 194.08 6,821.91 Err:509 Err:509 Err:509 35.15 6,821.91 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.04 OBRAS DE CONCRETO ARMADO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
08.04.01 CONCRETO F'C=210 KG/CM2 m3 25.44 434.07 11,042.74 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 143.98 38.99 5,613.78 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.04.03 ACERO FY=4200 KG/CM2 kg 620.00 4.55 2,821.00 Err:509 Err:509 Err:509 620.00 2,821.00 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.05 REVOQUES Y ENLUCIDOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
08.05.01 TARRAJEO CON IMPERMEABILIZANTES m2 93.14 30.31 2,823.07 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.05.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 69.54 30.31 2,107.76 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.06 ESTRUCTURA DE MADERA Y COBERTURA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
08.06.01 TIJERAL DE MADERA TIPO 01 L=3.00M u 5.00 677.82 3,389.10 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.06.02 VIGA DE MADERA 3" X 4" m 9.90 21.12 209.09 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.06.03 CORREAS Y TIRANTES DE MADERA p2 106.76 7.18 766.54 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.06.04 COBERTURA DE CALAMINA 11 CANALES E=3MM m2 46.98 45.91 2,156.85 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.07 INSTALACIONES SANITARIAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
08.07.01 TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 100MM m 14.58 16.27 237.22 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.07.02 TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 50MM m 76.60 68.42 5,240.97 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.07.03 CODO PVC SAP 6"X90° u 3.00 55.43 166.29 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.07.04 CODO PVC SAP 4"X90° u 2.00 34.42 68.84 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.07.05 TEE PVC-SAP 4"* 2" u 23.00 30.84 709.32 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.07.06 TEE PVC-SAP 150mmx150mm u 3.00 54.85 164.55 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.07.07 TEE PVC-SAP 200mmx150mm u 1.00 42.35 42.35 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.07.08 TAPON PVC-SAP 2" u 23.00 23.01 529.23 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.08 FILTROS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
08.08.01 FILTRO DE GRAVA m3 12.48 180.66 2,254.64 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.08.02 FILTRO DE ARENA m3 9.36 259.66 2,430.42 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
08.08.03 FILTRO DE LADRILLO m2 31.20 110.56 3,449.47 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09 FILTRO BIOLOGICO (01 UND) - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
09.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
09.01.01 LIMPIEZA DE TERRENO MANUAL m2 12.75 0.35 4.46 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.01.02 TRAZO Y REPLANTEO m2 12.75 3.19 40.67 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.02 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
09.02.01 EXCAVACION EN TERRENO SEMIRROCOSO m3 18.63 74.68 1,391.29 Err:509 Err:509 Err:509 18.63 1,391.29 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.02.02 REFINE NIVELACION INTERIOR APISONADO MANUAL m2 6.90 2.86 19.73 Err:509 Err:509 Err:509 6.90 19.73 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 21.42 16.72 358.14 Err:509 Err:509 Err:509 21.42 358.14 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.03 OBRAS DE CONCRETO SIMPLE - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
09.03.01 SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2 10.75 194.08 2,086.36 Err:509 Err:509 Err:509 10.75 2,086.36 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VALORIZACION DE OBRA Nº 04
Obra CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
ENTIDAD MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR Plazo de Ejecución : 120 Días Calend
SISTEMA Sistema a suma alzada Presupuesto Base : S/. 1,421,088.00 Avance Anterior : Err:509 Inicio del Plazo de Ejecución : 27-dic-14
Contratista CONSORCIO N & F Monto de Contrato : S/. 1,421,088.00 Fr = 1.00000 Avance Actual : Err:509 Fin del Plazo de Ejecución : 25-abr-15
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 Adelantos : Ninguno a la fecha Avance Acumulado : Err:509 Total dias ejecutados : 36 Días Calend
Valorizado @ 31-ene-15 Saldo por Ejecutar : Err:509 Faltan para terminar la Obra : 84 Días Calend
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
09.04 OBRAS DE CONCRETO ARMADO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
09.04.01 CONCRETO F'C=210 KG/CM2 m3 15.11 434.07 6,558.80 Err:509 Err:509 Err:509 7.59 3,294.59 50.23% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 79.05 38.99 3,082.16 Err:509 Err:509 Err:509 58.12 2,266.10 73.52% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.04.03 ACERO FY=4200 KG/CM2 kg 830.36 4.55 3,778.14 Err:509 Err:509 Err:509 830.36 3,778.14 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.05 REVOQUES Y ENLUCIDOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
09.05.01 TARRAJEO CON IMPERMEABILIZANTES m2 85.95 30.31 2,605.14 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.06 FILTROS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
09.06.01 FILTRO DE GRAVA m3 12.42 180.66 2,243.80 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.06.02 FILTRO DE LADRILLO m2 13.80 110.56 1,525.73 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.07 SISTEMA DE DESINFECCION (HIPOCLORADOR POR GOTEO) - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
09.07.01 HIPOCLORADOR DIFUSION inc Gancho u 1.00 32.40 32.40 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.07.02 TAPA METALICA 0.40X0.45X1/8" u 1.00 108.77 108.77 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
09.07.03 ACCESORIOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
09.07.03.01 CANALETA DE DISTRIBUCION DE PVC m 50.00 67.95 3,397.50 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
10 FILTRO BIOLOGICO PARA BIODIGESTORES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
-
11 RECONSTRUCCION DE CAPTACIONE EXISTENTE - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
11.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
11.01.01 DEMOLICION DE CAPTACION EXISTENTE glb 1.00 1,138.18 1,138.18 Err:509 Err:509 Err:509 1.00 1,138.18 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.01.02 ELIMINACION DE DESMONTE PROVENIENTE DE LA DEMOLICION DE CAPTACION glb 1.00 324.33 324.33 Err:509 Err:509 Err:509 1.00 324.33 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.01.03 LIMPIEZA DE TERRENO MANUAL m2 19.90 0.35 6.97 Err:509 Err:509 Err:509 19.90 6.97 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.01.04 TRAZO Y REPLANTEO SIN EQUIPO m2 19.90 2.84 56.52 Err:509 Err:509 Err:509 19.90 56.52 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
11.02.01 REFINE NIVELACION INTERIOR APISONADO MANUAL m2 8.29 2.09 17.33 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.02 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 1.73 5.02 8.68 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.03 ELIMINACION MATERIAL EXCEDENTE A MANO D<200M m3 4.46 16.72 74.57 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.04 FILTROS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
11.02.04.01 FILTRO DE GRAVA m3 4.41 180.66 796.71 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.05 OBRAS DE CONCRETO ARMADO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
11.02.05.01 CONCRETO EN MUROS REFORZADOS F'C= 210 KG/CM2 EN TABIQUE Y PLACAS m3 4.44 506.72 2,249.84 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.05.02 ENCOFRADO Y DESENCOFRADO MUROS REFORZADOS m2 45.92 49.97 2,294.62 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.05.03 ACERO FY=4200 KG/CM2 kg 158.46 4.55 720.99 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.06 REVOQUES Y ENLUCIDOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
11.02.06.01 TARRAJEO CON IMPERMEABILIZANTES m2 54.61 34.32 1,874.22 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.06.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 26.70 28.29 755.34 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.07 VARIOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
11.02.07.01 TUBERIA DE REBOSE Y DESAGUE DE 2" SAL PVC u 1.00 1,226.35 1,226.35 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.07.02 TUBERIA DE REBOSE Y DESAGUE DE 3" SAL PVC u 1.00 798.52 798.52 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.07.03 TUBERIA DE SALIDA DE CAPTACION PVC SAP C-10 DE 1 1/2" u 1.00 274.72 274.72 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.07.04 TUBERIA DE SALIDA DE CAPTACION PVC SAP C-10 DE 2" u 1.00 466.10 466.10 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.08 PINTURA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
11.02.08.01 PINTURA LATEX EN MUROS 2 MANOS m2 28.60 7.11 203.35 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.09 CARPINTERIA METALICA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
11.02.09.01 TAPA METALICA 0.73X0.73X1/8" u 2.00 166.77 333.54 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
11.02.09.02 PINTURA EN CARPINTERIA METALICA m2 4.00 31.13 124.52 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
-
12 REHABILITACION DE RESERVORIO EXISTENTE (44 M3) - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
12.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
12.01.01 LIMPIEZA DE TERRENO MANUAL m2 21.62 0.35 7.57 Err:509 Err:509 Err:509 21.62 7.57 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.01.02 TRAZO Y REPLANTEO SIN EQUIPO m2 21.62 2.84 61.40 Err:509 Err:509 Err:509 21.62 61.40 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.02 REVOQUES Y ENLUCIDOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
12.03 TARRAJEO EN INTERIOR DE RESERVORIO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
12.03.01 PICADO DE TARRAJEO INTERIOR DE RESERVORIO m2 63.71 8.16 519.87 Err:509 Err:509 Err:509 63.71 519.87 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VALORIZACION DE OBRA Nº 04
Obra CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
ENTIDAD MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR Plazo de Ejecución : 120 Días Calend
SISTEMA Sistema a suma alzada Presupuesto Base : S/. 1,421,088.00 Avance Anterior : Err:509 Inicio del Plazo de Ejecución : 27-dic-14
Contratista CONSORCIO N & F Monto de Contrato : S/. 1,421,088.00 Fr = 1.00000 Avance Actual : Err:509 Fin del Plazo de Ejecución : 25-abr-15
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 Adelantos : Ninguno a la fecha Avance Acumulado : Err:509 Total dias ejecutados : 36 Días Calend
Valorizado @ 31-ene-15 Saldo por Ejecutar : Err:509 Faltan para terminar la Obra : 84 Días Calend
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
12.03.02 TARRAJEO CON IMPERMEABILIZANTES m2 63.71 34.32 2,186.53 Err:509 Err:509 Err:509 63.71 2,186.53 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.04 TARRAJEO EN EXTERIOR DE RESERVORIO - Err:509 Err:509 - - - - Err:509 Err:509 - Err:509 Err:509 -
12.04.01 PICADO DE TARRAJEO EXTERIOR DE RESERVORIO m2 64.64 4.33 279.89 Err:509 Err:509 Err:509 64.64 279.89 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.04.02 TARRAJEO EN EXTERIORES CON CEMENTO-ARENA m2 64.64 28.29 1,828.67 Err:509 Err:509 Err:509 64.64 1,828.67 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.05 PINTURA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
12.05.01 PINTURA LATEX EN MUROS 2 MANOS m2 64.64 7.11 459.59 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.05.02 PINTURA EN ESTRUCTURAS METALICAS glb 1.00 68.91 68.91 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.06 CARPINTERIA METALICA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
12.06.01 ESCALERA GATO, TUB F.GVZDO. C/PARANTES DE 1 1/2" SEGUN DISEÑO m 2.00 208.50 417.00 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.06.02 TAPA METALICA 0.60X0.60X1/8" u 2.00 88.77 177.54 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.07 INSTALACIONES SANITARIAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
12.07.01 TUBERIA DE REBOSE Y DESAGUE DE 2 1/2" SAL PVC u 1.00 212.37 212.37 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.07.02 TUBERIA DE SALIDA DE PVC SAP C-10 DE 1 1/2" u 2.00 182.42 364.84 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
12.07.03 ACCESORIOS DE RESERVORIO glb 1.00 1,442.69 1,442.69 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
-
13 MEJORAMIENTO DE LA LINEA DE CONDUCCION - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
13.01 MEJORAMIENTO DE LA LINEA DE CONDUCCION m 653.00 2.16 1,410.48 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
-
14 LINEA DE ADUCCION - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
14.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
14.01.01 LIMPIEZA DE LINEA DE ADUCCION m 170.00 0.35 59.50 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
14.01.02 TRAZO, NIVELACION Y REPLANTEO m 170.00 3.10 527.00 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
14.02 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
14.02.01 EXCAV. ZANJAS EN T.S.R P/TUB. 2"-4", HASTA 1.50M, A=0.60M m 170.00 11.88 2,019.60 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
14.02.02 REFINE, NIVELACION DE ZANJA Y CONFORMACION DE FONDOS m 170.00 3.01 511.70 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
14.02.03 PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO m 170.00 3.80 646.00 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
14.02.04 RELLENO COMP c/PLANCHA VIBRAT H<3.00m c/MAT PROPIO ZARAND. C=20cm m 170.00 5.02 853.40 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
14.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 29.75 16.72 497.42 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
14.03 TUBERIAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
14.03.01 TUBERIA PVC SAP ISO 4422 DN 75MM C-10 m 170.00 15.37 2,612.90 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
14.03.02 SUMINISTRO E INSTALACION DE ACCESORIOS PVC RED ADUCCION glb 1.00 501.64 501.64 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
14.03.03 PRUEBA HIDRAULICA+DESINFECCION TUB.6"-8" A ZANJA TAPADA m 170.00 2.70 459.00 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
-
15 RED DE DISTRIBUCION - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
15.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
15.01.01 LIMPIEZA DE RED DE DISTRIBUCION m 3,845.00 0.35 1,345.75 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.01.02 TRAZO, NIVELACION Y REPLANTEO m 3,845.00 3.10 11,919.50 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.02 DEMOLICION DE PAVIMENTO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
15.02.01 CORTE DE PAVIMENTO RIGIDO C/EQUIPO m 537.82 14.10 7,583.26 Err:509 Err:509 Err:509 537.82 7,583.26 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.02.02 DEMOLICION DE PAVIMENTO DE CONCRETO DE 8" m2 121.01 31.13 3,767.04 Err:509 Err:509 Err:509 121.01 3,767.04 100.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.02.03 REPOSICION DE PAVIMENTO DE CONCRETO F'C=210 KG/CM2, LOSA E=8" m2 121.01 93.08 11,263.61 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.03 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
15.03.01 EXCAV. ZANJAS EN TERRENO SEMI ROCOSO PARA AGUA m 547.00 12.51 6,842.97 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.03.02 EXCAVACION TERRENO COMPACTO c/BOLONERIA p/TUBO DE AGUA HASTA 1.5 m 3,298.12 12.51 41,259.48 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.03.03 REFINE, NIVELACION DE ZANJA Y CONFORMACION DE FONDOS m 3,845.00 3.01 11,573.45 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.03.04 PREPARACION DE CAMA DE APOYO CON MATERIAL DE PRESTAMO m 3,845.00 3.80 14,611.00 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.03.05 RELLENO COMP c/APISON T/CANGURO H<1.00m c/MAT/PROPIO ZARAN c=20cm m 3,845.00 5.02 19,301.90 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.03.06 ELIMINACION DE MATERIAL EXCEDENTE m3 672.88 16.72 11,250.55 Err:509 Err:509 Err:509 269.15 4,500.22 40.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.04 SUMINISTRO DE TUBERIAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
15.04.01 TUBERIA PVC CLASE A-10 AGUA POTABLE DE 2" + 3% DESPERDICIO m 175.00 9.77 1,709.75 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.04.02 TUBERIA PVC CLASE A-10 AGUA POTABLE DE 1 1/2" + 3% DESPERDICIO m 140.99 8.70 1,226.61 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.04.03 TUBERIA PVC CLASE A-10 AGUA POTABLE DE 1 1/4" + 3% DESPERDICIO m 692.64 7.08 4,903.89 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VALORIZACION DE OBRA Nº 04
Obra CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
ENTIDAD MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR Plazo de Ejecución : 120 Días Calend
SISTEMA Sistema a suma alzada Presupuesto Base : S/. 1,421,088.00 Avance Anterior : Err:509 Inicio del Plazo de Ejecución : 27-dic-14
Contratista CONSORCIO N & F Monto de Contrato : S/. 1,421,088.00 Fr = 1.00000 Avance Actual : Err:509 Fin del Plazo de Ejecución : 25-abr-15
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 Adelantos : Ninguno a la fecha Avance Acumulado : Err:509 Total dias ejecutados : 36 Días Calend
Valorizado @ 31-ene-15 Saldo por Ejecutar : Err:509 Faltan para terminar la Obra : 84 Días Calend
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
15.04.04 TUBERIA PVC CLASE A-10 AGUA POTABLE DE 1" + 3% DESPERDICIO m 578.71 4.69 2,714.15 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.04.05 TUBERIA PVC CLASE A-10 AGUA POTABLE DE 3/4" + 3% DESPERDICIO m 2,258.31 4.08 9,213.90 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.04.06 INSTALACION DE TUBERIAS DE PVC - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
15.04.07 INSTALACION DE TUBERIAS < 3" PVC SP C-10 m 3,845.00 3.01 11,573.45 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.04.08 SUMINISTRO E INSTALACION DE ACCESORIOS PVC RED DE DISTRIBUCION glb 1.00 1,601.20 1,601.20 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
15.04.09 PRUEBA HIDRAULICA+DESINFECCION TUB.6"-8" A ZANJA TAPADA m 3,845.00 2.70 10,381.50 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
-
16 CAJA DE VALVULA DE CONTROL - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
16.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
16.01.01 LIMPIEZA DE TERRENO MANUAL m2 7.00 0.35 2.45 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
16.01.02 TRAZO Y REPLANTEO m2 7.00 3.19 22.33 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
16.02 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
16.02.01 EXCAVACION MANUAL m3 8.40 32.91 276.44 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
16.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 10.50 16.72 175.56 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
16.03 OBRAS DE CONCRETO SIMPLE - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
16.03.01 CONCRETO F'c= 175 KG/CM2 m3 5.76 391.20 2,253.31 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
16.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 57.60 38.99 2,245.82 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
16.04 REVOQUES Y ENLUCIDOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
16.04.01 TARRAJEO CON IMPERMEABILIZANTES m2 42.48 34.32 1,457.91 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
16.05 CARPINTERIA METALICA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
16.05.01 TAPA METALICA 0.40X0.45X1/8" u 20.00 108.77 2,175.40 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
16.06 PINTURA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
16.06.01 PINTURA LATEX EN MUROS 2 MANOS m2 42.48 7.11 302.03 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
16.07 SUMINISTRO E INSTALACION DE VALVULAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
16.07.01 SUMINISTRO DE VALVULAS u 20.00 152.20 3,044.00 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
-
17 VALVULA DE PURGA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
17.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
17.01.01 LIMPIEZA DE TERRENO MANUAL m2 0.98 0.35 0.34 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
17.01.02 TRAZO Y REPLANTEO m2 0.98 3.19 3.13 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
17.02 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
17.02.01 EXCAVACION MANUAL m3 1.18 34.94 41.23 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
17.02.02 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 0.10 5.02 0.50 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
17.02.03 ELIMINACION MATERIAL EXCEDENTE A MANO D<200M m3 2.70 16.72 45.14 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
17.03 OBRAS DE CONCRETO SIMPLE - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
17.03.01 SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2 1.28 194.08 248.42 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
17.03.02 CONCRETO F'c= 175 KG/CM2 m3 4.70 391.20 1,838.64 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
17.03.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 6.72 38.99 262.01 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
17.04 SUMINISTRO E INSTALACION DE TUBERIAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
17.04.01 TUBERIA PVC SAP ISO 4422 DN 12.7 MM C-10 m 3.00 17.98 53.94 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
17.04.02 VALVULA DE PURGA 19.10mm (3/4") u 2.00 76.77 153.54 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
17.04.03 ABRAZADERA PVC D=19.1 MM C/SALIDA A 12.70 MM INC. ACCESORIOS u 4.00 154.82 619.28 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
-
18 CONSTRUCCION DE CONEXIONES DOMICILIARIAS DE AGUA POTABLE - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
18.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
18.01.01 TRAZO, NIVELACION Y REPLANTEO DURANTE LA EJECUCION DE LA OBRA m 603.00 3.26 1,965.78 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
18.02 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
18.02.01 EXCAVACION DE ZANJA HASTA 0.80 M, TERRENO COMPACTO CON BOLONERIA m 603.00 12.51 7,543.53 Err:509 Err:509 Err:509 112.50 1,407.38 18.66% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
18.02.02 REFINE, NIVELACION DE ZANJA Y CONFORMACION DE FONDOS m 603.00 3.01 1,815.03 Err:509 Err:509 Err:509 112.50 338.63 18.66% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
18.02.03 PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO m 536.00 3.80 2,036.80 Err:509 Err:509 Err:509 100.00 380.00 18.66% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
18.02.04 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 633.15 5.02 3,178.41 Err:509 Err:509 Err:509 118.13 593.01 18.66% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VALORIZACION DE OBRA Nº 04
Obra CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
ENTIDAD MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR Plazo de Ejecución : 120 Días Calend
SISTEMA Sistema a suma alzada Presupuesto Base : S/. 1,421,088.00 Avance Anterior : Err:509 Inicio del Plazo de Ejecución : 27-dic-14
Contratista CONSORCIO N & F Monto de Contrato : S/. 1,421,088.00 Fr = 1.00000 Avance Actual : Err:509 Fin del Plazo de Ejecución : 25-abr-15
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 Adelantos : Ninguno a la fecha Avance Acumulado : Err:509 Total dias ejecutados : 36 Días Calend
Valorizado @ 31-ene-15 Saldo por Ejecutar : Err:509 Faltan para terminar la Obra : 84 Días Calend
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
18.03 SUMINISTRO E INSTALACION DE TUBERIAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
18.03.01 TUBERIA PVC SAP ISO 4422 DN 19.1MM C-10 m 603.00 13.28 8,007.84 Err:509 Err:509 Err:509 112.50 1,494.00 18.66% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
18.03.02 PRUEBA HIDRAULICA+DESINFECCION TUB.6"-8" A ZANJA TAPADA m 603.00 2.70 1,628.10 Err:509 Err:509 Err:509 112.50 303.75 18.66% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
18.04 SUMINISTRO E INSTALACION DE ACCESORIOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
18.04.01 SUMINISTRO E INSTALACION DE ACCESORIOS RED SECUNDARIA 01 glb 1.00 1,391.90 1,391.90 Err:509 Err:509 Err:509 0.25 347.98 25.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
18.05 CONEXIONES DOMICILIARIAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
18.05.01 CONEXION DOMICILIARIA DE AGUA POTABLE L=4.50 M. u 134.00 135.08 18,100.72 Err:509 Err:509 Err:509 25.00 3,377.00 18.66% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
-
19 RED DE ALCANTARILLADO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
19.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
19.01.01 TRAZO, NIVELACION Y REPLANTEO DURANTE LA EJECUCION DE LA OBRA m 4,981.52 4.60 22,914.99 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.02 CORTE, DEMOLICION Y REPOSICION DE PAVIMENTO RIGIDO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
19.02.01 CORTE DE PAVIMENTO RIGIDO C/EQUIPO m 537.82 14.10 7,583.26 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.02.02 DEMOLICION DE PAVIMENTO DE CONCRETO DE 8" m2 215.13 31.13 6,697.00 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.02.03 REPOSICION DE PAVIMENTO DE CONCRETO F'C=210 KG/CM2, LOSA E=8" m2 215.13 93.08 20,024.30 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.03 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
19.03.01 EXCAVACION EN TERRENO COMPACTO CON BOLONERIA PARA TUB. 6-8" HAST 1.7 m 3,772.60 12.51 47,195.23 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.03.02 EXCAV. ZANJA (PULSO) P/TUB. T-SEMIROCOSO DN 160 - 200 DE HASTA 1.70 PROF. m 1,208.93 13.35 16,139.22 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.03.03 REFINE, NIVELACION DE ZANJA Y CONFORMACION DE FONDOS m2 3,985.22 0.35 1,394.83 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.03.04 PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO m 4,981.53 3.80 18,929.81 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.03.05 RELLENO COMP c/APISON T/CANGURO H<1.70m c/MAT/PROPIO ZARAN C=20CM m 4,981.53 5.02 25,007.28 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.03.06 ELIMINACION DE MATERIAL EXCEDENTE m3 1,494.46 16.72 24,987.37 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.04 SUMINISTRO DE TUBERIAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
19.04.01 TUBERIA PVC ALCANT. U.F. ISO 4435, S-25 200MM m 799.78 10.17 8,133.76 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.04.02 TUBERIA PVC ALCANT U.F. ISO 4435,S-25 160MM m 4,181.75 7.44 31,112.22 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
19.05 INSTALACION DE TUBERIAS DE ALCANTARILLADO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
19.05.01 INSTALACION DE TUBERIA PVC DESAGUE m 4,981.53 3.67 18,282.22 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
-
20 CRUCE ESPECIAL EN PUENTE Y RIACHUELO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
20.01 CRUCE BAJO RIACHUELO glb 1.00 1,500.00 1,500.00 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
20.02 CRUCE BAJO PUENTE PROVISIONAL glb 1.00 2,000.00 2,000.00 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
-
21 BUZONES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
21.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
21.01.01 LIMPIEZA DE TERRENO MANUAL m2 219.24 0.35 76.73 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.01.02 TRAZO Y REPLANTEO m2 219.24 3.19 699.38 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.02 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
21.02.01 EXCAVACION MANUAL DE BUZON HASTA 1.49 m. EN ROCA SUELTA m3 218.23 81.51 17,787.93 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.02.02 EXCAVACION MANUAL DE BUZON DE 1.50 A 1.99 m. EN ROCA SUELTA m3 49.74 94.06 4,678.54 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.02.03 EXCAVACION MANUAL DE BUZON DE 2.00 A 2.49 m. EN ROCA SUELTA m3 22.80 111.16 2,534.45 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.02.04 EXCAVACION MANUAL DE BUZON DE 2.50 A 2.99 m. EN ROCA SUELTA m3 11.17 231.96 2,590.99 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.02.05 EXCAVACION MANUAL DE BUZON DE 3.50 A 3.99 m. EN ROCA SUELTA m3 7.92 274.46 2,173.72 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.02.06 ELIMINACION DE MATERIAL EXCEDENTE m3 433.83 16.72 7,253.64 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.03 CONSTRUCCION DE BUZONES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
21.03.01 CONSTRUCCION DE BUZONES EN ROCA SUELTA HASTA 1.49 m u 86.00 1,243.69 106,957.34 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.03.02 CONSTRUCCION DE BUZONES EN ROCA SUELTA DE 1.50 HASTA 1.99 m u 13.00 1,439.13 18,708.69 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.03.03 CONST. BUZON e/ROCA SUELTA DE 1.5-1.99m c/DIPOSIT. CAIDA INT. DE BUZON u 1.00 2,182.25 2,182.25 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.03.04 CONSTRUCCION DE BUZONES EN ROCA SUELTA DE 2.00 HASTA 2.49 m u 5.00 1,644.85 8,224.25 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.03.05 CONSTRUCCION DE BUZONES EN ROCA SUELTA DE 2.50 HASTA 2.99 m u 2.00 1,842.97 3,685.94 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
21.03.06 CONSTRUC. BUZON EN ROCA SUELTA DE 2.5-2.99 m CON ESCALERA TIPO GATO u 1.00 2,411.45 2,411.45 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
-
VALORIZACION DE OBRA Nº 04
Obra CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
ENTIDAD MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR Plazo de Ejecución : 120 Días Calend
SISTEMA Sistema a suma alzada Presupuesto Base : S/. 1,421,088.00 Avance Anterior : Err:509 Inicio del Plazo de Ejecución : 27-dic-14
Contratista CONSORCIO N & F Monto de Contrato : S/. 1,421,088.00 Fr = 1.00000 Avance Actual : Err:509 Fin del Plazo de Ejecución : 25-abr-15
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 Adelantos : Ninguno a la fecha Avance Acumulado : Err:509 Total dias ejecutados : 36 Días Calend
Valorizado @ 31-ene-15 Saldo por Ejecutar : Err:509 Faltan para terminar la Obra : 84 Días Calend
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
22 CONSTRUCCION CONEXIONES DOMICILIARIAS - ALCANTARILLADO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
22.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
22.01.01 LIMPIEZA DE TERRENO MANUAL m2 469.00 0.35 164.15 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.01.02 TRAZO, NIVELACION Y REPLANTEO m 670.00 3.10 2,077.00 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.02 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
22.02.01 EXCAV. ZANJA (PULSO) P/CONEX. TUBO DN 160 TERR. COMPACTO c/BOLONERIA m 683.00 11.15 7,615.45 Err:509 Err:509 Err:509 134.13 1,495.55 19.64% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.02.02 REFINE NIVELACION INTERIOR APISONADO MANUAL m2 402.00 3.01 1,210.02 Err:509 Err:509 Err:509 78.90 237.49 19.63% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.02.03 PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO m 670.00 3.80 2,546.00 Err:509 Err:509 Err:509 131.50 499.70 19.63% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.02.04 RELLENO COMPAC c/PLANC. VIBRAT. H<3.00m c/MAT-PROPIO ZARAND C=20cm m3 683.40 5.02 3,430.67 Err:509 Err:509 Err:509 134.13 673.33 19.63% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 854.25 16.72 14,283.06 Err:509 Err:509 Err:509 427.13 7,141.53 50.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
22.03 CONEXIONES DOMICILIARIAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
22.03.01 CONEXIONES DOMICILIARIAS 4"X6" u 134.00 360.32 48,282.88 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
-
23 CRUCE AEREO DE ACUEDUCTOS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
23.01 PASE DE ACUEDUCTOS COLGANTES DE 50 MTS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
23.01.01 TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
23.01.01.01 LIMPIEZA DE TERRENO MANUAL m2 100.00 0.35 35.00 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.01.02 TRAZO Y REPLANTEO m2 100.00 5.76 576.00 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.02 MOVIMIENTO DE TIERRAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
23.01.02.01 EXCAVACION MANUAL m3 71.60 32.91 2,356.36 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.02.02 RELLENO CON MATERIAL PROPIO m3 17.60 5.02 88.35 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.02.03 ELIMINACION DE MATERIAL EXCEDENTE A MANO D<200M m3 64.48 16.72 1,078.11 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.03 OBRAS DE CONCRETO SIMPLE - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
23.01.03.01 SOLADO DE 4" 1:12 CEMENTO-HORMIGON m2 1.50 70.89 106.34 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.03.02 CONCRETO CICLOPEO f'c=140 kg/cm2 + 30 % PM. EN CAMARA DE ANCLAJE m3 20.76 262.73 5,454.27 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.03.03 ENCOFRADO Y DESENCOFRADO EN CAMARA DE ANCLAJE m2 88.24 38.99 3,440.48 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.03.04 DADOS DE CONCRETO m3 0.66 408.04 269.31 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04 OBRAS DE CONCRETO ARMADO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
23.01.04.01 ZAPATAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
23.01.04.01.01 CONCRETO f 'c=175 kg/cm2, PARA ZAPATAS m3 20.00 337.24 6,744.80 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.01.02 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 487.60 4.45 2,169.82 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.02 COLUMNAS - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
23.01.04.03 CONCRETO f 'c=210 kg/cm2 PARA COLUMNAS TORRE m3 2.18 468.39 1,021.09 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.04 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS TORRE m2 28.98 38.99 1,129.93 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.05 ACERO fy=4200 kg/cm2 GRADO 60 kg 483.66 4.55 2,200.65 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.06 ESTRUCTURA DE ACERO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
23.01.04.06.01 SUMINISTRO Y COLOCACION CABLE PRINCIPAL DE ACERO GALV. Ø 3/4" m 139.32 79.29 11,046.68 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.06.02 SUMIN Y COLOC GUARDACABOS p/CABLE 3/4" e/ANCLAJE MACIZO Ø 3" u 4.00 67.36 269.44 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.06.03 SUMINISTRO Y COLOC. GRAPAS TIPO CROSBY p/FIJACION DE CABLE Ø 3/4" u 40.00 40.48 1,619.20 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.06.04 SUMINISTRO Y COLOCACION DE PENDOLAS DE FIERRO LISO DIAM=1/4" m 86.20 33.73 2,907.53 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.06.05 DOBLADO Y SOLDADO DE EXTREMOS DE PENDOLAS S/DETALLE u 48.00 17.29 829.92 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.06.06 SUMIN Y COLOC. ABRAZADERA PLANCHA 1/4"x4"x4" en PENDOLA SUP. Ø3/4" u 48.00 44.17 2,120.16 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.06.07 SUMIN Y COLOC. ABRAZAD FF8"x1/2" P/INF. PENDOLA 1/4"+PERNO 3/4" c/a u 48.00 50.48 2,423.04 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.06.08 CARRITO DE DILATACION C/RODILLO MACIZO DE 2" u 4.00 412.73 1,650.92 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.06.09 MACIZO DE FIERRO LISO DE 3.0" PARA ANCLAJE Y SUJECION DE CABLE m 9.20 158.07 1,454.24 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.06.10 SUMINISTRO Y COLOCACION DE TUBO HDPE DIAM=8" m 107.80 55.99 6,035.72 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
23.01.04.07 PINTURA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
23.01.04.07.01 PINTURA ESMALTE 2 MANOS mil 270.00 7.11 1,919.70 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
-
VALORIZACION DE OBRA Nº 04
Obra CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
ENTIDAD MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR Plazo de Ejecución : 120 Días Calend
SISTEMA Sistema a suma alzada Presupuesto Base : S/. 1,421,088.00 Avance Anterior : Err:509 Inicio del Plazo de Ejecución : 27-dic-14
Contratista CONSORCIO N & F Monto de Contrato : S/. 1,421,088.00 Fr = 1.00000 Avance Actual : Err:509 Fin del Plazo de Ejecución : 25-abr-15
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 Adelantos : Ninguno a la fecha Avance Acumulado : Err:509 Total dias ejecutados : 36 Días Calend
Valorizado @ 31-ene-15 Saldo por Ejecutar : Err:509 Faltan para terminar la Obra : 84 Días Calend
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
24 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
24.01 OBRAS PROVISIONALES PARA TODA LA OBRA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
24.01.01 CARTEL DE IDENTIFICACION DE OBRA DE 3.60 x 2.40 M. u 1.00 1,222.76 1,222.76 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
24.01.02 CAMPAMENTO PROVISIONAL DE LA OBRA glb 1.00 5,171.53 5,171.53 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
-
25 TRABAJOS PRELIMINARES PARA TODA LA OBRA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
25.01 CINTA PLASTICA SEÑALIZADORA p/LIMITE DE SEGURIDAD DE OBRA m 2,270.10 0.93 2,111.19 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
25.02 PUENTE DE MADERA p/PASE PEATONAL SOBRE ZANJA (PROV. DURANTE LA OBRA) u 15.00 229.62 3,444.30 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
25.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUINARIA glb 1.00 5,000.00 5,000.00 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
25.04 PRUEBA A ZANJA TAPADA PARA TUBERIA DESAGUE DE 6" A 8" m 3,772.00 1.88 7,091.36 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
25.05 PRUEBA DE COMPACTACION DE SUELOS (PROCTOR MOD. - DENSIDAD DE CAMPO) u 10.00 105.53 1,055.30 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
25.06 FLETE TERRESTRE glb 1.00 65,701.00 65,701.00 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
-
26 MITIGACION DE IMPACTOS AMBIENTALES - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
26.01 PROGRAMA DE PREVENCIÓN Y MITIGACIÓN - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
26.01.01 ALQUILER DE BAÑOS PORTATILES PARA CAMPAMENTO - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
26.01.01.01 BAÑO PORTATIL TIPO DYSAL mes 6.00 600.00 3,600.00 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
-
27 CONTINGENCIA DE OBRA - Err:509 Err:509 - - - Err:509 Err:509 - Err:509 Err:509 -
27.01 ALQUILER DE CAMION CISTERNA PARA DOTACION DE AGUA A LA POBLACION glb 1.00 8,000.00 8,000.00 Err:509 Err:509 Err:509 - 0.00% Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
1 OBRAS PROVISIONALES - - - - - - - - - - -
1.01 CAMPAMENTO PROVISIONAL DE OBRA u 1.00 4,027.48 4,027.48 - 0.00% - 0.00% - - 0.00% 1.00 4,027.48 100.00%
1.02 CARTEL DE IDENTIFICACION DE OBRA. u 1.00 639.12 639.12 - 0.00% - 0.00% - - 0.00% 1.00 639.12 100.00%
1.03 ADECUACION DE TERRENO PARA PATIO DE MAQUINAS u 2.00 379.80 759.60 - 0.00% - 0.00% - - 0.00% 2.00 759.60 100.00%
2 OBRAS PRELIMINARES - - - - - - - - - - -
2.01 MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPOS glb 1.00 18,035.00 18,035.00 - 0.00% - 0.00% - - 0.00% 1.00 18,035.00 100.00%
2.02 FLETE TERRESTRE glb 1.00 3,500.00 3,500.00 - 0.00% - 0.00% 1.00 3,500.00 100.00%
2.03 TOPOGRAFÍA Y GEOREFERENCIACIÓN km 5.59 414.09 2,314.76 3.35 1,388.86 60.00% 2.24 925.91 40.00% 5.59 2,314.76 100.00% - - 0.00%
2.04 REUBICACION DE CERCO DE ALAMBRE CON PUAS m 2,000.00 9.94 19,880.00 - 0.00% - 0.00% - - 0.00% 2,000.00 19,880.00 100.00%
3 MOVIMIENTO DE TIERRA - - - - - - - -
3.01 EXPLANACIONES - - - - - - - - - - -
3.01.01 CORTE DE MATERIAL COMPACTO CON MAQUINARIA m3 13,813.00 5.27 72,794.51 - 0.00% - 0.00% - - 0.00% 13,813.00 72,794.51 100.00%
3.01.02 CORTE DE TIERRA AGRICOLA m3 12,294.79 3.57 43,892.40 - 0.00% - 0.00% - - 0.00% 12,294.79 43,892.40 100.00%
3.01.03 PERFILADO Y COMPACTADO EN ZONA DE CORTE m2 30,736.97 1.93 59,322.35 - 0.00% - 0.00% - - 0.00% 30,736.97 59,322.35 100.00%
3.02 TERRAPLENES - - - - - - - - - - -
3.02.01 TRANSPORTE DE MATERIAL GRANULAR PARA D<= 30KM m3 9,071.89 6.13 55,610.69 - 0.00% - 0.00% - - 0.00% 9,071.89 55,610.69 100.00%
3.02.02 CONFORMACION DE TERRAPLENES CON MATERIAL DE PRESTAMO m3 9,071.89 20.90 189,602.50 - 0.00% - 0.00% - - 0.00% 9,071.89 189,602.50 100.00%
4 AFIRMADO - - - - - - - - - - -
4.01 TRANSPORTE DE AFIRMADO EN CAMION VOLQUETE DE 15M3 m3 11,987.42 6.13 73,482.88 - 0.00% - 0.00% - - 0.00% 11,987.42 73,482.88 100.00%
4.02 AFIRMADO Y/O MATERIAL GRANULAR E=0.37M m3 11,987.42 26.86 321,982.10 - 0.00% - 0.00% - - 0.00% 11,987.42 321,982.10 100.00%
5 OBRAS DE DRENAJE - - - - - - - - - - -
5.01 DRENAJE SUB SUPÉRFICIAL - - - - - - - - - - -
5.01.01 TRANSPORTE DE PIEDRA m3 717.75 6.13 4,399.81 - 0.00% - 0.00% - - 0.00% 717.75 4,399.81 100.00%
5.01.02 INSTALACION DE DRENAJE Y COLOCACION DE PIEDRAS m2 2,392.50 17.51 41,892.68 - 0.00% - 0.00% 2,392.50 41,892.68 100.00%
5.02 CUNETAS - - - - - - - - - - -
5.02.01 CONFORMACION DE CUNETAS DE TIERRA m 11,177.08 2.33 26,042.60 - 0.00% - 0.00% - - 0.00% 11,177.08 26,042.60 100.00%
5.03 ALCANTARILLAS DE 24"(5UND) - - - - - - - - - - -
5.03.01 TRABAJOS PRELIMINARES - - - - - - - - - - -
5.03.01.01 TRAZO Y REPLANTEO m2 63.00 2.83 178.29 - 0.00% - 0.00% - - 0.00% 63.00 178.29 100.00%
5.03.02 MOVIMIENTO DE TIERRA - - - - - - - - - - -
5.03.02.01 EXCAVACIÓN MANUAL m3 88.20 37.24 3,284.57 - 0.00% - 0.00% - - 0.00% 88.20 3,284.57 100.00%
5.03.02.02 REFINE NIVELACION Y COMPACTACION m2 140.00 5.34 747.60 - 0.00% - 0.00% - - 0.00% 140.00 747.60 100.00%
5.03.02.03 RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO m3 28.05 31.50 883.58 - 0.00% - 0.00% - - 0.00% 28.05 883.58 100.00%
5.03.02.04 ELIMINACION DE MATERIAL m3 114.66 11.64 1,334.64 - 0.00% - 0.00% - - 0.00% 114.66 1,334.64 100.00%
5.03.03 CONCRETO SIMPLE - - - - - - - - - - -
5.03.03.01 CONCRETO CIMENTACIÓN 1:8+25% DE PM D=4" m3 8.55 279.96 2,393.66 - 0.00% - 0.00% 8.55 2,393.66 100.00%
5.03.03.02 ENCOFRADO Y DESENCOFRADO m2 73.06 42.75 3,123.32 - 0.00% - 0.00% - - 0.00% 73.06 3,123.32 100.00%
5.03.03.03 CONCRETO CLASE F (F'C = 140 KG/CM2) m3 7.00 320.67 2,244.69 - 0.00% - 0.00% - - 0.00% 7.00 2,244.69 100.00%
5.03.04 COLOCACION DE ALCANTARILLA - - - - - - - - - - -
5.03.04.01 COLOCACION DE ALCANTARILLA TMC D=24" m 27.50 337.65 9,285.38 - 0.00% - 0.00% - - 0.00% 27.50 9,285.38 100.00%
5.04 ALCANTARILLA DOBLE DE 36"(1UND) - - - - - - - - - - -
5.04.01 TRABAJOS PRELIMINARES - - - - - - - - - - -
5.04.01.01 TRAZO Y REPLANTEO m2 23.05 2.83 65.23 - 0.00% - 0.00% - - 0.00% 23.05 65.23 100.00%
5.04.02 MOVIMIENTO DE TIERRA - - - - - - - - - - -
5.04.02.01 EXCAVACIÓN MANUAL m3 39.19 37.24 1,459.44 - 0.00% - 0.00% - - 0.00% 39.19 1,459.44 100.00%
5.04.02.02 REFINE NIVELACION Y COMPACTACION m2 41.75 5.34 222.95 - 0.00% - 0.00% - - 0.00% 41.75 222.95 100.00%
5.04.02.03 RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO m3 13.20 31.50 415.80 - 0.00% - 0.00% - - 0.00% 13.20 415.80 100.00%
5.04.02.04 ELIMINACION DE MATERIAL m3 50.94 11.64 592.94 - 0.00% - 0.00% - - 0.00% 50.94 592.94 100.00%
5.04.03 CONCRETO SIMPLE - - - - - - - - - - -
5.04.03.01 CONCRETO CIMENTACIÓN 1:8+25% DE PM D=4" m3 2.48 279.96 694.30 - 0.00% - 0.00% - - 0.00% 2.48 694.30 100.00%
5.04.03.02 ENCOFRADO Y DESENCOFRADO m2 29.05 42.75 1,241.89 - 0.00% - 0.00% - - 0.00% 29.05 1,241.89 100.00%
VALORIZACION DE OBRA Nº 02
Obra CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
ENTIDAD MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR
SISTEMA Sistema a suma alzada Presupuesto Base : S/. 1,421,088.00 Avance Anterior : 0.14%
Contratista CONSORCIO N & F Monto de Contrato : S/. 1,421,088.00 Fr = 1.00000 Avance Actual : 0.09% Plazo de Ejecución : 120 Días Calend
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 Adelantos : S/. 213,163.20 Avance Acumulado : 0.23% Inicio del Plazo de Ejecución : 27-dic-14
Valorizado @ 31-ene-15 Saldo por Ejecutar : 99.77% Fin del Plazo de Ejecución : 25-abr-15
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
5.04.03.03 CONCRETO CLASE F (F'C = 140 KG/CM2) m3 2.44 320.67 782.43 - 0.00% - 0.00% - - 0.00% 2.44 782.43 100.00%
5.04.04 COLOCACION DE ALCANTARILLA - - - - - - - - - - -
5.04.04.01 COLOCACION DE ALCANTARILLA TMC D=36" m 11.00 426.75 4,694.25 - 0.00% - 0.00% - - 0.00% 11.00 4,694.25 100.00%
6 PROTECCIÓN AMBIENTAL - - - - - - - - - - -
6.01 RESTAURACION DE AREA AFECTADA POR CAMPAMENTO glb 1.00 1,500.00 1,500.00 - 0.00% - 0.00% - - 0.00% 1.00 1,500.00 100.00%
6.02 ALQUILER DE BAÑOS PORTATILES u 2.00 1,000.00 2,000.00 - 0.00% - 0.00% - - 0.00% 2.00 2,000.00 100.00%
6.03 ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE glb 1.00 2,500.00 2,500.00 - 0.00% - 0.00% - - 0.00% 1.00 2,500.00 100.00%
7 SEÑALIZACION Y SEGURIDAD VIAL - - - - - - - - - - -
7.01 SEÑAL INFORMATIVA u 3.00 350.96 1,052.88 - 0.00% - 0.00% - - 0.00% 3.00 1,052.88 100.00%
7.02 SEÑAL PREVENTIVA u 3.00 350.96 1,052.88 - 0.00% - 0.00% - - 0.00% 3.00 1,052.88 100.00%
7.03 HITOS KILOMETRICOS u 6.00 132.62 795.72 - 0.00% - 0.00% - - 0.00% 6.00 795.72 100.00%
8 VARIOS - - - - - - - - - - -
8.01 NIVELACION DE CORTE DE MATERIAL ORGANICO m3 12,294.79 1.86 22,868.31 - 0.00% - 0.00% - - 0.00% 12,294.79 22,868.31 100.00%
1 OBRAS PROVISIONALES - - - - - - - - - - -
1.01 CAMPAMENTO PROVISIONAL DE OBRA u 1.00 4,027.48 4,027.48 - - 0.00% 1.00 4,027.48 100.00% 1.00 4,027.48 100.00% - - 0.00%
1.02 CARTEL DE IDENTIFICACION DE OBRA. u 1.00 639.12 639.12 - - 0.00% 1.00 639.12 100.00% 1.00 639.12 100.00% - - 0.00%
1.03 ADECUACION DE TERRENO PARA PATIO DE MAQUINAS u 2.00 379.80 759.60 - - 0.00% 1.00 379.80 50.00% 1.00 379.80 50.00% 1.00 379.80 50.00%
2 OBRAS PRELIMINARES - - - - - - - - - - - -
2.01 MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPOS glb 1.00 18,035.00 18,035.00 - - 0.00% 0.169645 3,059.55 16.96% 0.17 3,059.55 16.96% 0.83 14,975.46 83.04%
2.02 FLETE TERRESTRE glb 1.00 3,500.00 3,500.00 - - 0.00% 0.742526 2,598.84 74.25% 0.74 2,598.84 74.25% 0.26 901.16 25.75%
2.03 TOPOGRAFÍA Y GEOREFERENCIACIÓN km 5.59 414.09 2,314.76 5.59 2,314.76 100.00% - 0.00% 5.59 2,314.76 100.00% - - 0.00%
2.04 REUBICACION DE CERCO DE ALAMBRE CON PUAS m 2,000.00 9.94 19,880.00 - - 0.00% - 0.00% - - 0.00% 2,000.00 19,880.00 100.00%
3 MOVIMIENTO DE TIERRA - - - - - - - - - - - -
3.01 EXPLANACIONES - - - - - - - - - - - -
3.01.01 CORTE DE MATERIAL COMPACTO CON MAQUINARIA m3 13,813.00 5.27 72,794.51 - - 0.00% 13,813.00 72,794.51 100.00% 13,813.00 72,794.51 100.00% - - 0.00%
3.01.02 CORTE DE TIERRA AGRICOLA m3 12,294.79 3.57 43,892.40 - - 0.00% 12,294.79 43,892.40 100.00% 12,294.79 43,892.40 100.00% - - 0.00%
3.01.03 PERFILADO Y COMPACTADO EN ZONA DE CORTE m2 30,736.97 1.93 59,322.35 - - 0.00% - 0.00% - - 0.00% 30,736.97 59,322.35 100.00%
3.02 TERRAPLENES - - - - - - - - - - - -
3.02.01 TRANSPORTE DE MATERIAL GRANULAR PARA D<= 30KM m3 9,071.89 6.13 55,610.69 - - 0.00% - 0.00% - - 0.00% 9,071.89 55,610.69 100.00%
3.02.02 CONFORMACION DE TERRAPLENES CON MATERIAL DE PRESTAMO m3 9,071.89 20.90 189,602.50 - - 0.00% - 0.00% - - 0.00% 9,071.89 189,602.50 100.00%
4 AFIRMADO - - - - - - - - - - - -
4.01 TRANSPORTE DE AFIRMADO EN CAMION VOLQUETE DE 15M3 m3 11,987.42 6.13 73,482.88 - - 0.00% - 0.00% - - 0.00% 11,987.42 73,482.88 100.00%
4.02 AFIRMADO Y/O MATERIAL GRANULAR E=0.37M m3 11,987.42 26.86 321,982.10 - - 0.00% - 0.00% - - 0.00% 11,987.42 321,982.10 100.00%
5 OBRAS DE DRENAJE - - - - - - - - - - - -
5.01 DRENAJE SUB SUPÉRFICIAL - - - - - - - - - - - -
5.01.01 TRANSPORTE DE PIEDRA m3 717.75 6.13 4,399.81 - - 0.00% - 0.00% - - 0.00% 717.75 4,399.81 100.00%
5.01.02 INSTALACION DE DRENAJE Y COLOCACION DE PIEDRAS m2 2,392.50 17.51 41,892.68 - - 0.00% - 0.00% - - 0.00% 2,392.50 41,892.68 100.00%
5.02 CUNETAS - - - - - - - - - - - -
5.02.01 CONFORMACION DE CUNETAS DE TIERRA m 11,177.08 2.33 26,042.60 - - 0.00% - 0.00% - - 0.00% 11,177.08 26,042.60 100.00%
5.03 ALCANTARILLAS DE 24"(5UND) - - - - - - - - - - - -
5.03.01 TRABAJOS PRELIMINARES - - - - - - - - - - - -
5.03.01.01 TRAZO Y REPLANTEO m2 63.00 2.83 178.29 - - 0.00% - 0.00% - - 0.00% 63.00 178.29 100.00%
5.03.02 MOVIMIENTO DE TIERRA - - - - - - - - - - - -
5.03.02.01 EXCAVACIÓN MANUAL m3 88.20 37.24 3,284.57 - - 0.00% - 0.00% - - 0.00% 88.20 3,284.57 100.00%
5.03.02.02 REFINE NIVELACION Y COMPACTACION m2 140.00 5.34 747.60 - - 0.00% - 0.00% - - 0.00% 140.00 747.60 100.00%
5.03.02.03 RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO m3 28.05 31.50 883.58 - - 0.00% - 0.00% - - 0.00% 28.05 883.58 100.00%
5.03.02.04 ELIMINACION DE MATERIAL m3 114.66 11.64 1,334.64 - - 0.00% - 0.00% - - 0.00% 114.66 1,334.64 100.00%
5.03.03 CONCRETO SIMPLE - - - - - - - - - - - -
5.03.03.01 CONCRETO CIMENTACIÓN 1:8+25% DE PM D=4" m3 8.55 279.96 2,393.66 - - 0.00% - 0.00% - - 0.00% 8.55 2,393.66 100.00%
5.03.03.02 ENCOFRADO Y DESENCOFRADO m2 73.06 42.75 3,123.32 - - 0.00% - 0.00% - - 0.00% 73.06 3,123.32 100.00%
5.03.03.03 CONCRETO CLASE F (F'C = 140 KG/CM2) m3 7.00 320.67 2,244.69 - - 0.00% - 0.00% - - 0.00% 7.00 2,244.69 100.00%
5.03.04 COLOCACION DE ALCANTARILLA - - - - - - - - - - - -
5.03.04.01 COLOCACION DE ALCANTARILLA TMC D=24" m 27.50 337.65 9,285.38 - - 0.00% 24.10 8,137.25 87.64% 24.10 8,137.25 87.64% 3.40 1,148.13 12.36%
5.04 ALCANTARILLA DOBLE DE 36"(1UND) - - - - - - - - - - - -
5.04.01 TRABAJOS PRELIMINARES - - - - - - - - - - - -
5.04.01.01 TRAZO Y REPLANTEO m2 23.05 2.83 65.23 - - 0.00% - 0.00% - - 0.00% 23.05 65.23 100.00%
5.04.02 MOVIMIENTO DE TIERRA - - - - - - - - - - - -
5.04.02.01 EXCAVACIÓN MANUAL m3 39.19 37.24 1,459.44 - - 0.00% - 0.00% - - 0.00% 39.19 1,459.44 100.00%
5.04.02.02 REFINE NIVELACION Y COMPACTACION m2 41.75 5.34 222.95 - - 0.00% - 0.00% - - 0.00% 41.75 222.95 100.00%
5.04.02.03 RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO m3 13.20 31.50 415.80 - - 0.00% - 0.00% - - 0.00% 13.20 415.80 100.00%
5.04.02.04 ELIMINACION DE MATERIAL m3 50.94 11.64 592.94 - - 0.00% - 0.00% - - 0.00% 50.94 592.94 100.00%
5.04.03 CONCRETO SIMPLE - - - - - - - - - - - -
5.04.03.01 CONCRETO CIMENTACIÓN 1:8+25% DE PM D=4" m3 2.48 279.96 694.30 - - 0.00% - 0.00% - - 0.00% 2.48 694.30 100.00%
5.04.03.02 ENCOFRADO Y DESENCOFRADO m2 29.05 42.75 1,241.89 - - 0.00% - 0.00% - - 0.00% 29.05 1,241.89 100.00%
VALORIZACION DE OBRA Nº 03
Obra CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO Plazo de Ejecución : 120 Días Calend
ENTIDAD MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR Días Ejecutados en dic-14 5 Días Calendarios
SISTEMA Sistema a suma alzada Presupuesto Base : S/. 1,421,088.00 Avance Anterior : 0.14% Días Ejecutados en ene-15 7 Días Calendarios
Contratista CONSORCIO N & F Monto de Contrato : S/. 1,421,088.00 Fr = 1.00000 Avance Actual : 13.93% Días Ejecutados en mar-15 1 Días Calendarios
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 Adelantos : S/. 213,163.20 Avance Acumulado : 14.06% Días Ejecutados en abr-15 1 Días Calendarios
Valorizado @ 31-may-15 Saldo por Ejecutar : 85.84% Días Ejecutados en may-15 31 Días Calendarios
Total Días Trabajados al 31-May-15 45 Días Calendarios
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
5.04.03.03 CONCRETO CLASE F (F'C = 140 KG/CM2) m3 2.44 320.67 782.43 - - 0.00% - 0.00% - - 0.00% 2.44 782.43 100.00%
5.04.04 COLOCACION DE ALCANTARILLA - - - - - - - - - - - -
5.04.04.01 COLOCACION DE ALCANTARILLA TMC D=36" m 11.00 426.75 4,694.25 - - 0.00% 9.92 4,235.00 90.22% 9.92 4,235.00 90.22% 1.08 459.25 9.78%
6 PROTECCIÓN AMBIENTAL - - - - - - - - - - - -
6.01 RESTAURACION DE AREA AFECTADA POR CAMPAMENTO glb 1.00 1,500.00 1,500.00 - - 0.00% - 0.00% - - 0.00% 1.00 1,500.00 100.00%
6.02 ALQUILER DE BAÑOS PORTATILES u 2.00 1,000.00 2,000.00 - - 0.00% - 0.00% - - 0.00% 2.00 2,000.00 100.00%
6.03 ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE glb 1.00 2,500.00 2,500.00 - - 0.00% - 0.00% - - 0.00% 1.00 2,500.00 100.00%
7 SEÑALIZACION Y SEGURIDAD VIAL - - - - - - - - - - - -
7.01 SEÑAL INFORMATIVA u 3.00 350.96 1,052.88 - - 0.00% - 0.00% - - 0.00% 3.00 1,052.88 100.00%
7.02 SEÑAL PREVENTIVA u 3.00 350.96 1,052.88 - - 0.00% - 0.00% - - 0.00% 3.00 1,052.88 100.00%
7.03 HITOS KILOMETRICOS u 6.00 132.62 795.72 - - 0.00% - 0.00% - - 0.00% 6.00 795.72 100.00%
8 VARIOS - - - - - - - - - - - -
8.01 NIVELACION DE CORTE DE MATERIAL ORGANICO m3 12,294.79 1.86 22,868.31 - - 0.00% - 0.00% - - 0.00% 12,294.79 22,868.31 100.00%
1 OBRAS PROVISIONALES - - - - - - - - - - -
1.01 CAMPAMENTO PROVISIONAL DE OBRA u 1.00 4,027.48 4,027.48 1.00 4,027.48 100.00% - 0.00% 1.00 4,027.48 100.00% - - 0.00%
1.02 CARTEL DE IDENTIFICACION DE OBRA. u 1.00 639.12 639.12 1.00 639.12 100.00% - 0.00% 1.00 639.12 100.00% - - 0.00%
1.03 ADECUACION DE TERRENO PARA PATIO DE MAQUINAS u 2.00 379.80 759.60 1.00 379.80 50.00% - 0.00% 1.00 379.80 50.00% 1.00 379.80 50.00%
2 OBRAS PRELIMINARES - - - - - - - - - - - -
2.01 MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPOS glb 1.00 18,035.00 18,035.00 0.17 3,059.55 16.96% - 0.00% 0.17 3,059.55 16.96% 0.83 14,975.46 83.04%
2.02 FLETE TERRESTRE glb 1.00 3,500.00 3,500.00 0.74 2,598.84 74.25% - 0.00% 0.74 2,598.84 74.25% 0.26 901.16 25.75%
2.03 TOPOGRAFÍA Y GEOREFERENCIACIÓN km 5.59 414.09 2,314.76 5.59 2,314.76 100.00% - 0.00% 5.59 2,314.76 100.00% - - 0.00%
2.04 REUBICACION DE CERCO DE ALAMBRE CON PUAS m 2,000.00 9.94 19,880.00 - - 0.00% - 0.00% - - 0.00% 2,000.00 19,880.00 100.00%
3 MOVIMIENTO DE TIERRA - - - - - - - - - - - -
3.01 EXPLANACIONES - - - - - - - - - - - -
3.01.01 CORTE DE MATERIAL COMPACTO CON MAQUINARIA m3 13,813.00 5.27 72,794.51 13,813.00 72,794.51 100.00% - 0.00% 13,813.00 72,794.51 100.00% - - 0.00%
3.01.02 CORTE DE TIERRA AGRICOLA m3 12,294.79 3.57 43,892.40 12,294.79 43,892.40 100.00% - 0.00% 12,294.79 43,892.40 100.00% - - 0.00%
3.01.03 PERFILADO Y COMPACTADO EN ZONA DE CORTE m2 30,736.97 1.93 59,322.35 - - 0.00% 30,736.97 59,322.35 100.00% 30,736.97 59,322.35 100.00% - - 0.00%
3.02 TERRAPLENES - - - - - - - - - - - -
3.02.01 TRANSPORTE DE MATERIAL GRANULAR PARA D<= 30KM m3 9,071.89 6.13 55,610.69 - - 0.00% 6,622.48 40,595.80 73.00% 6,622.48 40,595.80 73.00% 2,449.41 15,014.89 27.00%
3.02.02 CONFORMACION DE TERRAPLENES CON MATERIAL DE PRESTAMO m3 9,071.89 20.90 189,602.50 - - 0.00% 6,622.48 138,409.83 73.00% 6,622.48 138,409.83 73.00% 2,449.41 51,192.68 27.00%
4 AFIRMADO - - - - - - - - - - - -
4.01 TRANSPORTE DE AFIRMADO EN CAMION VOLQUETE DE 15M3 m3 11,987.42 6.13 73,482.88 - - 0.00% 1,198.74 7,348.29 10.00% 1,198.74 7,348.29 10.00% 10,788.68 66,134.60 90.00%
4.02 AFIRMADO Y/O MATERIAL GRANULAR E=0.37M m3 11,987.42 26.86 321,982.10 - - 0.00% 1,198.74 32,198.21 10.00% 1,198.74 32,198.21 10.00% 10,788.68 289,783.89 90.00%
5 OBRAS DE DRENAJE - - - - - - - - - - - -
5.01 DRENAJE SUB SUPÉRFICIAL - - - - - - - - - - - -
5.01.01 TRANSPORTE DE PIEDRA m3 717.75 6.13 4,399.81 - - 0.00% 430.65 2,639.88 60.00% 430.65 2,639.88 60.00% 287.10 1,759.92 40.00%
5.01.02 INSTALACION DE DRENAJE Y COLOCACION DE PIEDRAS m2 2,392.50 17.51 41,892.68 - - 0.00% 1,435.50 25,135.61 60.00% 1,435.50 25,135.61 60.00% 957.00 16,757.07 40.00%
5.02 CUNETAS - - - - - - - - - - - -
5.02.01 CONFORMACION DE CUNETAS DE TIERRA m 11,177.08 2.33 26,042.60 - - 0.00% - 0.00% - - 0.00% 11,177.08 26,042.60 100.00%
5.03 ALCANTARILLAS DE 24"(5UND) - - - - - - - - - - - -
5.03.01 TRABAJOS PRELIMINARES - - - - - - - - - - - -
5.03.01.01 TRAZO Y REPLANTEO m2 63.00 2.83 178.29 - - 0.00% - 0.00% - - 0.00% 63.00 178.29 100.00%
5.03.02 MOVIMIENTO DE TIERRA - - - - - - - - - - - -
5.03.02.01 EXCAVACIÓN MANUAL m3 88.20 37.24 3,284.57 - - 0.00% - 0.00% - - 0.00% 88.20 3,284.57 100.00%
5.03.02.02 REFINE NIVELACION Y COMPACTACION m2 140.00 5.34 747.60 - - 0.00% - 0.00% - - 0.00% 140.00 747.60 100.00%
5.03.02.03 RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO m3 28.05 31.50 883.58 - - 0.00% - 0.00% - - 0.00% 28.05 883.58 100.00%
5.03.02.04 ELIMINACION DE MATERIAL m3 114.66 11.64 1,334.64 - - 0.00% - 0.00% - - 0.00% 114.66 1,334.64 100.00%
5.03.03 CONCRETO SIMPLE - - - - - - - - - - - -
5.03.03.01 CONCRETO CIMENTACIÓN 1:8+25% DE PM D=4" m3 8.55 279.96 2,393.66 - - 0.00% - 0.00% - - 0.00% 8.55 2,393.66 100.00%
5.03.03.02 ENCOFRADO Y DESENCOFRADO m2 73.06 42.75 3,123.32 - - 0.00% - 0.00% - - 0.00% 73.06 3,123.32 100.00%
5.03.03.03 CONCRETO CLASE F (F'C = 140 KG/CM2) m3 7.00 320.67 2,244.69 - - 0.00% - 0.00% - - 0.00% 7.00 2,244.69 100.00%
5.03.04 COLOCACION DE ALCANTARILLA - - - - - - - - - - - -
5.03.04.01 COLOCACION DE ALCANTARILLA TMC D=24" m 27.50 337.65 9,285.38 24.10 8,137.25 87.64% - 0.00% 24.10 8,137.25 87.64% 3.40 1,148.13 12.36%
5.04 ALCANTARILLA DOBLE DE 36"(1UND) - - - - - - - - - - - -
5.04.01 TRABAJOS PRELIMINARES - - - - - - - - - - - -
5.04.01.01 TRAZO Y REPLANTEO m2 23.05 2.83 65.23 - - 0.00% - 0.00% - - 0.00% 23.05 65.23 100.00%
5.04.02 MOVIMIENTO DE TIERRA - - - - - - - - - - - -
5.04.02.01 EXCAVACIÓN MANUAL m3 39.19 37.24 1,459.44 - - 0.00% - 0.00% - - 0.00% 39.19 1,459.44 100.00%
5.04.02.02 REFINE NIVELACION Y COMPACTACION m2 41.75 5.34 222.95 - - 0.00% - 0.00% - - 0.00% 41.75 222.95 100.00%
5.04.02.03 RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO m3 13.20 31.50 415.80 - - 0.00% - 0.00% - - 0.00% 13.20 415.80 100.00%
5.04.02.04 ELIMINACION DE MATERIAL m3 50.94 11.64 592.94 - - 0.00% - 0.00% - - 0.00% 50.94 592.94 100.00%
5.04.03 CONCRETO SIMPLE - - - - - - - - - - - -
5.04.03.01 CONCRETO CIMENTACIÓN 1:8+25% DE PM D=4" m3 2.48 279.96 694.30 - - 0.00% - 0.00% - - 0.00% 2.48 694.30 100.00%
5.04.03.02 ENCOFRADO Y DESENCOFRADO m2 29.05 42.75 1,241.89 - - 0.00% - 0.00% - - 0.00% 29.05 1,241.89 100.00%
VALORIZACION DE OBRA Nº 04
Obra CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO Plazo de Ejecución : 120 Días Calend
ENTIDAD MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR Días Ejecutados en dic-14 5 Días Calendarios
SISTEMA Sistema a suma alzada Presupuesto Base : S/. 1,421,088.00 Avance Anterior : 0.14% Días Ejecutados en ene-15 7 Días Calendarios
Contratista CONSORCIO N & F Monto de Contrato : S/. 1,421,088.00 Fr = 1.00000 Avance Actual : 30.46% Días Ejecutados en mar-15 1 Días Calendarios
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 Adelantos : S/. 213,163.20 Avance Acumulado : 30.59% Días Ejecutados en abr-15 1 Días Calendarios
Valorizado @ 30-jun-15 Saldo por Ejecutar : 55.39% Días Ejecutados en may-15 31 Días Calendarios
Días Ejecutados en jun-15 30 Días Calendarios
Total Días Trabajados al 30-Jun-15 75 Días Calendarios
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
5.04.03.03 CONCRETO CLASE F (F'C = 140 KG/CM2) m3 2.44 320.67 782.43 - - 0.00% - 0.00% - - 0.00% 2.44 782.43 100.00%
5.04.04 COLOCACION DE ALCANTARILLA - - - - - - - - - - - -
5.04.04.01 COLOCACION DE ALCANTARILLA TMC D=36" m 11.00 426.75 4,694.25 9.92 4,235.00 90.22% - 0.00% 9.92 4,235.00 90.22% 1.08 459.25 9.78%
6 PROTECCIÓN AMBIENTAL - - - - - - - - - - - -
6.01 RESTAURACION DE AREA AFECTADA POR CAMPAMENTO glb 1.00 1,500.00 1,500.00 - - 0.00% - 0.00% - - 0.00% 1.00 1,500.00 100.00%
6.02 ALQUILER DE BAÑOS PORTATILES u 2.00 1,000.00 2,000.00 - - 0.00% - 0.00% - - 0.00% 2.00 2,000.00 100.00%
6.03 ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE glb 1.00 2,500.00 2,500.00 - - 0.00% - 0.00% - - 0.00% 1.00 2,500.00 100.00%
7 SEÑALIZACION Y SEGURIDAD VIAL - - - - - - - - - - - -
7.01 SEÑAL INFORMATIVA u 3.00 350.96 1,052.88 - - 0.00% - 0.00% - - 0.00% 3.00 1,052.88 100.00%
7.02 SEÑAL PREVENTIVA u 3.00 350.96 1,052.88 - - 0.00% - 0.00% - - 0.00% 3.00 1,052.88 100.00%
7.03 HITOS KILOMETRICOS u 6.00 132.62 795.72 - - 0.00% - 0.00% - - 0.00% 6.00 795.72 100.00%
8 VARIOS - - - - - - - - - - - -
8.01 NIVELACION DE CORTE DE MATERIAL ORGANICO m3 12,294.79 1.86 22,868.31 - - 0.00% - 0.00% - - 0.00% 12,294.79 22,868.31 100.00%
1 OBRAS PROVISIONALES - - - - - - - - - - -
1.01 CAMPAMENTO PROVISIONAL DE OBRA u 1.00 4,027.48 4,027.48 1.00 4,027.48 100.00% - 0.00% 1.00 4,027.48 100.00% - - 0.00%
1.02 CARTEL DE IDENTIFICACION DE OBRA. u 1.00 639.12 639.12 1.00 639.12 100.00% - 0.00% 1.00 639.12 100.00% - - 0.00%
1.03 ADECUACION DE TERRENO PARA PATIO DE MAQUINAS u 2.00 379.80 759.60 1.00 379.80 50.00% - 0.00% 1.00 379.80 50.00% 1.00 379.80 50.00%
2 OBRAS PRELIMINARES - - - - - - - - - - - -
2.01 MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPOS glb 1.00 18,035.00 18,035.00 0.1696 3,059.55 16.96% 0.3304 5,957.95 33.04% 0.50 9,017.50 50.00% 0.50 9,017.50 50.00%
2.02 FLETE TERRESTRE glb 1.00 3,500.00 3,500.00 0.74 2,598.84 74.25% - 0.00% 0.74 2,598.84 74.25% 0.26 901.16 25.75%
2.03 TOPOGRAFÍA Y GEOREFERENCIACIÓN km 5.59 414.09 2,314.76 5.59 2,314.76 100.00% - 0.00% 5.59 2,314.76 100.00% - - 0.00%
2.04 REUBICACION DE CERCO DE ALAMBRE CON PUAS m 2,000.00 9.94 19,880.00 - - 0.00% - 0.00% - - 0.00% 2,000.00 19,880.00 100.00%
3 MOVIMIENTO DE TIERRA - - - - - - - - - - - -
3.01 EXPLANACIONES - - - - - - - - - - - -
3.01.01 CORTE DE MATERIAL COMPACTO CON MAQUINARIA m3 13,813.00 5.27 72,794.51 13,813.00 72,794.51 100.00% - 0.00% 13,813.00 72,794.51 100.00% - - 0.00%
3.01.02 CORTE DE TIERRA AGRICOLA m3 12,294.79 3.57 43,892.40 12,294.79 43,892.40 100.00% - 0.00% 12,294.79 43,892.40 100.00% - - 0.00%
3.01.03 PERFILADO Y COMPACTADO EN ZONA DE CORTE m2 30,736.97 1.93 59,322.35 30,736.97 59,322.35 100.00% - 0.00% 30,736.97 59,322.35 100.00% - - 0.00%
3.02 TERRAPLENES - - - - - - - - - - - -
3.02.01 TRANSPORTE DE MATERIAL GRANULAR PARA D<= 30KM m3 9,071.89 6.13 55,610.69 6,622.48 40,595.80 73.00% 2,449.41 15,014.89 27.00% 9,071.89 55,610.69 100.00% - - 0.00%
3.02.02 CONFORMACION DE TERRAPLENES CON MATERIAL DE PRESTAMO m3 9,071.89 20.90 189,602.50 6,622.48 138,409.83 73.00% 2,449.41 51,192.68 27.00% 9,071.89 189,602.50 100.00% - - 0.00%
4 AFIRMADO - - - - - - - - - - - -
4.01 TRANSPORTE DE AFIRMADO EN CAMION VOLQUETE DE 15M3 m3 11,987.42 6.13 73,482.88 1,198.74 7,348.29 10.00% 2,311.26 14,168.02 19.28% 3,510.00 21,516.31 29.28% 8,477.42 51,966.57 70.72%
4.02 AFIRMADO Y/O MATERIAL GRANULAR E=0.37M m3 11,987.42 26.86 321,982.10 1,198.74 32,198.21 10.00% 2,311.26 62,080.44 19.28% 3,510.00 94,278.65 29.28% 8,477.42 227,703.45 70.72%
5 OBRAS DE DRENAJE - - - - - - - - - - - -
5.01 DRENAJE SUB SUPÉRFICIAL - - - - - - - - - - - -
5.01.01 TRANSPORTE DE PIEDRA m3 717.75 6.13 4,399.81 430.65 2,639.88 60.00% 287.10 1,759.92 40.00% 717.75 4,399.81 100.00% - - 0.00%
5.01.02 INSTALACION DE DRENAJE Y COLOCACION DE PIEDRAS m2 2,392.50 17.51 41,892.68 1,435.50 25,135.61 60.00% 957.00 16,757.07 40.00% 2,392.50 41,892.68 100.00% - - 0.00%
5.02 CUNETAS - - - - - - - - - - - -
5.02.01 CONFORMACION DE CUNETAS DE TIERRA m 11,177.08 2.33 26,042.60 - - 0.00% - 0.00% - - 0.00% 11,177.08 26,042.60 100.00%
5.03 ALCANTARILLAS DE 24"(5UND) - - - - - - - - - - - -
5.03.01 TRABAJOS PRELIMINARES - - - - - - - - - - - -
5.03.01.01 TRAZO Y REPLANTEO m2 63.00 2.83 178.29 - - 0.00% - 0.00% - - 0.00% 63.00 178.29 100.00%
5.03.02 MOVIMIENTO DE TIERRA - - - - - - - - - - - -
5.03.02.01 EXCAVACIÓN MANUAL m3 88.20 37.24 3,284.57 - - 0.00% - 0.00% - - 0.00% 88.20 3,284.57 100.00%
5.03.02.02 REFINE NIVELACION Y COMPACTACION m2 140.00 5.34 747.60 - - 0.00% - 0.00% - - 0.00% 140.00 747.60 100.00%
5.03.02.03 RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO m3 28.05 31.50 883.58 - - 0.00% - 0.00% - - 0.00% 28.05 883.58 100.00%
5.03.02.04 ELIMINACION DE MATERIAL m3 114.66 11.64 1,334.64 - - 0.00% - 0.00% - - 0.00% 114.66 1,334.64 100.00%
5.03.03 CONCRETO SIMPLE - - - - - - - - - - - -
5.03.03.01 CONCRETO CIMENTACIÓN 1:8+25% DE PM D=4" m3 8.55 279.96 2,393.66 - - 0.00% - 0.00% - - 0.00% 8.55 2,393.66 100.00%
5.03.03.02 ENCOFRADO Y DESENCOFRADO m2 73.06 42.75 3,123.32 - - 0.00% - 0.00% - - 0.00% 73.06 3,123.32 100.00%
5.03.03.03 CONCRETO CLASE F (F'C = 140 KG/CM2) m3 7.00 320.67 2,244.69 - - 0.00% - 0.00% - - 0.00% 7.00 2,244.69 100.00%
5.03.04 COLOCACION DE ALCANTARILLA - - - - - - - - - - - -
5.03.04.01 COLOCACION DE ALCANTARILLA TMC D=24" m 27.50 337.65 9,285.38 24.10 8,137.25 87.64% - 0.00% 24.10 8,137.25 87.64% 3.40 1,148.13 12.36%
5.04 ALCANTARILLA DOBLE DE 36"(1UND) - - - - - - - - - - - -
5.04.01 TRABAJOS PRELIMINARES - - - - - - - - - - - -
5.04.01.01 TRAZO Y REPLANTEO m2 23.05 2.83 65.23 - - 0.00% - 0.00% - - 0.00% 23.05 65.23 100.00%
5.04.02 MOVIMIENTO DE TIERRA - - - - - - - - - - - -
5.04.02.01 EXCAVACIÓN MANUAL m3 39.19 37.24 1,459.44 - - 0.00% - 0.00% - - 0.00% 39.19 1,459.44 100.00%
5.04.02.02 REFINE NIVELACION Y COMPACTACION m2 41.75 5.34 222.95 - - 0.00% - 0.00% - - 0.00% 41.75 222.95 100.00%
5.04.02.03 RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO m3 13.20 31.50 415.80 - - 0.00% - 0.00% - - 0.00% 13.20 415.80 100.00%
5.04.02.04 ELIMINACION DE MATERIAL m3 50.94 11.64 592.94 - - 0.00% - 0.00% - - 0.00% 50.94 592.94 100.00%
VALORIZACION DE OBRA Nº 05
Obra CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO Plazo de Ejecución : 120 Días Calend
ENTIDAD MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR Días Ejecutados en dic-14 5 Días Calendarios
SISTEMA Sistema a suma alzada Presupuesto Base : S/. 1,421,088.00 Avance Anterior : 44.61% Días Ejecutados en ene-15 7 Días Calendarios
Contratista CONSORCIO N & F Monto de Contrato : S/. 1,421,088.00 Fr = 1.00000 Avance Actual : 18.91% Días Ejecutados en mar-15 1 Días Calendarios
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 Adelantos : S/. 213,163.20 Avance Acumulado : 63.52% Días Ejecutados en abr-15 1 Días Calendarios
Valorizado @ 22-jul-15 Saldo por Ejecutar : 36.48% Días Ejecutados en may-15 31 Días Calendarios
Días Ejecutados en jun-15 30 Días Calendarios
Días Ejecutados en jul-15 22 Días Calendarios
Total Días Trabajados al 22-Jul-15 97 Días Calendarios
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
5.04.03 CONCRETO SIMPLE - - - - - - - - - - - -
5.04.03.01 CONCRETO CIMENTACIÓN 1:8+25% DE PM D=4" m3 2.48 279.96 694.30 - - 0.00% - 0.00% - - 0.00% 2.48 694.30 100.00%
5.04.03.02 ENCOFRADO Y DESENCOFRADO m2 29.05 42.75 1,241.89 - - 0.00% - 0.00% - - 0.00% 29.05 1,241.89 100.00%
5.04.03.03 CONCRETO CLASE F (F'C = 140 KG/CM2) m3 2.44 320.67 782.43 - - 0.00% - 0.00% - - 0.00% 2.44 782.43 100.00%
5.04.04 COLOCACION DE ALCANTARILLA - - - - - - - - - - - -
5.04.04.01 COLOCACION DE ALCANTARILLA TMC D=36" m 11.00 426.75 4,694.25 9.92 4,235.00 90.22% - 0.00% 9.92 4,235.00 90.22% 1.08 459.25 9.78%
6 PROTECCIÓN AMBIENTAL - - - - - - - - - - - -
6.01 RESTAURACION DE AREA AFECTADA POR CAMPAMENTO glb 1.00 1,500.00 1,500.00 - - 0.00% - 0.00% - - 0.00% 1.00 1,500.00 100.00%
6.02 ALQUILER DE BAÑOS PORTATILES u 2.00 1,000.00 2,000.00 - - 0.00% - 0.00% - - 0.00% 2.00 2,000.00 100.00%
6.03 ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE glb 1.00 2,500.00 2,500.00 - - 0.00% - 0.00% - - 0.00% 1.00 2,500.00 100.00%
7 SEÑALIZACION Y SEGURIDAD VIAL - - - - - - - - - - - -
7.01 SEÑAL INFORMATIVA u 3.00 350.96 1,052.88 - - 0.00% - 0.00% - - 0.00% 3.00 1,052.88 100.00%
7.02 SEÑAL PREVENTIVA u 3.00 350.96 1,052.88 - - 0.00% - 0.00% - - 0.00% 3.00 1,052.88 100.00%
7.03 HITOS KILOMETRICOS u 6.00 132.62 795.72 - - 0.00% - 0.00% - - 0.00% 6.00 795.72 100.00%
8 VARIOS - - - - - - - - - - - -
8.01 NIVELACION DE CORTE DE MATERIAL ORGANICO m3 12,294.79 1.86 22,868.31 - - 0.00% 12,294.79 22,868.31 100.00% 12,294.79 22,868.31 100.00% - - 0.00%
1 OBRAS PROVISIONALES - - - - - - - - - - - -
1.01 CAMPAMENTO PROVISIONAL DE OBRA u 1.00 4,027.48 4,027.48 1.00 4,027.48 100.00% - 0.00% 1.00 4,027.48 100.00% - - 0.00%
1.02 CARTEL DE IDENTIFICACION DE OBRA. u 1.00 639.12 639.12 1.00 639.12 100.00% - 0.00% 1.00 639.12 100.00% - - 0.00%
1.03 ADECUACION DE TERRENO PARA PATIO DE MAQUINAS u 2.00 379.80 759.60 1.00 379.80 50.00% - 0.00% 1.00 379.80 50.00% 1.00 379.80 50.00%
2 OBRAS PRELIMINARES - - - - - - - - - - - -
2.01 MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPOS glb 1.00 18,035.00 18,035.00 0.17 3,059.55 16.96% 0.3304 5,958.77 33.04% 0.50 9,018.31 50.00% 0.50 9,016.69 50.00%
2.02 FLETE TERRESTRE glb 1.00 3,500.00 3,500.00 0.74 2,598.84 74.25% 0.257474 901.16 25.75% 1.00 3,500.00 100.00% - - 0.00%
2.03 TOPOGRAFÍA Y GEOREFERENCIACIÓN km 5.59 414.09 2,314.76 5.59 2,314.76 100.00% - 0.00% 5.59 2,314.76 100.00% - - 0.00%
2.04 REUBICACION DE CERCO DE ALAMBRE CON PUAS m 2,000.00 9.94 19,880.00 - - 0.00% - 0.00% - - 0.00% 2,000.00 19,880.00 100.00%
3 MOVIMIENTO DE TIERRA - - - - - - - - - - - -
3.01 EXPLANACIONES - - - - - - - - - - - -
3.01.01 CORTE DE MATERIAL COMPACTO CON MAQUINARIA m3 13,813.00 5.27 72,794.51 13,813.00 72,794.51 100.00% - 0.00% 13,813.00 72,794.51 100.00% - - 0.00%
3.01.02 CORTE DE TIERRA AGRICOLA m3 12,294.79 3.57 43,892.40 12,294.79 43,892.40 100.00% - 0.00% 12,294.79 43,892.40 100.00% - - 0.00%
3.01.03 PERFILADO Y COMPACTADO EN ZONA DE CORTE m2 30,736.97 1.93 59,322.35 30,736.97 59,322.35 100.00% - 0.00% 30,736.97 59,322.35 100.00% - - 0.00%
3.02 TERRAPLENES - - - - - - - - - - - -
3.02.01 TRANSPORTE DE MATERIAL GRANULAR PARA D<= 30KM m3 9,071.89 6.13 55,610.69 6,622.48 40,595.80 73.00% 2,449.41 15,014.89 27.00% 9,071.89 55,610.69 100.00% - - 0.00%
3.02.02 CONFORMACION DE TERRAPLENES CON MATERIAL DE PRESTAMO m3 9,071.89 20.90 189,602.50 6,622.48 138,409.83 73.00% 2,449.41 51,192.68 27.00% 9,071.89 189,602.50 100.00% - - 0.00%
4 AFIRMADO - - - - - - - - - - - -
4.01 TRANSPORTE DE AFIRMADO EN CAMION VOLQUETE DE 15M3 m3 11,987.42 6.13 73,482.88 1,198.74 7,348.29 10.00% 6,308.76 38,672.70 52.63% 7,507.50 46,020.99 62.63% 4,479.92 27,461.90 37.37%
4.02 AFIRMADO Y/O MATERIAL GRANULAR E=0.37M m3 11,987.42 26.86 321,982.10 1,198.74 32,198.21 10.00% 6,308.76 169,453.29 52.63% 7,507.50 201,651.50 62.63% 4,479.92 120,330.60 37.37%
5 OBRAS DE DRENAJE - - - - - - - - - - - -
5.01 DRENAJE SUB SUPÉRFICIAL - - - - - - - - - - - -
5.01.01 TRANSPORTE DE PIEDRA m3 717.75 6.13 4,399.81 430.65 2,639.88 60.00% 287.10 1,759.92 40.00% 717.75 4,399.81 100.00% - - 0.00%
5.01.02 INSTALACION DE DRENAJE Y COLOCACION DE PIEDRAS m2 2,392.50 17.51 41,892.68 1,435.50 25,135.61 60.00% 957.00 16,757.07 40.00% 2,392.50 41,892.68 100.00% - - 0.00%
5.02 CUNETAS - - - - - - - - - - - -
5.02.01 CONFORMACION DE CUNETAS DE TIERRA m 11,177.08 2.33 26,042.60 - - 0.00% 4,000.00 9,320.00 35.79% 4,000.00 9,320.00 35.79% 7,177.08 16,722.60 64.21%
5.03 ALCANTARILLAS DE 24"(5UND) - - - - - - - - - - - -
5.03.01 TRABAJOS PRELIMINARES - - - - - - - - - - - -
5.03.01.01 TRAZO Y REPLANTEO m2 63.00 2.83 178.29 - - 0.00% 50.40 142.63 80.00% 50.40 142.63 80.00% 12.60 35.66 20.00%
5.03.02 MOVIMIENTO DE TIERRA - - - - - - - - - - - -
5.03.02.01 EXCAVACIÓN MANUAL m3 88.20 37.24 3,284.57 - - 0.00% 70.56 2,627.65 80.00% 70.56 2,627.65 80.00% 17.64 656.91 20.00%
5.03.02.02 REFINE NIVELACION Y COMPACTACION m2 140.00 5.34 747.60 - - 0.00% 112.00 598.08 80.00% 112.00 598.08 80.00% 28.00 149.52 20.00%
5.03.02.03 RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO m3 28.05 31.50 883.58 - - 0.00% 22.44 706.86 80.00% 22.44 706.86 80.00% 5.61 176.72 20.00%
5.03.02.04 ELIMINACION DE MATERIAL m3 114.66 11.64 1,334.64 - - 0.00% 91.73 1,067.74 80.00% 91.73 1,067.74 80.00% 22.93 266.91 20.00%
5.03.03 CONCRETO SIMPLE - - - - - - - - - - - - -
5.03.03.01 CONCRETO CIMENTACIÓN 1:8+25% DE PM D=4" m3 8.55 279.96 2,393.66 - - 0.00% 6.84 1,914.93 80.00% 6.84 1,914.93 80.00% 1.71 478.73 20.00%
5.03.03.02 ENCOFRADO Y DESENCOFRADO m2 73.06 42.75 3,123.32 - - 0.00% 58.45 2,498.74 80.00% 58.45 2,498.74 80.00% 14.61 624.58 20.00%
5.03.03.03 CONCRETO CLASE F (F'C = 140 KG/CM2) m3 7.00 320.67 2,244.69 - - 0.00% 5.60 1,795.75 80.00% 5.60 1,795.75 80.00% 1.40 448.94 20.00%
5.03.04 COLOCACION DE ALCANTARILLA - - - - - - - - - - - -
5.03.04.01 COLOCACION DE ALCANTARILLA TMC D=24" m 27.50 337.65 9,285.38 24.10 8,137.25 87.64% 3.40 1,148.13 12.36% 27.50 9,285.38 100.00% - - 0.00%
5.04 ALCANTARILLA DOBLE DE 36"(1UND) - - - - - - - - - - - -
5.04.01 TRABAJOS PRELIMINARES - - - - - - - - - - - -
5.04.01.01 TRAZO Y REPLANTEO m2 23.05 2.83 65.23 - - 0.00% 23.05 65.23 100.00% 23.05 65.23 100.00% - - 0.00%
5.04.02 MOVIMIENTO DE TIERRA - - - - - - - - - - - -
5.04.02.01 EXCAVACIÓN MANUAL m3 39.19 37.24 1,459.44 - - 0.00% 39.19 1,459.44 100.00% 39.19 1,459.44 100.00% - - 0.00%
5.04.02.02 REFINE NIVELACION Y COMPACTACION m2 41.75 5.34 222.95 - - 0.00% 41.75 222.95 100.00% 41.75 222.95 100.00% - - 0.00%
5.04.02.03 RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO m3 13.20 31.50 415.80 - - 0.00% 13.20 415.80 100.00% 13.20 415.80 100.00% - - 0.00%
5.04.02.04 ELIMINACION DE MATERIAL m3 50.94 11.64 592.94 - - 0.00% 50.94 592.94 100.00% 50.94 592.94 100.00% - - 0.00%
VALORIZACION DE OBRA Nº 05
ACTA DE CONCILIACION Nº 073-2016
Plazo de Ejecución : 120 Días Calend
Obra CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO Días Ejecutados en
dic-14
5 Días Calendarios
ENTIDAD MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR Días Ejecutados en ene-15 7 Días Calendarios
SISTEMA Sistema a suma alzada Presupuesto Base : S/. 1,421,088.00 Avance Anterior : 44.61% Días Ejecutados en mar-15 1 Días Calendarios
Contratista CONSORCIO N & F Monto de Contrato : S/. 1,421,088.00 Fr = 1.00000 Avance Actual : 34.91% Días Ejecutados en abr-15 1 Días Calendarios
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 Adelantos : S/. 213,163.20 Avance Acumulado : 79.52% Días Ejecutados en may-15 31 Días Calendarios
Valorizado @ 21-oct-16 @ 31-oct-16 Saldo por Ejecutar : 20.48% Días Ejecutados en jun-15 30 Días Calendarios
Días Valorizados: 11 Días Calendarios
Saldo de plazo por ejecutar: 34 Días Calendarios Días Ejecutados en oct-16 11 Días Calendarios
Total Días Trabajados al 31-Oct-16 86 Días Calendarios
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
5.04.03 CONCRETO SIMPLE - - - - - - - - - - - -
5.04.03.01 CONCRETO CIMENTACIÓN 1:8+25% DE PM D=4" m3 2.48 279.96 694.30 - - 0.00% 2.48 694.30 100.00% 2.48 694.30 100.00% - - 0.00%
5.04.03.02 ENCOFRADO Y DESENCOFRADO m2 29.05 42.75 1,241.89 - - 0.00% 29.05 1,241.89 100.00% 29.05 1,241.89 100.00% - - 0.00%
5.04.03.03 CONCRETO CLASE F (F'C = 140 KG/CM2) m3 2.44 320.67 782.43 - - 0.00% 2.44 782.43 100.00% 2.44 782.43 100.00% - - 0.00%
5.04.04 COLOCACION DE ALCANTARILLA - - - - - - - - - - - -
5.04.04.01 COLOCACION DE ALCANTARILLA TMC D=36" m 11.00 426.75 4,694.25 9.92 4,235.00 90.22% 1.08 459.25 9.78% 11.00 4,694.25 100.00% - - 0.00%
6 PROTECCIÓN AMBIENTAL - - - - - - - - - - - -
6.01 RESTAURACION DE AREA AFECTADA POR CAMPAMENTO glb 1.00 1,500.00 1,500.00 - - 0.00% - 0.00% - - 0.00% 1.00 1,500.00 100.00%
6.02 ALQUILER DE BAÑOS PORTATILES u 2.00 1,000.00 2,000.00 - - 0.00% - 0.00% - - 0.00% 2.00 2,000.00 100.00%
6.03 ACONDICIONAMIENTO DE DEPOSITOS DE MATERIAL EXCEDENTE glb 1.00 2,500.00 2,500.00 - - 0.00% - 0.00% - - 0.00% 1.00 2,500.00 100.00%
7 SEÑALIZACION Y SEGURIDAD VIAL - - - - - - - - - - - -
7.01 SEÑAL INFORMATIVA u 3.00 350.96 1,052.88 - - 0.00% - 0.00% - - 0.00% 3.00 1,052.88 100.00%
7.02 SEÑAL PREVENTIVA u 3.00 350.96 1,052.88 - - 0.00% - 0.00% - - 0.00% 3.00 1,052.88 100.00%
7.03 HITOS KILOMETRICOS u 6.00 132.62 795.72 - - 0.00% - 0.00% - - 0.00% 6.00 795.72 100.00%
8 VARIOS - - - - - - - - - - - -
8.01 NIVELACION DE CORTE DE MATERIAL ORGANICO m3 12,294.79 1.86 22,868.31 - - 0.00% 12,294.79 22,868.31 100.00% 12,294.79 22,868.31 100.00% - - 0.00%
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
05.04.01 OBRAS PRELIMINARES - - - - - - - - - - -
05.04.01.01 ENCAUSE DE RIO m3 21.00 35.20 739.20 - 0.00% 21.00 739.20 100.00% 21.00 739.20 100.00% - - 0.00%
05.04.01.02 TRAZO Y REPLANTEO m2 43.80 1.88 82.34 - 0.00% 43.80 82.34 100.00% 43.80 82.34 100.00% - - 0.00%
05.04.02 MOVIMIENTO DE TIERRA - - - - - - - - - - - -
05.04.02.01 EXCAVACION MASIVA CON MAQUINARIA m3 103.18 218.70 22,565.47 - 0.00% 103.18 22,565.47 100.00% 103.18 22,565.47 100.00% - - 0.00%
05.04.02.02 REFINE DE ZANJA PARA ZAPATA BAJO AGUA m3 29.48 32.52 958.69 - 0.00% 29.48 958.69 100.00% 29.48 958.69 100.00% - - 0.00%
05.04.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 128.98 13.28 1,712.85 - 0.00% 128.98 1,712.85 100.00% 128.98 1,712.85 100.00% - - 0.00%
05.04.03 OBRAS DE CONCRETO SIMPLE - - - - - - - - - - - -
05.04.03.01 ESTRIBOS - - - - - - - - - - - -
05.04.03.01.01 ZAPATAS - - - - - - - - - - - -
05.04.03.02.01.01 SOLADO ZAPATAS Cº F´C=100 kg/cm2 E=10cm m2 26.25 129.07 3,388.09 - 0.00% 26.25 3,388.09 100.00% 26.25 3,388.09 100.00% - - 0.00%
05.04.03.02 ALAS - - - - - - - - - - - -
05.04.03.02.01 ZAPATAS - - - - - - - - - - - -
05.04.03.02.01.01 SOLADO ZAPATAS Cº F´C=100 kg/cm2 E=10cm m2 5.30 129.07 684.07 - 0.00% 5.30 684.07 100.00% 5.30 684.07 100.00% - - 0.00%
05.04.04 OBRAS DE CONCRETO CICLOPEO - - - - - - - - - - - -
05.04.04.01 ESTRIBOS - - - - - - - - - - - -
05.04.04.01.01 ZAPATAS - - - - - - - - - - - -
05.04.04.02.01.01 ENCOF. DESENCOF. p/ ZAPATAS BAJO AGUA m2 5.60 62.01 347.26 - 0.00% 5.60 347.26 100.00% 5.60 347.26 100.00% - - 0.00%
05.04.04.02.01.02 CONCRETO F´C=175 km/cm2 + 30% PM m3 18.38 394.56 7,252.01 - 0.00% 18.38 7,252.01 100.00% 18.38 7,252.01 100.00% - - 0.00%
05.04.04.02 ALAS - - - - - - - - - - - -
05.04.04.02.01 ZAPATAS - - - - - - - - - - - -
05.04.04.02.01.01 ENCOF. DESENCOF. p/ ZAPATAS BAJO AGUA m2 14.95 62.01 927.05 - 0.00% 14.95 927.05 100.00% 14.95 927.05 100.00% - - 0.00%
05.04.04.02.01.02 CONCRETO F´C=175 km/cm2 + 30% PM m3 5.30 394.56 2,091.17 - 0.00% 5.30 2,091.17 100.00% 5.30 2,091.17 100.00% - - 0.00%
05.04.04.03 MUROS ESTRIBOS - - - - - - - - - - - -
05.04.04.03.01 ENCOF. Y DESENCOF. DE ESTRIBOS m2 29.10 64.01 1,862.69 - 0.00% 29.10 1,862.69 100.00% 29.10 1,862.69 100.00% - - 0.00%
05.04.04.03.02 CONCRETO F´C=175 kg/cm2 + 30% PM m3 17.66 394.56 6,967.93 - 0.00% 17.66 6,967.93 100.00% 17.66 6,967.93 100.00% - - 0.00%
05.04.04.04 ALEROS - - - - - - - - - - - -
05.04.04.04.01 ENCOFRADO Y DESENCOF. DE ALEROS m2 29.00 64.01 1,856.29 - 0.00% 29.00 1,856.29 100.00% 29.00 1,856.29 100.00% - - 0.00%
05.04.04.04.02 CONCRETO F´C=175 kg/cm2 + 30% PM m3 8.00 394.56 3,156.48 - 0.00% 8.00 3,156.48 100.00% 8.00 3,156.48 100.00% - - 0.00%
05.04.05 OBRAS DE CONCRETO ARMADO - - - - - - - - - - - -
05.04.05.01 CABEZAL DE ESTRIBO - - - - - - - - - - - -
05.04.05.01.01 ENCOFRADO Y DESENCOFRADO DE CABEZAL m2 3.85 64.01 246.44 - 0.00% 3.85 246.44 100.00% 3.85 246.44 100.00% - - 0.00%
05.04.05.01.02 ACERO FY=4200 KG/CM2 kg 90.01 6.26 563.46 - 0.00% 90.01 563.46 100.00% 90.01 563.46 100.00% - - 0.00%
05.04.05.01.03 CONCRETO F´C=175 KG/CM2 CABEZAL m3 1.40 394.56 552.38 - 0.00% 1.40 552.38 100.00% 1.40 552.38 100.00% - - 0.00%
05.04.05.02 LOSAS - - - - - - - - - - - -
05.04.05.02.01 ENCOFRADO Y DESENCOFRADO DE LOSAS m2 44.79 120.59 5,401.23 - 0.00% 44.79 5,401.23 100.00% 44.79 5,401.23 100.00% - - 0.00%
05.04.05.02.02 ACERO FY=4200 KG/CM2 kg 1,154.97 6.26 7,230.11 - 0.00% 1,154.97 7,230.11 100.00% 1,154.97 7,230.11 100.00% - - 0.00%
05.04.05.02.03 CONCRETO F´C=280 KG/CM2 PARA LOSAS m3 17.13 542.03 9,284.97 - 0.00% 17.13 9,284.97 100.00% 17.13 9,284.97 100.00% - - 0.00%
05.04.05.03 VIGAS SARDINEL - - - - - - - - - - - -
05.04.05.02.01 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 7.12 64.01 455.75 - 0.00% 7.12 455.75 100.00% 7.12 455.75 100.00% - - 0.00%
05.04.05.02.02 ACERO FY=4200 KG/CM2 kg 55.15 6.26 345.24 - 0.00% 55.15 345.24 100.00% 55.15 345.24 100.00% - - 0.00%
05.04.05.02.03 CONCRETO F´C=280 KG/CM2 PARA LOSAS m3 0.62 542.03 336.06 - 0.00% 0.62 336.06 100.00% 0.62 336.06 100.00% - - 0.00%
05.04.06 FALSO PUENTE - - - - - - - - - - - -
05.04.06.01 FALSO PUENTE DE MADERA m 8.00 2,836.40 22,691.20 - 0.00% 8.00 22,691.20 100.00% 8.00 22,691.20 100.00% - - 0.00%
06. OTROS - - - - - - - - - - - -
06.01 APOYO DE NEOPRENO und 2.00 1,007.01 2,014.02 - 0.00% 2.00 2,014.02 100.00% 2.00 2,014.02 100.00% - - 0.00%
06.02 JUNTA DE DILATACION DE ACERO ml 7.00 626.20 4,383.40 - 0.00% 7.00 4,383.40 100.00% 7.00 4,383.40 100.00% - - 0.00%
06.03 BARANDA METALICA (SEGÚN DISEÑO) und 2.00 1,930.06 3,860.12 - 0.00% - 0.00% - - 0.00% 2.00 3,860.12 100.00%
06.04 PINTURA EN BARANDAS METALICAS ml 47.50 35.93 1,706.68 - 0.00% - 0.00% - - 0.00% 47.50 1,706.68 100.00%
VALORIZACION DE OBRA Nº 01
Obra CREACION DE TROCHA CARROZABLE A NIVEL AFIRMADO DEL CENTRO POBLADO DE PUCARA HACIA JALCOY, DISTRITO DE HUAYLLAY -
ENTIDAD PASCO - PASCODISTRITAL DE HUAYLLAY
MUNICIPALIDAD Plazo de Ejecución : 120 Días Calendarios
SISTEMA Sistema a suma alzada Presupuesto Base : S/. 1,196,325.51 Avance Anterior : 0.00% Mes 01 Valor Nº 01 nov-16 20 Días Calendarios
Contratista CONSORCIO PUCARA I Monto de Contrato : S/. 1,196,325.51 Fr = 1.00000000 Avance Actual : 37.84% Mes 02 Valor Nº 02
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 Adelantos : S/. - Avance Acumulado : 37.84% Mes 03 Valor Nº 03
Valorizado @ 11-nov-16 @ 30-nov-16 Saldo por Ejecutar : 62.16% Mes 04 Valor Nº 04
Días Valorizados: 20 Días Calendarios
Saldo de plazo por ejecutar: 100 Días Calendarios Total Días Trabajados al 30-Nov-16 20 Días Calendarios
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
06.05 TUBERIA PVC SAL 4" ml 3.30 23.50 77.55 - 0.00% 3.30 77.55 100.00% 3.30 77.55 100.00% - - 0.00%
07. SEÑALIZACION - - - - - - - - - - -
07.01 SEÑALES INFORMATIVO SEGÚN DISEÑO und 2.00 4,030.05 8,060.10 - 0.00% - 0.00% - - 0.00% 2.00 8,060.10 100.00%
07.02 SEÑALES PREVENTIVOS SEGÚN DISEÑO und 4.00 4,030.05 16,120.20 - 0.00% - 0.00% - - 0.00% 4.00 16,120.20 100.00%
07.03 SEÑALES REGLAMENTARIAS SEGÚN DISEÑO und 5.00 4,030.05 20,150.25 - 0.00% - 0.00% - - 0.00% 5.00 20,150.25 100.00%
07.04 POTES KILOMETRICOS und 6.00 76.00 456.00 - 0.00% - 0.00% - - 0.00% 6.00 456.00 100.00%
08. IMPACTO AMBIENTAL - - - - - - - - - - -
08.01 RESTAURACION DE CANTERAS m2 7,520.00 0.50 3,760.00 - 0.00% - 0.00% - - 0.00% 7,520.00 3,760.00 100.00%
08.02 RESTAURACION DE CAMPAMENTO m2 150.00 15.42 2,313.00 - 0.00% - 0.00% - - 0.00% 150.00 2,313.00 100.00%
08.03 RESTAURACION DE PATIO DE MAQUINARIA m2 400.00 15.42 6,168.00 - 0.00% - 0.00% - - 0.00% 400.00 6,168.00 100.00%
08.04 PROGRAMA DE REVEGETACION est 1.00 11,173.69 11,173.69 - 0.00% - 0.00% - - 0.00% 1.00 11,173.69 100.00%
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
05.04.01 OBRAS PRELIMINARES - - - - - - - - - - - -
05.04.01.01 ENCAUSE DE RIO m3 21.00 35.20 739.20 21.00 739.20 100.00% - 0.00% 21.00 739.20 100.00% - - 0.00%
05.04.01.02 TRAZO Y REPLANTEO m2 43.80 1.88 82.34 43.80 82.34 100.00% - 0.00% 43.80 82.34 100.00% - - 0.00%
05.04.02 MOVIMIENTO DE TIERRA - - - - - - - - - - - -
05.04.02.01 EXCAVACION MASIVA CON MAQUINARIA m3 103.18 218.70 22,565.47 103.18 22,565.47 100.00% - 0.00% 103.18 22,565.47 100.00% - - 0.00%
05.04.02.02 REFINE DE ZANJA PARA ZAPATA BAJO AGUA m3 29.48 32.52 958.69 29.48 958.69 100.00% - 0.00% 29.48 958.69 100.00% - - 0.00%
05.04.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 128.98 13.28 1,712.85 128.98 1,712.85 100.00% - 0.00% 128.98 1,712.85 100.00% - - 0.00%
05.04.03 OBRAS DE CONCRETO SIMPLE - - - - - - - - - - - -
05.04.03.01 ESTRIBOS - - - - - - - - - - - -
05.04.03.01.01 ZAPATAS - - - - - - - - - - - -
05.04.03.02.01.01 SOLADO ZAPATAS Cº F´C=100 kg/cm2 E=10cm m2 26.25 129.07 3,388.09 26.25 3,388.09 100.00% - 0.00% 26.25 3,388.09 100.00% - - 0.00%
05.04.03.02 ALAS - - - - - - - - - - - -
05.04.03.02.01 ZAPATAS - - - - - - - - - - - -
05.04.03.02.01.01 SOLADO ZAPATAS Cº F´C=100 kg/cm2 E=10cm m2 5.30 129.07 684.07 5.30 684.07 100.00% - 0.00% 5.30 684.07 100.00% - - 0.00%
05.04.04 OBRAS DE CONCRETO CICLOPEO - - - - - - - - - - - -
05.04.04.01 ESTRIBOS - - - - - - - - - - - -
05.04.04.01.01 ZAPATAS - - - - - - - - - - - -
05.04.04.02.01.01 ENCOF. DESENCOF. p/ ZAPATAS BAJO AGUA m2 5.60 62.01 347.26 5.60 347.26 100.00% - 0.00% 5.60 347.26 100.00% - - 0.00%
05.04.04.02.01.02 CONCRETO F´C=175 km/cm2 + 30% PM m3 18.38 394.56 7,252.01 18.38 7,252.01 100.00% - 0.00% 18.38 7,252.01 100.00% - - 0.00%
05.04.04.02 ALAS - - - - - - - - - - - -
05.04.04.02.01 ZAPATAS - - - - - - - - - - - -
05.04.04.02.01.01 ENCOF. DESENCOF. p/ ZAPATAS BAJO AGUA m2 14.95 62.01 927.05 14.95 927.05 100.00% - 0.00% 14.95 927.05 100.00% - - 0.00%
05.04.04.02.01.02 CONCRETO F´C=175 km/cm2 + 30% PM m3 5.30 394.56 2,091.17 5.30 2,091.17 100.00% - 0.00% 5.30 2,091.17 100.00% - - 0.00%
05.04.04.03 MUROS ESTRIBOS - - - - - - - - - - - -
05.04.04.03.01 ENCOF. Y DESENCOF. DE ESTRIBOS m2 29.10 64.01 1,862.69 29.10 1,862.69 100.00% - 0.00% 29.10 1,862.69 100.00% - - 0.00%
05.04.04.03.02 CONCRETO F´C=175 kg/cm2 + 30% PM m3 17.66 394.56 6,967.93 17.66 6,967.93 100.00% - 0.00% 17.66 6,967.93 100.00% - - 0.00%
05.04.04.04 ALEROS - - - - - - - - - - - -
05.04.04.04.01 ENCOFRADO Y DESENCOF. DE ALEROS m2 29.00 64.01 1,856.29 29.00 1,856.29 100.00% - 0.00% 29.00 1,856.29 100.00% - - 0.00%
05.04.04.04.02 CONCRETO F´C=175 kg/cm2 + 30% PM m3 8.00 394.56 3,156.48 8.00 3,156.48 100.00% - 0.00% 8.00 3,156.48 100.00% - - 0.00%
05.04.05 OBRAS DE CONCRETO ARMADO - - - - - - - - - - - -
05.04.05.01 CABEZAL DE ESTRIBO - - - - - - - - - - - -
05.04.05.01.01 ENCOFRADO Y DESENCOFRADO DE CABEZAL m2 3.85 64.01 246.44 3.85 246.44 100.00% - 0.00% 3.85 246.44 100.00% - - 0.00%
05.04.05.01.02 ACERO FY=4200 KG/CM2 kg 90.01 6.26 563.46 90.01 563.46 100.00% - 0.00% 90.01 563.46 100.00% - - 0.00%
05.04.05.01.03 CONCRETO F´C=175 KG/CM2 CABEZAL m3 1.40 394.56 552.38 1.40 552.38 100.00% - 0.00% 1.40 552.38 100.00% - - 0.00%
05.04.05.02 LOSAS - - - - - - - - - - - -
05.04.05.02.01 ENCOFRADO Y DESENCOFRADO DE LOSAS m2 44.79 120.59 5,401.23 44.79 5,401.23 100.00% - 0.00% 44.79 5,401.23 100.00% - - 0.00%
05.04.05.02.02 ACERO FY=4200 KG/CM2 kg 1,154.97 6.26 7,230.11 1,154.97 7,230.11 100.00% - 0.00% 1,154.97 7,230.11 100.00% - - 0.00%
05.04.05.02.03 CONCRETO F´C=280 KG/CM2 PARA LOSAS m3 17.13 542.03 9,284.97 17.13 9,284.97 100.00% - 0.00% 17.13 9,284.97 100.00% - - 0.00%
05.04.05.03 VIGAS SARDINEL - - - - - - - - - - - -
05.04.05.02.01 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 7.12 64.01 455.75 7.12 455.75 100.00% - 0.00% 7.12 455.75 100.00% - - 0.00%
05.04.05.02.02 ACERO FY=4200 KG/CM2 kg 55.15 6.26 345.24 55.15 345.24 100.00% - 0.00% 55.15 345.24 100.00% - - 0.00%
05.04.05.02.03 CONCRETO F´C=280 KG/CM2 PARA LOSAS m3 0.62 542.03 336.06 0.62 336.06 100.00% - 0.00% 0.62 336.06 100.00% - - 0.00%
05.04.06 FALSO PUENTE - - - - - - - - - - - -
05.04.06.01 FALSO PUENTE DE MADERA m 8.00 2,836.40 22,691.20 8.00 22,691.20 100.00% - 0.00% 8.00 22,691.20 100.00% - - 0.00%
06. OTROS - - - - - - - - - - - -
06.01 APOYO DE NEOPRENO und 2.00 1,007.01 2,014.02 2.00 2,014.02 100.00% - 0.00% 2.00 2,014.02 100.00% - - 0.00%
06.02 JUNTA DE DILATACION DE ACERO ml 7.00 626.20 4,383.40 7.00 4,383.40 100.00% - 0.00% 7.00 4,383.40 100.00% - - 0.00%
06.03 BARANDA METALICA (SEGÚN DISEÑO) und 2.00 1,930.06 3,860.12 - - 0.00% - 0.00% - - 0.00% 2.00 3,860.12 100.00%
06.04 PINTURA EN BARANDAS METALICAS ml 47.50 35.93 1,706.68 - - 0.00% - 0.00% - - 0.00% 47.50 1,706.68 100.00%
VALORIZACION DE OBRA Nº 02
Obra CREACION DE TROCHA CARROZABLE A NIVEL AFIRMADO DEL CENTRO POBLADO DE PUCARA HACIA JALCOY, DISTRITO DE HUAYLLAY -
ENTIDAD PASCO - PASCODISTRITAL DE HUAYLLAY
MUNICIPALIDAD Plazo de Ejecución : 120 Días Calendarios
SISTEMA Sistema a suma alzada Presupuesto Base : S/. 1,196,325.51 Avance Anterior : 37.84% Mes 01 Valor Nº 01 nov-16 20 Días Calendarios
Contratista CONSORCIO PUCARA I Monto de Contrato : S/. 1,196,325.51 Fr = 1.00000000 Avance Actual : 30.51% Mes 02 Valor Nº 02
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 Adelantos : S/. - Avance Acumulado : 68.36% Mes 03 Valor Nº 03
Valorizado @ 11-nov-16 @ 30-nov-16 Saldo por Ejecutar : 31.64% Mes 04 Valor Nº 04
Días Valorizados: 20 Días Calendarios
Saldo de plazo por ejecutar: 100 Días Calendarios Total Días Trabajados al 30-Nov-16 20 Días Calendarios
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
06.05 TUBERIA PVC SAL 4" ml 3.30 23.50 77.55 3.30 77.55 100.00% - 0.00% 3.30 77.55 100.00% - - 0.00%
07. SEÑALIZACION - - - - - - - - - - - -
07.01 SEÑALES INFORMATIVO SEGÚN DISEÑO und 2.00 4,030.05 8,060.10 - - 0.00% - 0.00% - - 0.00% 2.00 8,060.10 100.00%
07.02 SEÑALES PREVENTIVOS SEGÚN DISEÑO und 4.00 4,030.05 16,120.20 - - 0.00% - 0.00% - - 0.00% 4.00 16,120.20 100.00%
07.03 SEÑALES REGLAMENTARIAS SEGÚN DISEÑO und 5.00 4,030.05 20,150.25 - - 0.00% - 0.00% - - 0.00% 5.00 20,150.25 100.00%
07.04 POTES KILOMETRICOS und 6.00 76.00 456.00 - - 0.00% - 0.00% - - 0.00% 6.00 456.00 100.00%
08. IMPACTO AMBIENTAL - - - - - - - - - - - -
08.01 RESTAURACION DE CANTERAS m2 7,520.00 0.50 3,760.00 - - 0.00% - 0.00% - - 0.00% 7,520.00 3,760.00 100.00%
08.02 RESTAURACION DE CAMPAMENTO m2 150.00 15.42 2,313.00 - - 0.00% - 0.00% - - 0.00% 150.00 2,313.00 100.00%
08.03 RESTAURACION DE PATIO DE MAQUINARIA m2 400.00 15.42 6,168.00 - - 0.00% - 0.00% - - 0.00% 400.00 6,168.00 100.00%
08.04 PROGRAMA DE REVEGETACION est 1.00 11,173.69 11,173.69 - - 0.00% - 0.00% - - 0.00% 1.00 11,173.69 100.00%
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
05.04 PONTON VEHICULAR L=8.00m (01 UND) - - - - - - - - - - - -
05.04.01 OBRAS PRELIMINARES - - - - - - - - - - - -
05.04.01.01 ENCAUSE DE RIO m3 21.00 35.20 739.20 21.00 739.20 100.00% - - 0.00% 21.00 739.20 100.00% - - 0.00%
05.04.01.02 TRAZO Y REPLANTEO m2 43.80 1.88 82.34 43.80 82.34 100.00% - - 0.00% 43.80 82.34 100.00% - - 0.00%
05.04.02 MOVIMIENTO DE TIERRA - - - - - - - - - - - - -
05.04.02.01 EXCAVACION MASIVA CON MAQUINARIA m3 103.18 218.70 22,565.47 103.18 22,565.47 100.00% - - 0.00% 103.18 22,565.47 100.00% - - 0.00%
05.04.02.02 REFINE DE ZANJA PARA ZAPATA BAJO AGUA m3 29.48 32.52 958.69 29.48 958.69 100.00% - - 0.00% 29.48 958.69 100.00% - - 0.00%
05.04.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 128.98 13.28 1,712.85 128.98 1,712.85 100.00% - - 0.00% 128.98 1,712.85 100.00% - - 0.00%
05.04.03 OBRAS DE CONCRETO SIMPLE - - - - - - - - - - - - -
05.04.03.01 ESTRIBOS - - - - - - - - - - - - -
05.04.03.01.01 ZAPATAS - - - - - - - - - - - - -
05.04.03.02.01.01 SOLADO ZAPATAS Cº F´C=100 kg/cm2 E=10cm m2 26.25 129.07 3,388.09 26.25 3,388.09 100.00% - - 0.00% 26.25 3,388.09 100.00% - - 0.00%
05.04.03.02 ALAS - - - - - - - - - - - - -
05.04.03.02.01 ZAPATAS - - - - - - - - - - - - -
05.04.03.02.01.01 SOLADO ZAPATAS Cº F´C=100 kg/cm2 E=10cm m2 5.30 129.07 684.07 5.30 684.07 100.00% - - 0.00% 5.30 684.07 100.00% - - 0.00%
05.04.04 OBRAS DE CONCRETO CICLOPEO - - - - - - - - - - - - -
05.04.04.01 ESTRIBOS - - - - - - - - - - - - -
05.04.04.01.01 ZAPATAS - - - - - - - - - - - - -
05.04.04.02.01.01 ENCOF. DESENCOF. p/ ZAPATAS BAJO AGUA m2 5.60 62.01 347.26 5.60 347.26 100.00% - - 0.00% 5.60 347.26 100.00% - - 0.00%
05.04.04.02.01.02 CONCRETO F´C=175 km/cm2 + 30% PM m3 18.38 394.56 7,252.01 18.38 7,252.01 100.00% - - 0.00% 18.38 7,252.01 100.00% - - 0.00%
05.04.04.02 ALAS - - - - - - - - - - - - -
05.04.04.02.01 ZAPATAS - - - - - - - - - - - - -
05.04.04.02.01.01 ENCOF. DESENCOF. p/ ZAPATAS BAJO AGUA m2 14.95 62.01 927.05 14.95 927.05 100.00% - - 0.00% 14.95 927.05 100.00% - - 0.00%
05.04.04.02.01.02 CONCRETO F´C=175 km/cm2 + 30% PM m3 5.30 394.56 2,091.17 5.30 2,091.17 100.00% - - 0.00% 5.30 2,091.17 100.00% - - 0.00%
05.04.04.03 MUROS ESTRIBOS - - - - - - - - - - - - -
05.04.04.03.01 ENCOF. Y DESENCOF. DE ESTRIBOS m2 29.10 64.01 1,862.69 29.10 1,862.69 100.00% - - 0.00% 29.10 1,862.69 100.00% - - 0.00%
05.04.04.03.02 CONCRETO F´C=175 kg/cm2 + 30% PM m3 17.66 394.56 6,967.93 17.66 6,967.93 100.00% - - 0.00% 17.66 6,967.93 100.00% - - 0.00%
05.04.04.04 ALEROS - - - - - - - - - - - - -
05.04.04.04.01 ENCOFRADO Y DESENCOF. DE ALEROS m2 29.00 64.01 1,856.29 29.00 1,856.29 100.00% - - 0.00% 29.00 1,856.29 100.00% - - 0.00%
05.04.04.04.02 CONCRETO F´C=175 kg/cm2 + 30% PM m3 8.00 394.56 3,156.48 8.00 3,156.48 100.00% - - 0.00% 8.00 3,156.48 100.00% - - 0.00%
05.04.05 OBRAS DE CONCRETO ARMADO - - - - - - - - - - - - -
05.04.05.01 CABEZAL DE ESTRIBO - - - - - - - - - - - - -
05.04.05.01.01 ENCOFRADO Y DESENCOFRADO DE CABEZAL m2 3.85 64.01 246.44 3.85 246.44 100.00% - - 0.00% 3.85 246.44 100.00% - - 0.00%
05.04.05.01.02 ACERO FY=4200 KG/CM2 kg 90.01 6.26 563.46 90.01 563.46 100.00% - - 0.00% 90.01 563.46 100.00% - - 0.00%
05.04.05.01.03 CONCRETO F´C=175 KG/CM2 CABEZAL m3 1.40 394.56 552.38 1.40 552.38 100.00% - - 0.00% 1.40 552.38 100.00% - - 0.00%
05.04.05.02 LOSAS - - - - - - - - - - - - -
05.04.05.02.01 ENCOFRADO Y DESENCOFRADO DE LOSAS m2 44.79 120.59 5,401.23 44.79 5,401.23 100.00% - - 0.00% 44.79 5,401.23 100.00% - - 0.00%
05.04.05.02.02 ACERO FY=4200 KG/CM2 kg 1,154.97 6.26 7,230.11 1,154.97 7,230.11 100.00% - - 0.00% 1,154.97 7,230.11 100.00% - - 0.00%
05.04.05.02.03 CONCRETO F´C=280 KG/CM2 PARA LOSAS m3 17.13 542.03 9,284.97 17.13 9,284.97 100.00% - - 0.00% 17.13 9,284.97 100.00% - - 0.00%
05.04.05.03 VIGAS SARDINEL - - - - - - - - - - - - -
05.04.05.02.01 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 7.12 64.01 455.75 7.12 455.75 100.00% - - 0.00% 7.12 455.75 100.00% - - 0.00%
05.04.05.02.02 ACERO FY=4200 KG/CM2 kg 55.15 6.26 345.24 55.15 345.24 100.00% - - 0.00% 55.15 345.24 100.00% - - 0.00%
05.04.05.02.03 CONCRETO F´C=280 KG/CM2 PARA LOSAS m3 0.62 542.03 336.06 0.62 336.06 100.00% - - 0.00% 0.62 336.06 100.00% - - 0.00%
05.04.06 FALSO PUENTE - - - - - - - - - - - - -
05.04.06.01 FALSO PUENTE DE MADERA m 8.00 2,836.40 22,691.20 8.00 22,691.20 100.00% - - 0.00% 8.00 22,691.20 100.00% - - 0.00%
VALORIZACION DE OBRA Nº 02
Obra CREACION DE TROCHA CARROZABLE A NIVEL AFIRMADO DEL CENTRO POBLADO DE PUCARA HACIA JALCOY, DISTRITO DE HUAYLLAY -
ENTIDAD PASCO - PASCODISTRITAL DE HUAYLLAY
MUNICIPALIDAD Plazo de Ejecución : 120 Días Calendarios
SISTEMA Sistema a suma alzada Presupuesto Base : S/. 1,196,325.51 Avance Anterior : 37.84% Mes 01 Valor Nº 01 nov-16 20 Días Calendarios
Contratista CONSORCIO PUCARA I Monto de Contrato : S/. 1,196,325.51 Fr = 1.00000000 Avance Actual : 30.51% Mes 02 Valor Nº 02 dic-16 21 Días Calendarios
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 Adelantos : S/. - Avance Acumulado : 68.36% Mes 03 Valor Nº 03
Valorizado @ 2-dic-16 @ 22-dic-16 Saldo por Ejecutar : 31.64% Mes 04 Valor Nº 04
Días Valorizados: 21 Días Calendarios
Saldo de plazo por ejecutar: 79 Días Calendarios Total Días Trabajados al 22-Dec-16 41 Días Calendarios
AVANCES
SALDO
ANTERIOR ACTUAL ACUMULADO
Item PARTIDAS Und Metrado Precio Unitario C. PARCIAL
Metrado Valorizado % Metrado Valorizado % Metrado Valorizado % Metrado Valorizado %
06. OTROS - - - - - - - - - - - - -
06.01 APOYO DE NEOPRENO und 2.00 1,007.01 2,014.02 2.00 2,014.02 100.00% - - 0.00% 2.00 2,014.02 100.00% - - 0.00%
06.02 JUNTA DE DILATACION DE ACERO ml 7.00 626.20 4,383.40 7.00 4,383.40 100.00% - - 0.00% 7.00 4,383.40 100.00% - - 0.00%
06.03 BARANDA METALICA (SEGÚN DISEÑO) und 2.00 1,930.06 3,860.12 - 0.00% - - 0.00% - - 0.00% 2.00 3,860.12 100.00%
06.04 PINTURA EN BARANDAS METALICAS ml 47.50 35.93 1,706.68 - 0.00% - - 0.00% - - 0.00% 47.50 1,706.68 100.00%
06.05 TUBERIA PVC SAL 4" ml 3.30 23.50 77.55 3.30 77.55 100.00% - - 0.00% 3.30 77.55 100.00% - - 0.00%
07. SEÑALIZACION - - - - - - - - - - - -
07.01 SEÑALES INFORMATIVO SEGÚN DISEÑO und 2.00 4,030.05 8,060.10 - 0.00% - - 0.00% - - 0.00% 2.00 8,060.10 100.00%
07.02 SEÑALES PREVENTIVOS SEGÚN DISEÑO und 4.00 4,030.05 16,120.20 - 0.00% - - 0.00% - - 0.00% 4.00 16,120.20 100.00%
07.03 SEÑALES REGLAMENTARIAS SEGÚN DISEÑO und 5.00 4,030.05 20,150.25 - 0.00% - - 0.00% - - 0.00% 5.00 20,150.25 100.00%
07.04 POTES KILOMETRICOS und 6.00 76.00 456.00 - 0.00% - - 0.00% - - 0.00% 6.00 456.00 100.00%
08. IMPACTO AMBIENTAL - - - - - - - - - - - -
08.01 RESTAURACION DE CANTERAS m2 7,520.00 0.50 3,760.00 - 0.00% - - 0.00% - - 0.00% 7,520.00 3,760.00 100.00%
08.02 RESTAURACION DE CAMPAMENTO m2 150.00 15.42 2,313.00 - 0.00% - - 0.00% - - 0.00% 150.00 2,313.00 100.00%
08.03 RESTAURACION DE PATIO DE MAQUINARIA m2 400.00 15.42 6,168.00 - 0.00% - - 0.00% - - 0.00% 400.00 6,168.00 100.00%
08.04 PROGRAMA DE REVEGETACION est 1.00 11,173.69 11,173.69 - 0.00% - - 0.00% - - 0.00% 1.00 11,173.69 100.00%
A: VALORIZACION CONTRACTUAL
Con I.G.V 744,198.23 175,039.88 94,978.35 270,018.23 474,180.00
Sin I.G.V. 630,676.47 148,338.88 80,490.13 228,829.01 36.28% 401,847.46
B: REAJUSTES
Reajuste 01 - - - -
Reajuste 02 - - - -
TOTAL (B) 0.00 0.00 0.00 0.00
C: AMORTIZACIONES
AMORTIZ .DEL ADELANTO DIRECTO #VALUE! #VALUE! #REF! #VALUE! #VALUE!
AMORTIZ. DEL ADELANTO DE MATERIALES - - - - -
TOTAL (C) #VALUE! #VALUE! #REF! #VALUE! #VALUE!
D: RETENCIONES
GASTOS DE LICITACION - - - -
MULTA POR ATRASO DE OBRA - - - -
TOTAL (D) 0.00 0.00 0.00 0.00
TOTAL COMPROM. A SOLIC. (VN + IGV) #VALUE! #VALUE! #REF! #VALUE! #VALUE!
Retenciones Fondo de Garantia de F.C. - - - -
01 INSTALACION DE BIODIGESTORES
01.01 INSTALACION DE BIODIGESTOR DE 7000 Lts -
01.02 INSTALACION DE BIODIGESTOR CON FILTRO DE AROS PET DE 7000 LTS EN TRAMO 12 u 1.00 16,350.06 16,350.06
01.03 FILTRO BIOLOGICO PARA BIODIGESTOR u 1.00 2,486.05 2,486.05
01.04 INSTALACION DE BIODIGESTOR DE 1300 Lts -
01.04.01 INSTALACION DE BIODIGESTOR CON FILTRO DE AROS PET DE 3000 LTS EN TRAMO 15 u 1.00 10,139.06 10,139.06
01.04.02 FILTRO BIOLOGICO PARA BIODIGESTOR u 1.00 2,486.05 2,486.05
02 INSTALACION DE LETRINAS -
02.01 INSTALACION DE LETRINAS u 2.00 4,000.00 4,000.00
04 CERCO PERIMETRICO -
04.01 TRABAJOS PRELIMINARES -
04.01.01 LIMPIEZA DE TERRENO MANUAL m2 150.00 52.50 52.50
04.01.02 TRAZO Y REPLANTEO m2 150.00 478.50 478.50
04.02 MOVIMIENTO DE TIERRAS -
04.02.01 EXCAVACION MANUAL m3 27.00 943.38 117.92 825.46
04.02.02 ELIMINACION DE MATERIAL EXCEDENTE m3 33.75 564.30 564.30
04.03 CERCO PERIMETRICO CON ALAMBRE DE PUAS -
04.03.01 CERCO PERIMETRICO DE ALAMBRE CON PUAS m 150.00 2,604.00 2,604.00
04.03.02 PUERTA DE INGRESO -
04.03.02.01 INSTALACION DE PUERTA DE INGRESO u 1.00 706.95 706.95
CRONOGRAMA DE AVANCE DE OBRA
Obra CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
ENTIDAD MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR
SISTEMA Sistema a suma alzada S/. 1,421,088.00 Plazo de Ejecución : 120 Días Calend
Contratista CONSORCIO N & F S/. 1,421,088.00 Inicio del Plazo de Ejecución : 27-dic-14
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 1.00000 Fin del Plazo de Ejecución : 25-abr-15
14 LINEA DE ADUCCION -
14.01 TRABAJOS PRELIMINARES -
14.01.01 LIMPIEZA DE LINEA DE ADUCCION m 170.00 59.50 59.50
14.01.02 TRAZO, NIVELACION Y REPLANTEO m 170.00 527.00 527.00
14.02 MOVIMIENTO DE TIERRAS -
14.02.01 EXCAV. ZANJAS EN T.S.R P/TUB. 2"-4", HASTA 1.50M, A=0.60M m 170.00 2,019.60 740.52 1,279.08
14.02.02 REFINE, NIVELACION DE ZANJA Y CONFORMACION DE FONDOS m 170.00 511.70 511.70
14.02.03 PREPARACION DE CAMA DE APOYO CON MATERIAL PROPIO ZARANDEADO m 170.00 646.00 646.00
14.02.04 RELLENO COMP c/PLANCHA VIBRAT H<3.00m c/MAT PROPIO ZARAND. C=20cm m 170.00 853.40 853.40
14.02.05 ELIMINACION DE MATERIAL EXCEDENTE m3 29.75 497.42 497.42
14.03 TUBERIAS -
14.03.01 TUBERIA PVC SAP ISO 4422 DN 75MM C-10 m 170.00 2,612.90 2,612.90
14.03.02 SUMINISTRO E INSTALACION DE ACCESORIOS PVC RED ADUCCION glb 1.00 501.64 501.64
14.03.03 PRUEBA HIDRAULICA+DESINFECCION TUB.6"-8" A ZANJA TAPADA m 170.00 459.00 306.00 153.00
15 RED DE DISTRIBUCION -
15.01 TRABAJOS PRELIMINARES -
15.01.01 LIMPIEZA DE RED DE DISTRIBUCION m 3,845.00 1,345.75 1,076.60 269.15
15.01.02 TRAZO, NIVELACION Y REPLANTEO m 3,845.00 11,919.50 11,919.50
15.02 DEMOLICION DE PAVIMENTO -
15.02.01 CORTE DE PAVIMENTO RIGIDO C/EQUIPO m 537.82 7,583.26 7,583.26
15.02.02 DEMOLICION DE PAVIMENTO DE CONCRETO DE 8" m2 121.01 3,767.04 3,767.04
15.02.03 REPOSICION DE PAVIMENTO DE CONCRETO F'C=210 KG/CM2, LOSA E=8" m2 121.01 11,263.61 11,263.61
15.03 MOVIMIENTO DE TIERRAS -
15.03.01 EXCAV. ZANJAS EN TERRENO SEMI ROCOSO PARA AGUA m 547.00 6,842.97 1,635.53 3,900.11 1,307.33
15.03.02 EXCAVACION TERRENO COMPACTO c/BOLONERIA p/TUBO DE AGUA HASTA 1.5 m 3,298.12 41,259.48 9,861.38 23,515.60 7,882.50
15.03.03 REFINE, NIVELACION DE ZANJA Y CONFORMACION DE FONDOS m 3,845.00 11,573.45 4,629.38 6,944.07
15.03.04 PREPARACION DE CAMA DE APOYO CON MATERIAL DE PRESTAMO m 3,845.00 14,611.00 3,896.27 10,714.73
CRONOGRAMA DE AVANCE DE OBRA
Obra CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
ENTIDAD MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR
SISTEMA Sistema a suma alzada S/. 1,421,088.00 Plazo de Ejecución : 120 Días Calend
Contratista CONSORCIO N & F S/. 1,421,088.00 Inicio del Plazo de Ejecución : 27-dic-14
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 1.00000 Fin del Plazo de Ejecución : 25-abr-15
17 VALVULA DE PURGA -
17.01 TRABAJOS PRELIMINARES -
17.01.01 LIMPIEZA DE TERRENO MANUAL m2 0.98 0.34 0.34
17.01.02 TRAZO Y REPLANTEO m2 0.98 3.13 3.13
CRONOGRAMA DE AVANCE DE OBRA
Obra CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
ENTIDAD MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR
SISTEMA Sistema a suma alzada S/. 1,421,088.00 Plazo de Ejecución : 120 Días Calend
Contratista CONSORCIO N & F S/. 1,421,088.00 Inicio del Plazo de Ejecución : 27-dic-14
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 1.00000 Fin del Plazo de Ejecución : 25-abr-15
19 RED DE ALCANTARILLADO -
19.01 TRABAJOS PRELIMINARES -
19.01.01 TRAZO, NIVELACION Y REPLANTEO DURANTE LA EJECUCION DE LA OBRA m 4,981.52 22,914.99 22,914.99
19.02 CORTE, DEMOLICION Y REPOSICION DE PAVIMENTO RIGIDO -
19.02.01 CORTE DE PAVIMENTO RIGIDO C/EQUIPO m 537.82 7,583.26 7,583.26
19.02.02 DEMOLICION DE PAVIMENTO DE CONCRETO DE 8" m2 215.13 6,697.00 6,697.00
19.02.03 REPOSICION DE PAVIMENTO DE CONCRETO F'C=210 KG/CM2, LOSA E=8" m2 215.13 20,024.30 20,024.30
CRONOGRAMA DE AVANCE DE OBRA
Obra CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
ENTIDAD MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR
SISTEMA Sistema a suma alzada S/. 1,421,088.00 Plazo de Ejecución : 120 Días Calend
Contratista CONSORCIO N & F S/. 1,421,088.00 Inicio del Plazo de Ejecución : 27-dic-14
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 1.00000 Fin del Plazo de Ejecución : 25-abr-15
21 BUZONES -
21.01 TRABAJOS PRELIMINARES -
21.01.01 LIMPIEZA DE TERRENO MANUAL m2 219.24 76.73 76.73
21.01.02 TRAZO Y REPLANTEO m2 219.24 699.38 699.38
21.02 MOVIMIENTO DE TIERRAS -
21.02.01 EXCAVACION MANUAL DE BUZON HASTA 1.49 m. EN ROCA SUELTA m3 218.23 17,787.93 9,338.66 8,449.27
21.02.02 EXCAVACION MANUAL DE BUZON DE 1.50 A 1.99 m. EN ROCA SUELTA m3 49.74 4,678.54 2,456.23 2,222.31
21.02.03 EXCAVACION MANUAL DE BUZON DE 2.00 A 2.49 m. EN ROCA SUELTA m3 22.80 2,534.45 1,330.59 1,203.86
21.02.04 EXCAVACION MANUAL DE BUZON DE 2.50 A 2.99 m. EN ROCA SUELTA m3 11.17 2,590.99 1,360.27 1,230.72
21.02.05 EXCAVACION MANUAL DE BUZON DE 3.50 A 3.99 m. EN ROCA SUELTA m3 7.92 2,173.72 1,141.20 1,032.52
21.02.06 ELIMINACION DE MATERIAL EXCEDENTE m3 433.83 7,253.64 7,253.64
21.03 CONSTRUCCION DE BUZONES -
21.03.01 CONSTRUCCION DE BUZONES EN ROCA SUELTA HASTA 1.49 m u 86.00 106,957.34 53,478.67 53,478.67
21.03.02 CONSTRUCCION DE BUZONES EN ROCA SUELTA DE 1.50 HASTA 1.99 m u 13.00 18,708.69 9,354.35 9,354.34
21.03.03 CONST. BUZON e/ROCA SUELTA DE 1.5-1.99m c/DIPOSIT. CAIDA INT. DE BUZON u 1.00 2,182.25 1,091.13 1,091.12
21.03.04 CONSTRUCCION DE BUZONES EN ROCA SUELTA DE 2.00 HASTA 2.49 m u 5.00 8,224.25 4,112.13 4,112.12
21.03.05 CONSTRUCCION DE BUZONES EN ROCA SUELTA DE 2.50 HASTA 2.99 m u 2.00 3,685.94 1,842.97 1,842.97
21.03.06 CONSTRUC. BUZON EN ROCA SUELTA DE 2.5-2.99 m CON ESCALERA TIPO GATO u 1.00 2,411.45 2,411.45
CRONOGRAMA DE AVANCE DE OBRA
Obra CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
ENTIDAD MUNICIPALIDAD DISTRITAL DE SIMON BOLIVAR
SISTEMA Sistema a suma alzada S/. 1,421,088.00 Plazo de Ejecución : 120 Días Calend
Contratista CONSORCIO N & F S/. 1,421,088.00 Inicio del Plazo de Ejecución : 27-dic-14
Residente de O. Ing. Vedoco A. DOMINGUEZ PALPA - C.I.P. Nº 70148 1.00000 Fin del Plazo de Ejecución : 25-abr-15
27 CONTINGENCIA DE OBRA -
27.01 ALQUILER DE CAMION CISTERNA PARA DOTACION DE AGUA A LA POBLACION glb 1.00 8,000.00 640.00 4,960.00 2,400.00
Valorización Nº 01 S/. 94,978.35 S/. - S/. 94,978.35 S/. - S/. - S/. 94,978.35 #REF! S/. - S/. - S/. - #REF! #REF!
Valorización Nº 02 S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. -
Valorización Nº 03 S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. -
Valorización Nº 04 S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. - S/. -
TOTAL S/. 94,978.35 S/. - S/. 94,978.35 S/. - S/. - S/. 94,978.35 #REF! S/. - S/. - S/. - #REF! S/. - #REF!
CURVA "S"
Cronograma de Avance de Obra Vs. Ejecución de Obra
OBRA : CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
90.0%
84.83%
80.00%
80.0%
70.0%
67.86%
60.0%
50.0% 49.17%
44.61%
39.34%
40.0%
30.0%
20.0%
14.16%
10.0%
OBRA : CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
90.0%
84.83%
80.00%
80.0%
70.0%
67.86%
63.52%
60.0%
50.0% 49.17%
44.61%
39.34%
40.0%
30.0%
20.0%
14.16%
10.0%
DE LAS VALORIZACIONES:
VALORIZACION Reajuste TOTAL Amortizaciones de VALORIZ. Otras Deducciones ( E ) NETO PAGADO S/.
Val. Monto REAJUSTADO Adelantos ( D ) NETA Gastos de Multa Fondo de Efectivo a
Total Neto A Garantía de Fiel entregar al
Adelanto 5% Garantía
Facturar Cumplimiento Contratista
Nº S/. F.R. T.R. ( VN ) Licit. y Pub. Efectivo IGV
Directo Conting. Social
A B C=A+B D1 D2 D3 VN = C - D VN - FG - E 19%
1 1,966.62 1.00000 1,966.62 #REF! - #REF! - - #REF! #REF! #REF! #REF! #REF!
2 1,311.08 1.00000 1,311.08 - - 1,311.08 - - 1,111.09 200.00 1,311.08 1,311.08 S/. -
3 - 1.00000 0.00 - - - - - - - - - S/. - S/. -
4 432,800.36 1.00000 432,800.36 - 21,640.02 - 411,160.34 - - 348,440.97 62,719.37 411,160.34 S/. - S/. 411,160.34
5 268,755.79 1.00000 268,755.79 Err:509 13,437.79 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
TOTAL 704,833.85 704,833.85 #REF! 35,077.81 #REF! #REF! #REF! #REF!
RESUMEN:
Valorizaciones Pagadas S/. - DE LOS ADELANTOS :
Valorización de Obra Anterior (no pagado) S/. 411,160.34 TOTAL ADELANTADO NETO PAGADO S/. Comp. Pago
Valorización de Obra Nº 04 Err:509 En Efectivo Materiales Efectivo IGV Total No. Fecha
Reajustes S/. - 0.00 0.00 0.00 0.00 0.00
Amortizacion del Adelanto Directo 15% #REF! 0.00 0.00 0.00 0.00 0.00
Falta Amortizar del Adelanto S/. -
Retenciones Fondo G. Fiel Cumplimiento #REF! 0.00 0.00 0.00 0.00 0.00
Mayores Gastos Generales S/. -
Retencion Contingencia Social 5% S/. 35,077.81
Por Liquidacion de Obra S/. -
Saldos por Valorizar S/. 518,348.40 Total con la presente Valorización : #REF!
Total Presupuesto Base #REF!
CONTROL FINANCIERO DE LA OBRA - 04
PROYECTO : CONSTRUCCION DEL CAMINO VECINAL GARACANCHA - CHAMPACRUZ, DISTRITO DE SIMON BOLIVAR - PASCO
A: VALORIZACION CONTRACTUAL
Con I.G.V 1,421,088.00 Err:509 Err:509 Err:509 Err:509
Sin I.G.V. 1,204,311.86 Err:509 Err:509 Err:509 Err:509 Err:509
B: REAJUSTES
Reajuste 01 Ninguno - - - -
Reajuste 02 Ninguno - - - -
TOTAL (B) Ninguno 0.00 0.00 0.00 0.00
C: AMORTIZACIONES
AMORTIZ .DEL ADELANTO DIRECTO - - - - -
AMORTIZ. DEL ADELANTO DE MATERIALES - - - - -
TOTAL (C) 0.00 0.00 0.00 0.00 0.00
D: RETENCIONES
GASTOS DE LICITACION - - - -
MULTA POR ATRASO DE OBRA - - - -
TOTAL (D) 0.00 0.00 0.00 0.00
TOTAL COMPROM. A SOLIC. (VN + IGV) 1,421,088.00 Err:509 Err:509 Err:509 Err:509
Retenciones Fondo de Garantia de F.C. - - - -
PROCESO : Err:509
CONTRATISTA : CONSORCIO N & F
Residente de O. : ING. ERIC MIGUEL CHAVEZ RIOS
Monto Contrato : S/. 1,421,088.00
Pres. Adicional : S/. - Ninguno
Total : S/. 1,421,088.00
MONTO % SALDO
VALORIZACION
DESCRIPCION ACUMULADO
CONTRATO ANTERIOR ACTUAL AVANCE POR
(s/IGV) CONTRACTUAL ADICIONAL ACUMULADO VALORIZAR
A: VALORIZACION CONTRACTUAL
Con I.G.V 1,421,088.00 633,983.81 268,755.79 902,739.60 518,348.40
Sin I.G.V. 1,204,311.86 537,274.41 227,759.14 765,033.56 63.52% 439,278.30
B: REAJUSTES
Reajuste 01 - - - -
Reajuste 02 - - - -
TOTAL (B) 0.00 0.00 0.00 0.00
C: AMORTIZACIONES
AMORTIZ .DEL ADELANTO DIRECTO - #REF! Err:509 #REF! -
AMORTIZ. DEL ADELANTO DE MATERIALES - - - - -
TOTAL (C) 0.00 #REF! Err:509 #REF! 0.00
D: RETENCIONES
GASTOS DE LICITACION - - - -
MULTA POR ATRASO DE OBRA - - - -
TOTAL (D) 0.00 0.00 0.00 0.00
TOTAL COMPROM. A SOLIC. (VN + IGV) 1,421,088.00 #REF! Err:509 #REF! 518,348.40
Retenciones Fondo de Garantia de F.C. 142,108.80 - - - -
Retencion Fondo Contingencia Social 5% 71,054.40 0.00 Err:509 Err:509 Err:509