Puentes Viga de 18 00 M PDF
Puentes Viga de 18 00 M PDF
L= Luz Libre + Ls
L= 6.40 m
h= L/15
h= 0.43 m defec= h - recubrimiento
h, asumido= 0.50 m defec= 0.46 m
DATOS
A= 4.1 m
h= 0.50 m
C= 0.25 m
D= 0.75 m
E= 0.25 m
e Asfalto= 0.05 m
recubrim. = 0.04 m
Ancho Efectivo
E= 1.219 + .06*L
E= 1.60 < 2.134 OK
CALCULO DE LA CARGA MUERTA (WD) MOMENTO POR CARGA MUERTA
2
Peso del Concreto = 1.20 Tn/m MD = WD * L /8
Peso del Asfalto = 0.10 Tn/m MD = 6.66 Tn-m
WD = 1.3 Tn/m
A= 4.47 m
a= 2.24 m d1= c*(d+e)/B
b= 0.08 m d1= 0.88 m
B= 6.4 m
c= 1.05 m d2= d1*e/(d+e)
d= 4.47 m d2= 0.14 m
e= 0.88 m
4P= 14.5 Tn
SEGUNDO CASO : CUANDO LAS CARGAS MAXIMAS SE ENCUENTRAN EQUIDISTANTES DEL CENTRO LUZ
A= 4.47 m
a= 2.24 m Y= B/4
B= 6.4 m Y= 1.6 m
c= 0.97 m
d= 4.47 m d1= Y*e/(B/2)
e= 0.97 m d1= 0.49 m
4P= 14.5 Tn
ML= (4P*d1)*2
ML= 14.07 Tn-m ML/2E= 4.39 Tn-m
a= 3.2 m Y= B/4
B= 6.4 m Y= 1.6 m
4P= 14.5 Tn
ML= 4P*Y
ML= 23.20 Tn-m ML/2E= 7.24 Tn-m
a= 3.2 m Y= B/4
B= 6.4 m Y= 1.6 m
P= 9 Tn
w= 0.96 Tn/m
ML= P*d1*d2
ML= 20.28 ML/2E= 6.33 Tn-m
I= 0.34 Tn -m FALSE
MI= I * ML.max.
MI = 2.17 Tn-m
M= MD + ML + MI
M= 16.06 Tn-m
donde: k = n/(n+r)
r=fy/fc
n=Es/Ec
Ec=15000√f'c
j=1 - k/3
fc=0.45*f'c
fy=0.45*f'y
datos :
f'c= 280 Kg/cm2
f'y= 4200 Kg/cm2
fc= 126 Kg/cm2
fy= 1890 Kg/cm2
r= 15
Es= 2.60E+06
Ec= 250,998.01
n= 10.36
K= 0.41
j= 0.86
b= 100 cm. (Tomando 1m de ancho de Losa)
Ǿ= 0.85
dserv. = 26.88 cm OK
2
Asp = (0.85-√(0.72 - 1.7*Mu/(Ǿ*f'c*b*d ))* f'c * b * d/f'y
Ǿ 3/4 Pulg. @ 15 cm
Ǿ 1/2 Pulg. @ 30 cm
Ast = 0.018 * b * h
Ǿ 1/4 Pulg. @ 35 cm
DISEÑO DE LA VIGA DE SARDINEL
ML= F * E
ML= 0.19 Tn-m
Ǿ 3/8 Pulg. @ 95 cm
2
Peso del Concreto = 0.30 Tn/m MD = WD * L /8
Peso de Baranda = 0.15 Tn/m MD = 2.30 Tn-m
WD = 0.45 Tn/m
4P = 14.5 Tn
L= 6.40 m
X= 0.30 m, Norma
E= 1.723 m
Pr= 4P/2
Pr= 7.25 Tn
P'= 2.36 Tn
ML = P' * L / 4
I= 0.34 Tn -m FALSE
MI= I * ML.max.
MI = 1.13 Tn-m
L= Luz Libre + Ls
L= 6.40 m
h= L/15
h= 0.43 m defec= h - recubrimiento
h, asumido= 0.50 m defec= 0.46 m
DATOS
A= 4.1 m
h= 0.50 m
C= 0.25 m
D= 0.75 m
E= 0.25 m
e Asfalto= 0.05 m
recubrimiento = 0.04 m
Ancho Efectivo
E= 1.219 + .06*L
E= 1.60 < 2.134 OK
CALCULO DE LA CARGA MUERTA (WD) MOMENTO POR CARGA MUERTA
2
Peso del Concreto = 1.20 Tn/m MD = WD * L /8
Peso del Asfalto = 0.10 Tn/m MD = 6.66 Tn-m
WD = 1.3 Tn/m
2
Mm = WD * L /8
Peso de Baranda = 0.15 Tn/m Mm = 1.52 Tn-m
Wm = 0.15 Tn/m
Mm = 0.37 Tn-m/m
a= 3.2 m Y= B/4
B= 6.4 m Y= 1.6 m
4P= 14.5 Tn
ML= 4P*Y
ML= 23.20 Tn-m
a= 3.2 m Y= B/4
B= 6.4 m Y= 1.6 m
w= 0.96 Tn/m
ML= ( W*Y*B)/2
ML= 4.92 Tn-m
CALCULO DE CARGA DE IMPACTO
I= 0.33
ML + MI = 35.77 Tn-m
2
Asp = (0.85-√(0.72 - 1.7*Mu/(Ǿ*f'c*b*d ))* f'c * b * d/f'y
Ǿ 3/4 Pulg. @ 15 cm
Ǿ 1/2 Pulg. @ 30 cm
C. CALCULO DEL ACERO DE TEMPERATURA
Ast = 0.018 * b * h
Ǿ 1/4 Pulg. @ 35 cm
DISEÑO ESTRUCTURAL DE PUENTE TIPO LOSA
DATOS:
LONGITUD DEL PUENTE = 22 m
DOS CARRILES = 3.6 m
VEREDAS = 0.6 m
ANCHO EFECTIVO = 7.2 m
F'c = 280 Kg/cm2
F'y = 4200 Kg/cm2
Peso Especifico Cº = 2400 Kg/m3
Peso Especifico Aº = 2250 Kg/m3
espesor Asfalto C = 0.075 m
Peso Asfalta = 200 Kg/m
ELEVACION
PLANTA
0.6
3.6
3.6
0.6
hmin = 0.19 cm
hmin = 0.20 cm
E = 10 + 5 √(L*W)
E= 232.94 Pulg.
E= 5.917 m
E (Pulg) = 148.208 OK
E (m) = 3.76 m
0.80 0.61
1
Yi
L
VA = Σ(Pi*Yi)
VA = 28,397.35 Kg
LINEAS DE INFLUENCIA CARGA DE CARRIL
W= 952
VA = 1/2 * W *L
VA = 10,472.00 Kg
11338 11338
1.2 20.8
0.95
1
Yi
VA = Σ(Pi*Yi)
VA = 22,057.56 Kg
FACTOR DE IMPACTO
FI = 1.33
2.75 2.75
5.5
11338 11338
11 1.2 9.8
4.9
5.5
L
Mcamion = 129,701.00 Kg-m
2
Mcarril = P*L /8
Mtandem = Σ(Pi*Yi)
E (2 ó + carriles) = 3.764 m
3.764 < 5.917
E ( 1 Carril) = 5.917 m
Llanta
Carril
0.6 W = 952
0.25
1.8
0.00
1
VDC = 52.80 Kg
2
MDC = 1/8 * WDC * L
Asfalto futuro
VDW = 1,856.25 Kg
2
MDW = 1/8 * WDW * L
VDC = 2,252.80 Kg
2
MDC = 1/8 * WDC * L
ASFALTO
WDW = WDWasfalto*(Ecrit- Vereda) /Ecrit
WDW = 112.50 kg
VDW = 1237.5
2
MDW = 1/8 * WDW * L
MDW = 6,806.25 kg-m
1.- DURABILIDAD
rs = 6 cm recubrimiento superior
ri = 2.5 cm recubrimiento inferior
fsjd n = nD*nR*nI 1
donde: k = n/(n+r)
r=fy/fc
n=Es/Ec
Ec=15000√f'c
j=1 - k/3
fs = 0.6*F'y
fc=0.60*F'c
fy=0.60*F'y
As = -901.73 cm2
Ǿ 1 Pulg. @ -1 cm
fsjd n = nD*nR*nI 1
donde: k = n/(n+r)
r=fy/fc
n=Es/Ec
Ec=15000√f'c
j=1 - k/3
fs = 0.6*F'y
fc=0.60*F'c
fy=0.60*F'y
As = -1207.32 cm2
Distribución del Acero
Ǿ 1 Pulg. @ 0 cm
Mint. = 71,623.37
fc = M/S , s = I/(h/2)
fc = M
1/6*b*h^2 b = ancho de diseño (cm) = 100
fc = 10,743,505.58 Kg/cm2
fr = 0.24 √F'c
fr = 33.744 Kg/cm2
AS = -902 cm2/cm
fs/n
b= 100
2
1/2 * b * x = n * As (d-x)
X= 150.30 cm
3 2
Icr = 1/3 * b * X + n * As (d - X )
fs/n = M(d-X)
Icr
fs = 147.28 Kg/cm2 OK
Mint. = 95,896.09
fc = M/S , s = I/(h/2)
fc = M
1/6*b*h^2 b = ancho de diseño (cm) = 100
fc = 14,384,414.00 Kg/cm2
fr = 0.24 √F'c
fr = 33.744 Kg/cm2
AS = -1208 cm2/cm
fs/n
b= 100
2
1/2 * b * x = n * As (d-x)
X= 200.00 cm
3 2
Icr = 1/3 * b * X + n * As (d - X )
fs/n = M(d-X)
Icr
fs = 112.65 Kg/cm2 OK
3.- DEFORMACIONES
WDC :
Losa = 40.32 Kg/m
Vereda = 720.00 Kg/m
WDW :
Asfalto = 1,215.00 Kg/m
Baranda = 400.00 Kg/m
4 3 3
ΔDL = 5 * WDL * L IE = (Mcr/Ma) *Ig + (1-(Mcr/Ma) )*Icr
384 * Ec * IE
3
Ig = 1/12 * Acalzada * h =
Ig = 0.56 cm4
Icrit = ############# cm4
Mcr = fr * Ig/Yt
Mcr = 2 Kg-m
3
(Mcr/Ma) = 0.00
IE = #############
ΔDL = -0.02 mm
Δt = -0.07 mm
Luz Puente
Δadm = 800
Δadm = 27.5 mm
Sí :
NL = 2 m= 1
ΣPLL+IM = FI * (WDC*NL)*m
ΣPLL+IM = 6,318.35 Kg
IE = ############ cm4
La Deflexión Será
CASO 1
P = FI * (Pcarril * 2)*m
P= 38,601.92 Kg
X= 1028 cm
b= 742 cm
Y1 = -0.53 mm
CASO 2
P = FI * (Pcarril * 2)*m
P= 38,601.92 Kg
X= 1172 cm
b= 1028 cm
Y2 = -0.63 mm
DEFLEXION TOTAL
Y = Y1 + Y2
Y= -1.16 mm
Y < Δadm OK
M = W * L2/8
M= 153,205.36 Kg-m
Ycarril = -0.26 mm
P = FI * Ptandem * 2 *m
P= 30,159.08 Kg
3
Ytandem = P*L
48 * Ec* Icr
G.- FATIGA
La carga será con un camión de 9.0m de espaciamiento entre ejes
posteriores.
6.50 9.00
14512 14512 ( Kg )
X= 11.00 m
14512 R 14512
6.50 9.0
11.00 2.25 CL
RA x' RB
RB = 17,480.36 Kg
Mc = RB * (L/2+x')
Mc = 231,614.82 Kg-m
U= 199,767.78 Kg-m
MLL+IM = U/E
σ= MLL+IM * y y = (d-x)
Icrit.
fsmáx. < ff OK
H.- VERIFICANDO EL ESTADO LIMITE DE RESISTENCIA I
γ
Mu = n*Σ( i*θi) = 0.95(1.25*MDC + 1.5*MDW + 1.75*MLL+IP)
Mu = 116,511.19 Kg-m
2 2
Mu = ǿ *F'c * b * d * (w-0.59w )
As = #NUM! cm2
Distribución del Acero
Ǿ 1 Pulg. @ #NUM! cm
γ
Mu = n*Σ( i*θi) = 0.95(1.25*MDC + 1.5*MDW + 1.75*MLL+IP)
Mu = 151,925.33 Kg-m
2 2
Mu = ǿ *F'c * b * d * (w-0.59w )
As = #NUM! cm2
Distribución del Acero
Ǿ 1 Pulg. @ #NUM! cm
Asd = 100/√L * As
Asd = 100/√L * As
Asd = #NUM! cm2/m
φ 5/8" @ 50cm
φ 5/8" @ 46cm φ 5/8" @ 46cm
φ 1" @ 12cm φ 1" @ 11cm
φ 1" @ 11cm
8.4
DISEÑO DE PUENTE VIGA LOSA METODO LRFD:
DISEÑO DE UN PUENTE TIPO VIGA LOSA DE 2 VIAS, CONSIDERANDO UNA LUZ DE 22.m Y S/C HL-93
DATOS:
LONGITUD DEL PUENTE (L) = 22 m
NUMERO DE VIGAS (N) = 3 Und
VEREDAS (v) = 0.6 m
ANCHO EFECTIVO (A) = 7.2 m (2 Vías)
F'c = 280 Kg/cm2
F'y = 4200 Kg/cm2
Peso Especifico Cº = 2400 Kg/m3
Peso Especifico Aº = 2250 Kg/m3
espesor Asfalto C = 0.075 m
Peso Asfalto = 200 Kg/m
Peso de Baranda = 200 Kg/m
separacion = 2.8 m (Norma Peruana)
LONGITUD EQUIVALENTE= 22
LUZ DEL PUENTE=
v L v
0.60 8.80 0.60
p 0.90
c 0.25
ts 0.18
H 1.10
1.15 0.50 1.50 0.50 1.50 0.50 1.50 0.50 1.15 8.80
u b S b S b S b u
PREDIMENSIONAMIENTO
ALTURA DE LA VIGA PRINCIPAL
H >= 0.07 * L H= 1.60 OK
S= s-b= 2.06
b= 0.74 m
b= 0.74 m OK
u = (L - (N * bw) - ( N -1 )*S)/2 = 0.43186959
ts = 18 cm
ts = 0.2 m
2
MDC = 1/8*WDC * L = 263,330.78 Kg - m
Carpeta Asfaltica
WDW = C * Pe *A/N = 405.00
4.30 4.30
0.952 Tn
2
Mcrep = 1/8 *Wre*L = 57.60 Kg - m
0.6 0.2
g = 0.075 + (S/2900) (S/L)
g= 0.66
n= nD*nR*nI = 1
γPDC = 1.25
γPDW = 1.5
γll+I = 1.75
Mu. = 366,153.76 Kg - m
Mu * 100
Ku = 2
φ*b*d
Ku = 6.91 kg/cm2
m = Fy/(0.85*F'c) = 17.65
ρ = 1/m(1-√(1-2m*Ku/Fy)) = 0.0017
As = ρ * b *d = 179.2 cm2
Usar 36 Ǿ 1"
a = Fy * As/(0.85*F'c*b) = 11.2941176 OK
β1 = 0.85
c= a/β1 = 13.29
ESPESOR DE LA LOSA
ts = (S + 10)/30 = 0.19 m
Usamos ts = 0.20 m
ts = 0.225 m
Pb = 474 Kg/m
Pb = 4.65 N/mm
Pa = 171.45 Kg/m2
Losa
Ws = 480 kg/m2
Volado de Losa
Ws = 540 kg/m2
MOMENTOS FLECTORES
Ancho de Franja Distribuidos Longitudinalmente con las cargas "In Situ" será :
P= 7.26
0.38 1.01
0.3
1.69
0.74
l = 22.37 * γ * (1 + IM/100) * P
γ= b/2 = 368.130412 mm
l= 795.16 mm
Nº Carriles Cargados = 2
m = 1.2
Swvolado = 1140.85
M = - 1.2 * P * X / 1.626
M= -5.44 Tn-m/m
7.26 7.26
1.59
1.06 0.21
2.5
2.78
(+)
M = m * Mmax./Sw
(+)
Sw = 660 + .55 * S
(+)
Sw = 2119.33
(+)
M = 1.57 Tn-m
MOMENTOS NEGATIVOS
7.26 7.26
0.90
1.75 0.90
3.08 4.88
2.85
2.15
(-)
M = - m * Minin / Sw
Sw = 1220
- m +* 0.25
Mmin/Sw
*S
Sw = 1883.33 mm
(-)
M = -1.82 Tn-m
n= nD*nR*nI = 0.95
nD = 0.95
nR = 0.95
nI = 1.05
SECCION A-A
SECCION B - B
ACERO POSITIVO
2
As = (0.85-√(0.72 - 1.7*Mu/(Ǿ*f'c*b*d ))* f'c * b * d/f'y
As = 4.11 cm2
Ǿ 5/8 Pulg. @ 48 cm
ACERO NEGATIVO
2
As = (0.85-√(0.72 - 1.7*Mu/(Ǿ*f'c*b*d ))* f'c * b * d/f'y
As = 12.32 cm2
Ǿ 5/8 Pulg. @ 16 cm
ACERO DE DISTRIBUCION
Se = S-b= 1917.07
(+)
As = % As
As = 2.24 cm2
Ǿ 1/2 Pulg. @ 57 cm
Stem >= 3 * ts ó 45 cm
Stem = 60 cm
Finalmanete Stem = 45 cm
φ 5/8 @ 20 cm φ 1/2 @ 45 cm
φ 5/8 @ 30 cm φ 1/2 @ 31 cm
(+)
As = 5.93
Ǿ 5/8 Pulg. @ 33 cm
(-)
As = 14.14
Ǿ 5/8 Pulg. @ 14 cm
Asdistri = 4.06
Ǿ 1/2 Pulg. @ 31 cm
Ast = 1.82
Ǿ 1/2 Pulg. @ 70 cm
p 0.90
c 0.25
ts 0.20
H 1.60
p 0.90
ts 0.20
H 1.60
15.16
Modelos Analitico Estructural
474
0.127
540 Kg/m
480 Kg/m
10.46