Está en la página 1de 24

Fórmula de Chezy con el coeficiente de Manning

Flujo Uniforme
PROYECTO DE ADECUACIÓN
2/3 1/2 CARACTERÍSTICAS HIDRÁULI
Q= A /n∗R ∗S );Q/ A=V
TRAMO

Tipo flujo

ABSCISA Q S n z:1 b y b/y A P R2/3 Br Sb BL B


DE (Km) HASTA (Km) (m3/s) (m/m) (m) (m) m2 m (m) (m) (m) (m)

1 K0+000.00 K0+360.00 4.00 0.0000 0.013 0.00 5.00 6.00 SUBCRITICO 0.83 30.00 17.00 1.46 0.25 0.45 0.70 5.20
K0+360.00 K0+386.00
2 K0+386.00 K0+411.00 31.97 0.0001 0.013 0.00 5.00 6.00 SUBCRITICO 0.83 30.00 17.00 1.46 0.50 -0.50 0.00 5.20
K0+411.00 K0+418.00
3 K0+418.00 K0+870.00 5.00 0.0019 0.015 1.50 1.00 1.02 SUBCRITICO 0.98 2.56 4.66 0.67 0.25 0.45 0.70 6.50
K0+870.00 K0+875.00
4 K0+875.00 K0+940.00 5.00 0.0019 0.015 0.00 1.75 1.47 SUBCRITICO 1.19 2.57 4.69 0.67 0.70 0.00 0.70 1.75
K0+940.00 K0+945.00
5 K0+945.00 K1+250.00 5.00 0.0023 0.015 1.50 1.00 0.97 SUBCRITICO 1.03 2.39 4.50 0.66 0.25 0.45 0.70 6.40
K1+250.00 K1+250.00
6 K1+250.00 K1+500.00 5.00 0.0019 0.015 1.50 1.00 1.02 SUBCRITICO 0.98 2.56 4.66 0.67 0.25 0.45 0.70 6.50
K1+500.00 K1+525.00
7 K1+525.00 K1+680.00 5.00 0.0019 0.015 1.50 1.00 1.02 SUBCRITICO 0.98 2.56 4.66 0.67 0.25 0.45 0.70 6.50
K1+680.00 K1+705.00
8 K1+705.00 K1+960.00 5.00 0.0019 0.015 1.50 1.00 1.02 SUBCRITICO 0.98 2.56 4.66 0.67 0.25 0.45 0.70 6.50
K1+960.00 K1+985.00
9 K1+985.00 K2+400.00 5.00 0.0019 0.015 1.50 1.00 1.02 SUBCRITICO 0.98 2.56 4.66 0.67 0.25 0.45 0.70 6.50
K2+400.00 K2+425.00

CONSORCIO HIDROTEC LTDA F.ICAZA Y CIA S.A 11/08/2020


PROYECTO DE ADECUACIÓN DE TIERRAS REMIGIO ROJAS
CARACTERÍSTICAS HIDRÁULICAS CANAL DE CONDUCCIÓN

BERMA Ht Hr V T D No. F t e
W (m) (m) (m/s) m m Froude (m) (m)

1.50 6.70 6.25 0.13 5.00 6.00 0.02 0.050 0.10

4.50 6.00 6.50 1.07 5.00 6.00 0.14 0.050 0.10

1.50 1.72 1.30 1.95 4.05 0.63 0.79 0.100 0.20

0.00 2.17 2.20 1.95 1.75 1.47 0.52 0.25 0.00

1.50 1.67 1.25 2.09 3.91 0.61 0.86 0.100 0.20

1.50 1.72 1.30 1.95 4.05 0.63 0.79 0.100 0.20

1.50 1.72 1.30 1.95 4.05 0.63 0.79 0.100 0.20

1.50 1.72 1.30 1.95 4.05 0.63 0.79 0.100 0.20

1.50 1.72 1.30 1.95 4.05 0.63 0.79 0.100 0.20

CONSORCIO HIDROTEC LTDA F.ICAZA Y CIA S.A 11/08/2020


AS REMIGIO ROJAS
NAL DE CONDUCCIÓN

FONDO CANAL I. FONDO CANAL F. NIV. AGUA I. NIV. AGUA F. NIV. BERMA I. NIV. BERMA F. ESTRUCTURA
msnm msnm msnm msnm msnm msnm
FINAL DESARENADOR
46.95 46.95 52.95 52.95 53.65 53.65 Canal Trapezoidal
46.95 1.50 ESTRUCTURA DE CAIDA INCLINADA H=1,50 m
45.45 45.45 51.45 51.45 51.45 51.45 Canal Trapezoidal
45.45 0.12 PASO BAJO VÍA
45.33 44.47 46.34 45.48 47.04 46.18 Canal Trapezoidal
44.47 0.05 TRANSICIÓN TRAPEZOIDAL A RECTANGULAR CON CONTROL
44.42 44.29 45.89 45.76 46.59 46.46 PUENTE CANAL
44.29 0.05 TRANSICIÓN RECTANGULAR a TRAPEZOIDAL
44.24 43.54 45.22 44.51 45.92 45.21 Canal Trapezoidal
0.00 CAMBIO DE PENDIENTE
43.54 43.07 44.56 44.08 45.26 44.78 Canal Trapezoidal
1.75 ESTRUCTURA DE CAIDA INCLINADA H=1,75 m
41.32 41.02 42.33 42.04 43.03 42.74 Canal Trapezoidal
1.75 ESTRUCTURA DE CAIDA INCLINADA H=1,75 m
39.27 38.79 40.29 39.81 40.99 40.51 Canal Trapezoidal
1.75 ESTRUCTURA DE CAIDA INCLINADA H=1,75 m
37.04 36.25 38.06 37.27 38.76 37.97 Canal Trapezoidal
1.50 ESTRUCTURA DE CAIDA INCLINADA H=1,50 m

CONSORCIO HIDROTEC LTDA F.ICAZA Y CIA S.A 11/08/2020


http://ponce.sdsu.edu/canalenlinea03.php

Fórmula de Chezy con el coeficiente de Manning


Flujo Uniforme
PROYECTO DE ADECUACI
2/3 1/2 CARACTERÍSTICAS HIDRÁU
Q= A /n∗R ∗S );Q/ A=V
TRAMO

Tipo flujo

ABSCISA Q S n z:1 D y Teta b/y A P R2/3 Br Sb BL


DE (Km) HASTA (Km) (m3/s) (m/m) (m) (m) Rad m2 m (m) (m) (m)

1 K0+000.00 K0+360.00 33.45 0.0005 0.013 0.00 4.40 3.64 4.57 SUBCRITICO 1.21 13.45 10.05 1.21 0.50 -0.50 0.00
K0+360.00 K0+386.00
2 K0+386.00 K0+411.00 31.97 0.0001 0.013 0.00 5.00 6.00 SUBCRITICO 0.83 30.00 17.00 1.46 0.50 -0.50 0.00
K0+411.00 K0+418.00
3 K0+418.00 K0+870.00 5.00 0.0019 0.015 1.50 1.00 1.02 SUBCRITICO 0.98 2.56 4.66 0.67 0.25 0.45 0.70
K0+870.00 K0+875.00
4 K0+875.00 K0+940.00 5.00 0.0019 0.015 0.00 1.75 1.47 SUBCRITICO 1.19 2.57 4.69 0.67 0.70 0.00 0.70
K0+940.00 K0+945.00
5 K0+945.00 K1+250.00 5.00 0.0023 0.015 1.50 1.00 0.97 SUBCRITICO 1.03 2.39 4.50 0.66 0.25 0.45 0.70
K1+250.00 K1+250.00
6 K1+250.00 K1+500.00 5.00 0.0019 0.015 1.50 1.00 1.02 SUBCRITICO 0.98 2.56 4.66 0.67 0.25 0.45 0.70
K1+500.00 K1+525.00
7 K1+525.00 K1+680.00 5.00 0.0019 0.015 1.50 1.00 1.02 SUBCRITICO 0.98 2.56 4.66 0.67 0.25 0.45 0.70
K1+680.00 K1+705.00
8 K1+705.00 K1+960.00 5.00 0.0019 0.015 1.50 1.00 1.02 SUBCRITICO 0.98 2.56 4.66 0.67 0.25 0.45 0.70
K1+960.00 K1+985.00
9 K1+985.00 K2+400.00 5.00 0.0019 0.015 1.50 1.00 1.02 SUBCRITICO 0.98 2.56 4.66 0.67 0.25 0.45 0.70
K2+400.00 K2+425.00

CONSORCIO HIDROTEC LTDA F.ICAZA Y CIA S.A 11/08/2020


PROYECTO DE ADECUACIÓN DE TIERRAS REMIGIO ROJAS
CARACTERÍSTICAS HIDRÁULICAS CANAL DE CONDUCCIÓN

B BERMA Ht Hr V T D No. F t e
(m) W (m) (m) (m/s) m m Froude (m) (m)

4.80 4.50 3.64 4.15 2.49 4.40 3.06 0.46 0.100 0.20

5.20 4.50 6.00 6.50 1.07 5.00 6.00 0.14 0.050 0.10

6.50 1.50 1.72 1.30 1.95 4.05 0.63 0.79 0.100 0.20

1.75 0.00 2.17 2.20 1.95 1.75 1.47 0.52 0.25 0.00

6.40 1.50 1.67 1.25 2.09 3.91 0.61 0.86 0.100 0.20

6.50 1.50 1.72 1.30 1.95 4.05 0.63 0.79 0.100 0.20

6.50 1.50 1.72 1.30 1.95 4.05 0.63 0.79 0.100 0.20

6.50 1.50 1.72 1.30 1.95 4.05 0.63 0.79 0.100 0.20

6.50 1.50 1.72 1.30 1.95 4.05 0.63 0.79 0.100 0.20

CONSORCIO HIDROTEC LTDA F.ICAZA Y CIA S.A 11/08/2020


EMIGIO ROJAS
E CONDUCCIÓN

FONDO CANAL I. FONDO CANAL F. NIV. AGUA I. NIV. AGUA F. NIV. BERMA I. NIV. BERMA F. ESTRUCTURA
msnm msnm msnm msnm msnm msnm
FINAL DESARENADOR
46.95 46.77 50.59 50.41 50.59 50.41 Canal Trapezoidal
46.77 1.50 ESTRUCTURA DE CAIDA INCLINADA H=1,50 m
45.27 45.27 51.27 51.27 51.27 51.27 Canal Trapezoidal
45.27 0.12 PASO BAJO VÍA
45.15 44.29 46.16 45.30 46.86 46.00 Canal Trapezoidal
44.29 0.05 TRANSICIÓN TRAPEZOIDAL A RECTANGULAR CON CONTROL
44.24 44.12 45.71 45.58 46.41 46.28 PUENTE CANAL
44.12 0.05 TRANSICIÓN RECTANGULAR a TRAPEZOIDAL
44.07 43.36 45.04 44.34 45.74 45.04 Canal Trapezoidal
0.00 CAMBIO DE PENDIENTE
43.36 42.89 44.38 43.90 45.08 44.60 Canal Trapezoidal
1.75 ESTRUCTURA DE CAIDA INCLINADA H=1,75 m
41.14 40.84 42.15 41.86 42.85 42.56 Canal Trapezoidal
1.75 ESTRUCTURA DE CAIDA INCLINADA H=1,75 m
39.09 38.61 40.11 39.63 40.81 40.33 Canal Trapezoidal
1.75 ESTRUCTURA DE CAIDA INCLINADA H=1,75 m
36.86 36.07 37.88 37.09 38.58 37.79 Canal Trapezoidal
1.50 ESTRUCTURA DE CAIDA INCLINADA H=1,50 m

CONSORCIO HIDROTEC LTDA F.ICAZA Y CIA S.A 11/08/2020


Formula de Manning
Flujo Uniforme

2/3 1/2
Q= A /n∗R ∗S );Q/ A=V
TRAMO

Tipo flujo

ABSCISA Q S n z:1 b y
DE (Km) HASTA (Km) (m3/s) (m/m) (m) (m)

1 K0+000.00 K0+360.00 32.30 0.0002 0.013 0.00 6.00 4.00 SUBCRITICO


K0+360.00 K0+386.00
2 K0+386.00 K0+411.00 26.92 0.0001 0.013 0.00 5.00 6.00 SUBCRITICO
K0+411.00 K0+418.00
3 K0+418.00 K0+870.00 4.39 0.0019 0.015 1.50 1.00 1.02 SUBCRITICO
K0+870.00 K0+875.00
4 K0+875.00 K0+940.00 4.05 0.0019 0.015 0.00 1.75 1.47 SUBCRITICO
K0+940.00 K0+945.00
5 K0+945.00 K1+250.00 4.37 0.0023 0.015 1.50 1.00 0.97 SUBCRITICO
K1+250.00 K1+250.00
6 K1+250.00 K1+500.00 4.39 0.0019 0.015 1.50 1.00 1.02 SUBCRITICO
K1+500.00 K1+525.00
7 K1+525.00 K1+680.00 4.39 0.0019 0.015 1.50 1.00 1.02 SUBCRITICO
K1+680.00 K1+705.00
8 K1+705.00 K1+960.00 4.39 0.0019 0.015 1.50 1.00 1.02 SUBCRITICO
K1+960.00 K1+985.00
9 K1+985.00 K2+400.00 4.39 0.0019 0.015 1.50 1.00 1.02 SUBCRITICO
K2+400.00 K2+425.00
10 K2+425.00 K2+690.00 4.39 0.0019 0.015 1.50 1.00 1.02 SUBCRITICO
K2+690.00 K2+715.00
11 K2+715.00 K3+000.00 4.39 0.0019 0.015 1.50 1.00 1.02 SUBCRITICO
K3+000.00 K3+025.00
12 K3+025.00 K3+180.00 4.05 0.0019 0.015 0.00 1.75 1.47 SUBCRITICO
K3+180.00 K3+205.00
13 K3+205.00 K3+560.00 4.05 0.0019 0.015 0.00 1.75 1.47 SUBCRITICO
K3+560.00 K3+565.00
14 K3+565.00 K3+620.00 4.39 0.0019 0.015 1.50 1.00 1.02 SUBCRITICO
K3+620.00 K3+645.00
15 K3+645.00 K3+950.00 4.39 0.0019 0.015 1.50 1.00 1.02 SUBCRITICO
K3+950.00 K3+955.00
16 K3+955.00 K4+080.00 3.78 0.0005 0.015 0.00 3.00 1.39 SUBCRITICO
K4+080.00 K4+085.00
17 K4+085.00 K4+195.00 4.58 0.00020 0.015 1.50 1.00 1.69 SUBCRITICO
K4+195.00 K4+213.00
18 K4+213.00 K4+634.40 4.58 0.00020 0.015 1.50 1.00 1.69 SUBCRITICO
PROYECTO DE ADECUACIÓN DE TIERRAS REMIGIO ROJAS
CARACTERÍSTICAS HIDRÁULICAS CANAL DE CONDUCCIÓN

b/y A P R2/3 Br Sb BL B BERMA Ht Hr V T D


m2 m (m) (m) (m) (m) W (m) (m) (m/s) m m

1.50 24.00 20.00 1.13 0.50 -0.50 0.00 6.20 4.50 4.00 4.50 1.35 6.00 4.00

0.83 30.00 22.00 1.23 0.50 -0.50 0.00 5.20 4.50 6.00 6.50 0.90 5.00 6.00

0.98 2.56 5.66 0.59 0.25 0.45 0.70 6.50 1.50 1.72 1.30 1.71 4.05 0.63

1.19 2.57 6.44 0.54 0.70 0.00 0.70 1.75 0.00 2.17 2.20 1.58 1.75 1.47

1.03 2.39 5.50 0.57 0.25 0.45 0.70 6.40 1.50 1.67 1.25 1.83 3.91 0.61

0.98 2.56 5.66 0.59 0.25 0.45 0.70 6.50 1.50 1.72 1.30 1.71 4.05 0.63

0.98 2.56 5.66 0.59 0.25 0.45 0.70 6.50 1.50 1.72 1.30 1.71 4.05 0.63

0.98 2.56 5.66 0.59 0.25 0.45 0.70 6.50 1.50 1.72 1.30 1.71 4.05 0.63

0.98 2.56 5.66 0.59 0.25 0.45 0.70 6.50 1.50 1.72 1.30 1.71 4.05 0.63

0.98 2.56 5.66 0.59 0.25 0.45 0.70 6.50 1.50 1.72 1.30 1.71 4.05 0.63

0.98 2.56 5.66 0.59 0.25 0.45 0.70 6.50 1.50 1.72 1.30 1.71 4.05 0.63

1.19 2.57 6.44 0.54 0.75 0.00 0.00 1.75 0.00 1.47 2.25 1.58 1.75 1.47

1.19 2.57 6.44 0.54 0.75 0.00 0.00 1.75 0.00 1.47 2.25 1.58 1.75 1.47

0.98 2.56 5.66 0.59 0.25 0.45 0.70 6.50 1.50 1.72 1.30 1.71 4.05 0.63

0.98 2.56 5.66 0.59 0.25 0.45 0.70 6.50 1.50 1.72 1.30 1.71 4.05 0.63

2.16 4.17 8.78 0.61 0.65 0.00 0.65 3.00 0.00 2.04 2.05 0.91 3.00 1.39

0.59 5.95 8.08 0.82 0.25 0.45 0.70 8.35 1.50 2.39 1.95 0.77 6.06 0.98

0.59 5.95 8.08 0.82 0.25 0.45 0.70 8.35 1.50 2.39 1.95 0.77 6.06 0.98
RAS REMIGIO ROJAS
ANAL DE CONDUCCIÓN

No. F t e FONDO CANAL I. FONDO CANAL F. NIV. AGUA I. NIV. AGUA F. NIV. BERMA I. NIV. BERMA F.
Froude (m) (m) msnm msnm msnm msnm msnm msnm

0.22 0.050 0.10 46.95 46.86 50.95 50.86 50.95 50.86


46.86 1.50
0.12 0.050 0.10 45.36 45.36 51.36 51.36 51.36 51.36
45.36 0.12
0.69 0.080 0.20 45.24 44.38 46.26 45.40 46.96 46.10
44.38 0.05
0.42 0.25 0.00 44.33 44.21 45.80 45.68 46.50 46.38
44.21 0.05
0.75 0.080 0.20 44.16 43.46 45.13 44.43 45.83 45.13
0.00
0.69 0.080 0.20 43.46 42.98 44.47 44.00 45.17 44.70
1.75
0.69 0.080 0.20 41.23 40.94 42.25 41.95 42.95 42.65
1.75
0.69 0.080 0.20 39.19 38.70 40.20 39.72 40.90 40.42
1.75
0.69 0.080 0.20 36.95 36.17 37.97 37.18 38.67 37.88
1.50
0.69 0.080 0.20 34.67 34.16 35.68 35.18 36.38 35.88
1.00
0.69 0.080 0.20 33.16 32.62 34.18 33.64 34.88 34.34
1.25
0.42 0.15 0.00 31.37 31.08 32.84 32.54 32.84 32.54
1.00
0.42 0.15 0.00 30.08 29.40 31.54 30.87 31.54 30.87
0.08
0.69 0.080 0.20 29.32 29.22 30.34 30.23 31.04 30.93
1.50
0.69 0.080 0.20 27.72 27.14 28.73 28.15 29.43 28.85
0.05
0.25 0.25 0.00 27.09 27.02 28.48 28.41 29.13 29.06
0.05
0.25 0.050 0.10 26.97 26.95 28.66 28.64 29.36 29.34

0.25 0.050 0.10 26.90 26.82 28.59 28.50 29.29 29.20


ESTRUCTURA ESTRUCTURA
TIPO
FINAL DESARENADOR
Canal Trapezoidal
ESTRUCTURA DE CAIDA INCLINADA H=1,50 m
Canal Trapezoidal
PASO BAJO VÍA
Canal Trapezoidal
TRANSICIÓN TRAPEZOIDAL A RECTANGULAR CON CONTROL
PUENTE CANAL
TRANSICIÓN RECTANGULAR a TRAPEZOIDAL
Canal Trapezoidal
CAMBIO DE PENDIENTE
Canal Trapezoidal
ESTRUCTURA DE CAIDA INCLINADA H=1,75 m
Canal Trapezoidal
ESTRUCTURA DE CAIDA INCLINADA H=1,75 m
Canal Trapezoidal
ESTRUCTURA DE CAIDA INCLINADA H=1,75 m
Canal Trapezoidal
ESTRUCTURA DE CAIDA INCLINADA H=1,50 m
Canal Trapezoidal
ESTRUCTURA DE CAIDA INCLINADA H=1,00 m
Canal Trapezoidal
ESTRUCTURA DE CAIDA INCLINADA H=1,25 m
CANAL EN CAJÓN
ESTRUCTURA DE CAIDA INCLINADA H=1,00 m
CANAL EN CAJÓN
TRANSICIÓN CR a CT
Canal Trapezoidal
ESTRUCTURA DE CAIDA INCLINADA H=1,50 m
Canal Trapezoidal
TRANSICIÓN CTRAPEZOIDAL a CRECTANGULAR
CANAL EN CAJÓN
TRANSICIÓN CTRAPEZOIDAL a CRECTANGULAR
Canal Trapezoidal
PASO BAJO VÍA
EMPALME CON CANAL PRINCIPAL
Formula de Manning
Flujo Uniforme

2/3 1/2
Q= A /n∗R ∗S );Q/ A=V
TRAMO

Tipo flujo

ABSCISA Q S n z:1 D y
DE (Km) HASTA (Km) (m3/s) (m/m) (m) (m)

1 K0+000.00 K0+360.00 3.99 0.0010 0.013 0.00 1.70 1.70 SUBCRITICO


K0+360.00 K0+386.00
2 K0+386.00 K0+411.00 26.92 0.0001 0.013 0.00 5.00 6.00 SUBCRITICO
K0+411.00 K0+418.00
3 K0+418.00 K0+870.00 4.39 0.0019 0.015 1.50 1.00 1.02 SUBCRITICO
K0+870.00 K0+875.00
4 K0+875.00 K0+940.00 4.05 0.0019 0.015 0.00 1.75 1.47 SUBCRITICO
K0+940.00 K0+945.00
5 K0+945.00 K1+250.00 4.37 0.0023 0.015 1.50 1.00 0.97 SUBCRITICO
K1+250.00 K1+250.00
6 K1+250.00 K1+500.00 4.39 0.0019 0.015 1.50 1.00 1.02 SUBCRITICO
K1+500.00 K1+525.00
7 K1+525.00 K1+680.00 4.39 0.0019 0.015 1.50 1.00 1.02 SUBCRITICO
K1+680.00 K1+705.00
8 K1+705.00 K1+960.00 4.39 0.0019 0.015 1.50 1.00 1.02 SUBCRITICO
K1+960.00 K1+985.00
9 K1+985.00 K2+400.00 4.39 0.0019 0.015 1.50 1.00 1.02 SUBCRITICO
K2+400.00 K2+425.00
10 K2+425.00 K2+690.00 4.39 0.0019 0.015 1.50 1.00 1.02 SUBCRITICO
K2+690.00 K2+715.00
11 K2+715.00 K3+000.00 4.39 0.0019 0.015 1.50 1.00 1.02 SUBCRITICO
K3+000.00 K3+025.00
12 K3+025.00 K3+180.00 4.05 0.0019 0.015 0.00 1.75 1.47 SUBCRITICO
K3+180.00 K3+205.00
13 K3+205.00 K3+560.00 4.05 0.0019 0.015 0.00 1.75 1.47 SUBCRITICO
K3+560.00 K3+565.00
14 K3+565.00 K3+620.00 4.39 0.0019 0.015 1.50 1.00 1.02 SUBCRITICO
K3+620.00 K3+645.00
15 K3+645.00 K3+950.00 4.39 0.0019 0.015 1.50 1.00 1.02 SUBCRITICO
K3+950.00 K3+955.00
16 K3+955.00 K4+080.00 3.78 0.0005 0.015 0.00 3.00 1.39 SUBCRITICO
K4+080.00 K4+085.00
17 K4+085.00 K4+195.00 4.58 0.00020 0.015 1.50 1.00 1.69 SUBCRITICO
K4+195.00 K4+213.00
18 K4+213.00 K4+634.40 4.58 0.00020 0.015 1.50 1.00 1.69 SUBCRITICO
PROYECTO DE ADECUACIÓN DE TIERRAS REMIGIO ROJAS
CARACTERÍSTICAS HIDRÁULICAS CANAL DE CONDUCCIÓN

b/y A P R2/3 Br Sb BL B BERMA Ht Hr V T D


m2 m (m) (m) (m) (m) W (m) (m) (m/s) m m

1.00 2.27 5.34 0.57 0.25 0.40 0.65 2.10 1.50 2.35 1.95 1.76 1.70 1.34

0.83 30.00 22.00 1.23 0.50 -0.50 0.00 5.20 4.50 6.00 6.50 0.90 5.00 6.00

0.98 2.56 5.66 0.59 0.25 0.45 0.70 6.50 1.50 1.72 1.30 1.71 4.05 0.63

1.19 2.57 6.44 0.54 0.70 0.00 0.70 1.75 0.00 2.17 2.20 1.58 1.75 1.47

1.03 2.39 5.50 0.57 0.25 0.45 0.70 6.40 1.50 1.67 1.25 1.83 3.91 0.61

0.98 2.56 5.66 0.59 0.25 0.45 0.70 6.50 1.50 1.72 1.30 1.71 4.05 0.63

0.98 2.56 5.66 0.59 0.25 0.45 0.70 6.50 1.50 1.72 1.30 1.71 4.05 0.63

0.98 2.56 5.66 0.59 0.25 0.45 0.70 6.50 1.50 1.72 1.30 1.71 4.05 0.63

0.98 2.56 5.66 0.59 0.25 0.45 0.70 6.50 1.50 1.72 1.30 1.71 4.05 0.63

0.98 2.56 5.66 0.59 0.25 0.45 0.70 6.50 1.50 1.72 1.30 1.71 4.05 0.63

0.98 2.56 5.66 0.59 0.25 0.45 0.70 6.50 1.50 1.72 1.30 1.71 4.05 0.63

1.19 2.57 6.44 0.54 0.75 0.00 0.00 1.75 0.00 1.47 2.25 1.58 1.75 1.47

1.19 2.57 6.44 0.54 0.75 0.00 0.00 1.75 0.00 1.47 2.25 1.58 1.75 1.47

0.98 2.56 5.66 0.59 0.25 0.45 0.70 6.50 1.50 1.72 1.30 1.71 4.05 0.63

0.98 2.56 5.66 0.59 0.25 0.45 0.70 6.50 1.50 1.72 1.30 1.71 4.05 0.63

2.16 4.17 8.78 0.61 0.65 0.00 0.65 3.00 0.00 2.04 2.05 0.91 3.00 1.39

0.59 5.95 8.08 0.82 0.25 0.45 0.70 8.35 1.50 2.39 1.95 0.77 6.06 0.98

0.59 5.95 8.08 0.82 0.25 0.45 0.70 8.35 1.50 2.39 1.95 0.77 6.06 0.98
RAS REMIGIO ROJAS
ANAL DE CONDUCCIÓN

No. F t e FONDO CANAL I. FONDO CANAL F. NIV. AGUA I. NIV. AGUA F. NIV. BERMA I. NIV. BERMA F.
Froude (m) (m) msnm msnm msnm msnm msnm msnm

0.49 0.080 0.20 46.95 46.59 48.65 48.29 49.30 48.94


46.59 1.50
0.12 0.050 0.10 45.09 45.08 51.09 51.08 51.09 51.08
45.08 0.12
0.69 0.080 0.20 44.96 44.11 45.98 45.12 46.68 45.82
44.11 0.05
0.42 0.25 0.00 44.06 43.93 45.52 45.40 46.22 46.10
43.93 0.05
0.75 0.080 0.20 43.88 43.18 44.85 44.15 45.55 44.85
0.00
0.69 0.080 0.20 43.18 42.71 44.20 43.72 44.90 44.42
1.75
0.69 0.080 0.20 40.96 40.66 41.97 41.68 42.67 42.38
1.75
0.69 0.080 0.20 38.91 38.43 39.93 39.44 40.63 40.14
1.75
0.69 0.080 0.20 36.68 35.89 37.69 36.90 38.39 37.60
1.50
0.69 0.080 0.20 34.39 33.88 35.40 34.90 36.10 35.60
1.00
0.69 0.080 0.20 32.88 32.34 33.90 33.36 34.60 34.06
1.25
0.42 0.15 0.00 31.09 30.80 32.56 32.27 32.56 32.27
1.00
0.42 0.15 0.00 29.80 29.12 31.27 30.59 31.27 30.59
0.08
0.69 0.080 0.20 29.04 28.94 30.06 29.96 30.76 30.66
1.50
0.69 0.080 0.20 27.44 26.86 28.46 27.88 29.16 28.58
0.05
0.25 0.25 0.00 26.81 26.75 28.20 28.14 28.85 28.79
0.05
0.25 0.050 0.10 26.70 26.68 28.38 28.36 29.08 29.06

0.25 0.050 0.10 26.63 26.54 28.31 28.23 29.01 28.93


ESTRUCTURA ESTRUCTURA
TIPO
FINAL DESARENADOR
Canal Trapezoidal
ESTRUCTURA DE CAIDA INCLINADA H=1,50 m
Canal Trapezoidal
PASO BAJO VÍA
Canal Trapezoidal
TRANSICIÓN TRAPEZOIDAL A RECTANGULAR CON CONTROL
PUENTE CANAL
TRANSICIÓN RECTANGULAR a TRAPEZOIDAL
Canal Trapezoidal
CAMBIO DE PENDIENTE
Canal Trapezoidal
ESTRUCTURA DE CAIDA INCLINADA H=1,75 m
Canal Trapezoidal
ESTRUCTURA DE CAIDA INCLINADA H=1,75 m
Canal Trapezoidal
ESTRUCTURA DE CAIDA INCLINADA H=1,75 m
Canal Trapezoidal
ESTRUCTURA DE CAIDA INCLINADA H=1,50 m
Canal Trapezoidal
ESTRUCTURA DE CAIDA INCLINADA H=1,00 m
Canal Trapezoidal
ESTRUCTURA DE CAIDA INCLINADA H=1,25 m
CANAL EN CAJÓN
ESTRUCTURA DE CAIDA INCLINADA H=1,00 m
CANAL EN CAJÓN
TRANSICIÓN CR a CT
Canal Trapezoidal
ESTRUCTURA DE CAIDA INCLINADA H=1,50 m
Canal Trapezoidal
TRANSICIÓN CTRAPEZOIDAL a CRECTANGULAR
CANAL EN CAJÓN
TRANSICIÓN CTRAPEZOIDAL a CRECTANGULAR
Canal Trapezoidal
PASO BAJO VÍA
EMPALME CON CANAL PRINCIPAL
CARACTERÍSTICAS HIDRÁULICAS CANAL DE CONDUCCIÓN

TRAMO ABSCISA Q S n y V T BL W B b Z Ht t e
De (Km) HASTA (Km) m3/s m/m m m/s m m m (m) m m (m) (m)
1 K0+000.00 K0+360.00 4.00 0.0000 0.013 6.00 0.13 5.00 0.70 1.50 5.20 5.00 0.00 6.70 0.050 0.100
0 K0+360.00 K0+386.00 0.00 0.0000 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0.000
2 K0+386.00 K0+411.00 31.97 0.0001 0.013 6.00 1.07 5.00 0.00 4.50 5.20 5.00 0.00 6.00 0.050 0.100
0 K0+411.00 K0+418.00 0.00 0.0000 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0.000
3 K0+418.00 K0+870.00 5.00 0.0019 0.015 1.02 1.95 4.05 0.70 1.50 6.50 1.00 1.50 1.72 0.100 0.200
0 K0+870.00 K0+875.00 0.00 0.0000 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0.000
4 K0+875.00 K0+940.00 5.00 0.0019 0.015 1.47 1.95 1.75 0.70 0.00 1.75 1.75 0.00 2.17 0.250 0.000
0 K0+940.00 K0+945.00 0.00 0.0000 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0.000
5 K0+945.00 K1+250.00 5.00 0.0023 0.015 0.97 2.09 3.91 0.70 1.50 6.40 1.00 1.50 1.67 0.100 0.200
0 K1+250.00 K1+250.00 0.00 0.0000 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0.000
6 K1+250.00 K1+500.00 5.00 0.0019 0.015 1.02 1.95 4.05 0.70 1.50 6.50 1.00 1.50 1.72 0.100 0.200
0 K1+500.00 K1+525.00 0.00 0.0000 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0.000
7 K1+525.00 K1+680.00 5.00 0.0019 0.015 1.02 1.95 4.05 0.70 1.50 6.50 1.00 1.50 1.72 0.100 0.200
0 K1+680.00 K1+705.00 0.00 0.0000 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0.000
8 K1+705.00 K1+960.00 5.00 0.0019 0.015 1.02 1.95 4.05 0.70 1.50 6.50 1.00 1.50 1.72 0.100 0.200
0 K1+960.00 K1+985.00 0.00 0.0000 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0.000
9 K1+985.00 K2+400.00 5.00 0.0019 0.015 1.02 1.95 4.05 0.70 1.50 6.50 1.00 1.50 1.72 0.100 0.200
0 K2+400.00 K2+425.00 0.00 0.0000 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0.000
10 K2+425.00 K2+690.00 5.00 0.0019 0.015 1.02 1.95 4.05 0.70 1.50 6.50 1.00 1.50 1.72 0.100 0.200
0 K2+690.00 K2+715.00 0.00 0.0000 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0.000
11 K2+715.00 K3+000.00 5.00 0.0019 0.015 1.02 1.95 4.05 0.70 1.50 6.50 1.00 1.50 1.72 0.100 0.200
0 K3+000.00 K3+025.00 0.00 0.0000 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0.000
12 K3+025.00 K3+180.00 5.00 0.0019 0.015 1.47 1.95 1.75 0.00 0.00 1.75 1.75 0.00 1.47 0.150 0.000
0 K3+180.00 K3+205.00 0.00 0.0000 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0.000
13 K3+205.00 K3+560.00 5.00 0.0019 0.015 1.47 1.95 1.75 0.00 0.00 1.75 1.75 0.00 1.47 0.150 0.000
0 K3+560.00 K3+565.00 0.00 0.0000 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0.000
14 K3+565.00 K3+620.00 5.00 0.0019 0.015 1.02 1.95 4.05 0.70 1.50 6.50 1.00 1.50 1.72 0.100 0.200
0 K3+620.00 K3+645.00 0.00 0.0000 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0.000
15 K3+645.00 K3+950.00 5.00 0.0019 0.015 1.02 1.95 4.05 0.70 1.50 6.50 1.00 1.50 1.72 0.100 0.200
0 K3+950.00 K3+955.00 0.00 0.0000 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0.000
16 K3+955.00 K4+080.00 5.00 0.0005 0.015 1.39 1.20 3.00 0.70 0.00 3.00 3.00 0.00 2.09 0.250 0.000
0 K4+080.00 K4+085.00 0.00 0.0000 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0.000
17 K4+085.00 K4+195.00 5.00 0.0002 0.015 1.69 0.84 6.06 0.70 1.50 8.35 1.00 1.50 2.39 0.050 0.100
0 K4+195.00 K4+213.00 0.00 0.0000 0.000 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.000 0.000
18 K4+213.00 K4+634.40 5.00 0.0002 0.015 1.69 0.84 6.06 0.70 1.50 8.35 1.00 1.50 2.39 0.050 0.100

PCI09 Página 15 11/08/2020


CARACTERÍSTICAS HIDRÁULICAS CANAL DE CONDUCCIÓN

TRAMO ABSCISA Q S n y V T BL W B b Z Ht t e
De (Km) HASTA (Km) m3/s m/m m m/s m m m (m) m m m m
1 K0+000.00 K0+360.00 5.00 0.0010 0.015 1.18 1.53 4.53 0.70 1.50 6.90 1.00 1.50 1.88 0.065 0.150
2 K0+386.00 K0+411.00 5.00 0.0019 0.015 1.02 1.95 4.05 0.70 1.50 6.50 1.00 1.50 1.72 0.100 0.200
3 K0+418.00 K0+870.00 5.00 0.0019 0.015 1.02 1.95 4.05 0.70 1.50 6.50 1.00 1.50 1.72 0.100 0.200
4 K0+875.00 K0+940.00 5.00 0.0019 0.015 1.47 1.95 1.75 0.70 0.00 1.75 1.75 0.00 2.17 0.250 0.000
5 K0+945.00 K1+250.00 5.00 0.0023 0.015 0.97 2.09 3.91 0.70 1.50 6.40 1.00 1.50 1.67 0.100 0.200

CONSORCIO HIDROTEC - F. ICAZA Y CIA S.A 11/08/2020


fondo Agua berma abscisa
46.95 52.95 53.65 0.00
46.95 52.95 53.65 360.00
45.45 51.45 51.45 386.00
45.45 51.45 51.45 411.00
45.33 46.34 47.04 418.00
44.47 45.48 46.18 870.00
44.42 45.89 46.59 875.00
44.29 45.76 46.46 940.00
44.24 45.22 45.92 945.00
43.54 44.51 45.21 1250.00
43.54 44.56 45.26 1250.00
43.07 44.08 44.78 1500.00
41.32 42.33 43.03 1525.00
41.02 42.04 42.74 1680.00
39.27 40.29 40.99 1705.00
38.79 39.81 40.51 1960.00
37.04 38.06 38.76 1985.00
36.25 37.27 37.97 2400.00
34.75 35.77 36.47 2425.00
34.25 35.26 35.96 2690.00
33.25 34.26 34.96 2715.00
32.71 33.72 34.42 3000.00
31.46 32.92 32.92 3025.00
31.16 32.63 32.63 3180.00
30.16 31.63 31.63 3205.00
29.49 30.95 30.95 3560.00
29.41 30.42 31.12 3565.00
29.30 30.32 31.02 3620.00
27.80 28.82 29.52 3645.00
27.22 28.24 28.94 3950.00
27.17 28.56 29.26 3955.00
27.11 28.50 29.20 4080.00
27.06 28.75 29.45 4085.00
27.04 28.73 29.43 4195.00
26.99 28.68 29.38 4213.00
26.90 28.59 29.29 4634.40

PCI09 Página 17 11/08/2020


fondo Agua Berma abscisa
46.95 48.13 48.83 0.00
46.59 47.77 48.47 360.00

45.09 46.11 46.81 386.00


45.04 46.06 46.76 411.00

44.92 45.94 46.64 418.00


44.06 45.08 45.78 870.00

44.01 45.48 46.18 875.00


43.89 45.36 46.06 940.00

43.84 44.81 45.51 945.00


43.14 44.11 44.81 1250.00

43.14 44.15 44.85 1250.00


42.66 43.68 44.38 1500.00

40.91 41.93 42.63 1525.00


40.62 41.64 42.34 1680.00

38.87 39.89 40.59 1705.00


38.38 39.40 40.10 1960.00

36.63 37.65 38.35 1985.00


35.85 36.86 37.56 2400.00

34.35 35.36 36.06 2425.00


33.84 34.86 35.56 2690.00

32.84 33.86 34.56 2715.00


32.30 33.32 34.02 3000.00

31.05 32.52 33.27 3025.00


30.76 32.22 32.97 3180.00

29.76 31.22 31.97 3205.00 29.76 31.22


29.08 30.55 31.30 3560.00 29.08 30.55

29.00 30.02 30.72 3565.00


28.90 29.91 30.61 3620.00

27.40 28.41 29.11 3645.00


26.82 27.83 28.53 3950.00

26.77 28.16 28.86 3955.00


26.71 28.10 28.80 4080.00

26.66 28.34 29.04 4085.00


26.63 28.32 29.02 4195.00

26.58 28.27 28.97 4213.00


26.50 28.19 28.89 4634.40
31.97 3205.00
31.30 3560.00
PENDIENTE COTA FONDO COTA AGUA COTA BERMA ABSCISA
1.41E-06 46.95 48.13 48.83 0.00
46.59 47.77 48.47 360.00

0.0001 45.09 46.11 46.81 386.00


45.04 46.06 46.76 411.00

0.0019 44.92 45.94 46.64 418.00


44.06 45.08 45.78 870.00

0.0019 44.01 45.48 46.18 875.00


43.89 45.36 46.06 940.00

0.0023 43.84 44.81 45.51 945.00


43.14 44.11 44.81 1250.00

0.0019 43.14 44.15 44.85 1250.10


42.66 43.68 44.38 1500.00

0.0019 40.91 41.93 42.63 1525.00


40.62 41.64 42.34 1680.00

0.0019 38.87 39.89 40.59 1705.00


38.38 39.40 40.10 1960.00

0.0019 36.63 37.65 38.35 1985.00


35.85 36.86 37.56 2400.00

0.0019 34.35 35.36 36.06 2425.00


33.84 34.86 35.56 2690.00

0.0019 32.84 33.86 34.56 2715.00


32.30 33.32 34.02 3000.00

0.0019 31.05 32.52 33.27 3025.00


30.76 32.22 32.97 3180.00

0.0019 29.76 31.22 31.97 3205.00


29.08 30.55 31.30 3560.00

0.0019 29.00 30.02 30.72 3565.00


28.90 29.91 30.61 3620.00

0.0019 27.40 28.41 29.11 3645.00


26.82 27.83 28.53 3950.00

0.0005 26.77 28.16 28.86 3955.00


26.71 28.10 28.80 4080.00

0.0002 26.66 28.34 29.04 4085.00


26.63 28.32 29.02 4195.00

0.0002 26.58 28.27 28.97 4213.00


26.50 28.19 28.89 4634.40

PCI09 Página 21 11/08/2020


INICIO CANAL DE CONDUCCION
ABSCISA ESTRUCTURA
0.00 FINAL DESARENADOR
360.00 ESTRUCTURA DE CAIDA INCLINADA H=1,50 m
418.00 PASO BAJO VÍA
875.00 TRANSICIÓN TRAPEZOIDAL A RECTANGULAR CON CONTROL
940.00 PUENTE CANAL
945.00 TRANSICIÓN RECTANGULAR a TRAPEZOIDAL
1250.00 CAMBIO DE PENDIENTE
1500.00 ESTRUCTURA DE CAIDA INCLINADA H=1,75 m
1680.00 ESTRUCTURA DE CAIDA INCLINADA H=1,75 m
1960.00 ESTRUCTURA DE CAIDA INCLINADA H=1,75 m
2400.00 ESTRUCTURA DE CAIDA INCLINADA H=1,50 m
2690.00 ESTRUCTURA DE CAIDA INCLINADA H=1,00 m
3000.00 ESTRUCTURA DE CAIDA INCLINADA H=1,25 m
3180.00 CANAL EN CAJÓN
3180.00 ESTRUCTURA DE CAIDA INCLINADA H=1,00 m
3565.00 TRANSICIÓN CR a CT
3620.00 ESTRUCTURA DE CAIDA INCLINADA H=1,50 m
3955.00 TRANSICIÓN CTRAPEZOIDAL a CRECTANGULAR
4080.00 CANAL EN CAJÓN
4085.00 TRANSICIÓN CTRAPEZOIDAL a CRECTANGULAR
4213.00 PASO BAJO VÍA
4634.40 EMPALME CON CANAL PRINCIPAL
PROYECTO DE ADECUACION DE TIERRAS REMIGIO ROJAS
CUADRO No 5
INVENTARIO DE ESTRUCTURAS

DESCRIPCIÓN TIPO TOTAL

CANAL DE CONDUCCIÓN
ESTRUCTURA DE CAIDA INCLINADA H=1,50 m
PASO BAJO VÍA
TRANSICIÓN TRAPEZOIDAL A RECTANGULAR CON CONTROL
PUENTE CANAL
TRANSICIÓN RECTANGULAR a TRAPEZOIDAL
CAMBIO DE PENDIENTE
ESTRUCTURA DE CAIDA INCLINADA H=1,75 m
ESTRUCTURA DE CAIDA INCLINADA H=1,75 m
ESTRUCTURA DE CAIDA INCLINADA H=1,75 m
YECTO DE ADECUACION DE TIERRAS REMIGIO ROJAS
CUADRO No 5
INVENTARIO DE ESTRUCTURAS

PLANOS DE REFERENCIA
TÍPICOS

También podría gustarte