Está en la página 1de 6

N.T.N.

Ø3/8"a 0.20
Y1 Y2 Y3 Y4

Hf = 0.85 min.
0.80 7.04 0.80
.30
ZC1 ZC1
1.00

0.45
0.80

0.80
X1
Ø1/2"a .10 A.D.

2.70
2.60

0.20
0.45 1.20 0.45

0.80
3.30

0.15

Ø1/2" a .10 A.D.


0.45

0.80
0.45

X2

0.45
DET. ZAPATA Z1
7.75

EXCAVACION ZAPATA DE MURO


2.90

4.25 Eje Long. (m) Ancho. (m) Prof. (m) Vol. (m3)
X1 7.04 0.45 0.80 2.53
4.18

2.70 X2 6.95 0.45 0.80 2.50


X3 4.25 0.45 0.80 1.53
X3
X4 6.25 0.45 0.80 2.25
.45
Y1 7.75 0.45 0.80 2.79
Y2 3.30 0.45 0.80 1.19
ZC1 ZC1 ZC1
Y3 7.93 0.45 0.80 2.85
0.80
0.80

0.80
0.45

X4

0.80 0.80
Y4 7.75 0.45 0.80 2.79
3.90 2.35 0.80
Total = 18.44
N.T.N.
Ø3/8"a 0.20
Y1 Y2 Y3 Y4

Hf = 0.85 min.
0.80 7.04 0.80
.30
ZC1 ZC1
1.00

0.45
0.80

0.80
X1
Ø1/2"a .10 A.D.

2.70
2.60

0.20
0.45 1.20 0.45

0.80
3.30

0.15

Ø1/2" a .10 A.D.


0.45

0.80
0.45

X2

0.45
DET. ZAPATA Z1
7.75

EXCAVACION EN ZAPATA DE COLUMNAS


2.90

4.25 Nombre
Elemento Bx. (m) By (m) Prof. (m) Cant. Vol.(m3)
4.18

ZC1 0.80 0.80 0.85 5 2.72


2.70

Total = 2.72
X3

.45
Total excavación = 18.44 m3+ 2.72 m3 = 21.16 m3
ZC1 ZC1 ZC1
0.80
0.80

0.80
0.45

X4

0.80 3.90 0.80 2.35 0.80


N.T.N.
Ø3/8"a 0.20
Y1 Y2 Y3 Y4

Hf = 0.85 min.
0.80 7.04 0.80
.30
ZC1 ZC1
1.00

0.45
0.80

0.80
X1
Ø1/2"a .10 A.D.

2.70
2.60

0.20
0.45 1.20 0.45

0.80
3.30

0.15

Ø1/2" a .10 A.D.


0.45

0.80
0.45

X2

0.45
DET. ZAPATA Z1
7.75

RELLENO DE REPOSICION EN ZAP. DE MUROS


2.90

4.25 Eje Long. (m) Ancho. (m) Prof. (m) Vol. (m3)
X1 7.04 0.3 0.55 1.16
4.18

2.70 X2 6.95 0.3 0.55 1.15


X3 4.25 0.3 0.55 0.70
X3
X4 6.25 0.3 0.55 1.03
.45 Y1 7.75 0.3 0.55 1.28
Y2 3.30 0.3 0.55 0.54
ZC1 ZC1 ZC1
Y3 7.93 0.3 0.55 1.31
0.80
0.80

0.80
0.45

X4
Y4 7.75 0.3 0.55 1.28
0.80 3.90 0.80 2.35 0.80 Total = 8.45
N.T.N.
Ø3/8"a 0.20
Y1 Y2 Y3 Y4

Hf = 0.85 min.
0.80 7.04 0.80
.30
ZC1 ZC1
1.00

0.45
0.80

0.80
X1
Ø1/2"a .10 A.D.

2.70
2.60

0.20
0.45 1.20 0.45

0.80
3.30

0.15

Ø1/2" a .10 A.D.


0.45

0.80
0.45

X2

0.45
DET. ZAPATA Z1
7.75

RELLENO DE REPOSICION EN ZAP. DE COLUMNAS


2.90

4.25
Nombre
4.18

Elemento Bx. (m) By (m) Prof. (m) Cant. Vol.(m3)


2.70 ZC1 0.80 0.80 0.55 5 1.76
Col. C1 0.15 0.20 0.55 -5 (0.08)
X3 Total = 1.68
.45
Total Relleno de Rep. = 8.45 m3+ 1.68 m3 = 10.13 m3
ZC1 ZC1 ZC1
0.80
0.80

0.80
0.45

X4

0.80 3.90 0.80 2.35 0.80


BOTE DE MATERIAL
Bote = (Vol. Excavación- Vol. Relleno Rep.) x (1+Exp. Material)
Para este ejemplo se ha considera tierra, Exp.= 25%
Bote = (21.16 m3 – 10.13 m3) x (1+0.25) =13.78 m3

RELLENO DE CALICHE COMPACTADO


Vol= Área interna construcción x espesor (m3)= Lx * Ly *esp.
Asumiendo un espesor de 0.20m
Vol. cal = (7.40 m +0.30 m ) x (7.75 m +0.30 m) x 0.20 m =12.40 m3

CORTE Y BOTE DE CAPA VEGETAL


Vol= Área de corte x espesor (m3)= Lx * Ly *esp.
Asumiendo un espesor de 0.25m
Vol. Cap. Vegetal = (7.85 m +2.00 m ) x (8.20 m+2.00 m) x 0.25 m =25.12 m3
EN EL PRESUPUESTO

No. PARTIDAS CANT. UNID P.U.RD$ VALOR RD$ TOTAL RD$

BAJO NIVEL DE PISO

1 MOVIMIENTO DE TIERRA:
1.01 Corte y bote de capa vegetal 25.12 3
m 272.61 6,847.96
1.02 Excavación 21.16 3
m 324.53 6,867.05
1.03 Relleno de reposición 10.13 3
m 106.31 1,076.92
1.04 Relleno de caliche compactado e= 12.40 3
m 900.98 11,172.15
1.05 Bote de material sobrante 13.78 3
m 312.16 4,301.56

SUB-TOTAL PRELIMINARES Y BAJO NIVEL DE PISO 30,265.66