Documentos de Académico
Documentos de Profesional
Documentos de Cultura
A B C D E
1
1
PISO 2
N. + 3.78 M
PISO 2
N. + 3.78 M
2 2
SALON DE MUSICA TERRAZA CAFE RESTAURANTE
15%
Lv
2", P 2%
5
A26
RA
RE
R
CA
PV
PISO 2 C
SA
N. + 3.78 M NI
TA
RI
A
2"
A29
,P
2% CONVENCIONES SANITARIAS
2% POZO DE REGISTRO (CÁMARA)
P
9m
3.1
3"
PISO 2 CAJA DE INSPECCION
N. + 3.78 M
ALL A28
C
PV Lv 2" LAVAMANOS
P 2%
PVC ALL-3" 4", P 2% 4", P 2%
N16 If If
If 4"
3 V7
PVC ALL-3"
V2
PVC SANT.-4"
N11
N12
N10
A15
4", P 2%
A14
V4
3 Us 2"
INODORO FLUXOMÉTRICO
N18 N2 2",
URINARIO SUSPENDIDO
Su N15 PVC ALL-3"
HALL P2
PISO 2
2", P 2%
A24
N13 %
Fr 2" FREGADERO (LAVAPLATOS)
N. + 3.78 M
2", P 2
Su La LAVANDERIA
2", P 2%
%
WC A25
Ld 2" LAVADORA
N14
Lv N19
Lv
4 2", P 2%
A21
2", P 2%
A22
V8
PVC ALL-3"
A27
Lv
A26
Lv
4 BAJANTES DE AGUAS LLUVIAS Y NEGRAS
P 2%
N9 2", P 2% 2", P 2% TUBERIA SANITARIA
m
PISO 2
1.66
Us V3 WC N. + 3.78 M
2"
2", P 2% PVC SANT.-4"
A20
T.
SAN
Us
V1 Su
2", P 2% PVC SANT.-4" 2", P 2%
PVC
A23
A19
SALON DE PINTURA N7 N8
%
PISO 2 P2
N3 N1 2",
N. + 3.78 M N5
N6
4", P 2
%
N4
5 5
Nivel -2.88
PVC SANT.-4"
Ventilación primaria
Longitud: 2.88 m
PVC ALL-3"
Longitud: 3.28 m
PVC ALL-3"
Ventilación primaria
Longitud: 2.88 m
PVC ALL-3"
Ventilación primaria
Longitud: 3.28 m
PVC ALL-3"
Longitud: 2.88 m
3
Nivel -5.76